SWOT analysis :
S W
-Availability of water in all respects - prime location close to the ring road -Easy to access -Fertile soil -There are no buildings on the island
Advertisement
-There are no main roads to it -The surrounding village has a lot of not very good buildings -The need to purify the water for its contamination on the sides of the earth
-Exploiting the surrounding lands to serve the project -Optimal utilization of the Nile -Connecting two provinces
TO-Residues from the surrounding agricultural land -large percentage of water
Site photos :
Area programeme “Generation and ANALYSIS” -programme of project -The Land -Concept
Programme : commirical details Area
-Fish farm -Fish market -sale hall
-Fish tanks -Fishing boats ----------------------1-Entrance hall -two room security 2-management -20 office -Action room -metting room 3-Halls -Guide hall -Garding and soring and market hall 4-servies -cool stores -Refrigerators 5-Resturant ------------------------
1-Entrance hall -two room security 2-management -20 office -Action room -metting room 3-Servies -café -stores -shops
Total area
2000��2 17650��2 400��2 3500��2 2000��2 600��2 400��2 6000��2 1000��2 2000��2 6000��2 5200��2 800��2 500��2 4400��2 400��2 3000��2 2000��2 600��2 400��2 1000��2 300��2 500��2 200��2 32450��2
Programme : industrial details Area
-Fish canning factory -Fish feed factory
1-Entrance hall -two room security 2-management -20 office -Action room -metting room 3-Halls 4-servies -cool stores -Refrigerators
-water tanks -Water treatment plant Total
1-Entrance hall -two room security 2-management -20 office -Action room -metting room 3-Halls 4-servies -Refrigerators ------------------------
17650��2 400��2 3000��2 2000��2 600��2 400��2 6000��2 1000��2 2000��2 400��2 3000��2 2000��2 600��2 400��2 6000��2 1000��2 2000��2 1000��2 5000��2 23150��2
The Island : proposed island
Parts to be removed with water disinfection proposal