DESIGN PORTFOLIO AMARTYA NITIN SONAJE SELECTED WORKS 2017 - 2022
Rachana Sansad’s Design Cell
TO WHOMSOEVER IT MAY CONCERN This is to certify that Master Amartya Nitin Sonaje, student of Fourth Year B.Arch. in Rachana Sansad’s Academy of Architecture, has successfully completed his internship tenure from 8th December 2020 to 15th April 2021 at the Rachana Sansad’s Academy of Architecture’s Design Cell, Mumbai. The internship was part of our association with the MCGM G South Ward to work on proposals for improvement of the public spaces in the ward. During her tenure at the Design Cell, she has worked on the following projects:
1. 2. 3. 4.
Abhyaas Galli, Worli, Mumbai (Complete project) P Balu Beach, Prabhadevi, Mumbai (Complete project) Worli A+ Gate, Worli, Mumbai (Final Designing and Execution) Saat Rasta, Mahalaxmi, Mumbai (Site visits)
His responsibility included Designing, Architectural drawings, BOQs, Presentations, Coordination with MCGM officials and contractors; and handling these projects. He has successfully completed 95 days of Internship and has shown responsibility and dedication in his work. Wishing him all the best for the future. Regards,
Ar. ROHIT SHINKRE (Design Cell Director), DESIGN CELL, RACHANA SANSAD’S ACADEMY OF ARCHITECTURE, MUMBAI COA Registration No.: CA/95/18379
CONTENTS 01. A COOPERATIVE WINERY
SEM- 10 | DESIGN DISSERTATION
02. NOSTALGIC PARK
SEM- 09 | ARCHITECTURAL DESIGN
03. JAPANESE FINE DINE RESTAURANT SEM- 05| INTERIOR DESIGN
04.
WORKING DRAWINGS
SEM- 06| ARCHITECTURAL DETAILING
05. ABHYAAS GALLI
ACADEMY OF ARCHITECTURE DESIGN CELL
P BALU BEACH
ACADEMY OF ARCHITECTURE DESIGN CELL
06. COMPETITIONS
CTBUH (INDIA) ARCHMELLO - MASTER STUDIO ARCHDAIS - HOUSE 2.0
07. INSTALLATIONS
KALA GHODA ART FESTIVAL 2018-19 DALAL STREET LIT FEST EXCHANGE 2019
8
01
A COOPERATIVE WINERY
- DIALOGUE WITH NATURE Design Dissertation - Sem 10 Site - Vinchur MIDC, Nashik Guide-Ar. Rajratna Jadhav
9
Terroir
Landscape and Architecture
Wine and Architecture
Theories around which the Design Dissertation of ‘ A Cooperative Winery’ revolves.
Architecture and Terroir
Phenomenology
The primary concern that inspired this study is the growing gap between product and source in contemporary culture. The modern consumer culture pays little attention to the origins of products. This phenomenon is prominent in architecture; too much contemporary work is solely image-based, following constantly shifting worldwide trends, resulting in buildings that are often unsuited for their surroundings. The architectural question that feeds off the previous problem is how a space can reveal process. This notion of process includes both facets of this project, wine and design. Processes that wish to be revealed within this space include wine but also construction, materiality, circulation and spatial integration
Aim: To design a tourist recreational hub with wine-making space which affects the economic growth of farmers and entrepreneurs.
10
Multi Stage Gravity Flow diagram for the Design to proceed.
SITE PLAN AND SCHEME
01
The plots are allotted by the MIDC in Additional Vinchur Industrial belt.
02
Massing of the functions are extruded according to the respective site.
03
The functions are divided into public, industrial, private zones.
04
The main zones are further sub divided into sub zones.
05
The massing o fthe functions are pushed back inorder to the create the vineyards’ experiential space.
06
Creating a final massing for the functions to house.
The roof of the winery is a sloping, in order to gain maximum north light into the industrial as well as public zones and then harvest the maximum sunlight for solar generated electricity.
07 11
WINERY - LEVEL 01 AR
1 - Kitchen 2 - Indoor Restaurant 3 - Outdoor Restaurant 4 - Lift Lobby 5 - Lobby 6 - Toilets 7 - Dispatch room 8 - Viewing gallery
12
9 - HVAC room 10- Technical Room 11 - Information corridor 12 - Information corridor 13 -Catwalk for Tank Hall (Level 1) 14 -Catwalk for Tank Hall (Level 2) 15 -Catwalk for Tank Hall (LEVEL 3) 16 -Vehicular ramp 7.5 m. wide
RCHITECTURAL PLAN
17 -Destemming Pad 18 -Loading and Unloading Platform 19 - Grape Seed screening platform 20 -Incharge Cabin 21 -AHU Room 22 -Oil Extraction area 23 -Catwalk for Oil refinery
13
ARCHITECTURAL SECTION (Through Re
ARCHITECTURAL SECTION (Through Tank Hall and Cellar Room)
14
estaurant, Wine Shop and Car Parking)
ARCHITECTURAL SECTION (Through Tank Hall and Barrel room)
15
HOTEL - LEVEL 04 ARC
1 - Swimming Pool 2 - Party Lawn 3 - Suite 4 - Executive vRoom 5 - AHU room 6 - Linen Room 7 - Common Guests Gath
16
CHITECTURAL PLAN
hering space
17
ARCHITECTURAL SECTION (Through Suite rooms, Exe
18
ecutive rooms, BOH spaces and swimming pool)
19
PRODUCED BY AN AUTODESK STUDENT VERSION
DIAGO
C
CONNECTION AT THE JUNCTION OF CASTELLATED BEAM AND COLUMN
ZIPPER TRUSS BOTTOM CONN
PRODUCED BY AN AUTODESK STUDENT VERSION
STRUCTURAL ISOMETRIC VIEW 20
MID JUNCTION DETAIL OF WIND BRACING
ONAL DIAGRID COMPRESSION MEMBER
CAST END CONNECTION SOLID STEEL BULLET CONNECTION JOINT
CONNECTION GUSSET PLATES
PRODUCED BY AN AUTODESK STUDENT VERSION
TENSION ROD
TENSION ROD CLEVES CONNECTOR
FLOORING DETAIL OF TANK HALL
PRODUCED BY AN AUTODESK STUDENT VERSION
40 MM THICK PRE-ENGINEERED TERRACOTTA TILE SLABS 100 MM DIA TUBULAR STEEL STANCHION TO SUPPORT THE TOP CHORD OF THE BUTTERFLY TYPE ROOF TRUSS PRODUCED BY AN AUTODESK STUDENT VERSION
CONNECTOR BETWEEN THE CORTEN STEEL VERTICAL FINS AND THE R.C.C. COLUMN
450 MM X 50 MM CORTEN STEEL INSULATED BOX SECTION USED AS VERTICAL FINS ON THE FACADE DOUBLE GLAZED OPENABLE WINDOW CORTEN STEEL PLATE COVERING THE BIOCLIMATIC INJECTION AIR DIFFUSOR
END WALL DETAIL OF TANK HALL PRODUCED BY AN AUTODESK STUDENT VERSION
NECTION, LONGEST BAY
W OF WINE PRODUCTION UNIT CONNECTION AT THE JUNCTION OF PINNED JOINT AND DIAGRID MEMBERS
21
VIEW OF THE BARREL HALL
VIEW OF THE TANK HALL
22
VIEW FROM THE VINEYARDS
VIEW FROM THE AMPHITHEATRE
23
24
02
NOSTALGIC PARK
Architectural Design - Sem 09 Site - Versova Crematorium, Mumbai Guide-Ar. Rishi Vora
25
The approach is futuristic imagining the situation around 30-40 yrs down the line, where the communities reside in secularism. Considering the acceptance of new things, the programs are proposed (but the symbiotic relation brings the connect of retaining the traditional values in the new techniques). Assuming the millennials and the Gen-Z to be more aware of the environment deterioration, they will always opt for an eco-friendly lifestyle and for that matter their “DEATH” too. Thus the project aims changing the way we (Indian population) accept “DEATH” and the process of the funeral/ burial/ cremation of the dead. The project does not say that the traditional practice and rituals are wrong in any manner, but tries to imagine a modern and an advanced process of “DEATH”.
LEVEL 01 ARCHITECTURAL PLAN
26
27
ARCHITECTURAL SECTION
28
N (Through Workshops)
29
ARCHITECTURAL SECTION (Through Vertical
30
Cemetery, Plastination lab and Museum)
31
ARCHITECTURAL DETAIL
32
LS (Through Museum)
33
VIEW OF THE STRUCTURE FROM VERSOVA KOLIWADA
VIEW OF THE BURIAL GROUND 34
VIEW OF THE PROMENADE
VIEW OF THE CREMATORIUM 35
03. JAPANESE FINE DINE RESTAURA Interior Design - Sem 05
Site: BKC Complex, Mumbai
The interiors of the restaurant should reflect the culture and the cuisine and also live up to the international standards. The design space should be functional, aesthetic and should endure in the contemporary context. The restaurant’s theme was inspired by sushi restaurants found in the backstreets of Japan’s major cities. “Atisuto,” meaning “artist” in Japanese, is filled with graffiti stricken walls which were inspired by avant-garde artists who admired Japanese culture and expressed themselves freely by painting directly on the walls
MOOD BOARD
LIGHTING OF THE F
36
ANT
ARCHITECTURAL SECTION
ARCHITECTURAL SECTION
FACADE
37
04. WORKING DRAWINGS E
860
2920
J
3500
580
1) All dimensions are in 'millimeters' unless specified 2) The drawing is not to be scaled. The dimensions are strictly to be followed. 3) All levels are unfinished levels unless specified. 4) The contractor shall verify all on site dimensions including elevations prior to the commencement of work on site. 5) The contractor shall inform the architect and/or project engineer on site regarding any conditions/modifications required to be done prior to the commencement of work. 6) The contractor shall coordinate and verify the work indicated on the drawings between the architectural and various trade drawings, including but not limited to structural, electrical, plumbing, fire protection and exterior enclosure systems. 7) All work shall conform to relevant BIS codes and shall be best practice of each trade. 8) Any discrepancy is to be brought to the notice of the architect/ consultant before commencement of the site. 9) All work is to be completed to the satisfaction of site engineer/ project manager and architects
C32,C33
H
C30,C31
G
F
2520
GENERAL NOTES
C24,C25,C26, C27,C28,C29
C18,C19,C20
D
C12,C13,C14, C15,C16,C17
C
2540
Site: Panchavati, Nashik
PRODUCED BY AN AUTODESK STUDENT VERSION
C21,C22,C23
B
3250
C10,C11
A
C7,C8,C9
C5,C6
C1,C2,C3,C4
Arch. Detailing - Sem 06
K
1720
1780
01 A-201 10800 8130 C12
1990
2 1750
1580
1480
1990
1
D1 C22
C13,C22,C25, C33
3
(300 x 300MM)
C13
C25
6100
3460
3
(300 x 300MM)
(3775 x 6875MM)
ENGINEERED MARBLE FLOORING
D1
PRODUCED BY AN AUTODESK STUDENT VERSION
1750
3360
IPS FLOORING
C33
(300 x 300MM)
FFL + 0.35 M SSL + 0.10 M SHOP-2
1300
5610
(300 x 300MM)
FFL + 0.30 M SSL + 0.10 M VERANDAH
UP
4
(300 x 300MM)
4
FFL + 0.60 M SSL + 0.35 M COMMON STORAGE SPACE
6990
FFL + 0.60 M SSL + 0.35 M ENTRANCE TO COMMON STORAGE SPACE
REVISION TABLE
2950
4040
6990
6250
1550
8360
7
UP
UP
SC1,SC2,SC3, SC4,SC5,SC6
20990
17600
MICROCONCRETE FLOORING
3720
(23020 x 3475MM)
2350
1480
RAMP OF SLOPE 1:10
+ 1.50 M
3720
5
C26
(300 x 300MM)
19220
650
C23
(300 x 300MM)
C14
IPS FLOORING
(300 305 x x 660 x 600M M)
+ 1.35 M
+ 1.05 M
02 A-202
C8
+ 0.75 M
5
C14,C23,C26
FFL + 0.30 M SSL + 0.10 M VERANDAH
2020
2
FFL + 0.00 M SSL + 0.00 M
C2
(300 x 594 x 291 x 600MM)
1300
C2,C8
1
PRODUCED BY AN AUTODESK STUDENT VERSION
(300 x 600MM)
(3775 x 6875MM)
ENGINEERED MARBLE FLOORING
(300 x 600MM)
RAMP OF SLOPE 1:10
01 A-301
C32
D6
(300 x 300MM)
FFL + 0.35 M SSL + 0.10 M SHOP-1
C7
(300 x 600MM)
2
C1,C7
C24
(300 x 300MM)
2000
1990
9320
C1
1980
690
C21
(300 x 300MM)
1
1990
C12,C21,C24, C32
7
D2
REVISION
DESCRIPTION
(7045 x 5110MM)
MICROCONCRETE FLOORING
5 6
19
7
17
9
16
10
3620 2020
1480 1750 C16
C28
(300 x 300MM)
(300 x 600MM)
10
15 14
PROJECT NAME :
(3775 x 6875MM)
150
C11
V1
D6
C17
(600 x 300MM)
C29
(300 x 600MM)
(300 x 600MM)
8760
12
16930
01 A-301
3250
860
B
C
2520
2920
D
E
580
1720
G
NORTH
J
51
ACADEMY OF ARCHITECTURE, MUMBAI
1780
H
ROLL NO.
T.Y. B.ARCH
SEMESTER 6
3500
F
A - 103
SCALE - 1:50 NAME: AMARTYA NITIN SONAJE
01 A-202
2540
A
SHEET NUMBER :
ARCHITECTURAL PLAN (GF)
C31
(300 x 300MM)
690
7250
12
C20
(300 x 300MM)
PANCHAVATI ANECDOTES
150
1400
1300
11
FFL + 0.35 M SSL + 0.10 M SHOP-4 ENGINEERED MARBLE FLOORING
C6
(600 x 300MM)
C17,C20,C29, C31
C30
(300 x 300MM)
C19
(300 x 600MM)
D1
3750
4000
C10
(300 x 300MM)
8
18
3750
11
1250
4
21 20
KEY PLAN
D1
1750
1580
1 2 3
23
(300 x 300MM)
7900
550
1480
RAMP OF SLOPE 1:10
C6,C11
IPS FLOORING
UP
1750
1
2
10
FFL + 0.30 M SSL + 0.10 M VERANDAH
1480
22
3400
(300 x 300MM)
FFL + 0.35 M SSL + 0.10 M SHOP-3 ENGINEERED MARBLE FLOORING
C5
C4
9
C27
C18
(300 x 600MM)
(3775 x 6875MM)
IPS FLOORING
3600
1460
UP
3350
FFL + 0.00 M SSL + 0.00 M
FFL + 0.30 M SSL + 0.10 M VERANDAH
(300 x 600MM)
C4,C5,C10, C16,C19,C28, C30
8
C15
(300 x 300MM)
(300 x 594 x 291 x 600MM)
8
RAMP OF SLOPE 1:10
2350
1
660 x (300 x 600MM) 305 x
+ 1.50 M
5
6
10
+ 0.90 M
+ 1.05 M 7
C3
+ 0.75 M
C3,C9
9
2
3620
7
6
9
8
10
1
4
2
3
5
C9
± 0.00 M
C15,C18,C27
02 A-201
GROUND FLOOR ARCHITECTURAL PLAN SIGN AND STAMP
K
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
2520
2920
3500
580
K
1720
N P
R
Q
2190
2810
T
S
430
4300
C59
C56
Y
Z AA
V W X
U 170
4310
690
C53 C54,C55
C50,C51
C48,C49
C46,C47
C44,C45
C42,C43
C40,C41
C38,C39
L
3210
1780
C58
J
C34,C35
H
C32,C33
G
140 3410
C57
F
C30,C31
C19,C20
E
C24,C25
D
C21
B
C12,C13
C5,C6
C10,C11
GENERAL NOTES 1) All dimensions are in 'millimeters' unless specified 2) The drawing is not to be scaled. The dimensions are strictly to be followed. 3) All levels are unfinished levels unless specified. 4) The contractor shall verify all on site dimensions including elevations prior to the commencement of work on site. 5) The contractor shall inform the architect and/or project engineer on site regarding any conditions/modifications required to be done prior to the commencement of work. 6) The contractor shall coordinate and verify the work indicated on the drawings between the architectural and various trade drawings, including but not limited to structural, electrical, plumbing, fire protection and exterior enclosure systems. 7) All work shall conform to relevant BIS codes and shall be best practice of each trade. 8) Any discrepancy is to be brought to the notice of the architect/ consultant before commencement of the site. 9) All work is to be completed to the satisfaction of site engineer/ project manager and architects
180
2080
1450
870
670
01 A-201
34470
2
5590
6670
1950
1120
1150
(300 x 300MM)
550
1480
W2
D3
D3
20
1950
(300 x 300MM)
19
D3
1
1130
C43
18
W2
(300 x 300MM)
17
C33
(300 x 300MM)
C39
1180
750
C58
C55
C51
C47
(300 x 300MM)
1150
520
1950
3
(304 x 648 x 300 x 600MM)
V2
(300 x 300MM)
(300 x 300MM)
1150
2930
30730 CORRIDOR
CORRIDOR
CORRIDOR
FFL + 6.60 M SSL + 6.35 M
(27400 x 2000M)
5850
4620
5530
FFL + 6.60 M SSL + 6.35 M
5530
(27400 x 2000M)
PRODUCED BY AN AUTODESK STUDENT VERSION
FFL + 6.60 M SSL + 6.35 M
(27400 x 2000M)
6
C57
6
(304 x 648 x 300 x 600MM)
23770
REVISION TABLE
02 A-202
11140
C57
8360
PRODUCED BY AN AUTODESK STUDENT VERSION
14
C25
W2
D3
3
C13
D4
16
4
(300 x 300MM)
1
(3850 x 9965MM)
MARBLE FLOORING
MARBLE FLOORING
3990
3990
8 7 6 5
3
(304 x 648 x 300 x 600MM)
(300 x 300MM)
FFL + 6.60 M SSL + 6.35 M ROOM NO.- 3
13
C13,C25, C33,C39, C43,C47,C51, C55,C58
C59
C54
(300 x 300MM)
W2
(3850 x 4325MM)
9
A-301
7250 C50
(300 x 300MM)
FFL + 6.60 M SSL + 6.35 M STORAGE AND MAINTENANCE ROOM
10
MARBLE FLOORING
D4
D4
01
1950 C46
(300 x 300MM)
5360
(3850 x 7870MM)
2540
2540
(3850 x 7870MM)
FFL + 6.60 M SSL + 6.35 M ROOM NO.- 2
C42
V1
(300 x 300MM)
W2
V2
V2
MARBLE FLOORING
C38
(300 x 300MM)
2330
FFL + 6.60 M SSL + 6.35 M ROOM NO.- 1
10320
C32
(300 x 300MM)
1400
C24
(300 x 300MM)
W2
11
C21
(300 x 300MM)
1
1950
10110
12
1950
15
C12,C21,C24, C32,C38,C42, C46,C50,C54, C59
950 C12
REVISION
DESCRIPTION
FFL + 6.60 M SSL + 6.35 M
TEMPLE
COMMON GATHERING SPACE
02 A-201
(83.7 SQ.M)
9720
9520
9720
+/- 0.00 M
1 2 3 4
SERVICE CORRIDOR
13590
1950
C40
(33300 x 2000M)
(300 x 600MM)
(300 x 600MM)
FFL + 6.60 M W2 SSL + 6.35 M ROOM NO.- 4
2790
C56
(3775 x 7000MM)
(3775 x 7000MM)
(304 x 648 x 300 x 600MM)
2550
2980
1930 C48
C44
(300 x 600MM)
W2
FFL + 6.60 M SSL + 6.35 M ROOM NO.- 5
10
860
D4
4300
D4
3740
860
MARBLE FLOORING
3750
MARBLE FLOORING
4000
860
3740
7 8
12
7760
C34
MARBLE FLOORING
D4
1950
(300 x 600MM)
W2
(3775 x 7600MM)
C20
150
12
C45
(300 x 600MM)
3210
1950
1950
PROJECT NAME :
W2
C41
(300 x 600MM)
1980
V2
V2
W2 C35
(300 x 600MM)
1950
1150
1150 W2
C31
(300 x 600MM)
11910
11
(304 x 648 x 300 x 600MM)
(300 x 600MM)
1950
ARCHITECTURAL PLAN (SF)
C53
C49
(300 x 600MM)
7760
4160
12
36810
01
A-301
2920
580
3500
1720
1780
3210
2190
2810
690
4310
4300
430 2080
180 1450
870
670
140
E
F
G
H
J
K
L
PRODUCED BY AN AUTODESK STUDENT VERSION
38
A - 105 NORTH
SEMESTER 6
170 2520
D
SHEET NUMBER :
SCALE - 1:50 NAME: AMARTYA NITIN SONAJE
01 A-202
3410
B
PANCHAVATI ANECDOTES
150
W2
C11
(600 x 300MM)
D3
D3
300
D3
V2
MARBLE FLOORING
V1
C6
(600 x 300MM)
300
10
STORAGE AND MAINTENANCE ROOM
1150
9
11
(3850 x 3350MM)
C20,C31,C35, C41,C45,C49, C53
C30
(300 x 600MM)
FFL + 6.60 M SSL + 6.35 M ROOM NO.- 6
2940
6
14
2510
3740
C19
3350
2550
1 2
15 13
(33300 x 2000M)
1250
(300 x 600MM)
D3
4
16
3750
C10
(300 x 300MM)
3
11
17
FFL + 6.60 M SSL + 6.35 M
SERVICE CORRIDOR 1950
6640
5
C6,C11
18
(300 x 300MM)
11740
(33300 x 2000M)
1150
2550
UP
20 19
C5
10
750
FFL + 6.60 M SSL + 6.35 M
4000
3600
SERVICE CORRIDOR
1480
C5,C10, C19,C30,C34, C40,C44,C48, C56
KEY PLAN 3970
FFL + 6.60 M SSL + 6.35 M
N P
Q
R
S
T
U
V W X
Y
Z AA
T.Y. B.ARCH
ACADEMY OF ARCHITECTURE, MUMBAI SIGN AND STAMP
FIRST FLOOR ARCHITECTURAL PLAN
ROLL NO.
51
PRODUCED BY AN AUTODESK STUDENT VERSION
GENERAL NOTES
C58
C54
C51
C47
C39
C43
C25
C33
C37
C8
C13
C22
1) All dimensions are in 'millimeters' unless specified 2) The drawing is not to be scaled. The dimensions are strictly to be followed. 3) All levels are unfinished levels unless specified. 4) The contractor shall verify all on site dimensions including elevations prior to the commencement of work on site. 5) The contractor shall inform the architect and/or project engineer on site regarding any conditions/modifications required to be done prior to the commencement of work. 6) The contractor shall coordinate and verify the work indicated on the drawings between the architectural and various trade drawings, including but not limited to structural, electrical, plumbing, fire protection and exterior enclosure systems. 7) All work shall conform to relevant BIS codes and shall be best practice of each trade. 8) Any discrepancy is to be brought to the notice of the architect/ consultant before commencement of the site. 9) All work is to be completed to the satisfaction of site engineer/ project manager and architects
C2 MANHOLE (1000MM DIAMETER)
OHT LEVEL = +15.4M
3100
1600
OVERHEAD WATER TANK 2000MM DOMESTIC WATER TANK
5570 1500
PARAPET WALL 60 MM PLASTER WITH DRIP MOULD PARAPET WALL 970 MM (200 MM THICK)
1250
F1
970 820 2820
1050 2190
2190 F1
W1 C1
SCHEDULE FOR WALL FINISHES
CERAMIC TILING 10 MM THICK SCREEDING ALPINE WHIITE COLOUR WATER CLOSET (CONCEALED)
ROOM NO. -1
S1
S1
F1
DHARAMSHALA
F1
SAND FINISH EXTERNAL PLASTER 25MM THICK
2370
2740
2370
2370
2620
2740
2620
W1 C1 S1
1640
W2 C2
F2
1140
2850 1620
1620
2820
2850 W2 C2 S1
W1
W2
12MM THK PLASTER, 2 COATS OF WHITE WASH, 1 COAT OF 5MM P.O.P. PUTTY, 2 COATS OF PRIMER, 2 COATS OF WHITE DISTEMPER
ALL ROOMS
23MM THK 1:2:4 PLASTER, 2 COATS OF WHITE WASH, 2 COATS OF PRIMER, 2 COATS OF WHITE EXTERIOR PAINT
TOILETS
SCHEDULE FLOOR FINISHES
STAIRCASE
S1
PUMP ROOM
F2
2370
W1 C1
W1 C1
F3
W1 C1 S1
W1 C1 S1
NEERU INTERNAL PLASTER 25 MM THICK
W1 C1
F1
BOTTICINO EXTRA LIGHT ITALIAN MARBLE FLOORING (500 X 300 X 15MM)
TERRACE GATHERING F3 W1C1 SPACE S1
W1 C1 S1
S1
SUNK SLAB FOR OPEN SPACE
1640
W2 C2 S1
F1
INTERNAL CERAMIC TILING 10 MM THICK (600 X 600 MM)
W3
SPACE FRAME ROOF COVERED WITH TOUGHENED GLASS
S1
40
F2
1050 ROOM NO. -2
2740
2760
W2 C2 S1
D3
2190 1140
STORAGE AND MAINTENANCE ROOM
D3
2180
2180
2630
2180
F2
STAIRCASE 2190
W1 C1 S1
F1
PLINTH FFL = +3.6M FIRST FLOOR LEVEL = +3.35M
LOUVERED WINDOW (650 X 450 MM)
D3
W3
1000
1680 F1
BRICK BAT FILLING 150 MM THICK
1000
D4
W1 C1 S1
W1 C1 S1
2740
F1
970
970 ROOM NO. -3
COMMON TOILET (HIS) D3
W1 C1 S1
2820
2190
1050
2820
1140
W2 C2 S1
D4
D3 F1
2190
2840 1790 1660 1600
7150
F2
FFL = +6.6M SECOND FLOOR LEVEL = +6.35M
D3
W3
W2
2190
FFL = +9.90M TERRACE LEVEL = +9.65M
970
820
2300
2470
SCREEDING 20 MM THICK
F1
F1
20MM THK 1:2:4 SCREEDING, 15MM BOTTICINO EXTRA LIGHT ITALIAN MARBLE FLOOR
F2
150MM BB COBA LAID TO SLOPE, 20MM SCREEEDING, 10MM THK ANTI-SKID CERAMIC TILES
F3
100MM BB COBA LAID TO SLOPE, 20MM THK SCREEEDING, 20MM THK IPS FLOORING
CORRIDORS, VERANDAHS
20MM THK 1:2:4 SCREEDING, 20MM THK BHUTRA ENGINEERED MARBLE FLOOR
SHOPS
F4
2080
3690
3600
3100
3100
3360
3100
2980
F3
10MM THK PLASTER, 2 COATS OF WHITE WASH, 1 COAT OF 5MM P.O.P. PUTTY, 2 COATS OF PRIMER 2 COATS OF WHITE DISTEMPER
ALL ROOMS
TOILETS
10MM THK PLASTER, 2 COATS OF WHITE WASH,
SCHEDULE FOR SKIRTING
W1 C1 S1
S1
20MM THK PLASTER, WHITE RED GRANITE SKIRTING
ALL ROOMS, TOILETS, STAIRCASE
ARCHITECTURAL SECTION
01 A-301
SECTION THROUGH DHARAMSHALA AND TOILETS
C7
C8
SCALE - 1:50
C58
C9
C10 OVERHEAD WATER TANK 2000MM FLUSH TANK
OHT LEVEL = +15.4M
1300 1500
1300
REVISION TABLE REVISION
MANHOLE (1000MM DIAMETER)
PRODUCED BY AN AUTODESK STUDENT VERSION
PLINTH FFL = +0.30M GROUND LEVEL = +0.0M
C1
C2
VERANDAH
SHOP - 1
TOILETS
SCHEDULE FOR CEILING FINISHES
UNDER GROUND WATER TANK
GODDOWN
ALL ROOMS, STAIRCASE
DESCRIPTION
OVERHEAD WATER TANK 2000MM DOMESTIC WATER TANK STAIRCASE
D3
4100
2600
STAIRCASE MUMMTY ROOM
BOTTICINO EXTRA LIGHT ITALIAN MARBLE TILING (10MM THICK)
V1
FFL = +9.90M TERRACE LEVEL = +9.65M 1110
W1 C1
2930
S1
STAIRCASE
SPACE FRAME ROOF COVERED WITH TOUGHENED GLASS
1110
W1 C1
2940
F3
FFL = +6.6M SECOND FLOOR LEVEL = +6.35M
KEY PLAN
SCREEDING FOR STAIRCASE TILING 20 MM THICK
F1
1110
S1
F1
Ø100MM ROUND TEAKWOOD HANDRAIL
V1
Ø50MM ROUND TEAKWOOD BALUSTERS
W1 C1
V1
ARCHITECTURAL SECTIONS
25MM ROUND NOSING
1110
D1
D1
PROJECT NAME :
PANCHAVATI ANECDOTES
TEAKWOOD TIMBER RAILING
W1 C1 S1
D1
JALI WALL/ VENT FOR VENTILATION AND LIGHT FOR STAIRCASE BLOCK
STAIRCASE
F3
S1
2940
W1 C1
1110
F3
1230
TERRACE GATHERING SPACE
PLINTH FFL = +3.6M FIRST FLOOR LEVEL = +3.35M
1130
1130
2780
S1
F1
3590
1900 F3
W1 C1
1000
2
4
3
SCALE 9200- 1:20 8000
1000
1000
1000
1000
9200
A-402d
1000
1000
1000
1000
1000
1000
A-403b
1000
1000
1000
DETAILED SECTION OF STAIRCASE
SCALE - 1:20 ARCHITECTURAL SECTION OF SPACE FRAME SCALE - 1:20
1000 8000
1000
700
1300
1500
1800
650 200
1520
40
36
5000
100
150
60
600
150
600
T.Y. B.ARCH
ROLL NO.
51
PLINTH BEAM (300 Ø50 X 450 MM) MM USED AS CHORD
MILD STEEL SPLICE SECTION
RUBBLE SOLING 230 MM THICK MILD STEEL THREADED BALL USED FOR SUPPORTING GUTTER Ø80 MM USED FOR CONNECTION
HOLLOW CIRCULAR STEEL SECTION
KEY PLAN
HOLLOW CIRCULAR STEEL SECTION INTERNAL NEERU FINISH Ø50 MM USED AS A CHORD PLASTER 25 MM THICK
PERIPHERAL R.C.C. BEAM 300 X 600 MM
BRICK WALL REVISION TABLE PERIPHERAL R.C.C. BEAM DETAIL AT 'B' (DETAILED SECTION THROUGH THE 150 MM THICK TOUGHENED GLASS REVISION DESCRIPTION LOUVERED VENT) 300 X 600 MM A-402e 8 MM THICK EXTERNAL SAND FINISH SCALE REVISION TABLE - 1:5 TOUGHENED GLASS PLASTER 25 MM THICK REVISION SEALANT 8 MM THICK 150 MM R.C.C. LINTEL 5 MM THICK
165
650
300
1000
MILD STEEL THREADED BALL
125 MM TOILET SUNK SLAB HOLLOW CIRCULAR STEEL SECTION Ø80 MM USED FOR CONNECTION Ø50 MM USED AS A CHORD 150 MM THICK
250
PERIPHERAL R.C.C. BEAM NAME: AMARTYA NITIN SONAJE 300 X 600MM TOUGHENED GLASS ACADEMY OF ARCHITECTURE,
1000
280 650
600
2450 65
50
50
MILD STEEL THREADED BALL THE TOUGHENED GLASS 100 MM BRICK BAT COBA Ø80 MM USED FOR CONNECTION
BRICK BAT COBA SHEET NUMBER : COUNTER SUNK A - 401 RAK - CHERRY WASH BASIN NORTH (OVAL SHAPED)
USED FOR SUPPORTING GUTTER PERIPHERAL R.C.C. BEAM MUMBAI PCC BED 150 MM THICK
DESCRIPTION
35 X 60 MM PURLIN MEMBER TO SUPPORT
SCALE - 1:20
SEMESTER 6 PLINTH 450 MM THICK 20 MM THICK MILD STEEL SPLICE SECTION
REVISION
HOLLOW ALUMINIUM SECTION CERAMIC FLOOR TILING 35 X 60 MM PURLIN MEMBER TO SUPPORT HOLLOW ALUMINIUM SECTION THE TOUGHENED GLASS 40 MM SCREEDING LAYER
300 200 TILING CERAMIC DADO (600 X 600 MM) URINAL (HINDWARE) 300 200 URINAL PARTITION ON BOTH SIDE OF THE URINALS (50 MM THICK) ALPINE WHITE COLOUR WATER CLOSET (CONCEALED)
600
600
1000
1000
STAIRCASE DETAILS
REVISION TABLE
Ø50 MM USED AS A CHORD 15 MM ANTI - SKID
EXTERNAL SAND PLASTER 25 MM THICK
300 XSTEEL 600MM SIGN AND STAMP HOLLOW CIRCULAR SECTION
A-401b
- 1:5
5000
1300
SCALE - 1:20 1000 1000
8000
1000
30SCALE
SCREEDING PANCHAVATI ANECDOTES40 MM THICK
1000 1000
0
DESCRIPTION
PROJECT NAME :
BOTTICINO EXTRA LIGHT ITALIAN TOUGHENED GLASS MARBLE 1000 1000 300 20 MM THICK FLOORING (500 X 300 X 25 MM) DETAILED SECTION OF COMMON TOILET BLOCK
1000
1000
2630
2630
500
8000
1000 1000
2200
900
6700
500 800
2940
STAIRCASE BEAM (450 X 300 MM)
500
1000
2100
6
BOTTICINO EXTRA LIGHT ITALIAN MARBLE FLOORING (500 X 300 X 25 MM)
500
ARCHITECTURAL PLAN OF SPACE FRAME
5
SCALE - 1:2
200
500
1000
8
7
12
DETAIL AT 'A' (CONNECTION BETWEEN SPACE FRAME MEMBERS)
450
1000
11
15
B
600
1000
1000 1000
6500
16
Ø8
TOUGHENED GLASS 8 MM THICK
SEALANT 10 MM THICK INTERNAL 5 MM THICK SEALANT CERAMIC DADO TILING 5 MM SECTION THICK HOLLOW CIRCULAR STEEL (300 X300 MM) Ø50 MM USED AS A CHORD HOLLOW CIRCULAR STEEL 10 MM SECTION TILE DROP
LOUVERED WINDOW
V2
V2
- 1:20 8 MMSCALE THICK
BOTTICINO EXTRA LIGHT ITALIAN DETAIL AT 'A' (CONNECTION BETWEEN SPACE FRAME MEMBERS) INTERNAL NEERU PLASTER A-403c MARBLE - 1:2 25 THICK KEY MM PLAN SCALE TREAD (1500 X 300 X 25 MM) 10 MM THICK INTERNAL
500
3150
17
REVISION
PERIPHERAL R.C.C. BEAM 300 XSAND 600MMFINISH PLASTER EXTERNAL
A-403c
DETAILED SECTION OF COMMON TOILET BLOCK TOUGHENED GLASS
DETAIL AT 'A' (DETAILED SECTION THROUGH TOILET TILE DROP)
A-402d
30
REVISION TABLE
1900
18
9 SCALE500 - 1:20
1000
A-403a
1
900
1000
V1
800
2630
700
500
500
300
19
ARCHITECTURAL PLAN OF SPACE FRAME 10
A-403a
300
20
1000
500
150 150 150 150 150 150 150 150 150 150
1000 1000
21
2630
22
0
300 X 600MM
450
23
1000
MM USED AS CHORD 10 MM Ø50 THICK
Ø8
25 MM THICK
26
6500
1000
Ø80 MM USED FOR CONNECTION LIGHT AND VENTILATION
MILD STEEL SPLICE SECTION PERIPHERAL USED R.C.C. FOR BEAMSUPPORTING GUTTER
SCALE - 1:20
SCALE - 1:5
A-402c
engineer/ project manager and architects
THE TOUGHENED GLASS 100 MM BRICK BAT COBA
DETAILED SECTION OF SPACE FRAME SCALE - 1:5
MILD STEEL THREADED BALL MILD STEEL THREADED BALL Ø80 MM USED FORTO CONNECTION JALI WALL PROVIDE
1000
1000 1000
1230 1000 500
500
30
A-403c
PRODUCED BY AN AUTODESK STUDENT VERSION
25 24
29
33
Ø50 MM USED AS CERAMIC CHORD FLOOR TILING
HOLLOW ALUMINIUM SECTION HOLLOW ALUMINIUM SECTION USED AS PURLIN MEMBER TO SUPPORT 40 MM SCREEDING USED AS PURLIN MEMBER TO SUPPORT THE TOUGHENED GLASS
PRODUCED BY AN AUTODESK STUDENT VERSION
28
32
31
DETAILED SECTION OF SPACE FRAME
MILD STEEL SPLICE SECTION WALL 230 GUTTER MM THICK USEDBRICK FOR SUPPORTING
36
DETAILED PLAN OF COMMON TOILET BLOCK
A-402a
A-403c
TOUGHENED GLASS SUNK SLAB FOR CORRIDOR 20 MM THICK TOUGHENED GLASS
RAK - DUO SPRAY DOUCHE SET
HOLLOW CIRCULAR STEEL SECTION HOLLOW CIRCULAR STEEL SECTION 15 MM ANTI - SKID Ø50 MM USED AS CHORD
GRANITE PADDING HOLLOW CIRCULAR STEEL SECTION SEALANT 20 MMAS THICK Ø50 MM USED A CHORD 5 MM THICK MILD STEELLOUVERED THREADED BALL ALUMINIUM HOLLOW CIRCULAR STEEL SECTION Ø80 MM USED FOR CONNECTION WINDOW FRAME
DESCRIPTION
PROJECT NAME :
PANCHAVATI ANECDOTES TOILET DETAILS
SHEET NUMBER :
A - 402 NORTH
Ø50 MM USED AS A CHORD HOLLOW ALUMINIUM SECTION V2 MILD STEEL THREADED BALL KEY PLAN 35 X 60 MM PURLIN MEMBER TO SUPPORT 6 MM THICK GLASS Ø80 MM USED FOR CONNECTION THE TOUGHENED GLASS ALUMINIUM ANGLE HOLLOW OVER ALUMINIUM SECTION ALUMINIUM SHEET PRESSED 20TO MM THICK STEPPED 35 X 60 MM PURLIN MEMBER TO SUPPORT FORM THE GUTTER GRANITE SILL THE TOUGHENED GLASS MILD STEELR.C.C. SPLICE SECTION SILL ALUMINIUM SHEET PRESSED OVER 150 X 250 MM USED FOR TO SUPPORT TO FORM THE GUTTER THE GUTTER
SCALE - 1:20
60
1000 1000 1000
37
380
HOLLOW CIRCULAR STEEL SECTION Ø50 MM USED AS CHORD HOLLOW CIRCULAR STEELPLATE SECTION SQUARE SHAPED STEEL BASE
1000
38
(CONCEALED)
ALUMINIUM SHEET PRESSED ALUMINIUM SHEET PRESSED HEALTH FASCAUTE OVER TO FORM GUTTER OVER TO FORM GUTTER
450
500
500 1000
1750
1000
3150
2940 1000
39
880
150 MM THICK
C 40
520
FEMALES20 MM THICK
6700
INTERNAL NEERU PLASTER 25 MM THICK
1000
A
V1
610
41
460
700
600
2600
PRODUCED BY AN AUTODESK STUDENT VERSION
1000
1000
1000
1000
1000
1000
1230 1000
1000
EXTERNAL SAND PLASTER 43 42 25 MM THICK
1000
9500
TOILET
B
44
880
LOUVERED WINDOW
MILD STEEL SPLICEALPINE SECTION MILD STEEL SPLICE SECTION WHITE COLOUR USED FOR SUPPORTING GUTTER USED FOR SUPPORTING GUTTER WATER CLOSET
1000
PRODUCED BY AN AUTODESK STUDENT VERSION
1000
380
1000
1000
D4 COBA BRICK BAT 100 MM THICK
D4
D3
1000
PRODUCED BY AN AUTODESK STUDENT VERSION
48
A
9500
RCC STAIRCASE SLAB 150MM THICK
49
10 MM THK47ANTI - SKID 46 CERAMIC TILES 45 (600 X 600MM)
A
B
EXTERNAL SAND PLASTER
10 MM THICK INTERNAL PERIPHERAL R.C.C.CERAMIC BEAM PERIPHERAL R.C.C. BEAM DADO TILING 300 X 600MM 300 X 600MM (300 X 300MM) V2
TW CORRIDOR HANDRAIL A B
54
300
PRODUCED BY AN AUTODESK STUDENT VERSION
53
52
51
1000
1000
600
6500
63
LOUVERED WINDOW 62 61 ALPINE WHITE COLOUR 60 WATER CLOSET 59 (CONCEALED) 58 HEALTH FASCAUTE 57 A-402c RAK - DUO SPRAY DOUCHE SET
ACCESS TO DUCT50
STAINLESS STEEL BALUSTER1000 300 1000 50 MM DIAMETER BOLTED TO V2 ITALIAN EXTRA LIGHT MARBLE TREAD
1) All dimensions are in 'millimeters' unless specified 2) The drawing is not to be scaled. The
dimensions are strictly 2) The drawing is not to be scaled. The dimensions are strictly to be followed. to be followed. 3) All levels are unfinished levels unless specified. 3) All levels are unfinished levels unless specified. 4) The contractor shall verify all on site 4) The contractor shall verify all on site dimensions including dimensions including elevations prior to the commencement of work on elevations prior to the commencement of work on site. site. 5) The contractor shall inform the architect and/or 5) The contractor shall inform the architect and/or project project engineer on site regarding any engineer on site regarding any conditions/modifications conditions/modifications required to be done prior to the commencement required to be done prior to the commencement of work. of work. 6) The contractor shall coordinate and verify the 6) The contractor shall coordinate and verify the work indicated work indicated on the drawings between the architectural and on the drawings between the architectural and various trade various trade drawings, including but not limited to structural, drawings, including but not limited to structural, electrical, electrical, plumbing, fire protection and exterior enclosure plumbing, fire protection and exterior enclosure systems. systems. 7) All work shall conform to relevant BIS codes 7) All work shall conform to relevant BIS codes and shall be and shall be best practice of each trade. best practice of each trade. 8) Any discrepancy is to be brought to the notice 8) Any discrepancy is to be brought to the notice of the of the architect/ consultant before commencement of architect/ consultant before commencement of the site. 9) All work is to be completed to the satisfaction the site. 9) All work is to be completed to the satisfaction of site of site engineer/ project manager and architects
MILD BALL 25 MM THICK MILD STEEL TREADED BALLSTEEL TREADED 300 Ø80 MM USED FOR CONNECTION Ø80 MM USED FOR CONNECTION
V2
V2
300
GENERAL NOTES
GENERAL NOTES
All dimensions are in 'millimeters' unless TOUGHENED GLASS1)specified
600
V1 500
165
D3500
SCALE - 1:20
150
500
DETAILED SECTION OF COMMON TOILET BLOCK
A-402b
65
1000
500
1000
URINAL PARTITION WALL ON BOTH SIDE OF THE URINALS (50 MM THICK) COUNTER SUNK RAK - CHERRY WASH BASIN (OVAL SHAPED)
TOUGHENED GLASS 20 MM THICK 20 MM THICK
450
1000
4110
500
1000
STAINLESS STEEL HANDRAIL 75 MM DIAMETER ATTACHED TO 1190 50 MM BALUSTER
2250
500 BRICK WALL1000 230 MM THICK 66 GRANITE SILL 65 6500 20 MM 64 THICK
URINALS (HINDWARE)
1800
1800
TWO JAGUAR BIB TAP PARTITION BRICK WALL 150 MM THICK 1000
100
OVERHEAD WATER D4 TANK D4 DOMESTIC TANK 1250
RAK JOY - JOYMR12068 LED MIRROR (1800 X 700 X 32 MM)
1100
NAHANI TRAP 150 MM D3 COUNTER SUNK RAK- CHERRY WASH BASIN (OVAL SHAPED)
880
900
400370
INTERNAL NEERU PLASTER 25 MM THICK 10 MM THICK INTERNAL CERAMIC DADO TILING (600 X 600 MM)
2460
1280
TOILET
1) All dimensions are in 'millimeters' unless specified 2) The drawing is not to be scaled. The dimensions are strictly to be followed. 3) All levels are unfinished levels unless specified. 4) The contractor shall verify all on site dimensions including elevations prior to the commencement of work on site. 5) The contractor shall inform the architect and/or project engineer on site regarding any conditions/modifications required to be done prior to the commencement of work. 6) The contractor shall coordinate and verify the work indicated on the drawings between the architectural and various trade drawings, including but not limited to structural, electrical, plumbing, fire protection and exterior enclosure systems. 7) All work shall conform to relevant BIS codes and shall be best practice of each trade. 8) Any discrepancy is to be brought to the notice of the architect/ consultant before commencement of the site. 9) All work is to be completed to the satisfaction of site engineer/ project manager and architects
EXTERNAL SAND PLASTER 25 MM THICK
200
50
MALES
A-402b
1000
1) All dimensions are in 'millimeters' unless specified 2) The drawing is not to be scaled. The dimensions are strictly to be followed. 740 3) All levels are unfinished levels unless specified. 4) The contractor shall verify all on site dimensions including elevations prior to the commencement of work on 670 site. 5) The contractor shall inform the architect and/or project engineer on site regarding any conditions/modifications required to be done prior to the commencement of work. 6) The contractor shall coordinate and verify the work indicated on the drawings between the architectural and 520 880 various trade drawings, including but not limited to structural, electrical, plumbing, fire protection and exterior enclosure systems. 7) All work shall conform to relevant BIS codes 1490 and shall be best practice of each trade. 8) Any discrepancy is to be brought to the notice of the consultant PRODUCED BY AN AUTODESKarchitect/ STUDENT VERSIONbefore commencement of the site. PRODUCED BY AN AUTODESK STUDENT VERSION 9) All work is to be completed to the satisfaction of site engineer/ project manager and architects 900
340
610
URINALS (HINDWARE)
GENERAL NOTES
GENERAL NOTES
MANHOLE (1000MM DIAMETER)
OVERHEAD WATER TANK FLUSH TANK
10 MM THICK INTERNAL CERAMIC DADO TILING (600 X 600MM) HT. 2500 MM
1000
SCALE - 1:50
PRODUCED BY AN AUTODESK STUDENT VERSION
URINAL PARTITION WALL 50 MM THICK
500
51
ARCHITECTURAL SECTIONS
ARCHITECTURAL SECTION SECTION THROUGH STAIRCASE
PRODUCED BY AN AUTODESK STUDENT VERSION
A-402d
A-403b
ROLL NO.
SIGN AND STAMP
02 A-301
500
T.Y. B.ARCH
SEMESTER 6
ACADEMY OF ARCHITECTURE, MUMBAI
VERANDAH
S1
PRODUCED BY AN AUTODESK STUDENT VERSION
A-403b
A - 301
SCALE - 1:50 NAME: AMARTYA NITIN SONAJE
2320 VERANDAH
PLINTH FFL = +0.30M GROUND LEVEL = +0.0M
SHEET NUMBER :
NORTH
W1 C1 S1
250
NAME: AMARTYA NITIN SONAJE SEMESTER 6
PANCHAVATI ANECDOTES SHEET NUMBER :
A - 403 6 MM THICK TO CONNECT DETAILS THE SPLICE SECTION AND MS PLATE NORTH
DETAIL AT 'B' (CONNECTION BETWEEN SPACE FRAME ANDMILD RCC BEAM STEEL
PLATE
SCALE - 1:50
ROLL NO.
51
ARCHITECTURAL DETAILS 39 SIGN AND STAMP
MILD STEEL ANGLE CLEAT MILD STEEL SPLICE SECTION 6 MM THICK TO CONNECT 150 X 250 MM USED FOR TO SUPPORT PROJECT NAME : THE SPLICE SECTIONTHE ANDGUTTER MS PLATE
MILD STEEL PLATE MILD STEEL ANGLE CLEAT ARCHITECTURAL 15 MM THICK BOLTED TO R.C.C. BEAM
T.Y. B.ARCH
ACADEMY OF ARCHITECTURE, MUMBAI
KEY PLAN
PROJECT NAME :
PANCHAVATI ANECDOTES
05 (a). ABHYAAS GALLI Academy of Architecture Design Cell
40
Site: Worli, Mumba
ai
41
A Stretch of the Junction Dr. Annie Besant Road and Sudam Kalu Ahire Marg (Abhyaas Galli) U
Photo montage of the Study unit
42
Photo montage of th
ISOMETRIC VIEW OF THE STRETCH
Study unit
Reading Space
Upto 100 meters.
he Study unit (Night view)
Library Pod
Portable Toilet
43
A Stretch from 100 meters to 200 meters.
Photo montage of the Reading space
44
Photo montage of the Reading spa
ace
ISOMETRIC VIEW OF THE STRETCH
STREET SECTIONS
Photo montage of the Reading space
45
05 (b). P BALU BEACH Academy of Architecture Design Cell
46
Site: Prabhadevi, M
Mumbai
47
48
49
Photo montage of the Viewing Deck
Photo montage of the Gym Pod 50
Photo montage of the Seating area
Photo montage of the Library Pod 51
06 (a). COMPETITIONS CTBUH (India) - High Rise Building
52
To design a Tropical Highrise building in a particular context. The Aim of the workshop was to break the notion of typical highrise buildings in a surrounding context creating cities of tomorrow for better environment and public realm.
53
06 (b). COMPETITIONS Archmello - The Master Studio
54
To design a Co-working commercial space for freelancing architects, Studios for established firms and a learning center for architecture students. The idea is to create a community where students from different architecture schools work under one roof so that there is a constant exchange of ideas and thoughts at the curriculum level with students learning different studio programs, new softwarre skills, presemtation ideas and so on. The major thought behind the competition is to design a facility where the design students and professionals work together encouraging design dialogue, interactive sessions, workshops etc and a new generation of Architects.
55
06 (c). COMPETITIONS Archdais - House 2.0
56
To design an ideal house design - one that is a constant space of solace and shelter for the body, as well as mind. The thought of the competition is to know the idea of the house design, in the context of any site that is selected. The house should be a stand alone form of a single housing unit like the bungalow, villa or the row house.
57
07 (a). INSTALLATIONS Kala Ghoda Arts Festival 2018-19
The installation expresses the importance of time defining and capturing events that can be created in the exact same manner. A union of space and time creates an event. Event cannot individually exist without time. This pavillion is a pause in the event. The change of time transforms the space and this idea is amplified through the play of light and shadow within the pavillion and in a manner that the pavillion gets inhabited by the people. The perception of this break in the event through the passage of time is unique for each individual, thereby getting inscribed in ones memory as a moment in time.
58
07 (b). INSTALLATIONS Dalal Street Lit Fest Exchange 2019
The installation expresses the importance of water and its sources. Various installations and Danglers were placed in and around the building during the fest symbolising the water conservation and its needs and water source as the treasure. This Live project was a part of the DSLFX as the main theme for the year 2019. These installations were made out of waste platstic water bottles.
59
THANKYOU amartyasonaje1999@gmail.com amartyas17@aoamumbai.in