AshleyMorris. P o r t f o l i o
Waitrose. Milngavie Working within a small team, consisting of myself and a senior architectural technologist, we received a project at planning stage from Waitrose, a Ma jor UK Supermarket after receiving land in Milngavie, Scotland. We started to prepare the project for tender in AutoCAD however after training in Revit I requested the stage be done in the software. Bringing the project into Revit allowed us to detect difficult aspects of the build and resolve them quickly through using a central model. This was a collaboration with structural engineers and multiple consultants at once. Being the lead for modelling in Revit I was able to create a lot of the crucial components in the build including Revit Families, now used throughout future Waitrose projects. I worked on the project for 2 years and it was completed in June 2015.
A
B
C
D
Parapet 44.452 m
E
F
G
H
J
K
A
FFL
37.600 m
A
1 : 100
12
11
10
9
8
7
6
5
4
3
2
1
Parapet 44.452 m
A
FFL
37.600 m
A
1 : 100
1 Parapet 44.452 m
2
3
4
5
6
7
8
9
10
11
12
A
FFL
37.600 m
A
1 : 100
K
J
H
G
F
E
D
C
B
Parapet 44.452 m
A
A
H
20/05/15
Drawing status amended to Record Drawings from Construction, sprinkler tank ladder position amended and glazing amended to suit sub-contractors drawings, trolley bays and cycle stands have moved position.
AJM
IR
G F
01/04/15 16/03/15
Entrance Doors width and height amended Signage stubs amended and removed to suit integrity's comments
AJM AJM
IR IR
E
06/03/15 02/03/15 27/02/15
Signage Stubs amended to suit integritys setting AJM out Signage stub dimensions added from grid AJM Glazing set out amended to suit fit-out architects AJM requirements.
IR
D C B
23/12/14
BOH window system detail added and render section removed. External door 06 (Detail K) has been adjusted and dimensions added for cladding setting out.
AJM
IR
A
10/12/14
Annotation added and render section added at AJM the request of Waitrose.
Rev Project Title
Retail Development (Waitrose)
37.600 m
A
Drawing status amended to construction from building warrant
AJM
IR
Description
Rev By
Chk'd
Drawing Title
Elevations
Job-Dwg No
12874 - 411
1 : 100
Rev
On behalf of
THE HARRIS PARTNERSHIP WAKEFIELD 2 St. Johns North, Wakefield, WF1 3QA t. 01924 291 800 f. 01924 290 072
IR
13/08/14
Date
Main Street, Milngavie, Glasgow, G62 6JN
FFL
IR IR
Client
Town Centre Securities
Status
Record Drawings
Scale
Drawn By
1 : 100 IR
Drawing Size
Checked By
AJM
THE HARRIS PARTNERSHIP MANCHESTER 2nd Floor, Carvers Warehouse, 77 Dale Street, Manchester, M1 2HG t. 0161 238 8555 f. 0161 244 5809 THE HARRIS PARTNERSHIP MILTON KEYNES The Old Rectory, 79 High Street Newport Pagnell, MK16 8AB t. 01908 211 577 f. 01908 211 722
A1 Date
OCT/13
THE HARRIS PARTNERSHIP READING 101 London Road, Reading, RG1 5BY t. 0118 950 7700 f. 0118 956 8642
A R C H I T E C T S www.harrispartnership.com
K
K
K
Parapet 44.452 m
A
Parapet 44.452 m A
Canopy Entrance 41.340 m A
K
37.600 m
A
1 : 20
FFL
FFL
37.600 m
A
J
15/05/15
Sheathing board amended to siniat and annotation amended and removed.
AJM
IR
H
13/02/15
Sheathing board replaced by OSB with breather AJM membrane added and scissor lift pit amended to suit sub-contractors standard details with dimension added from outerleaf.
IR
G
27/01/15
Scissor lift position amended to suit AJM sub-contractors standard details and service yard bollards added.
IR
F
21/01/15
Dock Bumpers and dimensions added and wall build-up above 3.6m amended to suit contractor's requirements.
AJM
IR
E D C B
13/01/15 19/12/14 15/12/14 02/12/14
Dimensions (in red) added to edge of materials Dimensions and notes added Duraline layer added to BOH perimeter wall. Detail notes amended, removed and added, stud wall build up amended with blockwork plinth added and U-Value table has been added.
AJM AJM AJM AJM
IR IR IR IR
A
12/11/14
AJM Drawings amended to include revised levels, amended drainage to siphonic, wall build up amended and gas ventilation system added with build up and slab size amended according to structural engineer's details.
IR
Date
Description
Chk'd
1 : 20 Rev Project Title
Retail Development (Waitrose)
Rev By
Drawing Title
Sections (Sheet 3)
Job-Dwg No
12874 - 428
Main Street, Milngavie, Glasgow, G62 6JN
Rev
On behalf of
THE HARRIS PARTNERSHIP WAKEFIELD 2 St. Johns North, Wakefield, WF1 3QA t. 01924 291 800 f. 01924 290 072 Client
Town Centre Securities
Status
Record Drawings
Scale
As indicated
Drawn By
AJM
Checked By
Drawing Size
IR
THE HARRIS PARTNERSHIP MANCHESTER 2nd Floor, Carvers Warehouse, 77 Dale Street, Manchester, M1 2HG t. 0161 238 8555 f. 0161 244 5809 THE HARRIS PARTNERSHIP MILTON KEYNES The Old Rectory, 79 High Street Newport Pagnell, MK16 8AB t. 01908 211 577 f. 01908 211 722
A1 Date
OCT/13
THE HARRIS PARTNERSHIP READING 101 London Road, Reading, RG1 5BY t. 0118 950 7700 f. 0118 956 8642
A R C H I T E C T S www.harrispartnership.com
J
K 2
2
Parapet 44.452 m A
Parapet 44.452 m
A
Canopy Front 42.080 m
Canopy Front 42.080 m
A
K
A
FFL
A
A
4 432
2
1 : 20
37.600 m
A
FFL
37.600 m
37.600 m
FFL
1 : 20
H
15/04/15
Studwork Plinth amended as advised by contractor and sheathing board amended to siniat and annotation added/removed
AJM
IR
G F
19/03/15 13/02/15
Annotation Added Block / Brickwork setout dims added and sheathing board replaced by OSB with breather membrane added.
AJM AJM
IR IR
E
27/01/15
Call out of perimeter DPC detail added, Resysta support system added to sub-contractors details and dimensions added.
AJM
IR
D C B
13/01/15 19/12/14 02/12/14
Dimensions (in red) added to edge of materials AJM Dimensions and notes added AJM Detail notes amended, removed and added, AJM stud wall build up amended with blockwork plinth added and U-Value table has been added.
IR IR IR
A
12/11/14
AJM Drawings amended to include revised levels, amended drainage to siphonic, wall build up amended and gas ventilation system added with build up and slab size amended according to structural engineer's details. Studwork extended above 3.6m to accommodate for high brickwork.
IR
Description
Chk'd
Rev Project Title
Retail Development (Waitrose)
Date
Rev By
Drawing Title
Sections (Sheet 7)
Job-Dwg No
12874 - 432
Main Street, Milngavie, Glasgow, G62 6JN
Rev
On behalf of
THE HARRIS PARTNERSHIP WAKEFIELD 2 St. Johns North, Wakefield, WF1 3QA t. 01924 291 800 f. 01924 290 072 Client
Town Centre Securities
Status
Record Drawings
Scale
As indicated
Drawn By
AJM
Checked By
Drawing Size
IR
THE HARRIS PARTNERSHIP MANCHESTER 2nd Floor, Carvers Warehouse, 77 Dale Street, Manchester, M1 2HG t. 0161 238 8555 f. 0161 244 5809 THE HARRIS PARTNERSHIP MILTON KEYNES The Old Rectory, 79 High Street Newport Pagnell, MK16 8AB t. 01908 211 577 f. 01908 211 722
A1 Date
OCT/13
THE HARRIS PARTNERSHIP READING 101 London Road, Reading, RG1 5BY t. 0118 950 7700 f. 0118 956 8642
A R C H I T E C T S www.harrispartnership.com
K 2
2
Parapet 44.452 m
Parapet 44.452 m
A
A
Canopy Front 42.080 m
Canopy Front 42.080 m
A
K
A
Canopy Entrance 41.340 m
A
FFL
A
37.600 m
1 : 20
A
37.600 m
FFL
1 : 20
Client
Town Centre Securities
Status
Record Drawings
Scale
As indicated
Drawn By
AJM
H
15/04/15
Studwork Plinth amended as advised by contractor and sheathing board amended to siniat and annotation added/removed
AJM
IR
G F
19/03/15 13/02/15
Annotation Added Block / Brickwork setout dims added and sheathing board replaced by OSB with breather membrane added.
AJM AJM
IR IR
E
27/01/15
IR
D C B
13/01/15 19/12/14 02/12/14
Resysta support system added to sub-contractors AJM details and dimensions added. Dimensions (in red) added to edge of materials AJM Dimensions and notes added AJM Detail notes amended, removed and added, AJM stud wall build up amended with blockwork plinth added and U-Value table has been added.
A
12/11/14
AJM Drawings amended to include revised levels, amended drainage to siphonic, wall build up amended and gas ventilation system added with build up and slab size amended according to structural engineer's details.
IR
Description
Chk'd
Rev Project Title
Retail Development (Waitrose)
Date
Rev By
Drawing Title
Sections (Sheet 8)
Job-Dwg No
12874 - 433
Main Street, Milngavie, Glasgow, G62 6JN
IR IR IR
Rev
On behalf of
THE HARRIS PARTNERSHIP WAKEFIELD 2 St. Johns North, Wakefield, WF1 3QA t. 01924 291 800 f. 01924 290 072
Checked By
Drawing Size
IR
THE HARRIS PARTNERSHIP MANCHESTER 2nd Floor, Carvers Warehouse, 77 Dale Street, Manchester, M1 2HG t. 0161 238 8555 f. 0161 244 5809 THE HARRIS PARTNERSHIP MILTON KEYNES The Old Rectory, 79 High Street Newport Pagnell, MK16 8AB t. 01908 211 577 f. 01908 211 722
A1 Date
OCT/13
THE HARRIS PARTNERSHIP READING 101 London Road, Reading, RG1 5BY t. 0118 950 7700 f. 0118 956 8642
A R C H I T E C T S www.harrispartnership.com
H
J
Parapet 44.452 m
K
A
A
Canopy Front 42.080 m
Canopy Entrance 41.340 m
A
FFL
37.600 m
A
1 : 20
1
Parapet 44.452 m
2
A
Canopy Entrance 41.340 m A
FFL
37.600 m
Retail Development (Waitrose) Main Street, Milngavie, Glasgow, G62 6JN
A
1 : 20
13/05/15
IR
20/01/15 19/01/15 06/01/15 10/12/14
Drawing status amended to Record Drawings from Construction Drawing rearranged and dimensions added. Dimension added for fabricator Indicative steel lines added to show fabricators Indicative Steel Removed due to Issue by Fairhurst
AJM
E D C B
AJM AJM AJM AJM
IR IR IR IR
A
21/11/14
More detail and notes added, entrance pod roof and indicative steelwork amended.
AJM
13/08/14
Drawing status amended to construction from building warrant
AJM
Date
Description
Rev By
Rev Project Title
F
Client
Town Centre Securities
Status
Record Drawings
Scale
Drawn By This drawing is copyright and may not be reproduced in whole or part without written authority. Do not scale off this drawing.
1 : 20 AJM
Drawing Size
Checked By
IR
IR IR
Chk'd By
Drawing Title
Entrance Pod Details
Job-Dwg No
12874 - 437 On behalf Fof Rev
THE HARRIS PARTNERSHIP WAKEFIELD 2 St. Johns North, Wakefield, WF1 3QA t. 01924 291 800 f. 01924 290 072 THE HARRIS PARTNERSHIP MANCHESTER 2nd Floor, Carvers Warehouse, 77 Dale Street, Manchester, M1 2HG t. 0161 238 8555 f. 0161 244 5809 THE HARRIS PARTNERSHIP MILTON KEYNES The Old Rectory, 79 High Street Newport Pagnell, MK16 8AB t. 01908 211 577 f. 01908 211 722
A0 Date
OCT/13
THE HARRIS PARTNERSHIP READING 101 London Road, Reading, RG1 5BY t. 0118 950 7700 f. 0118 956 8642
A R C H I T E C T S www.harrispartnership.com
sports direct. liverpool This project was passed onto me at the construction stage of the process to try and spread the workload throughout the company. As I received it at a late stage, the project was drawn up in AutoCAD and the structural frame was already being erected, therefore I was simply job running working alongside the main contractor to get the job complete. I worked on this project for around 4 months of my time at The Harris Partnership, working alongside other projects to get the project completed in September 2014.
B J 05
06
07
08
09
3000
Stair 2
800
verti cal bracing
140
7595 215mm wide blockwork centred on gridline
300 from grid
285
B security shutters
Note Text Scale 1:100
Titles Text Scale 1:100
C 2167 vertical bracing
192
95 from grid
D
E 140
Goods Lift
300 from grid Service Riser 03 (for GF)
140 215mm wide blockwork centred on gridline
140
300 from grid 1047
verti cal bracing
F1
3000 169
Lobby
Structural door opening TBC to comply with fire regs.
2055
Stair 3
1810
3000
Proposed Riser 04
215mm wide blockwork centred on gridline
150
1810 140
858
346
Feature flashings to be fitted before blockwork. Blockwork to be built up to flashings not behind.
1360
997
7595
security shutters
484 from grid
764
F
140
VIEW A - Proposed South Elevation Facing Customer Car Park 1:200
Goods In (Lift access to FF level)
2965
549 from grid
2585
vertical bracing
Main Entrance to Gym Brick plinth to full perimeter of building, to be Baggeridge brick K20165 Staffordshire smooth blue.
verti cal bracing
02a
01
01a
00
Passenger Lift
Escalator Circulation Core G1
Unit 1 Entrance to Gym at 1st Floor
H
securit y shut t ers
01 Trespa Meteon exterior cladding, 300mm depth at different lengths of up to 3m. Colour to be 3 different shades of grey with infrequent random red and blue panels (invisible fixing detail to be incorporated).
GYM Cladding to be insulated composite panels laid horizontally in 1.2m high modules, to be Eurobond 150mmTh 'Europanel Extra', Prisma micro-rib finish, colour metallic silver.
08a
09
09a
10
02
03
140
verti cal bracing
securit y shut t ers
140
securit y shut t ers
J Flashing to eaves and cladding to be steel with PVDF finish, colour metallic silver.
08 143 from grid
Stair 1
Flashing to eaves and cladding to be steel with PVDF finish, colour metallic silver.
155
02
HPS200 steel trapezoidal roof panel system, Kingspan 120mmTh KS1000 RW Ecosafe, colour Albatross.
235
03
2055
04
3345
05
140
06
404 from grid
07
03a
03b
04
04a
143 from grid
08
security shutters
09
G 346 from grid
G
10
C
Structural door opening TBC to comply with fire regs.
Unit 1 Entrance to Retail Store 3212
A Existing retaining wall
Main Entrance to Sports Direct Retail Unit
Service Riser 02 (for FF)
1360
Lobby
Proposed Riser 01
858
verti cal bracing
215mm wide blockwork centred on gridline
140
Full height glazing system to be Kawneer AA 100 SSG system (Structural Silicone Glazed)
Fire Exit Doors
10
346 from grid
04
RWP
150 1810
security shutters
SIGN (3)
A1
Feature fins - Trespa Meteon exterior cladding system, 1.2m module. Colour Black (invisible fixing detail to be incorporated).
GYM
SIGN (4)
First Floor Level +7.5m (6.5m floor to ceiling at ground)
03
02a
998
2055
Recessed feature cladding band at high level to be Euroclad Rainscreen Sinusoidal half round metal profile system, recessed horizontally laid, horizontal profile - colour Black.
GYM
02
01a
A
Flashing to eaves and cladding to be steel with PVDF finish, colour metallic silver.
Haunch +11.1m (3.6m clear to haunch)
Cladding to be insulated composite panels laid horizontally in 1.2m high modules, to be Eurobond 150mmTh 'Europanel Extra', Prisma micro-rib finish, colour metallic silver.
01 501
00
155
H
G1
vertical bracing
Flashing to eaves and cladding to be steel with PVDF finish, colour metallic silver.
Full height glazing system to be Kawneer AA 100 SSG system (Structural Silicone Glazed)
Recessed feature cladding band at high level to be Euroclad Rainscreen Sinusoidal half round metal profile system, recessed horizontally laid, horizontal profile - colour Black.
G
F
1810
E
1035
D
Trespa Meteon exterior cladding, 300mm depth at different lengths of up to 3m. Colour to be 3 different shades of grey with infrequent random red and blue panels (invisible fixing detail to be incorporated).
security shutters
C
B
A1
285
A HPS200 steel trapezoidal roof panel system, Kingspan 120mmTh KS1000 RW Ecosafe, colour Albatross.
04b
05
05a
Elevation Key Plan (NTS)
D
Recessed feature cladding band at high level to be Euroclad Rainscreen Sinusoidal half round metal profile system, recessed horizontally laid, horizontal profile - colour Black.
Cladding to be insulated composite panels laid horizontally in 1.2m high modules, to be Eurobond 150mmTh 'Europanel Extra', Prisma micro-rib finish, colour metallic silver.
Perimeter Fencing
Service Yard
VIEW B - Proposed West Elevation Facing Railway 1:200
J
H
G
F1
F
C
D
E
A
B
External Material Schedule :
HPS200 steel trapezoidal roof panel system, Kingspan 120mmTh KS1000 RW Ecosafe, colour Albatross.
Trespa Meteon exterior cladding, 300mm depth at different lengths of up to 3m. Colour to be 3 different shades of grey with infrequent random red and blue panels (invisible fixing detail to be incorporated).
Expanded metal mesh system to front of cladding system, fixed back to curved steel framework projecting from building line with plastic flexi face signage area contained within.
Element
Flashing to eaves and cladding to be steel with PVDF finish, colour metallic silver.
Haunch +11.1m (3.6m clear to haunch)
GYM
First Floor Level +7.5m (6.5m floor to ceiling at ground)
Recessed feature cladding band at high level to be Euroclad Rainscreen Sinusoidal half round metal profile system, recessed horizontally laid, horizontal profile - colour Black.
Cladding to be insulated composite panels laid horizontally in 1.2m high modules, to be Eurobond 150mmTh 'Europanel Extra', Prisma micro-rib finish, colour metallic silver.
Description
Colours
Wall Cladding:
Europanel extra composite micro-rib cladding panel. Prisma micro-
Metallic silver
High Level Cladding: 2No Feature Fins:
rib finish. Recessed EuroClad rainscreen sinusoidal half round metal profile. Trespa Meteon exterior cladding system with invisible fixing detail.
Black Black
2No Feature Walls and 1No Feature Fin:
Trespa Meteon exterior cladding system with invisible fixing detail.
Main Roof:
HPS200 Kingspan KS1000 RW EcoSafe composite cladding.
Cobalt Blue Passion Red Urban Grey Steel Grey Mid Grey Albatross
Eaves Flashing/ gutter:
Steel with PVDF finish.
Metallic silver
Brickwork Plinth:
Baggeridge Brick K20165.
Staffordshire Smooth blue
Fire Escape from Circulation Core beyond
Goods In (Lift access to FF level)
Fire Exit Doors
Goods In Delivery vehicles to be able to access Goods Lift externally during out of hours trading. External door type and size TBC.
Glazing/ Ent. Doors: Service Doors:
Kawneer AA 100 SSG system (Structural Silicone Glazed). Steel faced doors with insulated core - Polyester Powder coated.
Anthracite Anthracite
Feature Mesh:
Eye Tech expanded aluminum etched mesh with anodized finish.
Silver
C 08.09.14
IR
AJM
B
30.07.14 Location Plan Updated
AJM
IR
A
09.05.14 View A - Look-alike locations updated to
SMW
IR
match glazing dwg (rev A). Front facade finished ground levels raised to line through with entrance levels. Feature fin bases updated to suit raised levels. View B - Building protection bollards indicated either end of building. View C - Footpath omitted adjacent service road. Building protection bollard indicated at corner. Ground levels adjacent circulation core FE raised to tie in with front facade. View D - Grid updated to latest GA. Finished ground levels raised to tie in with front facade. Look-alike panel indicated. Further details added to materials schedule. Latest GA plan added.
VIEW C - Proposed North Elevation Facing Service Yard 1:200
Cladding (rear of signage feature) to be insulated composite panels laid horizontally in 1.2m high modules, to be Eurobond 150mmTh 'Europanel Extra', Prisma micro-rib finish, colour metallic silver.
00
01
02
HPS200 steel trapezoidal roof panel system, Kingspan 120mmTh KS1000 RW Ecosafe, colour Albatross.
03
03a
03a
04
GYM
Haunch +11.1m (3.6m clear to haunch)
05a
06
07
08
08a
09
10
09a
SIGN (3)
Line of Ormskirk Road (dashed)
Service Yard
Expanded metal mesh system to front of cladding system, fixed back to curved steel framework projecting from building line with plastic flexi face signage area contained within.
VIEW D - Proposed East Elevation Facing Ormskirk Road 1:200
Rev Date
Description
Project Title
Proposed Retail Development
Rev By
Chk'd By
Ormskirt Road Aintree Sefton
Cladding to be insulated composite panels laid horizontally in 1.2m high modules, to be Eurobond 150mmTh 'Europanel Extra', Prisma micro-rib finish, colour metallic silver.
Full height glazing system to be Kawneer AA 100 SSG system (Structural Silicone Glazed)
J:\9001-10000\9616\17.0 Drawings and Issue Sheets\400 Series - Construction
05
SIGN (4)
GYM
Feature fins - Trespa Meteon exterior cladding system, 1.2m module. Colour Black (invisible fixing detail to be incorporated).
CAD file reference
04b
Trespa Meteon exterior cladding, 300mm depth at different lengths of up to 3m. Colour to be 3 different shades of grey with infrequent red and blue panels (invisible fixing detail to be incorporated).
Flashing to eaves and cladding to be steel with PVDF finish, colour metallic silver.
First Floor Level +7.5m (6.5m floor to ceiling at ground)
04a
Drawing status amended to Record (As Built).
Client
SportsDirect
Status
RECORD
Scale
1:200
Drawn By
SMW
Drawing Title
Proposed Unit 1 Elevations
Job-Dwg No
9616-407
Indicative Landscaping (By others)
Drawing Size
Checked By
PRW
A1 Date
03/14
Rev
THE HARRIS PARTNERSHIP WAKEFIELD 2 St. Johns North, Wakefield, WF1 3QA t. 01924 291 800 f. 01924 290 072
C
On behalf of
THE HARRIS PARTNERSHIP MANCHESTER 2nd Floor, Carvers Warehouse, 77 Dale Street, Manchester, M1 2HG t. 0161 238 8555 f. 0161 244 5809
THE HARRIS PARTNERSHIP MILTON KEYNES The Old Rectory, 79 High Street Newport Pagnell, MK16 8AB t. 01908 211 577 f. 01908 211 722 THE HARRIS PARTNERSHIP READING 101 London Road, Reading, RG1 5BY t. 0118 950 7700 f. 0118 956 8642
A R C H I T E C T S www.harrispartnership.com
J
PIR Insulation board.
H
G
G1
Factory made membrane lined gutter with PIR Insulation to 0.25W/m2K U value. Include for weir overflows as required. Size dependant on drainage sytem and no. of drops - to specialists design and detail.
00
02
02a
03
04
05
D
06
07
08
09
08a
C
ROOF CONSTRUCTION : Main roof to be constructed from Kingspan 120 mm thk KS1000 RW Ecosafe - composite steel trapezoidal roof panel system with 25 year guarantee. The panel comprising of 0.5mm thick HPS200 coated steel outer sheet, colour: Albatross. 120 mm thk LPCB approved PIR insulation core to the appropriate requirements of LPS 1181 (see paragraph 3.11) and 0.4mm white lining channel coated steel liner panel. All fixed with carbon steel fixings to suitably spaced steel purlins with all external laps sealed in mastic. All exposed fixings to be self coloured to match surface colour. Roofing / cladding sub contractor to include all necessary flashing's etc to penetrations required by fit out works. Overall roof construction to achieve minimum U value as required by SBEM calc's.
2800
2No layers of 12.5mm plaster board to underside of cold rolled beams or timber joist to form capping to Shaft to achieve 1hr fire resistance. Complete with 25mm plywood deck to top and sides of beams/joists.
D
E G
E
F1
3600 Floor to U/S of Haunch
Cavity Void
3500
SH 3400
3400
3150 (TBC)
1200
M
H
08
09
08a
10
09a
J
Gym
Lift Shaft
7600
G
C
G1
Circulation Core
F H
JN K
L
F
G
Expanded metal mesh system to front of cladding system, fixed back to curved steel framework (to St Eng. design & details) projecting from building line with plastic flexface signage area contained within. Signage sat within mesh void to create 'picture frame' appearance as indicated on THP Dwg No: 9616-430 Signage Details (latest revision).
Fire barriers with 1 Hr FR to external perimeter at each office floor level. Vertical barriers at 20M centres. See THP Fire Strategy dwg for details.
75mm thk (TBC) Sand/ cement screed to first floor, to St Eng. design and details.
1000
1200
Exposed Soffit and supporting steel spray coated - colour white (TBC). Finish to Steelwork to meet the required Fire Rating.
Floor Beam (to St Eng details)
01
02
03
03a
03b
04
04a
04b
05
05a
Section Key Plan (NTS) Minimum 'U' Values - Roof: - Walls: - Floors: - Windows, rooflights and curtain walling: - Fire Exit Doors: - High-usage entrance doors: - Roof ventilators (inc. smoke vents): - Air Permeability:
0.18 W/m².K 0.26 W/m².K 0.22 W/m².K 1.80 W/m².K 2.20 W/m².K 3.50 W/m².K 3.50 W/m².K 5m³/(h.m) at 50pa
All structural steel to be 1hr fire protected. All ground / first floor steelwork subject to specialist design and detail.
1200
215
1600
Brick plinth to full perimeter of building, to be Baggeridge brick K20165 Staffordshire smooth blue. DPC at min 150mm above ground level. Step DPC where necessary i.e. at door thresholds. Install proprietary weepholes at max 900 mm crts.
Footpath at higher level beyond to tie in with front facade/ entrance levels.
2. External downpipe locations and sizes TBC by specialist roofing sub-contractor. Positions to be agreed with Tenant prior to design being finalised. 3. All gutters to incorporate weir overflow / outlets, number of outlets required to specialist contractor design and detail.
Fir rated Lintels to lift shaft door openings. Naylor precast prestressed or equal/ similar approved - see St Eng. schedule.
Automated internal Security Roller Shutters integral to structure. To provide protection to glazing along grids 01 and H (see THP elevations). Shutters to specialist contractors design and details.
5. Contractor to ensure all necessary seals / trims / flashing's are provided for air permeability test.
All penetrations fire stopped to current Building Regulations. Note: No internal pier projections permitted. All concealed steelwork within wall cavity to be painted with two full coats of bituminous paint above ground level.
7500 Floor to Floor
Lift Shaft
7500 Floor to Floor SHS supporting Glazing and Roller Shutter in accordance with structural engineers details. Box shutter and supporting steelwork concealed with metal cover - finish/ colour to match curtain walling. NOTE SHS POSITION IN ABEYANCE FOLLOWING RECEIPT OF SPECIALIST CONTRACTORS DETAILS AND SHUTTER BOX SIZE.
215
Circulation Core
Mezzanine floor - by others
C
08.09.14
Drawing status amended to Record (as Built).
B
24.07.14
Revision changed due to administration error.
A
24.04.14 Main steelwork updated to Engineer's dwgs,
bracing indicated. External cladding along grids A and G pulled inboard to suit reduced perimeter steel sizes. Lifts/ sizes updated as per Kone dwgs, note referring to offset beam adjacent passenger lift omitted. Column position to Grids G1/ 03b updated to suit passenger lift size and position. Additional column added to grid 04a as per fabricators dwg, grid references updated. 2No feature columns to grids G/02 & 3 updated to standard UC's - elliptical cladding indicated with FR shutters to rear of glazing. Curtain walling frame depth updated. Toe edge detail and steel amended.
GROUND FLOOR SLAB (CIRCULATION CORE): Insitu reinforced concrete ground floor slab with power float finish suitable for paint finish to Structural Engineer's design and specification, on suitable gauge (BBA approved) membrane/DPM (determined by Eng.) with joints lapped and taped on sand blinding, on 50mm thk Kingspan Thermafloor TF70 (or equal/ similar approved). All on min. 150mm thick consolidated clean hardcore fill to Engineer's specification.
GROUND FLOOR SLAB (MAIN UNIT): Insitu reinforced concrete ground floor slab with power float finish suitable for paint finish to Structural Engineer's design and specification, on suitable gauge (BBA approved) membrane/DPM (determined by Eng.) with joints lapped and taped on a sand blinding. All on min. 150mm thick consolidated clean hardcore fill to Engineer's specification.
KONE - 8 PERSONS PASSENGER LIFT DDA COMPLAINT.
DPM to lap with DPC's to walls and to be installed strictly in accordance with manufacture's instructions. Floor build-up to achieve 0.22 W/m².K U-Value or as required by SBEM calculation.
DPM to lap with DPC's to walls and to be installed strictly in accordance with manufacture's instructions. Floor build-up to achieve 0.22 W/m².K U-Value or as required by SBEM calculation. FSL 16.330
FSL 16.330
1100
J:\9001-10000\9616\17.0 Drawings and Issue Sheets\400 Series - Construction
Foundations beyond (shown dashed).
AJM
AJM
IR
SMW
IR
Description
Project Title
Proposed Retail and Leisure Development
Rev By
Chk'd By
Ormskirk Road Aintree Sefton
Client
SportsDirect
Status
RECORD
Scale
1:25
Drawn By
SMW
Drawing Title
Unit 1 - Detailed Section J (Sheet 4)
Job-Dwg No
9616-415
Drawing Size
Checked By
PRW
THE HARRIS PARTNERSHIP WAKEFIELD 2 St. Johns North, Wakefield, WF1 3QA t. 01924 291 800 f. 01924 290 072
Lift Pit
IR
Rev Date
SportsDirect Retail
2180 SO
PVDF coated pressed steel flashings, colour: Metallic Silver - RAL 9006. Joints/ gaps to include air seals to maintain thermal performance and air tightness measures.
Notes: 1. Specialist contractor to determine lightning protection locations.
4. Roofing / cladding sub contractor to include all necessary flashing's etc to penetrations required by fit out works. 140 mm thk solid dense fair faced, paint grade concrete blockwork at Ground Floor. 7/kN min. strength grade or as specified by St Eng. All joints fully compacted with mortar and finished with bucket handle profile. Blockwork restrained and tied to Engineer's design & details.
6500 Clear Height Zone To Ground Floor
Glazing 50
4800 Curtain Walling
50
Proprietary Curtain Walling system to be Kawneer AA 100 SSG system (Structural Silicone Glazed) - frame colour: Anthracite. Thermally broken, double glazed sealed units with flush glazing to the exterior. Insulated spandrel panels and visible face caps where indicated on THP Glazing Details Dwg (9616-424),
Note: Gyms/ dance studios fall into class 4 of British Standards BS 6399: Part1:1996 'Loading of Buildings' This states the minimum imposed load for these areas is 5kN/m². However additional loads for finishes need to be allowed for i.e. Partitions, Screed & Finishes, Plant Areas etc.
12100 LIFTWELL HEIGHT TO U/SIDE OF LIFTING BEAM
1200
Underside of escalator
Glazing
All steel needs to be in conjunction with drawings from the structural engineer
FIRST FLOOR SLAB (MAIN UNIT): Composite reinforced insitu concrete floor on metal profile decking with surface suitable to receive screed finish to Structural Engineer's design and specification. Note consideration to be given to vibration/ noise from Gym equipment etc. Details and requirements to be confirmed by Fitting Out Contractor.
Cavity Void
12400
Underside of escalator
Feature fin beyond - Trespa Meteon exterior cladding system, 1.2m module. Colour Black (invisible fixing detail to be incorporated).
CAD file reference
10
09a
A1
300 Overhang
Recessed feature cladding band at high level to be Euroclad Rainscreen Sinusoidal (half round) horizontally laid metal profile insulated cladding system - supported off secondary metal rail system (between main portal steels). Wall build-up to achieve 0.26 W/m².K U-Value or as required by SBEM calculation. Insulation to run between main steels and notched to front face of portal - all to Cladding Contractor's details. Finish/ colour - TBC/ Black with matching corresponding steel PVDF coated flashings. Install Integral louvres within band zone where required to M&E/ Cladding Contractor's design & details locations to be discussed/ agreed.
Glazing to achieve min. 'U' value of 1.80 W/m².K or as required by SBEM calculations. For glazing details see THP Dwg No: 9616-424 (latest revision).
01a
B
All junctions to be air sealed in accordance with manufacturers guidelines. NB: contractor to ensure all necessary seals / trims / flashing's are provided for air permeability test.
System to be been tested and certified in accordance with Centre for Window and Cladding Technology (CWCT). Curtain Walling to meet the requirements of Parts N and L, with Manifestation in accordance with parts N and M. To be installed only by Kawneer authorised dealers.
01
A
6°
Parapet formed with secondary steelwork to St Eng. design and details. Flashings to be pressed steel with PVDF finish with nom. fall towards roof gutter. Colour: Metallic Silver - RAL 9006. Flashings to be suitably stiffened to avoid rippling.
THE HARRIS PARTNERSHIP MANCHESTER 2nd Floor, Carvers Warehouse, 77 Dale Street, Manchester, M1 2HG t. 0161 238 8555 f. 0161 244 5809
A1 Date
03/14
Rev
On behalf of
THE HARRIS PARTNERSHIP MILTON KEYNES The Old Rectory, 79 High Street Newport Pagnell, MK16 8AB t. 01908 211 577 f. 01908 211 722 THE HARRIS PARTNERSHIP READING 101 London Road, Reading, RG1 5BY t. 0118 950 7700 f. 0118 956 8642
C
A R C H I T E C T S www.harrispartnership.com
00
01
ROOF CONSTRUCTION : Main roof to be constructed from Kingspan 120 mm thk KS1000 RW Ecosafe - composite steel trapezoidal roof panel system with 25 year guarantee. The panel comprising of 0.5mm thick HPS200 coated steel outer sheet, colour: Albatross. 120 mm thk LPCB approved PIR insulation core to the appropriate requirements of LPS 1181 (see paragraph 3.11) and 0.4mm white lining channel coated steel liner panel. All fixed with carbon steel fixings to suitably spaced steel purlins with all external laps sealed in mastic. All exposed fixings to be self coloured to match surface colour. Roofing / cladding sub contractor to include all necessary flashing's etc to penetrations required by fit out works. Overall roof construction to achieve minimum U value as required by SBEM calc's.
02
03
03a
04
03b
04a
05
04b
05a
Parapet formed with secondary steelwork to St Eng. design and details. Flashings to be pressed steel with PVDF finish with nom. fall towards roof gutter. Colour: Metallic Silver - RAL 9006. Flashings to be suitably stiffened to avoid rippling. All junctions to be air sealed in accordance with manufacturers guidelines. NB: contractor to ensure all necessary seals / trims / flashing's are provided for air permeability test.
PIR Insulation board.
300 Overhang
2800
Recessed feature cladding band at high level to be Euroclad Rainscreen Sinusoidal (half round) horizontally laid metal profile insulated cladding system - supported off secondary metal rail system (between main portal steels). Wall build-up to achieve 0.26 W/m².K U-Value or as required by SBEM calculation. Insulation to run between main steels and notched to front face of portal - all to Cladding Contractor's details. Finish/ colour - TBC/ Black with matching corresponding steel PVDF coated flashings. Install Integral louvres within band zone where required to M&E/ Cladding Contractor's design & details - locations to be discussed/ agreed.
Lift shaft beyond, refer to THP dwg no. 9616-426 Lift Pit Details (latest revision).
Eurobond composite wall panels beyond to main building.
Concrete slab forming First Floor landing supported of steel trimmer beams with 75mm thk (TBC) Sand/ cement screed to Structural Engineer's design and details.
Lift Access at FF level 2500 Minimum Clear
Handrail/ glazed balustrade beyond returned back to lift.
3150 (TBC)
3150 To u/s of P/board Ceiling (TBC)
50
Circulation Core
Glazing
Handrail/ glazed balustrade.
Bulkhead/ floor structure return beyond.
For internal glazing details see THP Dwg. No: 9616-425 (latest revision).
50
Steel trimmer beam beyond supporting landing to lift.
Blockwork FR Compartment wall beyond (up to First Floor then metal stud) - 140 mm thk solid dense fair faced, paint grade concrete blockwork at Ground Floor. 7/kN min. strength grade or as specified by St Eng. All joints fully compacted with mortar and finished with bucket handle profile. Blockwork restrained and tied to Engineer's design & details. Dot and dab p/board to Circulation Core internal blockwork walls - finish TBC. All penetrations fire stopped to current Building Regulations. Note: No internal pier projections permitted. All concealed steelwork within wall cavity to be painted with two full coats of bituminous paint above ground level.
10650 (TBC)
Proprietary Curtain Walling system to be Kawneer AA 100 SSG system (Structural Silicone Glazed) - frame colour: Anthracite. Thermally broken, double glazed sealed units with flush glazing to the exterior. Insulated spandrel panels and visible face caps where indicated on THP Glazing Details Dwg (9616-424),
Reinforced PCC Stair and landings to specialist contractors design & details. All staircases to be compliant with Building Regulations Parts: K, M and B and BS4800, BS9999.
50
System to be been tested and certified in accordance with Centre for Window and Cladding Technology (CWCT). Curtain Walling to meet the requirements of Parts N and L, with Manifestation in accordance with parts N and M. To be installed only by Kawneer authorised dealers.
All steel needs to be in conjunction with drawings from the structural engineer
Circulation Core (Void)
Retail type Escalator providing travel to Gym floor - arrangement: parallel 2 units (one up, one down configuration). Escalator to current Code Standards - Kone TravelMaster 110 indicated (TBC) or equal/ similar approved. Finishes - glass balustrade with brushed satin stainless steel side cladding. Soffit cladding to be Grey powder coated sheet steel cladding (RAL7036). Note all finishes TBC.
Escalator height Note: 7.5m dimension is from finished slab level (GF) to finished slab level (FF). Dimension does not take into account any floor finishes which may effect the overall floor to floor height.
50
Steel box section supporting Roller Shutter in accordance with structural engineers details. Box shutter and supporting steelwork concealed with metal cover - finish/ colour to match curtain walling.
Feature cladding to entrance facade and feature fins be Trespa Meteon exterior cladding panels at different lengths of up to 3m. Colour to be 3 different shades of grey with infrequent red and blue panels. Feature fins to be colour Black. Panels secured using Trespa TS200 support system as follows: Panels with a minimum thickness of 10 mm to be invisibly fixed on an aluminium sub-frame comprising horizontal rails and hanging brackets to suitable spaced centres fixed with inserts or screws to the back of the panel. Brackets fixed off load bearing walls (concrete, masonry to St Eng. specification). Support structure for projecting feature fins to be structural steelwork to St Eng design & details. 90 mm thk rigid insulation board to void (where internal blockwork occurs) to achieve required minimum U-Values with 50 mm minimum clear ventilated cavity zone to conform with cladding and insulation manufactures recommendations.
Stair 1 FOR STAIR DETAILS REFER TO THP DWG. No's: 9616-420 Stair 1 Details (latest revision); 9616-421 Stair 2 Details (latest revision); 9616-422 Stair 3 Details (latest revision).
Automated internal Security Roller Shutters integral to structure. To provide protection to glazing along grids 01 and H (see THP elevations). Shutters to specialist contractors design and details.
50 2100 Automatic Doors to Gym Entrance
Circulation Core (Void) 7500 Floor to Floor
Glazing
Feature fin beyond - Trespa Meteon exterior cladding system, 1.2m module. Colour Black (invisible fixing detail to be incorporated).
7500 (floor slab to floor slab)
Glazing to achieve min. 'U' value of 1.80 W/m².K or as required by SBEM calculations. For glazing details see THP Dwg No: 9616-424 (latest revision).
Glazing
9600 Entrance Curtain Walling
Glazing
12400
Exposed columns to rear of curtain walling to be cladded in white GRP. Cladding supported of proprietary clips and lining channels (Gypframe or equivalent). Steelwork to SE / fabricators details. All steelwork FR to 60 mins.
Entrance Facade
Stair bulkhead beyond 13200 Trespa Cladding
Glazing
50
FSL
Lift shaft beyond, refer to THP dwg no. 9616-326 Lift Pit Details (latest revision).
Automatic door gear by specialist contractor.
Lift Access at GF level
Gym Entrance Intermediate support by Structural engineer. 2500 Minimum Clear
30 mm thk Kingspan Styrozone H350 or similar BBA approved CFC free closed cell rigid insulation, secured against perimeter slab edge. Sealed with polysuphide sealant to Engineer's details.
GROUND FLOOR SLAB (CIRCULATION CORE): Insitu reinforced concrete ground floor slab with power float finish suitable for paint finish to Structural Engineer's design and specification, on suitable gauge (BBA approved) membrane/DPM (determined by Eng.) with joints lapped and taped on sand blinding, on 50mm thk Kingspan Thermafloor TF70 (or equal/ similar approved). All on min. 150mm thick consolidated clean hardcore fill to Engineer's specification.
Void under stairs
DPM to lap with DPC's to walls and to be installed strictly in accordance with manufacture's instructions. Floor build-up to achieve 0.22 W/m².K U-Value or as required by SBEM calculation. 30°
FSL 16.330 150 min.
FSL 16.330
Escalator pit fully tanked to Engineer's details. Insulation as per floor. All foundations to Structural Engineer's design and details.
Escalator Pit
Minimum 'U' Values - Roof: - Walls: - Floors: - Windows, rooflights and curtain walling: - Fire Exit Doors: - High-usage entrance doors: - Roof ventilators (inc. smoke vents): - Air Permeability:
0.18 W/m².K 0.26 W/m².K 0.22 W/m².K 1.80 W/m².K 2.20 W/m².K
00
01
01a
02
02a
03
04
05
06
A
3.50 W/m².K 5m³/(h.m) at 50pa
Notes: 1. Specialist contractor to determine lightning protection locations. 2. External downpipe locations and sizes TBC by specialist roofing sub-contractor. Positions to be agreed with Tenant prior to design being finalised. 3. All gutters to incorporate weir overflow / outlets, number of outlets required to specialist contractor design and detail.
08
08a
09
09a
10
B
C
D
E G
E
JN K
L
F
G
C
G1
M
4. Roofing / cladding sub contractor to include all necessary flashing's etc to penetrations required by fit out works.
H
01
02
03
03a
03b
04
Section Key Plan (NTS)
04a
04b
F H
C
08-09-14
Drawing status amended to Record (As Built).
B
24-07-14
Revision changed due to administration error.
A
29-05-14
Slab edge detail and steel amended.
AJM IR
Date
Description
Rev By
Rev
AJM
IR
AJM IR Chk'd By
F1
J
J:\9001-10000\9616\17.0 Drawings and Issue Sheets\300 Series - Tender and Contract November 2012
07
3.50 W/m².K
All structural steel to be 1hr fire protected. All ground / first floor steelwork subject to specialist design and detail.
CAD file reference
D
A1
05
Project Title
Proposed Retail and Leisure Development
Drawing Title
Unit 1 - Detailed Section M (Sheet 7)
Job-Dwg No
9616-418
G
08
08a
09
09a
10
Ormskirk Road Aintree Sefton
Client
SportsDirect
Status
RECORD
Scale
1:25
Drawn By
SMW
05a
Rev
THE HARRIS PARTNERSHIP MANCHESTER 2nd Floor, Carvers Warehouse, 77 Dale Street, Manchester, M1 2HG t. 0161 238 8555 f. 0161 244 5809
Drawing Size
Checked By
On behalf of
THE HARRIS PARTNERSHIP WAKEFIELD 2 St. Johns North, Wakefield, WF1 3QA t. 01924 291 800 f. 01924 290 072
PRW
THE HARRIS PARTNERSHIP MILTON KEYNES The Old Rectory, 79 High Street Newport Pagnell, MK16 8AB t. 01908 211 577 f. 01908 211 722
A0 Date
03/14
THE HARRIS PARTNERSHIP READING 101 London Road, Reading, RG1 5BY t. 0118 950 7700 f. 0118 956 8642
A R C H I T E C T S www.harrispartnership.com
C
A 00
01
01a
02
03
02a
04
05
06
07
08
09
08a
10
09a
A
A1
J
H
G
G1
F
F1
E
D
6182 2050
C
B
B
A
A1
34692
6182
5860
3990
2192
3454
5743
5743
5743
5743
2406
C
5860 2407
3453
B
+12.40 Eaves
D
B
E
3600 Floor to U/S of Haunch
+11.10 Haunch
+7.50 F.F.L First Floor
Gym
F1
G
G
H J 01
02
03
03a
03b
04
04a
04b
05
09
08a
10
09a
05a
Section Key Plan (NTS)
7500 Floor to Floor
6500 Clear Height Zone To Ground Floor
08
A
G1
1000
Circulation Core
+6.50 F.F.L Floor to Ceiling
F
Mezzanine floor - by others
SportsDirect Retail
+0.00 F.F.L Ground Floor
Minimum 'U' Values - Roof: - Walls: - Floors: - Windows, rooflights and curtain walling: - Fire Exit Doors: - High-usage entrance doors: - Roof ventilators (inc. smoke vents): - Air Permeability:
Section A-A (1:100)
0.18 W/m².K 0.26 W/m².K 0.22 W/m².K 1.80 W/m².K 2.20 W/m².K 3.50 W/m².K 3.50 W/m².K 5m³/(h.m) at 50pa
All structural steel to be 1hr fire protected. All ground / first floor steelwork subject to specialist design and detail.
Notes:
00
01 1660
02
01a
03
02a
6178
6178 2100
2630
03a 6178
03b
04
04a 6178
05
05a
55602 6178
3548
06
07 6178
08 6178
08a 6178
09
10
09a 6178
1. Specialist contractor to determine lightning protection locations. 2. External downpipe locations and sizes TBC by specialist roofing sub-contractor. Positions to be agreed with Tenant prior to design being finalised. 3. All gutters to incorporate weir overflow / outlets, number of outlets required to specialist contractor design and detail. 4. Roofing / cladding sub contractor to include all necessary flashing's etc to penetrations required by fit out works.
+11.10 Haunch
5. Contractor to ensure all necessary seals / trims / flashing's are provided for air permeability test.
1000
C
08-09-14
Drawing status amended to Record (As Built)
IR
B
24-07-14
Revision changed due to administration error.
AJM IR
A
04-06-14
Steel Sizes changed
AJM IR
Date
Description
Rev By
Rev
Project Title
6500 Clear Height Zone To Ground Floor
+6.50 F.F.L Floor to Ceiling
Gym
7500 Floor to Floor
+7.50 F.F.L First Floor
3600 Floor to U/S of Haunch
+12.40 Eaves
+0.00 F.F.L Ground Floor
Section B-B (1:100)
AJM
Chk'd By
Proposed Retail and Leisure Development Ormskirk Road Aintree Sefton
Mezzanine floor by others
SportsDirect Retail
Client
SportsDirect
Status
RECORD
Scale
1:100
Drawn By
SMW
Drawing Title
Unit 1 - Overall Sections
Job-Dwg No
9616-411
Drawing Size
Checked By
PRW
THE HARRIS PARTNERSHIP WAKEFIELD 2 St. Johns North, Wakefield, WF1 3QA t. 01924 291 800 f. 01924 290 072 THE HARRIS PARTNERSHIP MANCHESTER 2nd Floor, Carvers Warehouse, 77 Dale Street, Manchester, M1 2HG t. 0161 238 8555 f. 0161 244 5809
A1 Date
03/14
Rev
On behalf of
THE HARRIS PARTNERSHIP MILTON KEYNES The Old Rectory, 79 High Street Newport Pagnell, MK16 8AB t. 01908 211 577 f. 01908 211 722
CAD file reference
J:\9001-10000\9616\17.0 Drawings and Issue Sheets\400 Series - Construction
THE HARRIS PARTNERSHIP READING 101 London Road, Reading, RG1 5BY t. 0118 950 7700 f. 0118 956 8642
C
A R C H I T E C T S www.harrispartnership.com
R
05a
Stair 1:
H
G1
Staircase to be compliant with Building Regulations parts K, M and B and: BS EN 14843:2007 (precast concrete products (stairs)) . BS 9999:2008 (code of practice for fire safety in the design, management and use of buildings).
G
Trespa feature fin beyond
100
100
6°
Stair Data: Type: Precast reinforced concrete stairs and landings. Concrete finished to a high quality level suitable to receive direct paint finish. Stair width: 1400mm Clear between handrails: 1200mm Goings - total 41 at: 250mm Risers - total 45 at: 166.67mm
42
41
40
39
38
37
36
35
34
Disabled Refuge
23
24
25
26
27
28
29
30
31
32
Minimum 2m headroom above pitchline throughout flight. Landing widths to be continuous. All nosings to be distinguishable. All dimensions must be confirmed on site prior to fabrication.
Landing
33
1200
Position of wall on ground floor (dashed).
All to be designed / detailed by specialist sub−contractor. Structural support for stairs to engineers design.
Lift shaft beyond, refer to THP dwg no. 9616-326 Lift Pit Details (latest revision). Lift doors beyond.
04b
100
Circulation Core
G
Balustrade and handrail to specialists details. Both handrail and balustrade must be capable of resisting the horizontal force given in BS EN 1991-1-1:2002. Handrail to be a min. of 900mm above pitchline of stair, balustrade to be a min. of 1100mm high on landings. All balustrading to be designed / detailed by specialist sub−contractor and to be non−climbable and stops falls from height.
H
Gym
Balustrade to be polyester powder coated with perforated mild steel infill panels, with 40mm tubular handrail, 60mm min. clear from back of handrail to wall finish. Balusters/ stanchions to be fixed to treads. Include matching wall mounted handrail where applicable.
75mm thk Sand/ cement screed to first floor, to St Eng. design and details.
1100
05a 100
Handrail/ glazed balustrade. Toughened glass infill panels to BS 6262-4 2005. Clear glazed infill panels - toughened low Iron glass (thickness to manufactures recommendations for retail occupancy). Satin stainless steel handrails to suitable grade. All brackets, fixings etc to be in matching stainless steel.
Edge trims and joinery details in Oak (TBC).
STAIR 1 PLAN AT FIRST FLOOR (1:25)
Stairs are to be designed such that neither the stair or the balustrade will allow the passage of a 100mm dia. sphere. Balustrades should not be easily climbable.
3600 Floor to U/S of Haunch
43
100
3825
44
1200
400
45
Lift shaft lid beyond
117
05
4168 2750 (11 goings @ 250)
117
3000
1200
up
1200
300
P/board on dot & dab. 45
21
20
19
18
17
16
15
14
13
12
11
1200
1
2
3
4
5
6
7
8
42
Floor Beam (to St Eng details)
41 40
Reinforced PCC Stair and landings to a high quality grade finish, i.e. suitable to receive direct paint finish. All to specialist contractors design & details. All staircases to be compliant with Building Regulations Parts: K, M and B and BS4800, BS9999.
39
Landing
38 37
1100
400
23
100
10
Landing 22
43
1300
118
1000
2985 2750 (11 goings @ 250)
118
2000
9
36
Position of metal stud wall on first floor (dashed). 34
1200
1200
35
FOR STAIR DETAILS REFER TO THP DWG. No's: 9616-420 Stair 1 Details (latest revision); 9616-421 Stair 2 Details (latest revision); 9616-422 Stair 3 Details (latest revision).
4000
1200
44
05
1300 100
25 1200
5585
up
3000
13
33
SITE MEASURE STOREY HEIGHTS AND CLEARANCES PRIOR TO MANUFACTURE.
32
100
31
Circulation Core
04b
25 24
Finish to treads TBC. All tread edges to incorporate contrasting nosings - Gradus Ltd or equal/ similar approved. Material/ finish: Stair nosing trims: Aluminium/ insert colour to be agreed. To meet the guidance in Approved Document M and BS8300:2009+A1:2010.
23 22 21 20
100
19 18 17
60
1200
16
16
15
117
14
13
12
11
1200
1
2
3
4
5
6
7
8
100
10
Outline of emergency exit doors in foreground.
11
Landing
10 9
9
8
100
STAIR 1 PLAN AT GROUND FLOOR (1:25) CAD file reference
J:\9001-10000\9616\17.0 Drawings and Issue Sheets\400 Series - Construction
SportsDirect Retail
2
04b
G
IR
Column sizes updated as per latest fabricators dwgs. Grid refs updated, disabled refuge indicated. Passenger lift size in elevation updated. Dwg references updated to 400 series.
Rev Date
Description
Project Title
Proposed Retail and Leisure Development
H
Rev By
Client
SportsDirect
Status
RECORD
Scale
1:25
Drawn By
SMW
Drawing Title
Proposed Stair 1
Job-Dwg No
9616-420
1100
3
FSL 16.330
2000 (8 goings @ 250)
AJM
SMW
Built).
Chk'd By
Drawing Size
Checked By
PRW
A1 Date
03/14
300
5
1500
1200
1200
6
4
300
IR
23.05.14 Steelwork moved to u/s of stair landings.
Ormskirk Road Aintree Sefton
7
up
08.09.14 Drawing status amended to Record (As
A
13 12 3500
17
2000 Min. Headroom
18
400
19
3000
20
1100
2750 (11 goings @ 250)
21
Stair 1
15
B
14
05
4168
7500 Floor to Floor
26
Oak moldings forming side trims to treads and u/s of stringer edge (TBC).
6500 Clear Height Zone To Ground Floor
7500 Floor To Floor
05a
RW
STAIR 1 PLAN AT MID LANDING (1:25)
Fire Escape
28 27
H 4000
G
29
1100
2000 (8 goings @ 250)
300
Satin Stainless Steel handrail and balustrade with matching brackets, fixings etc.
30
1
FSL 16.330
Rev
THE HARRIS PARTNERSHIP WAKEFIELD 2 St. Johns North, Wakefield, WF1 3QA t. 01924 291 800 f. 01924 290 072
On behalf of
THE HARRIS PARTNERSHIP MANCHESTER 2nd Floor, Carvers Warehouse, 77 Dale Street, Manchester, M1 2HG t. 0161 238 8555 f. 0161 244 5809 THE HARRIS PARTNERSHIP MILTON KEYNES The Old Rectory, 79 High Street Newport Pagnell, MK16 8AB t. 01908 211 577 f. 01908 211 722 THE HARRIS PARTNERSHIP READING 101 London Road, Reading, RG1 5BY t. 0118 950 7700 f. 0118 956 8642
A R C H I T E C T S www.harrispartnership.com
B
fort william, scotland proposed development This project, I worked alongside a company director to get this project drawn up in Revit, preparing it to go out for tender as it was a requirement by the client and contractor for it to be drawn up using Revit. The project comprised of a retail park and an Aldi supermarket on a traditional contract. Being one of the more experienced Revit users within the company I was asked lead the project build. I created one central model to allow collaboration across the board and corresponded with structural engineers and fabricators to build a like for like model. Due to leaving the company to travel Australia, I unfortunately couldn’t see the project through until completion and was passed on within the company.
T.O.Parapet 23.870 m
19
18
17
16a
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
A
Roof
22.770 m
A
T.O.Canopy 18.469 m A
FFL
14.395 m
A
External FFL 14.170 m
A
1 : 200
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
16a
17
18
19
T.O.Parapet 23.870 m A
Roof
22.770 m
A
T.O.Canopy 18.469 m
A
FFL
14.395 m
A
External FFL 14.170 m
A
1 : 200
G
T.O.Parapet 23.870 m
F
E1
E
D1
D
C1
C
B1
B
A
A
Roof
22.770 m
A
T.O.Canopy 18.469 m A
FFL
14.395 m
A
External FFL 14.170 m A
1 : 200
A
B
B1
C
C1
D
D1
E
E1
F
G
Unit D Parapet 21.495 m A
T.O.Canopy 18.469 m -
A
Rev
FFL
Project Title
North Road, Fort William, Highland PH33 6TG
Drawing Set up
AJM
IR
Description
Rev By
Chk'd By
Elevations
Job-Dwg No
7445A - (00) 2
14.395 m
A
External FFL 14.170 m A
06/07/15
Date
Drawing Title
Client
Rev
THE HARRIS PARTNERSHIP WAKEFIELD 2 St. Johns North, Wakefield, WF1 3QA t. 01924 291 800 f. 01924 290 072
1 : 200 This drawing is copyright and may not be reproduced in whole or part without written authority. Do not scale off this drawing.
On behalf of
MORBAINE
THE HARRIS PARTNERSHIP MANCHESTER 2nd Floor, Carvers Warehouse, 77 Dale Street, Manchester, M1 2HG t. 0161 238 8555 f. 0161 244 5809
Status
TENDER
Scale
As indicated
Drawn By
AJM
Checked By
Drawing Size
IR
THE HARRIS PARTNERSHIP MILTON KEYNES The Old Rectory, 79 High Street Newport Pagnell, MK16 8AB t. 01908 211 577 f. 01908 211 722
A1 Date
JULY/15
THE HARRIS PARTNERSHIP READING 101 London Road, Reading, RG1 5BY t. 0118 950 7700 f. 0118 956 8642
A R C H I T E C T S www.harrispartnership.com
-
Roof
T.O.Parapet 23.870 m
F
A
A
T.O.Parapet 23.870 m
F
Roof
22.770 m
A
22.770 m
A
T.O.Canopy 18.469 m
T.O.Canopy 18.469 m A
A
T.O Internal Blockwork 17.320 m
A
FFL
14.395 m
A
FFL
14.395 m
A
External FFL 14.170 m
External FFL 14.170 m
A
A
1 : 20
-
1 : 20
Rev Project Title
Retail Unit Development North Road, Fort William, Highland PH33 6TG
06/07/15
Date
Drawing Set up
AJM
Description
Rev By
Drawing Title
Sections (Sheet 5)
Job-Dwg No
7445A - (21) 5
IR
Chk'd By
Rev
-
On behalf of
Client
Status
This drawing is copyright and may not be reproduced in whole or part without written authority. Do not scale off this drawing.
THE HARRIS PARTNERSHIP WAKEFIELD 2 St. Johns North, Wakefield, WF1 3QA t. 01924 291 800 f. 01924 290 072
MORBAINE
THE HARRIS PARTNERSHIP MANCHESTER 2nd Floor, Carvers Warehouse, 77 Dale Street, Manchester, M1 2HG t. 0161 238 8555 f. 0161 244 5809
TENDER
Scale
As indicated
Drawn By
AJM
Checked By
Drawing Size
IR
THE HARRIS PARTNERSHIP MILTON KEYNES The Old Rectory, 79 High Street Newport Pagnell, MK16 8AB t. 01908 211 577 f. 01908 211 722
A0 Date
JULY/15
THE HARRIS PARTNERSHIP READING 101 London Road, Reading, RG1 5BY t. 0118 950 7700 f. 0118 956 8642
A R C H I T E C T S www.harrispartnership.com
1
A
Roof
22.770 m
A
A
22.770 m
A
Roof
T.O.Parapet 23.870 m
A
T.O.Parapet 23.870 m
T.O Internal Blockwork 17.320 m
T.O Internal Blockwork 17.320 m A
A
FFL
14.395 m
A
A
1 : 20
FFL
14.395 m
A
External FFL 14.170 m
External FFL 14.170 m
A
1 : 20
-
Rev Project Title
Retail Unit Development North Road, Fort William, Highland PH33 6TG
06/07/15
Date
Drawing Set up
AJM
Description
Rev By
Drawing Title
Sections (Sheet 1)
Job-Dwg No
7445A - (21) 1
IR
Chk'd By
Rev
-
On behalf of
Client
Status
This drawing is copyright and may not be reproduced in whole or part without written authority. Do not scale off this drawing.
THE HARRIS PARTNERSHIP WAKEFIELD 2 St. Johns North, Wakefield, WF1 3QA t. 01924 291 800 f. 01924 290 072
MORBAINE
THE HARRIS PARTNERSHIP MANCHESTER 2nd Floor, Carvers Warehouse, 77 Dale Street, Manchester, M1 2HG t. 0161 238 8555 f. 0161 244 5809
TENDER
Scale
As indicated
Drawn By
AJM
Checked By
Drawing Size
IR
THE HARRIS PARTNERSHIP MILTON KEYNES The Old Rectory, 79 High Street Newport Pagnell, MK16 8AB t. 01908 211 577 f. 01908 211 722
A0 Date
JULY/15
THE HARRIS PARTNERSHIP READING 101 London Road, Reading, RG1 5BY t. 0118 950 7700 f. 0118 956 8642
A R C H I T E C T S www.harrispartnership.com
university work Throughout my three years at the University of Huddersfield, I was set varied projects with a variety of different briefs. These projects ran from design to technical aspects of the process, working with both processes side by side allowed me to identify my design limitations through different technologies. This allowed me to make the projects into my own and really start enjoy the briefs.
Thankyou. please feel free to contact me on amorris3692@outlook.com