CPM UHTG
(Ultra High Temperature Gasification)
Energy Recovery from Waste and Biomass
P.O. Box: 114 – 5118. Verdun, Beirut, Lebanon. www.cpmsarl.com
Mob: +961334976 Mr. Bill Alhussayni. info@cpmsarl.com
CPM UHTG (Ultra High Temperature Gasification)
P.O. Box: 114 – 5118. Verdun, Beirut, Lebanon. www.cpmsarl.com
Mob: +961334976
Mr. Bill Alhussayni. info@cpmsarl.com
2
Syngas Production = Carbon Conversion Burning Fire with oxygen
Various technologies
CPM UHTG High temperatures no oxygen
- Incineration - Pyrolysis - Plasma - others Simple but very dirty
Complicated and dirty
P.O. Box: 114 – 5118. Verdun, Beirut, Lebanon. www.cpmsarl.com
Mob: +961334976
Simple and sophisticated Mr. Bill Alhussayni. info@cpmsarl.com
3
Process Details
Cracking of the organic material into a low molecular combustible gas, using high temperatures in an oxygen-free environment:
CnHm
CH4 + H2 + C
CH4 + H2O
CO + 3H2
C + H2O
CO + H2
C + CO2
2 CO
P.O. Box: 114 – 5118. Verdun, Beirut, Lebanon. www.cpmsarl.com
Mob: +961334976 Mr. Bill Alhussayni. info@cpmsarl.com
4
Waste = Raw Material • All organic (carbonaceous ) material can be used without changing the process
P.O. Box: 114 – 5118. Verdun, Beirut, Lebanon. www.cpmsarl.com
Mob: +961334976 Mr. Bill Alhussayni. info@cpmsarl.com
5
Waste Streams
6
The Technology
P.O. Box: 114 – 5118. Verdun, Beirut, Lebanon. Mob: +961334976 Mr. Bill Alhussayni. 7 www.cpmsarl.com info@cpmsarl.com
What is Syngas
P.O. Box: 114 – 5118. Verdun, Beirut, Lebanon. www.cpmsarl.com
Mob: +961334976 Mr. Bill Alhussayni. info@cpmsarl.com
8
Gas Composition Comparison
9
Process Overview
Waste
P.O. Box: 114 – 5118. Verdun, Beirut, Lebanon. www.cpmsarl.com
Mob: +961334976 Mr. Bill Alhussayni. info@cpmsarl.com
10
Syngas Utilization
P.O. Box: 114 – 5118. Verdun, Beirut, Lebanon. Mob: +961334976 Mr. Bill Alhussayni. 11 www.cpmsarl.com info@cpmsarl.com
Typical Material Flow
12
Why UHTG Technology
P.O. Box: 114 – 5118. Verdun, Beirut, Lebanon. www.cpmsarl.com
Mob: +961334976 Mr. Bill Alhussayni. info@cpmsarl.com
13
CPM UHTG a Unique Company with Unique Products Shredder-Sterilizer Combination Fitted for the pre-treatment of hospital waste or Any type of residue which needs to be sanitized Immediately
Multi-Fuel Turbine Generator Set A world novelty: a turbine which works with any type of liquid or gaseous fuel or a combination thereof, incl. flare or synthetic gas, intended for the utilization of the CPM UHTG syngas
Off-Heat to Electricity A CPM UHTG patented technology to convert heat directly into electricity, mainly intended to utilize the off-heat from the CPM UHTG gasifier P.O. Box: 114 – 5118. Verdun, Beirut, Lebanon. www.cpmsarl.com
Mob: +961334976 Mr. Bill Alhussayni. info@cpmsarl.com
14
THE COMPANY •
1989
Development of waste neutralization and solidification system
•
1992
First demonstration plant operational in Switzerland
•
1993
Development of pyrolysis technology
•
1995
Development of UHT gasification with induction electricity
•
1996
Demonstration plant in England
•
1999
Development of industrial plant in Germany
•
2000
Operation of industrial plant Emmerich
•
2003
Operation of industrial plant Neustadt
•
2007
Construction of the 25 t/d commercial, industrial plant Munich
•
2008
Operation of small, 1 t/d unit Munich
•
2012
Completion of the 25 t/d commercial, industrial plant Munich P.O. Box: 114 – 5118. Verdun, Beirut, Lebanon. www.cpmsarl.com
Mob: +961334976 Mr. Bill Alhussayni. info@cpmsarl.com
15
Strategic Partners
P.O. Box: 114 – 5118. Verdun, Beirut, Lebanon. www.cpmsarl.com
Mob: +961334976 Mr. Bill Alhussayni. info@cpmsarl.com
16
CPM UHTG (Ultra High Temperature Gasification)
P.O. Box: 114 – 5118. Verdun, Beirut, Lebanon. Mob: +961334976 Mr. Bill Alhussayni www.cpmsarl.com info@cpmsarl.com
17