Klenkhart & Partner Consulting • Established in 1991 • Wide Experience on „planning in skiareas“ • Realization of about 500 projects of lifts, skiruns and artificial snow making • Realization of about 40 artificial lakes for snowmaking from a volume of 10.000 m³ to 200.000m³ (sum of about 2 Mio. m³) • Today – a leading Austrian company in: – Masterplan – studies for winter- and outdoor sports all over the world – Detailled plannings of projects in ski-areas and infrastructure

• For public and private clients Klenkhart & Partner Consulting

2


Team Work for Poiana Braşov • Contract for Masterplan, June 2007, signed by the Consiliul Judetean Brasov – Thank You! • Team of 10 experts working on the project (some of them): – Christian Klenkhart (Project Manager) – Peter Hartl (Satellit images, 3D-Views, GIS) – Stefan Szauter (snow making)

• Very thanks to Dir. Mr. Ion Rufa for the detailled information and his support Klenkhart & Partner Consulting

3


Table of Contents • • • • •

Climatic conditions The Existing Skiarea (Ski Lifts, Slopes, etc.) Capacity of the Existing Skiarea Goal for the development Step 1: Snow making, widening and flattering of ski runs and 2 new lifts • Step 2: Development to Rişnov • Investments • Recommendations for Implementation Klenkhart & Partner Consulting

4


Climatic conditions • Poiana Braşov: continental climate 1992-2001

Nov.

Dec.

Jan.

Feber

March

day

1,80°C

-2,19°C

- 2,84°C -2,56°C

0,00°C

night

-1,45°C

-5,44°C

- 5,76°C -5,81°C

-3,18°C

• Cold and dry conditions are good for snow - making • The Skiarea of Poiana Braşov is north – faced: long lasting good snow - conditions, but in Dec. and Jan. it is very cold in the lower parts without any sun Klenkhart & Partner Consulting

5


Existing Lifts Name of the lift

Year of building

Telecabina Kanzel PB

1971

1726

2449

350

Telecabina Capra Neagra PB

1982

1775

2809

504

Telegondola Postavarul Expres 8EUB

2005

1710

2140

1.823

Teleschi Bradul SL

1969/1986

1114

458

900

Teleschi Stadion

1988

1039

300

900

Teleschi Slalom

1977

1255

575

600

Teleschi Subteleferic

1978

1326

492

500

Teleschi Ruia

1969/1986

1655

502

900

Teleschi Kanzel

1969/1986

1783

313

900

Altitude of the top – station

Sum of the capacity

Length in m

Capacity in pers. / h

7.377

Klenkhart & Partner Consulting

6


Existing Lifts and Pists

Teleski Ruia

Klenkhart & Partner Consulting

7


Existing Lifts and Pists

A lot of steep an small pists The famous Lupului Klenkhart & Partner Consulting

8


Results of the capacity analyses Simulation existing area: „a good day in winter“ 1600 pers. on pists 500 pers. on the lift 600 pers. waiting 300 pers. in restaurants 3000 pers. in the area

1 skier needs about 150 m² !

Klenkhart & Partner Consulting

9


Existing ski area • Many small and steep pists • Pists to croweded from 10 am • Artficial snow making only at Bradul • 16.000 m / 50 ha skiruns • pists are bumpy • old machines for grooming • pists in good stabil conditions in summer

Klenkhart & Partner Consulting

10


Inklination modell

FIS - Guideline: Blue: easy, up to 25% Red: medium, 25% - 40% Black: difficult, more than 40% Klenkhart & Partner Consulting

11


Exposition - modell

Blue: north - face Green: west - face Yellow: south – face Red: east - face

Klenkhart & Partner Consulting

12


The Intention of the „Ski – Plan“ • First Step: – Flattering and widening of the existing pists and skiways – Establishing an Artificila Snow making system – Development of the lifts: 2 new lifts (Ruia and Lupului); building of new pists for these lifts

• Second Step: – Development of the skiarea to Risnov (2 lifts) Klenkhart & Partner Consulting

13


Ski area after Step 1 • 6 CLD Ruia: 2.400 pers./h; ca. 1.100 m length • 4 CLF Lupului: 1.600 pers./h; ca. 800 m length • Artficial snow making with a lake with 120.000 m³ • 22.800 m / 67 ha skiruns • corrections and widening of all existing pists • new machines for grooming

Klenkhart & Partner Consulting

14


Pists after Step 1

Klenkhart & Partner Consulting

15


Artificial Snow Making • Basic layer of artificial snow on 58 ha within 100 snow-making hours • 2.500 m³ water/ha and year • Artificial Lake on Ruia: 120.000 m³, water from melting ( two refill – stations with pumps) and from the don’t used water of the drinking water asset of Poiana Brasov • 3 pumps with 50 l/s and 50 bar (400 kW) • Water with gravitation pressure for the lower parts of the pists about 100 l/s Klenkhart & Partner Consulting

16


Hydraulik system of the suggested snow - making asset

Klenkhart & Partner Consulting

17


Suggested system of Snow Making •

System of snow – making lances with a central compressor – station: – Advantage: the lances are situated along all pists (every 50 m) and ski – runs (every 100 m); you don‘t have to transport it during the whole winter, you ca use it whenever the conditions are good – Advantage: the lances were build up in Oct. and must not be relocated during the whole winter – Drawback: the lances make not so much snow (max. 4l/s) ¾ We recommand: a system of lances for all ski-runs except on the wide pists

System of snow – making propeller - machines: – Advantage : the propellor machines make a lot of snow (max. 12l/s) – Drawback: electricity in the field, expansive machines ¾ We recommand: propellor machines on the wide pists (upper part of Subteleferic, Sulinar below Ruia, pists above Bottom station Klenkhart & Partner Consulting

18


Artificial Lake on Ruia

120.000 m続

Klenkhart & Partner Consulting

19


Artificial Lake on Ruia 3D - Modell

Sulinar Subteleferic Klenkhart & Partner Consulting

20


Artificial Lake on Ruia Upper layer: fine sand Below: gravel Depth of 3-5 m: limestone – rock 80.000m³ material to dig sealing: HDPE-Folie

geological – geotechnical study made by NEOLITOS SRL / Brasov Klenkhart & Partner Consulting

21


Examples of artificial lakes

Klenkhart & Partner Consulting

22


Examples of artificial lakes

Klenkhart & Partner Consulting

23


Examples of artificial lakes

Klenkhart & Partner Consulting

24


Methods of pist-corrections

Riprap (stones)

Klenkhart & Partner Consulting

25


More parking - places

Costs: parkdeck: underground car park:

about â‚Ź 6.000,--/place about â‚Ź 10.000,--/place

Klenkhart & Partner Consulting

26


Results of the capacity analyses Simulation after step 1: „a good day in winter“ 2500 pers. on pists 700 pers. on the lift 700 pers. waiting 300 pers. in restaurants 4200 pers. in the area Klenkhart & Partner Consulting

27


3D View Step 1

Klenkhart & Partner Consulting

28


Ski area after Step 2 •

8 EUB Rişnov: 2.400 pers./h; ca. 2.000 m length

6CLD Valea Seaca : 2.400 pers./h; ca. 1.950 m length

32.000 m / 105 ha skiruns

4 long new pists, skirun to the bottom station in Risnov

Klenkhart & Partner Consulting

29


Top-station 8EUB Risnov Skirun north-ridge

Skirun south-ridge Skirun valley

Klenkhart & Partner Consulting

30


Results of the capacity analyses Simulation after step 2: „a good day in winter“ 3400 pers. on pists 1300 pers. on the lift 800 pers. Waiting 500 pers. In restaurants 6000 pers. In the area Klenkhart & Partner Consulting

31


3D View Step 2

Klenkhart & Partner Consulting

32


FIS - Homologation

Discipline

Min. Altitude Diff.

Max. Altitude Diff.

Slalom Men Slalom Women Giant Slalom Men Giant Slalom Women

120 m 120 m 200 m 200 m

220 m 180 m 400 m 400 m

Super G Men Super G Women Downhill Men Downhill Women

225 m 225 m 400 m 400 m

500 m 500 m 1.000 m 700 m

Klenkhart & Partner Consulting

9 9 9 9 9 9 9 9 33


Required Investments • Step 1: – 2 Lifts and pists, 2 grooming machines 7,81 Mio € – Artificial Snow – making incl. Lake 10,00 Mio € – Electricity, other pists, parking, etc. 2,19 Mio €

• Sum step 1

20,0 Mio €

• Step 2: – 3 Lifts and pists, grooming machines 18,0 Mio € – Electricity, pists, snowmaking, parking... 7,5 Mio €

• Sum step 2

25,5 Mio € Klenkhart & Partner Consulting

34


The investments include • Power supply (medium voltage system, transformer stations) • All lifts complete (delivery and assembly, implementation: poles, foundations, cable track, etc…) • Ski run and ski trail construction in the area • All technical snow facilities incl. pump-stations • Ticket system • 5 Grooming machines • Safety equipment for pists • Construction of funpark, ski beginners area, etc. Klenkhart & Partner Consulting

35


Recommendation for Implementation • Complementing the winter season, various attractions to promote the winter and the sommer season should be developed; • The result of the Cost-Benefit Analysis is positive for the implementation of Step 1 (2 new lifts, pists, grooming machines) and realistic scenario (15% more skiers, switch to day tickets, imputed interest: Euribor + 2%) • Development of infrastructure and snow-making is of common interest (Municipality, EU, etc.) • Therefore the implementation of Phase 1 is definitely recommended Klenkhart & Partner Consulting

36


Recommendation for Implementation • Investment of the Municipality will trigger significant private investments (hotels, restaurants, services, etc.) • Further flexible development of Step 2 depending on the reception of the potential markets and the highway from Bukarest; • Implementation of these 2 Steps guarantee high standard of the Ski Area – comparable with leading resorts in the Alps; Klenkhart & Partner Consulting

37


Recommendation for Implementation • Pist – corrections and pist - construction: Construction company with experience in „alpin constructions“ in steep slopes and in dynamiting

• Building of the artificial lake: The Construction company should have realized at least 2 or 3 such artificial lakes and should also have experience in dynamiting

• Building the cable and pipe- trenches, etc.: Local Construction company Klenkhart & Partner Consulting

38


Starting Point ... Poiana Brasov: The capital for winter sports in Romania and the wider region!

... It‘s feasible! ... It‘s attractive! Klenkhart & Partner Consulting

39


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.