A N A W E N DE OLIVEIRA a r c h i t e c t
2021
Ana Wen de Oliveira date of birth: nov 01, 1989 / Basel, Switzerland m: anawdeoliveira@gmail.com p: +41 76 503 6979
2
SHORT CV PR O F ES S ION A L E XPERI E N CE Janurary 2017 - August 2021
Architect at Carolina Penna Arquitetura, São Paulo, SP. carolinapenna.com
October 2015 - Janurary 2017
Architect at Iná Arquitetura, São Paulo, SP. ina.arq.br
Janurary 2012 - May 2015
Architect at Carolina Penna Arquitetura, São Paulo, SP. carolinapenna.com Worked in partnership with Studio Arthur Casas, São Paulo, SP. www.arthurcasas.com Worked in partnership with Jacobsen Arquitetura, São Paulo, SP. www.jacobsearquitetura.com Worked in partnership with Gui Mattos Arquitetura, São Paulo, SP. www.guimattos.com.br
August 2009 - February 2010
Architect in training at Loeb e Capote Associados, São Paulo, SP. www.loebarquitetura.com.br
E DU C AT ION Janurary 2007 - Janurary 2013
Bachelor in Architecture and Urbanism at Mackezie University, São Paulo.
August 2010 - July 2011
Univesity year exchange in Architecture and Urbanism at University of Coimbra, Portugal.
AWAR D S October 2013
3rd place in Restauração do Sobrado Aguiar Vallim Competition (Carolina Penna Arquitetura)
October 2013
3rd place in Restauração da Destilaria Central Competition (Carolina Penna Arquitetura)
August 2013
3rd place in Restauração do Sobrado Competition (Carolina Penna Arquitetura)
September 2011 Project Approved for the 9th Bienal de Arquitetura in São Paulo, by International Architecture Students Competition
T ECHNIC AL SKI LLS ArchiCAD, Autocad, InDesign, Photoshop, MS Office, Sketchup, Illustrator Portuguese, English, German
3
4
CONTENTS HOUSING 01 | Luxury House
p. 6
02 | Countryside House
p. 12
03 | Gourmet Terrace
p. 14
04 | Apartment Renovation
p. 18
EDUCATIONAL 05 | Public Kindergarden
p. 20
06 | Makerspace
p. 26
07 | Makerspace
p. 28
08 | School interior
p. 30
HEALTH 09 | Public Health Centre
p. 36
COMMERCIAL 10 | Fashion Studio
p. 40
COMPETITION CO MPETITION 11 | Brazilian Antartic Station
12 | Sobrado Aguiar Historical Renovation
p. 42 p. 48
5
1
2
3
4
5
6
7
8
-1.66 1
A
2 3
-1,58
-1.66
-0,88
ENCOSTO BANCO
4
DT 06
5
504 6 7 8
-1,16 PONTO DE TV NO TETO
-0.18
VARANDA
54,27 m2 PD:3,10 m
-0,13 0,85
AM 11 0,96
411
B
±0,00
DT 01 2,34
500
1 2 3
6,44
4,53
4
GOURMET 2
5
0,50
52,29 m PD:3,10 m
MG
6
DT 05
7
504
FB
8
1,69
9
FB
10 11 12
0,95
13 14 15
C
16
JANTAR
27,49 m2 PD:3,10 m
DT 02
DET 07
501
505
AM 09
MC 16
408
714
±0,00
D SAUNA
MC 10
3,86 m2 PD:2,80 m
710
LOUCEIRO
MC 14
2,20 m2 PD:2,60 m
713
ESCRITÓRIO
COZINHA
8,93 m2 PD:3,10 m
±0,00
GL
22,44 m2 PD:2,60 m
405
MC 13
AM 16
712
414
FZ DESPENSA
±0,00
3,80 m2 PD:2,60 m
FB
MASSAGEM
7,00 m2 PD:3,10 m
±0,00
S
MG
710
6,65 m2 PD:2,60 m
MG
AM 06
GL
SPA
SPA
12,05 m2 PD:3,10 m MC 11
1
PÁTIO SERVIÇO
AM 10
31,54 m2
FB
410
3
ESTAR
4
80,08 m2 PD:3,10 m
5 6
MC 12
S
DT 03 LAVABO
1
2
3
4
5
6
7
8
9
10
ADEGA
4,42 m2±0,00 PD:2,60 m
3,31 m2 PD:2,80 m
BRINQUEDOTECA
DT 04 20
19
18
17
16
15
14
13
12
DEPÓSITO SOB ESCADA
39,32 m2 PD:3,10 m
503
11
3,42 m2 PD:2,60 m
±0,00
AM 08 407
MLR
510
7
502
MSR
±0,00
MLR
711
DET 13
2
AM07 406
CIRCULAÇÃO 2
19,22 m PD:3,10 m
NOTAS PROJETO:
- PORTAS PISO-FORRO, SALVO INDICAÇÃO EM PLANTA; - PARA ESPECIFICAÇÃO LOUÇAS E METAIS, VERIFICAR MEMORI - PARA REVESTIMENTOS, VERIFICAR MEMORIAL DESCRITIVO; - PARA ACABAMENTOS MARCENARIA, VERIFICAR PLANTA DE A - PARA ELETRODOMÉSTICOS E EQUIPAMENTOS, VERIFICAR PLAN
ÁREA DE SERVIÇO
14,90 m2 PD:2,60 m
E
- CONFERIR MEDIDAS NO LOCAL; - MEDIDAS E NÍVEIS EM METROS, SALVO INDICAÇÃO; - MEDIDAS E NÍVEIS ACABADOS ; - NÃO TIRAR MEDIDAS COM RÉGUA OU ESCALÍMETRO; - QUALQUER DIFERENÇA ENTRE PROJETO E EXECUÇÃO, CONSU - NÃO ALTERAR ESTE PROJETO SEM PRÉVIA AUTORIZAÇÃO DO A - CONSIDERAR NÍVEL 0.00 NA COTA 694.70 DO LEVANTAMENTO
PÁTIO
86,88 m2
PARA UMA PERFEITA E CLARA LEITURA PLOTAR SEMPRE COLOR
R05
13.08.2021
REVISÃO LAYOUT COZINHA E ÁREA DE SERVIÇO; EQUIPAMENTOS GO
R04
24.05.2021
REVISÃO ESCADA SERVIÇO, SALA GERADOR, ARMÁRIO AQUECEDOR
R03
23.02.2021
REVISÃO GERAL
R02
29.01.2021
REVISÃO GERAL
R01
24.11.2020
REVISÃO GERAL
R00
10.11.2020
EMISSÃO INICIAL
REV.
DATA
DESCRIÇÃO
CLIENTE
ADRIANA E RAFAEL HAWILLA LOCAL
Lote 04, quadra F3 - Condomínio Quinta da Baroneza - Fase 2 - Brangança Paulista - SP
6
PLANTA DO LAYOUT PAV. INFERIOR ESC:1:50 GSPublisherVersion 0.8.100.12
ARQUIVO
FASE DO PROJETO
PROJETO EXECUTIVO COORDENADOR
ADRIANA
ARH-ARQ-PE-101-R04
COLABORADOR
CAROLINA P.
FORMATO
FOLHA A0
r jerônimo 11 3078 0 ASSUNTO
LIBERADO PARA
PLANTA DE LAYO
HOUSING Luxury House 07.2020 - now Status: Under Construction
01
7
CORTE AA ESC:1:50 A
B
A
D
B
C
E
D
E
24,90 24,90 5,95
5,95
9,85 3,90
5,95
9,10
9,10
BERIAL COM MANTA EM TPO BEIRAL COM MANTA EM TPO LAJE IMPERMEABILIZADA
VIGAMENTO DE MADEIRA DECORATIVO
FORRO EM MADEIRA
BEIRAL COM MANTA EM TPO
0,20
VIGAMENTO DE MADEIRA DECORATIVO
LAJE COM MANTA EM TPOBRISE COM EM MADEIRA PEDRISCO
0,21
6,83
PORTAS CAMARÃO EM RIPADO DE MADEIRA
GRAMA SINTÉTICA SORBE LAJE IMPERMEABILIZADA
GUARDA-CORPO EM VIDRO
2,55
3,30 GRAMA SINTÉTICA SORBE LAJE IMPERMEABILIZADA
BEIRAL COM MANTA TPO
REVESTIMENTO EM PEDRA MOLEDO
2,70
BEIRAL COM MANTA TPO
6,01
0,30
PORTAS CAMARÃO EM RIPADO DE MADEIRA
ENTRADA DE ENERGIA, ÁGUA E GÁS
PASSARELA COM GUARDA-CORPO EM VIDRO
FORRO EM MADEIRA
0,22
GUARDA-CORPO EM VIDRO
FORRO EM MADEIRA 3,70
3,60
1,10
0,52
3,30
NOTAS PROJETO:
- PORTAS PISO-FORRO - PARA ESPECIFICAÇÃ - PARA REVESTIMENTO - PARA ACABAMENTO - PARA ELETRODOMÉS
3,10
LAJE EM BALANÇO
PÁTIO
2,60
0,00
LAJE EM BALANÇO
- CONFERIR MEDIDAS - MEDIDAS E NÍVEIS EM - MEDIDAS E NÍVEIS AC - NÃO TIRAR MEDIDAS - QUALQUER DIFERENÇ - NÃO ALTERAR ESTE P - CONSIDERAR NÍVEL
0,00
2,54
0,00
PARA U -2,75
ELEVAÇÃO 03 ESC:1:50 R04
31.05.2021
REVISÃO
R03
23.02.2021
REVISÃO
R02
29.01.2021
REVISÃO
R01
24.11.2020
REVISÃO
R00
10.11.2020
EMISSÃO
REV.
DATA
CLIENTE
ADRIANA E RAFAE LOCAL
Lote 04, quadra F3 Baroneza - Fase 2 - B
ARQ
FASE DO PROJETO
8
7
6
5
4
3
2
1
PROJETO EXECUTIVO
CORTE BB ESC:1:50
COORDENADOR
ADRIANA
AR
COLABORADOR
CAROLINA P
31,40
7,90
GSPublisherVersion 0.8.100.10
VIGAMENTO DE MADEIRA DECORATIVO
PORTAS CAMARÃO EM RIPADO DE MADEIRA
5,00
BEIRAL COM MANTA TPO
3,70
BRISE EM MADEIRA
3,70
3,70
PORTAS CAMARÃO EM RIPADO DE MADEIRA
BEIRAL COM REVESTIMENTO P06
3,70
REVESTIMENTO V02
3,70
BRISE EM MADEIRA
GUARDA-CORPO EM VIDRO
NOTAS PROJETO:
- PORTAS PISO-FORRO, - PARA ESPECIFICAÇÃO - PARA REVESTIMENTOS - PARA ACABAMENTOS - PARA ELETRODOMÉST
ESCADA ACESSO FIREPLACE
- CONFERIR MEDIDAS N - MEDIDAS E NÍVEIS EM - MEDIDAS E NÍVEIS ACA - NÃO TIRAR MEDIDAS C - QUALQUER DIFERENÇA - NÃO ALTERAR ESTE PR - CONSIDERAR NÍVEL 0.
0,00 -0,13
PARA UM
-1,36
R03
09.06.2021
REVISÃO G
R02
29.01.2021
REVISÃO G
R01
24.11.2020
REVISÃO G
R00
10.11.2020
EMISSÃO I
REV.
8
DATA
CLIENTE
ADRIANA E RAFAEL LOCAL
ELEVAÇÃO 04 ESC:1:50
Lote 04, quadra F3 - C Baroneza - Fase 2 - Bra FASE DO PROJETO
ARQUIV
LEGENDA DE ACABAMENTOS
HOUSING
02
02
PISOS SIMB
1,805 1,305
0,50
DESCRIÇÃO
P01
0,30
1,10
a
BOX - VIDRO FIXO
V05 | CIMENTO QUEIMADO
+3,69
F03 | FORRO DE GESSO
M05 | MISTURADOR DE MESA
F03 | FORRO DE GESSO
0,31
BANHO 02 5,77 m2 PD:2,70 m
0,31
0,60
1,35
F03 | FORRO DE GESSO
PISO GRANITO CACÃO
Luxury House 07.2020 - now Status: Under Construction
20 A
M02 | CHUVEIRO DE PAREDE
PISO EM ASSOALHO DE MADEIRA DE DEMOLIÇÃO EM TÁBUAS
P03
PISO DECK CUMARU EM TÁBUAS
P04
PISO PORCELANATO 60x60
P05
PISO PARA ACESSO DE VEÍCULOS - VER PROJETO DE PAISAGISMO
P06
ACABAMENTO EM CHAPA DE ALUMÍNIO - PINTURA CORTÉN
P07
GRAMA SINTÉTICA SOBRE LAJE IMPERMEABILIZADA
P08
PISO EM GRANITO SIENA APICOADO
P09
PISO PORCELANATO REFINE CERAMICHE, MODELO BLOCK, COR MIST
M02 | CHUVEIRO DE PAREDE A01 | PAPELEIRA 1,25
BC01 | BANCADA ESCULPIDA
2,71 0,30
0,02
1,00
1,10 0,50
M07 | REGISTRO DE GAVETA
FORRO DE GESSO ACARTONADO COM TABICA, PREPARADO PARA RECEBER PINTURA LÁTEX ACRÍLICO COR BRANCO FOSCO
F04
LAJE EM CONCRETO COM PINTURA
F05
FORRO PARA SAUNA SECA
0,40
SANCA EM MADEIRA
PAREDES SIMB
M24 | RALO OCULTO
DESCRIÇÃO ACABAMENTO EM PINTURA TEXTURIZADA MINERAL TERRACOR
V01
3,67
3,69
FORRO RIPAS DE MADEIRA (FORRO VAZADO COM ILUMINAÇÃO DA CLARABÓIA) DE ACORDO COM AMOSTRA
F03
1,60
0,20
R4 | RODPÉ EMBUTIDO
FORRO RIPAS DE MADEIRA DE ACORDO COM AMOSTRA
F02
SANCA EM GESSO ACARTONADO
R03 | RODAPÉ EMBUTIDO
R03 | RODAPÉ EMBUTIDO
0,25
3,69
0,18 0,40
0,85 0,65
0,96
0,20
0,17
0,50
M14 | SIFÃO FIXO
0,25
0,08
0,48
0,65
0,85
0,40
1,05
0,45
M07 | REGISTRO DE GAVETA
V05 | CIMENTO QUEIMADO
A04 | TOALHEIRO 40 CM M14 | SIFÃO FIXO
+3,67 R03
1,00
0,30
NICHO
BC01 | BANCADA ESCULPIDA
0,03
03
NICHO
0,40
M05 | MISTURADOR DE MESA
1,105
DESCRIÇÃO
F01 A03 | TOALHEIRO 60 CM
2,71
2,71
L01 | BACIA COM CAIXA ACOPLADA 0,70
SIMB
V05 | CIMENTO QUEIMADO
L02 | BIDÊ COM 3 FUROS
1,10
P01 F03 V05 R04
05
BASE EM ALVENARIA
TETOS
ESPELHO COM MOLDURA
M09 | MISTURADOR PARA BIDÊ
1,25
0,80
3,20
01
3,67
ACABAMENTO EM PEDRA MOLEDO COM JUNTA SECA
V02
ACABAMENTO PINTURA EXTERNA TEXTURIZADA MINERAL A DEFINIR
V03 0,50
PLANTA ESC:1:20
0,115
0,115
2,00
PAINEL EM MADEIRA A DEFINIR
V04
2,23
ACABAMENTO EM CIMENTO QUEIMADO COR A DEFINIR
V05
VISTA 01 ESC:1:20
VISTA 03 ESC:1:20
VISTA 02 ESC:1:20
ACABAMENTO PINTURA ACRÍLICA PARA ÁREAS MOLHADAS
V06
ACABAMENTO PINTURA ACRÍLICA BRANCA
V07
ACABAMENTO EM PORCELANATO 60x60
V08
ACABAMENTO SAUNA SECA
V09
02
02
01
P02
ACABAMENTO PISCINA EM GRANITO SIENA APICOADO COM IMPERMEABILIZANDO HIDROFUGANTE
V10
1,805
ACABAMENTO EM MÁRMORE A DEFINIR COM IMPERMEABILIZANTE
V11
SIMB
F03 | FORRO DE GESSO
BANHO 02 5,77 m2 PD:2,70 m
F03 | FORRO DE GESSO
A03 | TOALHEIRO 60 CM
1,115
3,20
+3,69
V05 | CIMENTO QUEIMADO
R03 - RODAPÉ EM GRANITO SIENA APICOADO 7cm COM PERFIL EM ALUMÍNIO, H=1" X L=3/4", (ACABADO COM PISO FICARÁ 3/4" X 3/4"), PINTURA CINZA NO PERFIL
R04
R04 - RODAPÉ EM GRANITO SIENA APICOADO 5cm COM PERFIL EM ALUMÍNIO, H=1" X L=3/4", (ACABADO COM PISO FICARÁ 3/4" X 3/4"), PINTURA CINZA NO PERFIL
R05
RODAPÉ (PISO PORCELANATO H=10cm)
R06
RODAPÉ PORCELANATO REFINE CERAMICHE, MODELO BLOCK, COR MIST
CÓD.
DESCRIÇÃO
BC01
BANCADA ESCULPIDA EM GRANITO SIENA APICOADO COM IMPERMEABILIZANTE NAS 6 FACES. MEDIDAS CONFORME PROJETO
BOX - VIDRO FIXO
2,51
2,73 0,40
NICHO
L02 | BIDÊ COM 3 FUROS
0,20
BOX - VIDRO FIXO
0,18
1,60
RALO LINEAR OCULTO
+3,67
0,02
0,32
BC01 | BANCADA ESCULPIDA
L01 | BACIA COM CAIXA ACOPLADA
03
GAVETA
0,40
PRATELEIRA RIPADA
0,65
0,85
0,96
A01 | PAPELEIRA 1,00
R04 | RODAPÉ EMBUTIDO 3,67
R03 | RODAPÉ EMBUTIDO
0,25
0,95
R2 - RODAPÉ INVERTIDO (EMBUTIDO NA PAREDE), COM PERFIL EM ALUMÍNIO, H=1" X L=3/4", (ACABADO COM PISO FICARÁ 3/4" X 3/4"), PINTURA MARROM
R03
2,71
05
0,10
R1 - RODAPÉ INVERTIDO (EMBUTIDO NA PAREDE), COM PERFIL EM ALUMÍNIO, H=1" X L=3/4", (ACABADO COM PISO FICARÁ 3/4" X 3/4"), PINTURA CINZA
R02
ACABAMENTOS DE BANCADA
A03 | TOALHEIRO 60 CM
0,90
01
DESCRIÇÃO
R01
V05 | CIMENTO QUEIMADO
1,33
0,15
0,20
OCULTO
RALO 0,15 LINEAR
1,35
0,525
RODAPÉS
3,69
3,69
LEGENDA DE ACABAMENTOS 0,50
PLANTA DE PISO ESC:1:20
PISOS
VISTA 04 ESC:1:20
SIMB
VISTA 05 ESC:1:20
DESCRIÇÃO
P01
PISO GRANITO CACÃO
P02
PISO EM ASSOALHO DE MADEIRA DE DEMOLIÇÃO EM TÁBUAS
P03
PISO DECK CUMARU EM TÁBUAS
P04
PISO PORCELANATO 60x60
P05
PISO PARA ACESSO DE VEÍCULOS - VER PROJETO DE PAISAGISMO
P06
ACABAMENTO EM CHAPA DE ALUMÍNIO - PINTURA CORTÉN
P07
GRAMA SINTÉTICA SOBRE LAJE IMPERMEABILIZADA
P08
PISO EM GRANITO SIENA APICOADO
P09
PISO PORCELANATO REFINE CERAMICHE, MODELO BLOCK, COR MIST
A
2,00 0,02
SIMB
0,745
0,50 2,00
2,71
2,71
0,40
DETALHE BANCADA | PLANTA TAMPO ESC:1:10
NOTAS PROJETO:
FORRO RIPAS DE MADEIRA (FORRO VAZADO COM ILUMINAÇÃO DA CLARABÓIA) DE ACORDO COM AMOSTRA
F03
FORRO DE GESSO ACARTONADO COM TABICA, PREPARADO PARA RECEBER PINTURA LÁTEX ACRÍLICO COR BRANCO FOSCO
F04
LAJE EM CONCRETO COM PINTURA
- PORTAS PISO-FORRO, SALVO INDICAÇÃO EM PLANTA; - PARA ESPECIFICAÇÃO LOUÇAS E METAIS, VERIFICAR MEMORIAL LOUÇAS E METAIS; - PARA REVESTIMENTOS, VERIFICAR MEMORIAL DESCRITIVO; - PARA ACABAMENTOS MARCENARIA, VERIFICAR PLANTA DE ACABAMENTOS; - PARA ELETRODOMÉSTICOS E EQUIPAMENTOS, VERIFICAR PLANILHA ESPECÍFICA;
F05
FORRO PARA SAUNA SECA SANCA EM MADEIRA
PROJ. ALVENARIA ACABADA
SANCA EM GESSO ACARTONADO
PAREDES PROJEÇÃO SIFÃO
SIMB
M24 | RALO OCULTO 0,60
0,50
V01
0,50
3,67 V02 CUBA ESCULPIDA V03
BAGUETE EM PEDRA PARA ARREMATE ASSOALHO NO DESNÍVEL BOX
0,01
BANHO
GAVETA
2,23 PERFIL "L" EM ALUMÍNIO PINTURA MARROM, PARA ARREMATE ENTRE PISOS
0,02
ALVENARIA
ASSOALHO DE MADEIRA/GRANITO
GAVETA
PISO DE MADEIRA SUÍTES
VISTA 02 ESC:1:20
0,025
PISO EM PEDRA CIRCULAÇÃO
PISO DE MADEIRA
0,68
0,015
0,68 0,01 VISTA 0,02 03 2,00 ESC:1:20 DETALHE BANCADA | PLANTA MARCENARIA ESC:1:10 0,56
5
V06 V07 V08 V09
CONTRAPISO
CONTRAPISO
V11
ACABAMENTO EM PINTURA TEXTURIZADA MINERAL TERRACOR
CONTRAPISO
ACABAMENTO PINTURA EXTERNA TEXTURIZADA MINERAL A DEFINIR
0,50
SIMB
DETALHE 02 ESCALA 1:2 BAGUETE EM PEDRA - DESNÍVEL BOX - BANHO CASAL
DETALHE 03 ESCALA 1:2 *PINTAR PERFIL NA COR MARROM ONDE FOR F03 | ASSOALHO DE DE MADEIRA E NA COR CINZA ONDE FOR FORRO GRANITO GESSO
DETALHE 04 MADEIRA X PEDRA - SUÍTES ESCALA 1:2
ACABAMENTO EM CIMENTO QUEIMADO COR A DEFINIR ACABAMENTO PINTURA ACRÍLICA PARA ÁREAS MOLHADAS ACABAMENTO PINTURA ACRÍLICA BRANCA ACABAMENTO EM PORCELANATO 60x60 ACABAMENTO SAUNA SECA ACABAMENTO PISCINA EM GRANITO SIENA APICOADO COM IMPERMEABILIZANDO HIDROFUGANTE ACABAMENTO EM MÁRMORE A DEFINIR COM IMPERMEABILIZANTE
DESCRIÇÃO
R01
R1 - RODAPÉ INVERTIDO (EMBUTIDO NA PAREDE), COM PERFIL EM ALUMÍNIO, H=1" X L=3/4", (ACABADO COM PISO FICARÁ 3/4" X 3/4"), PINTURA CINZA
R02
R2 - RODAPÉ INVERTIDO (EMBUTIDO NA PAREDE), COM PERFIL EM ALUMÍNIO, H=1" X L=3/4", (ACABADO COM PISO FICARÁ 3/4" X 3/4"), PINTURA MARROM
1,33
R03
R03 - RODAPÉ EM GRANITO SIENA APICOADO 7cm COM PERFIL EM ALUMÍNIO, H=1" X L=3/4", (ACABADO COM PISO FICARÁ 3/4" X 3/4"), PINTURA CINZA NO PERFIL
R04
R04 - RODAPÉ EM GRANITO SIENA APICOADO 5cm COM PERFIL EM ALUMÍNIO, H=1" X L=3/4", (ACABADO COM PISO FICARÁ 3/4" X 3/4"), PINTURA CINZA NO PERFIL
R05
RODAPÉ (PISO PORCELANATO H=10cm)
R06
RODAPÉ PORCELANATO REFINE CERAMICHE, MODELO BLOCK, COR MIST
2,00
28.05.2021
REVISÃO GERAL
R00
10.11.2020
EMISSÃO INICIAL
CP CP
DATA 21.05.2021
DESENH.
DESCRIÇÃO
CLIENTE
ADRIANA E RAFAEL HAWILLA
A03 | TOALHEIRO 60 CM
Lote 04, quadra F3 - Condomínio Quinta da Baroneza - Fase 2 - Brangança Paulista - SP
CÓD.
DESCRIÇÃO
BC01
BANCADA ESCULPIDA EM GRANITO SIENA APICOADO COM IMPERMEABILIZANTE NAS 6 FACES. MEDIDAS CONFORME PROJETO
ARQUIVO
FASE DO PROJETO
PROJETO EXECUTIVO COORDENADOR
ACABAMENTOS DE BANCADA
A03 | TOALHEIRO 60 CM 1,115
R01
REV.
LOCAL
F03 | FORRO DE GESSO
V05 | CIMENTO QUEIMADO
V05 | CIMENTO
PARA UMA PERFEITA E CLARA LEITURA DO DESENHO, PLOTAR SEMPRE COLOR
PAINEL EM MADEIRA A DEFINIR
RODAPÉS
LAJE
- CONFERIR MEDIDAS NO LOCAL; - MEDIDAS E NÍVEIS EM METROS, SALVO INDICAÇÃO; - MEDIDAS E NÍVEIS ACABADOS ; - NÃO TIRAR MEDIDAS COM RÉGUA OU ESCALÍMETRO; - QUALQUER DIFERENÇA ENTRE PROJETO E EXECUÇÃO, CONSULTAR ARQUITETURA; - NÃO ALTERAR ESTE PROJETO SEM PRÉVIA AUTORIZAÇÃO DO ARQUITETO RESPONSÁVEL; - CONSIDERAR NÍVEL 0.00 NA COTA 694.70 DO LEVANTAMENTO TOPOGRÁFICO
ACABAMENTO EM PEDRA MOLEDO COM JUNTA SECA
CONTRAPISO
DETALHE BANCADA | PLANTA PRATELEIRA ESC:1:10 GSPublisherVersion 0.8.100.12
5
V10
PISO EM PEDRA
0,20
DETALHE 01 - RALO INVISÍVEL BANHOS ESCALA 1:2
V04 V05
FOLHA DA PORTA EM MADEIRA
PERFIL EM ALUMÍNIO 1" x 3/4 ", PINTURA MARROM/CINZA
0,02
0,02 0,01
0,03
ALVENARIA
0,01
0,115
2,00
ACABAMENTO
VISTA 01 ESC:1:20
0,10
PERFIL METÁLICO NA PAREDE PARA ARREMATE PEDRA X TEXTURA E FIXAÇÃO DO VIDRO FIXO
0,115
PERFIL METÁLICO NA PAREDE PARA ARREMATE PEDRA X TEXTURA E FIXAÇÃO DO VIDRO FIXO
PERFIL METÁLICO NA PAREDE PARA ARREMATE PEDRA X TEXTURA E FIXAÇÃO DO VIDRO FIXO 0,01
PROJEÇÃO PORTA DE VIDRO DE CORRER
0,02
0,50
ANTA :1:20
DESCRIÇÃO
0,60
0,55
3,67
3,69
FORRO RIPAS DE MADEIRA DE ACORDO COM AMOSTRA
F02
GAVETAS E FECHAMENTO EM MADEIRA A DEFINIR
1,00
1,00
1,10
0,50
PRATELEIRA EM MADEIRA A DEFINIR R03 | RODAPÉ EMBUTIDO
1,10
0,02 0,65
R03 | RODAPÉ EMBUTIDO
0,25
0,25
R4 | RODPÉ EMBUTIDO
M07 | REGISTRO DE GAVETA
V05 | CIMENTO QUEIMADO
1,60
0,40
NICHO
A04 | TOALHEIRO 40 CM M14 | SIFÃO FIXO
VISTA FRONTAL ESC:1:10
0,40
0,20
0,18
DETALHE BANCADA |
DESCRIÇÃO
F01
A03 | TOALHEIRO 60 CM
ADRIANA
ARH-ARQ-PE-402-R01
COLABORADOR
CAROLINA P.
FORMATO
FOLHA A0
r jerônimo da veiga, 164, sala 12A itaim SP 11 3078 0607 www.triplexarquitetura.com.br ASSUNTO
FOLHA
REVISÃO
R01
LIBERADO PARA
AM 03 | AMPLIAÇÃO BANHO 02
9
ESCALA
402
1:20, 1:50, 1:10, 1:2
© Copyright. Todos os Direitos Reservados. Leis nº 5988/73, nº 5194/66 e nº 6619/78.
0,50
0,31
0,10
0,755
2,005
0,85
0,96
0,50
TETOS
NICHO 0,30
0,30 0,03
BASE EM ALVENARIA
BANCADA E CUBA EM PEDRA 0,08
0,20
0,01
M07 | REGISTRO DE GAVETA V05 | CIMENTO QUEIMADO M14 | SIFÃO FIXO BC01 |
0,02
L01 | BACIA COM CAIXA ACOPLADA
BC01 | BANCADA ESCULPIDA
0,17
M05 | MISTURADOR DE MESA
M02 | CHUVEIRO DE PAREDE
ESPELHO COM MOLDURA
M07 | REGISTRO DETALHE BANCADA |DE GAVETA CORTE BB ESC:1:10 M14 | SIFÃO FIXO
0,40
0,20
GAVETA
BANCADA ESCULPIDA
M05 | MISTURADOR DE MESA
0,85
FIXO
L02 | BIDÊ COM 3 FUROS
0,65
PEFIL EM AÇO INOX PARA FRONTÃO EMBUTIDO
0,41
M14 | SIFÃO FIXO
0,17
0,02
M09 | MISTURADOR PARA BIDÊ
GAVETA
0,05
2,71 0,48
Inc = 1%
1,25
Inc = 1%
M07 | REGISTRO DE GAVETA
3,69
0,02
0,025 A01 | PAPELEIRA
M07 | REGISTRO DE GAVETA
DETALHE BANCADA | CORTE AA ESC:1:10
0,01
PONTO ÁGUA QUENTE E FRIA ATRÁS DA BANCADA
PROJ. ALVENARIA ACABADA
PAREDE
0,20
TAMPA EM PEDRA
A
B
F03 | FORRO DE GESSO
BANCADA EM PEDRA M02 | SEMCHUVEIRO SAIA DE
0,03
GAVETAS EM LÂMINA DE MADEIRA A DEFINIR M14 | SIFÃO FIXO
V05 | CIMENTO QUEIMADO 0,32
0,04
GAVETA
PERFIL EM AÇO INOX PARA FRONTÃO EMBUTIDO
1,25
0,20
0,18
0,02
BC01 | BANCADA ESCULPIDA
M05 | MISTURADOR DE MESA
0,14
0,31
PERFIL EM AÇO INOX PARA FRONTÃO EMBUTIDO
M05 | MISTURADOR DE MESA M05 | MISTURADOR DE PEFIL EM AÇO INOX MESA PARA FRONTÃO EMBUTIDO BOX - VIDRO FIXO
0,50 F03 | FORRO DE GESSO
0,50 M05 | MISTURADOR DE MESA
0,695
0,60
0,995
0,32
0,705
1,005
F03 | FORRO DE GESSO
04
03
09
11
05
07
06
04
b
20A
0,845
20A
0,55
02
02
0,98
COZINHA ±0,00
22,44 m2 PD:2,60 m 2,68
F03 | FORRO DE GESSO
0,02
0,99
0,02
0,99
0,02
0,27 0,02
PRATELEIRA
0,99
0,02
Aterramento
Para sua segurança, ligue corretamente o aterramento do seu produto. A conexão incorr pode resultar em acidentes com fogo, choque elétrico ou outros danos pessoais. Se o local n possuir um aterramento, providencie, consulta um eletricista de sua confiança. Verifique se a tensão da rede elétrica no local de instalação a mesma indicada na etiqueta fixada próxima ao plugue do cabo de alimentação do seu produto. O produto deve ser ligado em uma tomada elétrica adequada e em bom estado. A tensão admissível na rede elétrica de sua residência deve estar dentro da faixa indicad na tabela a seguir:
FRONTÃO EM QUARTZO
M18 | MISTURADOR MONOCOMANDO DE MESA
M18 | MISTURADOR MONOCOMANDO DE MESA 2,60
0,78
M19 | CUBA DUPLA
2,60
0,42
1,38
1,38 NICHOS ILUMINADOS
M18 | MISTURADOR MONOCOMANDO DE MESA 2,60
PRATELEIRA
0,90 0,275 0,02
0,90
0,275 0,02
PRATELEIRA
0,27 0,02
MI 220
EQ03 | FILTRO DE ÁGUA
R04
V06
3,055 0,15
PRATELEIRA
0,02
0,70
FRONTÃO EM QUARTZO
0,02
F03
V06 | PINTURA PARA ÁREAS MOLHADAS
1/5
F03 | FORRO DE GESSO
10 P01
1/5
0,295 0,02
4,785
1,235 2,30
RALO LINEAR OCULTO
±0,00 MLL
GL
GL
TR
FO 220
1/5
10 01
10
0,30
BC02 | BANCADA EM QUARTZO
GAVETA
GAVETA
GAVETA
GAVETA
GAVETA
0,01
GAVETA
Tensão do produto 127 V 220 V 0,51
GAVETA
0,92
PRATELEIRA
PRATELEIRA
PRATELEIRA
Conecte o aterramento do produto à um terra efetivo.
a
R03 0,53
0,02
5
0,10
0,48
0,48
0,48
0,96
0,10
0,02
2,405
0,65
Risco de Choque Elétrico
0,10
0,10
b
0,10
0,00 0,10
0,00
Limites de tensão de 104 a 140 V de 198 a 242 V
0,28 0,02
1,02
PRATELEIRA 0,28 0,02
BASE EM ALVENARIA H=10cm
GAVETA
1,02
1,70
0,02 0,92
0,46
M17 | SIFÃO DE COZINHA / TANQUE
PRATELEIRA
GAVETA
GAVETA
0,02
20A
0,10
0,02
GAVETA
1,22
GAVETA
GAVETA
0,46
GAVETA
A07 | LIXEIRA DE EMBUTIR
0,82 0,92
PRATELEIRA
1,02
GAVETA
0,02
0,815
R03 | RODAPÉ EM GRANITO COM BUNHA
GAVETA
1,02
0,53
0,46
08
3,64
0,85
0,53
0,82
1,15
0,92
0,90
0,26 0,02
1,35
1,40
0,65
FG 220
0,02
0,02
08
1,22
BC02 | BANCADA EM QUARTZO
0,30
CF
2,125
0,76
TE
0,76
0,80
0,525
1/5
2,00
1,96
TR
BASE EM ALVENARIA H = 10cm
0,78
01
0,27 0,02
GL
GL
BASE EM ALVENARIA H = 10cm
2,60
TR
2,66
0,02
22,44 m2 PD:2,60 m
0,645
1,78
FI
1,195
água e esgoto filtro
COZINHA
1,98
03
09
06
05
0,65
a
07
1,845
0,56
11
3,055 0,65
0,02
0,61
0,465
0,02
0,465
0,02
0,02
0,465
0,02
0,93
0,02
0,10
0,02
0,53
Não remova o aterramento do produt
0,65
Não use adaptadores e/ou extensõe
PLANTA ESC:1:20
VISTA 02 Não seguir estas instruções pode trazer risco de vida, incêndio ou ESC:1:20 choque elétrico.
VISTA 01 ESC:1:20
PLANTA PISO ESC:1:20
Importante • Nunca conecte o seu produto através de T’s e/ou adaptadores com outro eletrodoméstico na mesma tomada. Não use extensões. Este tipo de ligação pode provocar sobrecarga na rede elétrica, prejudicando o funcionamento do seu produto e resultando em acidentes com fogo. Use uma tomada exclusiva.
• Em caso de oscilação na tensão
da rede elétrica, instale um estabilizador automático de voltagem com potência mínima de 1000 Watts, entre o produto e a tomada.
1/6
1/6
1/6
0,70
0,17
0,865
0,02
0,02
0,865
0,02
0,02
0,70
0,02
0,67
0,02
2,68
0,15
0,02
0,50
0,02
0,27 0,02
0,57
0,28 0,02
0,02
0,29 0,02
PRATELEIRA EQ03 | FILTRO DE ÁGUA
0,78
2,60 1,99
0,02
0,02
0,04
0,60
A07 | LIXEIRA DE EMBUTIR
0,46
GAVETA PRATELEIRA
0,92
GAVETA GAVETA
BASE EM ALVENARIA H=10cm
PRATELEIRA
0,02 0,28
0,80 0,66 0,02
GAVETA
ÁREA PARA GELADEIRAS
0,02
0,10
0,10 0,545
0,55
0,285
0,65
VISTA 06 ESC:1:20
VISTA 05 ESC:1:20
VISTA 04 ESC:1:20
F03 | FORRO DE GESSO
0,08
2,26
0,57 0,02 2,60
0,78
2,60
FRONTÃO EM QUARTZO
0,10
GAVETA
0,05 GAVETA
0,25
0,92
0,79
0,25
0,92
0,77
0,40
GAVETÃO
GAVETA
GAVETA
0,92 0,82
GAVETA
GAVETA
ÁREA PARA GUARDAR BANCOS
0,14 0,13
GAVETA
0,25
GAVETA
GAVETA
0,92
GAVETA
GAVETA
GAVETÃO
M24 | RALO OCULTO
0,25
GAVETA
0,02
0,14 0,13
GAVETA INTERNA
0,17
0,82
0,40
0,16
0,05
0,02
1,96
0,07 0,08
0,74 0,90
0,08
0,10
0,02
0,53
0,02
0,65
0,08
1/4
1/4
1/4 2,30
VISTA 08 ESC:1:20
1/4
0,08
0,02
0,08
0,57 0,65
VISTA 09 ESC:1:20
0,44
0,02 0,90
0,44
0,10
0,10
0,10
0,00 0,10
BASE EM ALVENARIA H=10cm
0,02 0,65
VISTA 07 ESC:1:20
ÁREA PARA GUARDAR LIVROS
0,10 0,53
2,30
ÁREA PARA GUARDAR LIVROS
0,10
GAVETA
0,10
0,10
0,10 0,02 0,65
M18 | MISTURADOR MONOCOMANDO DE MESA
M18 | MISTURADOR MONOCOMANDO DE MESA
0,30 0,92
GAVETA
0,02 0,40 0,05
EQ02 | GELADEIRA SIDE INVERSE
GAVETA
0,33
0,68
GAVETA
0,02
0,03 0,165 0,165 0,165 0,165
0,92
FORNO EMBUTIDO
0,00
0,55
EQ02 | GELADEIRA SIDE INVERSE
0,41
EQ01 | COOKTOP À GÁS
TAMPO EM MADEIRA MACIÇA IMPERMEABILIZADA
0,64 0,05 0,77
0,04 0,02 0,46
FECHAMENTO EM MARCENARIA
0,02 0,26
PRATELEIRA
0,92
0,02
M17 | SIFÃO DE COZINHA / TANQUE
0,90
EQ12 | MICROONDAS DE EMBUTIR MICROONDAS EMBUTIDO
EQ11 | FORNO DE EMBUTIR
BC02 | BANCADA EM QUARTZO
M20 | CUBA SIMPLES
0,65
PRATELEIRA
0,03
0,07 1,21
2,60
TAMPO EM MADEIRA MACIÇA IMPERMEABILIZADA
0,01 0,02
0,02 0,78
2,60
M18 | MISTURADOR MONOCOMANDO DE MESA
0,92
0,02
EQ08 | EXAUSTOR DE ILHA
PRATELEIRA
0,47
PRATELEIRA
0,02
0,02
F03 | FORRO EM GESSO
0,57
0,61
0,27 0,02 0,90
0,275 0,02 0,295
PRATELEIRA
10
PRATELEIRA
PRATELEIRA
F03 | FORRO DE GESSO
PRATELEIRA
GSPublisherVersion 0.8.100.12
PRATELEIRA
PRATELEIRA
0,10 0,10
0,08
0,02
F03 | FORRO DE GESSO
M12 | REGISTRO DE GAVETA
0,02 0,78
0,04 0,02 0,26
PRATELEIRA
GAVETA
PRATELEIRA
NICHO FMICROONDAS EMBUTIDO
0,02 0,02
1,02
PRATELEIRA
GAVETA
PRATELEIRA
NICHO FORNO EMBUTIDO
0,46
1,35
GAVETA
1,40
VISTA 03 ESC:1:20
2,60
0,595 1,96
GAVETA
PRATELEIRA
0,05
EQ03 | FILTRO DE ÁGUA
0,05 R03 | RODAPÉ EM GRANITO COM BUNHA
PRATELEIRA
0,45
0,455
0,02
NICHO ILUMINADO
0,57
PRATELEIRA
0,165 0,165 0,165 0,165
0,82
0,02
0,10 0,865
0,02
0,00
0,10
0,53
0,375
0,045 0,02 0,045
0,02
0,055
2,60 0,30 0,01
GAVETÃO
0,92
0,76
TEMPEROS
1,02
GAVETA LIXO
TEMPEROS
0,69
0,70
0,02 0,26
0,60
0,70
PRATELEIRA
1,02
GAVETÃO PRATELEIRA
EQ11 | FORNO DE EMBUTIR
0,05
0,07
0,02 0,02
0,02
GAVETA INTERNA
0,46
NICHO LAVA LOUÇA
0,00
0,10
0,10 1/6
PRATELEIRA M17 | SIFÃO DE COZINHA / TANQUE
BASE EM ALVENARIA H=10cm
0,00
1/6
0,92
0,82
GAVETÃO
1/6
BC02 | BANCADA EM QUARTZO M19 | CUBA DUPLA
M16 | REGISTRO DE GAVETA
LIXEIRA 1,02
GAVETA TEMPEROS
0,40
0,70 R03 | RODAPÉ EM GRANITO COM BUNHA
M18 | MISTURADOR MONOCOMANDO DE MESA
0,02
2,60 0,30 0,02
GAVETÃO
0,90
0,40
GAVETA INTERNA
0,78
0,055
1,38
1,38
EQ01 | COOKTOP À GÁS
FRONTÃO EM QUARTZO
0,02
PRATELEIRA
EQ01 | COOKTOP À GÁS
BC02 | BANCADA EM QUARTZO
0,49
EQ02 | GELADEIRA SIDE INVERSE
EQ12 | MICROONDAS DE EMBUTIR
M18 | MISTURADOR MONOCOMANDO DE MESA
0,485
0,64
EQ02 | GELADEIRA SIDE INVERSE
0,495
0,49
0,92
F03 | FORRO DE GESSO EQ08 | EXAUSTOR DE ILHA
EQ08 | EXAUSTOR DE ILHA
0,40
0,415
0,78
0,27 0,02
0,40
0,02
0,90
1,96
0,275 0,02
0,80
0,275 0,02
F03 | FORRO DE GESSO
F03 | FORRO DE GESSO
0,10
0,55 0,65
VISTA 10 ESC:1:20
01
HOUSING Luxury House 07.2020 - now Status: Under Construction
0,45
1,60
1,60
0,03
PRATELEIRA
1,60
1,60
0,40
0,03
PRATELEIRA
PAINEL RIPAS DE MADEIRA
PAINEL RIPAS DE MADEIRA
1,05
2,70
PAINEL RIPAS DE MADEIRA
ILUMINAÇÃO INDIRETA NA CABECEIRA SUPORTE CABECEIRA PARA LED 0,52
SUPORTE CABECEIRA PARA LED 0,58
0,06
CABECEIRA EM PALHA CAMA KING
MESA DE CABECERIA EMBUTIDA
1,10
0,06 GAVETA
GAVETA
GAVETA
0,10
GAVETA
0,08
GAVETA
0,15
CAMA KING
MESA DE CABECERIA EMBUTIDA
0,15
0,02
1,10
0,18
0,16
CABECEIRA EM PALHA
0,37
MESA DE CABECEIRA EMBUTIDA NA MARCENARIA
0,34
0,34
ACESSO A TOMADA
0,52
0,61
0,75
0,07
0,37
0,58 0,14
0,50
GAVETA
1,10
CABECEIRA EM PALHA 0,62
VISTA 02 ESC:1:20
VISTA 01 ESC:1:20
VISTA 02 SEM PORTAS ESC:1:20 +6,83 2 COBERTURA
0,45
0,03 0,43
0,40
0,40
0,43
0,03
0,03 0,40
1,60
PRATELEIRA ILUMINADA - VER DETALHE PROJ. LUMINOTÉCNICO
PRATELEIRA
PRATELEIRA
PRATELEIRA ILUMINADA - VER DETALHE PROJ. LUMINOTÉCNICO
PRATELEIRA 0,03
0,03
0,03
PRATELEIRA
1,05
ACESSO A TOMADA NA MARCENARIA
1,80 GAVETA
GAVETA
GAVETA
GAVETA
GAVETA
GAVETA
GAVETA
0,75
GAVETA
GAVETA
GAVETAS COM ACABAMENTO EM PALHA
GAVETA
GAVETA
GAVETA
GAVETA
GAVETA
GAVETA
GAVETA
GAVETA
GAVETA
GAVETA
GAVETA +3,70 1 PAV SUPERIOR
0,07
0,17
0,45 0,02
GAVETA
GAVETA
0,17
0,16
GAVETA
0,02
GAVETA
0,02 0,12
1,80 0,14 0,16
GAVETA
0,45
0,75
GAVETA
0,45
0,34
0,06
ACESSO PARA TOMADA
0,225
GAVETA
0,225
0,18 0,12
0,16
1,10
GAVETA
0,02 0,16 0,12
0,62
0,02 0,12
0,58
CABECEIRA EM PALHA
MESA DE CABECEIRA EMBUTIDA NA CABECEIRA
0,205 0,00 0,225
ILUMINAÇÃO INDIRETA NA CABECEIRA
1,05
1,05
2,70
PAINEL RIPAS DE MADEIRA
VISTA 04 SEM PORTAS ESC:1:20
0,04
0,04 0,64
0,02
0,02
0,97
0,97 0,02
1,90
0,02
VARÃO
0,97
0,48
0,97
1,40
0,97
0,48
0,255
GAVETA
0,02
GAVETA
0,04
0,02
0,10
VARÃO 0,02
a
VARÃO
0,02
0,02
c
0,43
1,90
0,02
0,445
GAVETA
GAVETA
0,72
0,02
VARÃO
0,50
b
0,43
VARÃO 1,40
PRATELEIRA
PRATELEIRA 0,02
0,02 0,13
USB
0,02 0,43 0,02
USB
CANALETA PARA TOMADAS E USB
0,02
PRATELEIRA
0,50
VARÃO
VARÃO
0,97
VARÃO
CANALETA PARA TOMADAS E USB
PRATELEIRA
PRATELEIRA 0,02
PRATELEIRA
0,64
0,04
VISTA 04 ESC:1:20
0,64
VISTA 03 ESC:1:20
05 1,435
GAVETA
1,935
06
VISTA 05 ESC:1:20
07
CLOSET
0,02
0,67
0,02
0,67
0,02
0,64 VARÃO
PRATELEIRA
PRATELEIRA
0,02
0,355
PRATELEIRA
VARÃO
PARA UMA PERF PL
PRATELEIRA
PRATELEIRA
PRATELEIRA
PRATELEIRA
GAVETA
GAVETA
GAVETA
GAVETA
GAVETA
GAVETA
GAVETA
GAVETA
0,97
PRATELEIRA
2,70
0,02
PRATELEIRA
c a
0,04
1,96
0,02 VARÃO
VARÃO
0,97
0,355 0,04
0,74
0,97
0,02
VARÃO
EMISSÃO INICIAL
R00
REV.
DATA
0,02
PRATELEIRA
CLIENTE
0,02
0,04 0,04
b
PLANTA ESC:1:20
PRATELEIRA
VARÃO
0,01 0,03 0,03 0,03 0,01 0,16 0,16 0,16 0,16 0,02
0,05
PRATELEIRA
0,04
0,02 0,07
0,02
0,48 0,50
PRATELEIRA
0,355
0,97 0,13 0,02
PRATELEIRA
0,355
VARÃO
0,02
0,72 0,465
GAVETA
0,02 0,43 0,02
0,02
PRATELEIRA
0,02
0,02
0,255
GAVETA
USB
PLANTA ESC:1:20
PRATELEIRA 0,02
0,64
0,02 0,10
PRATELEIRA
b
0,43
GAVETA
0,02
CANALETA PARA TOMADAS E USB c
0,58 0,62
- CONFERIR MEDIDAS NO LOCAL; - MEDIDAS E NÍVEIS EM METROS, SA - MEDIDAS E NÍVEIS ACABADOS ; - NÃO TIRAR MEDIDAS COM RÉGU - QUALQUER DIFERENÇA ENTRE PR - NÃO ALTERAR ESTE PROJETO SEM - CONSIDERAR NÍVEL 0.00 NA COT
0,04
PRATELEIRA
0,355
PRATELEIRA
0,04
0,46
20,21 m2 PD:2,70 m
a
0,02
- PORTAS PISO-FORRO, SALVO IND - PARA ESPECIFICAÇÃO LOUÇAS E - PARA REVESTIMENTOS, VERIFICAR - PARA ACABAMENTOS MARCENA - PARA ELETRODOMÉSTICOS E EQU
VISTA 06 ESC:1:20
4,66 m2 PD:2,70 m
03
SUÍTE MASTER
GAVETA
0,43
08
3,825
02 1,93
TV
0,02 0,02
0,43
3,62
0,43
GAVETA
0,02
NOTAS PROJETO:
01 04
ADRIANA E RAFAEL HAWILLA LOCAL
Lote 04, quadra F3 - Condomínio Baroneza - Fase 2 - Brangança Pa
VISTA 07 ESC:1:20
VISTA 08 ESC:1:20
ARQUIVO
FASE DO PROJETO
PROJETO EXECUTIVO COORDENADOR
ADRIANA
GSPublisherVersion 0.8.100.12
11
ARH-ARQ-PE-703-R00
COLABORADOR
CAROLINA P.
FORMATO
FOLHA A0
cobertura de madeira laminada
cobertura e pilares de madeira laminada
passarela: cobertura e paredes em concreto aparente piscina em conceto armado
terraço jardim sobre laje pintura externa: massa raspada e tinta acrílica
12
rev externo: pedra natual rev interno: cerâmica
13 N
DECK
S
53,25 m 2 PD:2,40 m
PISCINA
42,60 m2 PD:2,40 m
VARANDA
54,07 m2 PD:2,40 m
07
CIRCULAÇÃO
42,92 m2 PD:2,40 m
ML
Ref.
JANTAR
31,89 m2 PD:2,40 m
HOME / JOGOS
65,20 m2 PD:2,40 m
ML
S 1 2 3 4
5
6
7
8
9
10
11
12
13
14
15
16
17
SERVIÇO
51,87 m2 PD:2,40 m
S
Countryside House 02.2021 - now Status: Project in development
HOUSING
02
SIMB b
a c
DESCRIÇÃO
PISOS
INTERRUPTOR PADRÃO SEM INDICAÇÃO → H=1,05m
SIMB
TOMADA BAIXA PADRÃO BRASILEIRO 10A/127V SEM INDICAÇÃO → CX 4x2 - H=0,30m
P01
TOMADA MÉDIA PADRÃO BRASILEIRO 10A/127V SEM INDICAÇÃO → CX 4x2 - H=1,05m
P02
TOMADA ALTA PADRÃO BRASILEIRO 10A/127V SEM INDICAÇÃO → CX 4x2 - H=2,30m
PREVER RALO SOB BANCADA
B
C
FL101
FL102
TETO
SIMB
TOMADA MÉDIA PADRÃO BRASILEIRO 20A/220V SEM INDICAÇÃO → CX 4x2 - H=1,05m ALVENARIA BLOCO 14cm TOMADA ALTA PADRÃO BRASILEIRO 20A/220V SEM INDICAÇÃO → CX 4x2 - H=2,30m
F01
PREVER VERGA E ALVENARIA DE FECHAMENTO SOBRE A PORTA
0,15
2,75
COOKTOP ELÉTRICO EMBUTIDO 0,25
NOVA GRELHA
F02
0,20
BANCADA EM PEDRA COM FRONTÃO
BANCADA NOVA EM PEDRA 2,75x0,60m
PROJ. ESTANTE TRINCA
PARE
SIMB ALVENARIA BLOCO 19cm
M03
60cm
105cm 105cm 105cm
P02
ÁREA DE SERVIÇO
A
AP
0,55
-0,10
FL100
P01
F01
V01
TORNEIRA DE JARDIM
V02
A
c
a
BANCO EM PEDRA ENGASTADO COM GRAPA NA ALVENARIA ALVENARIA SOB CAIXILHO H=40cm
AC NOVO
X
PREVER DRENO ATÉ A GRELHA INDICADA
V01
RODA
FL100
R02
b
NOVA SOLEIRA EM PEDRA
DESCIDA DE AP PREVER RECOLHIMENTO NA CALHA EXISTENTE
60cm
1,45 0,80 x 2,15
0,45
5,53 m2
1,40
Laje-065 M02
PROJEÇÃO DA CALHA DA COBERTURA
SIMB
R01
R02
f d
c e b
a
V02
NOVA MARCENARIA
ALVENARIA EXISTENTE
+0,30
ALVENARIA BLOCO 9cm
X
CALHA EXISTENTE
VARANDA
CUBA ESCULPIDA
17,11 m2
SALA DE TV
a
D
10,69 m2
±0,00
±0,00
F02
V01
6,27 m2 P01
IMPERMEABILIZAR AS PAREDES QUE FICARÃO EM CONTATO COM A TERRA
D
FL100 P02
DRENO DO JARDIM PISO EM TIJOLO,ASSENTADO SOBRE CONTRAPISO ARMADO
5,25 x 2,03
AC EXIST
AF NA PAREDE H=100cm
0,50
PD = 2,70m
b
MANTER BAGUETE EXISTENTE
b
2,23 m2
c
0,20
a
LAVABO
NOVO PISO EM PORCELANATO
JARDIM
FL100
R02
JAR
+0
1,75 0,25 NIVELAR O PISO DA VARANDA COM O TRILHO DA PORTA
PREVER COMPLEMENTO DE ALVENARIA NO MURO DO VIZINHO H TOTAL MURO = 3,10m - PINTAR DOS DOIS LADOS DO MURO LADO DO MURO DO VIZINHO: CIMENTO QUEIMADO
NÃO "TAMPAR" OS DUTOS DO AC DO VIZINHO
14
B
C
FL101
FL102
CRISTIANO E ADRIANA Rua Artur de Souza Marques 932, casa 12
PLANTA DE CIVIL, ELÉTRICA
HOUSING RENOVATION Gourmet Terrace 01.2021 - 04.2021 Status: Built
03
COBERTURA EM TELHA SANDUICHE DET 01 MURO DO VIZINHO COBERTURA EM TELHA SANDUICHE
ESTRUTURA EM MADEIRA
0,24
CALHA ESTRUTURA EM MADEIRA COM FORRO DE GESSO
SPLIT EXISTENTE
FITA DE LED FORRO EM GESSO
V01 CAIXILHO 4 FOLHAS
2,46
1,72
VARANDA BANCO EM PEDRA H=43cm
BANCADA EM PEDRA
1,05
BANCO EM PEDRA H=43cm JARDIM
0,30 0,43
2,70
2,60
V01
0,30
SALA DE TV
ENCHIMENTO NO JARDIM
R02
R02
0,00
0,00
DUAS FIADAS DE BLOCO DE ALVENARIA
CORTE AA ESC:1:25
CORTE DD ESC:1:25
15
F01
V01 V01
0,43
AM - VARANDA VISTA 01 ESC:1:25
04
BANCADA EM PEDRA COM FRONTÃO
02
AM - VARANDA VISTA 03 ESC:1:25
LATERAL FIXA EM COMPENSADO NAVAL REVESTIDO DE FOLHA DE FREIJÓ
PROJ. ESTANTE TRINCA
2,75 1,10
MARCENARIA: 3 PORTAS DE GIRO REVESTIDAS DE FOLHA DE FREIJÓ PUXADOR CAVA
R02
1,65
MARCENARIA: 3 PORTAS DE GIRO EM COMPENSADO NAVAL REVESTIDO DE FOLHA DE FREIJÓ
0,35
M02
0,90 0,45
BANCO EM PEDRA R02
COOKTOP ELÉTRICO EMBUTIDO
0,56
0,35 0,41
FITA DE LED SOB BANCO
0,90 0,04
0,43
0,90
FITA DE LED SOB BANCO
M03
BANCADA EM PEDRA COM FRONTÃO
BANCO EM PEDRA
0,41
0,47
M03
0,04
CUBA 50X40 TRAMONTINA
M02
0,56
BANCADA EM PEDRA COM FRONTÃO
COOKTOP ELÉTRICO EMBUTIDO 2 BOCAS
0,45
0,04
M03
ILUMINAÇÃO DIRETA DE SOBREPOR SOB ESTANTE
0,04 0,04
0,35 0,56
COOKTOP ELÉTRICO EMBUTIDO 2 BOCAS
V01
ESTANTE TRINCA BM STUDIO
ESTANTE TRINCA BM STUDIO
R01
AM - VARANDA VISTA 02 ESC:1:25
BANCO EM PEDRA
M02 Laje-065 ÁREA SECA
0,60
0,60
M03
01 ÁREA MOLHADA
1,45 03 0,80 x 2,15
0,30
1,50
0,95 2,75
AM - PLANTA BANCADA ESC:1:25
16
CRISTIANO E ADRIANA Rua Artur de Souza Marques 932, casa 12
AM - PLANTA MARCENARIA ESC:1:25
ISONOMÉTRICA ESC:1:50
DETALHE AM - BANCADA VARANDA . ESC 1:25, 1:50 . FOLHA 201-R00
HOUSING RENOVATION Gourmet Terrace 01.2021 - 04.2021 Status: Built
03
0,50
BANCO EM PEDRA COM SAIA 6cm
0,06
0,06
X CANTONEIRA EM "L"
X
ENGASTAR BARRA NA ALVENARIA BARRA 30x40mm
X
5,95
X
X X
BARRA 30x40mm A CADA 60cm
X X
Under Construction Photo
ENGASTAR BARRA NO CONTRAPISO
17 CRISTIANO E ADRIANA
SERRALHERIA . ESC 1:25 . FOLHA 205-
3
B
A
C
D
E
F
G
Y2
PRATARIA 3,89 m2 PD:2,60 m
COZINHA 22,88 m2 PD:2,60 m-0,005
ALMOÇO
GL
18,57 m2 PD:2,80 m
FB
4
GL
AD
GL MG
ML ML GOURMET 38,48 m2 PD:2,80 m
DESPENSA 2,87 m2 PD:2,60 m
ÁREA DE SERVIÇO 19,65 m2 PD:2,60 m -0,005
HAAL SOCIAL 8,20 m2 PD:2,80 m
DORMITÓRIO SERVIÇO 7,00 m2 PD:2,60 m
BANHO SERVIÇO
L
1
2
4
3
5
6
7
8
9
11
10
13
12
14
15
S
18E(0,165 m) 17P(0,295 m)
D
6,49 m2 PD:2,80 m
16
18
ROUPARIA
17
3,07 m2 5 PD:2,60 m-0,00
1 CLOSET
LIVING
D
19E(0,175 m) 18P(0,285 m)
S
23,62 m2 PD:2,80 m
72,35 m2 PD:2,80 m
ESCRITÓRIO
K
19
18
17
16
15
14
13
9
12
8
11
7
6
10
5
4
3
2
1
15,75 m2 PD:2,80 m
TERRAÇO 5,55 m2 PD:2,60 m
CORREDOR 12,69 m2 PD:2,80 m
±0,00
X MASTER 25,98 m2 PD:2,80 m
SUÍTE 01
SUÍTE 02 (QUARTO KIDS)
SALA ÍNTIMA
16,25 m2 PD:2,80 m
BRINQUEDOTECA
17,19 m2 PD:2,80 m
14,82 m2 PD:2,80 m
BANHO 01
BANHO MASTER
17,19 m2 PD:2,80 m
BANHO 02
3,96 m2 PD:2,60 m±0,00
15,19 m2 PD:2,60 m±0,00
VAZIO
J
BANHO 03
4,05 m2 ±0,00 PD:2,60 m
4,07 m2 ±0,00 PD:2,60 m
LAVABO 3,76 m2 PD:2,60 m±0,00
-0,02
TERRAÇO 6,50 m2 PD:2,60 m
2 VAZIO VAZIO
VAZIO
VAZIO
VAZIO
I
ELEMENTO DECORATIVO DE FACHADA
ELEMENTO DECORATIVO DE FACHADA
A
VAZIO
B
C
D
E
F
G
Y2
H
18 PLANTA DO APTO
NOTAS PROJETO:
HOUSING RENOVATION Apartment renovation 04.2021 - now Status: Project in development
04
3 LEGENDA DE ALVENARIAS
B
A
C
D
E
F
G
SIMB
Y2
DESCRIÇÃO ALVENARIA / PORTA A DEMOLIR ALVENARIA / PORTA A CONSTRUIR
PRATARIA
SU G VR EST F ÃO PR PAR D A OJE A P TIS ANÁ OSIÇ TA LIS ÃO DE E D D O AC O
3,89 m2 PD:2,60 m 3,21
2,97
COZINHA 22,88 m2 PD:2,60 m-0,005
GL
AD
1,00
0,1 0,1 5 5
GOURMET 38,48 m2 PD:2,80 m
DESPENSA
EM
0,75
PA
RA
DR
EN
50 19,65 m2 1, PD:2,60 m -0,005 0,15
2,87 m2 PD:2,60 m
AG
2,00
ÁREA DE SERVIÇO
MG
1,5 4
0,15
RIZ SAÍD FB ON A TA EM LN G A M REL AR HA 5,9 CE 9 NA RIA 4,1 5
LO RA 55 0,
4
HO
0,8 85
18,57 m2 PD:2,80 m
3,1 0
GL
0,80
RA
LO
1,5 6
5
1,51
GL
LO
ML
GE S EX TÃO AU DO ST D OR UT O
ALMOÇO
RA
ML
SU
RA
LO
0,80
3,90
5
HAAL SOCIAL
9,59
8,20 m2 PD:2,80 m
LO
RA
0,70 0,55
DORMITÓRIO SERVIÇO 7,00 m2 PD:2,60 m
BANHO SERVIÇO 0,95
3,07 m2 5 PD:2,60 m-0,00
L
5
0,34
1
3
2
4
5
6
7
8
9
11
10
12
13
14
15
S
18E(0,165 m) 17P(0,295 m)
D
6,49 m2 PD:2,80 m
16
18
ROUPARIA
17
LO RA
0,90
CORREDOR 12,69 m2 PD:2,80 m
±0,00
DR EN AG
LIVING 72,35 m2 PD:2,80 m
PA RA
19
18
17
16
15
14
9
13
8
11
12
7
10
6
5
4
3
15,75 m2 PD:2,80 m
2
0,05
ESCRITÓRIO 1
5,55 m2 PD:2,60 m
K
RA LO
D
S
19E(0,175 m) 18P(0,285 m)
HO RIZ SAÍD ON A TA EM LN G A M REL AR HA CE NA
CLOSET 23,62 m2 PD:2,80 m
TERRAÇO
EM
RIA
1
SUGESTÃO DA POSIÇÃO DO VRF PARA ANÁLISE DO PROJETISTA DE AC
X MASTER 2,33
25,98 m2 PD:2,80 m 4,105
0,15
5,18
0,15 1,10
1,84
4,94
0,15
2,22
0,15 0,90
3,30
5,165
0,15 2,445
1,82
0,15 0,90
1,82
1,845
0,15
2,35
6,33
2,24
RALO PARA DRENAGEM
1,89
1,22
0,97
0,24
1,89
LAVABO 3,76 m2 PD:2,60 m±0,00
0,30
0,30
4,07 m2 ±0,00 PD:2,60 m
1,30 1,05
1,05 1,30
0,60
1,235
0,535
0,40
0,30 0,35
0,35
1,35
-0,02
0,10
2
DR EN AG
BANHO 03
4,05 m2 ±0,00 PD:2,60 m
J
EM
17,19 m2 PD:2,80 m
3,96 m2 PD:2,60 m±0,00
3,775 15,19 m2 PD:2,60 m±0,00
PA RA
0,795
BRINQUEDOTECA BANHO 02 0,775
BANHO 01
BANHO MASTER
1,375
17,19 m2 PD:2,80 m
14,82 m2 PD:2,80 m
RA LO
SALA ÍNTIMA
16,25 m2 PD:2,80 m
VAZIO
SUÍTE 02 (QUARTO KIDS)
0,775
SUÍTE 01
TERRAÇO 6,50 m2 PD:2,60 m
VAZIO VAZIO
VAZIO
VAZIO
VAZIO
ELEMENTO DECORATIVO DE FACHADA
I
ELEMENTO DECORATIVO DE FACHADA 0,40
0,55
0,70 1,25
A
VAZIO
B
2,15 2,15
0,05 0,05
1,30 1,30
C
D
E
F
G
Y2
H
LEGENDA DE ALVENARIAS SIMB
DESCRIÇÃO ALVENARIA / PORTA A DEMOLIR ALVENARIA / PORTA A CONSTRUIR
PLANTA DO APTO ESC:1:50
4
NOTAS PROJETO: - PORTAS PISO-FORRO, SALVO INDICAÇÃO EM PLANTA; - PARA ESPECIFICAÇÃO LOUÇAS E METAIS, VERIFICAR MEMORIAL LOUÇAS E METAIS; - PARA REVESTIMENTOS, VERIFICAR MEMORIAL DESCRITIVO; - PARA ACABAMENTOS MARCENARIA, VERIFICAR PLANTA DE ACABAMENTOS; - PARA ELETRODOMÉSTICOS E EQUIPAMENTOS, VERIFICAR PLANILHA ESPECÍFICA;
- CONFERIR MEDIDAS NO LOCAL; - MEDIDAS E NÍVEIS EM METROS, SALVO INDICAÇÃO; - MEDIDAS E NÍVEIS ACABADOS; - NÃO TIRAR MEDIDAS COM RÉGUA OU ESCALÍMETRO; - QUALQUER DIFERENÇA ENTRE PROJETO E EXECUÇÃO, CONSULTAR ARQUITETURA; - NÃO ALTERAR ESTE PROJETO SEM PRÉVIA AUTORIZAÇÃO DO ARQUITETO RESPONSÁVEL;
PARA UMA PERFEITA E CLARA LEITURA DO DESENHO,
19
1 0,48 3,68
AB' AB"
AC
20
Landscaping
DET01
+0,02
i
A: 20,42 m2
AP
±0,00 002 ALMOXARIFADO A: 5,42 m2
013 ENTRADA ALUNOS A: 66,12 m2
001 SECRETARIA A: 11,27 m2
016 COZINHA A: 32,85 m2
±0,00
JARDIM
-0,05
A: 6,57 m2
A: 10,98 m2
017 DESPENSA A: 7,08 m2
GL
JARDIM
024 023 EDUCATIONAL A SERVIÇO LAVANDERIA
FR
GL
JARDIM
003 SANIT. FEM. A: 7,62 m2
A.C.
004 SANIT. MAS. A: 7,62 m2
AP
Public Kindergarden +0,02 03.2019 - 03.2021 Status: Built ML
05
INÍCIO PAGINAÇÃO
±0,00
SC
AP
3,60
RACK DTI
±0,00
QFL-ADM
ABRIGOS
CD-TEL
005 EDUCADORES A: 19,07 m2 +0,02
INÍCIO PAGINAÇÃO
46,70
A1
A2
A3
A4
A5
01
CC
A6
A6'
A7
A8
CALÇAD
M1
M2
M3
M4
PLANTA 10 1:10
M5
40,00 10,00
10,00
10,00
0,80
10,00
2 COB. MADEIRA +4,05 1 COB. CONCRETO +2,92
SALA
PATIO CENTRAL
2,40 0,40
TERRAÇO
V2
V1
V2 0,40
JARDIM ±0,00
V5
V2
2,40
V2
V1
±0,00
SALA
JARDIM
TERRAÇO
0 PAV. TÉRREO ±0,00
-0,21
CORTE B 1:10 M1
M2
M3
M4
M5
40,00 10,00
10,00
10,00
10,00
2 COB. MADE +4,05
1 COB. CONC +2,92
V1
V1
0 PAV. TÉRRE ±0,00
ELEVAÇÃO 1:1 M5
M4
M3
M2
M1
40,00 10,00
10,00
10,00
10,00
21
M1
M2
M3
M4
M5 MURO GRADIL
40,00 10,00
10,00
10,00
10,00
MA ±0,00
JARDIM
JARDIM
23,94 m2
i = 0,5%
i = 0,5% BASE EM ALVENARIA H=40cm
LAVAPÉS
±0,00
+0,02 S02
S02
i = 0,5%
A.C.
BASE EM ALVENARIA H=15cm
A.C.
i = 0,5%
+0,02 16,35 m2
i = 0,5%
i = 0,5%
+0,45
JARDIM i = 0,5%
±0,00
±0,00
±0,00
697,10 i = 0,5%
i = 0,5%
CD-TEL
S02
QT - G4/G5 S02
BANCO
MB
BANCO INSP. HIDRÁULICA
INSP. HIDRÁULICA
JARDIM
MESA DE ARTES
CANTEIRO P/ ÁRVORE INTERNA
JARDIM
JARDIM
i = 0,5%
i = 0,5%
CANTEIRO P/ ÁRVORE INTERNA
BANCO
BANCO
#toPZvalue
JARDIM
7,88 m2
7,88 m2 CANTEIRO P/ ÁRVORE INTERNA ±0,00 S02
7,88 m2
±0,00
-0,80
-0,40
7,88 m2
+0,02
16,35 m2
+0,02 16,35 m2
A.C.
MC
23,94 m2
INSP. ELETRICA
i = 0,5%
BASE EM ALVENARIA H=15cm
S02
QT - G1
S02
±0,00
7,88 m2 i = 0,5%
LAVAPÉS BASE EM ALVENARIA H=15cm
7,88 m2
QT - G2/G3
23,94 m2
JARDIM 699,41
A.C.
±0,00
+0,02
+0,02
LAVAPÉS
S02
CD-TEL
S02
+0,02
S02
CD-TEL
±0,00 A.C.
S02
A.C.
JARDIM
S02
±0,00
CANTEIRO P/ ÁRVORE INTERNA
+0,02
+0,02
7,97 m2
i = 0,5%
7,97 m2
BANCO
BANCO
i = 0,5%
±0,00 CANTEIRO P/ ÁRVORE INTERNA
JARDIM
JARDIM INSP. HIDRÁULICA INSP. HIDRÁULICA
INSP. HIDRÁULICA
01
423,09 m2 699,41
MD
i = 0,5% INSP. ELETRICA INSP. HIDRÁULICA
INSP. HIDRÁULICA
INSP. HIDRÁULICA
INSP. ELETRICA
S01
S01
S01
02
S01
±0,00
699,41
i = 0,5%
S01 INSP. HIDRÁULICA
15,22 m2
+0,02 60,27 m2
i = 0,5%
+0,02 CD-TEL
7,62 m2
5,42 m2
INÍCIO DA PAGINAÇÃO
11,27 m2
BASE EM ALVENARIA H=10cm
-0,02 RALO RALO -0,02
+0,02 S01 4,90 m2
INSP. HIDRÁULICA
INSP. ELETRICA
GRELHA
7,07 m2
5,69 m2 +0,02
INSP. ELETRICA
INSP. ELETRICA
19,17 m2
±0,00
S01
39,85 m2
JARDIM -0,05
JARDIM
BASE EM ALVENARIA H=10cm
GRELHA JARDIM
GRELHA GRELHA GRELHA
+0,02
GRELHA BASE EM ALVENARIA H=10cm
7,62 m2
±0,00
A.C.
±0,00 +0,02 19,07 m2
BASE EM ALVENARIA H=10cm
RACK DTI
QFL-ADM
4,90 m2
QFL-SERV
i = 0,5%
+0,02
20,42 m2
Kindergarden in use
-0,28
12,02 m2
2,62 m2
BASE EM ALVENARIA H=10cm
±0,00 10,56 m2
BASE EM BASE EM ALVENARIA H=10cm ALVENARIA H=15cm
2 10,56 m±0,00
A.C.
BASE EM ALVENARIA H=15cm
±0,00
BASE EM ALVENARIA H=15cm
S01
3,14 m2
±0,00
INSP. ELETRICA
ME
INSP. ELETRICA
7,06 m2 BASE EM CONCRETO CONFORME ESPECIFICAÇÃO FORNECEDOR DOS EQUIPAMENTOS
INSP. HIDRÁULICA
INCLINAÇÃO 1%
CALÇADA
22
PISOS 1:100
EDUCATIONAL Public Kindergarden 03.2019 - 07.2019 Status: Built
05
23
24
05
EDUCATIONAL Public Kindergarden 03.2019 - 07.2019 Status: Built
300 200
100 TUBO DE AÇO GALVANIZADO C/ PINTURA ESMALTE Ø=38,1mm, e=2,25mm
FECHAMENTO SUPERIOR CHAPA e=3mm
100
220
60
TUBO REDONDO DE AÇO GALVANIZADO C/ PINTURA ESMALTE Ø= 38,1mm, e=2,25mm
35
60
BARRA RENDONDA Ø=12,7mm GUIA DE BALIZAMENTO A12
TUBO DE AÇO Ø=50,8mm e=2,25mm SOLDADO NA CHAPA DE BASE
920
P12
A12
MÁX 100 MÓDULO SIMPLES
PERFIL "L" 51mm e=4,8mm
MÁX 180 MÓDULO DUPLO PERFIL "T" 51mm e=4,8mm
BARRA RENDONDA Ø=12,7mm
BARRA CHATA 32 x 4,8mm
TUBO DE AÇO GALVANIZADO Ø=76,2mm, e=2,25mm C/ PINTURA ESMALTE
MÁX 180 MÓDULO DUPLO
60
V10
0,15
10
TUBO DE AÇO GALVANIZADO Ø=76,2mm, e=2,25mm C/ PINTURA ESMALTE
TUBO REDONDO DE AÇO GALVANIZADO C/ PINTURA ESMALTE Ø= 38,1mm, e=2,25mm
60
7,02 i=7,97%
1,21
09
16
0,25 0,30
697,10
220
0,15
TUBO DE AÇO GALVANIZADO C/ PINTURA ESMALTE Ø=38,1mm, e=2,25mm
P12
MÁX 11 1,10
TUBO AÇO Ø=50,8mm, e=2,25mm SOLDADO NA CHAPA DE BASE
MÁX 11
70
10
60
5
CHUMBADOR METÁLICO Ø=1/4" PROFUNDIDADE NO CONCRETO MÍN 50mm
10 BARRA CHATA 32x4,8mm
PERFIL "L" 51mm e=4,8mm
JARDIM
A11
84 110
CHUMBADOR METÁLICO Ø=1/4" PROFUNDIDADE NO CONCRETO MÍN 50mm
5
1,20
1,2 8
697,66 PATAMAR
VARIÁVEL
700
GUIA DE BALIZAMENTO A11
10
PERFIL "T" 51mm e=4,8mm
GUIA DE BALIZAMENTO
GUIA DE BALIZAMENTO
PERFIL "L" 51mm e=4,8mm
PERFIL "T" 51mm e=4,8mm
MONTANTE DE FIXAÇÃO GALVANIZADO A FOGO
MONTANTE DE FIXAÇÃO GALVANIZADO A FOGO
50
100 6,82 % i=8,21 P12
DETALHE TÍPICO GUARDA CORPO 1:25
DETALHE TÍPICO GUARDA CORPO COM CORRIMÃO DUPLO 1:25
DETALHE TÍPICO CORRIMÃO DUPLO 1:5
DETALHE TÍPICO CORRIMÃO DUPLO 1:5 i = 0,5%
V10
8,26
08 P12
297,30
1,20
11 07
06
4,90
A11
PATAMAR
1
698,54
0,30
1,27
0,25
698,22
A12 1
1,10
0,61
0,41
2
0,61 0,60
0,41
PISO: GRAMA 4
A13 4
5
(5 x 0,122m)
A13
699,41
0,60
0,41 0,41
3
3 2 1
0,60 0,59
0,30
6
0,25
1,53
3,66
P12
0,15
PATAMAR
A12
V10
ESCADA 01 - CORTE 01 1:50
0,15
6,96
i=8, 33%
1,61
7,12
0,41 0,15
JARDIM
698,80 12
5
A13 P12
A11
699,41
13
ESCADA 03
4,80
i = 0,5%
JARDIM
P12
A12
A12
2
698,00 RAMPA 02
4,16
0,15
P12
1,90
05
P13
A13
0,4 2
NÍVEL DO LEVANTAMENTO TOPOGRÁFICO E PAISAGISMO +699,41 É IGUAL AO 0,00 DA ARQUITETURA
4,57
3,52
04
698,80 3
4000,69
GUIA DE BALIZAMENTO 0,25 0,30
GUIA DE BALIZAMENTO
5 0,1
A11 A12
0,15
0,61 0,60 3,02
0,80
2 1
6 x 0,133m)
0,61
(5 x 0,122m)
0,60
3
V10
698,00
GUIA DE BALIZAMENTO
5 0,1
5,71
ESCADA 02 - CORTE 04 1:50
ESCADA 01 - CORTE 03 1:50
P12
6,36
03
4 5 4 3 2 1
698,80 6
A12
A13
4,78
0,60
0,01 1,31
3,96
9 2,0
0 0,3 5 0,2
698,80
6 5
699,41 5
ESCADA 01
GUIA DE BALIZAMENTO
6
0,74
698,80
5 0,1
6 4,8
698,80 PATAMAR
0,15
A13
A12
2,97
4
01
P12
P8
699,41
2,29
P12
A12
5
0,13
3 2,3
0,15
A11 3
1,42
A12
4
0,42
1,42
1,43
A12
0,61
2
1,43 V10
- COTAS E NÍVEIS EM METROS, EXCETO ONDE INDICADO. AS COTAS SÃO DE ALVENARIA ACABADA. - VERIFICAR TABELA DE ACABAMENTOS PARA CÓDIGOS DOS ACABAMENTOS. - NÃO USAR A ESCALA NO DESENHO PARA OBTEREM-SE MEDIDAS. - ESTE DESENHO DEVERÁ SER VERIFICADO COM OS CORRESPONDETES DE ESTRUTURA, INSTALAÇÕES HIDRÁULICAS E ELÉTRICAS, HAVENDO QUALQUER DIFERENÇA, O ESCRITÓRIO DEVERÁ SER CONSULTADO. - ANTES DE EXECUTAR DEVERÁ SER VERIFICADO EM LOCO, AS DIMENSÕES E NIVEIS INDICADOS NESTE DESENHO, INFORMANDO AO ESCRITÓRIO AS DIFERENÇAS APONTADAS OU DÚVIDAS DE INTEREPRETAÇÃO. - TODOS OS ACABAMENTOS ASSINALADOS NO PROJETO DEVERÃO SER EXECUTADOS DE ACORDO COM AS ESPECIFICAÇÕES CORRESPONDENTES. - OS DESENHOS SÓ PODERÃO SER EXECUTADOS EM OBRA QUANDO APRESENTAREM O CARIMBO "PROJETO EXECUTIVO". - PARA PERFEITA COMPREENSÃO DOS PROJETOS PLOTE EM COLORIDO.
JARDIM
4,36
1
A13 GUIA DE BALIZAMENTO
5,71
ESCADA 04 0,74
5 0,1
ESCADA 02
RAMPA 01 - CORTE 02 1:50
0,15
NOTAS: 1,78
2 0,4 1 0,4
4,05
0,95
2 0,4
P12
EQUIVALÊNCIA DE NÍVEIS
V10
0,4 2
A13
699,41
01
0,80
0,15
2,96
698,00
R00
A06
Emissão Inicial
REVISÃO
6 5 4 3 2 1
6
A13
5 4
V10
3
DATA
PREFEITURA MUNICIPAL DE SÃO CAETANO DO SUL SEOHAB - SECRETARIA DE OBRAS E HABITAÇÃO - DIRETORIA DE OBRAS
BC01
GUIA DE BALIZAMENTO
2
APROVADO
697,30
1
PROCESSO Nº
GUIA DE BALIZAMENTO
SÃO CAETANO DO SUL,
ESCADA 01, 02, 03, RAMPA 01 E 02 - PLANTA 1:50
xx/03/19
MODIFICAÇÃO
698,00 0,15
698,80 P11
GUIA DE BALIZAMENTO
A11
0,70
0,30
A12 7,76
M12 M02
0,25
(6 x 0,116m)
RAMPA 01
0,60
0,30
(6 x 0,133m)
1,20
0,30
0,25
0,15
0,25
P12
1,30
A12 i=8,13%
02
A12
A12
A13
1
1,60
2
3
0,15
4
3,42
5
1,80
1,80
1,79
1,80
P8
0,15
4,26 1,30
699,41
/
/
ESCADA 04 - PLANTA 1:50
GUIA DE BALIZAMENTO
ESCADA 02 E RAMPA 02 - CORTE 05 1:50
ESCADA 03 - CORTE 06 1:50
ASSINATURA RESPONSÁVEL D.O.
ASSINATURA E CARIMBO DO RESPONSÁVEL DA SECRETARIA REQUISITANTE
A13
6
699,41
ASSINATURA E CARIMBO DO TÉCNICO RESPONSÁVEL DA SEOHAB
0,87
(6 x 0,145m)
5
A12
3 2 1
698,54
698,80
GUIA DE BALIZAMENTO
GUIA DE BALIZAMENTO
0,58
PATAMAR
698,22
1,70 0,56 0,56
0,70
(6 x 0,116m)
3 2
PATAMAR
O SÃ
ESCADA 04 - CORTE 11 1:50
698,00
1
24 -10 -1948
6 5 4
28 - 7 -1877
diTHIENE
A13
697,30
4
V10
L SU
CA
E TA
NO
DO
697,66
PREFEITURA MUNICIPAL DE SÃO CAETANO DO SUL 697,30
SEOHAB - SECRETARIA DE OBRAS E HABITAÇÃO A13
ESCADA 03 - CORTE 07 1:50
RAMPA 02 - CORTE 09 1:50
699,41
arquitetura e urbanismo
6 4 2
698,54
0,87
0,58
3 1
(6 x 0,145m)
5
RUA CARDOSO DE ALMEIDA 313 CJ 101 CEP 05013-000 TEL 3666-8526 PERDIZES SÃO PAULO SP WWW.CAROLINAPENNA.COM
RESPONSÁVEL
RRT/ART
DESENHO
7794946
ANA CAROLINA PENNA
A11
ANA CAROLINA PENNA
A11
GUIA DE BALIZAMENTO 698,80
698,22
V10
0,58
PATAMAR
ESCADA 04 - CORTE 12 1:50
A13
0,70 697,30
GUIA DE BALIZAMENTO
ESCADA 03 - CORTE 08 1:50
0,56
697,66
0,56
1
(6 x 0,116m)
PATAMAR
1,70
698,00 6 5 4 3 2
A13
A13
A13
V10
697,30
GUIA DE BALIZAMENTO
RAMPA 02 - CORTE 10 1:50
6 5 4 3 2 1
0,87
A13
V10
698,80
(6 x 0,145m)
A13
PROJETO
EMI ESCOLA INFANTIL
LOCAL
RUA JAYME DA COSTA PATRÃO s/n AGENTE
ETAPA
ARQUITETURA (ARQ)
PROJETO EXECUTIVO
TÍTULO
ESCALA
DETALHE ESCADA EXTERNA 01, 02, 03, 04 e RAMPA 01
1:50, 1:5, 1:25
ARQUIVO
EMI-ARQ-PE-303-R00
ESCADA 04 - CORTE 13 1:50 GSPublisherVersion 0.11.100.18
Nº PROCESSO
19.729/2018
AGENTE
FASE
FOLHA
ARQ
PE
303
REVISÃO
R00
DIREITOS AUTORAIS RESERVADOS. REPRODUÇÃO TOTAL OU PARCIAL PROIBIDA
25
FabLab Saúde Sala Técnico
Setor Fabriçação Digital Bancada eletrônica e painel ferramentas
Setor Impressão 3D
Laser
Painel Decorativo Pintura
Bancada de Trabalho
Lounge
Impressora 3D
Ploter
Tela metálica
LEGENDA DE CORES PINTURA - TINTA ACRÍLICA COR: Corredeiras 30BB 08/225 Coral
0,67
PINTURA - TINTA ACRÍLICA COR: Inverno Azul 70BG 28/169 Coral
QUADRADO
PINTURA - TINTA ACRÍLICA COR: Caminho do Jardim 30GY 31/202 Coral
LEGENDA GUIA DE MARCAÇÃO EM GIZ DE LINHA - FAZER A MARCAÇÃO COM O NÍVEL
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
0,67
10,64 (DIVIDIR EM 16 PARTES IGUAIS)
26
VISTA PAINEL COLORIDO 1:50
SEGUIR A MEDIDA DO COMPRIMENTO PARA FAZER UM QUADRADO
0,67
2,66
0,67
0,67
LAJE
PONTO DE DADOS E VOZ h=0,30m PONTO DE DADOS h=CANALETA
EDUCATIONAL
PONTO DE DADOS h=2,75m (próx ao teto) PONTO WIFI - ACCESS POINT
S
CANALETA DUPLA P/ ELÉTRICA E REDE ACIMA DA BANCADA. A BANCADA TEM 90cm DE ALTURA. VERIFICAR O MODELO DA CANALETA E POSICIONAR ACIMA DE 90cm
0,60
0,80
0,90
0,80
0,90
TV
CC 0,80
0,90
0,80
Makerspace 03.2019 - 10.2019 PONTO DE TV h=1,55m QUADRO EXISTENTE - ELÉTRICA E FIBRA Built Status: INTERRUPTOR
06
0,80 CÂM.
a,b,c
S
0,25
1,85
d
0,45
0,15
S
BB
0,15
1/2
BB
AA
1,20
g
1,10
S
f
0,50
RACK 0,90
S
0,75
0,50
0,15
AA
CÂM. 0,80
CÂM. CÂM.
GL
1,85
1/2
S
0,70
0,15 h
TV
CÂM.
CÂM.
0,70
CÂM. CÂM. 1,45
0,80
2,15
0,80
1,19
CC CANALETA DUPLA P/ ELÉTRICA E REDE ABAIXO DO PEITORIL. PEITORIL TEM 80cm DE ALTURA. VERIFICAR O MODELO DA CANALETA E POSICIONAR ABAIXO DE 80cm
OBS: O SISTEMA DE REDE E ELÉTRICA DEVEM SER SEPARADOS. UTULIZAR CANALETA DUPLA PRÓPRIA PARA ESTE FIM OU UTILIZAR DUAS CANALETAS INDIVIDUAIS
PROJETO FABLAB SAÚDE
PLANTA DE ELÉTRICA E REDE . ESC 1/50 . FOLHA 002-00
GSPublisherVersion 0.4.100.15
27
Makerspace in use
28
07
MARCENARIA
EDUCATIONAL 10
9
8
Makerspace 03.2017 - 08.2017 ATENÇÃO: COMO NÃO EXISTE PLANTAStatus: DA SALA EA Built
11
7 12
6
OBRA ESTÁ EM ANDAMENTO, VERIFICAR SE AS MEDIDAS ESTÃO BATENDO COM O REAL ANTES DE EXECUTAR O SERVIÇO. QUALQUER DÚVIDA, ENTRAR EM CONTATO. NÃO NOS RESPONSABILIZAMOS POR MEDIDAS IMPRECISAS.
13
5
4
14 3
2,7 25
15
PREVER EXAUSTOR PARA LASER NO LADO EXTERNO, EM FUNÇÃO DO RUÍDO DO EQUIPAMENTO
0,155
2,45
COMPRESSOR
0,40
CHILLER
1
16 x
0,1 7=
2
07
07
ESTANTE - EXPOSIÇÃO DE TRABALHOS 2,955
06
ESTANTE - EXPOSIÇÃO DE TRABALHOS 1,86
1,425 6,23
5
PREVER CALHA ELÉTRICA PARA AS BANCADAS
LASER 1,40
0,85
0,80
01
01
MESA - 6 ALUNOS
ARMAZENAMENTO 03 ESTANTE PARA MATERIAIS, CONSUMÍVEIS, PROJETOS EM ANDAMENTO COM BANCADA 04 ARMÁRIO FECHADO 7,32
01
01
02
02
0,60
04
1,90
BANCADA - 3 ALUNOS
MESA - 6 ALUNOS
1,90
BANCADA - 3 ALUNOS
MESA - 6 ALUNOS
0,45
ESTANTE
5,145
03 ACABAMENTO ARREDONDADO Ø10cm
MARCENARIA TRABALHO 01 MESAS COLETIVAS - TEAM DESK 02 BANCADA
02
PROJETOR
MESA - 6 ALUNOS
1,90
05
BANCADA - 3 ALUNOS
BANCADA + ESTANTE
02
1,40
1,90
0,85
BANCADA - 3 ALUNOS
1,40
7,14
PAINEL FERRAMENTAS
PAINEL
0,80
PAINEIS 05 PAINÉIS DE FERRAMENTAS 06 PAINEL EM PINUS PARA COMUNICAÇÃO VISUAL
ESPECIAL ARMAZENAMENTO 07 ESTANTE PARA EXPOSIÇÃO DE TRABALHOS - ENTRADA 08 ESTANTE PARA EXPOSIÇÃO DE TRABALHOS - BANCOS
6,235
ARMÁRIO
TELA PROJEÇÃO RETRÁTIL
08 9,17
2,65
MAKERSPACE ANGLO MORUMBI R. DIOGO PEREIRA 324 MORUMBI SP 03178-200 GSPublisherVersion 0.0.100.42
0,40
ESTANTE - EXPOSIÇÃO DE TRABALHOS
OBS: A OBRA ESTÁ EM ANDAMENTO, CONFIRMAR MEDIDAS FINAIS NO LOCAL ANTES DE EXECUTAR QUALQUER COMPRA.
MARCENARIA PARA ORÇAMENTO ESC.
29
LEGENDA DE CO
MARCENARIA D - 1 UNIDADE
BANCADA E
FOLHA DE M
MADEIRA P
FÓRMICA T
FÓRMICA T
FÓRMICA T
5,95 1,425
1,07
FÓRMICA T
NICHO PRATELEIRA REGULÁVEL
NICHO PRATELEIRA REGULÁVEL
TX
NICHO PRATELEIRA REGULÁVEL
TX
TX
NICHO PRATELEIRA FIXA
NICHO PRATELEIRA FIXA
NICHO PRATELEIRA REGULÁVEL
LATERAL REVESTIDA EM FOLHA DE PINUS
NICHO FIXA
1.80m
1.80m
NICHO PRATELEIRA FIXA
PAINEL PEGBOARD FUROS PEQUENOS
L
ACABAMEN ACABAMEN
OBS: CONSIDERA
TX
ÁREA PARA GUARDAR ESCADINHA
NOBREAK E CHILLER
FILTRO LASER
0.80m
0.80m
0,70
0,15
BANCADA EM MARCENARIA GAVETA
TX
LATERAL REVESTIDA EM FOLHA DE PINUS
LASER
PRATELEIRAS REGULÁVEIS
EXAUSTOR
TX
PREVER FURAÇÃO NA MARCENARIA PARA PASSAGEM DA TUBULAÇÃO DA EXAUSTÃO
ESTABILIZADOR E CHILLER
ÁREA PARA GUARDAR ESCADINHA
0,13
TX
TX
1.00m
0,90
PRATELEIRA REGULÁVEL
0,75
0,90
TX
GAVETA
1.00m
0,13 0,02
GAVETAS
PRATELEIRAS REGULÁVEIS
0,80 0,13 0,02
GAVETAS
0,80 0,65
2,30
0,70
2,30
0,70
2,30 1,60
VIDRO - DE TX
PAINEL PEGBOARD
1.00m 0.80m
FÓRMICA T FÓRMICA B
2,65 (MEDIDA CRÍTICA)
TUBULAÇÃO DA EXAUSTÃO DA LASER PASSA PELA MARCENARIA PARA CHEGAR AO SHAFT
VISTA 2 1:25
VISTA 1 1:25
VISTA 3 1:25
LEGENDA DE CORES E ACABAMENTOS BANCADA EM PEDRA: GRANITO SIENA FOLHA DE MADEIRA JEQUITIBÁ
PAINEL PEGBOARD PARA FERRAMENTAS
MADEIRA PINUS / TOPO APARENTE
SHAFT
Lab de Ideias
EXAUSTOR NICHOS
TOPO APARENTE
LASER
0,80
0,405 PROFUND. SHAFT
NICHO GRELHA
FILTRO LASER
LATERAL EM PINUS
DIVISÓRIA GAVETA 1 2 UNIDADES
FÓRMICA TX VERMELHO - CÓD. L103DIVISÓRIA GAVETA 3 DIVISÓRIA GAVETA 2 FÓRMICA TX AMARELO - CÓD L523 2 UNIDADES 1 UNIDADE FÓRMICA TX AZUL - CÓD L012
LARG
GAVE
LARG
FÓRMICA LAR TX AZUL ESCURO - CÓD L178 G GA
TA
VETA
GAVE
0,90
NICHO PRATELEIRA FIXA
0,40
0,62
0,35
1.80m
TX 0,35
NICHO PRATELEIRA REGULÁVEL
TX
0,35
0,70
0,35
TX
0,40
0,35
PAINEL ARAMADO VER DET FL 200
SHAFT DE ÁGUA PLUVIAL
0,70
0,71
0,35
0,71
FÓRMICA T
3,725
0,80
NOTAS:
- COTAS E NÍVEIS E DE ALVENARIA ACA - VERIFICAR TABEL ACABAMENTOS. - NÃO USAR A ESC - ESTE DESENHO D CORRESPONDETES ELÉTRICAS, HAVEN SER CONSULTADO - ANTES DE EXECU DIMENSÕES E NIVE ESCRITÓRIO AS DIF INTEREPRETAÇÃO. - TODOS OS ACABA EXECUTADOS DE A CORRESPONDENTE - OS DESENHOS SÓ APRESENTAREM O - PARA PERFEITA C
TA
FÓRMICA TX VERDE - CÓD LT56 FÓRMICA TX VERDE ESCURO - CÓD L113 FÓRMICA BRANCA/LOUSA
R01 R00
Revisã Emissã
REVISÃO
MODIFICA
VIDRO - DEFINIR ESPESSURA COM FORNECEDOR 2
3
1
3,30
2,65 (MEDIDA CRÍTICA)
PROF
UND.
GAVE
TA
TX L
ACABAMENTO EM FÓRMICA A BRANCA TX AVET D. G ACABAMENTO EM FÓRMICA BRANCA LOUSA FUN PRO
UND.
PROF
G
A AVET
OBS: CONSIDERAR TODA MARCENARIA EM COMPENSADO NAVAL
PAINEL ARAMADO VER DET FL 200
MARCENARIA D - PLANTA (NÍVEL 1.00m) 1:25 NOTAS:
BANCADA EM MARCENARIA
GAVETAS
ÁREA PARA CHILLER E ESTABILIZADOR
FILTRO DA LASER
30
LASER
MARCENARIA D 1:25
DETALHE DIVISÓRIA GAVETA 1:25
- COTAS E NÍVEIS EM METROS, EXCETO ONDE INDICADO. AS COTAS SÃO DE ALVENARIA ACABADA. - VERIFICAR TABELA DE ACABAMENTOS PARA CÓDIGOS DOS ACABAMENTOS. - NÃO USAR A ESCALA NO DESENHO PARA OBTEREM-SE MEDIDAS. - ESTE DESENHO DEVERÁ SER VERIFICADO COM OS CORRESPONDETES DE ESTRUTURA, INSTALAÇÕES HIDRÁULICAS E ELÉTRICAS, HAVENDO QUALQUER DIFERENÇA, O ESCRITÓRIO DEVERÁ SER CONSULTADO. - ANTES DE EXECUTAR DEVERÁ SER VERIFICADO EM LOCO, AS DIMENSÕES E NIVEIS INDICADOS NESTE DESENHO, INFORMANDO AO ESCRITÓRIO AS DIFERENÇAS APONTADAS OU DÚVIDAS DE INTEREPRETAÇÃO. - TODOS OS ACABAMENTOS ASSINALADOS NO PROJETO DEVERÃO SER EXECUTADOS DE ACORDO COM AS ESPECIFICAÇÕES CORRESPONDENTES. - OS DESENHOS SÓ PODERÃO SER EXECUTADOS EM OBRA QUANDO
RUA CARD PERD
PROJETO
CAMB LOCAL
RUA MAURÍCIO F. K AGENTE
ARQUITETURA ( TÍTULO
MARCENARIA D
ARQUIVO
EDUCATIONAL
Lab Artes
Library, Laboratory, Art room, Makerspace 03.2019 - 05.2021 Status: Built
08
Lab Ideias Lab Ciências
Biblioteca
Lanchonete
anta esquemática
Atelier Artes
Lab Idéias
Lab Ciências
Operacional
Eventos Quadra Arquibancada
Biblioteca
Palco Performance
Lanchonete Café
School in use
31
PORTA DE GIRO EM VIDRO COM REQUADRO EM MADEIRA
Biblioteca
LEGENDA DE CORES E ACABAMENTOS
FECHAMENTO EM VIDRO
BANCADA EM PEDRA: GRANITO SIENA FOLHA DE MADEIRA JEQUITIBÁ
FECHAMENTO EM COMPENSADO NAVAL CURVADO
FECHAMENTO LATERAL EM COMPENSADO NAVAL
FECHAMENTO EM COMPENSADO NAVAL CURVADO
MADEIRA PINUS / TOPO APARENTE FÓRMICA TX VERMELHO - CÓD. L103 Entrada
FÓRMICA TX AMARELO - CÓD L523 FECHAMENTO EM VIDRO
FÓRMICA TX AZUL - CÓD L012
PILAR
Leitura
Armário FÓRMICA TX AZUL ESCURO - CÓD L178 Professor
FÓRMICA TX VERDE - CÓD LT56
2,90
FÓRMICA TX VERDE ESCURO - CÓD L113 FÓRMICA BRANCA/LOUSA
Banco
VIDRO - DEFINIR ESPESSURA COM FORNECEDOR ACABAMENTO EM FÓRMICA BRANCA TX
Banco
TX L
ACABAMENTO EM FÓRMICA BRANCA LOUSA Estudo
OBS: CONSIDERAR TODA MARCENARIA EM COMPENSADO NAVAL
Palco
Banco
NOTAS:
BASE EM ALVENARIA SEGUIR RODAPÉ CORRESPONDENTE AO PISO DO CORREDOR
MARCENARIA J (VISTA EXTERNA) 1:25
PILAR
FECHAMENTO EM COMPENSADO NAVAL REVESTIDO
FECHAMENTO EM VIDRO
FECHAMENTO LATERAL
FORRO EM GESSO VERIFICAR PROJETO DE ARQUITETURA
COMPENSADO FORRO DE GESSOEM - VERIFICAR PROJETO DE ARQUITETURA NAVAL
- COTAS E NÍVEIS EM METROS, EXCETO ONDE INDICADO. AS COTAS SÃO DE ALVENARIA ACABADA. - VERIFICAR TABELA DE ACABAMENTOS PARA CÓDIGOS DOS ACABAMENTOS. - NÃO USAR A ESCALA NO DESENHO PARA OBTEREM-SE MEDIDAS. - ESTE DESENHO DEVERÁ SER VERIFICADO COM OS CORRESPONDETES DE ESTRUTURA, INSTALAÇÕES HIDRÁULICAS E ELÉTRICAS, HAVENDO QUALQUER DIFERENÇA, O ESCRITÓRIO DEVERÁ SER CONSULTADO. - ANTES DE EXECUTAR DEVERÁ SER VERIFICADO EM LOCO, AS DIMENSÕES E NIVEIS INDICADOS NESTE DESENHO, INFORMANDO AO ESCRITÓRIO AS DIFERENÇAS APONTADAS OU DÚVIDAS DE INTEREPRETAÇÃO. - TODOS OS ACABAMENTOS ASSINALADOS NO PROJETO DEVERÃO SER EXECUTADOS DE ACORDO COM AS ESPECIFICAÇÕES CORRESPONDENTES. - OS DESENHOS SÓ PODERÃO SER EXECUTADOS EM OBRA QUANDO LEGENDA DE CORES E ACABAMENTOS APRESENTAREM O CARIMBO "PROJETO EXECUTIVO". BANCADA EM PEDRA: GRANITO SIENA - PARA PERFEITA COMPREENSÃO DOS PROJETOS PLOTE EM COLORIDO. FOLHA DE MADEIRA JEQUITIBÁ FÓRMICA TX VERMELHO - CÓD. L103
0,43
0,40
MADEIRA PINUS / TOPO APARENTE PILAR FECHAMENTO LATERAL EM COMPENSADO NAVAL
FECHAMENTO EM VIDRO
FÓRMICA TX AMARELO - CÓD L523
PILAR
0,60
FECHAMENTO EM COMPENSADO NAVAL CURVADO
nichos e acabamentos de nichos biblioteca Inicial FÓRMICA TXR00 VERDE - CÓDEmissão LT56
0,395
FECHAMENTO EM COMPENSADO NAVAL CURVADO
FÓRMICA TXR02 AZUL - CÓD Revisão L012 1,175
Revisão indicação FÓRMICA TXR01 AZUL ESCURO - CÓD L178
0,395
1,175
0,61
MODIFICAÇÃO FÓRMICA TXREVISÃO VERDE ESCURO - CÓD L113 FÓRMICA BRANCA/LOUSA 2,47 (SEGUIR ALTURA DAS PRATELEIRAS) 2,90
2,90 0,395 1,55
2,80
2,90
MARCENARIA DIVISÓRIA EM COMPENSADO NAVAL
1,17
0,60
1,19
0,10
0,30
0,10
VISTA 10 1:25
BASE EM ALVENARIA REVESTIDA DO RODAPÉ CORRESPONDENTE AO PISO
DATA
VIDRO - DEFINIR ESPESSURA COM FORNECEDOR TX L
ACABAMENTO EM FÓRMICA BRANCA TX ACABAMENTO EM FÓRMICA BRANCA LOUSA
OBS: CONSIDERAR TODA MARCENARIA EM COMPENSADO NAVAL
arquitetura e urbanismo RUA CARDOSO DE ALMEIDA 313 CJ 101 CEP 05013-000 TEL 3666-8526 PERDIZES SÃO PAULO SP WWW.CAROLINAPENNA.COM
NOTAS:
1,205
0,03
INTERNO
0,50
32
1,19
0,59
0,10
0,10
EXTERNO
1,76
0,425
0,61
BASE EM ALVENARIA REVESTIDA DO RODAPÉ CORRESPONDENTE AO PISO
0,395
0,395
FECHAMENTO EM VIDRO
01/02/21 07/01/21 06/11/20
PORTA PIVOTANTE NA MARCENARIA COM VISOR EM VIDRO
VISTA 11 (VISTA EXTERNA) 1:25
BASE EM ALVENARIA SEGUIR RODAPÉ CORRESPONDENTE AO PISO DO CORREDOR
- COTAS E NÍVEIS EM METROS, EXCETO ONDE INDICADO. AS COTAS SÃO PROJETO DE ALVENARIA ACABADA. - VERIFICAR TABELA DE ACABAMENTOS PARA CÓDIGOS DOS ACABAMENTOS. LOCAL - NÃO USAR A ESCALA NO DESENHO PARA OBTEREM-SE MEDIDAS. RUA MAURÍCIO F. KLABIN, 307 - VILA MARIANA - SP - ESTE DESENHO DEVERÁ SER VERIFICADO COM OS CORRESPONDETES AGENTE DE ESTRUTURA, INSTALAÇÕES HIDRÁULICAS E ETAPA ELÉTRICAS, HAVENDO QUALQUER DIFERENÇA, O ESCRITÓRIO DEVERÁ ARQUITETURA (ARQ) LIBERADO SER CONSULTADO. - ANTES DE EXECUTAR DEVERÁ SER VERIFICADO EM LOCO, AS TÍTULO DIMENSÕES E NIVEIS INDICADOS NESTE DESENHO, INFORMANDO AO MARCENARIA J ESCRITÓRIO AS DIFERENÇAS APONTADAS OU DÚVIDAS DE INTEREPRETAÇÃO. - TODOS OS ACABAMENTOS ASSINALADOS NO PROJETO DEVERÃO SER ARQUIVOCOM AS ESPECIFICAÇÕES EXECUTADOS DE ACORDO CORRESPONDENTES. 0240-ARQ-LO-116-R022 - OS DESENHOS SÓ PODERÃO SER EXECUTADOS EM OBRA QUANDO
CAMB
PARA OBRA ESCALA
1:25, 1:50
1 UNIDADE
COR FÓRMICA TX BRANCO
1 UNIDADE
- ANTES DE EXECUTAR DEVERÁ SER VERIFICADO EM LOCO, AS DIMENSÕES E NIVEIS INDICADOS NESTE DESENHO, INFORMANDO AO ESCRITÓRIO AS DIFERENÇAS APONTADAS OU DÚVIDAS DE INTEREPRETAÇÃO. - TODOS OS ACABAMENTOS ASSINALADOS NO PROJETO DEVERÃO SE EXECUTADOS DE ACORDO COM AS ESPECIFICAÇÕES CORRESPONDENTES. - OS DESENHOS SÓ PODERÃO SER EXECUTADOS EM OBRA QUANDO APRESENTAREM O CARIMBO "PROJETO EXECUTIVO". - PARA PERFEITA COMPREENSÃO DOS PROJETOS PLOTE EM COLORID
0,06
COR FÓRMICA TX AZUL - CÓD. L012
0,06
0,50 0,56
COR FOLHA DE MADEIRA PINUS
PLANTA DA CAIXA 1/10
D
(ME
PLANTA DA TAMPA 1/10
Library, Laboratory, Art room, Makerspace 03.2019 - 05.2021 Status: Built
08
IA)
NAR
LVE
3,30 FT E A A E SH
NTR
E IDA
EDUCATIONAL
5 UNIDADES
3,90
R01 R00
Revisão fórmica TX branca na caixa-banco Emissão Inicial
REVISÃO
MODIFICAÇÃO
11/11/2 06/11/2 DATA
0,90
0,90 5
0,49
TAMPO DA MESA EM COMPENSADO NAVAL REVESTIDO
0,05
8 0,4
0,71
ESTRUTURA DA MESA EM SERRALHEIRA COM PINTURA BRANCA BASE DA MESA. VERIFICAR COM SERRALHEIRO MEDIDAS NECESSÁRIAS PARA ESTRUTURAÇÃO DA MESA
0,43
105º
arquitetura e urbanismo RUA CARDOSO DE ALMEIDA 313 CJ 101 CEP 05013-000 TEL 3666-8526 PERDIZES SÃO PAULO SP WWW.CAROLINAPENNA.COM
PROJETO
CAMB LOCAL
VISTA SUPERIOR
VISTA INFERIOR
RUA MAURÍCIO F. KLABIN, 307 - VILA MARIANA - SP
75º
MOBILIÁRIO: MESA ESTUDO MESA COM TAMPO EM COMPENSADO NAVAL. BASE EM SERRALHERIA
4 UNIDADES
AGENTE
ETAPA
ARQUITETURA (ARQ)
LIBERADO PARA OBRA
TÍTULO
ESCALA
DETALHE MOBILIÁRIO
1:10, 1:2
)
MOBILIÁRIO: BANCO ALL
COR FÓRMICATX VERMELHO - CÓD. L103
O
(ME
E
NTR
AE
DID
COR FOLHA DE MADEIRA PINUS
LD FINA
W DRY
IT 3,49 DEPÓS DO
LV
A RE
O
ESS
ROF
OP
COR FÓRMICA TX AMARELO - CÓD. L523
RIA ENA
ARQUIVO
0240-ARQ-LO-201-R021
MB02 - DETALHE BANCO ESTUDOS 1:20
MB 03 - DETALHE MESA ESTUDOS 1:20
AGENTE
FASE
FOLHA
REVISÃO
ARQ
LO
201
R01
DIREITOS AUTORAIS RESERVADOS. REPRODUÇÃO TOTAL OU PARCIAL PROIBIDA
GSPublisherVersion 0.0.100.28
REBAIXO PARA ENCAIXE DA TAMPA
0,60 0,12
0,02 0,36
0,44
REBAIXO PARA "ESCONDER" OS RODÍZIOS
FUNDO DA CAIXA
RODÍZIO
FUNDO DA CAIXA
0,06
FUNDO DA CAIXA
0,45
REBAIXO PARA "ESCONDER" OS RODÍZIOS
0,44
0,45
0,03 0,35
0,44
REBAIXO PARA "ESCONDER" OS RODÍZIOS
RODÍZIO
RODÍZIO
0,01
CAIXA EM COMPENSADO NAVAL REVESTIDO DE FÓRMICA
REBAIXO PARA ENCAIXE DA TAMPA
FURO NA CAIXA PARA ENCAIXE DA MÃO
0,01
0,45
TAMPA DA CAIXA COM 1 CANTO CHANFRADO P/ ACESSO A CAIXA
CAIXA EM COMPENSADO NAVAL REVESTIDO DE FÓRMICA
REBAIXO PARA ENCAIXE DA TAMPA
0,60
0,24
0,06
0,24
VISTA FRENTE E FUNDO 1/10
VISTA LATERAL 1/10
CORTE 1/10
0,60 CHANFRO PARA ACESSO A CAIXA
RODÍZIOS PARA MOVIMENTAÇÃO DA CAIXA-BANCO
SUPORTE PARA APOIO DA TAMPA DA CAIXA
0,50
TAMPA DA CAIXA
0,56
0,60
FUNDO DA CAIXA
COR FÓRMICA TX AZUL - CÓD. L012
1 UNIDADE
COR FÓRMICA TX BRANCO
1 UNIDADE
0,06
MOBILIÁRIO: CAIXA-BANCO
0,06
0,50 0,56
COR FOLHA DE MADEIRA PINUS
5 UNIDADES
PLANTA DA CAIXA 1/10
PLANTA DA TAMPA 1/10
NOTAS: - COTAS E NÍVEIS EM METROS, EXCETO ONDE INDICADO. AS COTAS SÃO DE ALVENARIA ACABADA. - VERIFICAR TABELA DE ACABAMENTOS PARA CÓDIGOS DOS ACABAMENTOS. - NÃO USAR A ESCALA NO DESENHO PARA OBTEREM-SE MEDIDAS. - ESTE DESENHO DEVERÁ SER VERIFICADO COM OS CORRESPONDETES DE ESTRUTURA, INSTALAÇÕES HIDRÁULICAS E ELÉTRICAS, HAVENDO QUALQUER DIFERENÇA, O ESCRITÓRIO DEVERÁ SER CONSULTADO. - ANTES DE EXECUTAR DEVERÁ SER VERIFICADO EM LOCO, AS DIMENSÕES E NIVEIS INDICADOS NESTE DESENHO, INFORMANDO AO ESCRITÓRIO AS DIFERENÇAS APONTADAS OU DÚVIDAS DE INTEREPRETAÇÃO. - TODOS OS ACABAMENTOS ASSINALADOS NO PROJETO DEVERÃO SER EXECUTADOS DE ACORDO COM AS ESPECIFICAÇÕES CORRESPONDENTES. - OS DESENHOS SÓ PODERÃO SER EXECUTADOS EM OBRA QUANDO APRESENTAREM O CARIMBO "PROJETO EXECUTIVO". - PARA PERFEITA COMPREENSÃO DOS PROJETOS PLOTE EM COLORIDO.
33
34
01.03
04.03
04.02
03.02
03.14
03.07
03.13
04.04
04.06
10.06
04.06
COBERTURA
Public Health Centre 05.2019 - 09.2019 Status: Under Construction 05.08 05.0905.05
05.07 05.06
01.03
05.11
05.02 03.11
03.11
05.01 05.03
09 01.09
01.05 02.06
01.13
01.12 01.14
11.11
11.09
05.12
11.10
10.08
02.01
03.01
10.09
11.07
01.07
10.02
11.08
01.01
10.05
04.07
03.16
04.07
03.16
03.16
03.16
03.15
02.07
02.08
03.15
01.16 01.15
09.12
08.01
06.05
08.02
08.06
09.10
01.03
04.03
04.02
03.02
03.14
03.07
03.13
03.10
03.17
04.05 04.04
04.06
10.06
04.06
03.17
09.18
04.08 04.10
03.08
03.05 03.06
04.09
05.08 05.0905.05
05.07 05.06
01.10
05.02 03.11
03.11
07.04
11.03 01.13
02.06
01.12 01.14
09.06
11.11
06.19
06.16 06.25
06.18
06.12
06.14
06.04
09.02
09.0509.05
06.24
07.09
07.10 07.09
09.05 09.05
06.17
06.11 06.02
06.13
09.01
11.05
09.09
11.06
10.08
06.16
06.03
07.07
07.07
07.05 07.05
06.10
10.03
09.04 09.07
09.03
11.09
11.10
07.08
11.04
05.12
PAVIMENTO SUPERIOR
10.04
09.08
06.21
06.07 06.08
07.06
07.03
01.05 05.01 05.03
06.20
06.09
08.04
11.01
01.09
06.01
08.05
11.02
01.02
01.06
06.22
06.23
07.02
01.08 02.03
03.11
03.11 05.10
03.09 05.04
08.07
08.03
06.23
07.01
02.05
03.10
03.03
04.09 05.13
02.04
03.10
03.10
10.01
01.11
03.10
03.10
03.12
03.04
06.22
01.04 02.02
03.10
03.10
COBERTURA
06.06
06.15
09.13
09.14 10.11
10.10
PAVIMENTO SUPERIOR SETORIZAÇÃO PAVIMENTO INFERIOR
SETORIZAÇÃO PAVIMENTO SUPERIOR
10.09
11.07
10.02
11.08
10.05
09.12
06.06 06.15
09.13
09.14
08.01
10.11
08.06
09.10
08.07
08.03
06.22
06.23
06.23
06.01
07.02
06.08
07.06
07.01
06.09
08.05
11.02
08.04
07.04
10.04
09.08
11.03
09.06
07.08
09.04 09.03
06.16 06.19
06.16 06.25
06.18
09.02
09.0509.05
06.24
07.09
07.10 07.09
09.05 09.05
06.17
06.12
06.14
06.04
11.04 09.07
06.21
06.03
07.07
07.07
07.05 07.05
06.10
10.03
07.03 11.01
cód.
06.20 06.07
06.11 06.02
06.13
09.01
11.05
09.09
11.06
TABELA DE ÁREAS PAV. SUPERIOR (áreas internas)
TABELA DE ÁREAS PAV. SUPERIOR (áreas internas)
06.05
08.02
06.22
10.10
SETORIZAÇÃO PAVIMENTO INFERIOR
PAVIMENTO INFERIOR
ambiente
01. ACOLHIMENTO 01.01 ACOLHIMENTO 01.02 ESPERA ACOLHIMENTO 01.03 SALA PRÉ-CONSULTA 1 01.04 SALA PRÉ-CONSULTA 2 01.05 COLETA 01.07 ENTREGA EXAMES 01.08 IMUNIZAÇÃO 01.09 ASSISTÊNCIA SOCIAL 01.10 INALAÇÃO COLETIVA 01.11 MEDICAÇÃO 01.15 DEPÓSITO 01 ELEVADOR 01.16 02. PROCEDIMENTOS ESPERA PROCEDIMENTOS 02.01 SALA PROCEDIMENTO 01 02.02 SALA PROCEDIMENTO 02 02.03 POSTO E SERVIÇO DE ENFERMAGEM 02.04 CIRC PROCEDIMENTOS 02.05 SALA DE UTILIDADES 02.06
área (m²)
cód.
67,06 112,43 7,95 8,05 14,09 30,55 7,85 5,94 8,05 8,05 5,47 5,24 280,73 m² 62,93 18,93 19,12 19,13 31,35 7,96 159,42 m²
03. ESPECIALIDADES ESPERA ESPECIALIDADES 03.01 NEUROPSICOLOGIA / PSICOPEDAGOGIA 03.02 FONAUDIOLOGIA 03.03 CONSULTORIO ODONTOLOGIA 03.04
171,60 8,49 9,66 28,31
TABELA DE ÁREAS PAV. INFERIOR (áreas internas) cód.
TABELA DE ÁREAS PAV. SUPERIOR (áreas internas)
TABELA DE ÁREAS PAV. SUPERIOR (áreas internas) ambiente
01. ACOLHIMENTO 01.01 ACOLHIMENTO 01.02 ESPERA ACOLHIMENTO 01.03 SALA PRÉ-CONSULTA 1 01.04 SALA PRÉ-CONSULTA 2 01.05 COLETA 01.07 ENTREGA EXAMES 01.08 IMUNIZAÇÃO 01.09 ASSISTÊNCIA SOCIAL 01.10 INALAÇÃO COLETIVA 01.11 MEDICAÇÃO 01.15 DEPÓSITO 01 ELEVADOR 01.16 02. PROCEDIMENTOS ESPERA PROCEDIMENTOS 02.01 SALA PROCEDIMENTO 01 02.02 SALA PROCEDIMENTO 02 02.03 POSTO E SERVIÇO DE ENFERMAGEM 02.04 CIRC PROCEDIMENTOS 02.05 SALA DE UTILIDADES 02.06
área (m²) 67,06 112,43 7,95 8,05 14,09 30,55 7,85 5,94 8,05 8,05 5,47 5,24 280,73 m² 62,93 18,93 19,12 19,13 31,35 7,96 159,42 m²
03. ESPECIALIDADES ESPERA ESPECIALIDADES 03.01 NEUROPSICOLOGIA / PSICOPEDAGOGIA 03.02 FONAUDIOLOGIA 03.03 CONSULTORIO ODONTOLOGIA 03.04
171,60 8,49 9,66 28,31
TABELA DE ÁREAS PAV. INFERIOR (áreas internas) cód.
01.06
03.11
03.11
05.10
03.09 05.04
01.08
02.03
03.10
01.02
02.05
03.10
03.10
03.03 03.08
03.05 03.06
01.10
SETORIZAÇÃO PAVIMENTO SUPERIOR
10.07
cód.
03.17
10.01
01.11 02.04
HEALTH
09.18
04.08 04.10
04.09 05.13
01.04
03.10
03.10
03.12
03.04
02.02
03.10
03.10
03.17
04.05
04.09
03.10
ambiente
06. DIAGNOSTICO IMAGEM 06.01 ESPERA CENTRO DE IMAGEM 06.02 ULTRASONOGRAFIA /ECO 06.03 ULTRASONOGRAFIA 01 06.04 ULTRASONOGRAFIA 02
cód. 03.05 03.06 03.07 03.08 03.09 03.10 03.10 03.10 03.10 03.10 03.10 03.10 03.10 03.11 03.11 03.12 03.13 03.14 03.17 03.17
ambiente ÁREA SUJA ÁREA LIMPA AVALIAÇÃO FUNCIONAL SALA TESTES OTORR. CABINE AUDIOMETRIA CONSULTÓRIO CONSULTÓRIO CONSULTÓRIO CONSULTÓRIO CONSULTÓRIO CONSULTÓRIO CONSULTÓRIO CONSULTÓRIO C. GINECOLOGIA/UROLOGIA C. GINECOLOGIA/UROLOGIA C. OTORRINO C. OFTALMOLOGIA TERAPIA OCUPACIONAL CIRC ESPECIALIDADES CIRC ESPECIALIDADES
área (m²) 4,69 4,78 9,86 8,83 7,94 9,23 9,23 9,23 9,26 9,26 9,26 9,27 9,32 12,04 12,32 17,11 11,87 8,58 29,10 31,33 450,57 m²
04. REABILITAÇÃO 01.03 ESPERA REABILITAÇÃO 04.02 CONSULTORIO FISIO 04.03 RECEPÇÃO 04.04 GINÁSIO FISIOTERAPIA 04.05 CONSULTORIO FISIO PÉLVICO
54,72 9,92 11,02 88,62 9,76
TABELA DE ÁREAS PAV. INFERIOR (áreas internas)
área (m²) 128,40 9,53 7,41 7,43
cód. 07.03 07.04 07.06 07.08 07.10
ambiente SECRETÁRIA ADM COPA CIRC ADM CIRCULAÇÃO ADM
ambiente
9,80 16,00 25,25 9,89 14,24
ambiente
TABELA DE ÁREAS PAV. SUPERIOR (áreas intern
área (m²)
ÁREA SUJA ÁREA LIMPA AVALIAÇÃO FUNCIONAL SALA TESTES OTORR. CABINE AUDIOMETRIA CONSULTÓRIO CONSULTÓRIO CONSULTÓRIO CONSULTÓRIO CONSULTÓRIO CONSULTÓRIO CONSULTÓRIO CONSULTÓRIO C. GINECOLOGIA/UROLOGIA C. GINECOLOGIA/UROLOGIA C. OTORRINO C. OFTALMOLOGIA TERAPIA OCUPACIONAL CIRC ESPECIALIDADES CIRC ESPECIALIDADES
cód.
4,69 4,78 9,86 8,83 7,94 9,23 9,23 9,23 9,26 9,26 9,26 9,27 9,32 12,04 12,32 17,11 11,87 8,58 29,10 31,33 450,57 m²
04. REABILITAÇÃO 01.03 ESPERA REABILITAÇÃO 04.02 CONSULTORIO FISIO 04.03 RECEPÇÃO 04.04 GINÁSIO FISIOTERAPIA 04.05 CONSULTORIO FISIO PÉLVICO
54,72 9,92 11,02 88,62 9,76
TABELA DE ÁREAS PAV. INFERIOR (áreas internas)
área (m²)
cód.
ambiente
04.10 05. APOIO 05.02 05.03 05.04 05.07 05.10 05.11 05.12 05.13
ambiente
áre
CIRC FISIO
PAVIMENTO INFERIOR SANIT FUNC. MAS. DML 01 CIRCULAÇÃO SERVIÇOS DML 02 SALA TÉCNICA TI ESCADA 01 ESCADA 02 ESCADA 03
05. APOIO SANITÁRIOS 01.06 SANIT COLETA 01.12 SANIT PCD 01.13 SANIT F 01.14 SANIT M 02.07 SANIT PCD FEM 02.08 SANIT PCD MAS 03.11 SANIT GIN/URO 03.11 SANIT GIN/URO 03.15 SANIT FEM 03.15 SANIT MAS 03.16 SANIT PCD FEM 03.16 SANIT PCD FEM 03.16 SANIT PCD MAS 03.16 SANIT PCD MAS
TABELA DE ÁREAS PAV. INFERIOR (áreas intern
área (m²)
cód.
ambiente
áre
06. DIAGNOSTICO IMAGEM 07.03 SECRETÁRIA 9,80 09.13 DEPÓSITO MATERIAIS 07.04 ADM 16,00 09.14 TRANSFORMADOR 750kVa 06.01 ESPERA CENTRO DE IMAGEM 128,40 07.06 COPA 25,25 06.02 ULTRASONOGRAFIA /ECO 9,53 07.08 CIRC ADM 9,89 09. APOIO SANITÁRIOS 06.03 ULTRASONOGRAFIA 01 7,41 07.10 CIRCULAÇÃO ADM 14,24 06.04 ULTRASONOGRAFIA 02 7,43 06.16 SANIT PCD 92,28 m² 06.05 INTERPRETAÇÃO E LAUDOS 8,16 06.20 VEST 06.06 MÉTODOS GRÁFICOS 16,22 08. FARMÁCIA 06.21 SANIT TESTE ERGOMÉTRICO 8,82 08.01 DISPENSA MEDICAÇÃO 18,74 06.22 SANIT FEM 06.07 HOLTER / MAPA / ESPIROMETRIA 7,41 08.02 ESPERA FARMÁCIA 46,47 06.22 SANIT MAS 06.08 ELETROENCEFALOGRAMA 7,44 internas) 08.03 ADM ALTO CUSTO 15,53 06.23 SANIT PCD 06.09 TABELA DE ÁREAS PAV. SUPERIOR (áreas internas) TABELA DE ÁREAS PAV. SUPERIOR (áreas RELAÇÃO DE FOLHAS DO PRO TABELA DE ÁREAS EXTERNAS 7,41 08.04 9,59 06.23 SANIT PCD 06.10 folha conte cód. ambiente área (m²) ELETRONEUROMIOGRAFIA ambiente área (m²) RECEB. cód. cód. ambiente área (m²) RESSONÂNCIA MAGNÉTICA 49,07 08.05 HIG. RETIRADA 14,24 07.05 SANIT FUNCIONARIOS 06.11 PE 001 R00 SÍNTE AFS ARQ 04.10 CIRC FISIO 9,84 04.06 SANIT PCD FEM 3,12 10. PAISAGISMO COMANDOS RM TOMO 17,43 08.06 ESTOQUE / MED ALTO CUSTO 32,68 07.05 SANIT FUNCIONARIOS 06.12 183,88 m² 04.06 SANIT PCD MAS 3,11 PE 002 R00 TABEL AFS ARQ JARDIM ENTRADA 124,78 SALA TÉCNICA RM 8,90 08.07 CIRC FARMÁCIA 10.01 10,17 07.07 VEST FEM 06.13 04.07 SANIT FEM 13,48 05. APOIO 10.02 JARDIM 01 PE 003 R00 DEMO AFS ARQ RECUPERAÇÃO / PREPARO / EMERGÊN... 21,67 147,42 m² 07.07 VEST51,35 MAS 06.14 04.07 SANIT MAS 13,57 05.02 SANIT FUNC. MAS. 2,46 10.03 JARDIM 02 PE 004 R00 IMPLA AFS ARQ RAIOS X 25,21 09. APOIO 07.09 VEST58,05 PNE 06.15 04.08 VEST 3,73 05.03 DML 01 3,49 JARDIM 03 URODINÂMICO 10,09 07.09 VEST57,81 PNE 47,05 09.01 CIRC SERVIÇO 10.04 06.16 PE 100 R00 PLANT AFS ARQ 04.09 VEST 2,91 05.04 CIRCULAÇÃO SERVIÇOS 102,65 JARDIM 04 100,07 ELETROCARDIO 5,87 09.05 SANIT FUNC 09.02 Q. ELÉTRICO 10.05 2,57 06.17 PE 102 R00 PLANT AFS ARQ 04.09 VEST 2,91 05.07 DML 02 3,78 10.06 JARDIM SOBRE LAJE 01 56,52 POSTO DE ENFERMAGEM 9,38 09.05 SANIT FUNC 09.03 ARM. ROUPA SUJA 5,83 06.18 05.01 SANIT FUNC. FEM. 3,47 05.10 SALA TÉCNICA TI 10,42 PE 103 R00 PLAN AFS ARQ 10.07 JARDIM SOBRE LAJE 02 100,54 TOMOGRAFIA 41,17 09.05 SANIT FUNC 09.04 ARM. ROUPA LIMPA 8,00 06.19 05.05 SANIT FUNC. FEM 2,49 05.11 ESCADA 01 26,39 JARDIM LATERAL 11,23 PE 104 R00 PLANT AFS ARQ DML 5,36 09.05 SANIT FUNC 09.06 ALMOXARIFADO 10.08 24,97 06.24 05.06 SANIT FUNC. MAS. 3,83 05.12 ESCADA 02 11,02 10.09 JARDIM LATERAL 29,54 PE 105 R00 PLANT AFS ARQ CIRCULAÇÃO IMAGEM 120,23 09.07 CENTRAL DE RECEBIMENTO 7,97 06.25 05.08 SANIT FUNC. FEM. 2,29 05.13 ESCADA 03 9,42 10.10 JARDIM LATERAL 53,56 522,61 m² 09.08 ESTACIONAMENTO COBERTO 285,13 PE 111 R00 PLANT AFS ARQ 05.09 SANIT FUNC. MAS 2,32 169,63 m² 10.11 JARDIM ESTACIONAMENTO 28,52 09.09 PARADA AMBULANCIA 40,81 07. OPERACIONAL PE 121 R00 PLANT AFS ARQ 121,47 m² 05. APOIO SANITÁRIOS 671,97 m² DIRETOR CLÍNICO 8,60 09.10 GERADOR DE ENERGIA 750KVA 07.01 28,12 01.06 01.12 01.13 01.14 02.07 02.08 03.11 03.11 03.15 03.15 03.16 03.16 03.16 03.16
SANIT COLETA SANIT PCD SANIT F SANIT M SANIT PCD FEM SANIT PCD MAS SANIT GIN/URO SANIT GIN/URO SANIT FEM SANIT MAS SANIT PCD FEM SANIT PCD FEM SANIT PCD MAS SANIT PCD MAS
07.02
GSPublisherVersion 0.4.100.13
3,00 GERENTE DE ENFERMAGEM 3,34 2,18 2,18 3,03 3,04 3,13 3,90 14,15 14,15 3,02 3,05 3,02 3,05
TABELA DE ÁREAS PAV. INFERIOR (áreas internas)
área (m²)
03.05 03.06 03.07 03.08 03.09 03.10 03.10 03.10 03.10 03.10 03.10 03.10 03.10 03.11 03.11 03.12 03.13 03.14 03.17 03.17
cód.
ambiente
09.13 09.14
DEPÓSITO MATERIAIS TRANSFORMADOR 750kVa
09. APOIO SANITÁRIOS 06.16 SANIT PCD
área (m²) 20,57 9,53 489,68 m² 3,00
8,50
1.365,70 m² 09.12 QGBT
11. ABRIGOS EXTERNOS 09.18 ABRIGO GAS ODONTO 11.01 RESÍDUOS COMUNS 11.02 RESÍDUOS RECICL 11.03 RESÍDUOS QUÍMICOS 11.04 RESID INFECT, CX PERF. 11.05 BOX LAVAGEM CARROS 11.06 VAGA P/ AMBULÂNCIA 11.07 ABRIGO DE ÁGUA E GÁS 11.08 CABINE BLINDADA 11.09 ABRIGO GASES 11.10 ABRIGO AR COMPRIMIDO 11.11 ABRIGO BOMBA VÁCUO
9,13
1,38 6,00 5,09 2,35 3,31 3,16 19,10 3,06 4,00 3,32 17,01 3,33 71,11 m² 743,08 m²
AFS ARQ
PE 122 R00 PLANT
AFS ARQ
PE 123 R00 PLANT
AFS ARQ
PE 124 R00 PLANT
AFS ARQ
PE 130 R00 PLANT
AFS ARQ
PE 132 R00 PLANT
AFS ARQ
PE 133 R00 PLANT
AFS ARQ
PE 300 R00 ELEVA
AFS ARQ
PE 400 R00 AMPLI
AFS ARQ
PE 401 R00 AMPLI
AFS ARQ
PE 402 R00 AMPLI
AFS ARQ
PE 403 R00 AMPLI
AFS ARQ
PE 405 R00 AMPLI
AFS ARQ
PE 406 R00 AMPLI
AFS ARQ
PE 407 R00 AMPLI
AFS ARQ
PE 408 R00 AMPLI
AFS ARQ
PE 409 R00 AMPLI
AFS ARQ
PE 500 R00 DETAL
AFS ARQ
PE 501 R00 DETAL
AFS ARQ
PE 502 R00 DETAL
35
1
2
3
4
5
6
7
8 62,20
6,20
4,20
4,20
HH 202
4,20
II 202
2,15
4,20
4,20
FF 201
CONTINUA FOLHA 102
N
EE 201
DIVISA TERRENO V3
V3 V8
V8
V8
V8
3,55
BB 200
SR-01
0,31
V8
AP 4,80
1,14 0,31 ALVENARIA P/ PASSAGEM DE ELÉTRICA H=88cm
V8
AP
V8
0,31
3,89
MESA
J15
P7
T4
PA16
J12
V8
JARDIM 3,92 5 x módulo de 0,80M
10.07 JARDIM SOBRE LAJE 02 A: 100,54 m2 PD: 3,27 m
MESA
PA15 V8
AP 0,47
0,31
SR-01
V8
BANCO
0,10
V8
B
J15
0,10
J15
V8
3,31 4 x módulo de 0,80m
i=2%
AP 4,78
3,90
0,80
3,89
AP
AP
AP
V8
V8
2,15
0,10
A
0,31
1,00
1,90
1,00
0,31
0,96
1,95
0,98
0,31
0,47 62,09
ALVENARIA P/ PASSAGEM DE ELÉTRICA H=78cm
5,20
0,10
0,10 5,23
J16
03.01 ESPERA ESPECIALIDADES A: 171,60 m2 PD: 3,15-4,45 m
4,78
P4
T2
V2
T3
0,10
01.03 ESPERA REABILITAÇÃO A: 54,72 m2 PD: 2,80 m
4,78
R2
ALVENARIA P/ PASSAGEM DE ELÉTRICA H=78cm
P4
T1
V2
R2
T3
±0,00
6,84
6,90
5,00
2,18
2,18
2,28
ALVENARIA P/ PASSAGEM DE ELÉTRICA H=88cm
CC 201 3,20
0,15 1,49
1,64
0,15 0,80 0,40
0,15 J03
2,30
J03
0,80
2,30
2 20
1
0,15
1,97
±0,00
7,80
0,40
V1
T8
0,90
R4
0,58
P1
V1
0,90
R4
0,50
P1
V1
J18
J18
1,00
2,05
1,00
0,15
0,15 0,80
2,75 0,80
J03
J03
0,80
0,80 J02
4,02
0,22
0,15
05.10 SALA TÉCNICA TI A: 10,42 m2 PD: 2,80 m
0,32
0,05 1,22
PA03
03.11 SANIT GIN/URO 0,15 0,20
03.09 CABINE AUDIOMETRIA A: 7,94 m2 PD: 2,80 m
0,27
5,27
03.11 C. GINECOLOGIA/UROLOGIA A: 12,04 PD: 2,80
0,15
4,05
R2
1,37
1,97
T3
1,19 0,22
0,80
0,04
0,80
1,93
V7
1,97
0,90
PA01
J02
1,19
0,15
0,57
R2
P4
V2
T3
R2
PA02
HIDRANTE T8
0,90
J18
J18
0,10
R4
P1
1,20
J18
AP
V4
V2
2,30
0,80 J03
0,80
0,50
2,20 T3
PA02
V2
0,15
PA10 PA01
0,15
0,15
PA02
0,90 1,51
V7
0,90
V1
1,20
T8
0,90
1,80
0,10
R4
0,20
2,00
4,58
05.04 CIRCULAÇÃO SERVIÇOS A: 102,65 m2 PD: 2,80 m
J18
J18
P4
J18
J18
V2
T3
0,90
7,27
R2
J18
J18
J18
H 3,80
P4
J04
PA02
0,10
PA02
0,90
1,15
P4
0,15
1,95
V2
03.10 CONSULTÓRIO
1,60
4,02
R4
PA01 T8
0,50
0,80
0,75
0,90 T8
0,15
V2
0,80
2,40 PA01
V1
R4
0,55
1,97
05.09 SANIT FUNC. MAS 05.05 SANIT FUNC. FEM A: 2,49 m2 A: 2,32 m2 PD: 2,80 m PD: 2,80 m
P1
T8
05.06 SANIT FUNC. MAS. A: 3,83 m2 PD: 2,80 m
05.07 DML 02 A: 3,78 m2 PD: 2,80 m 1,92
0,22
0,70
1,30
V1
P4
J03
R2
0,80
T3
03.08 SALA TESTES OTORR. A: 8,83 m2 PD: 2,80 m
P4
1,97
0,15
0,52
0,52 0,70
0,10
PA06
0,90 P1
0,47
0,22
1,04 1,87
05.08 SANIT FUNC. FEM. A: 2,29 m2 PD: 2,80 m PA01 P1
3,05
21
1,20
0,10
AP
1,20
0,15 1,55
3,41
V7
1,73
3 19
1,18
0,50
0,90
0,80
0,10
1,50
2,45
J02
0,10
0,82
0,80
0,22 0,50 4 18
R2
PCF
5 17
V2
03.03 FONAUDIOLOGIA A: 9,66 m2 PD: 2,80 m
03.06 ÁREA LIMPA A: 4,78 m2 PD: 2,80 m
0,45
J02
0,50
0,45
V2
0,15
0,80 0,85
0,60
3,98
0,90
6 16
T3
0,14
0,90
1,95
0,15
P4
1,60
0,80
J04
0,80
16,85 5,00
4,02
0,05 J02
0,80
J04
0,80 0,69
J02
0,80
2,30
0,80
J03
0,80 14,70
0,80 J03
4,25
R2
0,15
T3
1,60
J03
T1
0,15
R4
V2
0,15
0,85
J04
R2
2,30
T3
0,80 V2
J09
1,20
0,15
J02
T8
P4
0,70 0,80 J03 V7
0,90
PA02
7,05
J03
1,60 2,92
PT03
0,80
V1
V2
0,80
V2
03.12 C. OTORRINO A: 17,11 m2 PD: 2,80 m
2,00
0,15
P4
0,80
2,95 0,15
P4
P4
AP
0,85
0,90
PA02
0,15
PA02
0,90
3,19
1,75
14,53
0,81 J03
0,80 J03
0,80
P1
0,10
1,93 0,70 1,00
PA10
0,60
7 15
V2
1,20
03.05 ÁREA SUJA A: 4,69 m2 PD: 2,80 m
1,97
D
DIVISA TERRENO
3,52
J01 J01
4,27 0,15 0,80
0,15 1,60 0,90
PA02
0,55
0,15
2,53
J03
VAZIO
4,02
2,12
0,22
0,15
1,50
0,80
0,52
J03
1,60
2,12
2,12 0,15 2,45
0,80 0,20 J03
0,80
R2
±0,00
1,77
8 14
T3
AP
0,90 10,75
PA03
4,96 P4
V7
0,80
R4
T5
V1
0,89
14,85
PA03
8,20 9 13
0,30
0,80
1,50 0,15
1,05 10 12
R2
AP
P4
0,90
PA01
1,95
2,44
11
T3
1,60
4,02
1,05
0,15 3,33
- 1,90
V2
09.18 ABRIGO GAS ODONTO A: 1,38 m2 PD: 1,18 m
0,52
S
0,26
V7
03.13 C. OFTALMOLOGIA A: 11,87 m2 PD: 2,80 m
R2
T3
V7
4,19
2,00
P1 V1 T8 R4
05.13 ESCADA 03 A: 9,42 m2 PD: 3,30 m
V2
J09
0,05
1,40
0,45
AP
V4
P1
J02
0,60
G
P8
0,22
4,50 0,65 04.09 VEST A: 2,91 m2 PD: 2,80 m
P4
1,92
0,75 AP
V2
1,90
R2
T3
V7
P4
J03
0,80
V2
0,49 PA03
0,80
J04
R5
0,25
0,15
PA01
J02
T3
0,90
7,05
V7
R4
T8
P1 V1
0,45
1,40
0,60
1,64
0,15
0,79
J03
1,60
P4
0,94
1,80
R4
T3
V1
V2
6,62
04.10 CIRC FISIO A: 9,84 m2 PD: 2,80 m
0,90
P1
03.15 SANIT MAS A: 14,15 PD: 2,50
0,22
J13
AP
V4
04.09 VEST A: 2,91 m2 PD: 2,80 m 0,65
P6
0,15
+0,25
0,90
J02
0,80 0,15
J02
0,80
R4
T8
V1
04.08 VEST A: 3,73 m2 PD: 2,80 m
1,15
14,45
P1
4,99
0,49
04.06 SANIT PCD FEM A: 3,12 m2 PD: 2,80 m 0,20
AP
03.14 TERAPIA OCUPACIONAL A: 8,58 m2 PD: 2,80 m
03.04 CONSULTORIO ODONTOLOGIA A: 28,31 m2 PD: 2,80 m
10.06 JARDIM SOBRE LAJE 01 A: 56,52 m2 0,00 m
0,81
0,15
1,55
R4
T8
V1
0,96
1,20
1,50 P1
0,40
0,80 0,24
0,90
J02
0,80
0,15
0,15
PA02
04.06 SANIT PCD MAS A: 3,11 m2 PD: 2,80 m 0,20 2,06
PA01
4,02
0,81
0,15 0,15
04.04 GINÁSIO FISIOTERAPIA A: 88,62 m2 PD: 2,80 m
R2
T3
V7
03.16 SANIT PCD FEM A: 3,05 m2 PD: 2,50 m 2,05 0,10 1,40 0,20
0,10
P4
03.17 CIRC ESPECIALIDADES A: 31,33 m2 PD: 3,55 m
1,47
J03
0,80
2,85
V2
0,90
V6
4,02
R2
T3
V7
03.07 AVALIAÇÃO FUNCIONAL A: 9,86 m2 PD: 2,80 m
0,35
2,60 3,75
J03
0,80
P4
AA 200
0,15
0,80
R5
J04
T3
ALVENARIA H = 2,80m
2,05 1,40
E
0,80
4,02 V2
03.02 NEUROPSICOLOGIA / PSICOPEDAGOGIA A: 8,49 m2 PD: 2,80 m
0,35
J03
3,95
V7
±0,00
0,90
PA02
V2
0,90
1,10
0,15
PA02
3,41
J04
25,97 0,80
P6
0,80
2,90
04.03 RECEPÇÃO A: 11,02 m2 PD: 2,80 m
04.05 CONSULTORIO FISIO PÉLVICO A: 9,76 m2 PD: 2,80 m
0,40
0,80
03.16 SANIT PCD MAS A: 3,02 m2 PD: 2,50 m 0,10 2,03 0,20 1,40
4,02
AP
i=2%
COBERTURA ABRIGOS
0,10
P4
0,80
0,40
1,82
2,05
0,80 0,80
J04
29,25
9,80
T7
03.16 SANIT PCD FEM A: 3,02 m2 PD: 2,50 m 2,03 0,10 1,40 0,20
0,15
4,80
04.02 CONSULTORIO FISIO A: 9,92 m2 PD: 2,80 m R2 T3 P4 V2 V7
0,40
F
AP
1,33
0,95
0,26
V6
PA10
0,80
0,95
0,15
1,40
i=2%
J13
J03
0,45
3,99
0,28
P1
AP AP
14,48
2,56 0,15 0,80
J03
3,41
04 301
-1,32
V6
03.16 SANIT PCD MAS A: 3,05 m2 PD: 2,50 m 2,05 0,20 1,40
0,10
0,15 0,55
0,80
1,00
R4
T6
PA03
PA10
1,85
1,00
V1
0,90
V10
0,22
0,15
J01
1,00
P1
4,38 2,02
0,22
0,35
R4
J01
0,46
R4
1,08 PA03
1,17
0,70
T6
V1
0,10
0,90
0,70
T8
3,35
P1 V1
0,11
PA02
4,05
P1
2,05 1,80
0,10
0,28
PA03
1,22
0,15
0,01
0,70 04.07 SANIT MAS A: 13,57 m2 PD: 2,50 m 4,02
R4
0,40 0,22
0,70
T8
0,90
2,75
1,65
0,70
R4
T6
V1
V10
PA01
04.07 SANIT FEM A: 13,48 m2 PD: 2,50 m P1 V1
P1
4,28 2,02
0,90 PA03
0,15
0,16 J02
0,80
0,70
R4
T6
V1
0,28
V6
0,35
V4
D
P1
4,25
V6
PA01
C
1,83
1,90 1,77
0,05 1,65
V10
0,90
0,90
V10
PA02
8,29 0,35
0,90
V10
1,49
3,02 1,45
0,22
0,22
1,10
1,00
1,10
1,00
1,10
1,00
AP 1,10
1,00
1,10
1,00
1,18
1,00
AP 1,08
1,00
1,10
1,00
AP 1,10
V4
1,00
1,10
1,00
J18
AP 1,10
1,00
SR003
HH 202
6,20
36
* PARA DETALHES DE ÁREAS MOLHADAS VERIFICAR SÉRIE 400
GSPublisherVersion 0.4.100.13
II 202
4,20
4,20
FF 201
EE 201
6,35
4,20
02 300
4,20
PLANTA CIVIL PAV. SUPERIOR 1:50
CONTINUA FOLHA 102
62,46
CONTINUA FOLHA 103
HEALTH 62,20 4,20
8
9
01 300
01 300 9
10
Public Health Centre 05.2019 - 09.2019 Status: Under Construction
10
11
11
12
12
13
13
14
14
15
15
16
16
LEGENDA DE ALVENARIA
62,20 4,20 2,15
2,15 4,20
4,20
4,20 4,20
4,20 2,15
4,20
2,15 4,20
4,20
LEGENDA DE ALVENARIA
7,55 7,55
PAREDE DE VEDAÇÃO 20 cm (BLOCO DE 19cm + REVESTIMENTO 1cm)
PAREDE DE VEDAÇÃO 20 cm (BLOCO DE 19cm + REVESTIMENTO 1cm)
GG 202
GG 202
DD 201
DD 201
09
PAREDE DE VEDAÇÃO 15 cm (BLOCO DE 14cm + REVESTIMENTO 1cm)
PAREDE DE VEDAÇÃO 15 cm (BLOCO DE 14cm + REVESTIMENTO 1cm)
PAREDE DE VEDAÇÃO 15cm (ENCHIMENTO PARA INSTALAÇÕES)
PAREDE DE VEDAÇÃO 15cm (ENCHIMENTO PARA INSTALAÇÕES)
PAREDE DE VEDAÇÃO 10cm (BLOCO DE 9cm + REVESTIMENTO 1cm)
PAREDE DE VEDAÇÃO 10cm (BLOCO DE 9cm + REVESTIMENTO 1cm)
LEGENDA DE GASES LEGENDA DE GASES PONTO DE AR COMPRIMIDO COM CANOPLA
2
P4
0,15
V3
7,60 0,15
2,20
J18
AP 1,10 1,00
1,10 1,00
AP 1,00 0,52 0,15
2,66
2,66
0,15
V3
BANC
O
0,239
BANC
O
PA17
SEN 4,90
. ROBER
30,76
0,35
AV. SEN
2,36
PA17
30,76
0,35
TO SÍMON
SEN TO SÍMON
0,10
0,10
2,36
0,90 1,27
1,15
1,15
0,90
4,90
2,18
2,21
2,18
0,12 0,06
0,10
0,10
1,18 0,90 1,17
2,21
0,15
0,12 0,06
0,22 1,97 PA02
2,00 PA02
0,15 2,00 PA02
V1
T10 R4
4,90
PA18
14,52 2,30
PA18
14,52 2,30
0,90 1,25 15,77
4,90
0,25
0,15 2,00
1,15
0,15
1,15
0,90
PA02
0,31
0,31 1,20 0,90
1,15
1,15
0,15
12/09/19 DATA
SÃO CAETANO DO SUL, /
/
/
/ ASSINATURA RESPONSÁVEL D.O. ASSINATURA RESPONSÁVEL D.O. ASSINATURA E CARIMBO DO RESPONSÁVEL DA SECRETARIA REQUISITANTE
4,90
4,90
PA18
2,30
2,30
PA18
2,50
2,33
0,90 0,90
1,15 1,15
ASSINATURA E CARIMBO DO RESPONSÁVEL DA SECRETARIA REQUISITANTE
0,90
CALÇADA
1,15
CALÇADA
6 7 2,02 17 P4
16
8 15
V2
9 14
T3
10 13
R2
2
3
0,15 0,10
4,60
0,58
T10 R4
PT01
21
20
D
4 19
5 18
6 17 P4
7 16
8 15
V2
9 14
10 13
NO
L SU
CA
E TA
NO
DO
DO
2,15
PREFEITURA MUNICIPAL DE SÃO CAETANO DO SUL PREFEITURA MUNICIPAL DE SÃO CAETANOSEOHAB DO SUL- SECRETARIA DE OBRAS E HABITAÇÃO
G
SEOHAB - SECRETARIA DE OBRAS E HABITAÇÃO
11 12
R2
T3
11.09 ABRIGO GASES A: 3,32 m2 3,21 PD: 2,50 m
0,15 0,15
P1
V1
arquitetura e urbanismo
H
1,60
RESPONSÁVEL
12.711/2018 PT01
0,67
DESENHO
ANA CAROLINA PENNA
PROJETO
AFS ATENDE FACIL SAUDE AFS ATENDELOCAL FACIL SAUDE 12.711/2018
AV. SEN. ROBERTO SÍMONSEN, 282
AV. SEN. ROBERTO SÍMONSEN, 282
ACESSO PEDESTRES ACESSO PEDESTRES
V4
RRT/ART
ANA CAROLINA PENNA 0000008222091 ANA CAROLINA PENNA
PROJETO
LOCAL ±0,00 P2
10.08 JARDIM LATERAL A: 11,23 m2 0,00 m
0000008222091
Nº PROCESSO Nº PROCESSO
PT01
V4
RESPONSÁVEL DESENHO
RRT/ART
ANA CAROLINA PENNA
1,60
1,60 PT01
RUA CARDOSO DE ALMEIDA 313 CJ 101 CEP 05013-000 TEL 3666-8526 PERDIZES SÃO PAULO SP WWW.CAROLINAPENNA.COM
RUA CARDOSO DE ALMEIDA 313 CJ 101 CEP 05013-000 TEL 3666-8526 PERDIZES SÃO PAULO SP WWW.CAROLINAPENNA.COM
H
0,15
T10 R4
±0,00
0,18
±0,00
0,15
0,67
E TA
G
L SU
CA
11
12
11.11 ABRIGO BOMBA VÁCUO 3,33 m2 GASES 11.09A:ABRIGO 0,15 3,22 PD: A:2,50 3,32mm2 0,15 3,21 PD: 2,50 m T10 R4 P1 V1 ±0,00 P1 T10 R4 V1 ±0,00 1,60 1,60 0,18 1,60 PT01 PT01
P2
0,15
0,58
diTHIENE
arquitetura e urbanismo
11.11 ABRIGO BOMBA VÁCUO 4,88 A: 3,33 m2 3,22 PD: 2,50 m
V1
diTHIENE
05.12 ESCADA 02 0,10 A: 11,02 m2 0,00 m
D
3,45
P1
R4
DIVISA
05.12 ESCADA 02 0,10 A: 11,02 m2 0,00 m 1
T8
2,15
0,70 0,40
0,10
0,10 5
18
V1
1,95
4
1,50
0,40
0,70
1,25
0,82 3
S
F
F P1
1,40 2,08
1,95
2
01.12 SANIT PCD A: 3,34 m2 PD: 2,80 m 0,20 R4 T8 0,15
V1
2,42
1
19 V2 21 T320 R2
P4
0,70
4,60 2,02
P1
APAP APAP
2,42
S
1,45
ASSINATURA E CARIMBO DO TÉCNICO RESPONSÁVEL DA SEOHAB
R4
T8
V1
PA03
01.14 SANIT M A: 2,18 m2 PD: 2,80 m
2
1,03
AP AP AP AP
P1
2,65 PA01
A: 2,18 m PCD 01.12 SANIT PD: 2,80 m m2 A: 3,34 PD: 2,80 m 1,45 0,15 0,20 1,40 0,15 2,08
0,40
0,15
0,60 0,40
1,20
01.14 SANIT M A: 2,18 m2 PD: 2,80 m PA10 0,15
1,45
R4
T8
V1
1,13
PA01 PA03
PA01
P1 R4
T8
1,13
R4 V1
1,50
T8 P1 1,80
V1
0,15
0,90
PA06
P1 R4
T8
V1
2,65
0,15
T10 R4 P1 V1 11.10 ABRIGO ±0,00AR COMPRIMIDO A: 17,01 m2 PD: 2,50 1,60 m 1,60 ±0,00 PT01 PT01
1,60
P1
PT01
i=5% i=5%
Emissão Inicial 12/09/19 MODIFICAÇÃO DATA
0,15
P1
3,32
0,70
1,45
0,15
0,15
4,88
11.10 ABRIGO AR COMPRIMIDO A: 17,01 m2 PD: 2,50 m ±0,00
COBERTURA PARADA DE AMBULÂNCIA
REVISÃO
MODIFICAÇÃO
ASSINATURA E CARIMBO DO TÉCNICO RESPONSÁVEL DA SEOHAB
R4
T301.13R2 SANIT F A: 2,18 m2 PD: 2,80 m
0,15
0,10
1,04
AP 0,52 0,15
1,00
3,45
3,67
3,67
CONTINUA FOLHA 103
V7
1,03 R2
5,46 0,20 0,90 0,26
1,15
T8
J18
1,18
Emissão Inicial
PREFEITURA MUNICIPAL DE SÃO CAETANO DO SUL SEOHAB - SECRETARIA DE OBRAS E HABITAÇÃO - DIRETORIA DE OBRAS PREFEITURA MUNICIPAL DE SÃO CAETANO DO SUL SEOHAB - SECRETARIA DE OBRAS E HABITAÇÃO - DIRETORIA DE OBRAS APROVADO APROVADO PROCESSO Nº
JARDIM
5,46 0,90 0,26
01.13 SANIT F V2
PA10
4,39 2,02
02 300
AGENTE ETAPA
AGENTE
ETAPA
ARQUITETURA (ARQ) PROJETO EXECUTIVO
ARQUITETURA (ARQ)
PROJETO EXECUTIVO
TÍTULO
TÍTULO
ESCALA
ESCALA
PLANTA CIVIL PAV. SUPERIOR (PARTE 1) 1:50 PLANTA CIVIL PAV. SUPERIOR (PARTE 1)
10.08 JARDIM LATERAL A: 11,23 m2 0,00 m
1:50
ARQUIVO MURO H=2.50m MURO H=2.50m
4,20
6,35
6,35
* PARA DETALHES DE ÁREAS MOLHADAS VERIFICAR SÉRIE 400 ALHES DE ÁREAS MOLHADAS VERIFICAR SÉRIE 400
on 0.4.100.13
0,90
V1
PA01
2,02
T3
R00 REVISÃO
AA 200
AA 200
PROCESSO Nº
J18
1,00 1,18 10,65
COBERTURA PARADA DE AMBULÂNCIA
4,20
R2
1,80
0,10
V2
T3
P1
0,82
0,60 AP AP AP AP
1,80
E
AP
JARDIM
0,22
1,20 PA10
2,00 4,39
62,46 62,46
V2
0,20
P4
1,05
0,15
4,02
0,10
J18
J18
1,00 1,10
PA02
0,90
P4
1,25
R2
R00
E
V8
V8
AP
JARDIM
0,90
PA06 T3
0,10
2,37
01.05 COLETA A: 14,09 m2 PD: 2,80 m
3,31
V7
0,10
V4
J18
1,10 1,00 10,65
7,48
1,20
01.09 ASSISTÊNCIA SOCIAL A: 5,94 m2 PD: 2,80 m
2,33
PA06 0,15
0,90 1,23
V2
P2 P2
JARDIM
3,32
P4
0,05
0,90
3,31 PA02 1,05
0,10
2,00
J18
1,00 AP 1,10
R2
1,20 0,45 2,00 PA02
R2
03 301
PT07
1,10 1,00
V4
D
D
- COTAS E NÍVEIS EM METROS, EXCETO ONDE INDICADO. AS COTAS SÃO - COTAS E NÍVEIS EM METROS, EXCETO ONDEDE INDICADO. AS ACABADA. COTAS SÃO ALVENARIA DE ALVENARIA ACABADA. - VERIFICAR TABELA DE ACABAMENTOS PARA CÓDIGOS DOS - VERIFICAR TABELA DE ACABAMENTOS PARAACABAMENTOS. CÓDIGOS DOS ACABAMENTOS. - NÃO USAR A ESCALA NO DESENHO PARA OBTEREM-SE MEDIDAS. - NÃO USAR A ESCALA NO DESENHO PARA OBTEREM-SE MEDIDAS. - ESTE DESENHO DEVERÁ SER VERIFICADO COM OS - ESTE DESENHO DEVERÁ SER VERIFICADO COM OS CORRESPONDETES DE ESTRUTURA, INSTALAÇÕES HIDRÁULICAS E CORRESPONDETES DE ESTRUTURA, INSTALAÇÕES HIDRÁULICAS E QUALQUER DIFERENÇA, O ESCRITÓRIO DEVERÁ ELÉTRICAS, HAVENDO ELÉTRICAS, HAVENDO QUALQUER DIFERENÇA, O ESCRITÓRIO DEVERÁ SER CONSULTADO. SER CONSULTADO. - ANTES DE EXECUTAR DEVERÁ SER VERIFICADO EM LOCO, AS - ANTES DE EXECUTAR DEVERÁ SER VERIFICADO EM LOCO, AS INDICADOS NESTE DESENHO, INFORMANDO AO DIMENSÕES E NIVEIS DIMENSÕES E NIVEIS INDICADOS NESTE DESENHO, INFORMANDO AO ESCRITÓRIO AS DIFERENÇAS APONTADAS OU DÚVIDAS DE ESCRITÓRIO AS DIFERENÇAS APONTADAS OUINTEREPRETAÇÃO. DÚVIDAS DE INTEREPRETAÇÃO. - TODOS OS ACABAMENTOS ASSINALADOS NO PROJETO DEVERÃO SER - TODOS OS ACABAMENTOS ASSINALADOS NOEXECUTADOS PROJETO DEVERÃO SER COM AS ESPECIFICAÇÕES DE ACORDO EXECUTADOS DE ACORDO COM AS ESPECIFICAÇÕES CORRESPONDENTES. CORRESPONDENTES. - OS DESENHOS SÓ PODERÃO SER EXECUTADOS EM OBRA QUANDO - OS DESENHOS SÓ PODERÃO SER EXECUTADOS EM OBRA QUANDO APRESENTAREM O CARIMBO "PROJETO EXECUTIVO". APRESENTAREM O CARIMBO "PROJETO EXECUTIVO". - PARA PERFEITA COMPREENSÃO DOS PROJETOS PLOTE EM COLORIDO. - PARA PERFEITA COMPREENSÃO DOS PROJETOS PLOTE EM COLORIDO.
0,22
J18 J18
1,00 1,10
T3
1,03
1,10 1,00
V8
03 301
1,95
V7
2,50
T3
R2
T3
7,48
0,40
5,35
V4
1,00 1,10
NOTAS: NOTAS:
0,15
J18 J18
AP 1,07 1,00
EQUIVALÊNCIA DE NÍVEIS EQUIVALÊNCIA DE NÍVEIS NÍVEL DO LEVANTAMENTO TOPOGRÁFICO E PAISAGISMO +745,60 É NÍVEL DO LEVANTAMENTO TOPOGRÁFICO E PAISAGISMO É IGUAL AO 0,00+745,60 DA ARQUITETURA IGUAL AO 0,00 DA ARQUITETURA
01.02 ESPERA ACOLHIMENTO A: 112,43 m2 PD: 3,55 m
01.02 ESPERA ACOLHIMENTO A: 112,43 m2 PD: 3,55 m
0,15 V2
T1
V2
V4
J18 J18
1,00 1,10
R2
PT07
1,18 1,00
AP
R2
T3
0,22
J18 J18
1,00 AP 1,07
10.01 JARDIM ENTRADA A: 124,78 m2 0,00 m
SÃO CAETANO DO SUL,
1,18
1,10
1,10 1,00
T3
T1
V2
1,60
J18
1,00 1,18
PA02
0,25 0,90
1,25 15,77 0,90
PA02
V2
0,22
J18 J18
AP 1,10 1,00
0,15
1,17 0,90 1,27 0,90
PA02 PA02
0,80
V7
0,15 0,20
0,50
0,94
3,55
P4
P4
48,45
3,01
2,74
3,01
1,18 0,90
PA02 PA02
1,00 0,90
2,00 PA02
0,24
0,15 PA02
0,90 1,00
2,00 J10
0,15 1,95
11,38 3,37 0,90 PA03
0,80
0,90 5,35
P7
0,10
V8
AP
P4 P4
4,02
0,15
1,20
R4
T8
V1
0,50 PA06
0,90
V2
48,45 J18
0,15
0,15 2,74
0,90
PA02 1,97
0,15
1,20 0,90
J10 0,15 0,80
0,25
1,20 0,20 1,10 2,00 0,66 1,34
PA09
0,45
R4
4,02
pistola de água com pressão
1,01
R2
1,03
T8
T3
C
C
P7
0,15
V1
1,50
2,37
01.05 COLETA A: 14,09 m2 PD: 2,80 m
1,97
0,10 1,80 pistola de água com pressão
Pia de despejo com descarga
P1
V7
HIDRANTE
R4
V2
2,42
T8
01.11 MEDICAÇÃO A: 8,05 m2 PD: 2,80 m
1,74
V1
0,90
R2
1,52
R4
RÉGUA MOD. MAXIM S - R3 01 UND - RESSONÂNCIA - INFERIOR 01 UND - TOMOGRAFIA - INFERIOR
V3
10.01 JARDIM ENTRADA A: 124,78 m2 0,00 m
0,22
P1 T8
O2
V3
AP
0,10
1,18
R4 T8 P1 V1 R4 T8 3,19 P1 V1 1,01 0,90
T3
01.08 IMUNIZAÇÃO A: 7,85 m2 PD: 2,80 m
01.09 ASSISTÊNCIA 01.06 SOCIAL SANIT COLETA A: 5,94 m2 A: 3,00 m2 PD: 2,80 m PD: 2,80 m
0,15 0,20 P1
1,04
PA01
PA01
V7
4,02
0,65
VAC
RÉGUA MOD. MAXIM S - R3 01 UND - RESSONÂNCIA - INFERIOR 01 UND - TOMOGRAFIA - INFERIOR
V8 V3
0,10
4,78
4,78
4,02
4,02
PA10 PA01
P4
0,15 1,23
0,90
02.06 SALA DE UTILIDADES A: 7,96 m2 PD: 2,80 m
R4
AR
V3
ALVENARIA P/ PASSAGEM DE ELÉTRICA H=78cm ALVENARIA P/ PASSAGEM DE ELÉTRICA H=78cm
1,20
R3
0,15
1,97
0,65
T8
0,05
05.03 DML 01 P1 V1 2 02.06mSALA DE UTILIDADES A: 3,49 2 PD: 2,80 m A: 7,96 m PD: 0,15 2,80 m 1,77 0,22 4,02 0,50 0,35 1,93
0,90
1,93
0,35
0,15
0,35 R4
T8
PA02
0,22
0,52
0,35
1,93
2,00
4,75
0,94 T3
V5
0,32
R2
T3
01.10 INALAÇÃO COLETIVA A: 8,05 m2 PD: 2,80 m
P4
0,40 P5
R3
0,80
P4
R2
T3
V7
J01
1,60 1,12
3,55
J01
0,80
V2
01.08 IMUNIZAÇÃO A: 7,85 m2 PD: 2,80 m
0,15
R4
1,50
0,90 PA03
4,75
T8 4,02
V1
V2
1,00
2,00 4,02
01.06 SANIT COLETA A: 3,00 m2 PD: 2,80 m
P1
V7
4,29
3,47
0,95 PA09PA02 PA02
ALVENARI H=1,07m 0,80
R2 T3 P4 V2 V7 02.05 CIRC PROCEDIMENTOS A:4,02 31,35 m2 PD: 3,55 m
02.03 SALA PROCEDIMENTO 02 A: 19,12 m2 PD: 2,80 m
1,60 0,15
R2 T3 V2 V7 T1 T3 R2 V2 4,02
0,15 11,38 3,37
1,00
0,32
0,50 0,40
V1
0,90
0,80
0,40 PA02
0,90 0,24 0,90
4,75
1,00
J10
1,00
0,80
2,29
0,80 J03
0,80
J01
0,80
T3 J02
P5 J02 V5
J02
J01
J02
0,80
01.11 MEDICAÇÃO A: 8,05 m2 PD: 2,80 m
0,15
1,34 0,15
0,81
J01 PA09
1,00
P4
01.10 INALAÇÃO COLETIVA A: 8,05 m2 PD: 2,80 m
4,02
05.01 SANIT FUNC. FEM. A: 3,47 m2 05.03 DML 01 PD: 2,80 m P1 V1 A: 3,49 m2 0,222,80 m 0,15 0,15 1,77 PD: 1,77 0,15 0,22
1,49
0,55
02.03 SALA PROCEDIMENTO 02 A: 19,12 m2 PD: 2,80 m
0,80 2,29 0,15
0,15 3,23
J02 J02 0,32 1,00 0,80 0,45 0,80
0,52
0,90
1,93
R4 P1
P4 P4
1,20
J03
1,00
V7
PA02 2,00
4,29
4,72 1,20 0,90 0,25
J10
1,00
0,20 1,10 2,00 0,66
1,72
0,15
R2
0,15
T8
0,90
1,04
1,04 0,90
PA02
3,47 1,20
0,80
J03
1,00
V2
R2
4,02 2,00
AP
CC 201
0,10
02.05 CIRC PROCEDIMENTOS A: 31,35 m2 PD: 3,55 m
4,02
0,55
0,22
0,22
0,22
J01
0,80 0,80
4,72
2,32
0,95 PA09 J01
0,15
0,40
0,80
J03
0,80 0,80 0,80
4,75
0,80 0,85 14,48
J03 ALVENARI H=1,07m
T3
V2
O2
1,86
1,86
1,49 J01
J01 J01
0,80 0,80
J01
0,85
P4
V2
PT01
V1
P4
R2
0,22
P4
01.04 SALA PRÉ-CONSULTA 2 A: 8,05 m2 PD: 2,80 m 4,02
0,35
R2
T3
±0,00
AP
J01
2,30
0,80 J03
0,80 0,15
0,22
P1 R4 0,50
01.04 SALA PRÉ-CONSULTA 2 A: 8,05 m2 PD: 2,80 m 4,02
R2
T3
T1 3,79
V2
±0,00 DE ENFERMAGEM 02.04 POSTO E SERVIÇO A: 19,13 m2 PD: 2,80 m
Pia de despejo com descarga
3,19
R2
T3
V7
J03
0,80
J01
0,850,80 0,80 0,80 0,15
J03
0,80 0,80
J03
T3
V2
3,98
0,81 0,80
R2
PA01
V2
0,10
J03
0,80 0,80
P4
BASE EM ALVENARIA H=10cm 3,28
P4
3,79 02.04 POSTO E SERVIÇO DE ENFERMAGEM A: 19,13 m2 PD: 2,80 m
0,85
0,15 0,85
1,00
0,10 T8
0,35
P4
0,80 2,75
BASE EM ALVENARIA H=10cm
0,22
AP
1,12
0,15
1,00
AP
1,720,80
3,98
J03
T3
V7
0,55
1,97
0,56
AP
O2
5,94 5,94 V8
4,78 AP 0,10 ALVENARIA P/ PASSAGEM DE ELÉTRICA H=88cm
4,78 ALVENARIA P/ PASSAGEM DE ELÉTRICA H=88cm
HIDRANTE
P12,00 V1
2,32 0,80
2,30 0,15 2,30 0,15 2,30
0,80
0,22
03.11 C. GINECOLOGIA/UROLOGIA A: 12,32 m2 PD: 2,80 m 2,62 J02 J02 0,72 0,90 0,32 0,80 0,15 0,80
0,40
0,29 R4
0,90
1,00
0,35
J01
0,80 0,22 0,80 0,22
3,52 0,15
0,85 0,80
J03
0,80 0,85 0,80
J03
0,80 J03
2,30 0,90 0,90
0,05 0,15
0,90
1,90
PA08
R2
0,45 PA03 05.02 SANIT FUNC. MAS. A: 2,46 m2 SANIT 05.01 SANIT03.11 FUNC. FEM.GIN/URO PD: 2,80 m 2 A: 3,47 m2A: 3,90 m PD:2,62 2,80 mPD: 2,80 m 1,25 0,15 0,22 0,15 0,15 1,77 0,20
1,49
0,05
0,90
T8
V2
P4
01.03 SALA PRÉ-CONSULTA 1 A: 7,95 m2 PD: 2,80 m 4,02
2,42
V1
1,00
0,22 T3
V7
0,15
R3
T3
V5
1,60
V2
01.03 SALA PRÉ-CONSULTA 1 A: 7,95 m2 PD: 2,80 m 4,02
0,35
02.02 SALA PROCEDIMENTO 01 A: 18,93 m2 PD: 2,80 m
02.02 SALA PROCEDIMENTO 01 A: 18,93 m2 PD: 2,80 m 0,56
3,28
0,80
T3
V7
P5
VAC
5,35
PA13
R2
T3
R2
1,74
0,50
T3
V2
V2
1,52
R4 P1
2,14
PA13 P4
0,22
0,10 T8
0,15
0,15
1,64
1,64
J01
0,80 0,80
J01
3,35 0,15 2,30 0,90
PA02
0,15 2,30
0,85 14,48 V2
0,80
V1
1,80
AP
1,60
PA01
0,10
1,49
0,15
0,15 3,52
2,00
0,15
0,15
0,45 1,80 P1
7,27
PA10
03.11 SANIT GIN/URO A: 3,90 m2 0,15 PD: 2,80 m 2,62
0,20
PA01
0,29 R4
1,00
0,90
PA03
2,19
0,15
0,90
1,25
ARMÁRIO DE QUADROS 1,97
PA10
0,72
1,40
R3
AR
5,35
PA10 P4
VAZIO
R2
T3
PA02
PA02
0,65 0,40 0,15 05.02 SANIT FUNC. MAS. A: 2,46 m2 PD: 2,80 m 0,55
0,15 0,05
PA03
03.11 SANIT GIN/URO A: 3,13 m2 2,10 PD: 2,80 m 0,15 0,20 1,49
1,97
1,90 0,15
PA02
0,90
0,90
0,15 0,05
0,15
1,15
0,15
PA08
1,49 0,45
0,90
V7
T3
V5
O2
O SÃ
T8
0,15 2,00 3,23
P4 V2
03.11 C. GINECOLOGIA/UROLOGIA A: 12,32 m2 PD: 2,80 m 2,62
0,55 1,40
P5
6,90
6,64
CC 201
7,48 7,48
2,14
PA10
4,02
R2
03.10 CONSULTÓRIO A: 9,23 m2 PD: 2,80 m
R2
T3
01.15 DEPÓSITO 01 A: 5,47 m2 PD: 2,80 m
AR
24 -10 -1948
V1
PA02
0,15 1,55 2,30 0,90
3,35 2,75
3,23 2,00 V7
01.16 ELEVADOR A: 5,24 m2 PD: 3,55 m
01.15 DEPÓSITO 01 A: 5,47 m2 PD: 2,80 m
T7
VAC
O SÃ
ARMÁRIO DE QUADROS
1,22 0,65 0,40
0,05
0,10 P1
PA02
PA02
0,90 0,15 3,35 2,75
V2
2,03 1,40
AR
24 -10 -1948
0,20
T3
V7
4,02
4,02
03.11 C. GINECOLOGIA/UROLOGIA A: 12,04 m2 PD: 2,80 m 2,10
2,19
PA02
0,32
PA03
03.11 SANIT GIN/URO A: 3,13 m2 2,10 PD: 2,80 m
P4
R2
T3
03.10 CONSULTÓRIO A: 9,23 m2 PD: 2,80 m
4,02
P4
1,15 0,04
0,90 0,15
05
PA02
0,90
0,85 14,55
1,50 0,90
PA02 PA02
1,55
2,30
V7
PA03
01.16 ELEVADOR V6 A:FEM 5,24 m2 02.07 SANIT PCD A: 3,03 m2PD: 3,55 m PD: 2,50 m 0,10 0,20
T7
0,10
0,15
1,60
V2
4,02
1,60 0,22
V2
J03
3,23 0,80
J03
P4
1,37 0,55
R2
VAZIO
03.10 CONSULTÓRIO 4,02 A: 9,23 m2 PD: 2,80 m
AP
4,02
R2
T3
0,80
V7
C. GINECOLOGIA/UROLOGIA A: 12,04 m2 PD: 2,80 m 2,10
P4
0,22
0,90
0,15 0,90
PA02
1,55
0,15
PA02
03.17 CIRC ESPECIALIDADES A: 29,10 m2 R2 V2 PD: V73,55 T3 m
P4
0,80 0,15
J04
0,80
4,02
1,60
2,00 03.10 CONSULTÓRIO 4,02 A: 9,23 m2 PD: 2,80 m
R2
T3
T3
V7
03.10 CONSULTÓRIO A: 9,26 m2 PD: 2,80 m
P4
03.10 CONSULTÓRIO A: 9,26 m2 PD: 2,80 m 4,02 V7
V2
4,02
P4
R2 R2
T3 T3
±0,00 03.10 CONSULTÓRIO A: 9,26 m2 PD: 2,80 m
1,55
0,15 0,85 2,30
1,50
14,55
4,02
V2
T1 V7
V2 V2
1,65
PA02
1,65
0,80 0,85
PA02
0,80 0,80
P4
R2
AP
AP
4,02
1,60
1,60
R2
±0,00
R2 T3 P4 V2 V7 03.17 CIRC ESPECIALIDADES A: 29,10 m2 PD: 3,55 m
J03
0,80 0,85
AP
J13
AP
03.10 CONSULTÓRIO A: 9,32 m2 PD: 2,80 m
0,15
03.10 CONSULTÓRIO A: 9,23 m2 PD: 2,80 m
1,60
0,10
1,00
4,02
2,00
T3
1,55
0,90
R2
T3
T1
V2
AP J13
1,00
P4
R2
T3
1,60
V2
1,00
03.10 CONSULTÓRIO A: 9,32 m2 PD: 2,80 m
PA02
T3
0,90
P4
V7
1,50 V7
0,10
R4
0,22 0,22
0,60
0,15 2,05 0,90
PA02 PA02
0,90 V2
4,02
V7
V2
P4 P4
R2
T3
4,02
1,55
2,30
P4
1,60
03.10 CONSULTÓRIO A: 9,26 m2 PD: 2,80 m 4,02 V2
T8
1,00
3,35 0,90 2,30 0,15
PA02
0,90
0,85 0,80
R2
T3
V7
AP
1,60
P4
0,15
03.10 CONSULTÓRIO A: 9,23 m2 PD: 2,80 m
V2
1,00
R2
T3
03.10 CONSULTÓRIO A: 9,26 m2 PD: 2,80 m
J03
4,02
V7
T6
V1
02.08 SANIT PCD MAS A: 3,04 m2 PD: 2,50 m 2,04 0,23 1,40
4,02
1,50
1,60
AP 03.10 CONSULTÓRIO A: 9,26 m2 PD: 2,80 m
V2
1,68
HIDRANTE
0,15
0,60
1,68
HIDRANTE 3,52
0,80
0,15
0,80
2,05
0,40
0,15
4,27
PA02 J03
R2
T3
V7
P1
0,50
1,00
0,22
4,02 V7
7,44 7,44
R4
T8
4,02
V2
0,22
N20
O2
O
0,45 0,50
4,02 P4
1,99
O2
LAD
0,90
03.10 CONSULTÓRIO A: 9,27 m2 PD: 2,80 m
0,10
VAC
GO
0,95
2,04 0,22
AR
ER
0,45
T6
V1
PA03
V6
02.08 SANIT PCD MAS V6 02.07 SANIT PCD FEM A: 3,04 m2 A: 3,03 PD: m2 2,50 m 2,04 0,10 PD: 2,50 m 1,40 2,03 0,23 0,10 1,40 0,20
V6
PA01
0,70 0,70 03.15 SANIT FEM 4,02 0,22 A: 14,15 m2 PD: 2,50 m
O2
OP
0,90
0,15
0,70
O2
ÇÃ
R4
P1
03.10 CONSULTÓRIO A: 9,27 m2 PD: 2,80 m
V2
V10 V6
V6
PA01 0,35
VAC
O
0,95
0,10 1,99
LAD
T6PA10 T8
V1
1,94 0,10 1,94
0,28 2,04 0,18 0,10
0,90
GO
P1
AP
R4
T6
V1
0,10
V10
PA03
V6
T7
0,70 0,70 03.15 SANIT FEM 4,02 A: 14,15 m2 PA10 PD: 2,50 m
R4
T8
4,10 1,942,02 1,94
ER
T6
V1
0,35 0,15
0,35 0,15 0,70
V6
P1
0,70
0,70 0,35
P1
R4 T6 P1 V1 R4 T6 0,90 0,28 0,18 0,10
0,90
OJE
V1
0,28
PA03 V10
V6
T7
0,70 0,70 03.15 SANIT MAS 4,02 0,15 A: 14,15 m2 PD: 2,50 m
V6
0,70 0,70 0,22 03.15 SANIT MAS 4,02 A: 14,15 m2 PD: 2,50 m
4
P1
4,10 2,02
0,90
OP
PA01
4
3,99 R4 T6
V1
V10 V6
4
P1
0,28 0,28
V10 V10
4
0,90
1,60
5
4
3,99
0,28 1,60
VERM. VERM. VERM. VERM. VERM. 220 V 220 V 220 V 220 V 220 V
AR
N20
ÇÃ
0,90
AR
0,500 N20
P2
-0,02
PA11
4,39 3,21
3,21
AR
-0,02
±0,00 6,64
6,83
±0,00
T4
P2
P2
PR
2,00 4,39
3,23
2,75
N20
O2
0,500
R2
T3
T1
V2
T4
6,90
P4
P2
OJE
4,39 2,00
0,90
O2
RÉGUA MOD. MAXIM S - R2 RÉGUA MOD. MAXIM S - R2 04 UNDS - RECUP. / PREP. / EMERGÊNCIA - INFERIOR 04 UNDS - RECUP. / PREP. / EMERGÊNCIA - INFERIOR
ACESSO PRINCIPAL
PR
0,26 3,23
VAC
1,100
N20
ACESSO PRINCIPAL
R2
T3
T1
V2
PA14
V2
01.01 ACOLHIMENTO A: 67,06 m2 PD: 2,80 m P4
BB 200
BB 200
PA11
4,39
AR
RÉGUA MOD. MAXIM S - R1 02 UNDS - PROCEDIMENTOS - SUPERIOR
0,239
1,31 R2
T2
VERM. VERM. VERM. VERM. VERM. VERM. 220 V 220 V 220 V 220 V 220 V 220 V
AR
1,100 VERM. VERM. VERM. VERM. VERM. 220 V 220 V 220 V 220 V 220 V
2,60
T3
V2
R2
T2
01.01 ACOLHIMENTO A: 67,06 m2 PD: 2,80 m
3,79
3,79 P4
T3
5,20
V2
5,19
P4
P4
B
V8
PA12
PA12
02.01 ESPERA PROCEDIMENTOS A: 62,93 m2 PD: 3,15m-4,45 m
5,20
R2
T3
B
AP
V8
6,83
T2
V2
5,19
P4
R2
N20
RÉGUA MOD. MAXIM S - R1 02 UNDS - PROCEDIMENTOS - SUPERIOR
AP
7,60
5,95
2,18 0,10
ALVENARIA P/ PASSAGEM DE ELÉTRICA H=78cm
ALVENARIA P/ PASSAGEM DE ELÉTRICA H=78cm
T3
1,200 1,200 VERM. VERM. VERM. VERM. VERM. VERM. 220 V 220 V 220 V 220 V 220 V 220 V
0,15
2,20 9,65
1,95
1,95
V8
0,24 5,95
02.01 ESPERA PROCEDIMENTOS +0,00 A: 62,93 m2 PD: 3,15m-4,45 m
+0,00
T2
O
S
0,15
J17
9,65
ALVENARIA P/ PASSAGEM DE ELÉTRICA H=88cm
ALVENARIA P/ PASSAGEM DE ELÉTRICA H=88cm
BANC
O
. ROBER
0,98
BANC
28 - 7 -1877
0,17
8,23
J17
1,96
V8
T3
01.07 ENTREGA EXAMES A: 30,55 m2 PD: 2,80 m
0,15
8,23
AP AP 0,95 0,24
0,31 0,98
T1
V2
R2
T3
AV. SEN
1,00 1,96
T1
V2
01.07 ENTREGA EXAMES A: 30,55 m2 PD: 2,80 m
R2
T3
V2
0,42
1,90 0,95
P4
22
V3
AP
V8
AP 0,31
1
DIVISA
1,00
21
2
0,42
AP 1,00 V8
0,31
20
3
PA14
1,00
19
4
R2
1,31
V8
2,15 1,90
V8
0,31
6
2,60
0,80
0,80
7 T3
0,22
AP 3,90 2,15 62,09
8 V2
0,15
0,15
PA15
4,78
0,47
9
0,22
AP
0,10
AP 4,78 0,31 3,90 62,09
-1,90
PA15
0,17
J12
V8
J15
PA16
18
5
P4
10 P4
-1,90 J12 PA16
J15
17
22
1
0,239
3
0,239
4
V3
18 22E(0,17 19 20 m) 21 21P(0,30 m)
28 - 7 -1877
5
3,55
17
6
0,239
16
7
3,43
15
8
3,43
14
9
3,17
13
10
11 11
3,17
12 22E(0,17 m) 21P(0,30 m)
4,99 4,99
R2
S
J14
3,00 3,17
J14
3,00 3,17
T4
T4
JARDIM JARDIM
05.11 ESCADA 01 A: 26,39 m2 PD: 2,80 m
D
D 12 P7 P7
PONTO DE AR COMPRIMIDO INDUSTRIAL COM CANOPLA PONTO DE AR COMPRIMIDO INDUSTRIAL COM CANOPLA PONTO DE GÁS NITROSO COM CANOPLA PONTO DE GÁS NITROSO COM CANOPLA PONTO DE GÁS OXIGÊNIO COM CANOPLA PONTO DE GÁS OXIGÊNIO COM CANOPLA PONTO DE VÁCUO COM CANOPLA PONTO DE VÁCUO COM CANOPLA RÉGUA GASES: RÉGUA GASES: OXIGÊNIO, VÁCUO, AR COMPRIMIDO E NITROSO OXIGÊNIO, VÁCUO, AR COMPRIMIDO E NITROSO
0,239
0,27 0,08
AP ±0,00 ±0,00 05.11 ESCADA 01 A: 26,39 m2 13 PD: 14 2,8015m 16
PONTO DE AR COMPRIMIDO COM CANOPLA
A
A
AP
0,15
3,92 5 x módulo de 0,80m
V8
V8
SR-01
V8
V8
V8
V8
V8
V8
V8
APAPAPAP SR-01 APAPAPAP 3,92 5 x módulo de 0,80m
V8
V3
V3
GUARDA-CORPO V8
V3
V3
GUARDA-CORPO
V3
V8
3,55
V3
JARDIM
V8
0,27 0,08
JARDIM V3 V3
DIVISA TERRENO DIVISA TERRENO
4,20
4,20 6,35
GG 202
6,35GG
202
4,20
DD 201
4,20
DD 201
ARQUIVO
AFS-ARQ-PE-102-R00
AFS-ARQ-PE-102-R00
7,55
7,55
PLANTA CIVIL PAV SUPERIOR 1:50
PLANTA AGENTE CIVIL PAV FASE SUPERIOR FOLHA 1:50
ARQ
PE
AGENTE REVISÃO
FASE
102 ARQ R00 PE
FOLHA
REVISÃO
102
R00
DIREITOS AUTORAIS RESERVADOS. REPRODUÇÃO TOTAL OU PARCIAL PROIBIDA DIREITOS AUTORAIS RESERVADOS. REPRODUÇÃO TOTAL OU PARCIAL PROIBIDA
37
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
62,20 7,55
4,20
2,15
4,20
4,20
4,20
2,15
4,20
4,20
4,20
2,15
4,20
4,20
4,20
6,20
CAIXA DO ELEVADOR
VIGA METÁLICA COM ACABAMENTO V8 TELHA TERMOACÚSTICA TIPO SANDUÍCHE
VIGA METÁLICA COM ACABAMENTO V8
FORRO INCLINADO T2
FORRO INCLINADO T2
FORRO INCLINADO T2
VIGA METÁLICA COM ACABAMENTO V8
FORRO INCLINADO T2
VIGA METÁLICA
VIGA METÁLICA COM ACABAMENTO V8
VIGA METÁLICA COM ACABAMENTO V8
FORRO INCLINADO T2
FORRO INCLINADO T2
FORRO INCLINADO T2
VIGA METÁLICA COM ACABAMENTO V8 RUFO
RUFO RUFO
VIGA METÁLICA COM ACABAMENTO V8 RUFO
MARCENARIA MC004, VER DET. FL509
TELHA TERMOACÚSTICA TIPO SANDUÍCHE
LAJE IMPERMEABILIZADA
TELHA TERMOACÚSTICA TIPO SANDUÍCHE
CALHA
+3,65
PERGOLADO ENTRADA PRINCIPAL
ACABAMENTO V3
CALHA
MARCENARIA MC007, VER DET. FL510
GRELHA DE AC
MARCENARIA MC006, VER DET. FL510
GRELHA DE AC
MARCENARIA MC006, VER DET. FL510
GRELHA DE AC
MARCENARIA MC005, VER DET. FL509
GRELHA DE AC
MARCENARIA MC005, VER DET. FL509
GRELHA DE AC
CALHA
CALHA
FORRO T4 FORRO T1 FORRO T3
ESPERA 02
ESPERA REABILITAÇÃO BANCO
BANCO
FORRO T3
FORRO T1 FORRO T3
MARCENARIA MC009, VER DET. FL511
MARCENARIA MC009, VER DET. FL511
VIGA METÁLICA COM ACABAMENTO V8 FORRO T1 FORRO T3
2,80
FORRO T1 FORRO T3
2,80 RAIO X
INTERPRETAÇÃO E LAUDOS
-3,80
ESPERA FARMÁCIA
ESPERA CENTRO DE IMAGEM
BANCO
±0,00
DET
VIGA METÁLICA COM ACABAMENTO V8
PORTÃO DE ACESSO AO ESTACIONAMENTO
VIGA METÁLICA COM ACABAMENTO V8
VIGA METÁLICA COM ACABAMENTO V8
FORRO T3
3,63
FORRO T3
±0,00
0,82
0,84
PERFIL TERRENO EXISTENTE
BANCO
ESPERA ESPECIALIDADES
±0,00
1,00
±0,00
0,17
ACOLHIMENTO
±0,00
-0,02
2,80
ACESSO PRINCIPAL
2,80
2,76
3,13
3,65
FORRO T1 FORRO T3
MARCENARIA MC002, VER DET. FL508 GERADOR DE ENERGIA 750KVA
QGBT
ESTOQUE/ MED ALTO CUSTO
-3,80
-3,80
-3,80
-3,80
PERFIL TERRENO EXISTENTE
A
B
C
D
E
F
G
H
H
G
F
E
D
C
B
-4,42
CORTE CC 1:50
A
29,25 29,25 3,55
6,90
1,95
4,90
4,90
4,90
2,15
2,15
4,90
4,90
4,90
6,90
3,55
1,95
TELHA TERMOACÚSTICA TIPO SANDUÍCHE PLACAS DA FACHADA, VER DET. FL506
VIGA METÁLICA
+5,00
MARCENARIA MC003, VER DET. FL507
VIGA METÁLICA COM ACABAMENTO V8
TELHA TERMOACÚSTICA TIPO SANDUÍCHE
BASE EM ALVENARIA PARA EQUIPAMENTO DE AC
RUFO MARCENARIA MC008 VER DET. FL511
RUFO
VIGA METÁLICA COM ACABAMENTO V8 CAIXA D' ÁGUA
CHILLER
VIGA METÁLICA COM ACABAMENTO V8
FORRO INCLINADO T2 RUFO
+3,61 VIGA METÁLICA COM ACABAMENTO V8
FORRO T1 FORRO T3
FORRO T1 FORRO T3
NÍVEL DO LEVANTAMENTO TOPOGRÁFICO E PAISAGISMO +745,60 É IGUAL AO 0,00 DA ARQUITETURA
VIGA METÁLICA COM ACABAMENTO V8
NOTAS:
TELHA TERMOACÚSTICA TIPO SANDUÍCHE
FORRO T1 FORRO T3
EQUIVALÊNCIA DE NÍVEIS
PLACAS DA FACHADA, VER DET. FL506
CALHA
RUFO
- COTAS E NÍVEIS EM METROS, EXCETO ONDE INDICADO. AS COTAS SÃO DE ALVENARIA ACABADA. - VERIFICAR TABELA DE ACABAMENTOS PARA CÓDIGOS DOS ACABAMENTOS. - NÃO USAR A ESCALA NO DESENHO PARA OBTEREM-SE MEDIDAS. - ESTE DESENHO DEVERÁ SER VERIFICADO COM OS CORRESPONDETES DE ESTRUTURA, INSTALAÇÕES HIDRÁULICAS E ELÉTRICAS, HAVENDO QUALQUER DIFERENÇA, O ESCRITÓRIO DEVERÁ SER CONSULTADO. - ANTES DE EXECUTAR DEVERÁ SER VERIFICADO EM LOCO, AS DIMENSÕES E NIVEIS INDICADOS NESTE DESENHO, INFORMANDO AO ESCRITÓRIO AS DIFERENÇAS APONTADAS OU DÚVIDAS DE INTEREPRETAÇÃO. - TODOS OS ACABAMENTOS ASSINALADOS NO PROJETO DEVERÃO SER EXECUTADOS DE ACORDO COM AS ESPECIFICAÇÕES CORRESPONDENTES. - OS DESENHOS SÓ PODERÃO SER EXECUTADOS EM OBRA QUANDO APRESENTAREM O CARIMBO "PROJETO EXECUTIVO". - PARA PERFEITA COMPREENSÃO DOS PROJETOS PLOTE EM COLORIDO.
FORRO T3
ACOLHIMENTO
SALA TÉCNICA RACKS
3,15
CIRCULAÇÃO SERVIÇOS
2,80
2,80
2,80
ESPERA ESPECIALIDADES
BANCO
JARDIM SOBRE LAJE
ESPERA 01 CIRCULAÇÃO SERVIÇOS
IMPERMEABILIZAÇÃO VER DET. FL131
0,78
0,88
ENTREGA EXAMES
ALVENARIA PARA PASSAGEM DE ELÉTRICA
3,13
PILAR METÁLICO COM ACABAMENTO V8 ALVENARIA PARA PASSAGEM DE ELÉTRICA
±0,00
±0,00
±0,00
±0,00
±0,00
-0,02
0,83
0,83
DET
±0,00
DET
1,00
±0,00
SANCA DE GESSO SC01 FORRO T3
FORRO T1
FORRO T3
FORRO T3
FORRO T8
FORRO T3
FORRO T1
FORRO T3
FORRO T3
FORRO T3
VIGA METÁLICA COM ACABAMENTO V8
FORRO T1 FORRO T3
CIRCULAÇÃO IMAGEM
RECUPERAÇÃO/ PREPARO/EMERGÊNCIA
DML
ESCADA 02
SALA TÉCNICA RM
2,80
INTERPRETAÇÃO E LAUDOS
2,80
CIRCULAÇÃO SERVIÇOS
2,80
2,80
-1,80
MÉTODOS GRÁFICOS
PILAR METÁLICO COM ACABAMENTO V8
ESPERA FARMÁCIA
JARDIM 04 JARDIM 03
-3,80
-3,80
-3,80
-3,80
-3,80
-3,80
-3,80
R00
-3,82
Emissão Inicial
REVISÃO
A
B
C
E
F
G
13/08/19
MODIFICAÇÃO
DATA
PREFEITURA MUNICIPAL DE SÃO CAETANO DO SUL SEOHAB - SECRETARIA DE OBRAS E HABITAÇÃO - DIRETORIA DE OBRAS
CORTE DD 1:50
CORTE EE 1:50
APROVADO PROCESSO Nº SÃO CAETANO DO SUL,
/
/
ASSINATURA RESPONSÁVEL D.O. ASSINATURA E CARIMBO DO RESPONSÁVEL DA SECRETARIA REQUISITANTE
27,30 3,55
6,90
9,80
4,90
2,15 PLACA CIMENTÍCIA
TELHA TERMOACÚSTICA TIPO SANDUÍCHE
FORRO INCLINADO T2 VIGA METÁLICA
FORRO T4 - VER DET FL 505
LAJE IMPERMEABILIZADA RUFO
CAIXA D' ÁGUA
TELHA TERMOACÚSTICA TIPO SANDUÍCHE
ASSINATURA E CARIMBO DO TÉCNICO RESPONSÁVEL DA SEOHAB
VIGA METÁLICA
BASE EM ALVENARIA PARA EQUIPAMENTO DE AC
ACABAMENTO EM PINTURA V4 RUFO
CALHA +3,61
diTHIENE 24 -10 -1948
+3,45
FORRO T3
FORRO T3
FORRO T8
FORRO T8
FORRO T3
DO
SEOHAB - SECRETARIA DE OBRAS E HABITAÇÃO
NEUROPSICO/ PSICOPEDAGOGIA
AVALIAÇÃO FUNCIONAL
CONSULTORIO ODONTOLOGIA
DET 1:10
CIRCULAÇÃO SERVIÇOS 2,80
ESPERA ESPECIALIDADES
3,14
ALVENARIA PARA PASSAGEM DE ELÉTRICA
2,50
VIGA METÁLICA COM ACABAMENTO V8
NO
PREFEITURA MUNICIPAL DE SÃO CAETANO DO SUL
SANCA DE GESSO
VER DET. IMPERMEABILIZAÇÃO FL 131
L SU
CA
E TA
0,64
PILAR METÁLICO COM ACABAMENTO V8
O SÃ
ACABAMENTO EM PINTURA V4 VIGA METÁLICA COM ACABAMENTO V8
28 - 7 -1877
PLACAS DA FACHADA, VER DET. FL506
arquitetura e urbanismo RUA CARDOSO DE ALMEIDA 313 CJ 101 CEP 05013-000 TEL 3666-8526 PERDIZES SÃO PAULO SP WWW.CAROLINAPENNA.COM
±0,00
-0,02
±0,00
DET
RESPONSÁVEL
7,45
JARDIM SOBRE LAJE
RRT/ART
FORRO T3
2,80
FORRO T3
FORRO T3
FORRO T3
FORRO T3
RECEBIMENTO
ALMOXARIFADO
CENTRAL DE RECEBIMENTO
2,80
ACESSO FARMÁCIA NOTURNA
1,00
0,83
ANA CAROLINA PENNA
-3,80
ANA CAROLINA PENNA
PROJETO
AFS ATENDE FACIL SAUDE
LOCAL
CIRCULAÇÃO SERVIÇOS
AV. SEN. ROBERTO SÍMONSEN, 282
ADM. ALTO CUSTO
-3,82
DESENHO
0000008222091
Nº PROCESSO
12.711/2018
AGENTE
ETAPA
ARQUITETURA (ARQ)
PROJETO EXECUTIVO
TÍTULO
ESCALA
CORTES C, D, E, F
1:50, 1:10
ARQUIVO
-3,80
-3,95
AFS-ARQ-PE-201-R00
CORTE FF 1:50
AGENTE
FASE
FOLHA
REVISÃO
ARQ
PB
201
R00
DIREITOS AUTORAIS RESERVADOS. REPRODUÇÃO TOTAL OU PARCIAL PROIBIDA
GSPublisherVersion 0.4.100.13
38
09
HEALTH Public Health Centre 05.2019 - 09.2019 Status: Under Construction
H
A
B
C
D
E
F
G
G
F
E
D
H
C
B
A
29,25 1,95
2,15
4,90
4,90
4,90
6,90
3,55
+5,00
RUFO
TELHA TERMOACÚSTICA TIPO SANDUÍCHE
CAIXA D'ÁGUA 29,25 3,55
6,90
4,90
4,90
4,90
2,15
VIGA METÁLICA COM ACABAMENTO V8
1,95
VIGA METÁLICA COM ACABAMENTO V8
LAJE IMPERMEABILIZADA FORRO T1 FORRO T3
+4,87 FORRO T3 1,40
RUFO
RUFO
TELHA TERMOACÚSTICA TIPO SANDUÍCHE
+3,61 VIGA METÁLICA COM ACABAMENTO V8 0,64
0,85
+3,45
FORRO T1 FORRO T3
FORRO T3
FORRO T3
FORRO T3
FORRO T3
ACOLHIMENTO
SALA PRÉ-CONSULTA 1
SALA PRÉ-CONSULTA 2
MEDICAÇÃO
INALAÇÃO COLETIVA
FORRO T8
FORRO T3
SANIT COLETA
COLETA
GINÁSIO FISIOTERAPIA
1 COBERTURA +3,55
TELHA TERMOACÚSTICA TIPO SANDUÍCHE
ALVENARIA PARA PASSAGEM DE ELÉTRICA
ESPERA REABILITAÇÃO
±0,00
±0,00
±0,00
-0,17 8,38
ABRIGO GASAR COMPR
2,50
CIRCULAÇÃO SERVIÇOS
2,80
2,80
IMUNIZAÇÃO
ALVENARIA PARA PASSAGEM DE ELÉTRICA
SANIT PCD MAS
MURO DE DIVISA
FORRO T3
DET
PILAR METÁLICO COM ACABAMENTO V8
RECEPÇÃO
3,12
LAJE IMPERMEABILIZADA RUFO +3,45
2,52
PLACAS DA FACHADA, VER DET. FL506
2,80
LAJE IMPERMEABILIZADA
FORRO T8
LAJE IMPERMEABILIZADA CHILLER
VIGA METÁLICA COM ACABAMENTO V8
VIGA METÁLICA COM ACABAMENTO V8
VIGA METÁLICA COM ACABAMENTO V8
±0,00
GUARDA-CORPO SR-01
0 PAV. TÉRREO ±0,00
FORRO T8
URODINÂMICO
SANIT PCD
FORRO T3
ALVENARIA PARA PASSAGEM DE ELÉTRICA
FORRO T3
FORRO T3
RECUPERAÇÃO/ PREPARO/EMERGÊNCIA
ULTRASONOGRAFIA/ ECO
-3,80
-3,80
GERADOR DE ENERGIA 750KVA
DEPÓSITO MATERIAIS
-3,80
-4,48 2,80
-4,72
ESCADA MARINHEIRO SR005
3,24
2,80
POSTO DE ENFERMAGEM
CABINE ALÇAPÃO ACESSO RESERV. INFERIOR
ESTACIONAMENTO
CIRCULAÇÃO SERVIÇOS
CALÇADA
ESPERA CENTRO DE IMAGEM
PILAR METÁLICO COM ACABAMENTO V8 CORRIMÃO SR002
0,83 FORRO T3
FORRO T1 FORRO T3
PILAR METÁLICO COM ACABAMENTO V8
ESCADA 03
4,31
±0,00
1,00
±0,00
3,62
-1,80 ±0,00
-3,80
-3,80
-3,80
-1 SUBSOLO -3,80
1,30
ELEVADOR PROJEÇÃO RESERVATÓRIO INFERIOR CASA DE BOMBAS E RESERVATÓRIO INFERIOR -7,20
-5,10
CORTE HH 1:50
CORTE GG 1:50 EQUIVALÊNCIA DE NÍVEIS
NÍVEL DO LEVANTAMENTO TOPOGRÁFICO E PAISAGISMO +745,60 É IGUAL AO 0,00 DA ARQUITETURA
NOTAS:
A
B
C
D
E
F
G
H
29,25 3,55
6,90
4,90
4,90
4,90
2,15
1,95
LAJE IMPERMEABILIZADA TELHA TERMOACÚSTICA TIPO SANDUÍCHE +5,00
VIGA METÁLICA PLACAS DA FACHADA, VER DET. FL506
RUFO
VIGA METÁLICA COM ACABAMENTO V8
1,50
FORRO INCLINADO T2 CAIXA D'ÁGUA
CALHA
PLACA CIMENTÍCIA
BASE EM ALVENARIA PARA EQUIPAMENTO DE AC
- COTAS E NÍVEIS EM METROS, EXCETO ONDE INDICADO. AS COTAS SÃO DE ALVENARIA ACABADA. - VERIFICAR TABELA DE ACABAMENTOS PARA CÓDIGOS DOS ACABAMENTOS. - NÃO USAR A ESCALA NO DESENHO PARA OBTEREM-SE MEDIDAS. - ESTE DESENHO DEVERÁ SER VERIFICADO COM OS CORRESPONDETES DE ESTRUTURA, INSTALAÇÕES HIDRÁULICAS E ELÉTRICAS, HAVENDO QUALQUER DIFERENÇA, O ESCRITÓRIO DEVERÁ SER CONSULTADO. - ANTES DE EXECUTAR DEVERÁ SER VERIFICADO EM LOCO, AS DIMENSÕES E NIVEIS INDICADOS NESTE DESENHO, INFORMANDO AO ESCRITÓRIO AS DIFERENÇAS APONTADAS OU DÚVIDAS DE INTEREPRETAÇÃO. - TODOS OS ACABAMENTOS ASSINALADOS NO PROJETO DEVERÃO SER EXECUTADOS DE ACORDO COM AS ESPECIFICAÇÕES CORRESPONDENTES. - OS DESENHOS SÓ PODERÃO SER EXECUTADOS EM OBRA QUANDO APRESENTAREM O CARIMBO "PROJETO EXECUTIVO". - PARA PERFEITA COMPREENSÃO DOS PROJETOS PLOTE EM COLORIDO.
VIGA METÁLICA RUFO
+3,60
ACABAMENTO EM PINTURA V4
VIGA METÁLICA COM ACABAMENTO V8
R00 VIGA METÁLICA COM ACABAMENTO V8
ACABAMENTO EM PINTURA V4
ABRIGO DE GÁS ODONTO
Emissão Inicial
REVISÃO
13/08/19
MODIFICAÇÃO
DATA
PREFEITURA MUNICIPAL DE SÃO CAETANO DO SUL SEOHAB - SECRETARIA DE OBRAS E HABITAÇÃO - DIRETORIA DE OBRAS
PILAR METÁLICO COM ACABAMENTO V8 ESPERA
DET 1:10
2,80
3,13
APROVADO GUARDA-CORPO SR001
ALVENARIA PARA PASSAGEM DE ELÉTRICA
SÃO CAETANO DO SUL,
/
/
ASSINATURA RESPONSÁVEL D.O.
+0,25
ASSINATURA E CARIMBO DO RESPONSÁVEL DA SECRETARIA REQUISITANTE
±0,00
VIGA METÁLICA COM ACABAMENTO V8
VIGA METÁLICA COM ACABAMENTO V8
PROCESSO Nº
JARDIM SOBRE LAJE 01
BANCO
DET
VIGA METÁLICA COM ACABAMENTO V8
ASSINATURA E CARIMBO DO TÉCNICO RESPONSÁVEL DA SEOHAB
4,10
3,62
ACESSO FARMÁCIA NOTURNA
24 -10 -1948
28 - 7 -1877
diTHIENE ESTACIONAMENTO
O SÃ
L SU
CA
E TA
-3,80 ACESSO ESTACIONAMENTO
NO
DO
PREFEITURA MUNICIPAL DE SÃO CAETANO DO SUL
-4,27
SEOHAB - SECRETARIA DE OBRAS E HABITAÇÃO
arquitetura e urbanismo
CORTE II 1:50
RUA CARDOSO DE ALMEIDA 313 CJ 101 CEP 05013-000 TEL 3666-8526 PERDIZES SÃO PAULO SP WWW.CAROLINAPENNA.COM
RESPONSÁVEL
RRT/ART
ANA CAROLINA PENNA
DESENHO
0000008222091
ANA CAROLINA PENNA
Nº PROCESSO
PROJETO
12.711/2018
AFS ATENDE FACIL SAUDE
LOCAL
AV. SEN. ROBERTO SÍMONSEN, 282 AGENTE
ETAPA
ARQUITETURA (ARQ)
PROJETO EXECUTIVO
TÍTULO
ESCALA
CORTES G, H, I
1:50, 1:10
ARQUIVO
AFS-ARQ-PE-202-R00 AGENTE
FASE
FOLHA
REVISÃO
ARQ
PB
202
R00
39
DIREITOS AUTORAIS RESERVADOS. REPRODUÇÃO TOTAL OU PARCIAL PROIBIDA
GSPublisherVersion 0.4.100.13
6,70 REMOVER PISO EM AZULEJO EXISTENTE
0,97
REMOVER PISO EM AZULEJO EXISTENTE
0,10
1,35
0,15
1,00
DD
CC
0,15
TESOURA EM MADEIRA
3,95
0,29 1,30
0,87
V02
V03
PAREDE DE VEDAÇÃO 15 cm (BLOCO DE 14cm + REVESTIMENTO 1cm)
1,82
LAVABO A: 1,67 m2 PD: 2,30 m
PAREDE DE VEDAÇÃO 10cm (BLOCO DE 9cm + REVESTIMENTO 1cm)
LEGENDA DE PILAR 2,35
2,00
1,30
PILAR EXISTENTE
PAINEL PEG BOARD PILAR NOVO 1,32
ATELIÊ
5,75
A: 33,05 m2 PD: 6,10 m
AA
01
P02 V05
3,26
P01 F01
R02
V01
DESCRIÇÃO TOMADA BAIXA 127 V 10A h=0,30m
R03 TOMADA MÉDIA 127 V 10A h=1,05m
PREVER ILUMINAÇÃO EM FITA DE LED EMBUTIDA NA MARCENARIA
3,93
PT01 1,90
JARDIM A: 12,87 m2 PD: 0,00 m
LEGENDA DE ELÉTRICA - PLANTA SÍMBOLO
0,30
5,75
5,90
0,00
ALVENARIA A MANTER ALVENARIA A DEMOLIR
R01
2,60 -0,11
LEGENDA DE ALVENARIA
PAREDE DE VEDAÇÃO 20 cm (BLOCO DE 19cm + REVESTIMENTO 1cm)
1,70
1,14
R01
V01
V03
PRATELEIRA EM PINUS FIXADA NA CREMALHEIRA VER DET. FOLHA 003
FORRO EM GESSO
AP
ESPELHO
AC P01 F01 V02
P01 F01
0,80
-0,02
TESOURA EM MADEIRA
0,15
A: 2,23 m2 PD: 2,30 m
0,50
0,35 0,75 PT03
ML 0,75
0,65
Á. SERVIÇO
0,15
0,45 0,55
PT02 1,67
0,00
0,50
COMPLEMENTO EM MADEIRA PARA ARREMATE DO CAIXILHO
1/2 AC
1,08
AP
0,30
0,15
1/2
BB
TOMADA BAIXA 220 V 20A h=0,30m PONTO DE DADOS E VOZ h=0,20m
CORTE AA 1:50
PONTO DE DADOS h=1,05m
V01
1,14
PONTO WIFI h=TETO/FORRO
S V04
AP
PLANTA DEMOLIÇÕES 1:50 DD
CAIBRO
TERÇA
TESOURA EM MADEIRA
FORRO DE GESSO LISO INCLINADO COM TABICA - SEGUIR INCLINAÇÃO DO TELHADO FORRO DE GESSO LISO COM TABICA
LEGENDA DE ILUMINAÇÃO
7,50
DD
A
LUMINÁRIA EMBUTIDA REDONDO Ø24cm, C/ ABA E DIFUSOR LÂMPADA E27 REF: ARQUITETURA DA LUZ, EM030B QUANTIDADE: 2 unid FITA DE LED EMBUTIDA NA MARCENARIA BRANCO QUENTE, 24W QUANTIDADE: 8,70m
S
0,50
1/4
AP
0,15
0,80
c 1/2
LEGENDA DE ACABAMENTOS 0,10
1/4
2A
1/2
1,10
e
0,25 1,10
a
01
MURO EXISTENTE
AA
FORRO EM GESSO SOBRE AS TERÇAS RUFO
AA a
1,10
01
2A
c
BB PRATELEIRA EM PINUS FIXADA NA CREMALHEIRA VER DET. FOLHA 002
0,02 0,36 0,34
S c
b A
a
AP
0,50
0,50 2,60 (AO LADO DA ALVENARIA DA FACHADA)
AP
0,50
4,02 (SOBRE ALVENARIA DO BANHEIRO)
2,00
PROJEÇÃO DA ALVENARIA DE FECHAMENTO DA EDÍCULA
CALHA
PREVER DUAS FIADAS DE TELHA DE VIDRO
DD
F01
V02
PORCELANATO 20x10 branco REF: Eliane metro white 20x10cm
V03
PINTURA ACRILICA ACETINADA COR TERRACOTA REF: A definir com amostra em obra
V04
R01
PAINEL PEGBOARD
FORRO LISO EM GESSO, COM TABICA PINTURA ACRÍLICA ACETINADO BRANCO
PINTURA ACRILICA ACETINADA COR VERDE CLARO REF: A definir com amostra em obra PINTURA ACRILICA ACETINADA COR TERRACOTA - MURO REF: A definir com amostra em obra RODAPÉ EM PORCELANATO 10x60 cimento queimado,cortado na obra REF: Portobello Bauhaus Cement 60x60 Esmaltado Borda Reta
R02
RODAPÉ EM LAJOTA CERÂMICA TERRACOTA REF: Pierini Cotto 12,5x26 cm
R03
RODAPÉ EM EPS h=7cm REF: Santa Luzia
PLANTA ESTRUT TELHADO 1:50 CC
PREVER DUAS FIADAS DE TELHA CERÂMICA
RODAPÉ EM PORCELANATO IGUAL AO PISO 7,56
LISTA - MADEIRA COBERTURA
PREVER ILUMINAÇÃO EM FITA DE LED EMBUTIDA NA MARCENARIA
CORTE CC 1:50
AP
AP
DESCRIÇÃO ARARA EM SERRALHERIA VER DET. FOLHA 003
TABEIRA 2 X 19CM GARAPEIRA APARELHADA RIPA 1,2 X 5 GARAPEIRA RIPÃO 1,9 X 5 GARAPEIRA CAIBRO 6 X 8CM GARAPEIRA APARELHADA (MEDIDA ACABADA 4,5 x 6,5) VIGA 16CM GARAPEIRA APARELHADA (MEDIDA ACABADA 4,5 x 14 DESEMPENADA) VIGA 20CM GARAPEIRA APARELHADA (MEDIDA ACABADA 4,5 x 18 DESEMPENADA) VIGA 25X6,50 ACIMA GARAPEIRA APARELHADA (MEDIDA ACABADA 4,5 x 23)
TERÇA EM MADEIRA TESOURA EM MADEIRA
FORRO EM GESSO
TELHAS DE VIDRO
8 90 171 123 31 34 49
PISO EM LAJOTA CERÂMICA TERRACOTA REF: Pierini Cotto 12,5x26 cm
0,10
PLANTA DE FORRO, ILUMINAÇÃO E ELÉTRICA 1:50
PISO EM PORCELANATO 60x60 - cimento queimado REF: Portobello Bauhaus Cement 60x60 Esmaltado Borda Reta
P02
V05
1,10
a,b,c
QDD (ml)
ARARA EM SERRALHERIA VER DET. FOLHA 003
1/4
BB
RIPAS DEVEM SEGUIR DISTANCIAMENTO INDICADO PELO FORNECEDOR DA TELHA
P01
V01
1/4
2A
1/2
CORTE BB 1:50
5,75
c
1/2
LEGENDA DE FORRO
TESOURA EM MADEIRA
LUMINÁRIA PENDENTE, LÂMPADA T8 REF: ARQUITETURA DA LUZ, PE060, 1,25m QUANTIDADE: 7 unid
0,60
0,45
ML
TESOURA SOBRE ALVENARIA
ARARA EM SERRALHERIA VER DET. FOLHA 003
1,20
e
0,15 d
FORRO EM GESSO
COMPLEMENTO EM MADEIRA PARA ARREMATE DO CAIXILHO
PLANTA CIVIL 1:50 CC
0,92
S
d
RIPA
TESOURA SOBRE PILAR E CAIXILHO DA FACHADA
CC
0,60
AP
(PAISAGISMO) QUADRO DE LUZ
AP
FAZER ENCHIMENTO DO CONTRAPISO NIVELAR COM O PISO DO ATELIÊ
REMOVER MURETA
LUM 13 LUMINÁRIA PROJETOR DE EMBUTIR LED 11W NO PISO
INTERRUPTOR
I = 30%
5,75
Acabamento em stain osmocolor transparente ou pintura branca - a decidir com o cliente
01
AA
1,32
2,35
I = 30%
BB
AP
0,10
TELHADO NOVO
CALHA
AP
CORTE DD 1:50
NOTAS: - COTAS E NÍVEIS EM METROS, EXCETO ONDE INDICADO. AS COTAS SÃO DE ALVENARIA ACABADA. - VERIFICAR TABELA DE ACABAMENTOS PARA CÓDIGOS DOS ACABAMENTOS. - NÃO USAR A ESCALA NO DESENHO PARA OBTEREM-SE MEDIDAS. - ANTES DE EXECUTAR DEVERÁ SER VERIFICADO EM LOCO, AS DIMENSÕES E NIVEIS INDICADOS NESTE DESENHO, INFORMANDO AO ESCRITÓRIO AS DIFERENÇAS APONTADAS OU DÚVIDAS DE INTEREPRETAÇÃO. - TODOS OS ACABAMENTOS ASSINALADOS NO PROJETO DEVERÃO SER EXECUTADOS DE ACORDO COM AS ESPECIFICAÇÕES CORRESPONDENTES. - PARA PERFEITA COMPREENSÃO DOS PROJETOS PLOTE EM COLORIDO.
R02 R01 R00 REVISÃO
Revisão geral Revisão geral Emissão Inicial
21/07/20 29/05/20 30/03/20
MODIFICAÇÃO
DATA
PLANTA DE COBERTURA 1:50 TABELA DE CAIXILHOS - PORTAS CÓDIGO TAMANHO L X A TIPO DE ABERTURA
PT01 1,90 1,80×2,35 Correr 2 Folhas
MATERIAL
Alumínio ou Alumínio com pintura Branca
TELHA CERÂMICA
PT02 PT03 1,67×2,35 0,80×2,10 Abrir Simples c/ bandeira vidro fixo e maxim ar Abrir Simples Camarão Alumínio Madeira semi-sólida c/ pintura esmalte
FECHAMENTO EM VIDRO FIXO
TABEIRA EM MADEIRA PINTURA BRANCA
MÃO-AMIGO
0,87
0,80
0,80
3,04
1,90
3,65
PLANTA 1,67
arquitetura e urbanismo RUA CARDOSO DE ALMEIDA 313 CJ 101 CEP 05013-000 TEL 3666-8526 PERDIZES SÃO PAULO SP WWW.CAROLINAPENNA.COM
ATELIÊ SUZANA VELLOSO ENDEREÇO
RUA TEERÃ, 192, VILA LEOPOLDINA - SP AGENTE
ETAPA
ARQUITETURA (ARQ)
PROJETO EXECUTIVO
DESCIDA DE AP TÍTULO
ESCALA
PROJETO EXECUTIVO
1:50, 1:1
1,18
PINTURA BRANCA
40
0,11
2,10
2,35 PORTAS RECOLHEM ATRÁS DA ALVENARIA
±0,00 -0,11
ARQUIVO
136-ARQ-PE-001-R02 AGENTE
1,18
VISTA
2,35
CANTEIRO JARDIM
FIXO
NOTA: FAZER A MEDIÇÃO NO LOCAL ANTES DE PRODUZIR OS CAIXILHOS
ELEVAÇÃO 01 1:50
FASE
FOLHA
ARQ PE 001
REVISÃO
R02
DIREITOS AUTORAIS RESERVADOS. REPRODUÇÃO TOTAL OU PARCIAL PROIBIDA
COMMERCIAL Fashion Studio 03.2020 - 08.2020 Status: Built
10 Perspectiva
Planta
P1 - Piso Porcelanato cimento queimado
V3 - Pintura Cor: Terra do fogo - Coral
área 6,70 x 5,60 = 37,5m² acabamentos
V2 - Porcelanato Metro White 20x10 branco
Perspectiva
V1 - Pintura Cor: branco
P2 - Piso Cerâmica Lajota
P1 - Piso Porcelanato cimento queimado
V5 - Pintura muro Cor: Outono Quente - Coral
Fachada
V4 - Pintura Cor: Pinheiro da Noruega - Coral
41
42
INTERNATIONAL COMPETITION Architect: Carolina Penna and Maximiliano Pintore Area: 3.772m2 Location: Keller Peninsulla, Antarctic
Comandante Ferraz, Brazilian Antartic Station 2013
11
The Antarctic landscape, rarefied, hostile and uninhabited solely constituted by nature, immediately evokes the fascination and desire to confront the realization of a “habitat” of unique and unequivocal characteristics. A work primarily symbolic, significant of the constructive men’s gesture in the nature at all. An uniqueness mark in the chaos of the history of the place. The first stone. From this suggestion, the primary shape was designed according to topography: a stagger toward the sea, which does not exceed the natural profile of the land, allows for maximum exposure to the sun and landscape surroundings and compacts the entire volume. A simple and deliberately non-gestural form delegates their expressive power to the own skin. The “burned” wooden seeks an ambiguous relationship with the context, linked to a phenomenological perception of rediscovery of sensible experience. With the belief that the organization of matter has a meaning that precedes the formation of a representative language, the “burning” wood diametrically opposes to the form, reinforcing the idea of liberation from anxiety of the arbitrary gesture. The mirrored surface of polished stainless reflects the whole “nature as possible.” Chameleon-like and mutant, the exterior skin hides the volumes and reinforces its essence.
43
Materials and finishing Two built materials were chosen for the execution of the architectural object: wood and stainless steel. The wood, in various versions: massif for beams, columns and finishing construction; in structural and non-structural panels for the realization of the slabs, the exterior walls and partitions; “burned” into the exterior finishing, which burned procedure results in a surface layer of carbon crystalline nature particularly suited to aggressive environments. The stainless steel was used in two versions: Duplex for structural use of all support bases; polished plates for external cladding and roofing. Sustainability Passive Heating: The climate is characterized by very rigid temperatures and highly variable solar radiation throughout the year. These features make heat loss containment priority over passive solar gain. For these reasons were reduced glass surfaces. We considered only glasses with high heat insulation characteristics, such as double insulated glass. A system of indirect gain was adopted to capture solar radiation: an intermediate space that functions as a solar greenhouse, reducing losses from glass surfaces and uncontrolled air leaks. Furthermore, the solar greenhouse can mitigate the envelope in the case of lack of solar radiation. It also enables the connection between the different parts of the assembly through a protected environment that does not increase the heated volume, but on the contrary reduces the energy requirement of the complex.
44
INTERNATIONAL COMPETITION Comandante Ferraz, Brazilian Antartic Station 2013
11
Ventilation The use of natural ventilation is limited by low temperatures throughout the year. The solar greenhouse design allows the solar radiation heated air exchange. The integrated automatized system regulates the air flow based on each room temperature. Renewable source of energy The lack of constant solar radiation, the frequent snowfall and freezing temperatures do not allow the widespread use of solar thermal systems. Therefore, solar panels were considered to capture the northeastern facade solar radiation, mainly horizontal, to maximize the Antarctic low solar radiation. The Aeolic technology is the best for this environment because it can take advantage of the constantly “cut-in” winds of medium size turbines. 1 or 2 vertical axis turbines are proposed, with the total power of 35-40 kW, to produce an amount of electricity estimated around 150 MWh / year. Such energy could cover the total, or near total, base needs. Vertical axis turbines have been chosen to make the most of any directions winds.
45
46
INTERNATIONAL COMPETITION Comandante Ferraz, Brazilian Antartic Station 2013
11
47
Architect: Carolina Penna Area: 2.000m2 Location: Bananais, Brazil Built in 1855, the Solar Aguiar Vallim was an important urban reference in Municipality of Bananal. Officially proclaimed as a historical monument by Condephaat, it was built between Rosario Square and Matriz. It represents the peak of the coffee economy, especially when the city reaches the first coffee producer in the province. It’s noticed that urban improvements are also significant, as well as public lighting and investments on particular work such as mansions. One of these is the Comendador Manoel de Aguiar Vallim’s house. The writer Augusto Emilio Zaluar said, in 1860, during his pilgrimage through São Paulo: ‘’the village has buildings worthy of a capital city. The Aguiar Vallim’s house, located at Rosario Square, is one of them, noticeable for its sixteen front windows railing.’’
Bananal in the end of 19th Century and Vallim’s house spotlighted
Originally built as a residence of Comendador Manoel Aguiar Vallim’s family, the house was different from others. The houses were usually detachedly built, however, this one singly occupied the urban lot, extended down the river, therefore, its four facades were freely facing streets around it. The interior was generous and rich, decorated with wall paintings by José Maria Villarongo. The city had lived its best prosperity moment between 1860 to 1880, when its urban plan and infrastructure were established. From 1890, many farm families had immigrated to other places where coffee was more prosperous. Many buildings, which fell into disuse, had been used to other purposes. In 1911, Vallim’s house was used as school by Grupo Escolar Nogueira Cobra and then, in 1930, become a hotel called Hotel Brasil. In 1950, however, the city faced an economic decline due to the new built highway, which excluded Bananal city to the main route between São Paulo and Rio de Janeiro. In 1973, the Grupo Escolar is transferred to a new building, and the City Hall moved to the house until 1980. Since the house needed repairs, some temporary support columns were added to avoid its ruination. The building was abandoned and transformed into municipal deposit. For this reason, its state of conservation became worse, showing serious problems in its wood pieces and cob walls. Despite of not being used for three decades, the Solar is still a symbol of local cultural identity. It remains in people’s mind due its affective appeal for hosting Bananal’s students. This attachment might explain the importance of preserving this building, full of significance.
48
Bad conservation status
COMPETITION
12
Sobrado Aguiar Vallim, Historical Renovation PROPOSTA CONTEXTO 2013URBANO
PORTAS ABERTAS Considering the historical background and the circumstances in Considerando o panorama histórico, os sucessivos momentos pelos quais passou
CENTRO HISTÓRICO DE BANANAL ARTICULAÇÃO DAS PRAÇAS EXISTENTES COM A PROPOSTA URBANA DO PROJETO
which this building is nowadays, the idealized restoration e as circunstâncias em que se encontra o bem cultural, o projeto de restauro idealizado pro- project põe a efetiva reinserção do bem tombado na dinâmica urbana da cidade, por meio de uma
estratégia de potencialização do caráter programaheritage proposto para instalação proposes the re-insertion ofpúblico this do historic ina the citydaby using Prefeitura Municipal de Bananal no Solar Aguiar Valim.
Para of tanto, a distribuição das necessidades exigidas obedece a uma hierarquia de a strategy bringing public functions to the building. Therefore, the ordem funcional e simbólica, reordenando o espaço e estabelecendo novas relações, com
diferentes graus de contato entre população e administração municipal, edificação e espaço goal is to setup the City Hall at Solar Aguiar Vallim. In order to make público. A partir desta lógica, o pavimento térreo, essencialmente público, abre-se com
this it is important reorganize all the anecessities by functional suas work, grandes portas para as ruas e to praças, recebendo livremente população e oferecendo uma nova permeabilidade conquistada, através da reconexão dos espaços livres ao redor.
O saguão de entrada é mantido como acesso a conexão existente com public, and symbolic hierarchy. Hence, the principal main efloor is essentially o salão aos fundos é reforçada, tornando-o um ponto de encontro, com área reservada para
exposições livres e, onde se localiza a necessária plataforma móvel de circulação vertical,the squaopened to everyone, creating a permeable space between para pessoas com mobilidade reduzida. Ao redor deste núcleo central, com possibilidade de
acesso interno ou direto pela praça, são locados os serviços de atendimento ao cidadão. re and Com the obuilding. The entrance hall is the main access and also the intuito de enfatizar o caráter desejado e valorizar os esforços e anseios da população, representada pela figura da Associação Amigos do Solar, como reconhecimento
connection the back hall. duas It works ascomplementares a meetingaopoint, da importância de until sua atuação, são propostas atividades progra- an area ma de necessidades dado: um espaço destinado à Associação, que permanece no local que
ocupa atualmente, voltado para a esquina da Praça Rubião Junior com a Rua Ernani Graça; reserved to exhibitions. e um café, aberto para a mesma rua, para a Praça Pedro Ramos (Matriz), para o pátio aos fundos do terreno e para o espaço expositivo no salão. Assim, independente do funciona-
On is where private restricted mentothe e dasupper atividadesfloor administrativas, o Solar pode serand vivenciado e usufruídoactivities por todos, will hacomo uma atrativa opção de lazer no centro da cidade.
No pavimento concentram-se atividades de uso ou ppen. The publicsuperior, access would asbe limited forcontrolado the reason that the restrito, como os setores sem acesso ao público em geral, a Secretaria de Turismo e a área
reservada Office para o Gabinete Prefeito. O salão nobre permanece como espaçoindestinado à Mayor and do Secretary of Tourism are located this floor. The realização de eventos ou exposições especiais, de acordo com a sua natureza.
IGREJA DA MATRIZ
LARGO DA MATRIZ
PRAÇA PEDRO RAMOS
HOTEL BRASIL E CASARIO HISTÓRICO
SOLAR AGUIAR VALLIM
FÓRUM
PRAÇA RUBIÃO JUNIOR
IGREJA N S HOMENS PRETOS
As áreas livres que rodeiam a construção, a Praça Rubião Junior e o pátio posnoble hall is reserved for events or special exhibitions. terior, também objeto de intervenção projetual, são agora compreendidos como um espaço contínuo, permeando o piso térreo, possibilitando novos e interessantes trajetos.
O pátio, antes destinado aos escravos, posteriormente utilizado como depósito, The outdoor area around the building, the Rubião Junior Square sempre isolado para serviços, é vislumbrado como oportuno elemento de conexão, com
imenso potencial espacial, possibilitado a partir da derrubada do muro que o encerra, and the back patio, are seeing as one, a continuous space, permeabrindo-o para a Praça Pedro Ramos, como local de passagem, prestando-se a espaço de apoio às atividades a se desenvolverem na prefeitura, ou mesmo uma área de estar urbana,
ating the mainacolhedora floor, letting new and interesting paths happen. The de escala reduzida, e democrática. A Praça Rubião Junior, que ao longo do tempo foi sendo descaracterizada, de
modo a is atender exigências da realizaçãofactor, de grandes eventos públicos, patio usedàs as a connecting especially afteré redesenhada the demolition of especificamente para este fim, local de aglomeração pública por excelência, de onde pode-
se apreciar, sem barreiras ou obstruções, o conjunto que a conforma. the existing wall, opening the area histórico and allowing outdoor activities. PRAÇA E IGREJA DA MATRIZ
VISTA DA MATRIZ PARA SOLAR E CASARIO
VISTA GERAL RUA ERNANI GRAÇA 1/200
Assim, restaurado, entregue e aberto ao público, o Solar Aguiar Vallim, que historicamente desempenha papel central na vida cotidiana da cidade de Bananal, terá reabilitada mais do que a sua condição física, mas, fundamentalmente, a sua função social.
PANORÂMICA DA PRAÇA RUBIÃO JUNIOR
CASARIO HISTÓRICO
PÁTIO
SOLAR AGUIAR VALLIM
PRAÇA RUBIÃO JUNIOR
EDITAL 37/2013 MÓDULO 01 RESTAURAÇÃO DO “SOBRADO AGUIAR VALLIM” PROPONENTE D2PENNA ARQUITETURA LTDA RESPONSÁVEL TÉCNICO PROF. DR. MARCIO NOVAES COELHO JR.
04
49
PROPOSTA IMPLANTAÇÃO
REFERÊNCIAS
RUA DR. JOSÉ RANGEL DE ALMEIDA
VEGETAÇÃO PROPOSTA QUIOSQUES NOVA PROPOSTA SOB A PÉRGOLA PORTAS BASCULANTE EM INOX POLIDO MÓDULO DE SANITÁRIOS ESTRUTURA INDEPENDENTE EM INOX POLIDO
REFLEXO DA PAISAGEM
PÉRGOLA ESTRUTURA LEVE POUSADA SOBRE A PRAÇA ÁREA DE SOMBREAMENTO
LINHA D’ÁGUA CANALETA EM CHAPA DE AÇO CORTEN SÍMBOLO DO RIO BANANAL
BANCO EM PEDRA COM APOIO EM MADEIRA PONTO DE ENCONTRO
PISO PAGINADO EM FAIXAS DE PEDRA E GRAMA
ESTRUTURA DE MADEIRA - SOLAR
AMPLIAÇÃO DO PASSEIO
PÁTIO
FAIXA DE PISO ALINHADA AO SOLAR RESPEITA E VALORIZA O BEM TOMBADO PISO CIMENTÍCIO COM AGREGADOS ALTA RESISTÊNCIA, ANTIDERRAPANTE PAGINADO COM FAIXAS DE GRANITO SERRADO
PRAÇA RUBIÃO JUNIOR
PISOS EM PEDRA - SOLAR
MANUTENÇÃO DO MARCO DA CIDADE ÁREA ABERTA PARA REALIZAÇÃO DE EVENTOS
EVENTOS NA PRAÇA - SOLAR
PLANOS INCLINADOS GRAMADOS COM FORRAÇÃO RESISTENTE A PISOTEIO DESTINADA A LAZER, DESCANSO, SÍMBOLO DOS VALES VERDES DE BANANAL
BANCO LINEAR EM PEDRA RELEVO - VISTA DO SOLAR
PÉRGOLA ALINHADA ÀS EDIFICAÇÕES
REMOÇÃO DOS SANITÁRIOS EXISTENTES ABERTURA DO PÁTIO COM A RUA
POSSIBILIDADE DE CONEXÃO COM O HOTEL BRASIL ATRAVÉS DO PÁTIO
50
BANCO LINEAR EM PEDRA
RUA ERNANI GRAÇA
IMPLANTAÇÃO 1/500
REFERÊNCIA LINHA D’ÁGUA
EDITAL 37/2013 MÓDULO 01 RESTAURAÇÃO DO “SOBRADO AGUIAR VALLIM” PROPONENTE D2PENNA ARQUITETURA LTDA RESPONSÁVEL TÉCNICO PROF. DR. MARCIO NOVAES COELHO JR.
05
COMPETITION Sobrado Aguiar Vallim, Historical Renovation 2013
12
PROPOSTA SOBRADO AGUIAR VALLIM
ENGENHARIA
FLEXIBILIDADE DE LAYOUT ADAPTAÇÃO A MUDANÇAS FUTURAS
MÓDULO DE SANITÁRIOS PRIVATIVOS ESTRUTURA NOVA INDEPENDENTE GABINETE DO PREFEITO
ÁREA DE ATENDIMENTO AO PÚBLICO ACESSO DIRETO DA PRAÇA
ASSESSORIA DO GABINETE FINANCEIRO
ASSIT. SOCIAL
ACESSORIA JURÍDICA
ATENDIMENTO
REMOÇÃO DE ALVENARIAS EM ESTADO RUIM DE CONSERVAÇÃO
LICITAÇÃO SALA DE REUNIÃO
PROGRAMA FORNECIDO
PROGRAMA CONSOLIDADO
GABINETE DO PREFEITO ASSESSORIA DO GABINETE ASSESSORIA JURÍDICA SALA DE REUNIÃO SECRETARIA DE TURISMO RECEPÇÃO E TELEFONISTA SETOR DE CADASTRO SETOR DE PROTOCOLO SETOR DE ENGENHARIA SETOR FINANCEIRO SETOR DE ASSISTÊNCIA SOCIAL SETOR DE LICITAÇÃO SETOR DE PATRIMÔNIO SETOR JURÍDICO SETOR RECURSOS HUMANOS SALA DE INFORMÁTICA BANHEIROS COPA ALMOXARIFADO EXPOSIÇÕES
RECEPÇÃO E TELEFONISTA SANITÁRIO COPA ALMOXARIFADO EXPOSIÇÕES CAFÉ DO SOLAR ESPAÇO A.A. DO SOLAR SETOR DE CADASTRO SETOR DE PROTOCOLO SETOR DE ENGENHARIA SETOR FINANCEIRO SETOR DE ASSISTÊNCIA SOCIAL SETOR DE LICITAÇÃO SALÃO DE ATOS GABINETE DO PREFEITO ASSESSORIA DO GABINETE ASSESSORIA JURÍDICA SALA DE REUNIÃO SANITÁRIO/COPA PRIVATIVO SECRETARIA DE TURISMO SETOR DE PATRIMÔNIO SETOR JURÍDICO SETOR RECURSOS HUMANOS SALA DE INFORMÁTICA SANITÁRIO
TÉRREO
MÓDULO DE SANITÁRIOS ESTRUTURA NOVA INDEPENDENTE SUPERIOR
SETORIZAÇÃO
SETOR DE INFORMÁTICA
COPA
MÓDULO DE SANITÁRIOS E COPA ESTRUTURA NOVA INDEPENDENTE
ESCADA DE ACESSO RESTRITO AO PÚBLICO
DESENHO DO PISO DA ESCOLA MANUTENÇÃO DA MEMÓRIA
ÁREA DE EVENTOS MANTIDA VALORIZANDO A VISUAL PARA O VALE E PRAÇA
SAGUÃO RECEPÇÃO
CIRCULAÇÃO EM NÍVEL PARA PORTADORES DE MOBILIDADE REDUZIDA PLATAFORMA PARA PORTADORES DE MOBILIDADE REDUZIDA SHAFT DE INSTALAÇÕES
PAV. SUPERIOR
ÁREA SEM ILUMINAÇÃO DIRETA UTILIZADA COMO ALMOXARIFADO
ALMOXARIFADO EXPOSIÇÕES
PAINÉIS COM PINTURAS DE JOSÉ MARIA VILLARONGO SALÃO DE ATOS
PAV. TÉRREO
DEPÓSITO
EXPOSIÇÕES
ARQUIVO
EIXO DE CIRCULAÇÃO ENTRE PÁTIO E PRAÇA ÁREA SEM ILUMINAÇÃO DIRETA UTILIZADA COMO DEPÓSITO
PROTOCOLO
PLATAFORMA PARA PORTADORES DE MOBILIDADE REDUZIDA SHAFT DE INSTALAÇÕES
ARQUIVO
FLUXOS CADASTRO
SETOR DE PATRIMÔNIO SETOR DE TURISMO
REMOÇÃO DE SANITÁRIO EXISTENTE NÃO ORIGINAL
PAV. TÉRREO
ÁREA DE EXPOSIÇÕES CONECTADA AO CAFÉ
SETOR JURÍDICO
REMOÇÃO DE SANITÁRIO E COPA EXISTENTE NÃO ORIGINAL
SETOR DE RECURSOS HUMANOS CAFÉ ESPAÇO ASSOC. AMIGOS DO SOLAR
PLANTA PAV. SUPERIOR 1/200
ESPAÇO PARA ASSOCIAÇÃO AMIGOS DO SOLAR - RECONHECIMENTO DA IMPORTÂNCIA DO TRABALHO DESENVOLVIDO POR ELES
PLANTA PAV. TÉRREO 1/200
EDITAL 37/2013 MÓDULO 01 RESTAURAÇÃO DO “SOBRADO AGUIAR VALLIM” PROPONENTE D2PENNA ARQUITETURA LTDA RESPONSÁVEL TÉCNICO PROF. DR. MARCIO NOVAES COELHO JR.
06
51
PAREDES E ESQU ANÁLISE PRELIMINAR Considerand Imponente, o Solar Aguiar Vallim, com área construída totalizando apropeças de madeira da c ximadamente 2.000 m2, se apresenta atualmente de forma contraditória. ExternaConsiderand Imponente, o Solar Aguiar Vallim, com área construída aproportas e janelas, bem c mente, tem seus planos externos aparentemente em bom estadototalizando de conservação; PROPOSTA MEMORIAL DESCRITIVO peças deaproveitament madeira da c ximadamente m2, se apresentacomprometido, atualmente decom forma contraditória. Externamáximo internamente, 2.000 mostra-se claramente diversos elementos em portas e janelas, mente, tem seus planos externos aparentemente metidos, visando bem à conc precárias condições, além de partes faltantes. em bom estado de conservação; PROPOSED PROJECT PROPOSTA MEMORIAL DESCRITIVO máximo aproveitament internamente, mostra-se claramente comprometido, com diversos elementos em Deverá ser e Conforme a documentação disponibilizada e por meio de ANÁLISE PRELIMINAR PAREDESeEanalisada, ESQUADRIAS metidos, con precárias condições, além de partesque faltantes. tência devisando pinturasàdeco visita técnica realizada, constata-se o imóvel sofreu uma série de reformas Wall and Windows Deverá ser Conforme a documentação disponibilizada e analisada, e por meio de Imponente, o Solar Aguiar Vallim, com área construída totalizando aproConsiderando o estado generalizado avançado de biodeterioração das para verificação de core ao longo do tempo, que resultaram em seguidasEmodificações de seus espaANÁLISE PRELIMINAR PAREDES ESQUADRIAS tência dedas pinturas técnica realizada, constata-se série de reformas ximadamente 2.000 m2, se apresentavisita atualmente de forma contraditória. Externa- que o imóvel peças desofreu madeirauma da construção, será necessária análise dos esteios paredes,deco ços internos ou mesmo deconservação; elementos estruturais, em virtude das das necessidades Since th do wood pieces are in advanced deterioration, it is de necessamente, tem seusoplanos externos aparentemente emtempo, bom totalizando estado deresultaram portas estage janelas,oof bem como próprias esquadrias, buscando o tratamento e de cor para verificação ao que em seguidas modificações de seus espaImponente, Solar Aguiar Vallim, comlongo área construída aproConsiderando estado generalizado avançado biodeterioração das PISOS específicas de cada uso que abrigou e de cada momento. Em parte realizadas internamente, claramente comprometido, diversos elementos em peças de máximo aproveitamento dos elementos íntegros, substituição ximadamente 2.000 mostra-se m2, se apresenta atualmente de formacom contraditória. Externamadeira da virtude construção, será necessária análise edos esteios dasdaqueles paredes,já comproços internos ou mesmo de elementos estruturais, em das necessidades ryantes to analize, one by one, piece can be order to keep as da edificação. dabom abertura doconservação; estudo dewhich tombamento, sobre muitas intervenções não foram precárias além de partes faltantes. visando àrestored consolidação estrutural das diversas mente, tem seuscondições, planos externos aparentemente em estado de portas emetidos, janelas, bem como das próprias in esquadrias, buscando o partes tratamento e PISOS específicas de cada usoForam que abrigou esanitários de cada momento. realizadas Conformeclaramente a documentação disponibilizada e analisada, e por meio de máximo Deverá serEm executada análise de estratigráfica para averiguação da exisinternamente, mostra-se comprometido, com diversos elementos em aproveitamento dos elementos íntegros, e substituição daqueles já comproDe modo ger encontrados registros. criados e uma copa, eparte há indícios que visitacondições, técnica realizada, que o imóvel sofreu uma de reformas de decorativas, alémdas daquelas de que jádaseedificação. tem notícia, bem como antes da abertura dosérie estudo de tombamento, sobre muitas intervenções não foram many ofinternas them as possible. If this is tência not the case, it estrutural is suggested to replace precárias além de constata-se partes faltantes. metidos, visando àpinturas consolidação diversas partes madeira no pavimento divisões foram modificadas e diversos elementos substituídos, inclusive ao longo do tempo, que resultaram em seguidas modificações demeio seusdeespapara verificação de cores primitivas nos de espaços Conforme a documentação disponibilizada e analisada, e por Deverá ser executada estratigráfica parainternos. averiguação da exis- De modo ger encontrados registros. Foram criados sanitários e uma copa, eanálise há indícios que turabem decomo sustentação do com aplicação de argamassa cimentícia sobre paredes de pau-a-pique. internos ou mesmo de elementos estruturais, em virtude das necessidades visita ços técnica realizada, constata-se que othem. imóvel sofreu uma série de reformas tência de pinturas decorativas, além those daquelasinclusive de que jádecorated se tem notícia, The walls also have to be analized, especially with madeira no pavimento divisões internas foram modificadas e diversos elementos substituídos, deteriorada, com divers Das obras documentadas, alémverificação da substituição do conjunto estrutural da específicas deque cada uso que abrigou e de cada momento. realizadas PISOS ao longo do tempo, resultaram em seguidas modificações deEm seusparte espapara de cores primitivas nos espaços internos. tura de sustentação do com aplicação de argamassa cimentícia sobre paredes de pau-a-pique. antes da abertura do estudo de tombamento, sobre muitas intervenções não foram ços internos ou mesmo de elementos estruturais, em virtude necessidades gos. Deverão ser verific cobertura e These dedas seu entelhamento, com instalação escoras,part no final da década paintings. should be preserved fordebeing of the historical heriencontrados sanitários eDas uma copa, há indícios de que PISOS De modo do geral, os pisos,estrutural cimentado no pavimentodeteriorada, térreo e assoalho de divers com documentadas, além da substituição conjunto da específicas de cadaregistros. uso que Foram abrigoucriados e de cada momento. Emobras parte erealizadas dediversos 1980,elementos as principais intervenções foram: madeira substituição de trechos deteriorados internas foramde modificadas ecobertura substituídos, inclusivecom instalação no superior, apresentam patologiasgos. graves. Porém, aser estruantesdivisões da abertura do estudo tombamento, sobre muitas intervenções não foram Deverão verific e de de seu entelhamento, depavimento escoras, no finalnãoda década tage. dossobre estrutura; na fachada dos fundos, inserção deno pilar de térreo com aplicação deForam argamassa de encontrados registros. criadoscimentícia sanitários eesteios umaparedes copa, emadeira hápau-a-pique. indíciosda de que tura sustentação pisos de madeira (barrotes e vigas) encontra-se Dedemodo geral, os dos pisos, cimentado pavimento eINSTALAÇÕES assoalho de bastante PR de 1980, as principais intervenções foram: substituição de trechos deteriorados divisões internasDas foram modificadas e diversos substituídos, inclusive madeiradeteriorada, no pavimento superior, nãopontos apresentam patologias a estruobras documentadas, alémelementos da substituição do na conjunto estrutural com diversos de comprometimento pelaPorém, ação de insetos xilófaconcreto embutido alvenaria de da adobe; recuperação de portas e janelas; revisão graves. INSTALAÇÕES PR dos esteios madeira dadivisórias estrutura; na de fachada dosdos fundos, inserção de pilar com aplicação argamassa cimentícia com sobre paredes de pau-a-pique. tura sustentação de madeira (barrotes ede vigas) encontra-se bastante coberturade e de seu entelhamento, instalação dede escoras, no final da década internas, gos. Deverão serpisos verificados e, construtiva quando necessário, reforçados ou substituídos. As instalaçõe e refazimento de paredes respeitando a técnica Floor Das obras documentadas, além foram: da substituição do conjunto estrutural da de adobe; deteriorada, com diversos de comprometimento pela ação de insetos xilófade 1980, as principais intervenções substituição de trechos deteriorados concreto embutido natodo alvenaria recuperação depontos portas e janelas; revisão padrões atuais de aten primitiva; revisão de o revestimento externo; novo reforço estrutural provisório, cobertura e de seudeentelhamento, com instalação de escoras, no paredes final da década gos. Deverão ser verificados e, quando construtiva necessário, reforçados ou substituídos. As instalaçõe dos esteios madeira da estrutura; narefazimento fachada dos fundos, inserção de pilar de internas, INSTALAÇÕES ena de divisórias aPREDIAIS técnica 12good conservation aporção generally floors in arespeitando status. However, do prédio, no revisão ano are de 2010. de 1980, as principais intervenções foram: substituição decentral trechos deteriorados concreto embutido na alvenaria de In adobe; recuperação deway, portas ethe janelas; padrões atuais de aten primitiva; revisão de todo o revestimento externo; novo reforço estrutural dos esteios de madeira da estrutura; na fachada dosrespeitando fundos, inserção derealizados pilar de INSTALAÇÕES e refazimento de paredes divisórias internas, aainda técnica construtiva AsPREDIAIS instalações prediais deverão ser totalmente revistas e substituídas por INSERÇÕES Foram diversos levantamentos por técnicos doprovisório, Conde12 na porção central do prédio, no ano de 2010. the floos sustain structure such as joists and beams are deteriorated. They concreto embutido na alvenaria de adobe; recuperação de portas e janelas; revisão primitiva; revisão de todo o revestimento externo; reforço estrutural provisório,pelo IPT padrões atuais dedeatendimento a normas técnicas. phaat, bemnovo como laudos produzidos - Instituto Pesquisas Tecnológicas e refazimento paredes a técnica construtiva As instalações prediais deverão serdototalmente revistas e substituídas por na porçãodecentral dodivisórias prédio, nointernas, ano de respeitando 2010. 12 Foram INSERÇÕES ainda realizados diversos levantamentos por técnicos CondeCom o intuito de São Paulo, material de fundamental importância para todas as fases de desenprimitiva; revisão de todo o revestimento externo; novo reforço estrutural provisório, padrões atuais de atendimento a normas técnicas. must be analized and replaced if necessary. INSERÇÕES Foram ainda realizados diversos levantamentos por técnicos do Conde- pelo phaat, bem como laudos produzidos IPT Instituto de Pesquisas Tecnológicas 12 vo o programa solicitad volvimento do projeto de restauro do bem. na porção do prédio, no produzidos ano de 2010. phaat,central bem como laudos pelo IPT - Instituto de Pesquisas Tecnológicas Com o aintuito São Paulo, material de fundamental importância para nestas todasdeas fases de desenForam ainda realizados diversos de levantamentos técnicos CondeCom o intuito implementar de anamodo mais adequado agresside São Paulo, material de fundamental importância para todas asdofases deapresentadas desen- INSERÇÕES buscae menos preservar leitu Aspor propostas agora baseiam-se informações phaat,volvimento bem comodo laudos produzidos pelodo IPT - Instituto dedo Pesquisas Tecnológicas vo o programa solicitad volvimento projeto de restauro do bem. Intervention vo o programa solicitado, foi definida uma estratégia de ocupação do imóvel, que projeto de restauro bem. e, quando estas se faz lisadaspara e nos princípios edesenrecomendações das cartas patrimoniais dedepreservação Com o intuito de implementar modo mais adequado e menos agresside São Paulo, material de fundamental importância todas as fases de busca preservar anestas leitura dainformações construção original, de interferências As propostas agora apresentadas baseiam-se nestas informações anabusca preservar a leitu As propostas agoraa apresentadas baseiam-se ana- com o mínimo tanto mat patrimônio cultural. Para elaboração das próximas etapas de projeto, será vo oconstruction programa solicitado, foifazem definida uma estratégia de ocupação dointroduzidos, imóvel, queelementos volvimento de restauro do bem.Indoorder e, quando estas se necessárias, marcando claramente novos lisadasdoeprojeto nos princípios e recomendações das ecartas patrimoniais de preservação to preserve the original with minimal interferences, itosquando e, estas se faze lisadas nos princípios e recomendações das cartas patrimoniais de preservação busca preservar a leitura construção com o do mínimo de interferências Para tanto, As propostas agoraPara apresentadas baseiam-se nestasetapas informações ana- será das ainda adeatualização informações disponíveis, comoriginal, avaliação introduzidos, tantodamaterial como espacialmente. do patrimônio cultural. a elaboração dasimprescindível próximas projeto, introduzidos, tanto mat do patrimônio cultural. Para a elaboração dasestas próximas etapas deestruturas projeto, será e, quando sePara fazem necessárias, marcando claramente os novos elementos lisadas e nos princípios e recomendações das cartas patrimoniais dee preservação tanto, estas são dispostas com afastamento em relação ainda imprescindível a atualização was das informações disponíveis, com avaliação do às paredes e, ainda, co conjunto estrutural do estado de conservação de cada elemento construtivo da defined a occupation strategy fortanto thematerial property. Inside of the house it introduzidos, do patrimônio Para das próximas projeto, será Paradetanto, e ainda imprescindível a atualização informações disponíveis, com avaliação do garantindo às paredes e, ainda,como com espacialmente. possibilidade de relocação, flexibilidade conjunto cultural. estrutural e doa elaboração estado de conservação deetapas cada de elemento construtivo dadas usos e ocupação. São edificação. Para tanto, estas estruturas são dispostas com afastamento em relação ainda imprescindível a atualização das informações disponíveis, com avaliação do usos e de ocupação. São utilizadas divisórias baixas, para manter a espacialidade dos co edificação. às paredes e, ainda, conjunto estrutural e do estado de conservação cada elemento construtivo da is proposed to use low partitions to keep the spatiality of those generous ambientes às paredes e, ainda, com possibilidade de relocação, garantindo flexibilidade de generosos. conjunto estrutural e do estado de conservação de cada elemento construtivo da ambientes generosos. Os ritmos dos vãos existentes são sempre rigorosamente usos e ocupação. São edificação. usos e ocupação. São utilizadas divisórias baixas, para manter a espacialidade dos Nos espaç edificação. respeitados. respeitados. Nos espaços sem iluminação e ventilação naturais (antigas alcovas), rooms. ambientes generosos. Os ritmos dos vãos existentes são sempre rigorosamente ambientes generosos. são instalados ambientes de não permanência, como almoxarifado, depósito eambient sãoalcovas), instalados respeitados. Nos espaços sem iluminação e ventilação naturais (antigas respeitados. Nos espaç arquivos. arquivos. ambientes de não permanência, como almoxarifado, depósito e On the principle of parsimony,são allinstalados the bathrooms were carefully located, in Instalações sanitárias são introduzidas onde necessário com parcimônia, são instalados ambients arquivos. Instalações para atender ao programa dado, conforme o mesmo princípio, como elementos arquivos. Instalações sanitárias são introduzidas onde necessário com parcimônia, favor of not obstruct passages andautônomos views. encerrados em contêineres, posicionados de modo paraa não atender obstruirao progra para atender ao programa dado, conforme o mesmo princípio, como elementos Instalações passagens e visuais. encerradoss autônomos encerrados em contêineres, posicionados de modo a nãoautônomos obstruir para atendere visuais. ao progra passagens passagens e visuais. autônomos encerrados passagens e visuais.
VISTA DA FACHADA PRINCIPAL 1/300 VISTA DA FACHADA PRINCIPAL 1/300
52 EDITAL 37/2013 MÓDULO 01 RESTAURAÇÃO DO “SOBRADO AGUIAR VALLIM” PROPONENTE D2PENNA ARQUITETURA LTDA RESPONSÁVEL TÉCNICO PROF. DR. MARCIO NOVAES COELHO JR. 07 EDITAL 37/2013 MÓDULO 01 RESTAURAÇÃO DO “SOBRADO AGUIAR VALLIM” PROPONENTE D2PENNA ARQUITETURA LTDA RESPONSÁVEL TÉCNICO PROF. DR. MARCIO NOVAES COELHO JR.
07
PROPOSTA MEMORIAL D PROPOSTA MEMORIAL D
12
RECONSTRUÇÃO DA COBERTURA CONFORME RECONSTRUÇÃO DA SISTEMA ESTRUTURAL COBERTURA CONFORME ORIGINAL SISTEMA ESTRUTURAL ORIGINAL MOBILIÁRIO E DIVISÓRIAS MOBILIÁRIO E DIVI-: PRESERVASÓRIAS A ESPA-: CIALIDADE ORIGINAL PRESERVA A ESPA-
CIALIDADE ORIGINAL FORRO DE MADEIRA DE ACORDO COM FORRO DE MADEIRA DESENHO ORIGINAL DE ACORDO COM DESENHO ORIGINAL
CORTE TRANSVERSAL 1/300 CORTE TRANSVERSAL 1/300
DIAGRAMA - HIPÓTESE DA POSIÇÃO ORIGINAL DAS TESOURAS SER CONFIRMADA POR PESQUISA HISTÓRICO ICONOGRÁFICA DIAGRAMA - A HIPÓTESE DA POSIÇÃO ORIGINAL DAS TESOURAS A SER CONFIRMADA POR PESQUISA HISTÓRICO ICONOGRÁFICA
desempenho mais eficiente dos materiais e, portanto, mais COBERTURA COMPETITION COBERTURA desempenho mais dosminuciosa materiaisanálise e, portanto, mais te desenvolvida emeficiente função da das propr Sobrado Aguiar Vallim, Historical Renovation te desenvolvida função preservar, da minuciosa análise dasà propr do imóvel que seem pretende condicionada situaç Questão fundamental a ser enfrentada pela intervenção pretenQuestãodofundamental ser enfrentada intervenção pretendofundamental, imóvel que sedistinguindo-se pretende preservar, condicionada 2013 e, do desenho original15à ,situaç dida, a cobertura Solar Aguiara Vallim, tem sidopela motivo de preocupação evita 15 dida, a cobertura Aguiar Vallim, tem sido motivo preocupação e, fundamental, distinguindo-se doretorno desenho original , evita permanente desdedooSolar final da década de 1980, quando foide inteiramente do falseamento com um pretenso à forma original, permanentepor desde final estrutura, da décadaque, de 1980, quando foi inteiramente do falseamento com um histórico pretensoem retorno substituída umaonova superdimensionada, resultou no explicitando o processo si. à forma original, substituída por nova portantes estrutura,da que, superdimensionada, resultou no explicitando o processo histórico emnão si. resta dúvidas. Com abalamento dasuma paredes edificação, exigindo a instalação de Entre uma opção e outra, abalamento das paredes portantes da exigindo a de instalação de Entre uma opção e outra, nãoEm resta dúvidas. Com escoras provisórias para contenção doedificação, processo deflagrado arruinamencustos, não há grandes dis-paridades. termos de execu escoras provisórias contenção de arruinamen- custos, há grandes dis-paridades. Em termos to do bem tombado,para situação em quedoseprocesso encontradeflagrado desde então. propostanão é menos agressiva, tecnicamente simplesdee execu resul Roof tombado, situação em que se encontra desde então. to do bemConforme proposta menos tecnicamente simples e resul pareceres contidos na documentação fornecida, a obra te relaçãoémais sutilagressiva, e harmônica entre o novo e o preexiste Conforme contidos na documentação fornecida, a obra te relaçãoAmais sutil eapesar harmônica entredoo pressuposto novo e o preexiste consistiu na completapareceres substituição do telhado original por outro modelo primeira, de partir da in 13por outro modelo The namain the principal ismínima, the roof. It da has been permaconsistiu substituição do and telhado original A primeira, apesar de partir do da pressuposto da in estrutural, oucompleta seja, intervention foram introduzidas doze tesouras por meio mera consolidação situação existe onde haviaconcern apenas 13 estrutural, seja, foram dozetodas tesouras onde havia apenas mínima, por da mera consolidação da situação operação tãomeio invasiva e com tal grau de alteração daexiste lógica nove, cujosouapoios, antes introduzidas distribuídos por as paredes, inclusive nently discussed since 1980, when it was entirely se replaced for nove, cujos apoios, antes por todas as paredes, inclusive operação invasiva enew com talstructure, grau de alteração daalógica mostra tão mais umaavez equivocada, representando fina as principais internas, comdistribuídos a nova estrutura, passam a transferir todos as internas, comas a nova estrutura, passam transferir se mostrahá mais umadevez cometido cerca 25 equivocada, anos atrás. representando a fina os principais esforços apenas sobre paredes externas, feitasade adobe etodos taipa which was sobre overdimensioned. Itmas caused overweight onhá walls, being parecer talvez os esforços apenas as paredes externas, de adobean e taipa cometido cerca de apesar 25 anos atrás. A structural segunda, de, a princípio, de pilão. A iniciativa manteve volumetria original,feitas desconsiderou o de pilão. A iniciativa manteve física volumetria original, masresultado, desconsiderou o A segunda, apesar reconstrução, de, a princípio,após parecer talvez se tratar de uma ne-cessária equilibrad comportamento e a natureza do prédio. Como passaram add supported on acima the building. Because of that,e itdareconstrução, ispossibilidade noticedapós ato natureza física do prédio.columns Como resultado, passaram se tratar de umaenvolvidas ne-cessária equilibrad das premissas de reversibilid acomportamento sernecessary verificadasediversas trincas e rachaduras, principalmente dos avãos ser do verificadas diversas trincas e rachaduras, dos das e da possibilidade de reversibilid ção premissas anterior, seenvolvidas revela perfeitamente adequada, viável e co pavimento superior, potencializado peloprincipalmente desalinho entreacima as novas central supported structures deepened they to be strengvãosthat do pavimento superior, potencializado pelo desalinho entre as novas çãopropósitos anterior,needed se perfeitamente adequada, e co os derevela preservação, de acordo com osviável princípios tesouras ethe a modulação estrutural da edificação, devido à redistribuição do and tesouras e a modulação estrutural da edificação, devido à redistribuição os propósitos de preservação, de acordo com os princípios cartas patrimoniais, garantindo ao bem cultural autenti posicionamento dos pontos de apoio, causando desequilíbrio na transfe-do nas thened. posicionamento dos de 14apoio, causando desequilíbrio na transfenas cartasDe patrimoniais, ao bem na cultural . acordo comgarantindo definição contida Cartaautenti de Bu rência das cargas dapontos cobertura 14 rência dasDado cargas da cobertura . novas patologias podem ser obserDe acordo com definição contida na Carta de Bu o tempo decorrido, reconstrução deve ser efetivada quando constituir condição Dado o tempo decorrido, novas patologias ser obserreconstrução devethe constituir condição vadas, como o comprome-timento estrutural da central do prédio, sobrevivência deser umefetivada bem cujaquando integri-dade tenha sido c Considering the complexity ofparte thepodem situation and thede fragility of cultural herita16 vadas, como o comprome-timento da parteecentral do prédio, de um bem cuja integri-dade tenhaportant sido c que sofreu afundamento e precisouestrutural receber reforço, a deterioração das Considerando, porsobrevivência desgastes ou de modificações...” 16 quege, sofreu afundamento e precisou receber reforço, eeatambém deterioração Considerando, por desgastes modificações...” the intervention would be detrimental to das the endangering itseprotecpróprias escoras provisórias, feitas de madeira roliça sofrem pro-bulding, causados pela ou sobrecarga atual o risco iminente aportant que o próprias provisórias, feitas de madeira roliça eresistência também sofrem pro- tra causados pela asobrecarga atual e o risco iminenteapresent a que o cesso deescoras biodeterioração, fragilizando-se e perdendo estática. submetido, intervenção proposta se justifica, cesso de biodeterioração, fragilizando-se e perdendo resistência estática. tra submetido, a intervenção proposta se justifica, apresent tion. Thus,da two scenerios are proposed: Diante complexidade da situação e fragilidade em que se uma solução efetiva para o problema. da complexidade situação e fragilidade em que uma solução efetiva para o problema. encontra oDiante bem cultural, fica clara adanecessidade de atualização dasse O desenho da nova cobertura deverá ser elabora encontra o bem cultural, fica clara a necessidade de atualização das O desenhoanterior da nova deverá seraselabora informações disponíveis, com a elaboração de novos laudos técnicos, o modelo estrutural docobertura prédio, and amarrando pared - considering the huge impact the house has already sufferd, informações disponíveis, com a elaboração técnicos, o modelo distribuindo estrutural anterior do prédio,osamarrando as pared que identifiquem com propriedade e clareza de as novos atuais laudos condições físicas externas, uniformemente esforços por toda que identifiquem com propriedade clareza as atuais condições físicasthe current externas, distribuindo uniformemente os esforços por todade dos diversos elementos construtivos do imóvel, visando ao embasamento fazendo coincidir e montantes com os esteios targeting a eminimal intervention, roofos banzos is maintained. dos diversos da elementos do imóvel, ao embasamento fazendo coincidir os banzos e montantes com os esteios de fundamental solução construtivos estrutural a ser adotadavisando para a resolução do paredes de pau-a-pique e adobe devidamente recuperados fundamental da solução estrutural ser adotada para resolução do paredes pau-a-pique e adobe devidamente recuperados problema. quais as de cargas serão transferidas até as fundações, conso However, it is anecessary toaadd a structural reinforcement, replacing the problema.Conceitualmente, nos vemos diante de uma contradição paradoquais em as cargas serão transferidas atésua as fundações, junto sua unidade, reequilibrando estabilidadeconso e re Conceitualmente, nos vemos diante de uma contradição paradojunto em sua unidade, reequilibrando sua estabilidade e re xal. A intervenção mostrou-se claramente equivocada e danosa à comportamento estrutural original. oldrealizada supporting columns, composed by new columns, beams and foundaxal. A intervenção realizada mostrou-se equivocada e danosa estrutural original. e a lógica estrutural or adequada preservação do bem cultural, claramente colocando em risco a própria pos-à comportamento Preservando a volumetria adequadade preservação do bemAssim cultural, colocando em riscosea delineiam: própria posa volumetria e externamente, a lógica estrutural or sibilidade sua salvaguarda. sendo, dois cenários das telhasPreservando cerâmicas reaproveitadas, a nov tions, or: sibilidade -deconsiderando sua salvaguarda. Assim sendo,jádois cenários se delineiam: das telhas conforme cerâmicasareaproveitadas, externamente, nov o grande impacto sofrido, visando à desejável apresenta imagem tradicional marcante eapecu - considerando o grande impacto já sofrido, visando à desejável apresenta da conforme tradicional marcante e cimal pecu mínima intervenção, a atual cobertura é mantida, por se encontrar bom paisagem cidade.aOimagem beiral deverá ser refeito, - seeking to rescue the essence andem of thedaseguindo cultural heritage, is com 17it refeito, mínimade intervenção, a atual cobertura é mantida, se encontrar emintegrity bom paisagem cidade. O beiral deverá com cimal estado conservação, mediante os reparos que por se fizerem necessários. condutores desenho originalser . Internamente, com 17 . Internamente, com estado de conservação, reparosdas queescoras se fizerem condutores desenho original Entretanto, para que sejamediante possível os a retirada quenecessários. a sustentam ção do forroseguindo de madeira conforme documentação disponíve proposed to dismount thedecurrent roof, saving its pieces construct a ção do forro de impacto madeirato conforme documentação Entretanto, para que seja possível a retirada das escoras quereforço a sustentam desde que foi erguida, será imprescindível a inserção um estrunão acarretará na leitura da espacialidadedisponíve dos apo desdedeque foi erguida, será imprescindível a inserção de um reforço estrunão acarretará impacto na leitura da espacialidade dos apo tural grandes proporções interior do edifício original, composto por new roof, no with mixed structures, combining wood and steel, showing the turalconjunto de grandes proporções interior do edifício que, original, composto porser um de novos pilares,novigas e fundações, ainda que possa um conjunto de novos pilares, vigas e fundações, que, ainda que possa ser visualmente tratado ou até camuflado, representa grande risco, dada abuilt and what is the intervention. difference between whatum was originally 12 CONDEPHAAT, Processo nº 59491/2009, p. 168 visualmenteem tratado oude atéestabilidade camuflado,do representa umcorre grande risco,dedada a fragilidade termos imóvel, que o risco sofrer 12 13 CONDEPHAAT, p. 168 é composta Segundo ParecerProcesso Técnico nº do59491/2009, IPT, a nova cobertura fragilidade termos de estabilidade imóvel, que corre o risco depor sofrer ainda maiorem abalo estrutural. Tal opçãodoacarretará ainda a alteração 13 Segundo Parecer Técnico do IPT, a nova cobertura é composta 12 tesouras secundárias diagonais nas extremidades, Between two proposals, there’s no doubt, budget would be almost the ainda maior estrutural. Tal opção acarretará ainda a alteração completo da abalo lógicathese de comportamento da edificação, efetivando, em por última theprincipais, principais, tesourasem secundárias diagonais nas extremidades, de madeira,12apoiadas cinta de concreto armado, 6 tirantes me completo da lógica depresente, comportamento edificação, efetivando, em última instância, a situação ou seja,da consolidando como permanente de madeira,Naquele apoiadasmomento em cintajádeapresentava concreto armado, 6 tirantes me cerâmicas. sinais de deterioraç same. In of execution, the is less and tecnically, simpler, instância, a situação presente, ou seja,(escoras), consolidando como permanente uma solução que terms se previu provisória aindasecond que com outro dese-agressive, cerâmicas.e Naquele momento apresentava de deterioraç rompidos elementos faltantesjáou em estágiosinais de apodrecimento. uma solução que se previu provisória (escoras), ainda que com outro desenho (reforço), transferindo diretamente ao solo a carga superdimensionada Processo rompidos enºelementos faltantes 59491/2009, p. 80) ou em estágio de apodrecimento. resulting in a harmonic conexion the old Processo and the new. 14 nhoum (reforço), transferindo diretamente ao solo a original cargabetween superdimensionada de elemento espúrio, enquanto a substância perde seu inerente nº 59491/2009, p. 80) CONDEPHAAT, Processo nº 48609/2003, p. 181 de um tornando-se elemento espúrio, enquanto ou, a substância original perde seu inerente 1514 Carta CONDEPHAAT, p. 181 Histórico e de Veneza.Processo In IPHANnº- 48609/2003, Instituto do Patrimônio papel, mero invólucro; 15 Carta de Veneza. In IPHAN Rio - Instituto do Patrimônio Histórico papel, tornando-se mero invólucro; ou, ewould Cartas Pa-trimoniais. de Janeiro: IPHAN, 2000. p. 94e - buscando resgatar a essência integridade do bemthe cultural, Therefore, the new roof show Solar’s (Brasil). traditional remarkable image 16 Cartas Pa-trimoniais. Rio de Janeiro: IPHAN, 2000. p. 94 Carta de Burra, ICOMOS - Austrália, 1980. Ibid., p. 250 resgatar a essência integridade do bem cultural, impõe-se a- buscando possibilidade de reparação do eerro outrora cometido, com nova (Brasil). 16 17 Carta deCONDEPHAAT Burra, ICOMOS - Austrália, Ibid., p. 250 - Ibid., p. 64 1980.the impõe-se a possibilidade de reparação do erro outrora cometido, com nova substituição, ou seja, propondo-se des-monte da atual cobertura, com to the cityscape. The ovolumetry and original logical1817 Acervo structure would remain 64 substituição, ou de seja, propondo-se des-monte dapara atual cobertura, com aproveitamento seus elementosoconstitutivos, a construção de uma 18 Acervo CONDEPHAAT - Ibid., p. 52 Acervo CONDEPHAAT - Ibid., p. 52 aproveitamento elementos para a construção uma novasame. cobertura, de emseus estrutura mista, constitutivos, de madeira combinada com aço,decom nova cobertura, em estrutura mista, de madeira combinada com aço, com
53
EDITAL 37/2013 MÓDULO 01 RESTAURAÇÃO DO “SOBRADO AGUIAR VALLIM” PROPONENTE D2PENNA ARQUITETURA LTDA RESPONSÁVEL TÉCNICO PROF. DR. MARCIO NOVAES COELH
Public Space
PROPOSTA MEMORIAL DESCRITIVO
ESPAÇO PÚBLICO
The project proposed to the patio and square wants to enrich the culO desenho proposto para o espaço público – praça e pátio – surge da intenção de valorizar o bem
tural respecting its osurroundings. Using Solar a refecultural heritage, que se deseja reabilitar, respeitando entorno, núcleo histórico também the protegido por leias estadual, inserido na Zona Histórica Central.
rence, the square’s trace topassou attend current needs of local Da mesma forma que o Solar,isa configured Praça Rubião Junior por diversos momentos, tendo adquirido formas também diversas ao longo dos anos. Diante da falta de informações e impossibilidade
public gathering. For this someéinfrastructure are needed, de estabelecer referência histórica para areason, sua reestruturação, proposta uma nova configuração espacial,just atendendo às atuais necessidades de aglomeração pública no local.
Referenciado, no próprio Solar, orespecting desenho da praçaand se descortina como grande área livre to organize theportanto, outdoor space, enriching important para o exercício das atividades costumeiras, com a infraestrutura necessária e a disposição de poucos, mas
essenciais,ofelementos posicionados visando à sua conformação espacial, respeitando e valorizando visuais visuals the Solar. importantes do conjunto cultural. A arborização existente é preservada e complementada com novas espécies, posicionadas
The exiting trees are preserved. The markets are reorganized under the estrategicamente. O redesenho dos canteiros gramados ajuda a definir a ocupação do lugar e proporciona novos espaços de descanso, lazer ou contemplação.
big pergula, axis, built in metale reconfigurados structure and creating Os pontosstructural comerciais existentes são reorganizados sob umawood, grande pérgola, eixo estruturador, estrutura leve e vazada, construída em estrutura metálica e de madeira, que cria espaços
de acolhimento e encontro para a população. space for meeting and movement.
O piso recebe tratamento adequado para o impacto da movimentação imaginada, ganhando padronização que cria uma textura neutra e respeitosa em relação ao bem, se aproximando delicadamente The patio opens itselfno directly to the street and the square by removing e, furtivamente, reaparecendo pátio. O pátio, por sua vez, se liberta de sua conformação de isolamento, abrindo-se diretamente para a walls and através existing inappropriate public bath-rooms, are relocarua e a praça, da remoção do muro e dos inadequados sanitários públicos, which que são transferidos para o fundo do lote, garantindo-lhe o acesso livre. O espaço conquistado ganha, ainda, outras conexões, com a ted to de the back thee,lot. abertura duas portas of do café eventualmente, pode possibilitar novas aberturas do hotel, resgatando a relação direta que as duas construções um dia tiveram. A estrutura pergolada reaparece aqui, marcando e anunciando percurso.is Estruturada por pórticos regulares, sua proporção obedece àamodenatura das in The holeo novo complex now complete and able to assume new role construções vizinhas, estabelecendo um diálogo de hierarquia espacial. conjunto, assim a assumir um novo papel na vida da ser the city,O which is tocompleto bringe apto social memory, to value itscidade, localdeve identity and entendido, através das ações e medidas propostas, como mais uma etapa importante para a construção da memória social, para valorização e afirmação da identidade apropriação do bemboth culturalfor repleto de to appropriate this cultural heritage fulllocal of esignificance, people significação, pela população e para ela.
and for itself.
VISTA AÉREA DA PROPOSTA
PÉRGOLA EM ESTRUTURA METÁLICA E VIGAS EM MADEIRA
BANCO EM PEDRA COM APOIO EM MADEIRA
MOBILIÁRIO PRAÇA
CORTE TRANSVERSAL PELO EIXO DO SAGUÃO 1/300
54
EDITAL 37/2013 MÓDULO 01 RESTAURAÇÃO DO “SOBRADO AGUIAR VALLIM” PROPONENTE D2PENNA ARQUITETURA LTDA RESPONSÁVEL TÉCNICO PROF. DR. MARCIO NOVAES COELHO JR.
09
COMPETITION
12
Sobrado Aguiar Vallim, Historical Renovation 2013 PROPOSTA IMAGENS
EDITAL 37/2013 MÓDULO 01 RESTAURAÇÃO DO “SOBRADO AGUIAR VALLIM” PROPONENTE D2PENNA ARQUITETURA LTDA RESPONSÁVEL TÉCNICO PROF. DR. MARCIO NOVAES COELHO JR.
10
55
https://www.linkedin.com/ in/ana-w-4268a252/ @answen https://www.facebook.com/ profile.php?id=100071924715279 56