ARCHITECTURAL PORTFOLIO Andrea Sรกnchez Gorozabel
Architecture, more than just forms.
CONTENT [01-02] Contact [03-04] Resume [05-06] Selected Projects [07-12] Museum [13-22] TAAC [23-34] Frankfurt [35-58] Limbo [59-72] 2D Projects [73-82 ] Built Projects [83-90] Extras
ANDREA SĂ NCHEZ GOROZABEL
CONTACT sanchezgorozabel@gmail.com (442) 2322486 QuerĂŠtaro
01
Human Scale I grew up in a city called Guayaquil in Ecuador (my country), and I had a lot of changes in my life, to finally decide at my age of 18 years old that I wanted to leave everything that I knew and become a total stranger. I moved to Mexico to study the career I have always wanted and not sure why. Architecture. That was the beginning of everything.
02
RÉSUMÉ
Work
Education
Skills
2014 (May)
2014
PC skills
Internship in the”Cátedra de Urbanismo de México” in collaboration with the Master Planning of the Tecnológico de Monterrey Campus Querétaro. Developing Charrette.
-Web page Design -Graphic Design -Pespectives (before and after)
2014 (July)
VGVM Architects, Querétaro. 2015 (Feb) FA Factor Arquitectura, Querétaro.
03
Graduated from Tecnológico de Monterrey campus Querétaro as an Architect
2013
Intership with TU- Universitat de Darmstadt, Alemania.
2009
Graduated from Liceo Panamericano highschool, Guayaquil, Ecuador.
1991
Borned at Guayaquil, Ecuador.
-Archicad (advanced) -Autocad (intermediete) -Artlantis (advanced) -Illustrator (advanced) -Inn desing (advanced) -Sketch up (intermediate) -Premiere (basic) -Wix (advanced) -Crowdmap
Hand skills
- Photography - Óleo technique - Graphic Design
Language Skills -English -Spanish
Social Assistance 2012
Apollame IA. Organization that seeks to engage young people in decisions concerning the country today.
2011
Dif. Collaboration on Mathematics and English classes for children 5-7 years
2009
Comparte Sonrisas. Organization created by foreign students from the Tecnológico de Monterrey in order to promote the work of children and street youth.
04
[M] [T] [F]
SELECTED WORK [M] [T] [F] [L]
Museum Taac Frankfurt Limbo
[L] 05
06
[M]
Museum/Pavillion of Architecture Location: ITESM, QuerĂŠtaro Description: The project consisted in taking one part of your body and experiment with it in order to come with a form for the next pavillion of Architecture. Time: Second year project
07
08
[M]
Diagram (Floor plan)
The project was runned by the architect Arabella Masson student of Peter Zumthor, basically the project had to be inspired by a part of the human body and use it to develop the form of the pavillion/museum. In this case particurally I decided to use my hands. In order to be inspired I made a mold of my hand with a spcial mass, to continue the process, I divide it into 4 pieces, selected the most funtional form of the 4 and that piece I multiply it all around the same core making a cirle form, and finally covered the pieces with a metal shader that allowed light and wind to me in.
A
C
D Diagram (Section)
Floor plan
Section A
WORKING PROCESS
B
Section B
Section C
Section D Sections
Model
09
10
[M] photomontage made by photos of the model and photoshop
11
12
[T]
TAAC Taller Activo Location: Desarrollo San Pablo, QuerĂŠtaro Description: The project was design in response to the needs of a impoverished comunity and the goal was to finance it as well. The project is developed in the two scales, architectonic and urban.
13
Time: Third year of career
14
[T] URBAN PLAN
MASTER PLAN Located between city and Industrial zone.
TAAC - Taller Activar (Active Workshop) The project proposed had a small intervention radius, besides that, it was necessary for us to present an urban project that justified the intentions of the local project. We worked in conjunction with the community in order to know and understand the real problems that they were facind at the time. As a result we came with a strategy that enclosed the intervention area. Focused in three important points: the revitalization of a nature reserve that represented a danger for the citizens due to its lack of maintenance. 2 the Linear Park that will unify two colonies. 3 the opening of a new school in order to improve the life around the area and because it was one of the community’s demand.
Four main Intervention point connected with a linear park. Letting the project in the middle of the urban plan.
15
16
[T]
Intervention 1
Intervention 2
Intervention 3
Nature Reserve
Linear Park
School
URBAN PLAN
The idea was to connect important points of intervention and make it a continue walkway available to all.
Nature Reserve
The actual Natural Reserve was a constant complain of the community, first because it was a large land that separated them from the industrial zone, second the land has a terrible slope that was totally un-walkable and third it was a garbage dumb because no one gave it the importance and nobody care about its maintenance. Our purpose was to take advantage of its slope and make some areas with balconies and connect them with a two tracks, one for bicycles and another for walkers with a 10% inclination, and as a result it became a nice place to walk for people of all ages.
17
Illistration of the corridors
18
[T] Architecture Project
In the same project it was required to develop a master plan for the actual terrain, we developed numerous activities for the whole community to enjoy. Divided by a central axis that communicates one street with the other, with the correct amount of shadows for the walkers that pass by.
Activities
One of the obstacles we had was the location of a “Tianguis” because people never liked the idea but it was requirement to put it. The structure was based on fabric that the same community will do in order to create connection between the two users of the space, it also had metal to the balance.
TIANGUIS’ STRUCTURE
Master Plan
Perspective
19
20
[T] Architecture Project. Perspective of Tianguis, usind 3d model and Photoshop.
21
22
[F]
Frankfurt, Active Buildings, Active Cities. Location: Frankfurt, Germany Description: frankfurt/main, district bockenheimer warte the rivival of a cityblock to create an interactive environment Time: Fourth year of career
23
24
[F]
The following project took place in Frankfurt, Germany. With the collaboration of 4 universities from different countries with only 10 students from each one. The countries who participate were Egypt, El cairo; USA, San Francisco; Germany, Frankfurt and Berlín; and Mexico. We were put together in groups of 5 people, 1 representa of each city/country and the host was the TU-UNIVERSITAT Darmstadt, wich receive us with a set of lectures given everyday and floor just for us and our necessities. Promoting always the idea of a more environmentally-friendly world, with the implement of more technology and better use of CO2.
In particularly my group and I decide to work in the urban plan. The background relies in a urban neighborhood very traditional and specifically the block was an old library with an ancient Museum that was there since World War II. Our concept was about “re-using”, instead of taking the old building down we made new adhesions by this we were able to complete the missing blocks and with this we could enclose the public space. We open the buildings through to make a new green corridor that went all the way from South to North, ending in an important plaza. Unifying the public space.
CONZEPT The red lines are a reference for the existing buildings, the grey marks are the ones we are adding.
25
26
[F]
Palmengarten
I
I I
I
I
III
I
I
I
I
I
IV
25
I
IV
I
Sozialrathaus
IV
III
III
21a
22 II
IV
IV
II
IV
IV III
16 IV
13
II II
12 IV
VII
I
II
12b
V
SchmidPlatz
II
IV
6
V
I
10
II
Verwaltungsgericht I
VI
I
12
14
16
VI VI
V
24
26
Adalbertstr.
I
I
I
I
I
IV
IV
II
Bockenheimer V
III II
IV
I
I
I
II
IV
I
I
IX
II
107
101
II
III
I
V
109
II III
I
V
I
18e
111
133
I
I
VI
I
I I
108
85
I
I III
124
I
Bockenheimer Warte
V I
II
IV
IV
V
V
17 15
19
21
21a
23
V V
I
I
1
III I
I
I
IV
IV
IV
IV
V
V
IV
V
IV
7
7a
7b
9
11
13
1a
3
3a
5
18
28
Universitätsbibliothek Joh.Chr.Senkenberg 134-138
4
V
8
V
Carlo-
IV
2
V
I
10a I
2
II
8a
12a
V
SchopenhauerArchiv
V V
1
II
II
IV I I
V
r Str.4 Leipzige
IV
I
V V
Bockenheimer Depot
II
V
8
3
5
II
I
I
6 IV
I I
V I
I
I
I
10
V I
IV
I
9
II
I
I
unterirdisch
Baumanagement
V
II
III
Trafo
Hess.
I
14
II III
IX I
III IV
IV
II
IV II
I
IV
I
16a
II
II
I
IV I
I
15 IV
III
I
III
III
I
I
IV
VII
II
18 III
17
I
II I
IV
20
19
IV IV IV
I
IV
IV
21
I
IV
III
VII IV
24 III
IV
IV III
I III
I
I
II
26
23
I
11
I
I I
28
IV
I
III
IV
27
I I
I
I
I
I
I
I
III
V
18f I
I VI
III III
V
IV
V
18a I
I
IV
I
VI
VI
V
16
27
25
I
V
12
IV
IV
IV
V
V
22
V
IV
IV
V
V
V
V
V
I
IV
IV
VI
V
V
IV
V
VII V
I
III
II
V
26
1
25
23
7
III
5
3
32
1
30
21
V
IV
Corneliusstr.
V
19
III
I
17
I
V
V
34
9
V
V
VI
V
Robert-Mayer-
3
27
Naturmuseum Senckenberg
Konfuzius-Inst. VI
I
V
I
IX VI
I
V
I
Str.
Volkssternwarte Frankfurt Physikalischer Verein
V
V VI
5
VII
I
VI
I
IV
7
IV
V
I V
9
V
V III
V
11
I
Ev.Kirche Christuskirche
I
II
IV
25
IV
VI
I III
V
Dantestr.
University
V
I
V
Beethovenplatz 23
V
III
IV
V V
2
6
I
I
V
V VI
V
4
III
I
IV
V
I
4
VII
Mertonstr.
I
V
V
IV
V
r.
V
V
I
I IV
V
III
V
II
III
V
V
V VI
V
IV
V
V
V
V
IV
17
V
V
III
V
19
V
I V
II
IV
23
V
III IV
I
Graefst
There was an existing chimney in the middle of the new green corridor we proposed, instead of overthrow it, we cover it in a plant that could change within different seasons of the year. We open new axis in horizontal way as well as vertical way, the connections between the North and South were as important as the connection between East and West, N-S connections were created mainly for tourist, to hang around and to give importance to these buildings. E-W connections were mainly for users, citizens that live their day by day and they need commerce and public parks. Like new amenities to the zone.
V V
I
V
14
III
V I
V
VI 18
20
IX
IV IV
V
I V
IX
V
V
II
22
VI
V
18b I
30a I
I
V
18g
I
18c
V
I
I
18d
IV
III
V
V
V
VI III
V
V
I
III
V I
Theodor-W.Adorno-Platz
V
I
IV
V
V
V
Institut f. Didaktik d. Physik
116 114 112
VI II
II
106
I I
V
125
123
I
121
V VI
VI
Varrentr
appstr.
IV
IV
VI
Pharmazie u.
VI
113
111
AfE - Turm
Institut für
II X
I
102
Kettenhofweg
119 115
V
104
I
IV
VI
-S tr.
V V
I
V
-Mayer
VII
I
I
I
I
I
I
V I
I
V
Robert
VI
VI
I
LebensmittelChemie
V
IV
II II V
I
II
XII
IV
II
IV
I
II
III
22-24 IV
III I
IV
G
II
III
III XX III
IV
Hamburg
94
II
V
Veterinäramt
31
I
e
II
o
rg
15
-V
o
ig
t-
Ärztekammer
S
92
W e s t e n d s t r. 8
III
6
t r.
97
II
III
88
84
82
80
78
95
89
II
4
90
II
III
87
85
83
III II
er
III
V
23
III III
VI
Gutenberg-
Post
14
schule
III
XL
IV IV
I
III
12
Allee III
XXXIV
4
Frankfurter Schule für V
Bekleidung und Mode
II X
II
XLVI
2
IV
Hamburg
I
I
er Allee
I I XV
X
2
6
Ludwig-Erhard-Anlage
Theodor-
Heuss-
Allee
Bettinaplatz 5
7
5
III
56
Theodor-Heuss-Allee
IV XIII XIII
XIII
XIII
54
III
27
V
V
Friedric
e
t-Anlag
h-Eber
II
XIII
28
[F]
Sections of uses and green energy
Close-up to the sustainable analysis of the area, chimney zone.
29
30
[F]
31
ACTUAL CORRIDOR (BEFORE)
32
[F]
CORRIDOR (AFTER)
Perspective using photos of the place and Photoshop
33
34
[L] Centro Reavitacional LIMBO Location: San Miguel de Allende, MÊxico Description: Limbo is a cementery with a new tipology of death and associate it more to mexican’s culture. The project is develop in urban and architectonic scale.
35
Time: Graduation Project
36
[L] Urban Scale
Limbo was created in order for people to embrace and accept dead in a more pacific way. It was developed in Urban Scale as well as Architectural Project Scale. The Urban Scale was a group of number of interventions that took place in the travel in order to arrive to Limbo. The main key for this project was the Genius Loci of the place, I used it as a important tool to make the concept strong and imposing throughout the entire project.
CONCEPT
37
38
[L]
El objetivo principal es articular el proyecto con el resto de la ciudad.
Ciudad
Limbo
Urban Scale
To begin, Limbo is located far away from the current Urban development of the city of San Miguel de Allende.
Presa
The corridor to arrive to Limbo is what I called El Borde, within a travel of 1k of beautiful natural landscape. The urban intervention took place in this kilometer. Perspective of project B
Map 1 Espacio a intervenir es todo el andador que llega desde la ciudad al proyecto
The idea was to divide it into two parts, cars allowed and cars don’t allowed. The architectural intervention begins in the walkway, with Two projects located in A and B in the map 3. Peatón Coche
The First one (A) is a project with natural flowers growing, this means that instead of buying a new kind of flower, you have the opportunity to just grab it and make your own group of flowers to take to grave. The second one (B) is a project of ephemera architecture with the intention of invite the user to contemplate and admire the beauty of the place, as well as reflexion about their current situation.
39
Map 2 Se intervendrán dos terrenos para adecuarlos a la peatonal.
B
A
Map 3
40
[L] Urban Scale Perspective of project A using 3d model and Photoshop.
41
42
[L] Architectonic Project Scale
Location
43
Limbo was located at the border of San Miguel de Allende’s Dam, that actually is one of the largest in the country but unfortunately is contaminated totally, beside this, its beauty is perfect and most of the people that visit and even live in SMA hasn’t heard of its existence. That was one of the main factors that inspired me to use for limbo, because a project as sensitive as this, could only be worth of a pure nature.
The main idea of Limbo was to create a place as special as death means to every mexican citizen, friendly, lovely and playful. In the terrain there was an existing ranch with no owner and with really old settlements. Which I used to locate the administrative area, as a reception and distribution place. In the rest of the terrain is located a combination of places that between nature and architecture they complement in order to loose feelings and emotions suffocated in the depths of our beings.
44
[L]
The project was composed by serial of layers that as one, they do not make any sense. But as singular they are in perfect harmony and well thought.
Architectonic Project Scale
Nature landspace
Main important Views
Architecture
Impost Landscape Master Plan of Limbo
45
46
[L] Architectonic Project Scale Limbo’s landscape invites you to hide and find yourself in the process of death.
Section of how every escenary is waiting at the end of each room
47
48
[L] Architectonic Project Scale Architecture is introspective but related to the exterior.
Transition room
Mortuary room
Dome with the deceased in it
Section of the inner spaces Mortuary room Transition room
49
Altar with the deceased in it
50
[L] Architectonic Project Scale Perspective using 3d model and Photoshop.
Floor plan
51
52
[L] Architectonic Project Scale .
Landscape Isometric .
53
Perspective using 3d model, Photoshop and photos of the place .
54
[L] Architectonic Project Scale
Section of the entire project
55
56
[L] Architectonic Project Scale
Model in plaster (yeso) Photo: Laura MontaĂąo
57
58
Projects
2D 59
60
T
P
P
P
F
F
F
F
S
T
S
S
PLANTA LOCALIZACIÓN
Colon norte G
H
I
S-03
0
P
63.200
2
3
4
5
6
7
ESCALA 1:200 ACOTACIÓN: METROS
P
PROFESOR:
F
D
Museo
F
30 DE OCTUBRE DEL 2012
P
1
ARQ. HECTOR MEZA
F
FECHA:
E
T
+15.00
57.000
+26.00
Humbolt 4
F
Circulacion
Torre Cuartos II
+102.00
8.150
00
.0
+98.00
Metrobus ANDREA SANCHEZ 1203097 ARGELIA BORBOLLA 1202911
6
1
CAFETERIA
70
0
!! "
6.625
9.
+26.00 S
T
7
0
+0.00
S
6.926
7.550
7.548
"#$%&'($
30.000
70
7.390
S
3
E
68.000
F
G
H
I
ITESM CAMPUS QUERETARO
9.
!
2
S-03
Besides the complexity of combining the different uses between each other, the project demanded a compromise to the city, in order to accomplish this, I decided that a common connection was required to integrate the project with its surroundings. This “Bridge” goes through the middle of the project and becoming the main entrance of the Museum.
"#$%&
Juarez
A-01 PLANTA DE CONJUNTO
Site Plan
61
TALLER DE ARQUITECTURA V
+82.00
5
22.000
5
Conexion
HOTEL
+82.00
6.625
4
Torre Cuartos I
ESCUELA DE ARQUITECTURA Y DISEÑO
.0 24
Circulacion
2
UBICACION :
Balderas
00
6
57
MEXICO D.F.
F
CONEXIÓN J-S
Pista de correr
A
7.
PROYECTO ARQUITECTÓNICO CONSTRUCTIVO:
CONEXIÓN
+26.00
6
24
8.
20
FIVE STARS HOTEL Located in Mexico City. This project was a mix of multiple uses in which I developed in addition to the Hotel (18 floors), a Museum (3 floors) of Art and Muralism and a three floor comercial area.
B
7.
59.000
[H]
7
59
C
62
P
P
P
PLANTA LOCALIZACIÓN
B
A
C
D
E
F
G
H
I
norte 0
1
2
3
4
5
6
7
ESCALA 1:200 ACOTACIÓN: METROS
Sala Revolucion
Baja
Sala Porfiriato
Museo
+5.00
Sanitario
ARQ. HECTOR MEZA
Llega a Nivel inferior
Mezzanine
Sala Interactiva
FECHA:
Recorrido libre
Servicio
PROFESOR:
K
30 DE OCTUBRE DEL 2012
1 Sala México moderno
2 Sala Siglo XIX
PROYECTO ARQUITECTÓNICO CONSTRUCTIVO:
Servicio
+5.00
incl.
demasiado
Servicio
Sanitario
Bodega
Bodega
Sanitario
3 Local Accesorios
Local Ropa
Local Bolsas
Local Joyeria
Comercio
Local Electronicos
+5.00
lobby +5.00
4 S-04
Local Zapateria Local Bolsas
Cocina / Almacen
PLANTA L
HOTEL
Doble Altura
HOTEL lobby bar
S-04
conexión UBICACION :
peq. Áng.
Sanitario Llega
Colon
S
n
5
9
Local Ropa
Terraza lobby bar
Local Accesorios
A
ANDREA SANCHEZ 1203097 ARGELIA BORBOLLA 1202911
Local Ropa
Local Joyeria
Local Bolsas
Local Ropa
AA +
F
G
H
I
Floor plan level 1
G
H
7.550
I
7.548
7.390
P
P
1
Sanitarios rampa 10%
Sanitarios
BAJA
Servicio Bodega
Andenes
Acceso Servicio Circulación de servicio
+0.00
A-07
1
3.000
F
PRIMER PISO
D
E
F
G
H
I
0
1
2
3
4
5
6
2.50
12.000
8.000
Tienda
Planta de Emergencia
J
norte
2 Subestación electrica
PROYECTO ARQUITECTÓNICO CONSTRUCTIVO:
C
F
+0.20
PLANTA LOCALIZACIÓN
B
+0.90
5.000
14
Museo
6.000
.1
36
50
80
8.2
A
9.364
Llega
4.9
51
P
4.0
P
PROFESOR:
Control
K
P
7
46
ESCALA 1:200 ACOTACIÓN: METROS
Sala Interactiva
Sala Siglo XIX
3 Local Accesorios
Local Ropa
Local Bolsas
Local Joyeria
Comercio
HOTEL
Local Electronicos
+5.00
lobby +5.00
4
lobby bar
S-04
S-04
Local Zapateria Local Bolsas
Cocina / Almacen
Motor Lobby +0.00
conexión
Acceso de Hotel
Humbolt
S
Local Joyeria
S H
I
Concierge
Floor plan level 2
Recepción
PATIO +0.00
1.500 Ducto
F
7.389
Local Electronicos
+0.20
4
S-04
S-04
Elevadores de huespedes
Acceso Motor Lobby
Local Zapateria 8.150
G
lobby +0.20
Comercio
Acceso de servicio
c
Acceso de oficinas 5
A-07 15.695 4.483
9
VESTIBULO +0.20
Local Accesorios
57
4.9
P
A+
Local Ropa
Local Joyeria
Local Bolsas
Local Ropa
SUBE
S
rampa 10% 14.491 P
ANDREA S ARGELIA BO
Acceso Hotel
Sube
PRIMER PISO
6.775
F
AA +
E
conexión
D
ESCUELA DE ARQUITECTURA Y DISEÑO
C
TALLER DE ARQUITECTURA V
B
ITESM CAMPUS QUERETARO
6
6.100
HOTEL
AA +
7
Local Bolsas 7.549
ANDREA SANCHEZ 1203097 ARGELIA BORBOLLA 1202911
Local Ropa
Local Joyeria
Local Bolsas
Local Ropa
Metrobus
Baja
2.014
16.000
Local Accesorios
8
A
9.000
6.325
Local Ropa
Terraza lobby bar
3 Local Accesorios
RECIBIDOR GENERAL
5
9
Balderas
Local Ropa
HOTEL
Doble Altura
Sanitario
1.050
PROYECTO ARQUITECTÓNICO CONSTRUCTIVO:
demasiado
Bodega
Bodega
Bodega
Acceso de Museo
UBICACION :
incl.
Sanitario
Cuarto de tableros
Acceso
MEXICO D.F.
peq. Áng.
Sanitario
Servicio
Servicio
Sanitario
+5.00 Llega
Sanitario
Salida de Museo
Servicio
Baja
CONEXIÓN J-S
Sala Independencia
Sala Proyección
Cuarto de medición
F
+0.20
2 J
Tanque de combustible
11.502
Descarga Camiones
16.100
Sanitario
FECHA:
PROFESOR:
Museo
+5.00
ARQ. HECTOR MEZA
Servicio
Sala Porfiriato
3.400
1 Sala México moderno
Llega a Nivel inferior
Mezzanine
30 DE OCTUBRE DEL 2012
Baja
Recorrido libre
4.400
.8
8.150
13
Sala Revolucion
K
2
ESC ACOTAC
Acceso a Andenes
10.314
E
F 6.926
0
AA +
D
E 9.448
P
conexión
C
ESCUELA DE ARQUITECTURA Y DISEÑO
B
D 7.200
TALLER DE ARQUITECTURA V
6
ITESM CAMPUS QUERETARO
7
A
C 6.327
S
8
B 10.193
T
ARQ. HECTOR MEZA
Baja
Sala Proyección
MEXICO D.F.
Sala Independencia
CONEXIÓN J-S
J
T
8
Acceso por Fonart
P
+0.00
PLANTA LOCALIZACIÓN
7
D
E
F
G
H
0
I
1
2
3
4
5
6
7
A
peq.
PROFESOR:
Sala de Introducción
Museo
Lobby
Servicio
B
C
D
E
F
G
H
I
S
Bodega
Servicio
Servicio
Copias
Ducto
4
S-04
S-04
Bodega de Oficina
Juarez conexión
ITESM CAMPUS QUERETARO
+10.00
Sanitarios Sanitarios
UBICACION :
demasiado
Comercio
Sanitarios
MEXICO D.F.
incl.
3
Terraza
HOTEL
peq. Áng.
Séptico
Sanitarios
PROYECTO ARQUITECTÓNICO CONSTRUCTIVO:
Conexión Puente Plaza Solidaridad +10.00
Vestibulo
CONEXIÓN J-S
Sala Independencia
Sala Virreinal
6
+10.00
2 J
FECHA:
demasiado
+7.50
14.192
ARQ. HECTOR MEZA
incl.
11.669
Áng.
1
Sala Prehispanica
Sala Conquista
K
S
30 DE OCTUBRE DEL 2012
ESCALA 1:200 ACOTACIÓN: METROS
Recepción/ Taquilla
20.000
C
4.000
norte B
A
S
Area de comida
Recepción ANDREA SANCHEZ 1203097 ARGELIA BORBOLLA 1202911
Oficinas
5
+10.00
Dirección
Floor plan
D
E
F
G
H
I
Floor plan level 3
PLAN
AA +
C
A-
TALLER DE ARQUITECTURA V
B
conexión
6
ESCUELA DE ARQUITECTURA Y DISEÑO
7
A
ITESM CAMPUS QUERETARO
8
63
AA +
S
9
A-08 SEGUNDO PISO
64
B
A
C
D
E
F
G
H
I
30.028
1
K
2
35.856
J
Pista de correr
3
Cuarto Tipo 5
Zona de Emergencia Escalera de Emergencia
Baño
Ducto
Cuarto Tipo 5
Baño Cuarto Tipo 5
Baño
Cuarto Tipo 5
Ducto
Espejo de agua
Baño
Torre Cuartos I
Elevador de Servicio
+26.00
Baño
Cuarto Tipo 5
00
Cuarto Tipo 3 Escalera de Emergencia
Servicio
.6
Baño
Cuarto Tipo 4
Acceso Pista
10
Ducto Cuarto Tipo 5 Baño
Ducto
4
Ducto
Cuarto Tipo 5
S-04
Torre Cuartos II
Baño
Circulacion Vestibulo
Zona Seca
Ducto
Cuarto Tipo 5
Zona Humeda
Zona Seca
S-04
Ducto
Zona Humeda
Zona Seca
Zona Seca
Zona Humeda
Zona Humeda
Zona Seca
10 .
60
0
Zona Seca
Zona Humeda
Ducto
+26.00
Elevadores
Zona Humeda
5
9
Cuarto Tipo 2
Cuarto Tipo 1
Cuarto Tipo 3
Cuarto Tipo 4
8
7
A
65
6
B
C
D
E
F
G
H
I
Bedroom floor plan
66
5
4
H
I
G
F
3
2
1
6.625
T
P
P
P
F
F
7.390
7.548
7.550
10.677
6.859
7.314
6
7
C
16.457
F
F
S
T
S
S
+102.00
8.150
6.625
+102.00
ALBERCA
PLANTA LOCALIZACIÓN
+94.00
norte +90.00 +89.00 +86.00
0
1
2
3
4
5
6
7
ESCALA 1:200 ACOTACIÓN: METROS
+94.00
+90.00 +89.00
+54.00
+50.00 +49.00 +46.00 +45.00 +42.00 +41.00
TORRE 2
+38.00
OFICINAS HOTEL
+10.00
MOTOR LOBBY
±0.000
+74.00
+70.00
TORRE 2
+62.00
TORRE 1
TORRE 2
!! "
+65.00
TORRE 1
!
+69.00 +66.00
A-15 FACHADA COLON
North Elevation
+77.00
+73.00
!! " "#$%&'($
CAFETERIA
SALON DE FIESTAS SERVICIO
9.326
RAMPA
!
ANDREA SANCHEZ 1203097 ARGELIA BORBOLLA 1202911
+5.00
ANDENES
4.326
+61.00 +58.00 +57.00 +54.00 +53.00
+46.00 +45.00 +42.00
TORRE 2
+41.00 +38.00 +37.00
TORRE 2
+50.00 +49.00
ESCALERAS DE EMERGENCIA
4.980
+22.00
+15.00 4.992
10.040 15.020
PLAZA DE LA SOLIDARIDAD
ACCESO AL MUSEO
RESTAURANTE
+26.00 +25.00
25.887
6.815
"#$%&'($
ESCUELA DE ARQUITECTURA Y DISEÑO
+30.00
MUSEO
+82.00
+78.00
TALLER DE ARQUITECTURA V
+34.00
+29.00
PUENTE
+81.00
+37.00
ITESM CAMPUS QUERETARO
PASILLO DE CUARTOS
ESCALERAS DE EMERGENCIA
+53.00
MEXICO D.F.
+58.00 +57.00
HOTEL
+61.00
+86.00 +85.00
UBICACION :
+62.00
CONEXIÓN J-S
TORRE 2
+66.00 +65.00
PROYECTO ARQUITECTÓNICO CONSTRUCTIVO:
+70.00 +69.00
TORRE 2
+74.00 +73.00
PROFESOR:
+77.00
PASILLO DE CUARTOS
+78.00
30 DE OCTUBRE DEL 2012
+82.00 ARQ. HECTOR MEZA
+81.00
FECHA:
PASILLO DE CUARTOS
+85.00
+34.00 +33.00
+30.00
+26.00
CAFERTERIA RAMPA
+5.00
OFICINAS
+10.00
HOTEL LOBBY
+15.00
MUSEO
+20.00
SALON DE FIESTAS RESTAURANTE
+25.00
±0.000
West Elevation
69
East Elevation
70
[B]
BUILT PROJECTS
73
74
[L]
LOMAS COUNTRY Located in Mexico City. The project was based on the curves of the original land and a series of platforms located to interact between them and their sourroundings. with a total of 4 floors and the combination of the decks, became the house a symphony of volumes working at differente profiles, as a result the remaining space is what makes this project unique and modern.
LOMAS COUNTRY
VGVM Architects
75
76
[L]
(on construction)
77
78
CIPRES III Located in Querétaro, México. The project develops several areas of human interaction. The comunity in which is located counted with limited resources. We worked with the Municipality in order to improve the infraestructure in general.
[C]
Basically the project was divided into half. One was guided to the outdoors activities such as futball and gym for older people. The other half resolved the administration and a couple of multi-task rooms. In adition to an Auditorium. In combination they communicate with a several of outdoors spaces that the comunity needed.
CIPRES III (Centro Integral de Prevención Social)
Prefabricated concrete pannels
Steel girders structure
Desnglass to keep light the structure
VGVM Architects
79
80
Tega House Located in QuerĂŠtaro, MĂŠxico. Tega House has as an open space loft concept with apparent finishes and the idea of playing and innovating with traditional materials. The client is a designer former architect willing to experiment with materials and design, open minded. The program was very simple two bedroom house with special attention to the study.
[T]
Tega House is a project in wich I was able to develop myself as an architect, I had the opportunity to design the entire project, from scketches to supervision on field, to work in materials wich require an elevated level of detail.
TEGA HOUSE
FA Factor Arquitectura
81
82
[T]
As a resoult we end up with a mix of materials and sensations that enphasize the architecture itself. The main character of the house is the apparent brick, most of the walls have rustic bricks finishing and as a contrast we use apparent concrete for floors for inner spaces and in some walls also for the facades.
RENDER facade
83
84
[T] RENDER - exterior hall
85
RENDER - living room
86
[T]
On construction
87
88
SD80 Located in QuerĂŠtaro, MĂŠxico. The program for this house was a 3 bedroom house develop in 1080 m2 located in Fraccionamiento Campanario. It consist in three levels including 1 for basement.
[S]
The House was a challenge because of its magnitud and for the special requirement of the client, who wanted a house not in warm tones instead he specify he was a cold man and his house had to be the same way. The project is on construction. SD80 HOUSE
FA Factor Arquitectura
89
90
[S]
The House develops an open concept facade which response to the orientation of the site. Besides the cold and fines finishes, we are integrated apparente elements of concrete to give the house the a differente personality. We decide that every element has to stands out from every facade, thats why we use dark colors for the flattaned walls and light warm tone fo wood finishes.
RENDER - South perspective
91
92
[S]
RENDER - east facade
93
94
[S] RENDER - north facade
93
94
VIÑEDOS HOUSE Located in San Miguel de Allende, México. The project is located in a vineyard condominium concep. Each client gets a building lot of 6000 square meters, in which they have to use 5000 for grapes production and the rest they can use it for construction. They have the opportunity to produce their own wine using the conduminium facilities.
[V]
The concept of this project was to mix the traditional architecture of San Miguel, with contemporary architecture, and find the line that bring together the two styles.
Viñedos house
The client wanted a vacation house that emphasize comfort and warm environment. A house to go and enjoy.
FA Factor Arquitectura
95
96
[V]
The house is based in solid - close facades that brigs up the axis game. Simplicity is the best word to describe it. In the inner spaces the house opens up to landscape and each room is oriented to frame the views. The main character of the house is the sunken patio that brings light to the bedrooms in the basement and creates an interesting play of landscapes with each personality. Giving to the project a real effect of surprise in each step.
RENDER - facade
97
98
[V]
RENDER - back facade
99
100
[V]
RENDER - sunken patio
101
102
EXTRAS 103
104
EXPACKAGE
ga
lle
TRAS
ta
s
Package cookies inspired by the band Pink Floyd
105
107
North Ireland, Belfost
Paul Brady THE ISLAND anti-war song
1980
Events of the Lebanese Civil War with the Troubles
Manchester, England
Oasis HALF THE WORLD AWAY
Dissapointment of their city. Wants to leave
Follow dreams find happiness half the world away
:)
Halifax, England
Ed Sheeran YOU NEED ME, I DON’T NEED YOU Fenchurch VO5 wax The Enterprise Nationwide Just Jack and Suffolk Brit School “fella” “rucksack”
REGRET!
Stoke-on-Trent England
Robbie Williams
KNUTSFORD CITY LIMITS instead of living in famous cities
time to live in Knutsford countryside and celebrities
London, England
Mumford and Sons SIGH NO MORE
Use small quotes of
Shakespeare's work,
relation with their zone. I can picture myself walking on the streets of England, in a rainy day,
“northern scum”
sacrifice of young people for political beliefs TOWN ON FIRE
“The Royle family” soundtrack stereotype of the low-working class.
He raps against stereotype makes the song stronger
poorer richer
england
“London’s got its gimmicks” something hidden or not good
Folk, Indie alternative.
“It’s better to live in Knutsfor because London’s got its gimmicks”
EXINPHOGRAPHIC
TRAS THE PUPPETS 108
Infographic about bands in UK.
109
INVESTITY
Educación del mercado Estudiantes se gradúan y consiguen trabajos por ende más dinero, como confían en nosotros invierten en nosotros
Segmento de mercado: alumnos universitarios 18-25 años hombres y mujeres Nivel socioeconómico C+
4
Sustentabilidad
PROCESO
RE invertir o entregar ganancias al cliente Portafolio
depósito de dinero
comunicación
SOLUCIÓN
mi dinero rinde más
ofrecer simuladores
cómo?
dinero y estudiar
2PROBLEMATICA
clientes
dos formas de conseguirlo
cliente interesado
Red de alumnos que quieren aprender
transferencia de dinero
test de adversión de riesgo, metas financieras y plazo de inversión
contratación
3
cita
no pierdo tiempo
INVESTITY lo hace por tí
qué?
mis metas se vuelven realidad capital suficiente
1DATOS
NO
2%TIENE BECA
de estudiantes reciben dinero de padres
380,000
alumnos en Querétaro
110
TRAS
Falta de conocimiento
90%
20%
de estudiantes trabaja
ingresos suben
Dejar que otro inviterta por mí porque yo “no sé”
No experiencia como trabajador
en las cosas que queremos
INFOGRAPHIC
Aprendo por medio de los simuladores
Tiempo
no se gasta
EX-
te permite como estudiante con un mínimo de $1000 pesos invertir mientras sigues estudiando
69% 31%
12%
de estudiantes ahorra su Gastan en dinero entretenimiento Gastan en extras de universidad
Infographic for business “INVESTITY”
111
<<I do not believe architecture should speak too much. It should remain silent and let nature in the guise of sunlight and wind speak>> Tadao Ando
112
113
thank you