Architecture Portfolio

Page 1

Salvaterra de Magos School

lniv Sanus Per Aquam City Museum

Alverca School

Vale de Figueira Station

Damaia School

Alverca School

lniv

Andreia Chan Gao


COVER LETTER & RESUME PULL


DIRECTORY PORTFOLIO

DR. AZEVEDO NEVES SECUNDARY SCHOOL (HIGH SCHOOL) SALVATERRA DE MAGOS EB2/3 AND SECUNDARY SCHOOL (HIGH SCHOOL) GAGO COUTINHO SECUNDARY SCHOOL (HIGH SCHOOL) NATIONAL VETERINARY RESEARCH LABORATORY (LNIV)

VALE DE FIGUEIRA STATION (TRAIN STATION)

SANUS PER AQUA - TOMAR CONVENT CITY MUSEUM - CORE XX AND XXI CENTURY


SERLACHIUS MUSEUM INTERNATIONAL DESIGN FINLAND, 2011

EXTENSION COMPETITION,

PROGRAM: Foyer Services, Conference and Representation Facilities, Restaurant and Kitchen Facilities, Exhibition Spaces, Collections Treatment and Storage Facilities, Offices, Conference Room and Library, Property Management Facilities, Circulations, Extension of the Exterior Circulation. BUILDING AREA: The design of the building extension, works as a connector between the Melasjarvi Lake, the Taavetinsaari island and the park, a destination point. Rather than going to the museum simply to look at art, visitors are welcomed to engage in artistic discourse primarily by the architecture of the building itself. According to the basic assumptions, for some of the design options taken, the new building is developed according to a constructive streamlined grid - oriented in a cross shape by two major circulation axes - the longitudinal (North - South ) crossing the (East-West) direction. This cross circulation (interior and exterior) provides a spatial distribution of the program in all quadrants (North-East, East / South, South / West and West / North) where we will insert the implemented different functional areas. The entrance foyer acts as the heart of the old and the new building, directing the visitors along all the museological spaces. CREDITS: Andreia Gao, Carla Rodrigues, Madalena Caiado,Mariana Henriques, Rui Cavaleiro (project team)

Pedestrian routes

Vehicles route

Parking

Museum Entranc

Site Plan_1/5000


JOENNIEMI MANOR

Diagrams

es

Service vehicles routes Loading and Unloading

ce

Loading and Unloading Access Facade_1/2000

TAAVETINSAARI

JOENNIEMI MANOR

TAAVETINSAARI

JOENNIEMI MANOR


105.5

106

106.5

107

107

106.5

105.5

106

106.5

107

106

105.5

105

104.5

104

103.5

103

102.5

105

105 102

101.5

104.5

104.5 101

100.5

104

104 100

SERLACHIUS MUSEUM INTERNATIONAL DESIGN FINLAND, 2011

103.5

103.5

103

103

102.5

102.5

102

102

EXTENSION COMPETITION,

PROGRAM: Foyer Services, Conference and Representation Facilities, Restaurant and Kitchen Facilities, Exhibition Spaces, Collections Treatment and Storage Facilities, Offices, Conference Room and Library, Property Management Facilities, Circulations, Extension of the Exterior Circulation. BUILDING AREA:

101.5

101.5

101

101

100.5

100.5

100

100

The design of the building extension, works as a connector between the Melasjarvi Lake, the Taavetinsaari island and the park, a destination point. Rather than going to the museum simply to look at art, visitors are welcomed to engage in artistic discourse primarily by the architecture of the building itself. According to the basic assumptions, for some of the Plan Level 103,00_1/1000 design options taken, the new building is developed according to a constructive streamlined grid - oriented in a cross shape by two major circulation axes - the longitudinal (North - South ) crossing the (East-West) direction. This cross circulation (interior and exterior) provides a spatial distribution of the program in all quadrants (North-East, East / South, South / West and West / North) where we will insert the implemented different functional areas. The entrance foyer acts as the heart of the old and the new building, directing the visitors along all the museological spaces. CREDITS: Andreia Gao, Carla Rodrigues, Madalena Caiado,Mariana Henriques, Rui Cavaleiro (project team)

Plan Level 107,50_1/1000


0

107

106.5

105.5

106

106.5

107

107

106.5

106

105.5

105.5

105

105

104.5

104.5

104

104

103

103

102.5

102.5

105

102

102

101.5

101.5

104.5 101

101

100.5

100.5

104 100

100

103.5

103

102.5

102

101.5

101 100.5 100

Plan Level 110,50_1/1000


Section AA_1/1000

Section BB_1/1000

Section CC_1/1000


Section DD_1/2000

Section EE_1/2000

Section FF_1/2000


NEW RAILROAD STATION OF SANTAR M AND ROAD-RAIL INTERFACE, PORTUGAL, 2006 - 2010 PROGRAM: Passenger areas, food and shopping areas (cafeteria, shops...), railway operators areas, REFER area, platforms, interface/outdoor, car silo. CLIENT: REFER, EPE BUILDING AREA: INTERFACE AREA: STATUS: Execution Project The new railroad Station of and road-rail interface , was part of the Modernization Project of the Northern Line (PMLN), Setil /Entroncamento. The creation of a pedestrian route connection was proposed due to the proximity between the new station and the future urban park. This new territorial reorganization allows a new visual and physical relationship with this rail infrastructure. So we opted for a functional layout in which the entry of passengers is situated at the highest elevation of the land, on the west side of the station - square - resulting in a access system that, through the galleries at the lobby level (57.00), processes the connection between entries and platforms, in circuits in which the access to the line, the path is always descending, and in the exit from the line, the path is always ascending. The car silo have 3 floors, partially buried and which coverage is the same share of the station square, this should have the least visual and environmental possible impact. MY COLLABORATION: Prior Study, Execution Project CREDITS: Andreia Gao, Carla Rodrigues, Gemma Villa Rui Cavaleiro, Talita Abraham (project team)

Site Plan_1/2000



Ground Floor Plan_1/2000

NEW RAILROAD STATION OF SANTAR M AND ROAD-RAIL INTERFACE, PORTUGAL, 2006 - 2010 PROGRAM: Passenger areas, food and shopping areas (cafeteria, shops...), railway operators areas, REFER area, platforms, interface/outdoor, car silo. CLIENT: REFER, EPE BUILDING AREA: INTERFACE AREA: STATUS: Execution Project The new railroad Station of and road-rail interface , was part of the Modernization Project of the Northern Line (PMLN), Setil /Entroncamento. The creation of a pedestrian route connection was proposed due to the proximity between the new station and the future urban park. This new territorial reorganization allows a new visual and physical relationship with this rail infrastructure. So we opted for a functional layout in which the entry of passengers is situated at the highest elevation of the land, on the west side of the station - square - resulting in a access system that, through the galleries at the lobby level (57.00), processes the connection between entries and platforms, in circuits in which the access to the line, the path is always descending, and in the exit from the line, the path is always ascending. The car silo have 3 floors, partially buried and which coverage is the same share of the station square, this should have the least visual and environmental possible impact.

Lower Level 1 Plan_1/2000

MY COLLABORATION: Prior Study, Execution Project CREDITS: Andreia Gao, Carla Rodrigues, Gemma Villa Rui Cavaleiro, Talita Abraham (project team)

Lower Level 3 Plan _1/2000


57,53

Lower Level 2 Plan _1/2000


Section A_1/2000

Section B_1/2000

Section C_1/2000

Section D_1/2000


Section E_1/2000

Section F_1/2000

Section G_1/2000

Section B_1/200


DR. AZEVEDO NEVES SECUNDARY SCHOOL DAMAIA, PORTUGAL, 2008 - 2011 PROGRAM: Standard classrooms, general office/ administration, student center / multipurpose centre, computer rooms, (new oportunities center) and special education/ dress rooms, fitness room, outdoor and indoor activities spaces / row of seats with support spaces/ reception desk. CLIENT: Parque Escolar, EPE BUILDING AREA: STATUS: Constructed

Existent

The Dr. Azevedo Neves Secondary School was part of the Modernization Program of Parque Escolar do Ensino As the name itself indicates, the most important intervention is related to the introduction of the Block A. This new body that grabs to the physically existing blocks B and C, is set around a - patio / plaza - which sees itself as a structural element of the entire project also connecting with the main entrance and the street that gives access to schools. This building consists in its essence, the Resource Center is structured on two floors (above the Demolished main entrance); and the "Library" and the break room are located above the access area to the central courtyard. MY COLLABORATION: Execution Project, Technical Assistance CREDITS: Andreia Gao, Gemma Villa, Madalena Caiado, Mariana Henriques, Talita Abraham (project team) New

Site Plan


Ground Floor Plan

EDUCATION UNITS

First Floor Plan

SPECIFIC USES

Second Floor Plan

CIRCULATIONS


DR. AZEVEDO NEVES SECUNDARY SCHOOL DAMAIA, PORTUGAL, 2008 - 2011 PROGRAM: Standard classrooms, general office/ administration, student center / multipurpose centre, computer rooms, (new oportunities center) and special education/ dress rooms, fitness room, outdoor and indoor activities spaces / row of seats with support spaces/ reception desk. CLIENT: Parque Escolar, EPE BUILDING AREA: STATUS: Constructed The Dr. Azevedo Neves Secondary School was part of the Modernization Program of Parque Escolar do Ensino As the name itself indicates, the most important intervention is related to the introduction of the Block A. This new body that grabs to the physically existing blocks B and C, is set around a - patio / plaza - which sees itself as a structural element of the entire project also connecting with the main entrance and the street that gives access to schools. This building consists in its essence, the Resource Center is structured on two floors (above the main entrance); and the "Library" and the break room are located above the access area to the central courtyard.

Roof Plan_1/2000

Section 1

MY COLLABORATION: Execution Project, Technical Assistance CREDITS: Andreia Gao, Gemma Villa, Madalena Caiado, Mariana Henriques, Talita Abraham (project team)

Section 2

First Floor Plan_


_1/2000

Ground Floor Plan_1/2000

1

2

4 3

Section 3

4 3

Section 4

2

1


Section AA_1/1000

Section BB_1/1000

Section CC_1/1000

Section DD_1/1000


A

B C

Section EE_1/200


SALVATERRA DE MAGOS EB2/3 AND SECUNDARY SCHOOL, PORTUGAL, 2008 - 2011 PROGRAM: activities of the 2nd laboratories, classes for the 3rd cycle and secondary general office / administration, teachers and staff break room, student cafeteria, resource rooms, workshops, NOC (new opportunities center) and special education, new body of dress rooms, and reception desk.

A

CLIENT: Parque Escolar, EPE BUILDING AREA: 11,800 m (127,014 sf) STATUS: Constructed The Salvaterra de Magos School / Secondary was part of the Modernization Program of Parque Escolar do Ensino The major objective of this proposal is to ensure a balanced way of joining two contiguous but separate schools physically the Antonio Lopes Salvaterra de Magos, by developing a comprehensive approach. A new multi-purpose school building is added core that will be physically closer to the existing blocks A and G. The new building is of different dimensions that are the structural element the whole project also linking with the main entrance and the street that provides access to school. MY COLLABORATION: Prior Study, Execution Project, Technical Assistance CREDITS: Andreia Gao, Carla Rodrigues, Rui Cavaleiro Victor (project team)

G

H

B C D


Circulations

Specific Uses

Education Units

Sports Demolition Plan


. o f P r

ã o n ç s u A s

R

u

a

E

n

g

.

r o B a i r

J

o

s

é

H

d a

e

n

ri

q

u

e

L

in

o

a l C h e s

a R u

i a r c t é N a

SALVATERRA DE MAGOS EB2/3 AND SECUNDARY SCHOOL, PORTUGAL, 2008 - 2011 PROGRAM: activities of the 2nd laboratories, classes for the 3rd cycle and secondary general office / administration, teachers and staff break room, student cafeteria, resource rooms, workshops, NOC (new opportunities center) and special education, new body of dress rooms, and reception desk. CLIENT: Parque Escolar, EPE

35

8 1 1 l a n i o c

15

a N a d

5

a r t

0

s E

STATUS: Constructed The Salvaterra de Magos School / Secondary was part of the Modernization Program of Parque Escolar do Ensino The major objective of this proposal is to ensure a balanced way of joining two contiguous but separate schools physically the Antonio Lopes Salvaterra de Magos, by developing a comprehensive approach. A new multi-purpose school building is added core that will be physically closer to the existing blocks A and G. The new building is of different dimensions that are the structural element the whole project also linking with the main entrance and the street that provides access to school.

m

BUILDING AREA: 11,800 m (127,014 sf)

MY COLLABORATION: Prior Study, Execution Project, Technical Assistance CREDITS: Andreia Gao, Carla Rodrigues, Rui Cavaleiro Victor (project team)

Site Plan_1/2000


m

0

5

15

35

m 35

15

5 0

First Floor Plan_1/2000

Ground Floor Plan_1/2000


B C Section AA_1/1000

A

A

Section BB_1/1000

B C Section CC_1/1000



GAGO COUTINHO SECUNDARY ALVERCA, PORTUGAL, 2009 -

SCHOOL,

PROGRAM: and specific use classrooms, general office / administration, student center / multipurpose (new oportunities center) and special education/ dress rooms, fitness room/ electricity, mechanical and aeronautics workshops. CLIENT: Parque Escolar, EPE

Existent

BUILDING AREA: STATUS: In Construction The Gago Coutinho Secondary (High) School was part of the Modernization Program phase 3 of the Parque Escolar do Ensino The most important intervention is related to the introduction of the new Block ADM. This new body that physically grabs to the existing blocks B and C, is set around two courtyards / plazas - which identify themselves as structural elements of the whole project. The body also links with the main entrance and the street that gives access to school. The ADM building, subdivided into A, D and M, but is a single building for the purpose of space organization that is situated along the entire Avenue Vilar Queiroz. Constructive and architectural solutions were also evaluated to respond to the resolution of current problems related to: environmental/thermal performance, safety and accessibility; acoustics; observed constructive pathologies; building infrastructure systems reorganization and remodeling.

Demolished

MY COLLABORATION : Prior Study, Execution Project CREDITS: Andreia Gao, Carla Rodrigues, Madalena Caiado, Mariana Henriques, Talita Abraham (project team)

New


First Floor Plan

Ground Floor Plan

Site Plan

Second Floor Plan

0

10

20m

Classrooms

Library | Multipurpose

Science & technology

Teachers Area | Administrative Area

Arts

Social Area | Cafeteria

Workshops

Sports Area

Storage / Technical Areas / Toilets

NOC -New Opportunities Center


Roof Plan_1/2000

GAGO COUTINHO SECUNDARY ALVERCA, PORTUGAL, 2009 -

SCHOOL,

PROGRAM: and specific use classrooms, general office / administration, student center / multipurpose (new oportunities center) and special education/ dress rooms, fitness room/ electricity, mechanical and aeronautics workshops. CLIENT: Parque Escolar, EPE BUILDING AREA: STATUS: In Construction The Gago Coutinho Secondary (High) School was part of the Modernization Program phase 3 of the Parque Escolar do Ensino The most important intervention is related to the introduction of the new Block ADM. This new body that physically grabs to the existing blocks B and C, is set around two courtyards / plazas - which identify themselves as structural elements of the whole project. The body also links with the main entrance and the street that gives access to school. The ADM building, subdivided into A, D and M, but is a single building for the purpose of space organization that is situated along the entire Avenue Vilar Queiroz. Constructive and architectural solutions were also evaluated to respond to the resolution of current problems related to: environmental/thermal performance, safety and accessibility; acoustics; observed constructive pathologies; building infrastructure systems reorganization and remodeling. MY COLLABORATION : Prior Study, Execution Project CREDITS:

First Floor Plan_1/2000 Andreia Gao, Carla Rodrigues, Madalena Caiado, Mariana Henriques, Talita Abraham (project team)


Second Floor Plan_1/2000

Ground Floor Plan_1/2000

Ground Floor Plan_1/1000


Section AA_1/1000

Section BB_1/1000

Section CC_1/1000


Section DD_1/200

C

C D

D

B

B

A

A


12

1 21.28

15

30

25.84

26.43

25

31.30

30

20

25

15

20

NATIONAL VETERINARY RESEARCH LABORATORY (LNIV), PORTUGAL, 2011

35

36.24

31.69

CLIENT: INRB, I.P. / LNIV - OEIRAS

32.55

33.47

37.11

31.84

33.29

40

29.72

36.37

36.50

24.55

27.23

35

34.20

30

25.08

30.35

PROGRAM: Body 1 Technical Unit of Animal Health, Unit of Public Hygiene, General Technical

35 39.67

30.29

35.43

31.46

31.88

45

30.63

29.82

45

32.65

34.46

37.73

49.26

28.57

28.12 38.35

36.80

29.04

30

40

35

45.18

33.76 32.08

40.38

33.10

36.64

50

48.58

Andreia Gao, Gemma Villa, Mariana Henriques, Rui Cavaleiro, Talita Abraham (project team)

32.89

34.66

36.82 36.71

50.40

MY COLABORATION: Basic Project CREDITS:

42.54

35.72

41.93 41.93

45

the Oeiras, belonging to Quinta de Recreio do Marques de Pombal. This intervention of "single building", this somehow transform it. The may a set three interconnected Passive systems were also implemented (bioclimatic), to water - recycling for capturing on the roof, geothermal heat implementation of panels. the the building an roof was created and to water were implemented as well, among others.

38.75

the

50.40

are

31.77

38.45

40

31.66

32.06

36.59

AREA: STATUS: Basic Project


LEVEL 3 management floor

LEVEL 2 management floor

FUNCTIONAL DIAGRAM LEVEL -1 AND -2

LEVEL 1 management floor technical floor of P3 lab FUNCTIONAL DIAGRAM LEVEL 0

A

B

LEVEL 0 lobby lab floors P3 lab floor

C

A. B.

MANAGEMENT

USA: LABORATORY OF PATHOLOGY, BACTERIOLOGY, VIROLOGY, PARASITOLOGY UHP: FOOD SAFETY LABORATORY

C.

P3. LABORATORY OF VIROLOGY AND BACTERIOLOGY

LEVEL -1 technical floor laboratory technical floor of P3 lab treatment centrals general technical support, garages, retail

FUNCTIONAL DIAGRAM LEVEL 1 AND 2

1 -­ CORE SUPPORT 2 -­ AHU -­ ANIMAL HEALTH UNIT 3 -­ PHU -­ PUBLIC HEALTH UNIT

LEVEL -2 water tanks

FUNCTIONAL DIAGRAM LEVEL 3

4 -­ GTS -­ GENERAL TECHNICAL SUPPORT


29.72

40

39.50

.50

36.24

33.47

39.5

0

38

0

35

40.0

37

.50

40.00 42.50

36.59

36.50

42.50

.50

40

43

40.00

42.50

40.00

45

42.50

45.00

45.00

42.00

37.73

49.26

48.00

Site Plan_1/2000

NATIONAL VETERINARY RESEARCH LABORATORY (LNIV), PORTUGAL, 2011 PROGRAM: Body 1 Technical Unit of Animal Health, Unit of Public Hygiene, General Technical

CLIENT: INRB, I.P. / LNIV - OEIRAS AREA: STATUS: Basic Project are

the

the Oeiras, belonging to Quinta de Recreio do Marques de Pombal. This intervention of "single building", this somehow transform it. The may a set three interconnected Passive systems were also implemented (bioclimatic), to water - recycling for capturing on the roof, geothermal heat implementation of panels. the the building an roof was created and to water were implemented as well, among others.

First Floor Plan_1/1000

MY COLABORATION: Basic Project CREDITS: Andreia Gao, Gemma Villa, Mariana Henriques, Rui Cavaleiro, Talita Abraham (project team)

Lower Level 1 Plan_1/1000


Roof Plan_1/1000

Third Floor Plan_1/1000

Second Floor Plan_1/1000

TRF

Ground Floor Plan_1/1000

Lower Level 2 Plan _1/1000


C

C

B

B

A

A

H

North Sol

Section AA_1/1000

Environ

Section BB_1/1000

Section CC_1/1000

Environmental Energy Per


Heating season (winter) South Solar Chimney

Addicted Air Outlet (Open upper grilles)

New Heated Air Inlet

( Open Lower Windows)

Sun Rays Solar protections Raised Blinds Mass of air heated by the sun Greenhouse Between the Two Facades Air Inlet (the outside temperature) Open Lower Windows

nmental Energy Performance

rformance

South Solar Chimney

Rainy seasons Rainwater Water Infiltration in humus Tubes of Water Collection and Forwarding Water Tank Reserve

Thermal Mass

North Solar Chimney Thermal Mass

Air outlet Open Superior Window

Thermal Mass

Thermal Mass

lar Chimney

COOLING SEASON (Summer)

Addicted Air Outlet

(Open Superior Window)

New Air Inlet

Air Inlet (outside temperature) Open Lower Windows

(Open lower grille)

Air outlet Open Superior Window

Sun Rays Solar protections Lower blinds Mass of air heated by the sun Chimney Effect Between the the Two Facades

Environmental Energy Performance

Dry seasons Water Infiltration in humus Buried Network Irrigation Water Tank Reserve Pumped to the roof

Effect of Direct Sun Rays Dissipation of the Solar Radiation Layer of humus Lower Thermal Losses and Gains (winter / summer) Less Electricity Consumption (HVAC)


VALE DE SANTAR M SECO NDARY RAILR OAD STATION, PORTUGAL, 2006 - 2010 PROGRAM: Passenger areas, platforms, "Kiss and ride" and "park and ride", shelter for passengers, upper walkay.

ADO

ERTO

RUA

DELG

HUMB

CLIENT: REFER, EPE BUILDING & PLATFORMS AREA: (21,920 sf) STATUS: Execution Project Following the fire that destroyed the building of the current Vale de secondary railroad station, it became necessary to reformulate the solution presented above, it was concluded to be more beneficial to opt for the demolition of the existing building. The new Vale de secondary railroad station, was part of the Modernization Project of the Northern Line (PMLN), Setil /Entroncamento. The conception of the solution considered the location conditions and accessibility of the station, the spaces available for intervention and the existing rail infrastructure, as well as, its relationship to the need for implementation of the interface features ("Kiss and ride" and "park and ride") and the crossing the railway line is through the upper walkway, with stairs and elevator to comply with the regulatory conditions of accessibility of disabled users. To replaced the current Passenger Building, it is solely proposed the existence of a hollow waiting and shelter area for passengers - although covered by a metal frame portico. MY COLABORATION: Prior Study, Execution Project CREDITS: Andreia Gao, Carla Rodrigues, Gemma Villa Rui Cavaleiro, Talita Abraham (project team)

Site Plan_1/2000


RUA DA LIBERDADE RU A DE CADIM A A 25 RU DE AB RIL

RUA DA RIBEIRA GRANDE

RUA DA RIBEIRA GRANDE


Roof Plan_1/500

VALE DE SANTAR M SECO NDARY RAILR OAD STATION, PORTUGAL, 2006 - 2010 PROGRAM: Passenger areas, platforms, "Kiss and ride" and "park and ride", shelter for passengers, upper walkay. CLIENT: REFER, EPE BUILDING & PLATFORMS AREA: (21,920 sf) STATUS: Execution Project Following the fire that destroyed the building of the current Vale de secondary railroad station, it became necessary to reformulate the solution presented above, it was concluded to be more beneficial to opt for the demolition of the existing building. The new Vale de secondary railroad Section AA_1/1000 station, was part of the Modernization Project of the Northern Line (PMLN), Setil /Entroncamento. The conception of the solution considered the location conditions and accessibility of the station, the spaces available for intervention and the existing rail infrastructure, as well as, its relationship to the need for implementation of the interface features ("Kiss and ride" and "park and ride") and the crossing the railway line is through the upper walkway, with stairs and elevator to comply with the regulatory conditions of accessibility of disabled users. To Section BB_1/1000 replaced the current Passenger Building, it is solely proposed the existence of a hollow waiting and shelter area for passengers - although covered by a metal frame portico.

Section DD_1/500

Section EE_1/500

MY COLABORATION: Prior Study, Execution Project CREDITS: Andreia Gao, Carla Rodrigues, Gemma Villa Rui Cavaleiro, Talita Abraham (project team) Section CC_1/1000

Section FF_1/500


Ground Floor Plan_1/500


VALE DE FIGUEIRA STATION, PORTUGAL, 2006 2010 PROGRAM: Passenger areas, technical areas, platforms, "Kiss and ride" and "park and ride", shelter for passengers, upper walkway. CLIENT: REFER, EPE BUILDING & PLATFORMS AREA: (24,750 sf) STATUS: Execution Project The conception of the solution considered the location conditions and accessibility of the station, the spaces available for intervention and the existing rail infrastructure, as well as, its relationship to the need for implementation of the interface features ("Kiss and ride" and "park and ride") and the crossing of the railway line that is through the upper walkway, with stairs and elevator to comply with the regulatory conditions of accessibility of disabled users. Taking advantage of the fact of having to build this infrastructure, and given that the top floor of the passenger building also needs an accessibility for the disabled, located along the upper walkway, is now proposed in order to serve that floor. A portico structure linking these two elements Building Passenger and Pedestrian Overpass is also introduced. As previously mentioned, the current passenger space will be recovered and intervened, which is a global intervention on the ground floor designed as a whole to the technical building -; and the upstairs part - will be in rough - with the perspective of a possible use of that space by external services of REFER. MY COLLABORATION: Prior Study, Execution Project CREDITS: Andreia Gao, Carla Rodrigues, Gemma Villa Rui Cavaleiro, Talita Abraham (project team)


Site Plan 1/2000

Roof Plan_1/500


First Floor Plan_1/500

VALE DE FIGUEIRA STATION, PORTUGAL, 2006 2010 PROGRAM: Passenger areas, technical areas, platforms, "Kiss and ride" and "park and ride", shelter for passengers, upper walkway. CLIENT: REFER, EPE BUILDING & PLATFORMS AREA: (24,750 sf) STATUS: Execution Project The conception of the solution considered the location Section A_1/1000 conditions and accessibility of the station, the spaces available for intervention and the existing rail infrastructure, as well as, its relationship to the need for implementation of the interface features ("Kiss and ride" and "park and ride") and the crossing of the railway line that is through the upper walkway, with stairs and elevator to comply with the regulatory conditions of accessibility of disabled users. Taking advantage of the fact of having to build this infrastructure, and given that Section B_1/1000 the top floor of the passenger building also needs an accessibility for the disabled, located along the upper walkway, is now proposed in order to serve that floor. A portico structure linking these two elements Building Passenger and Pedestrian Overpass is also introduced. As previously mentioned, the current passenger space will be recovered and intervened, which is a global intervention on the ground floor Section C_1/1000 designed as a whole to the technical building -; and the upstairs part - will be in rough - with the perspective of a possible use of that space by external services of REFER.

Section E_1/500

Section F_1/500

MY COLLABORATION: Prior Study, Execution Project CREDITS: Andreia Gao, Carla Rodrigues, Gemma Villa Section D_1/1000 Rui Cavaleiro, Talita Abraham (project team)

Section G_1/500


Ground Floor Plan_1/500


-Idanha-a-Nova 2011

BEIRA BAIXA, PORTUGAL, 2005 -

PROGRAM: Terraces, bedrooms, living room, kitchen, library, games room, garage. CLIENT: BUILDING AREA: STATUS: Constructed Rehabilitation project - the junction of two houses of the same owner in the village's urban center. MY COLLABORATION : Technical Assistance CREDITS:


A'

A


SANUS PER AQUA, TOMAR CONVENT, P O R T U G A L , 2 0 0 8 SEMINAR FAUTL: VI International Seminar Architecture - Architecture and Cosmology

of

WORKSHOP Water Of The Templars: The Convent and Aqueduct, Thermal Program The team responsible for coordinating the workshop consisted of: Jorge Cruz Pinto, Hugo Cantone, Antonello Monaco, Jorge Oseki, Mariagrazia Leonardi, Andrea Rosario Cristelli e Pedro Cabrito. Part of the workshop took place in Tomar, more precisely at the Convent of Christ and consisted in an open program from the interpretation of the Convent of Christ, where the design was the tool of representation analysis, of which the theme was water, geometry and space. The proposed architecture should be based on a hypothesis of a program of uses that respects the spirit of the place and aim to reuse the aqueduct which is currently disabled; and the presence of water as a functional element of revitalization. The title of our work was the Sanus Per Aquam, that is, we made a proposal for a Spa, so we took the cisterns of the Convent of Christ to create our Spa. In terms of the program we have: Pools caledarium, tepidarium, frigidarium, Turkish bath, sauna, Jacuzzi pool, biological pool, massage rooms, services, restrooms, shower and locker rooms. The skylights were used for natural lighting to caledarium, the old irrigation system for the gardens was turned into a water mirror, and the tanks were converted into swimming pools. TEAM: Marta Dabraio



C ITY M U SE UM _ COR E X X AN D X XI C EN TU RY , L I S B O N , P O R T U G A L PROGRAM: Public areas, service areas, technical areas, parking areas. FA-UTL: 2007 / 2008 BUILDING AREA: The area of intervention of this project is the area surrounding the road junction in the "Twin Towers". The establishment of this museum came in trying to make the connection to Monsanto by changing the road system and a green path, where the link is the building. This proposal consists in the creation of a new roundabout which develops according to the topography of the land, a green path with the intention of connecting the Parque Eduardo VII to Monsanto, and a museum located within the roundabout that will be part of a building - the bridge . This, at certain areas of land will be based on a system of platforms and tunnels that will connect the existing viaduct, adopting a pedestrian character, and of leisure, where outdoor cafes, banks, etc can exist. The Museum has two exterior parking areas, one for visitors and another to support it, surrounded by a large green space that can be used for exhibitions. The interior space is divided into public areas, service and technical areas, with the restaurant and cafeteria facing south, overlooking the Valley of Alcantara, and the exhibition area to the west overlooking Monsanto. Zinc and U-Glass will be used for exterior materials.

FACULTY:


Site Plan_1/5000


C ITY M U SE UM _ COR E X X AN D X XI C EN TU RY , L I S B O N , P O R T U G A L PROGRAM: Public areas, service areas, technical areas, parking areas. FA-UTL: 2007 / 2008 BUILDING AREA: The area of intervention of this project is the area surrounding the road junction in the "Twin Towers". The establishment of this museum came in trying to make the connection to Monsanto by changing the road system and a green path, where the link is the building. This proposal consists in the creation of a new roundabout which develops according to the topography of the land, a green path with the intention of connecting the Parque Eduardo VII to Monsanto, and a museum located within the roundabout that will be part of a building - the bridge . This, at certain areas of land will be based on a system of platforms and tunnels that will connect the existing viaduct, adopting a pedestrian character, and of leisure, where outdoor cafes, banks, etc can exist. The Museum has two exterior parking areas, one for visitors and another to support it, surrounded by a large green space that can be used for exhibitions. The interior space is divided into public areas, service and technical areas, with the restaurant and cafeteria facing south, overlooking the Valley of Alcantara, and the exhibition area to the west overlooking Monsanto. Zinc and U-Glass will be used for exterior materials.

FACULTY:

Roof Plan_1/1000


C

D

D05

B

CA

B

A01

D

A

First Floor Plan_1/1000

C

D

D05

B

CA Groud Floor Plan_1/1000

B

D

A


+ 20.00

+ 20.00

+ 20.00

+ 15.00

+ 15.00

+ 15.00

+ 10.00

+ 10.00

+ 5.00

+ 5.00

+ 10.00 + 5.00

Section BB_1/1000

Section AA_1/1000

+ 20.00

+ 20.00

+ 20.00

+ 15.00

+ 15.00

+ 15.00

+ 10.00

+ 10.00

+ 10.00

+ 5.00

Section CC_1/1000

+ 5.00

+ 5.00

Section DD_1/1000


+ 20.00 + 15.00 + 10.00 + 5.00

+ 20.00 + 15.00 + 10.00 + 5.00


CIAUD -

on

Design at the

Re-Stone Project

Hotel Spa - Quinta Praia das Fontes

Seminar FAUTL - VI International Seminar of Architecture - Architecture

Stone - FIMAL - Alentejo International Marble


RECOMMENDATION LETTERS PULL


Salvaterra de Magos School

lniv Sanus Per Aquam Damaia School

Alverca School

City Museum

Alverca School

Vale de Figueira Station

lniv


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.