Where can i get the real exam question of CCP Exam?

Page 1

Pass CCP - Certified Cost Professional exam in just 24 HOURS!

100% REAL EXAM QUESTIONS ANSWERS

CCP - Certified Cost Professional Exam Buy Complete Questions Answers File from

http://www.certs4you.com/AACE%20International/CCPdumps.html 100% Exam Passing Guarantee & Money Back Assurance


Sample Questions Question No 1: A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data. In an exit interview, an employee comments that the reason he is leaving the organization is lack of teamwork and cohesion among his co-workers. Which need of Maslow's hierarchy of needs is unmet? A. B. C. D.

Belongingness needs Primary needs Self-actualization needs Esteem needs

Answer: A

Question No 2: An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000. Answer the question using a straight line depreciation and a 10% interest rate. Which of the following should be included in the life-cycle cost analysis of a power plant? A. B. C. D.

Construction cost, operating cost, maintenance cost Factory expenses, distribution expenses, mark-up Capacity factor, end product units, physical dimensions Resources, work activities, final cost objects

Answer: A


Question No 3: Budgeted cost of work scheduled is all of the following except: A. B. C. D.

Total costs incurred in accomplishing work in a given-time period Baseline for performance measurement Sum of the budgets for work scheduled Includes portion of the budget for level-of-effort work

Answer: D

Question No 4: Which of the following best describes the concept of total cost management: A. A method of quantifying construction damages where the total job costs are subtracted from the original bid or estimate to determine the total cost amount for a claim B. The practices and processes utilized to manage the total life cycle cost investment in a portfolio of strategic assets C. A job cost system for ensuring all aspects of a particular manufacturing process are accumulated completely D. An integrating process that maps the fields of practice of cost engineering without linking it to project management, resource management, or accounting Answer: D

Question No 5: A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data. The following question requires your selection of CCC/CCE Scenario 26 (2.5.50.1.2) from


the right side of your split screen, using the drop down menu, to reference during your response/choice of responses. Which statement best describes the type of information available for a design phase estimate? A. Home office detail, specific vendor quotes, preliminary quantities with labor and material factors applied B. Square footage of buildings, factored indirects, types of rides and exhibits identified, utility requirements, conceptual layouts C. Detailed construction drawings, quantity takeoffs, detailed labor hours and material costs applied, quotes from all major subcontractors D. Utility requirements, detailed building plans and (- specifications, types of rides and exhibits identified, all vendor quotes or estimates received from subcontractors Answer: D Buy Complete Questions Answers File from

100% Exam Passing Guarantee & Money Back Assurance  PDF Version + Test Engine Software Version  90 Days Free Updates Service  Valid For All Countries


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.