PROFESSIONAL EXPERIENCE MARCH 2019 - PRESENT PART II ARCHITECTURAL ASSISTANT (UNTIL NOV 2020) ARCHITECT (NOV 2020 - PRESENT) ROBOTHAMS ARCHITECTS, WARWICK, UK Internal Refurbishments Aston University, Birmingham: Worked on two person team on various Internal refurbishments in the main building at Aston University. The project had complicated management role with muriple end user / stakeholder requirements with additional issues as faced nue to nature of the building. All projects had very strict deadlines due to restrictive construction period. The projects were traditional contracts and I performed project management and contract administrator duties. I am handing the current project independently. Programs used: AutoCAD, Microsoft Suite, Sketchup Support to other teams: I have supported other teams / sectors within the office during periods of deadlines helping to develop drawing packages as needed Programs used: AutoCAD, Microsoft Suite, Sketchup, Revit OCTOBER 2018 - MARCH 2019 PART II ARCHITECTURAL ASSISTANT NICOLAS TYE ARCHITECTS, BIRMINGHAM, U.K. Various residential extesnions: Developing on conceptual designs and Stage 3 design for multiple extensions along with the design of a new build modern home in Midlands. Working with client / contractor direct. FEBRUARY 2016 - SEPTEMBER 2017 PART II ARCHITECTURAL ASSISTANT STUDIO SPICER, STRATFORD-UPON-AVON, U.K. Residential Extensions: Independently design and develop the schemes for various residential extension projects. Developing planning application drawing package and successfully receiving planning approvals for the same. Detailed design and Building Control Package used by private clients to self built. Writing building control notes. One of these projects already on site. Client and consultant correspondence. Programs used: Vectorworks, Microsoft Word Concept Design and Planning Applications for new dwellings in the centre of Stratford-upon-Avon & Chipping Campden: Independently developed designs for dwellings in conservation area, one of the schemes located right next to a listed building. Developed a conceptual scheme, various design options for client. Developed the scheme for planning application complete with design and access statements and Heritage statements. Programs used: Vectorworks, Adobe InDesign

Planning Applications Package for a residential scheme in Stratford-upon-Avon: Assisted in developing a residential design scheme for a very sensitive site in Stratford-upon-Avon. The site of development is a stone throws away from the Grade I listed Holy Trinity Church along with other grade II listed buildings in very close proximity. Developed various concept schemes at feasibility and pre application stage. Developed all planning drawings for the planning application. Panels for Public consultation and supplementary information for Design and Access Statement and Heritage Statement. Liaising with various consultants. Attending client and consultant meetings and keeping meeting notes. Programs used: Vectorworks, Adobe InDesign, Adobe Photoshop, Sketchup. FEBRUARY 2016 - SEPTEMBER 2017 ARCHITECTURAL ASSISTANT GLANCY NICHOLLS ARCHITECTS,BIRMINGHAM,U.K. http://www.glancynicholls.com My experience in this period consists of working on various projects in educational and residential sector. Project list included of :

JUNE 2014 - SEPTEMBER 2014 INTERIOR DESIGNER INTERN G.K. ASSOCIATES, MUMBAI,INDIA http://www.gkassociates.co.in Responsible for planning of a 4 BHK conversion with detailed designing,material selection, making measure drawings. JUNE 2013 - DECEMBER 2015 JUNIOR ARCHITECT SE-ARCH ARCHITECTS, MUMBAI, INDIA http://www.se-arch.com Responsible for complete Conceptual Design and Detailed Drawings of the Hotel Villas on a sloping site at Makaibari,Darjeeling, India. [Conceptual Sketches, Architectural Drawings, Working Drawings, Furniture and Material Selection, 3D Drawings and Renders on Revit, Presentation Drawings. Responsible for Client and Consultant co-ordination for the same.

JUNE 2013 - DECEMBER 2015 ARCHITECTURE INTERN ABHA NARAIN LAMBHA &ASSOCIATES, MUMBAI, INDIA (Conservation Architects) RSA Academy: Stand alone extension to an existing http://www.anlassociates.com school, Tipton Responsible for Documentation of 3 sites,[Photographic Involvement Stages: RIBA Stage1-4 and hand sketched] Working in a small team and taking the project from Production of detailed Computer Drawings of the Docuconcept to tender. Primary point of contact for the con- mented site, sultant and client communication. Attending bi weekly [Plan, Elevation, Section and Construction Details] client meetings and Leading a team for producing inventories of the Art weekly Design team meetings. Deco buildings in Mumbai, India proposed to be a UNESCO site. Pebble Mill Student Housing: Luxury Student Housing Project, Birmingham EDUCATION EXPERIENCE Involvement Stages: RIBA Stage 2-4 Producing drawing information for Planning Application. JUNE 2008 - APRIL 2013 Developing presentations for client meetings. Bachelor’s in Architecture Collating Consultant information into Architectural IES’s College of Architecture, Mumbai,India Drawings. Detailed design and BIM modelling for Stage 3 Drawing. FEBRUARY 2014 - DECEMBER 2014 Master’s in Interior Design Various Feasibility Studies: Florence Design Academy,Florence,Italy Residential scheme at Thorp Street, Birmingham Residential Scheme at Lancaster Circus, Birmingham Expected - OCT-NOV 2018 Involvement Stages: RIBA Stage 0-1 Part I & Part II Accreditation in UK Hockley Mills: Residential Led Mixed Used Development, Architecture Registration Board, UK Birmingham COMPETITIONS Involvement Stages: RIBA Stage 1-3 Annual NASA Design Competition - 2011 Developing various design options for client meetings. Leading a team of 5 members, for the annual Incorporating design changes suggested at pre plancompetition held by ning stage National Association of Students of Architecture, India Responsible for responding to consultant and client [Now also SAARC Nations]. queries. Entry Selected in top 10, nationwide Developing a Design and Access Statement. Producing drawing information for planning application. Reuben’s Trophy Head - 2012 NASA Journalism Trophy - 2011 & 2012

AutoCAD

AutoDesk Revit

Microstation

Vectorworks

InDesign

Illustrator

Photoshop

Sketchup

3DsMax

Apple OS

MS office

Microsoft OS


NOTES

rad

Do NOT scale from drawing To be read in conjunction with Outline Specification. Refer to: 200 series drawings for GA Information and Layouts 400 series drawings for Detailed Layouts and Secondary Installations 500 series drawings for Fire Strategy Information and Branding 700 series drawings for All Schedules 800 series for Bulkhead Details 900 series for Principal Designer, Welfare and Site Compound Information For Structural and Mechanical / Electrical information and details refer to relevant consultant / sub-contractor drawings and specification. All electrical conduit to be chased in to wall.

rad

ALL SERVICE RUN POSITIONS TO BE AGREED ON SITE WITH ARCHITECT / RELEVANT ENGINEER PRIOR TO INSTALLATION ALL DIMENSIONS SUBJECT TO SITE INSPECTION. ANY DISCREPANCIES TO BE RAISED WITH ARCHITECT PRIOR TO CONSTRUCTION.

Remove all loose flaking paint from existing windows and sand back to achieve smooth even finish. Decorate with primer and Dulux metal paint as schedule. Note: sealing of all windows required as method described in finishes schedule.

All existing plastered walls to be made good following works achieving a smooth blemish free finish.

Adapt existing windows as required to allow duct exit point allowing intake / extraction to room.

rad

LEGEND

A

New Bullnose timber cill. Prepare for decoration

New Bullnose timber cill. Prepare for decoration

MB153B Office

159B

Office Type 'E'

Office Type 'E'

Existing

1127A

S0.34

rad

2800

rad

rad

Retain existing cill. Prepare for decoration

Retain existing cill. Prepare for decoration

Retain existing cill. Prepare for decoration

Retain existing cill. Prepare for decoration

New manually operated blind to be installed. New Anti Glare Film

New manually operated blind to be installed with addition blackout function New Anti Glare Film

New manually operated blind to be installed with addition blackout function New Anti Glare Film

Gypwall Classic stud wall comprising of 2 No. layer 12.5mm Soundbloc plasterboard each side & 92mm Gypframe C studs at 600mm centres. 3 x 25mm Isowool APR 1200 in cavity. Overall wall thickness 144mm. NOTE PATTRESS RQD BEHIND AV SCREEN POSITION

TYPE A 1800

min. 470

Gypwall stud wall comprising of 2 No. layer 12.5mm Soundbloc plasterboard each side & 92mm Gypframe C studs at 600mm centres. 3x25mm Isowool APR 1200 in cavity. Overall wall thickness CIRCA 140mm - to suit surrounding wall construction and provided a smooth transition to surrounding walls. Adapt plasterboard thickness to suit wall thickness as required. ALL feature plasterwork feature indents to be installed within corridor line in keeping with historical detailing

2807

MB154B Office

Office Type 'A'

122

S0.22

700

S0.08 Office Type 'C'

See 3747-710 for details of kitchenette facility

rad

MB154P Office

rad

*

Office Type 'C' MB154N Office

rad

S0.19 325

Office Type 'C'

MB154M Office

MB154L Office

rad

Retain existing cill. Prepare for decoration

Retain existing cill. Prepare for decoration

Retain existing cill. Prepare for decoration

Retain existing cill. Prepare for decoration

New manually operated blind to be installed with addition blackout function New Anti Glare Film

New manually operated blind to be installed. New Anti Glare Film

New manually operated blind to be installed. New Anti Glare Film

New manually operated blind to be installed. New Anti Glare Film

Retain high level window (removing boarding from as required) Make good / prepare for decoration Exposed beam line over

MB154F See demolition drawing for location of existing high level drainage from floor over to be retained / adapted as M&E proposal drawings.To be insulated for acoustic reasons and clad in isogenapak or similar achieving an acceptable exposed finish within space.

Office Type 'A'

min. 470

1800

MB154 Corridor 2

S0.11

Office Type 'C'

800h x 1200w Altro Chameleon binded to wall acting as splashback to bins. Colour to be confirmed

*

MB154E

MB154D Office

S0.10

Gypwall stud wall comprising of 1 No. layer 12mm Ply internal face (allowing fixings to wall for shelving / pinboards etc), and 1 No. layer 12.5mm Soundbloc plasterboard to shelf side, and 2 No. layer 12.5mm Soundbloc plasterboard on 70mm Gypframe C studs at 600mm centres. 1x50mm Isowool APR 1200 in cavity. Overall wall thickness 122mm NOTE: Setting out of walls is critical to the project and scheme is based on historical AU plans - See Detail A for setting out and agree all site dimensions on site with architect prior to boarding

TYPE C

Office Type 'A'

S0.20

See screen schedule (3747-700) for details of all glazed screens / manifestation

S0.09

MB153F

1124

*

MB154C Meeting Room

Meeting Room

S0.21

Office Type 'D'

2675

MB153G Office

*

Infill existing doorway. Add matching skirting to surroundings. Decorate

Infill existing doorway. Add matching skirting to surroundings. Decorate

2685

*

Office Type 'A'

1200 Threshold strip at change in floor finish

New manually operated blind to be installed. New Anti Glare Film

S0.32

Office Type 'D'

*

122

*

Threshold strip

MB154 Central Breakout

FURNITURE LAYOUT TO BE AGREED

MB154 Central Teapoint

325

MB153H Office

Infill existing doorway. Add matching skirting to surroundings. Decorate

122

Infill existing doorway. Add matching skirting to surroundings. Decorate

1200

603

FD30S

MB154Q Office

rad

Future Link designed into Wall M&E Strategy TBA re- ductwork / AHU Sizing etc Allow within metal studs for the wall to be easily removable in the future creating with metal stud positioned for a future doorway at 3100mm high.

S0.01

Electronic Access Type-1

D.01

Smoke seal to glazed screen. FD30S fire rated

Office Type 'B'

122

2685 1200 122

rad

MB154R Office

rad

600

S0.02

Electronic Access Type-3

S0.06

Office Type 'B'

Photocopiers

MB154 Corridor 1

S0.05

S0.33

Office Type 'D'

Retain existing parquet flooring. Full repair, resand and seal. New skirting to walls to match existing within space. Full decoration throughout required. Note: New lighting rqd within area ALL soffit mounted Wifi points to be centralised Infill existing doorway. Add matching skirting to surroundings. Decorate

Smoke seal to glazed screen. FD30S fire rated

MB154A Office

MB154A ECD Cpd

Office Type 'A'

S0.03

See screen schedule (3747-700) for details of all glazed screens / manifestation

Infill existing doorway. Add matching skirting to surroundings. Decorate Projection Wall

603

*

MB154T Office

MB154S Office

160

1800

*

Office Type 'A'

S0.04

162

Infill existing doorway. Add matching skirting to surroundings. Decorate

1200

*

Smoke seal to glazed screen. Not fire rated

1125

1130

162A

S0.23

Retain existing parquet flooring. Full repair, resand and seal. New skirting to walls to match existing within space. Full decoration throughout required. Note: New lighting rqd within area ALL soffit mounted Wifi points to be centralised

Infill existing doorway. Add matching skirting to surroundings. Decorate

MB151

for continuation of plan see drawing no. 3747-205

Meeting Room MB153J Meeting Room

Electronic Access Type-2

Threshold strip Retain existing parquet flooring. Full repair, resand and seal. New skirting to walls to match existing within space. Full decoration throughout required. Note: New lighting rqd within area ALL soffit mounted Wifi points to be centralised

1128

up

S0.28

See screen schedule (3747-700) for details of all glazed screens / manifestation

TYPE B

1127

Photocopiers

F

159A

2797

159C

1129A

1129

Office Type 'E'

Office Type 'E'

S0.27

MB153 Corridor

All walls to be flush even and blemish free throughout in preparation for decoration. New wall constructions to line through with existing finish lines including all bulkheads. All existing cut outs for services / fixings / holes etc removed, filled and made good. Infill / boarding of removed access panels / high level access panels and doors into high level crawl duct. Existing walls sanded to form key, ensure that the wall is secure, flat, smooth and dust free. Install bonding primer as recommended by manufacturer / specialist and skim throughout to achieve smooth blemish free finish. All junctions / corners etc to have suitable plaster beads to ensure no future cracking. Sand as required, treat, and decorate.

MB153E

MB153D Office

MB153C Office

Office Type 'E'

S0.25

122 1200

S0.24

159

Office Type 'A' Electronic Access Types: 1. Electronic Lock 1- Fire rated doors- lock type Eff Eff 142 electric strike. Proximity (exterior) and Manual (internal) 2. Electronic Lock 2- Lock type EL460. Proximity (exterior) and Manual (internal) 3. Electronic Lock 3- Lock type EL 460. Linked to fire alarm and released in the event of fire. Proximity (exterior) and Manual (internal). Note: Timing of locking system TBC by Aston University.

SEE TYPICAL OFFICE LAYOUTS DRAWING FOR ALL INTERNAL SETTING OUT INFORMATION critical in terms of length for shelving / setting out of all sockets / noticeboards etc

Office Type Note: 'C'

Office Type 'C'

2850

1133

Where screed levels vary between rooms, make allowance for removal as necessary to be able to achieve suitable levels for future latex installation. Remove all defective screed and replace as required prior to building works. It is essential to latex all floors prior to new walls being constructed to allow for future modifcation of layout as required Contractor to allow for all required woodblock infills to doorway thresholds following formation of new openings. All levels to tie through between spaces. To include full preparation of bed as required and stain to woodblock as existing floor

New Bullnose timber cill. Prepare for decoration

2785

MB153A Office

Floors Generally

Fixed shelving in all offices. See 3747-711 Note: sequencing recommends installation of shelving on relevant walls prior to installation of skirting to allow this to be subsequently butted into shelving.

New Bullnose timber cill. Prepare for decoration

MB154K

MB154J

EXPOSED HIGH LEVEL DRAINAGE PIPEWORK TO BE INSULATED AND CLAD IN ISOGENAPAK. SEE M&E SPECIFICATION FOR FURTHER INFORMATION

rad

Retain existing cill. Prepare for decoration

ALL HIGH LEVEL DUCTING / AIR HANDLING KIT TO BE WHITE

New manually operated blind to be installed. New Anti Glare Film

REQUIREMENT FOR 1 FULL OFFICE TO BE COMPLETED AS SOON AS POSSIBLE AND USED AS A BENCHMARKING STANDARD FOR FINISHES THROUGHOUT

A'

Fixed shelving in all offices. See 3747-711 Note: sequencing recommends installation of shelving on relevant walls prior to installation of skirting to allow this to be subsequently butted into shelving.

ANY POTENTIAL CLASHES OF NEW WALLS WITH HIGH LEVEL SERVICES TO BE NOTIFIED TO ARCHITECT PRIOR TO CONSTRUCTION OF WALL

Remove all loose flaking paint from existing windows and sand back to achieve smooth even finish. Decorate with primer and Dulux metal paint as schedule. Note: sealing of all windows required as method described in finishes schedule. Adapt existing windows as required to allow duct exit point allowing intake / extraction to room.

D C E

Final Issue

29.08.19 AS AEB

Furniture Updated to AU comment

04.07.19 AS AEB

Meeting Rooms added

20.06.19 AS AEB

B

Construction Issue

29.05.19 AS AEB

A

CORRIDOR 1128 INCLUDED IN SCOPE

22.03.19 AS AEB

REV DESCRIPTION

DATE DRN CKD

ABS BUILDING 110B

rad

110F

rad

rad

110G 110

rad

110A

110H

1104C

rad

rad

rad

114A up

1104B 1104A

rad

down

114

B

rad

rad

116

118

1108 up

1106

rad

1109

1110

107A

107

120 113

109B

115

1112A 122

124124A

rad

1112B

rad

rad

rad

rad

1112

119

111B

rad

rad

111A

107B

1111

rad

117

down

C 1107

1146 rad

111 103

190A

Robothams Architects The Old Library 12 Church Street Warwick CV34 4AB T 01926 493843 F 01926 495314 architects@robothams.co.uk www.robothams.co.uk

116A

1105

1104 1103

1145

w/s

rad

rad

110E

110C

up

A 1100

g

1144

190 w/s

w/s

rad

rad

110D 108 up

up

1101 down

1102

1143

190B

rad

rad

121

126

123

rad

188

w/s

rad

rad

rad

rad

134

rad

132

rad

rad

130

1112D

1112E

rad

1112C 125A

125

127

rad

rad

rad

rad

127C 127B

rad

rad

rad

127A

169

128

123A

171

136

rad

rad

rad

126A

1142

186

w/s

rad

rad

rad

rad

w/s

down

129A

rad

167 167A

129

rad

g

1113A

129B

PROJECT TITLE

up

1141

Deflection Joint at underside of beam downturn. As standard manufacturer supply allowing for 15mm deflection

rwp

down

1113

up

1114

rad

up

rad

rad

rad

rad

rad

rad

rad rad rad rad

138B

rad

rad

rad

rad

rad

rad

rad

rad

rad

rad

rad rad

rad

rad

138A

145

141

rad

rad

rad

rad

143

135A

161

rad

rad

142

144

1134

rad

rad

139

135 163

164B

174

172

170

168

rad

rad

165

178

176

138

rad

180A

178A

137

g

rad

rad

140 g

165A

B'

rad

rad

rad

B

166

A

rad

rad

rad

1133

164

159B 159

rad

164A

1119

1127A

159C

1129A

1132

F

159A

1127

1122A

1131

ASTON STREET

rad

D

133

1137

up

1120

G

up

up

162A

rad

ASTO

down

1123

1130

162

160

rad

rad

rad

rad

rad

rad

rad

rad

rad

rad

N EXPR

rad

rad

ASTON UNIVERSITY OFFICE DEVELOPMENT MED MB1 REFURBISHMENT DRAWING TITLE

GA PROPOSED SHEET 1 OF 2

rad

1129 down

rad rad

A'

ESSW AY

Location of refurbishment

LOCATION PLAN 1st Floor

Detail A - General Beam Abutment detail (Throughout) SETTING OUT OF ALL WALLS TO BE ON THIS BASIS 1:5

up

1115

1140 down

rad

1139

rad

1138

1135

1:1250 N

Top of plasterboard calk joint

up

down

up

rad

Plasterboard interior partition aligned such as plasterboard terminates at underside of soffit

1136

180C

180B

rad

Top of plasterboard calk joint Continuous Plasterboard not directly attached to side beam downturn to allow for deflection / avoid cracking at junctions

H

129C

rad

up

DUE TO CRITICAL NATURE OF OFFICE SIZES, ALL STUDS TO BE SET OUT ON SITE IN RELATION TO BEAM OVER (SEE DETAIL A ON DRAWING NO. 3747-207). CONTRACTOR TO MARK UP / DIMENSION ALL WALL POSITIONS AND ISSUE TO ARCHITECT FOR COMMENT PRIOR TO CONSTRUCTION

STATUS SCALE

FINAL ISSUE 1:50

SHEET SIZE

A0

DRAWN

AW

DATE

March 2019

CHECKED

AEB

DWG NO.

3747-204

REVISION

E

ASTON MB1 / L36-49: March 2019 - Sep 2019 Robothams Architects Various internal refurbishment at Aston University, UK

Cotswolds School Extension : Nov 2019 - Feb 2020 Robothams Architects Cheltenham, UK

Avonfields: Feb 2018 - Aug 2018 Studio Spicer Architects High end resdential development in Stratford-upon-Avon

Chipping Campden: Dec 2018 - Jan 2018 Studio Spicer Architects New dwellings in Chipping Campden

Extensions Dec 2018 - March 2018 Studio Spicer Architects Residential extension design

Pebble Mill Student Housing: Sep 2016 - Jan 2017 Glancy Nicholls Architects Luxury Student Housing Pershore Road, Birmingham

RSA Academy :Feb 2016 - Sep 2016 Glancy Nicholls Architects Standalone School Extension Oldbury,Tipton

Structural detail :Feb 2016 - Feb2016 Glancy Nicholls Architects Pines Special School, Faraday&Hartley and various other projects

Hockley Mills: Feb 2017 - July 2017 Glancy Nicholls Architects Residential led - Multiuse development in Jewellery Quarter, Birmingham.

Lancaster Circus: August 2016 Glancy Nicholls Architects Residential led - Multiuse development in Birmingham (Feasibility Study)


INTERNAL REFURBISHMENTS, ASTON UNIVERSITY Multiple intrnal refurbishment s completed over summer / christmas periods with very short design period and strict deadlines for the construction period. These projects had added challenges of multiple stakehoder involvement and approval process. For all the projects over £1million as Aston policy, we targetted SKA benchmark which is a simialr assessment process to BREEAM for commerical refurbishment process. This included of finding the right specifications, holding design team and contractor team workshops and records of items /energy use,etc. The projects I worked on were all on traditional contract with Robothams being the Contract Adminitstrator . I shadowed the project director on the first project and could handle a lot of CA duties individually. Some of them included of issuing instructions, site inspection, defects inspection, meeting minutes , maintainig the change control register,etc.


NOTES

ABS BUILDING 110B

rad

rad

110F

rad

110G 110

110A

rad

110H

1104C

rad

rad

rad

114A up

down

114

1104B 1104A

rad

rad

1108 up

1106

rad

107A

107

1109

Refer to: 200 series drawings for GA Information and Layouts 400 series drawings for Detailed Layouts and Secondary Installations 500 series drawings for Fire Strategy Information and Branding 700 series drawings for All Schedules 800 series for Bulkhead Details 900 series for Principal Designer, Welfare and Site Compound Information

1112

119

1112A 122

124

rad

1112B

rad

rad

rad

rad

1111

120 115

111B

rad

111A rad

124A

rad

rad

121

126

123

rad

188

w/s

141

down

C 1107

1110

rad

117 113

109B

107B

To be read in conjunction with Outline Specification.

118

1146 rad

111 103

190A

Do NOT scale from drawing

rad

116

116A

B 1105

1104 1103

1145

w/s

rad

rad

110E

110C

up

A 1100

g

1144

190 w/s

w/s

rad

rad

110D 108 up

up

1101 down

1102

1143

190B

123A

134

1112D

136

1112E

rad rad

130

125

rad

rad rad

1112C 125A

132

rad

rad

169

128

127C 127B

127

rad

rad

rad

rad rad

127A

rad

171

rad

126A

1142

rad

rad rad

rad

rad

rad

rad

rad

186

w/s

w/s

down

129A

rad

167

g

rad

rad

rad

Retain existing cill. Prepare for decoration

Retain existing cill. Prepare for decoration

Retain existing cill. Prepare for decoration

Retain existing cill. Prepare for decoration

Retain existing cill. Prepare for decoration

Retain existing cill. Prepare for decoration

Retain existing cill. Prepare for decoration

Retain existing cill. Prepare for decoration

Retain existing cill. Prepare for decoration

New manually operated blind to be installed. New Anti Glare Film

New manually operated blind to be installed. New Anti Glare Film

New manually operated blind to be installed with addition blackout function New Anti Glare Film

New manually operated blind to be installed with addition blackout function New Anti Glare Film

New manually operated blind to be installed with addition blackout function New Anti Glare Film

New manually operated blind to be installed. New Anti Glare Film

New manually operated blind to be installed. New Anti Glare Film

New manually operated blind to be installed. New Anti Glare Film

New manually operated blind to be installed. New Anti Glare Film

DUE TO CRITICAL NATURE OF OFFICE SIZES, ALL STUDS TO BE SET OUT ON SITE IN RELATION TO BEAM OVER (SEE DETAIL A ON DRAWING NO. 3747-207). CONTRACTOR TO MARK UP / DIMENSION ALL WALL POSITIONS AND ISSUE TO ARCHITECT FOR COMMENT PRIOR TO CONSTRUCTION

New metal secondary glazing to match other offices

New metal secondary

New manually operated blind to be installed. New Anti Glare Film

New manually operated

D

29.08.19 AS AEB

Plasterboard interior partition aligned such as plasterboard terminates at underside of soffit

110F

rad

rad

110G 110

110A

rad

rad

110H

1104C

rad

rad

114A up

down

1104B 1104A

rad

114

B

rad

rad

down

C 1107

1109

1112

119

1112A 122

124

rad

1112B

rad

rad

rad

rad

1111

rad

1110

120 115

111B

rad

111A rad

124A

126

123

rad

rad

rad

121

1112C 130

125A

rad

132 125

127

rad

rad

1112D

1112E

rad

rad rad

rad

rad rad

127C 127B

rad

rad

127A rad

128

123A

rad

rad

rad rad

rad

126A

1142

134

136 w/s

EQ

Top of plasterboard calk joint

D

rad rwp

133

138B

rad rad

rad

rad

1122A

rad

rad

rad

rad

rad

rad

1136

rwp

172

148

155

153A

153B

rad

rad

1125

1128

1124

162

160

158A

158B

158C

E

158D

156A

156B

rad

rad

rad

156C

154

156D

152 rad

rad

rad

rad

rad

rad

rad

rad

rad

EQ rad

down

rad

=

162A

162

rad

160

*

147C

*

NOTE Flooring ceiling to be removed locally to line of new wall construction. Contractor to allow for all relevant electrical disconnections as well as temporary propping of ceiling / adaptation of existing grid and support. Retain existing carpet tiles whilst works are ongoing to allow patching as necessary.

158A

1125

1127

*

* ** *

PROTECT EXPOSED WOODBLOCK DURING THE WORKS

Remove all pictures / pinboards etc and hand back to University Allow for reinstallation at clients discretion

1126

158B

158C

Query - assumed electrical items within cupboard are redundant / will be following installation of new EDC

158D

*** * * * * ** *

Remove blinds / film to corridor windows at high level

* *

Remove blockwork indent for fire hose etc. Remove all services etc and prepare for blockwork infill

149

153B

*

151

!

Asbestos encapsulated

* * * * * * * * *

Remove low level window retaining higher level panes

*

rad

rad

Smoke detector - By specialist supplier and fixed to soffit Full access is required for testing / cleaning etc

rad

=

rad

rad

rad rad

rad

rad rad rad rad

rad rad rad rad

rad

rad rad rad rad

rad rad

ASTON STREET

rad

rad rad

rad

rad rad rad

rad

rad

rad

rad rad

rad rad

rad

rad rad rad

rad rad

1200mm desk 1200mm desk

1200mm desk

1200mm desk

Adapt existing windows as required to allow duct exit point allowing intake / extraction to room.

Remove all loose flaking paint from existing windows and sand back to achieve smooth even finish. Decorate with primer and Dulux metal paint as schedule. Note: sealing of all windows required as method described in finishes schedule.

rad

rad

N

Infill existing doorway. Add matching skirting to surroundings. Decorate Infill existing doorway. Add matching skirting to surroundings. Decorate

1200mm desk

1500mm desk

TYPE A

1200mm desk

TYPE B

*

rad

Screen to include internal blind Threshold strip

Infill existing doorway. Add matching skirting to surroundings. Decorate

1500mm desk

1500mm desk

TYPE C

10 no. Lockable tambour units / lockers

1119

NO WORKS WITHIN TOILETS. CARRY OUT FULL DELAPS SURVEY PRIOR TO COMMENCEMENT OF WORKS AND ISSUE ALL INFORMATION TO CA / CLIENT TO BE KEPT IN A CLEAN HYGIENIC STATE AND REGULARLY INSPECTED BY SITE MANAGER. ALL DAMAGE / SUBSEQUENT DEEP CLEAN THE RESPONSIBILITY OF THE CONTRACTOR

1117

*

Access rqd for ductwork AHU strip out. Room to be assessed once strip out has been completed

1121

Retain existing parquet flooring. Full repair, resand and seal. New skirting to walls to match existing within space. Full decoration throughout required. Note: Retain and Protect existing lighting ALL soffit mounted Wifi points to be centralised

E

Gypwall Classic stud wall comprising of 2 No. layer 12.5mm Soundbloc plasterboard each side & 92mm Gypframe C studs at 600mm centres. 3 x 25mm Isowool APR 1200 in cavity. Overall wall thickness 144mm. NOTE PATTRESS RQD BEHIND AV SCREEN POSITION Gypwall stud wall comprising of 2 No. layer 12.5mm Soundbloc plasterboard each side & 92mm Gypframe C studs at 600mm centres. 3x25mm Isowool APR 1200 in cavity. Overall wall thickness CIRCA 140mm - to suit surrounding wall construction and provided a smooth transition to surrounding walls. Adapt plasterboard thickness to suit wall thickness as required. ALL feature plasterwork feature indents to be installed within corridor line in keeping with historical detailing Gypwall stud wall comprising of 1 No. layer 12mm Ply internal face (allowing fixings to wall for shelving / pinboards etc), and 1 No. layer 12.5mm Soundbloc plasterboard to shelf side, and 2 No. layer 12.5mm Soundbloc plasterboard on 70mm Gypframe C studs at 600mm centres. 1x50mm Isowool APR 1200 in cavity. Overall wall thickness 122mm NOTE: Setting out of walls is critical to the project and scheme is based on historical AU plans - See Detail A for setting out and agree all site dimensions on site with architect prior to boarding 800h x 1200w Altro Chameleon binded to wall acting as splashback to bins. Colour to be confirmed Retain high level window (removing boarding from as required) Make good / prepare for decoration Exposed beam line over See demolition drawing for location of existing high level drainage from floor over to be retained / adapted as M&E proposal drawings.To be insulated for acoustic reasons and clad in isogenapak or similar achieving an acceptable exposed finish within space.

1120

Room used to house Door Controller kit Full decoration rqd

All walls to be flush even and blemish free throughout in preparation for decoration. New wall constructions to line through with existing finish lines including all bulkheads. All existing cut outs for services / fixings / holes etc removed, filled and made good. Infill / boarding of removed access panels / high level access panels and doors into high level crawl duct. Existing walls sanded to form key, ensure that the wall is secure, flat, smooth and dust free. Install bonding primer as recommended by manufacturer / specialist and skim throughout to achieve smooth blemish free finish. All junctions / corners etc to have suitable plaster beads to ensure no future cracking. Sand as required, treat, and decorate.

Electronic Access Types: 1. Electronic Lock 1- Fire rated doors- lock type Eff Eff 142 electric strike. Proximity (exterior) and Manual (internal) 2. Electronic Lock 2- Lock type EL460. Proximity (exterior) and Manual (internal) 3. Electronic Lock 3- Lock type EL 460. Linked to fire alarm and released in the event of fire. Proximity (exterior) and Manual (internal). Note: Timing of locking system TBC by Aston University.

New refuge call point. Refer to dwg: 3747_707 for details

down

SEE TYPICAL OFFICE LAYOUTS DRAWING FOR ALL INTERNAL SETTING OUT INFORMATION Note: critical in terms of length for shelving / setting out of all sockets / noticeboards etc

2685

EXPOSED HIGH LEVEL DRAINAGE PIPEWORK TO BE INSULATED AND CLAD IN ISOGENAPAK. SEE M&E SPECIFICATION FOR FURTHER INFORMATION

L FINAL ISSUE K ADDITIONAL NIB TO WALL IN DESIGN STUDIO AS MARKED J NEW WALL TO BUSSBAR CUPBOARD AS DISCUSSED ON SITE H SHELVING ADDED IN PART TIME STAFF OFFICES

29.08.19 AS AEB 07.08.19 AS AEB 23.07.19 AS AEB 18.07.19 AS AEB

G BOXING ADDED IN DESIGN STUDIO.NEW SECONDARY GLAZING PROPOSED AS MARKED

12.07.19 AS AEB

F

04.07.19 AS AEB

BOXING ADDED IN DESIGN STUDIO

REV DESCRIPTION

DATE DRN CKD

ANY POTENTIAL CLASHES OF NEW WALLS WITH HIGH LEVEL SERVICES TO BE NOTIFIED TO ARCHITECT PRIOR TO CONSTRUCTION OF WALL E

Refuge/Fire Zone amended

25.06.19 AS AEB

D

Furniture layout updated. Meeting rooms added.

20.06.19 AS AEB

C

Construction Issue.

29.05.19 AS AEB

B

S0.30 to include internal blind

12.04.19 AS AEB

A

CORRIDOR 1128 INCLUDED IN SCOPE

22.03.19 AS AEB

REV DESCRIPTION

DATE DRN CKD

PROJECT TITLE

ASTON UNIVERSITY OFFICE DEVELOPMENT MED MB1 REFURBISHMENT DRAWING TITLE

rad

rad rad rad rad rad rad rad

rad

rad

rad

rad

rad

rad

rad

rad

rad

rad

rad

rad

rad

rad

rad rad rad

rad

STATUS

FINAL ISSUE

SCALE

1:50

DATE

March 2019

CHECKED

AEB

DWG NO.

3747-205

REVISION

L

SHEET SIZE

A0

1200

STATUS

FINAL ISSUE

SCALE

1:50

DATE

March 2019

CHECKED

AEB

3747-204

REVISION

E

NO.

SHEET SIZE

A0

DRAWN

AW

rad

T

rad

156A

156B

156C

154

156D

rad

rad

*

Remove tiered lecture theatre staging, handrails, seating etc throughout and prepare floors and wall for new fit out

up

**

148

#

Retain full window Existing high level drainage from floor over to be retained / adapted as M&E proposal drawings. To be insulated for acoustic reasons and clad in isogenapak or similar achieving an acceptable exposed finish within space. See M&E dwgs for full extent

1119

1117

1121 1122

E

dropped bulkhead covering ductwork to be stripped out as part of works

All openings / doors into existing high level crawl ducts to be removed and made good for subsequent plasterboard infill. Retain high level window

1123

1120

1124A

All existing signage to be removed Existing fire fighting kit to be removed and relocated

down

Existing louvered window to be removed

F

Final Issue

29.08.19 AS AEB

E

Marked existing timber windows to be removed

12.07.19 AS AEB

D

Refuge and firefighting zone amended. Dwg updated to suit M&E changes

25.06.19 AS AEB

C

Construction Issue

29.05.19 AS AEB

B

Corridor 1128 added to scope, minor updates added

22.03.19 AS AEB

A

Drawing issued to Tender

15.03.19 AS AEB

REV DESCRIPTION

DATE DRN CKD

152

rad

rad

rad

rad

rad

rad

rad

Robothams Architects The Old Library 12 Church Street Warwick CV34 4AB T 01926 493843 F 01926 495314 architects@robothams.co.uk www.robothams.co.uk

PROJECT TITLE

Remove existing secondary glazing where present to existing window -number- remove and store for reinstallation following works to windows. Remove existing anti glare window film. Remove all loose flaking paint from existing windows and sand back to achieve smooth even finish. Skim out reveals as required.

T

Encapsulated Asbestos

!

Trunking distribution by M&E Designers

Access Panels to be removed and openings prepared for closure / skim. (unless noted)

* *

Remove acoustic panels and hand back to client

rad

Remove existing secondary glazing where present to existing window - number - remove and store for reinstallation following works to windows. Remove existing anti glare window film. Remove all loose flaking paint from existing windows and sand back to achieve smooth even finish. Skim out reveals as required

up

PROTECT EXPOSED WOODBLOCK DURING THE WORKS Remove all pictures / pinboards etc and hand back to University Allow for reinstallation at clients discretion

*

rad

!

146

*

1122A

up

Remove low level window retaining higher level panes

#

Asbestos encapsulated

All new openings to be to height of 3000mm from FFL to match existing high level windows within corridor PROTECT EXPOSED WOODBLOCK DURING THE WORKS Remove all pictures / pinboards etc and hand back to University Allow for reinstallation at clients discretion

1124

*

149A

Speaker - By specialist supplier LCD TV - By specialist supplier and fixed back to structure Support pole to be set within acoustic panel as noted Lighting - By specialist supplier

=

ASTON STREET

rad rad rad

rad rad

rad

rad

rad rad rad

1116

147B

Chase suitably sized channel into the existing floor screed to the required depth for data/power cables to the proposed new lecturn.

dropped bulkhead to be stripped out as part of works

153A

**

147

rad

KEY

Wall Elevation A Scale 1:20

=

* * * * * **

Remove all pictures / pinboards etc and hand back to University Allow for reinstallation at clients discretion

up

1002

830

G

1128

1130

=

=

F

159A

PROTECT EXPOSED WOODBLOCK DURING THE WORKS

1129

155

up

1131

H

=

1127A

159C

1129A

1132

1117

3100 to underside

1500

100 = =

159

Remove tiered lecture theatre staging, handrails, seating etc throughout and prepare floors and wall for new fit out

rad

= 1250 =

=

O

159B

FFL

1350

Elevation B

=

1133

164 rad

4300

EQ

900

rad

rad

rad

Pendant speaker

Whiteboard 1800x1200

Connections to the AV chased into the wall

Elevation C

Remove existing secondary glazing / blinds where present to existing window. Remove existing anti glare window film. Remove all loose flaking paint from existing windows and sand back to achieve smooth even finish

BOXING ON HIGH LEVEL WINDOWS TO BE REMOVED REMOVE RAILINGS TO WINDOWS AND SECONDARY GLAZING

=

rad rad

164A

Projector screen and speakers to specialist subcontractor details

Wifi

T

rad

rad

rad rad

166

Lighting

EQ

Trunking Drop

1500mm desk

Existing

Window (red denotes glass panel to be replaced) CAUTION: Fragile Glass

Encapsulated Asbestos

Allow to remove large built in whiteboard

Remove existing blackout blinds and hand back to client. Remove existing secondary glazing where present to existing window - number - remove and store for reinstallation following works to windows. Remove existing anti glare window film. Remove all loose flaking paint from existing windows and sand back to achieve smooth even finish. Skim out reveals as required

168

T

*

147A

PROTECT EXPOSED WOODBLOCK DURING THE WORKS Remove all pictures / pinboards etc and hand back to University Allow for reinstallation at clients discretion

Lighting

MB149 Design Studio

MB148 Post Grad Researchers (28 No. Person)

B'

T = Top ! rad

BOXING ON HIGH LEVEL WINDOWS TO BE REMOVED REMOVE RAILINGS TO WINDOWS

rad

138B 141

1123

Remove blinds / film to corridor windows at high level

EQ EQ

TV

1200mm desk

RETAIN all ceiling lighting / exposed conduit etc unless noted for retention by M&E Engineer. Make good ceiling following strip out of redundant kit. Remove all wall mounted noticeboards etc. Store for reinstallation following redecoration (By Contractor)

135A

1120

1124A

down

rad

162A

1122

All new openings to be to height of 3000mm from FFL to match existing high level windows within corridor

rad

1121

1122A

170

145

1119

149A

rad

161

Remove existing secondary glazing / blinds where present to existing window. Remove existing anti glare window film. Remove all loose flaking paint from existing windows and sand back to achieve smooth even finish

EQ

EQ

Whiteboard 1800x1200

EQ

rad

rad

1134

143

1117 149

Allow to remove large built in whiteboard

Pendant speaker

EQ

Edge of TV to be set out 100mm from the wall end to avoid any clashes with the door post installation.

1200mm desk 1200mm desk 1200mm desk

Contractor to allow for all required woodblock infills to doorway thresholds following formation of new openings. All levels to tie through between spaces. To include full preparation of bed as required and stain to woodblock as existing floor

rad

174

147C

rad

Existing Crawl Space

Trunking under beam

EQ EQ

1200mm desk 1200mm desk

Where screed levels vary between rooms, make allowance for removal as necessary to be able to achieve suitable levels for future latex installation. Remove all defective screed and replace as required prior to building works. It is essential to latex all floors prior to new walls being constructed to allow for future modifcation of layout as required

Remove ceiling in addition to general strip out as above. Unknown services behind ceilings. Allow for 10 No. bays at circa 20sq.m each to have existing polystyrene tiles removed. Contractor to allow for full prep works removing glue etc to enable future skim as required

rad

ALL CORRIDOR WALLS ARE BLOCKWORK CONSTRUCTION

High Level over windows

Air conditioning unit

Mechanical Ventilation swirls to be in line with the lights/speakers

Lighting

1200mm desk

Remove all ceiling lighting / exposed conduit etc unless noted for retention by M&E Engineer. Make good ceiling for new light installation. Remove all wall mounted noticeboards etc. Store for reinstallation following redecoration (By Contractor)

rad

C

REVISION

Low level below window

rad

AEB

CHECKED

3747-400

Stud Wall Partitioning to circa 900mm. Glazed panels over in certain locations to circa 2400mm.

AS

DRAWN

EQ

EQ

1500mm desk

Floors Generally

Remove floor finishes throughout. Remove wall finishes unless plastered. Remove all fixied and fitted furniture. Remove all M&E kit to walls and ceilings unless stated for retention by M&E designers. Remove all blinds / secondary glazing etc. Make good all walls / floor /ceiling where walls removed to allow for future overskim throughout. NOTE: Where screed levels vary between rooms, make allowance for removal as necessary to be able to achieve suitable levels for future latex installation. Remove all defective screed and replace as required prior to building works

146

Low level below window

!

Lighting

rad

Do NOT scale from drawing

1116

rad

A1

147

rad

147B

Encapsulated Asbestos

Connections to the AV chased into the wall

1200mm desk

LEGEND

1:1250

rad

SHEET SIZE

1150

Existing structural beam

rad

1:1250

138A

rad

rad rad

147A

rad

March 2019

rad

1:20

DATE

rad

SCALE

Solid Brick / Blockwork Full Height

164B

rad

FINAL ISSUE

EQ

Wifi

rad

rad

142

144

rad

Wall Types For Demolition - Not To Scale

rad

176

TYPICAL OFFICE TYPE A FFL

STATUS

139

135 163

rad

EQ

rad

138

165

rad

rad

178

rad

DRAWING TITLE

Colour TBC

137

g

rad

H

rad

Y

Area of wall / fit out item to be removed (inclusive of ALL fitted furniture etc)

rad

178A

g

165A

up

O

rad

Y

140

up

151

Elevation A

down

1114

rad

180A

1126

EQ

rad

WA

DRAWING TITLE

WA

1113

rad

180B

DATE DRN CKD

MB1 REFURBISHMENT OFFICE DEVELOPMENT MED ASTON UNIVERSITY

EQ

DWG NO.

EQ

rad

SS

Inspection to be made on site with architect to agree which existing plastered walls are to be made good following works achieving a smooth blemish free finish.

rad

up

rad

22.03.19 AS AEB

PROJECT TITLE

Filing Cabinets by others

Filing Cabinets by others

WALL ELEVATION D

2157

rad

RE

up

rad

29.05.19 AS AEB

CORRIDOR 1128 INCLUDED IN SCOPE

rad

29.08.19 AS AEB

Construction Issue

A

rad

Site measure

WALL ELEVATION C

EQ

D

133

1137

180C

rad

radiator

FINAL ISSUE

B

Robothams Architects The Old Library 12 Church Street Warwick CV34 4AB T 01926 493843 F 01926 495314 architects@robothams.co.uk www.robothams.co.uk

3100

2100

C

REV DESCRIPTION

FFL

2157

rad

rad

down

Fixed shelving

Allow for acoustic sealing for radiator pipework between rooms. Isogenapak cladding to radiator pipework required. Max projection into room of 100mm allowing for desk installation

Site dimensions to be confirmed. Architect to be called on site after site measure and prior to installation

rad

A'

SS

A'

XP

Location of refurbishment

ALL SERVICE RUN POSITIONS TO BE AGREED ON SITE WITH ARCHITECT / RELEVANT ENGINEER PRIOR TO INSTALLATION

up

1115

1140 down

rad

1139

rad

LED light set out centrally to window Suspended at 2700mm to u/s

EQ

2157

rad

rad

RE

All existing plastered walls to be made good following works achieving a smooth blemish free finish.

rad

For Structural and Mechanical / Electrical information and details refer to relevant consultant / sub-contractor drawings and specification. All electrical conduit to be chased in to wall.

1135

Filing Cabinets by others

1150

rad

rad

1138

EQ

LED light

WALL ELEVATION A

rad

rad

up

rad

H 1:500

up

Office Type 'A'

FFL

rad

rad

rad

129C

1120

rad

LED light

EQ

160

rad

ALL DIMENSIONS SUBJECT TO SITE INSPECTION. ANY DISCREPANCIES TO BE RAISED WITH ARCHITECT PRIOR TO CONSTRUCTION.

1120

down

rad

GA PROPOSED SHEET 1 OF 2

down

1123

162

rad

down

rad

Location of Office Type A

Dimension To be confirmed

rad

RLOCATION ES PLAN SW AY

rad

1120

up

162A

NE

rad

A'

XP

rad

EQ LED light

1800

rad

rad

rad

rad rad

up

Supply

Return

1800

Overboard existing wall within reveal with 2 No. layers 15mm Soundbloc Plasterboard. New Skirting. Skim and decorate

up

Structural beam over

Return & Supply duct indicative positions TBC by M&E

Electrical run to feed office trunkings to run vertically and across to relevant position within wall construction

1122A

ASTON UNIVERSITY OFFICE DEVELOPMENT MED MB1 REFURBISHMENT

DWG Refer to: 100 series drawings for Site Plan / Site Info 200series drawings for GA Information 400series drawings for 1:20 Construction Sections 500 series drawings for Fire Strategy Information 700series drawings for All Schedules

1119

1123

Structural beam over

rad

rad

rad

129B

1141

141

1127

1st Floor

Ventilation ducts set out central to the corridor hung at 3500 to u/s

LED light

F

rad

Trunking mounted tight to u/s beams

rad

rad

rad

rad rad

rad

rad

rad rad

rad

g

Soffit

Existing crawl space Conduit feeding light to trunking direct

1127

To be read in conjunction Outline Specification.

up

rad

rad

145

up

WALL ELEVATION B

PLAN

1113A

rad

rad

129

rad

143

160

rad

NE

G

NE

XP

rad

A

162

TO

F

1130

TO

rad

AS

FFL

1119

1127A

159A

1129 down

AS

rad

All skirting to be installed after installation of fixed shelving

Detail A - General Beam Abutment detail (Throughout) SETTING OUT OF ALL WALLS TO BE ON THIS BASIS 1:5

159B 159 159C

1129A

Location of refurbishment

rad

All skirting to be installed after installation of fixed shelving

LED Lights Supply direct from u/s of duct

rad

rad rad

Plasterboard interior partition aligned such as plasterboard terminates at underside of soffit

138A

1127A

159A

radiator

Extract direct from u/s of duct

138B

B'

A

1133

164

1131

rad

159B 159 159C

Trunking mounted tight to u/s beams

138A

145

141

B

N

Wall Elevation A

1200

Corridor light set out at 3100mm to u/s Hung off centre of beam. See Detail B on 3747-

Ventilation ducts set out central to the corridor hung at 3500 to u/s

143

135A

161

rad

rad

LED Lights

138

142

144

1134

172

170

168

1st Floor

rad

rad rad rad rad rad

D1

163

164B

174

166

1132

B

D2

Allow for acoustic sealing for radiator pipework between rooms. Isogenapak cladding to radiator pipework required. Max projection into room of 100mm allowing for desk installation

137

139

135

LOCATION PLAN NOTES 1114

135A

ELECTRICAL TRUNKING - BY OTHERS Refer to electrical engineers drawings for details DESK BY OTHERS

140 g

g

138

rad

MB154 Corridor 2

down

1114 up

up

178

176

rad

142

144

rad

Supply

Office Type 'A' 8.10m²

up

D 1113

up

165

178A

164A

down

137

139

135

rad

Wall Elevation D

Filing cabinets by others

PROJECT TITLE

129C

1135

140

Return & Supply duct indicative positions TBC by M&E

1113A

129B

1115

133

1137

180C

180B

180A

rad

GA PROPOSED SHEET 2 OF 2

129A

129

1140 down

rwp

up

Trunking mounted tight to u/s beams

EQ

1139

1113

g

1138

165A

Detail A - General Beam Abutment detail (Throughout) SETTING OUT OF ALL WALLS TO BE ON THIS BASIS 1:5

g

Office Type 'A'

up

down

rad

Continuous Plasterboard not directly attached to side beam downturn to allow for deflection / avoid cracking at junctions

up

1136

up

Deflection Joint at underside of beam downturn. As standard manufacturer supply allowing for 15mm deflection

All existing plastered walls to be made good following works achieving a smooth blemish free finish.

chair by others

Wall Elevation C

Structural beam dotted above

EQ

ALL SERVICE RUN POSITIONS TO BE AGREED ON SITE WITH ARCHITECT / RELEVANT ENGINEER PRIOR TO INSTALLATION ALL DIMENSIONS SUBJECT TO SITE INSPECTION. ANY DISCREPANCIES TO BE RAISED WITH ARCHITECT PRIOR TO CONSTRUCTION.

LED light

LED light set out centrally to window Suspended at 2700mm to u/s

whiteboard

Wall Elevation B

For Structural and Mechanical / Electrical information and details refer to relevant consultant / sub-contractor drawings and specification. All electrical conduit to be chased in to wall.

Return & Supply duct indicative positions TBC by M&E

EQ

LED light

Corridor light set out at 3100mm to u/s Hung off center of beam. See Detail B on 3747-

1800x800mm desk by others

325

EQ 900Ø meeting table by others

chair by others

Fixed shelving

Return

g up

1141

H

N

Return always over desk

LED light set out centrally to window Suspended at 2700mm to u/s

Structural beam dotted above

Refer to electrical engineers drawings for details

Shelving dotted above

Structural beam over Supply

Top of plasterboard calk joint

Refer to: 200 series drawings for GA Information and Layouts 400 series drawings for Detailed Layouts and Secondary Installations 500 series drawings for Fire Strategy Information and Branding 700 series drawings for All Schedules 800 series for Bulkhead Details 900 series for Principal Designer, Welfare and Site Compound Information

Existing crawl space

Structural beam over

DATE DRN CKD

167A

Detail A - General Beam Abutment detail (Throughout) SETTING OUT OF ALL WALLS TO BE ON THIS BASIS 1:5

rad

Soffit EQ

29.05.19 AS AEB

Adapt existing windows as required to allow duct exit point

Robothams Architects The Old Library 12 Church Street Warwick CV34 4AB T 01926 493843 F 01926 495314 architects@robothams.co.uk www.robothams.co.uk

1108 up

1106 117

113

109B

rad

186

rad

118

1146 rad

107

107B

188

down

radiator

Construction Issue

allowing intake / extraction room.AEB CORRIDOR 1128 INCLUDED IN SCOPE 22.03.19to AS

rad

116

116A

1105

111 107A

103

rad

rad

110B

1104 1103

1145

190A

rad

rad

110E

110C

up

A 1100

g

1144 w/s

190 w/s

w/s

169

EQ

Remove all loose flaking paint from existing windows and sand back to achieve smooth even finish. Decorate with primer and 04.07.19 AS AEB Dulux metal paint as schedule. Note: sealing of all windows required as method20.06.19 describedAS in finishes AEB schedule. New metal secondary glazing to match existing in other offices

B

ABS BUILDING rad

110D 108

up

1101 down

1102

1143

w/s

171

Cross talk attentuator centred on column lines to sit 100mm from face tight to u/s beam

Meeting Rooms added

rad

Robothams Architects The Old Library 12 Church Street Warwick CV34 4AB T 01926 493843 F 01926 495314 architects@robothams.co.uk www.robothams.co.uk

A

REV DESCRIPTION

167

To be read in conjunction with Outline Specification.

Furniture Updated to AU comment

C Final Issue

rad

New manually operated blind to be installed. New Anti Glare Film

ANY POTENTIAL CLASHES OF NEW WALLS WITH HIGH LEVEL SERVICES TO BE NOTIFIED TO ARCHITECT PRIOR TO CONSTRUCTION OF WALL

up

DUE TO CRITICAL NATURE OF OFFICE SIZES, ALL STUDS TO BE SET OUT ON SITE IN RELATION TO BEAM OVER (SEE DETAIL A ON DRAWING NO. 3747-207). CONTRACTOR TO MARK UP / DIMENSION ALL WALL POSITIONS AND ISSUE TO ARCHITECT FOR COMMENT PRIOR TO CONSTRUCTION

New metal secondary glazing to match other offices

blind to be installed. REQUIREMENT FOR 1 FULL OFFICE TO BE New Anti Glare Film COMPLETED AS SOON AS POSSIBLE AND USED AS A BENCHMARKING STANDARD FOR FINISHES THROUGHOUT

Top of plasterboard calk joint

rad

REQUIREMENT FOR 1 FULL OFFICE TO BE COMPLETED AS SOON AS POSSIBLE AND USED AS A BENCHMARKING STANDARD FOR FINISHES THROUGHOUT

rad

glazing to match other ALL HIGH LEVEL DUCTING / AIR HANDLING offices KIT TO BE WHITE

Fixed shelving in all offices. See 3747-711 Note: sequencing recommends installation of shelving on relevant walls prior to installation of skirting to allow this to be subsequently butted into shelving.

190B

Threshold strip

1500mm desk

1500mm desk

1500mm desk

1500mm desk

Projection Screen

MB154H

Office EXPOSED HIGH LEVEL DRAINAGE PIPEWORK TO BE INSULATED AND CLAD IN ISOGENAPAK. SEE M&E SPECIFICATION FOR FURTHER INFORMATION

New manually operated blind to be installed. New Anti Glare Film

w/s

S0.40

rad

ALL HIGH LEVEL DUCTING / AIR HANDLING KIT TO BE WHITE

min.470

MB154J MB154J Office

New metal secondary glazing to match other offices

E

Electronic Access Type-2

Smoke seal to glazed screen. Not fire rated

rad

MB150 Part Time Staff Office

1800 OfficeType TypeNote: 'C' Office 'C'

A'

Continuous Plasterboard not directly attached to side beam downturn to allow for deflection / avoid cracking at junctions

S0.38 Smoke seal to glazed screen. Not fire rated

TO

rad

1600mm desk

SEE TYPICAL OFFICE LAYOUTS DRAWING S0.14 FOR ALL INTERNAL SETTING OUT INFORMATION OfficeofType 'C' for shelving / critical in terms length setting out of all sockets / noticeboards etc

S0.13 325

MB154K MB154K Office

rad

rad

rad

S0.12

OfficeType Type'C' 'C' Office

1122A

160

rad

1123

1600mm desk

MB154L Office

1127

1123

162

1600mm desk

1600mm desk

2685 2685

Office Type 'C'

MB154M Office

up

Threshold strip

rad

rad

rad

S0.11

Office Type 'C'

MB154N Office

S0.37 Smoke seal to glazed screen.

Electronic Access Type-2

Electronic Access Types: 1. Electronic Lock 1- Fire rated doors- lock type Eff Eff 142 electric strike. Proximity (exterior) and Manual (internal) 2. Electronic Lock 2- Lock typeS0.16 EL460. Proximity (exterior) and Manual (internal) 3. Electronic Lock 3- Lock type EL 460. Linked to fire alarm and released in the event of fire. Proximity S0.15 (exterior) and Manual (internal). Electronic Access Note: Timing of locking system TBC by Aston University. Type-3

rad

rad

S0.10

Office Type 'C'

*

S0.17

1200mm desk 1200mm desk

1200mm desk

1122

300mmx3600mm 2no.rows of framework shelves all in white. Row 1 set at 1300 from FFL and Row 2 set at 1650mm. Support framework fixed to floor to be circa 1200mm long so users have flexibility on position

Exposed beam line over

location of existing high level MB154FSee demolition drawing for MB154G MB154F be retained / adapted as M&E Office drainage from floor over toOffice proposal drawings.To be insulated for acoustic reasons and clad in isogenapak or similar achieving an acceptable exposed finish within space. OfficeType Type'A' 'A' Office Type 'A' Office

S0.18

1200mm desk

1500mm desk

1122A

1600mm desk

S0.09

1800

MB154 Corridor 2

Deflection Joint at underside of beam downturn. As standard manufacturer supply allowing for 15mm deflection

Allow for acoustic sealing for radiator pipework between rooms Isogenapak cladding to radiator pipework required. Max projection into room of 100mm allowing for desk installation

FD30S

1600mm desk

S0.08

MB154P Office

Top of plasterboard calk joint

Do NOT scale from drawing

D.04

Retain high level window (removing boarding from as required) Not fire rated Make good / prepare for decoration

rad

rad

325

min. min. 470 470

1500mm desk

1500mm desk

See 3747-702 for new Buzzbar Riser wall.

*

800h x 1200w Altro Chameleon binded to wall acting as splashback to bins. Colour to be confirmed

**

OfficeType Type'A' 'A' Office

Office Type 'A'

122

122 700

See 3747-710 for details of kitchenette facility

Adapt existing windows as required to allow duct exit point allowing intake / extraction to room.

NOTES

900mm desk 900mm desk

MB149A Busbar Cpd

Infill existing doorway. Add matching skirting to surroundings. Decorate

MB154E MB154E Office

S0.19

S0.20

*

*

MB154D Office

See screen schedule (3747-700) for details of all glazed screens / manifestation

Remove all loose flaking paint from existing windows and sand back to achieve smooth even finish. Decorate with primer and Dulux metal paint as schedule. Note: sealing of all windows required as method described in finishes schedule.

DUE TO CRITICAL NATURE OF OFFICE SIZES, ALL STUDS TO BE SET OUT ON SITE IN RELATION TO BEAM OVER (SEE DETAIL A ON DRAWING NO. 3747-207). CONTRACTOR TO MARK UP / DIMENSION ALL WALL POSITIONS AND ISSUE TO ARCHITECT FOR COMMENT PRIOR TO CONSTRUCTION

900mm desk 900mm desk

Glass cabinets Gypwall stud wall comprising of 1 No. layer 12mm Ply internal

rad

rad

900mm desk 900mm desk

Electronic No. layer 12.5mm Soundbloc plasterboard to shelf side, and 2Access No. layer 12.5mm Soundbloc plasterboard on 70mm Type-2 Gypframe C studs at 600mm centres. 1x50mm Isowool APR Threshold strip Smoke seal to Smoke seal to Remove lowthickness level window122mm only, 1200 in cavity. Overall wall glazed screen. S0.36 S0.35 glazed screen. adapting existing high level timber NOTE: Setting out of walls is critical to the projectNot and fire rated Not fire rated window frame as rqd to match Screen to include internalscheme blind Screen include internal blind is basedsurrounding on historical AU plans - See Detail A to for setting out and agree all site dimensions on site with architect prior to boarding Type-2

rad

2800

rad

900mm desk 900mm desk

New manually operated blind to be installed. New Anti Glare Film

rad

900mm desk

face (allowing fixings to wall for shelving / pinboards etc), and 1 TYPE C Electronic Access

Threshold strip

Remove low level window only, adapting existing high level timber window frame as rqd to match surrounding

*

Meeting Room

S0.21

Office Type 'C'

MB154 Central Teapoint

MB154Q Office

900mm desk

New metal secondary glazing to match other offices

Office Type 'B'

MB154R Office

Future Link designed into Wall M&E Strategy TBA re- ductwork / AHU Sizing etc Allow within metal studs for the wall to be easily removable in the future creating with metal stud positioned for a future doorway at 3100mm high.

Threshold strip at change in floor finish

S0.06

Office Type 'B'

*

Office Type 'A'

S0.22

1200

Electronic Access Type-3 Smoke seal to glazed screen. FD30S fire rated

S0.05

rad

FURNITURE LAYOUT TO BE AGREED

S0.02

MB154 Corridor 1

Office Type 'A'

1124 1124

Infill existing doorway. Add matching skirting to surroundings. Decorate

MB154C Meeting Room

MB154B Office

1200

603

600

MB154 Central Breakout

FD30S

122

1200 122

160

S0.03

See screen schedule (3747-700) for details of all glazed screens / manifestation

D.01

Infill existing doorway. Add matching skirting to surroundings. Decorate

*

MB154A Office

Photocopiers

S0.04

162

Infill existing doorway. Add matching skirting to surroundings. Decorate

*

Threshold strip

Electronic Access Type-1

1800

Office Type 'A'

Infill existing doorway. Add matching skirting to surroundings. Decorate

Smoke seal to glazed screen. FD30S fire rated

S0.01

Projection Wall

MB154A ECD Cpd

2685 Office Type 'A'

Infill existing doorway. Add matching skirting to surroundings. Decorate

603

*

MB154T Office

MB154S Office

900mm desk

Gypwall stud wall comprising of 2 No. layer 12.5mm Soundbloc plasterboard each side & 92mm Gypframe C studs at 600mm centres.260 3x25mm Isowool APR 1200 in cavity. MB151A Overall wall thickness CIRCA 140mm - to suit surrounding wall Busbar Cpd and provided a smooth transition to surrounding construction D.02 walls. Adapt plasterboard thickness to suit wall thickness as FD30S required. ALL feature plasterwork feature indents to be See 3747-702 for new installed within corridor line in keeping Buzzbar Riser wall. 2000 with historical detailing

Infill existing doorway. Add matching skirting to surroundings. Decorate

Infill existing doorway. Add matching skirting to surroundings. Decorate

122

Infill existing doorway. Add matching skirting to surroundings. Decorate

*

*

for continuation of plan see drawing no. 3747-205

*

Smoke seal to glazed screen. Not fire rated

2675 2675

for continuation of plan see drawing no. 3747-204

MB153F MB153F Office

Retain existing parquet flooring. Full repair, resand and seal. New skirting to walls to match existing within space. Full decoration throughout required. Note: New lighting rqd within area ALL soffit mounted Wifi points to be centralised

2807

Infill existing doorway. Add matching skirting to surroundings. Decorate

* rad

OfficeType Type'D' 'D' Office

MB153G Office

1125

1130

162A

S0.23

Office Type 'D'

MB153H Office

1200 1200

1127

Retain existing parquet flooring. Full repair, resand and seal. New skirting to walls to match existing within space. Full decoration throughout required. Note: New lighting rqd within area ALL soffit mounted Wifi points to be centralised

up

S0.31

F

up

162A

rad

New W20 section window

Retain existing parquet flooring. Full repair, resand and seal. New skirting to walls to match existing within space. Full decoration throughout required. Note: New lighting rqd within area ALL soffit mounted Wifi points to be centralised

min. min. 470 470

Office Type 'D'

MB153J Meeting Room

Electronic Access Type-2

1128

1800

2850 2850

2797

Meeting Room

Threshold strip

1129

S0.32

900mm desk

TYPE B

Photocopiers

1129A

F

159A

325

S0.33

rad

rad

See screen schedule (3747-700) for details of all glazed screens / manifestation

MB153 Corridor

S0.34

159C

S0.28

Electronic Access Type-2

Infill existing doorway. Add matching skirting to surroundings. Decorate

1127A

Office Type 'E'

S0.27

122 1200

159

Office Type 'E'

S0.25

900mm desk

122

Office Type 'E'

S0.24

900mm desk

Existing

Projection Wall

Office Type 'E'

1350

Projection Screen

2785

159B

1119

1127A

159A

up

1st Floor 1500mm desk

Threshold strip

New manually operated blind to be installed. Full height with blackout Capability

New Bullnose timber cill. Prepare for decoration

New manually operated blind to be installed. Full height with blackout Capability

New Bullnose timber cill. Prepare for decoration

rad

1133

Retain existing parquet flooring. Full repair, resand and seal. New skirting to walls to match existing within space. Full decoration throughout required. Note: Retain and Protect existing lighting ALL soffit mounted Wifi points to be centralised

2706

rad

Adapt existing windows as required to allow duct exit point allowing intake / extraction to room.

Remove all loose flaking paint from existing windows and sand back to achieve smooth even finish. Decorate with primer and Dulux metal paint as schedule. Note: sealing of all windows required as method described in finishes schedule.

rad rad

2931 All walls to122 900mm desk desk 900mm be flush900mm evendesk and blemish free900mm throughout in desk 900mm deskNew 900mm 900mm deskto line 900mm desk preparation for decoration. walldesk constructions through with existing finish lines including all bulkheads. All existing cut outs for services / fixings / holes etc removed, filled and made good. Infill / boarding of removed access panels / high level access panels and doors into high level OfficeType Type'E' 'E' Office crawl duct. Existing walls sanded to form key, ensure that the wall is secure, flat, smooth and dust free. Install bonding primer as recommended by manufacturer / specialist and skim S0.29 throughout to achieve smooth blemish free finish. All junctions / corners etc to have suitable plaster beads to ensure no future cracking. Sand as required, treat, and decorate. MB151 MB151 S0.30 Meeting Room Electronic Access Gypwall Classic stud wall comprising of 2 No. layer 12.5mm Type-3 900mm desk 900mm&desk 900mm desk 900mm desk Soundbloc plasterboard each side 92mm Gypframe C studs TYPE A Screen to include internal blind desk Isowool 900mm desk 900mm desk at 600mm centres.900mm 3 x 25mm APR900mm 1200desk in cavity. Overall wall thickness 144mm. NOTE PATTRESS RQD BEHIND AV SCREEN POSITION

159B 159 159C

1129A

G

LOCATION PLAN

Retain full window Prepare and decorate

Retain existing cill. All Prepare for decoration

MB153E MB153E Office

MB153D Office

MB153C Office

*

AS

New manually operated blind to be installed. New Anti Glare Film

MB153B Office

Contractor to allow for all required woodblock infills to doorway thresholds following formation of new openings. levels to tie through between spaces. To include full preparation of bed as required and stain to woodblock as existing floor

Retain existing cill. Prepare for decoration

New Bullnose timber cill. Prepare for decoration

S0.39

Existing cills to be retained Prepare for decoration

MB153A Office

New Bullnose timber cill. Prepare for decoration

Smoke seal to glazed screen. Not fire rated

Electronic Access Type-2

New manually operated blind to be installed. New Anti Glare Film

New Bullnose timber cill. Prepare for decoration

A

1133

164

1131

rad

New Bullnose timber cill. Prepare for decoration

New Bullnose timber cill. Prepare for decoration

166

ALL SERVICE RUN POSITIONS TO BE AGREED ON SITE WITH ARCHITECT / RELEVANT ENGINEER PRIOR TO INSTALLATION

Detail A - General Beam Abutment detail (Throughout) SETTING OUT OF ALL WALLS TO BE ON THIS BASIS 1:5

B'

rad

New manually operated blind to be installed. New Anti Glare Film

900

138A

141

1130

Chase suitably sized channel into the existing floor screed to the required depth for data/power

Where screed levels vary rooms, cables between to the proposed new make allowance lecturn.to be able to achieve suitable for removal as necessary levels for future latex installation. Remove all defective screed and replace as required prior to building works. It Lecturn is essential to latex all floors prior to new walls being MB149 to allow for future modifcation of layout as Design Studio

142

145

138B 135A

161

172

143

1129

Lockers

LEGEND

1114

140

1134

170

down

1500mm desk

New manually operated constructed blind to be installed. required Full height with blackout Capability

up

138

139

135

144

168

For Structural and Mechanical / Electrical information and details refer to relevant consultant / sub-contractor drawings and specification. All electrical conduit to be chased in to wall.

down

1113

137

g

163

164B

1132

All existing plastered walls to be made good following works achieving a smooth blemish free finish.

Floors Generally

Fixed shelving in all offices. See 3747-711 Note: sequencing recommends installation of shelving on relevant walls prior to installation of skirting to allow this to be subsequently butted into shelving.

D

133

g

165A

178

176

174

rad

ALL DIMENSIONS SUBJECT TO SITE INSPECTION. ANY DISCREPANCIES TO BE RAISED WITH ARCHITECT PRIOR TO CONSTRUCTION.

B

rad rwp

up

up

165

178A

164A

Top of existing EDC cupboartd to be closed off / fire proofed as part of scheme. Extend wall line to structural soffit. Currently open at top

ALL SERVICE RUN POSITIONS TO BE AGREED ON SITE WITH ARCHITECT / RELEVANT ENGINEER PRIOR TO INSTALLATION

1115

1140 down

rad

1139

1137

1135

New Bullnose timber cill. Prepare for decoration

For Structural and Mechanical / Electrical information and details refer to relevant consultant / sub-contractor drawings and specification. All electrical conduit to be chased in to wall.

up

1138

180C

180B

180A

B

Build nib with 2xno. layers of 12.5mm plasterboard on the outside face and 70mm stud

To be read in conjunction with Outline Specification. Refer to: 200 series drawings for GA Information and Layouts 400 series drawings for Detailed Layouts and Secondary Installations 500 series drawings for Fire Strategy Information and Branding 700 series drawings for All Schedules 800 series for Bulkhead Details 900 series for Principal Designer, Welfare and Site Compound Information

Adapt existing windows as required to allow duct exit point allowing intake / extraction to room.

A

Top of existing EDC cupboartd to be closed off / fire proofed as part of scheme. Extend wall line to structural soffit. Currently open at top

up

129C

rad

up

1136

down

New manually operated blind to be installed. New Anti Glare Film

MB147 Post Grad Researchers

Do NOT scale from drawing

Remove all loose flaking paint from existing windows and sand back to achieve smooth even finish. Decorate with primer and Dulux metal paint as schedule. Note: sealing of all windows required as method described in finishes schedule.

1113A

129B

1141

H

up

New Bullnose timber cill. Prepare for decoration

New Bullnose timber cill. Prepare for decoration

NOTES

129

rad

rad

167A

up

CONTRACTOR TO ALLOW FOR ALL CEILING WORKS REQUIRED DURING WIRING IN OF DATA CABLES TO ROOM 137 (DATA ROOM). ALL DAMAGED CEILING TILES FOLLOWING WORKS TO BE REPLACED. FULL DELAPIDATION SURVEY REQUIRED. CONTRACTOR TO ALLOW FOR OUT OF HOURS WORKING TO FORM THESE CONNECTIONS. TIME TBA WITH ASTON ESTATES

Encapsulated Asbestos

ASTON UNIVERSITY OFFICE DEVELOPMENT MED MB1 REFURBISHMENT DRAWING TITLE

GA Demolition

Conduits by M&E designers Trunking drop

EQ

900

X

EQ

Wifi

Wifi

=

O

=

Wifi Points

Fire Alarm/Heat sensor H

2X

=

Existing Beam O

=

EQ

*

EQ

EQ

REV DESCRIPTION

1150

1:100

DATE

January 2019

CHECKED

DWG NO.

3747-202

REVISION

SHEET SIZE

A0

DRAWN

AEB

F

DATE DRN CKD

Robothams Architects The Old Library 12 Church Street Warwick CV34 4AB T 01926 493843 F 01926 495314 architects@robothams.co.uk www.robothams.co.uk

1122A EQ

FINAL ISSUE

SCALE

Centre lines/Guide lines

H

1150

STATUS

PROJECT TITLE

ASTON UNIVERSITY OFFICE DEVELOPMENT MED MB1 REFURBISHMENT DRAWING TITLE

EQ

REFLECTED CIELING PLAN SHEET 1 OF 2

Reflected Ceiling Plan

rad

STATUS

FINAL ISSUE

SCALE

1:20

DATE

July 2019

CHECKED

AEB

DWG NO.

3747-411

REVISION

B

SHEET SIZE

A0

DRAWN

AS

Refurbishment of Research department- Aston Main builiding Completed in September 2019 - Traditional JCT standard contract - Architects are Contract Adminitrator

DRAWN

AW


NOTES Do NOT scale from drawing To be read in conjunction with Outline Specification.

D.13

D.01

SVP Drainage to be considered as vertical drop may clash with beam

3000mm wall height

3000mm wall height

2750mm ceiling height

1900

G37c

G37b

2750mm ceiling height

Wall Elevation C

Wall Elevation D

G37d

Refer to: 200 series drawings for GA Information and Layouts 400 series drawings for Detailed Layouts and Secondary Installations 500 series drawings for Fire Strategy Information and Branding 700 series drawings for All Schedules 800 series for Bulkhead Details 900 series for Principal Designer, Welfare and Site Compound Information For Structural and Mechanical / Electrical information and details refer to relevant consultant / sub-contractor drawings and specification. All electrical conduit to be chased in to wall. ALL SERVICE RUN POSITIONS TO BE AGREED ON SITE WITH ARCHITECT / RELEVANT ENGINEER PRIOR TO INSTALLATION

G37a

Wall hung mirror

ALL DIMENSIONS SUBJECT TO SITE INSPECTION. ANY DISCREPANCIES TO BE RAISED WITH ARCHITECT PRIOR TO CONSTRUCTION. All existing plastered walls to be made good following works achieving a smooth blemish free finish.

g

Dyson Wash + Dry Tap over Sanceram Marden 525

Wall Elevation B

1200

KEY Wall tiles - 150x600 / 100x600 / 50x600 Solus - Travertine range. Colour TBC

D.05

D.04

G37 Unisex WC

1800x450 Wall hung mirror

D.03

D.02

Wall Elevation A

1410

1810

D.06

Position for sanitary bin

1800x450 Wall hung mirror

6930

1800x450 Wall hung mirror

D.12

D.11

D.10

D.09

D.08

D.07

WALL ELEVATION C SCALE 1:20

G37k Ambulant WC

2150

G37j

Sanceram Doc M toilet pack with additional sanceram wash hand basin

G37h

G37g

3000mm wall height

1200 G37e

2750mm ceiling height

1900

WC short by 50mm. Width is + 230mm Dispensation 1730required

G37f

Wall mounted floating shelf

Wall mounted floating shelf

SVP Drainage to be considered as vertical drop may clash with beam University supply and contractor install toilet paper holder

PLAN SCALE 1:20

University supply and contractor install toilet paper holder

Sanceram Wall hung WC

1100

Sanceram Wall hung WC

Sample Tiling using random tile pattern 150x600/ 100x600 / 50x600 Range and colour TBC. Colour matching grout required

WALL ELEVATION D SCALE 1:20

Sanceram Marden 525 sink & Samceram Marden wall hung WC

Dyson Wash + Dry Sanitary bin below

G37k

Sanceram Wash hand basin & Dyson airblade v hand drier

Low level floor moounted WC and Grab rails required

WALL ELEVATION A SCALE 1:20

Wall Elevation D

Wall Elevation C

3000mm ceiling height

2750mm ceiling height

Venesta Vepps system

Sanceram Doc M toilet pack

G37c

G37j G37e

G37b

Toilet roll holder and soap dispenser. University supply and contractor installed

G37a

Toilet roll holder and soap dispenser. University supply and contractor installed

150

Hole for Dyson Wash + dry tap to be factory formed. On site installation required

Drawing updated to construction

24.06.21 AS AS

A

Drawing updated to tender

23.04.21 AS AEB

G37g

DATE DRN CKD

Robothams Architects The Old Library 12 Church Street Warwick CV34 4AB T 01926 493843 F 01926 495314 architects@robothams.co.uk www.robothams.co.uk

Wall hung mirror

Preplumbed Sanceram Marden 525 sink into Vepps system.

G37h

B

REV DESCRIPTION

PROJECT TITLE

450

Thomas Dudley sensor flush

450

Soap dispenser and toilet roll holder to be installed by contractor on free issue from university

2no. Durahook Coat hooks on door

Ground Floor - Old Exec Office Social Study / Collaboration Space Shelf

Sanitary bin below

DRAWING TITLE

Concealed cistern within Vepps unit

GA Layouts Unisex Toilets

Wall hung Sanceram Marden WC

STATUS

Construction

SCALE

1:10 /1:20

DATE

March 2021

CHECKED

AEB

DWG NO.

3950-710

REVISION

B

Sanitary bin

TYPICAL TOILET CUBICLE SCALE 1:10

WALL ELEVATION B SCALE 1:20

Structural beam over

G37k PLAN SCALE 1:10

G37e PLAN SCALE 1:10

Structural beam over

SHEET SIZE

A0

AS

DRAWN

NOTES

Existing Crawl Space

eet

Do NOT scale from drawing To be read in conjunction with Outline Specification.

4250

3920

oratio

3100

up

up

G122

wp

!

g

Caution! Glazed door weight approx 300kg each. Contact university atleast 48 hours prior to delivery to use the shortest access route for delivery

G162

C

S0.01

D.13

FD60S Integrity & Insulation

G37c

G37b

Electronic Access Type-1

For Structural and Mechanical / Electrical information and details refer to relevant consultant / sub-contractor drawings and specification. All electrical conduit to be chased in to wall. ALL SERVICE RUN POSITIONS TO BE AGREED ON SITE WITH ARCHITECT / RELEVANT ENGINEER PRIOR TO INSTALLATION ALL DIMENSIONS SUBJECT TO SITE INSPECTION. ANY DISCREPANCIES TO BE RAISED WITH ARCHITECT PRIOR TO CONSTRUCTION. All existing plastered walls to be made good following works achieving a smooth blemish free finish.

D.01

SVP Drainage to be considered as vertical drop may clash with beam

G37d

Coorp

up

SECTION A-A SCALE 1:20

Refer to: 200 series drawings for GA Information and Layouts 400 series drawings for Detailed Layouts and Secondary Installations 500 series drawings for Fire Strategy Information and Branding 700 series drawings for All Schedules 800 series for Bulkhead Details 900 series for Principal Designer, Welfare and Site Compound Information

n Str

down

up

G37a

D.14

g

FD30S

D.06

D.05

D.04

D.03

G127 Elec Cpd

D.02

G37 Unisex WC

D.12

D.11

D.10

D.09

D.08

D.07

Do NOT scale from drawing

G37j

G37h

G37g

G37f

G37e

up

g

gh ing throuipal Build Main . The Princ roller is nce into e the r Street Entra Shutter Doors ensur r must s off Pottea Rolle ing actor Contr r door accestimes and the open ge all d at shutte mana as materialsce close kept -person mustshutter site.Entran the to s g of banks ered actor closin contr and ved /delivother are remo d with share to be

G38 Collaboration / Relaxed Lounge

To be read in conjunction with Outline Specification. Refer to: 200 series drawings for GA Information and Layouts 400 series drawings for Detailed Layouts and Secondary Installations 500 series drawings for Fire Strategy Information and Branding 700 series drawings for All Schedules 800 series for Bulkhead Details 900 series for Principal Designer, Welfare and Site Compound Information

G128

SVP Drainage to be considered as vertical drop may clash with beam service distribution

For Structural and Mechanical / Electrical information and details refer to relevant consultant / sub-contractor drawings and specification. All electrical conduit to be chased in to wall.

C

ALL SERVICE RUN POSITIONS TO BE AGREED ON SITE WITH ARCHITECT / RELEVANT ENGINEER PRIOR TO INSTALLATION

g

All existing plastered walls to be made good following works achieving a smooth blemish free finish.

ular

Vehic

3000mm wall height

B

DRAWING UPDATED TO CONSTRUCTION

24.06.21 AS AS

A

DRAWING UPDATED TO TENDER

23.04.21 AS AEB

REV DESCRIPTION

G45 Cafe Breakout

DATE DRN CKD

G38 Printing Zone

GA Sections

STATUS

Construction 1:20

March 2021

CHECKED

AEB

DWG NO.

3950-206

REVISION

B

SHEET SIZE

A0

A

Contractor Storage Area. Standard marketing design to be provided by University and aquired / positioned by contractor at University direction. Construction H&S notices / signboards designs & locations by agreement of location with client. To be fully prtected with herris fencing.

Treehouse Booths

LY AN AT

ON G G IN IN AD RK PA

Y

Po

TI

tte

E M

Treehouse Booths G45 Open Collaboration (Flexible)

service distribution

700 Worktop

Adapt plinth vent to allow venting from the base of the cabinet

+

#

Pelmet

# #

600

600

Worktop: Manufacturer Range Finish

Plumbing extended to Brita Vitap from the boiler & cooler

600

Dimensions

600

Under counter Bin with hole in worktop

1800

800

g

To be read in conjunction with Outline Specification.

ASTON MAIN BUILDING

All existing plastered walls to be made good following works achieving a smooth blemish free finish.

Under counter Bin with hole in worktop

B

700 Worktop

A

PLAN SCALE 1:20

up

up

-

Glazed Screen added. Service riser added to quiet conc

23.03.21 AEB

-

)

Security Line

Phone Booth

d

815

600

Vehicular access for all deliveries. Deliveries to be made early AM due to sharing with predestrian zone. Drop off materials only for decant to site area. Vehicles are not allowed to park in this zone. Security passes will be provided so appropriate banksman as required to facilitate entry to be provided

1200mm rise/fall desk

1200mm rise/fall desk

1200mm rise/fall desk

1200mm rise/fall desk

B

G141

Hoarding Line Out of hours works Chapter 8 barriers to allow fire escape at all times

NOTE:

Robothams Architects Wa The Old Library 12 Church Street Warwick CV34 4AB T 01926 493843 F 01926 495314 architects@robothams.co.uk www.robothams.co.uk

·

Lift E available for use by the contractor during demolition stage between 7am-9am. All surfaces throughout to be fully protected during works.

·

All Asbestos will be removed prior to commencement of works except for fuse tapes. Any Asbestos found should be double bagged and the university to be contacted for removal

Note - Openings to be closed off during works to prevent leakage of dust / noise etc

LIVE OFFICE

Moveable chapter 8 barrier. Fire escape access to be maintained at all times

PROJECT TITLE

Ground Floor - Old Exec Office Social Study / Collaboration Space

FD30S

Shortest travel route for bringing in heavy items to site. University to be informed atleast 48 hours prior to use

DATE DRN CKD

SITE DELIVERIES LAYOUT SCALE 1:1000

D.15

Skip area for other contractors

Solid Hoarding Full height to prevent leakage of dust and noise. Add doorway as rqd for heavy goods access.

o

Tw

FD30S

WALL ELEVATION A SCALE 1:20

Hoarding to half of the corridor to allow access to AMS at all times.Full barriers allowed only during the time of door formation Note - Openings to be closed off during works to prevent leakage of dust / noise etc

No Parking Provision for site operatives. Limited spaces within Aston main car park will be provided by negotiation for KEY personnel only

)

ss

ce

ac

are

435

350 900

695 min. clear

AS

ed

y (sh

D.16

+ 800

24.06.21 AS 23.04.21 AEB

ar

G38 Quiet Concentration

G139 Busbar Cpd

#

600

W

ac Glazed screen ce removed. Stage 4 Tender Issue ss

REV DESCRIPTION

G45 Open Collaboration (Fixed)

Grohe Minta low flow tap

700

e

ay Drawing (shupdated to construction

C

Area of pavement / fire exit to be closed off during removal of M&E plant on roof. Adequate Chapter 8 barriers and banksman required to be present in the area the whole time while the works being carried out. University will De-Gas in advance

Make allowance for works within G35 for water connections

On

Unloading Only NO PARKING

Site waste storage as tender documents / Preliminaries. Standard marketing design to be provided by University and aquired / positioned by contractor at University direction. Construction H&S notices / signboards designs & locations by agreement of location with client.

Vivreau Vi Counter top tap with integrated drip tray

Undercounter Bin

INTERFACE WITH OTHER CONTRACTORS

during works. Lifts may be available out of hours in order to facilitate bulky items being delivered to site. Only with 48 hours notice and to full agreement of Aston University

Security Line

Base units cut to size to suit low level working area

Glass splashback

Hoarding Line

Staircase E used for direct access to site. All surfaces throughout to be fully protected

ALL SERVICE RUN POSITIONS TO BE AGREED ON SITE WITH ARCHITECT / RELEVANT ENGINEER PRIOR TO INSTALLATION

Decor panel to hide pipework for Vitap

Wheelchair area

et

Toilet Availability

Refer to: 200 series drawings for GA Information and Layouts 400 series drawings for Detailed Layouts and Secondary Installations 500 series drawings for Fire Strategy Information and Branding 700 series drawings for All Schedules 800 series for Bulkhead Details 900 series for Principal Designer, Welfare and Site Compound Information

ALL DIMENSIONS SUBJECT TO SITE INSPECTION. ANY DISCREPANCIES TO BE RAISED WITH ARCHITECT PRIOR TO CONSTRUCTION.

To be kept clear for wheelchair use

Contractor Mess Room. Standard marketing design to be provided by University and aquired / positioned by contractor at University direction. Construction H&S notices / signboards designs & locations by agreement of location with client. To be fully prtected with herris fencing

tre

Movement

For Structural and Mechanical / Electrical information and details refer to relevant consultant / sub-contractor drawings and specification. All electrical conduit to be chased in to wall.

B

2000

White Goods: Vivreau Vitap 304 Counter top tap with integrated drip tray Additional : # Cabinet lock: Panel to Tongue Depth 9.5mm Camlock with key. Same key required to unlock all doors

Do NOT scale from drawing

Contractor site office. Standard marketing design to be provided by University and aquired / positioned by contractor at University direction. Construction H&S notices / signboards designs & locations by agreement of location with client. To be fully prtected with herris fencing

rS

SITE COMPOUND LAYOUT SCALE 1:200

NOTES

600

Wall Elevation A

service distribution

150

Howdens Clerkenwell, Colour TBC Supermatt PVC Wrapped, MDF Square Style Supermatt PVC Wrapped, MDF Square Style BY JOINERY SUPPLIER N/A Allow for Egger H1150 ST10 To match joinery. Laminated 38mm thick, 700mm deep

+ Howdens Stainless steel effect - Plinth Vent fittings To allow venting of hot water boiler

+

#

Wall Elevation B

NOTE: Hole to be cut in base of kitchen cupboard which house kit for Hot/ Cold water taps locally to allow plinth vent to work. To be discussed on site.

Kitchen Fittings: Sink Grohe K200 composite sink Granite black Tap Grohe Minta Single Lever low flow tap Ironmongery: Handles N/A Soft Close Hinges Required

Vehicle access

A

G38 Study and Learn

AS

DRAWN

Site waste storage as tender documents / Preliminaries. Standard marketing design to be provided by University and aquired / positioned by contractor at University direction. Construction H&S notices / signboards designs & locations by agreement of location with client. To be fully prtected with herris fencing

LO R / UNLA G IN CU AD HI LO VE NO

SCALE DATE

g

NOTES Kitchen Units: Manufacturer Kitchen Range Cornice

Staircase for site access

ctor ingres contra ed. tial direct Poten area if requir to site

Treehouse Booths

drainage channel

drainage channel

1810

E

M

Ground Floor - Old Exec Office Social Study / Collaboration Space DRAWING TITLE

SECTION C-C SCALE 1:20

KEY

s

PROJECT TITLE

Position for sanitary bin

requi

TI

Robothams Architects The Old Library 12 Church Street Warwick CV34 4AB T 01926 493843 F 01926 495314 architects@robothams.co.uk www.robothams.co.uk

Y

Wall hung mirror

Dyson Wash + Dry Tap over Sanceram Marden 525

LY AN ON AT G G IN IN AD RK PA

d. be locate of are to cation skips clarifi WILL upon where R Area t TBC actor. AREA OTHE g contr Full exten ED WITH fencin nts by reme BE SHAR. Full heras all times red at TORS requi TRAC CON

2750mm ceiling height

ment

Move

LO R / UNLA G IN CU AD HI LO VE NO

ALL DIMENSIONS SUBJECT TO SITE INSPECTION. ANY DISCREPANCIES TO BE RAISED WITH ARCHITECT PRIOR TO CONSTRUCTION.

service distribution

SECTION B-B SCALE 1:20

at all ors by others in corrid s in use stored be acces ared !!! ials to !!!!!Sh No mater any time!! s . acces times d areas at for directregular / share used for itted to be ONLY lift permto be fully available t ase E of the Stairc No use throughou may be items to site. surfaces works. Lifts ate bulky ll hours g to facilit with 48 use.A durin cted order Only prote hours in of Aston to site. out of delivered agreement being and to full notice rsity r Unive Barrie ter 8 s to be ble Chap acces e Mova ase escap at all times of stairc Fire at top ained maint required e Notic use me to ver ETS TOIL are welco - howe ct. SITE Site Staff ry facilities respe sanita Note: d with rsity be treate Unive must they s etc Cafe' NOTE rsity usage All Unive ble for are availa

G37k

NOTES

SCOPE OF WORKS LAYOUT LOWER GROUND FLOOR SCALE 1:200

SERVER ROOM

LIVE OFFICE

Any disruption to power / data to this area to be out of hours

G145 Staff Kitchen - Useage to be maintained

B

Drawing updated to construction

24.06.21 AS AS

A

Tender Issue

23.04.21 AEB

REV DESCRIPTION

G50

Vivreau Vi Counter top tap with integrated drip tray

815

1220 max reach for wheelchair users

685 min. clear

900

PROJECT TITLE

600

600

600

A

Kitchenette

STATUS

Construction

SCALE

1:20

DATE

March 2021

CHECKED

AEB

DWG NO.

3950-711

REVISION

B

SHEET SIZE

Construction

SCALE

1:100

DRAWN

AEB

DATE

28.02.21

CHECKED

AEB

DWG NO.

3950-205

REVISION

C

A1

DRAWN

AS

EXISTING SCOPE OF WORKS SCALE 1:200

SHEET SIZE

NOTES Do NOT scale from drawing

STATUS

600

Drawing updated to construction

24.06.21 AS AS

Drawing updated to tender

23.04.21 AS AEB

REV DESCRIPTION

SCOPE OF WORKS LAYOUT GROUND FLOOR SCALE 1:200

Concept Furniture Layout

Approximate date of interface between 31.05.21 to 18.06.21 subject to change

Ground Floor - old Exec Office Social Study / Collaboration Space DRAWING TITLE

+ 600

B

DRAWING TITLE

Robothams Architects The Old Library 12 Church Street Warwick CV34 4AB T 01926 493843 F 01926 495314 architects@robothams.co.uk www.robothams.co.uk

350

# #

# Integrated Bins

down

!!!!!! NOTE !!!!! WORKS ONGOING BY DIFFERENT CONTRACTOR WITHIN THIS AREA. INTERFACE EXPECTED. Please follow government guidance on COVID safe rules.

Service Zone

Blanco Minta low flow tap with circular composite sink

WALL ELEVATION B SCALE 1:20

up

-

DATE DRN CKD

A1

Approximate date of interface between 12.07.21 to 21.08.21 subject to change

DATE DRN CKD

Robothams Architects The Old Library 12 Church Street Warwick CV34 4AB T 01926 493843 F 01926 495314 architects@robothams.co.uk www.robothams.co.uk

To be read in conjunction with Outline Specification.

PROJECT TITLE

Refer to: 200 series drawings for GA Information and Layouts 400 series drawings for Detailed Layouts and Secondary Installations 500 series drawings for Fire Strategy Information and Branding 700 series drawings for All Schedules 800 series for Bulkhead Details 900 series for Principal Designer, Welfare and Site Compound Information

CIRCULATION UPGRADE WORKS MAIN BUILDING ASTON UNIVERSITY

For Structural and Mechanical / Electrical information and details refer to relevant consultant / sub-contractor drawings and specification. All electrical conduit to be chased in to wall.

DRAWING TITLE

SITE COMPOUND / DELIVERIES

ALL SERVICE RUN POSITIONS TO BE AGREED ON SITE WITH ARCHITECT / RELEVANT ENGINEER PRIOR TO INSTALLATION ALL DIMENSIONS SUBJECT TO SITE INSPECTION. ANY DISCREPANCIES TO BE RAISED WITH ARCHITECT PRIOR TO CONSTRUCTION.

STATUS

CONSTRUCTION

SCALE

Varies

All existing plastered walls to be made good following works achieving a smooth blemish free finish.

DATE

APRIL 2021

CHECKED

AS

DWG NO.

3950_100

REVISION

B

SHEET SIZE

A0

DRAWN

AEB

Refurbishment of the old VC corridor - Aston Main builiding Due to start on site in July 2021 - Traditional JCT standard contract - Architects are Contract Adminitrator


KEY

133. 50

GE A

Block 14

Land understood in applicants ownership

Co

lum

n

Application boundary

Block 04

134.

Science Extension

00

Existing Staff Parking

Existing building

133.5

(drawing 3842-112,113,114)

0

Block 29

Existing overhead and temp structure

133.50

Existing Macadam Existing stone Removed existing container

Existing Staff Parking

13

4.5

0

Existing paving

13

4.0

0

134 .00

Block 03

Existing concrete

Block 15

Re organised parking 16+1 disabled spaces

Removed existing container

Existing grass

.00

135

Removed existing garage

Proposed demolition

13 4.0 0

Drain holding tank in this area

133.97

Proposed new building

Block 02

Sports hall extension

133.97

Reinstated stone to match existing

(drawing 3842-109,110,111) 134.00

Proposed Macadam

133.97 133.97 S

RA

HE

HE

RA

S

S RA HE

Proposed setts/paving Existing Staff Parking

133.97 133.97

S RA HE

S

RA

HE

Block 01

S

RA

HE

Proposed porous surface Proposed soft landscaping

S

RA

HE

Subject to existing threshold levels/ access requirements

Proposed trees

blend macadam to suit existing levels 135.09

New grass bank

Existing trees

Block 17

135.215

Block 16

Macadam cross falls @1:40

Trees to be removed Existing macadam to be removed. New macadam laid to adjust levels

Root protection Zone

Existing grass bank 135

Proposed Levels

.00

135.62

Netball Court gradient @1:120

ANCE

New netball court

135.50

Proposed new parking

ENTR

New retaining wall

Proposed new underground water tank

135.50

porous macadam (unfenced & unlit)

Proposed Fire Appliance route

Block 19

135.50

135.50

136.0

0

N

135.50

3.0

0

.00

135.00

0 1 2 3 4

136

New English Building 135.65

13

6

(drawing 3842-115,116,117)

ER TAIN CON

50 133.

132.50

10m

135.50 134

The Cedars

8

Boundary line (to be confirmed on site)

.00

135.50

4.5

13

135.50

plant compound

133

135.0

.50

13

5.5

HERA

0

S

0

TERRACE

HERA

S

0

135

135.50

135.50

.50

Re grading existing grass bank to allow for new parking bays

Note Existing / proposed site plans based on Sumo Services Limited surveys SOR015651-01-011.

Location Plan NTS

133.50

Removed existing concrete pad

37

133.24

26 25

mar

a

140

2

0

09.01.20 AS DPS

Updated to design development

02.01.20 AS DPS

DATE DRN CKD

Robothams Architects The Old Library 12 Church Street Warwick CV34 4AB T 01926 493843 F 01926 495314 architects@robothams.co.uk www.robothams.co.uk

160

Alta

32

152

1

13 3.5

Drawing updated to planning

A

136.0m

Brid Hou ge se

New parking

B

REV DESCRIPTION

Depot

Holly House

36

Block 18

136.00

135.69

150

1 to 33

ket Mar e Clos

PROJECT TITLE

THE COTSWOLD SCHOOL STATION ROAD BOURTON ON THE WATER

LB

Sun Gates

Ashburnham

Thorpe Arch

TRAP

Lyne Croft

2

Newhouse

MOUSE

Drain holding tank in this area

The Cedars

LANE

133.00

1

Beechcroft

DRAWING TITLE

Moore Cottage Hospital

PROPOSED SITE PLAN

Cheese Cott

19

5

1

23

Raincote

135.8m El Sub Sta ROAD

.00

The Bungalow

MOORE

133

Block 02

El Sub Sta LA

Well

Moore

Cott

Cott

Drayc

ott

Cottag

Moore Cottage Hospital

Avenu e

e

STATUS

PLANNING

SCALE

NTS

DATE

08.2019

CHECKED

AF

DWG NO.

3842-106

REVISION

B

The

Old School House

MOUSETRAP

Jessamine

S

RA

HE

S RA HE

RH

54

Site Boundary 48

1.2

Existing buildings within site boundary

42

2m

36

Key

Existing paved area The Triangle

KINGS

1

rg

ne

7

1

10

FARM

9 /

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/ /

PA RK

12

14

18

/

RH

Construction traffic entry into site Student/ Staff circulation and maintenance areas

/ /

m

2m

4

48

6.5

135.44

13

135.61

17

135.52 135.50

135.54

Extent of no build area - Scheduled Ancient Monument

AD

135.77

135.60

RO

135.73

Approximate location of existing tree/shrub Approximate location of Root Protection Area

Vehicular and pedestrian access to site

N

135.92

135.64

IO AT

135.97

136.00

Stati Farmon Hous e

ST

49

Little Court 136.00

Existing artificial surface pitches

7

Half Acre

136.13

Existing summer grass pitches

10

M Sta ea tio do n w

1

136.17

Existing winter grass pitches

11

lede

ville

Geo

Haz

ES

136.28

OW

14

Station House ee ry Tr e CherHous

Hill View SE X PL AC E

Existing green area

MEAD

Church

135.8m

Riding Centre

Sun's Eye

8 10 7 9

2

d swol Cot llas Vi

6

l

5

gie

4

Mo

ss

1.2

DPS

S

ard

rty

Playground

Elmfield

/ /

40

135.50

/

140.6m

DRAWN

RA

8

1 to

ou

eC

Th

138.4m

135.72

A0

HE

136.2m The Lawns

135.73

SHEET SIZE

135.12

/

/ /

Existing Habitat Area

136.00

/ /

/

/

/ /

/ / /

44

WB

/

/

/

/

/

/

/ / /

Existing Winter Pitches (school information)

/ / / / /

135.00

/

/

42

/ /

/

/ / /

5 A SIDE FOOTBALL GRASS CRICKET SQUARE & SENIOR ARTIFICIAL CRICKET

/

134.50

/ /

Residential / overlooking risk

/

43

/

/

Holly House

/ / / /

/

26

36

2130

S Vil tati la on

/

5 A SIDE FOOTBALL

135.50

136.00

37

Brickyard Coppice

Depot

134.50

134.50

/

/

133.50

/

/

/

/

/

133.60

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

133.58

133.44

/

/ /

/

/

/

/

/

/

/ /

BT

BT

BT G

BT

BT

BT

BT

BT BT

BT

Foul Water Drainage Route

G

/

/

/

Storm water drain route

160

G

ra

133.50

/

/

/

/

133.50

/

/

/

/

/

/ / /

/

/

/

/

/

BT

/

/

/

/

/

/

/

/

/ /

/

BT

/

/

/ /

/

BT

/

/

/

152

/

2

/

/ /

/

/

/

BT

/

/

/ /

/

BT

/

/

/ /

/

/

/

BT

/

/

/

/

/

1

/

/

/

BT

BT

ASR SW

BT

ASR

/

/

/

BT

SW

/

/ /

150

/ BT

/

/

/

ASR

/

/

/ /

/

/

/ /

/

/

/

/

/

/

/

SW

/

High voltage electricity cable

BT

/

/

133.50

ASR

/

/ /

/

/

BT

SW

/

/ /

2G ASTRO PITCH

134.00

/

/

134.00

/

/

BT

BT

BT BT BT

/

/

BT BT

/ /

/ / /

/

/

U

BT

/

/

/ / /

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

AOC

/

/

/

/

AOC

/

/

/

/

/

/

/

N

HERAS

/

/

133.50

/

/

U

/

U

/

/

/

AOC

/

/

/

/

/

/

/

/

/

/

/ /

U

G

/

133.50

133.50

/

/

/

/

U

U

/

/

/

/

/

U

/

/

/

DR

/

/ U

/

/

U

ASR

/ /

SW

ASR

/

ASR

W

SW

W

U

/

SW

U

/

ASR

/

DR

/

/

/

/

/

/ / / /

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/ /

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

135.23

W

W

/

/ /

/

/

/

/

/

/

/

/ /

134.00

/

/ /

135.00

/

/

/

/

/

/

/

/

W /

/

W

W

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/ /

/

/

133.50

/

/

W

W

W

W

/

/

/ /

/

/

/

W

/

/

/

/

/

/

W

/

/

/

W

W

/

/

/

W

W

/

/

/

/ /

/

W

/

/

W

W

/

/

/

/

W

W

/

/

SW

/ /

/

W

W

/

/

/

W

/

134.94

W

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

ASR

/

/

/

/

/

/

/

/ /

W

/

/

/

/

/

/

/

/

W

/

W

/

/

/

/

/

/

/

/

/

/

/

/

/

134.87

W

/

/

/

133.50

W

/

/

/

/

/

/

133.50

/

/

/

/

/

/ /

/

/

U

/

/

/

W

/

/

/

W

33

W

U

/

/

HERAS

/ W

/

/

/

U

W

/

/

134.50

/

/

W /

/

/

133.50

W

U

W /

/

HERAS

/

/

/

/

134.00

/ W

HERAS

/

U

FW

/

1 to

DR W

ASR

/

135.00

/

/

FW

PARKING

/

137.00

W

/

/

/

HERAS

133.50

/ /

t rke Ma se Clo

SW

W

/

FW

HERAS

/

/

W

ASR

/

/

/

/

/

/

W

/

SW

/

/

/

/

/

U

/ / /

/

/

/

ASR

ASR

/

HERAS

AOC

/

/

/

134.00

133.50

134.50

DR

/

/

/

/

/

Unknown Ground Services

/

/ DR

/

/ DR

/

/

/ /

ASR

/

/

DR

/

/

/

133.50

ASR

/

/

/

/

DR

/

ASR

/

/

/

/

DR

PARKING

133.50

DR

/

ASR

/

/

/

/

/

SENIOR FOOTBALL

/

134.50

BT

/

MUGA

/

135.00

5 A SIDE FOOTBALL

Gas main

BT

/

/

/

/

/ 134.50

134.50

BT

ma

/

/

/

CRICKET NETS

134.00

TRAINING GRID

135.50

BT

Alta

/

/

/

/ /

133.51

/

/

/

/

/

/

/

/

133.50

/ / /

/

BT

/

/ /

/ /

/

/

Mains water route

BT

/ / /

/ / /

/

/ /

/

BT

/

/

/

/

/

/

/ /

/

/

/

/

134.50

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

134.50

135.00

Bri Ho dge use

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

m

/ /

BT

/ /

BT

/

BT

/ 134.27

BT

/

BT

/

BT

/

/

BT

/ /

/

/

/ /

/

/

/

/

/

25

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

32

/

136.0

/

5 A SIDE FOOTBALL /

9 A SIDE FOOTBALL

BM 139.90m

139.4m

W

Overshadowing risk

135.00

135.50

/

/ /

/

/

/

/

/

/

/

/

W

/

/

/

/

135.50

/

/

/

/

/

/

/

/

/

/

/

/

/

W

/

W

135.50

/

/

/

W

/

/

/

133.50

/

134.50

/

/

/

134.00

/

/

/

/

/

/

/

/

/

134.00

/

/

C

/

/

/

/

/

BT

C

/

/ /

/

/

/

/

/

/

/

/ /

/

/

/

135.00

135.00

/

135.00

/

/

/

/

/

/

/

/

/

/

/

/

/

/

135.50

/

/

/

/

/

/

/

/

/

/

/

/ /

/ /

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

SW

/

/

ASR

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

U

/

/

/

/

/

/

U

/

/

/

U

/

/

02.01.20 AS DPS

Key & hatch updated.

20.12.19 DPS

-

/

U /

/

/

U

/

U

/

/

U

/

ef

Drawing updated to Planning

/

/ /

/

/

/

/

/ /

/

/

/

134.00

A

/

/

/

/ /

/

/

/

133.00

133.50

B

/

/ /

/

/

/

/

/

/

/

/

134.50

/

134.00

/

/

PARKING

/

/

/

133.50

134.00

/

/

/

/

/

133.00

133.00

133.50 134.00

136.50

136.00

/

REV DESCRIPTION

/

/

D

/

/

/

/

/

/

/

/

/

/

/ /

/

/ /

/

/

/

/

/

/

/

/

/

/ /

/

DATE DRN CKD

Sun Gates

/

U

/

U

/

/

/

/

/

/

/

/

/

/

/

/

/

/

SENIOR RUGBY

/

G

ASR

/

G

ASR

U

U

U

U

/

ASR

/

G

ASR U

G

/

ASR

G

ASR U

/

ASR

G

G

133.00

/

133.00

135.50

/

/

/

/

/

/

/

/

/

ASR

/

G 135.00

/

/

/

/

133.00

/

G

134.00

/

/

Ashburnham

ASR

/

133.50

/

/ /

/

135.00

/

/

/

/ /

/

133.00

/

/ /

/

/

133.00

/

/ /

/

/ / /

/ /

/ /

/ 136.00

/ /

/ /

/ /

ROAD

/

/

/ / /

/ /

135.50

/

/

/

/ /

/

/

/

/

/

/

/

/

/

/

/

/

/

ETRA

/

/

/

/

/

/

/

/

/

/

/

136.00

/

Beechcroft

/

/

/

/

/

/

/

/

MOUS

/

/

135.50

/

/

/

/

/

/

/

/

/

/

/

/ /

/

/

/

/

/

/

/ /

/ /

/

/ /

/

/ /

/

/

/

/

/

/

/

/

/

/

/

/

23

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/ /

/

1

/

/ /

/

/

/

/

/

/

/

/

/

/

/

/ /

/

/

14

36

6 16

8

/ /

/ /

/ /

/ / / /

/

/ / /

/ / /

ue

/ / /

/

BT

/ / /

/

BT BT

BT 134.42

BT BT

BT BT BT

/

BT BT

BT BT

/

/

BT BT

/ /

BT BT

/ /

BT BT

/

ntr

133.70

Na ig tta ht ge

/

/

Posts

Police Station

The Rectory

ry

e

Preliminary

SCALE

1:1250

DATE

December 2019

CHECKED

DPS

DWG NO.

3842-104

REVISION

B

SHEET SIZE

A1

DRAWN

AS

ains

ttage

STATUS

Capt

St

Cotta ge

m 131. 83

BM

Vie w rch

Cottage Allerton

Chu

Newbury

Churc Cott h Cott

London House

Lib ra

Allot Gdns

18

Co

/

OL HIL L Ch u Hou rch se

Existing Site constraints Roof Plan

133.83

Ce

Holly Co

AP LA Jaydee

Somerton

Cotswold View

Puffets

Sunnydale

1

Hill View

4

KE

MOUSETR

18

Old School House

BT

BT

1 to

Arran

Aven

/

BT

/

/

BT

/

Woodbine Cott Rose Cottage Juniper Cottage

/

/

La ns Ho down use e

BT

/

BT

/

BT

/

The

/

BT

/

BT

/

/

Stad Ston dle es

/

/

HO

/

/

SC

/

/

/

/

eri

/

/

/

/

/

134.10

/

/

Kimk

/

/

/

/

Place

/

/

/

/

Wen tnor

/

/

rfield

/

/

Coppe

/

/

Daymarth

/

/

/

rth

/

/

/

/

The Cotswold House

/

/

/

/

The Ga

/

/

/

/

Lyndale

/

/

/

/

Trev one or Co ttage

Man

133.50

/

/

Ivybank

/

/

/

/

s

/

/

/

Old Store

/

/

The Gables

/

/

/

Moore Health Centre

/

/

Springban k Villas

/

/

Sycamore House

use

/

/

/

/

Naight Villas

/

/

/

/

Fairview

/

/

Cotswold

/

/

/

/

e Ho

/

/

uth

Moor

LONG JUMP /

/

/

/

/

Strathspey

/

/

Cairngorm

/

/

Down House

/

/

ge

ra Ga

Yo

/

/

130.4m

DRAWING TITLE

/

Millstone

/

/

Wintertrees

/

/

134.60

134.22

The Cotswold School The Avenue Bourton on the Water

/

Greenstede

ttage

/

134.00

/

The New House

1

e Co

/

/

Wynchgate

/

Leadenwell House

/

Fosse View

/

/

Windrush View

/

LA

/

N

/

/

se

/

/

GR EE

/

/

1

Moor

/

Nurses Hou

/

Fosses ide

/

t

/

3

/

/

Sunnys ide

/

/

Ro w

/

/

1

/

/

Fo sse

/

/

Cour

6

The Nai

ght

FB

Garage

4 1

cott

/

3989

130.4m

1

Moore Cottage Hospital

Dray

/

FB

FB

/

The Mill House

Lansdo wn Villa

134.50

/

FB

FBs

field

Cott

/

Weir

Lansdown

Inn

/

FB

Barton Cott

Perry

/

ge

Little Gem

LB

4

Bourton-on-the-Water Primary School

Plum Tree Cott

/

The Mans e

/

/

CL

/

/

130.9m

Cott

15

22 46

/

Well

/

Dalmeny Cott

PROJECT TITLE

/

/

135.00

19

/ /

/ /

/ /

/

1.63m

BM 13

Brid

Weir

2

Chagford Mill Cott

132.2m

2392

1

Willowmead

20

18

2

rton

4

Bou

Peartree Cott

Jessamine

Fieldland House

ge

Malt Cottages

Robothams Architects The Old Library 12 Church Street Warwick CV34 4AB T 01926 493843 F 01926 495314 architects@robothams.co.uk www.robothams.co.uk

/

/

5

/

YR8 RUGBY

/ /

The Patch

/

28

d

135.50

/

/

/

/

/

/

/

/

/

/

/

/

/

134.00

Almond Place

El Sub Sta

Ambleside

Holt End Hol tC otta

MOORE

/

/

Newhouse Cheese Cott

Lansdown Cottages

Westmea

/

P LA NE

/

135.50

/

/

/ /

/

/

/

/

/

135.50

133.00

/

135.50

/

135.50

136.00

1

135.50

135.50

135.00

2

Raincote

135.50

134.50

The Dingle

48

A

/

135.50

/

The Cedars

134.00

54

Stonecroft

Holt End

/

133.50

Lyne Croft

132.50

/

CLOSE

Thorpe Arch

/

ilway

ed Ra

ntl Disma

135.50 135.50

/

/

136.00

135.00

/

Portchester

LANE

/

133.00

/

/

/

/

/

133.50

GREEN

/

/

/

/

133.50

3

/

/

133.00

ASR

G

The Bungalo w

/

/

/

42 9

/

SW ASR

133.00

134.50

134.00

Concept and Planning work to support other teams at the office


1 1

AVONFIELDS A high end residential development in the heart of Stratford-upon-Avon , the site for Avonfields is a stones throw away from the Grade I listed Holy Trinity Church. Site Location Plan

Existing Site photos

Existing Site photos

The project went through a very extensive preapplication process including a formal pre application. The proximity of the church along with other listed buildings made the proposed site quite sensitive. The geometry of site divided it into two parts which were treated as the North and the South Site. The development of the North site consisted of 4 three story houses which show the character of the typical townhouses of the conservation area of Stratford-upon-Avon. The south site showcase a more contemporary low bungalow style homes with geneour ous gardens with a feel of orchards which resonate with the original historic landscape of the site.]

Public green spaces around site

Historic photos of site

Proposed Site


8

Proposed building designed with golden section* proportions like many surrounding historic buildings

Proposed elevations following the Grid and rhythm like the original Avonfield (now Oldaker) and the Holy Trinity Church

*A golden section is a classical proportion used throughout history to create compositions that are pleasing to the eye. Examples of important buildings following these proportions include;The Greek Parthenon, Notredam, Taj Mahal and many more.

Proposed building roof form inspired by the geometrical corbelling of the terraces, and battlement of the Holy Trinity Church

Proposed building demonstrating the layers of defensive space commonly seen around the buildings of the Conservation area of Stratford-upon-Avon

Public consultation panels explaining the concept of the design of the North Site

Conceptual elevation development

Public consultation panels explaining materials and development pattern of the conservation area


Site Plan - Planning Application

Floor Plans - North Site


Floor Plans -North SIte

Floor Plans -South SIte




Plot Elevations



Bantam1920

Bantam1880

CHIPPING CAMPDEN

2.3 HERITAGE STATEMENT HISTORICAL MAPPING 1880 - 2014 - OBSERVATIONS:

The site for the project of Chipping Campden is the yard for a Grade II listed building on the high street of Chipping Campden. The geometry of the proposed site is quite narrow with adjoining buildings in very close proximity. These constraints made the design of the proposal to be sensitive in appearance but also in form and heirarchy. Unique design solutions to have minimum impact on the conservation area and the amenities of the adjacent buildings.

Bantam1970

A common observation of all the maps states that there has been a constant addition/reduction in the ancillary buildings to the main buildings over the years. The Map of 1880 shows development of ancillary/extension to the main house which stop at a boundary. Moving on From 1800s to 1923 ancillary buildings show up in 1923 on site on site, in a linear form along the west boundary. As seen in the historical image below taken in 1947, a long and narrow building along almost the entire back of the site is visible. These buildings were probably made using more temporary materials like tin, possibly as quick build sheds.

Ordinance Survey Map 1880

The layout strives to provide maximum natural light and amenity spaces for the proposed user of the dwellings. The project involved extensive study of the development patterns of the town and the study of the neighbourhood plan and local planning policies to have a proposal complaint and appropriate for the site.

Ordinance Survey Map 1923

STUDIO SPICER ARCHITECTS

Analysis of the historical maps identifies several observations that have contributed to the character and identity of the proposed site.

This shows that the proposed site has always been a functional yard to the main building at the front, facing the high street, being adopted and developed as required to suit the proprietors’ needs at any given time. The site has no significance as an open setting to the main building, evident © Landmark Ltd and use. Crown copyright 2014. FOR EDUCATIONAL USE ONLY. by Information the everGroup changing Residential development either side of the site between 0 1923 and 2010 is also noted.

Dec 17, 2014 15:19

Scale 1:1800 20

40

60

80

100

120

140

160

180

Jessica Tyler Birmingham City University

200 m

© Landmark Information Group Ltd and Crown copyright 2014. FOR EDUCATIONAL USE ONLY.

Scale 1:1800 0

DESIGN & ACCESS STATEMENT

Ordinance Survey Map 1975

NEW DWELLINGS TO THE REAR OF BANTAM TEA ROOMS 273_1_4.01_1963_AS

SIte Render and excerpt from the Design and Access Statement

20

40

60

80

100

Ordinance Survey Map 2010

120

140

160

180

5

Dec 17, 2014 15:21 200 m

Jessica Tyler Birmingham City University


Design Options for client


Floor Plans


Elevations


Notes:

closebo

loose

ard fenc

e (ht 1.

stone

75)

100.07 100.04

100.13

100.14 100.13

Health and Safety Information:

ard fenc e (ht 0.

95)

100.00

100.12

brick se

closebo

tts

PARKING

100.09

100.14 100.13

100.00

closeboard fence (ht 1.80)

100.12 flower (2)0.1 0Ø (ht 5.0)

100.00 99.97

closeboard

fence (ht 1.4

5)

bed 100.14

0.10Ø (ht 4.0)

100.08

0.30Ø (ht 11.0 )

100.06

flower

99.99

100.23 100.19 100.15

bed

rough

100.05

100.16 ground

0.20Ø trunk

100.05

100.07

100.05

Existing Timber shed to be removed

paving

100.05

Existing trees to be removed up paving 99.82 100.02 99.99 0.15Ø (ht 5.0)

99.85

0.75Ø (ht 10.0 )

LAWN

99.98 100.17 0.30Ø (ht 6.0)

99.79

grass

99.77

99.78 99.79 99.92 up

99.85

Existing timber shed to be removed

ilding

closeboard fence (ht 1.85)

99.92

brick bu

Residential Extensions The design of these resdential extension projects were essential to be quick and efficient. The clients were quite keen on the projects to be on budget and to be strated o n site fairly quickly. Both projects came with set of site and building constraints which required the knowledge of the building regulations, planning policies and detailed design.

tarmac 99.80

99.82 99.87

99.97 tl 100. 15

Proposed Patio, slabs to be confirmed by client laid on min 50mm sand/cement bedding

PATHWAY

99.96 paving

Proposed new metal security gate 1.85m high colour to be confirmed by client

99.95

99.87

up

99.93

loose

stone

99.97

99.97 paving

99.96

up

tl 100.

13

tarmac 99.99

99.99

rwp

New PVC rain water pipe connected into existing drainage system, colour to match existing

99.89 rwp

99.90

OVERL

AY CR

OSS

99.92

up 99.90 tl 100. 14

up

closeboard fence (ht 0.95)

closeboard fence (ht 1.80)

ic (TBM cl 100. ) 00 UTL

Existing driveway to be retained

99.97 tl 100. 13 99.93

STUDIO SPICER ARCHITECTS New manhole to connect to existing system, drainage flow assumed to be investigated on site

7 Mansell Street, Stratford-upon-Avon, Warwickshire, CV37 6NR Tel: 01789 293452 www.studiospicer.co.uk client

Emily Halderthay fs 0.89 sh 1.1 4

project

DRIVEWAY

99.84

rwp

99.85

99.87

closeboard fence (ht 0.90)

99.88

drawing title

lp

stw

99.71

Extension and Redevelopment Willowdale 192 Evesham Road, Stratford-upon-Avon CV37 9BS water

tarmac

99.70

ic cl 99.8 5 UTL

brick wall (ht 0.75)

rwp 99.81

EVESHAM ROAD

g 99.71

Proposed Site Plan 99.75

99.75

99.76

scale

1:50 @ A1

date

18.05.18

author

AS

CAD file

CAD format

382_Detailed.vwx

VectorWorks

project

drawing number


New window, please ref, elevations for measurements

New flue for the wood burning stove on ground floor

Notes:

Evesham Road

B

Notes:

New aluminium frame window in the existing opening frame colour to be New aluminium frame window in the confirmed by client existing opening frame colour to be confirmed by client New window, please ref, elevations for measurements New window, please ref, elevations for measurements

BEDROOM 4

B B

A A

New flue for the wood burning stove on ground floor New flue for the wood burning stove on ground floor

WARDR

MASTER BEDROOM

B B

Health a

Health a

WARDROBE

Finished floor levels to match the remaining house

Dismantle and remove existing single storey elements, allow for temporary props as required

Dismantle and remove existing single storey elements, allow for Dismantle remove existing temporaryand props as required single storey elements, allow for temporary props as required

Block up existing openings and plaster and skim to make good

Soil pipe routed in the floor zone to marked position. Pipe to be boxed PATHWAYout and insulated with minera wool Finished floor levels to match pipe routed in the floor zone for acoustic purposes Soil the remaining house to marked position. Pipe to be boxed

A A

Block up existing openings and plaster and skim to make good Block up existing openings and plaster and skim to make good

MASTER BEDROOM

BEDROOM 4

MASTER BEDROOM MASTER ENSUITE MASTER ENSUITE

Y CROS

for acoustic purposes

S

LAY CR

FAMILY BATH

OSS

Proposed RWP and drainage

LOBBY

Proposed RWP and drainage B and drainage Proposed RWP

B

B SNUG

DINING

SNUG

DINING

KITCHEN KITCHEN

LOBBY

SNUG

New dormer window

BEDROOM 2

BEDROOM 3

BEDROOM 2

BEDROOM 3

Services to be removed and capped off safely burner tobe removed and Services to capped off safely

Extractor fan over the be routed into the cieling opening on the North East elevation

OVER

LAY CR

OSS

OVER

LAY CR

New dormer window

N

Existing door to be removed and repositioned according to the Existing door to be removed new layout and repositioned according to the new layout

Dismantle and remove existing Extractor fan over the burner to single storey elements, allow forinto the cieling opening be routed Extractor fan over burner to on the North East the elevation temporary props as required be routed into the cieling opening

KITCHEN

LOBBY

Dismantle and remove existing single storey elements, allow for Dismantle remove existing temporaryand props as required single storey elements, allow for temporary props as required

on the North East elevation

DINING

FAMILY BATH

OVER

FAMILY BATH

B B

B

WARDROBE

Othe VEminera pipeinsulated routed inwith floor PATHWAYSoil RLAzone out and Ywool CROS to marked Pipe to be boxed S acousticposition. purposes PATHWAYfor out and insulated with minera woolOVERLA

Finished floor levels to match the remaining house

A

BEDROOM 4

OSS

BEDROOM 2

Key E Key

an n

New Soil pipe to be routed in floor zone New Soil pipe to be routed in floor zone

BEDROOM 3

ENTRANCE

Services to be removed Proposed and RWP and drainage capped off safely WC

LOBBY LOBBY

WC OVER

LAY C

ROSS

LOUNGE

OFFICE

UTILITY

LOUNGE

OFFICE

UTILITY

Existing door to be moved to suit the new layout Existing door to be moved to suit the new layout

B B

B B

FIRST FLOOR PLAN

Finished floor levels to match the remaining house Finished floor levels to match the remaining house

WC

OFFICE

UTILITY

Proposed new wood burning stove flue BEDROOM 5 BEDROOM 5

Contractor A to allow for new manhole A to pick up new Soil pipes

GROUND FLOOR PLAN Scale 1:50 GROUND FLOOR PLAN

Proposed new roof

Hot water cylinder to Mech. Eng spec waterrouted cylinder to in SoilHotpipe Mech. Eng spec

the floor zone to marked position. Pipe to be boxed out and insulated with mineral wool for acoustic purposes

Scale 1:50

EVESHAM ROAD EVESHAM ROAD

Specificat In general existing", t In general continuou existing", t continuou The contr property The contr finished/vi property agreed. finished/vi agreed. Survey dr informatio Survey confirmdr o informatio confirm All new o w by client. All new w by client.

Proposed new wood burning stove flue

Scale 1:50

Existing door to be moved to suit the new layout

Position for the new boiler and vent Position for the new boiler and vent

LOUNGE

A A A A

Scale 1:50

Proposed RWP and drainage DRIVEWAY DRIVEWAY

Specificat

FIRST FLOOR PLAN Scale 1:50FLOOR PLAN FIRST

Contractor to allow for new manhole to pick up new Soil pipes Contractor to allow for new manhole to pick up new Soil pipes Soil pipe routed in the floor zone to marked position. Pipe to be boxed Soil pipeinsulated routed inwith the mineral floor zone out and wool to Pipe to be boxed formarked acousticposition. purposes out and insulated with mineral wool for acoustic purposes

ENTRANCE LOBBY

N f

Proposed RWP and drainage

ENTRANCE

Proposed new roof

S S

B

client

Finished floor levels to match the remaining house

DRIVEWAY

Emily client

BEDROOM 6 BEDROOM 6

SHOWER ROOM SHOWER

Existing door to be repositioned according to the new layout Existing door to be repositioned

ROOM

according to the new layout

Emily

projec Propo Exten

projec

Willo Exten 192 E Willo Stratf 192 CV37E Stratf drawin CV37

BEDROOM 5

Prop drawin

Position for the new boiler and vent

Prop scale

1:100 scale

GROUND FLOOR PLAN Scale 1:50

Detailed Floor Plans

STUDIO SPICER STUDIO ARCHITECTS SPICER ARCHITECTS

Proposed Floor Plans Proposed Floor Plans

Building Building Control Control

A Hot water cylinder to Mech. Eng spec

1:100 CAD

382_D

SECOND FLOOR PLAN Scale 1:50 SECOND FLOOR PLAN

CAD

382_D projec

A A

Scale 1:50

EVESHAM ROAD

BEDROOM 6

Propo projec

382 382


Clay tiles to match existing Health and Safety Information:

New PPC aluminium window in existing opening, colour to be confirmed by client Mineral wool loft insulation 100mm between and 200mm over the joists. U-Value of 0.16 or better Clay tiles to match existing Health and Safety Information:

New aluminium window to match the cill and head height of exisitng window in master bedroom

New PPC aluminium window in existing opening, colour to be confirmed by client

Mineral wool loft insulation 100mm between and 200mm over the joists. U-Value of 0.16 or better

New aluminium window to match the cill and head height of exisitng window in master bedroom

New dormer window

22mm T&G chipboard on 225mm metal web joists, built into new walls with 100mm mineral wool fill

300mm render facing,cavity blockwork wall with 100mm full fill Knauff ditherm ultimate 32 mineral wool cavity wall insulation. U-Value 0.28 or better with plasterboard skim on dabs

New PPC aluminium window in existing opening, colour to be confirmed by client

300mm Brick facing,cavity blockwork wall with 100mm full fill Knauff ditherm ultimate 32 mineral wool cavity wall insulation. U-Value 0.28 or better with plasterboard skim on dabs, coursing to match existing

New dormer window

2300

300mm Brick facing,cavity blockwork wall with 100mm full fill Knauff ditherm ultimate 32 mineral wool cavity wall insulation. U-Value 0.28 or better with plasterboard skim on dabs, coursing to match existing

SECTION AA

600 min.

2300

2300

Existing floor and foundation

New aluminium sliding window, flush threshold with external levels

600 min.

22mm T&G chipboard on 225mm metal web joists, built into new walls with 100mm mineral wool fill

New aluminium sliding window, flush threshold with external levels

2300

New PPC aluminium window in existing opening, colour to be confirmed by client

PPC aluminium extractor fan duct grill, colour to match window frames

Scale 1:50

Existing floor and foundation

SECTION AA Scale 1:50

300mm render facing,cavity blockwork wall with 100mm full fill Knauff ditherm ultimate 32 mineral wool cavity wall insulation. U-Value 0.28 or better with plasterboard skim on dabs

PPC aluminium extractor fan duct grill, colour to match window frames

Extractor fan over hob, ducting to be routed in the cieling zone, installed according to the manufacturers instructions

Specification Note:

Prior to tender client to investigate foundation depth to be adequate to bear the load of the new first floor

The contractor shall satisfy themselves of such details by inv property and information available on site. Where the prod finished/visible item, "similar alternatives" will not be allowed agreed.

Extractor fan over hob, ducting to be routed in the cieling zone, installed according to the manufacturers instructions

Specification Note:

Prior to tender client to investigate foundation depth to be adequate to bear the load of the new first floor

The contractor shall satisfy themselves of such details by investigation of the property and information available on site. Where the product is a finished/visible item, "similar alternatives" will not be allowed unless expressly agreed.

In general, and specifically where items or details are noted as "to match existing", the design and specification of all products and finishes are to be continuous and identical to the existing dwelling specification.

In general, and specifically where items or details are noted existing", the design and specification of all products and fini continuous and identical to the existing dwelling specificatio

Survey drawings for the original dwelling have been provide information only and should not be relied upon for "as built confirm on site.

All new windows to be double glazed PPC aluminum, colo by client.

Survey drawings for the original dwelling have been provided for background information only and should not be relied upon for "as built" accuracy - please confirm on site.

Mineral wool loft insulation 100mm between and 200mm over the joists. U-Value of 0.16 or better

All new windows to be double glazed PPC aluminum, colour to be confirmed by client.

100mm FR5000 or similar approved between rafters and Celotex GD5040 52.5mm thick or similar approved insulated plasterboard under the rafters to achieve the U-Value of 0.18 or better

Nicholson AIRTRAK-AB1 roof ventilation system or similar approved to vent the roof

300mm render facing,cavity blockwork wall with 100mm full fill Knauff ditherm ultimate 32 mineral wool cavity wall insulation. U-Value 0.28 or better with plasterboard skim on dabs

22mm T&G chipboard on 225mm metal web joists, built into new walls with 100mm mineral wool fill 300mm render facing,cavity blockwork wall with 100mm full fill Knauff ditherm ultimate 32 mineral wool cavity wall insulation. U-Value 0.28 or better with plasterboard skim on dabs 300mm Brick facing,cavity blockwork wall with 100mm full fill Knauff ditherm ultimate 32 mineral wool cavity wall insulation. U-Value 0.28 or better with plasterboard skim on dabs,coursing to match existing

Existing roof tiles

Nicholson AIRTRAK-AB1 Codeventilation 5 Lead formed roof systemgutter or between the new wall and existing to roof valley similar approved vent the to lap under existing roof tiles roof

18mm WBP Plywood to support the gutter

STUDIO SPICER ARCH Existing roof tiles

7 Mansell Street, S Warw

Code 5 Lead formed gutter between the new wall and existing roof valley to lap under existing roof tiles Flush threshold with ACO brick slot drain

ww client

Finished floor level to be flush with rest of the building

Emily Halderthay

18mm WBP Plywood to support the gutter

STUDIO SPICER ARCHITECTS 7 Mansell Street, Stratford-upon-Avon, Warwickshire, CV37 6NR Existing roof system Tel: 01789 293452 www.studiospicer.co.uk

Existing floor and foundation

SECTION BB Scale 1:50

Detailed Building Sections

Finished floor level to be flush with rest of the building

Existing floor and foundation Existing roof system

DETAIL A

client

Scale 1:10

Emily Halderthay

project

Extension and Redevelopment Willowdale 192 Evesham Road, Stratford-upon-Avon CV37 9BS drawing title

Proposed Detailed Sections

project

scale

Extension and Redevelopment Willowdale 192 Evesham Road, Stratford-upon-Avon CV37 9BS

1:50 @ A1

CAD file

date

18.05.18

author

AS

CAD format


a1 Notes:

Do not measure from the drawings. All dimensions to b ordering and installation.

For any discrepancies in the drawings the contractor is t

All drawings to be read in conjuction with the NBS Spe Engineer's drawings

Aintree Road

Contractor to visit site to become aware of any site con

Health and Safety Information (L = latent risk C = construction phase risk)

EXISTING BEDROOM

EXISTING BEDROOM

Revision

New plaster to line through flush with existing New PVC window to match existing

A

27.03.18

AS

Updated accord

Rear wall to square with the side wall,coursing of the two new parallel walls to be different as the existing walls are not at right angles

New RWP to match existing rainwater goods connected into existing gutter of the lean to roof on the ground floor

a1 Notes:

Key X

Do not measure from the drawings. All dimensions to be confirmed prior to ordering and installation.

Blockwork Walls

EXISTING BATH

Studwork Walls

For any discrepancies in the drawings the contractor is to inform the Architect.

Existing Walls VANITY

WARDROBE

Proposed position of

All drawings to be read in conjuction with the NBS Specification and Structural EXISTING ENSUITE Engineer's drawings

Connect new wall to old using proprietary wall straters

Contractor to visit site to become aware of any site conditions.

In general, and specifically where items or details are existing", the design and specification of all products continuous and identical to the existing dwelling spe

New location of the soil pipe to be boxed out and to connect to the external downpipe within the floor zone

Assumed current location of the soil pipe

The contractor shall satisfy themselves of such detai property and information available on site. Where th finished/visible item, "similar alternatives" will not be agreed.

PROPOSED BEDROOM EXTENSION

Existing door to be reused in new opening to suit the new layout

Furniture and finishes to suit client choice

Survey drawings for the original dwelling have been information only and should not be relied upon for confirm on site.

2035

Existing door to be reused in new opening to suit the new layout

EXISTING BEDROOM

Specification Note:

All new windows to be double glazed PVC, to mat otherwise.

Health and Safety Information (L = latent risk C = construction phase risk)

AIRING CUPBOARD PROPOSED ENSUITE Finishes and fixtures to suit client choice, allow for fitting & fully tiling

Allow for relative patio paving to suit new layout with additional slabs to match exisitng as required, on 50mm sand/cement bedding on 150mm type 1 MOT

New double glazed, PVC window to match existing windows

New double glazed, PVC window to match existing windows

1135

1000

STUDIO SPICER A 7 Mansell

Revision A

27.03.18

AS

Connect new wall to old using proprietary wall straters

Layout of family room updated to suit client comment

New soil downpipe client

Andrew Urquhart

New Manhole chamber to meet ST requirements. New Foul pipe to existing manhole and tested prior to new constrcuton above.

New RWP & gulley to match existing rainwater goods connected into existing system

project

23 Aintree Road, SuA

a1 Notes: drawing title

Do not measure from drawings. All dimensions to be c Proposed firstthefloor plan ordering and installation.

PVC patio doors to match existing

For any discrepancies in the drawings the contractor is to scale date author

1:25@ to A1be read in conjuction 15.12.2017 All drawings with the NBSAS Specifi Engineer's drawings

Contractor to visit site to become aware of any site condi CAD file CAD fo

Proposed First Floor Plan Connect new wall to old using proprietary wall starters

EXISITNG LIVING ROOM

FAMILY ROOM

STUDIO SPICER ARCHITECTS

402_Technical_R1

Vector

project

BUILDING CONTROL

402

Health and Safety Information (L = latent risk C = construction phase risk)

2260

AR_

Copyright all m

Key Blockwork Walls Studwork Walls

Existing door to be reused in new opening to suit the new layout

Revision

Existing Walls

Allow for relaying patio paving to suit new layout with additional slabs to match exisitng as required, on 50mm sand/cement bedding on 150mm type 1 MOT

up Proposed position of new steel Specification Note:

New opening with lintel if required

PAVING

In general, and specifically where items or details are noted as "to match existing", the design and specification of all products and finishes are to be continuous and identical to the existing dwelling specification.

New opening with lintel if required

The contractor shall satisfy themselves of such details by investigation of the property and information available on site. Where the product is a finished/visible item, "similar alternatives" will not be allowed unless expressly agreed.

PASSAGE

Existing Paving

3385

Existing door to be reused in new opening to suit the new layout

Survey drawings for the original dwelling have been provided for background information only and should not be relied upon for "as built" accuracy - please confirm on site.

New door to match existing

All new windows to be double glazed PVC, to match exisitng unless specified otherwise.

PROPOSED STUDY

1360

Existing Timber Shed

PROPOSED KITCHEN

PROPOSED UTILITY

WC

PROPOSED DINING

New double glazed PVC a1 patio doors with window lights to match exisitng

Notes:

Do not measure from the drawings. All dimensions to be c ordering and installation. For any discrepancies in the drawings the contractor is to

All drawings to be read in conjuction with the NBS Specifi Engineer's drawings

Contractor to visit site to become aware of any site condi

STUDIO SPICER AR

7 Mansell St

Health and Safety Information (L = latent risk C = construction phase risk)

New double glazed, PVC window to match exsting window

1000

Andrew Urquhart

1135

project

STUDIO SPICER ARCHITECTS

First floor

STUDIO client SPICER ARCHITECTS

BUILDING CONTROL

First floor

Existing patio door refitted in new opening

1125

New RWP & gulley to match existing rainwater goods connected into existing system

Roof Plan

RWP from the new roof to discharge into the existing lean to roof gutter

New double glazed, PVC window to match exsting window

New window cill and head to align with existing

1360

7 Mansell Street, Stratford-upon-Avon, Warwickshire, CV37 6NR Tel: 01789 293452 www.studiospicer.co.uk

x

685

23 Aintree Road, SuA

New double glazed, PVC window to match exsting window

New window cill and head to align with existing

Connect new wall to old using proprietary wall straters

1125

1125

685 New double glazed, PVC window to match existing windows

Existing window to be rebricked, reusing the bricks from the poosition of the new external door. Brick coursing to match existing

client

Roof Plan scale

date

author

1:25@ A1

15.12.2017

AS

CAD file

CAD form

402_Technical

VectorW

project

402

Andrew Urquhart

AR

Copyright all mate

project

N

WestSuA Elevation 23 Aintree Road, Scale 1:50

Existing patio door to be reused in new opening to suit the new layout

drawing title

Revision

New double glazed, PVC window to match exsting window

Roof tiles to match existing

North Elevation Scale 1:50

Infill bricks to match existing bricks, coursing to match

Bricks to mat existing

drawing title

Proposed. Ground Floor Plan date

author

1:25@ A1

15.12.2017

AS

BUILDING CONTROL

project

CAD format

402_Technical _R1

VectorWorks 2035

600

drawing number

402

New double glazed, PVC window to match exsting window

AR_330_001_A

NORTH ELEVATION New PVC rainwater pipe to match existing New double glazed PVC patio doors to match exisitng

Copyright all material Studio Spicer Architecture Limited

First floor

3385 New door height to align with existing

1360

2260

WEST ELEVATION

Proposed Ground Floor Plan

CAD file

New window cill and head to align with existing

STUDIO SPICER ARCHITECTS

scale

New double glazed PVC patio doors with window lights to match exisitng

SOUTH ELEVATION

STUDIO SPICER AR

7 Mansell St

Floor Plans & Elevations

2035

East Elevation Scale 1:50

South Elevation Scale 1:50

client

Andrew Urquhart project

23 Aintree Road, SuA

drawing title

Elevations - Proposed

Elevations - Proposed

scale

date

author

1:50@A1

17.10.2017

AS

CAD file

CAD form

402_Proposed

VectorW


Do not measur ordering and in

Notes: Do not measure from the drawings. All dimensions to be confirmed prior to ordering and installation.

For any discrep

For any discrepancies in the drawings the contractor is to inform the Architect. All drawings to be read in conjuction with the NBS Specification and Structural Engineer's drawings

All drawings to Engineer's draw

Contractor to v

Contractor to visit site to become aware of any site conditions.

New roof ridge height to match existing

New roof ridge height to match existing Mineral wool loft insulation 100mm between and 200mm over the joists. U-Value of 0.16 or better

Concrete roof tiles to match existing Revision A

Revision A

2018.03.08

OS

2018

Piles and drainage detail added

PVC rainwater goods to match existing

Eaves detail to match existing

MDF skirting to match existing

Re-inforced Concrete Ground Beam, bridged with pre-stressed concrete lintols over drainage run. MDF skirting to match existing 22mm T&G chipboard on 225mm metal web joists, built into new walls with 100mm mineral wool fill

Detail Thru' Drain Run

In general, and specifically where items or details are noted as "to match existing", the design and specification of all products and finishes are to be continuous and identical to the existing dwelling specification. The contractor shall satisfy themselves of such details by investigation of the property and information available on site. Where the product is a finished/visible item, "similar alternatives" will not be allowed unless expressly agreed.

All new windows to be double glazed PVC, to match exisitng unless specified otherwise .

New RWP & gulley to match existing rainwater goods, connecting to the gutter on the existing lean to roof

New RWP & gulley to match existing rainwater goods, connecting to the gutter on the existing lean to roof

Specification N

In general, and s existing", the de continuous and

The contractor property and in finished/visible i agreed.

Survey drawing information onl confirm on site.

All new window otherwise .

75mm screed with150mm beam and block floor built into new walls

75mm screed with150mm beam and block floor built into new walls

New PVC patio doors to match existing

New PVC patio doors to match existing

Allow for relative patio paving to suit new layout with additional slabs to match exisitng as required, on 50mm sand/cement bedding on 150mm type 1 MOT

Allow for relative patio paving to suit new layout with additional slabs to match exisitng as required, on 50mm sand/cement bedding on 150mm type 1 MOT

150mm PIR celotex or similar U - Value of 0.12 or better

Line of exisitng manhole and foul route

1360

Flush threshold with ACO brick slot drain

Flush threshold with ACO brick slot drain

Min 150mm well compacted hardcore under B&B floor with min 175mm void

Specification Note:

Survey drawings for the original dwelling have been provided for background information only and should not be relied upon for "as built" accuracy - please confirm on site.

300mm cavity blockwork wall with 100mm full fill Knauf dritherm ultimate 32 mineral wool cavity wall insulation & facing bricks to match existing. Lined internally with plasterboard & skim on dabs U-Value to be 0.28 or better

Foundation depths TBC on site to LA satisfaction, assume 1.5m depth generally (based on previous foundation design requirements)

Detail Thru' Drain Run

22mm T&G chipboard on 225mm metal web joists, built into new walls with 100mm mineral wool fill

Re-inforced Concrete Ground Beam, bridged with pre-stressed concrete lintols over drainage run.

1360

exisitng manhole route

Health and Safe (L = latent risk

Health and Safety Information (L = latent risk C = construction phase risk)

150mm PIR celotex or similar U - Value of 0.12 or better Foundation depths TBC on site to LA satisfaction, assume 1.5m depth generally (based on previous foundation design requirements) Replace existing drainage under new extension Min 150mm well compacted hardcore under B&B floor with min 175mm void

Replace existing drainage under new extension Existing drainage run retained, and new manhole installed for access

Existing drainage run retained, and new manhole installed for access

STUDIO SPICER ARCHITECTS

7 Mansell Street, Stratford-upon-Avon , Warwickshire , CV37 6NR Tel: 01789 293452 www.studiospicer.co.uk

client

STU client

Andrew U

Andrew Urquhart project

Detailed Building Sections

project

23 Aintree Road, SuA

N

23 Aintree

drawing title drawing title

Proposed Section AA

Proposed


a1 Notes:

Do not measure from the drawings. Al ordering and installation.

Services Key

For any discrepancies in the drawings t Ceiling mounted 240V pendant light fitting, client to provide fitting - allow for wiring & fitting.

IP65

2

Light switch, 2 gang: White plastic, MK or similar, to match existing

3

Light switch, 3 gang: White plastic, MK or similar, to match existing

4

Light switch, 4 gang: White plastic, MK or similar, to match existing

SD sat1 2 S

TR RAD

All drawings to be read in conjuction w Engineer's drawings

Recessed low voltage downlighter IP65 rated for shower use. Manufacturer: JCC lighting Products or similar. Product Reference: JC3107 IP65 bathroom showerlight c/w transformer. Finish: Brushed Nickel Lamp: Dimensions: Diameter 84mm

Contractor to visit site to become awa

Health and Safety Information (L = latent risk C = construction phase

Modifire mains powered smoke & heat alarms with back up battery to BS 5446 part 1: when multiple units installed, all units to be interlinked

RAD

2

sat1

White plastic media Module Plate (4no.module euro plate) connected to existing TV system, location tbc: modules inc. 2*satallite, 1*TV & 1* radio. 13A Socket 2-gang, switched: White plastic, MK or similar, to match existing 110/240 Shaver socket outlet: White plastic, MK or similar, to match existing Towel rail; dual fuel with timer function (sized by heating engineer) Radiator (sized by heating engineer)

Boiler, existing moved to new location

Revision A

Location of HWT

27.03.18

AS

Hot water tank, existing moved to new location Extract Fan Bathroom: min. 15 litres/second Low voltage extractor fan and humidistat: Xpelair XIL 100, to be linked with bathroom lighting with min. 15min overrun, switch to be located above bathroom door.

Notes: Final locations for fittings to be confirmed with the Client and Architect on site. All lamps to be supplied with new LED bulbs.

EXISITNG LIVING ROOM

Specification Note:

FAMILY ROOM 2

In general, and specifically where item existing", the design and specification continuous and identical to the existi

RAD RAD

2

IP65

3

PAVING

IP65

IP65

3

The contractor shall satisfy themselve property and information available o finished/visible item, "similar alternativ agreed.

Survey drawings for the original dwe information only and should not be r confirm on site.

IP65

All new windows to be double glaze otherwise.

SD

PASSAGE

TR

IP65

IP65

IP65

IP65

IP65

IP65

IP65

IP65

RAD 2

2

IP65

TR

PROPOSED KITCHEN

2

IP65

PROPOSED DINING

IP65 2

IP65

2

PROPOSED UTILITY

WC IP65

IP65

2

PROPOSED STUDY

2

2 2

Utility layout to be confirmed by supplier; allow for socket & high level switched spur connections for 3nr. appliances, locations TBC

Kitchen layout to be confirmed by supplier; allow for socket & high level switched spur connections for 3nr. appliances, electric oven & extractor locations TBC

2

2 sat1

Allow for BWIC hob extract over

STUDIO SPI

x

client

Andrew Urquhart project

23 Aintree Road, SuA

Detailed M&E Plan drawing title

Proposed. Ground Floor M scale

date


HOCKLEY MILLS A residential led mixed use development in place of an old warehouse adjacent to the historic Jewellery Quarter. The proposed scheme is location right next to the Jewellery Quarter Railway station. The development consists of about 500 apartments (a mix of 1,2,3 bed apartments and a few penthouses) surrounded by five v courtyrads. A commercial unit of about 600sqm in addition to the a retail units and workshops and a new ticket counter for the Jewellery Quarter railway station. Historically the site consisted of a warehouse for the old hockley station. A viaduct which still exists on site is proposed to be used as a Gym/Leisure centre. An outline design for a hotel with about 42 rooms has also been proposed. The design of the scheme is goverened by the sloping topography of the Pitsford street. The elevational treatment takes precedents from the old warehouse architecture of the Hockley Shed. The materiality is inspired from the ones widely used in the jewellery quarter


3D View of the scheme from Pitsford Street


The existing site currently contains a storage shed for Mr.Tyre. Originally the site contained a warehouse shed for Hockley Station. The topography of the Pitsford street follows a very steep slope . The site is flanked by two lush green cemetries in the north and the south, namely Key Hill and Warstone (Brooksfield)Cemetry. The site is almost hidden due to the changing levels as it sits in the valley between the two cemetries.

SITE

Existing Street Elevations

The site is very close to the historical jewellery quarter which becomes a precedent for many features of the proposed design.

C. 1890

C. 1918

C. 1967

C. 1996


First Floor Plan

Typical Floor Plan

Street Elevations

Roof Plan


Proposed North and South Elevations


Proposed East Elevation

3D view looking into the commercial hub

Proposed West Elevation

Proposed Bay Elevations

3D view looking at the scheme from the railway platform


PEBBLE MILL STUDENT HOUSING A luxury student housing project has been proposed on Pershore Road near Pebble Mill Road, Birmingham. The proposed design is one of the multiple student housing projects with the branding of ‘Student Vita’ by Select properties. The project lies in a residential area and benefits from the close proximity of the Birmingham University which is about 15 mins walking distance. The site is surrounded by a dental hospital a community centre and is part of a flood alleviation scheme. The proposed building has very strict height restrictions. There are many A category trees that need to be presereved on site. The building follows many branding standards. These standards govern many things like the position of the windows, adding a courtyard to the design, etc. The landscaping of the scheme becomes a very mportant factor.


3D View of the scheme towards the entrance


The derelict

BBC’s

Social

Club, will be developed for wider mixed leisure and retail use

Diag showing proximity of the site to the university campuses

Natural constraints study

Manmade constraints study

Development opportunities study Massing options for the proposed scheme


Ground Floor Plan

Typical Floor Plan

Site sections in context with the surrounding buildings

Roof Plan


Proposed East and West Elevations


Proposed North Elevation

Proposed South Elevation

3D view showing the landscaped courtyard

Proposed Sections

3D view showing the landscaped entrance


Typical bay details for different facade materials

Detailed sections through the scheme



RSA ACADEMY (Extension Block) An extension to the existing RSA academy is proposed by sanwell council as an answer to the scarcity of schools for Key Stage 3 students. The new proposed structure could be an attached extension or a stand alone block. After the study of various options for the position of the extension a stand alone block is proposed in the north east part of the site. The new proposed building is meant to follow the same design principles of the existing building. The proposed building consists of 18 classroms, admin ofiices, a multipurpose hall and staff rooms. The classrooms are proposed to have moveable partitions to facilitate larger classrooms if required. The identified proposed site is on an existing football ground which is prposed to be moved and relandscped further north. Parking is to be used adjoining to the proposed site which is not completely utilised at presemt. The sports facilities on the RSA academy site are shared. Sustainable drainage in form of a swale and photovoltaic cells are proposed on the roof for sustainable energy production.


SITE Existing Site Panaromic View

Existing Site Photo

Conceptual plan for the new block

Various options for the position of the new extension to RSA Academy


Ground Floor Plan

First Floor Plan

Roof Plan

Proposed Sections


Proposed Elevations


RSA Academy -Door details

RSA Academy - Window details

RSA Academy - Sketches for consultants


RSA Academy - Development Photos


   

A

B

C

D

E

F

G

H

J

K

L

     

 



   

 

 

 



1

 

  













 



  

2

  



 

3





 



 

 



 

 



4



 





  



 







 













   



 



 





 











  



 



 

 







 



 



 

 

 

  

 















 





5















6





 













 

 

7  

 



8

 













 













 







9



 

 



 









 

  

 













10











 











 

 

 





 





 





      





 











RSA Academy - Reflected Cieling Plan


This drawing to be read in conjunction with all specifications and all other consultants design information. Any contradictions between this drawing and any other design information to be advised to the contract adminstrator and author immeadiately. The contractor to site measure, check and verify all information issued, and confirm the correctness of the contents prior to the commencement on site. The contractor to comply with all current statutory legislation, Building Regulations, British Standards, and good building practice. Do not scale from this drawing.

Revision Rev

description

date

dr by

ap by

NOTES: • • •

*

To be read in accordance with acousitc report To be read in accordance with GNA fire strategy plan drawing 1005 dB indicative acoustic ratings, shown to manufacturers detail. All acoustic ratings are subject to acousticians design & details

50dB Rw Folding partitions in accordance with acoustic report

Specification Key: W.1.007

W.1.008

W.1.009

W.1.010

Internal Metal Stud Partitions:

W.1.012

W.1.011

Type & Key colour

S.0.008

R.1.008

Staircase

Partition thickness (mm)

1.

22.3 m²

R.1.020

Toilet

R.1.010

R.1.009

23.2 m²

Classroom

Classroom

R.1.018

Classroom

2.

Classroom

Store

122

3.

18.4 m²

TW

R.1.017

Store

D.1.009

D.1.008

D.1.010

S.1.005

S.1.006

D.1.004

R.1.002

D.1.001

Circ.

W.1.005

S.1.004

D.1.006

D.1.007

S.1.003

D.1.005

14.1 m² D.1.003

S.1.002

R.1.005

Classroom R.1.007

R.1.006

*

60.1 m²

TW

Classroom 60.2 m²

D.1.002

S.1.001

S.1.009

D.1.015

S.1.008

R.1.012 Circ.

D.1.014

S.1.007

50dB

Severe

50dB

60

Severe

198

60

55dB

Severe

100

42dB

60

Severe

-3mm skim - 2x12.5mm plasterboard (WallBoard or similar approved) 48mm metal stud (Gypframe C stud or similar) - 2x12.5mm plasterboard (WallBoard or similar approved) - 3mm skim

W.1.014

32.4 m² 349.1 SF

60

138

6.

61dB

Severe

-3mm skim - 2x12.5mm plasterboard (SoundBloc or similar approved) - 70mm metal stud (Gypframe C stud or similar) witj 50mm Isover insulation - Resilient Bar (Gypframe RB1 Resiliemt Bar or similar) - 2x12.5mm plasterboard (SoundBloc or similar approved) - 3mm skim

D.1.016

60

200

7.

see acoustic report

Severe

- 3mm skim - 2x12.5mm plasterboard (SoundBloc or similar approved) 150mm full fill SFS 2x12.5mm plasterboard (SoundBloc or similar approved) - 3mm skim

R.1.003

R.1.014

30.0 m²

24.8 m²

60

200

8.

Toilet

Staff Room

*

D.1.017

1.3 m²

WC

4.4 m²

S.1.010

D.1.019

D.1.013

Severe

-3mm skim - 2x12.5mm plasterboard (SoundBloc or similar approved) 146mm metal stud (Gypframe C stud or similar) with 25mm Isover insulation - 2x12.5mm plasterboard (SoundBloc or similar approved) - 3mm skim

5.

40.6 m²

D.1.018

R.1.013 Store/Riser

R.1.004

60.3 m²

Classroom

R.1.001

Circ.

43.0 m²

D.1.012

W.1.013

Staircase

2.8 m²

D.1.011

60

198

4.

R.1.021

LIFT

45dB

-3mm skim - 2x12.5mm plasterboard (WallBoard or similar approved) 146mm metal stud (Gypframe C stud or similar) - 2x12.5mm plasterboard (WallBoard or similar approved) - 3mm skim

TW

TW

W.1.006

60

Duty Rating

-3mm skim - 2x12.5mm plasterboard (WallBoard or similar approved) 70mm metal stud (Gypframe C stud or similar) with 50mm Isover insulation - 2x12.5mm plasterboard (WallBoard or similar approved) - 3mm skim

60.4 m²

R.1.011

TW

122

Acoustics (Rw dB)

-2x12.5mm plasterboard (WallBoard or similar approved) - 70mm metal stud (Gypframe C stud or similar approved) - 2x12.5mm plasterboard (WallBoard or similar approved) - 3mm skim

R.1.019 60.4 m²

60.5 m²

60.4 m²

Fire resistance (mins)

see acoustic report

Severe

- 3mm skim - 2x12.5mm plasterboard (SoundBloc or similar approved) 150mm full fill SFS 2x12.5mm plasterboard (SoundBloc or similar approved) - 3mm skim

R.1.016

Classroom

R.1.015

W.0.001

TW

Mobile Board

TW

60.3 m²

Classroom

client:

60.4 m²

TW

project:

RSA Academy Tipton

W.1.004

W.1.003

W.1.002

W.1.001

W.1.016

W.1.015

title:

First floor wall types

date: drawn by:

19.07.16 RS

scale:

status:

1 : 100

Tender

dwg ref:

checked by: AA

16005-GNA-XX-01-DR-A-1009

rev :

/

c

the drawing, design and the building works depicted are the copyright of Glancy Nicholls Architects Ltd & may not be reproduced or amended, except by the written permission by Glancy Nicholls Architects Ltd. No liability will be accepted for any amendments made by other persons. The issue of this drawing/document does not confer any license for use of the design to any party whatsoever save as expressly agreed by Glancy Nicholls Architects Ltd.

Glancy Nicholls Architects The Engine Room, 2 Newhall Square, Birmingham, B3 1RU

0121 456 7474

26-27 Bedford Square, London. WC1B 3HP

0203 727 5252

registration No: 5141809

architects@glancynicholls.com

RSA Academy - Wall type Plan


RSA Academy - Landscape Strategy Plan


Toilet details for Pines Special School


Detailed drawings for Faraday and Hartley School


Toilet details for Pines Special School


1. Making the most of the site

3. Opening the iste upto the exisiting landscape

Lancaster Circus (Feasibility Study)

NORTHERN SITE SOUTHERN SITE

2. Linking pedestrain movement and creating an internal heart

4. Creating views whilst avoiding overlooking

This project is a feasibility study for a residential led mixed use development on two sites in Birmingham. Various studies and opportunities have been looked at taking advantage of the sun poisiton the existing greens around the site and utislising the full scope of the site. The proposed development can house c. 380 apartments in the southern site and c.220 apartments in the northern site along with amenities and retail space on the ground floor.

Aerial view showing the site

Ground Floor Plan

Various studies carried out to study the site potential

Potential arrangement of the structure on site

Typical Floor Plan


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.