Proj ec t B o o k let
Allison Fernandez Spring 2021 ADE 522 ADE 556
1
CONTENTS
A DE 522
2
Site ...................................................
4-5
Program .........................................
6-7
Floorplans .....................................
8-11
Sections .........................................
12-15
Render ............................................
16
AT E 5 5 6 Axon ...................................................
17
Framing .............................................
18-19
Egress .................................................
20-21
HVAC .................................................
22-23
Iterations ............................................
24-25
3
SEFAIRA SITE
Allison Fernandez
Site Location: ASU Tempe Campus Approx. 8 Miles from Weather station
4
Hayden Mall
Cady Mall
Forest Mall
Hayden Library
83
'1 '1
'1
'1
'1
'1
'1 '1
83
MU
Pkwy 5
PROGRAM
6
DN
DN
DN
UP
Offices Classrooms Conference Rooms UP
DN
Flex Space DN
UP
Testing Center / Computer Lab DN
Study Rooms
UP
UP
DN DN
DN
DN
DN
DN
DN DN
UP
7
UP UP
FLOOR PLANS DN
UP
Level 1
Total Occupancy Load: 556
UP
DN DN
Occupanies: A-3 Exterior/Computer Lab/Group Study: 7730 Load Factor: 15 Occupancy Load: 515 DN
DN
B Study Rooms: 4160 SF Total Load Factor: 100 gross Occupancy Load: 41
DN
DN
DN DN
Women’s
Men’s
UP
0’
8
10’
50’
Level 2
Total Occupancy Load: 670
UP
Occupanies: A-3 Lecture Halls (1) 100 Seats (1) 80 Seats (8) 30 Seats Exterior Patio: 3760 SF Load Factor: 15 Occupancy Load: 250
DN
UP UP
DN
UP
Women’s
Men’s
0’
10’
50’
UP
DN DN
DN
DN
DN
DN
9
FLOOR PLANS DN
DN
Level 3
UP
Total Occupancy Load: 381 Occupanies: A-3 Open/Shared Office Space: 5305 SF Total Load Factor: 15 Occupancy Load: 353 B Conference Rooms: 2810 SF Total Load Factor: 100 Gross Occupancy Load: 28
Open/Shared Office Space
Women’s UP
Men’s
DN
0’
10
10’
50’
Level 4
Total Occupancy Load: 195
Reception
Occupanies: A-3 Group Testing: 1457 SF Load Factor: 15 Occupancy Load: 97
DN
B Single Offices: 87 Individual Testing Rooms: 10 Occupancy Load: 97
DN
Women’s
S-2 Storage: 300 SF Load Factor: 300 gross Occupancy: 1
Men’s
0’ DN
10’
50’
UP
11
S E C T I O N D E TA I L
0’ 1’
12
5’
15’
13
S E C T I O N D E TA I L
0’ 1’
14
5’
15’
S
N
15
16
Roof Drainage
Flat Plate Slab Structure Curtain Wall System Atrium
17
FRAMING
1
2 DN
3
DN
4
5
Level 4
40’ A
B
C
D
E
Level 3
F
G
40’
H
30’ 1 DN
UP
30’ 2
3
4
UP
DN
5
18 A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
1
2 UP
DN
3
DN
UP
4
5
Level 2
A
B
C
D
E
F
G
H
Level 1 1 UP
DN DN
2
DN
DN
3 DN
DN
4
DN DN
UP
5
A
B
C
D
E
F
G
H
19
DN
EGRESS DN
Level 4
DN
UP
DN
DN
UP
Level 4
Level 3
DN
20
UP
DN
0’
10’
50’
DN
UP
DN
UP UP
DN
UP
DN
Level 2
UP
DN
UP
DN DN
UP
DN
UP UP
DN
DN
DN
DN
DN
UP
DN DN
UP
UP
DN
Level 2
Level 1
0’
10’
50’
UP
DN DN
DN
DN
DN
DN
21
H VAC
Level 4
22
Level 3
0’
10’
50’
DN
DN
DN
DN
Level 2
Level 1
0’
10’
50’
23
I T E R AT I O N S
h facade only in an attempt to minimize excessive light t increased significantly
24
Iteration 2 • Reintroduced South facade windows • Added shade structure over center atrium • Underlit still too high
Iteration 3 • Changed shade structure to primarily shade from south exposure, opens to Northern light • Added more windows along both North and South facades • Added horizontal 8ft overhangs along each level for shade and in attempt to reduce wall conduction • Daylighting improved significantly
Exercise 4 Reassembly
15’
30’
15’
ATE 556 Allison Fernandez
Section 2 4’
Section 2
14’
88’
4’
14’
4’
14’
Section 1
70’
4’
14’
4’
52’
12’ 2’
25