Work samples 2018_Facade

Page 1

YU LIU

[WORK SAMPLES] E-MAIL: louisyuliu321@gmail.com TEL: +1 213 880 6403

CONTENT: [Facade detailing + panelization] 1. Keruen II office tower 2. Lakhta Center ETFE roof and sphare glazing 4.Confidential Museum [Facade + BIM] 3. International airport 5.Office building [Architectural design] 6.Museum competition in China [BIM structural modelling] 8.W-14 Lurxary residential building [Academic work] 7.Senior apartment 9.Hotel design 10.Facade opitmization 11.Facade fabrication


[Project 1. KERUEN II OFFICE TOWER & SHOPPING MALL]

Yu (Louis) Liu

+1 213-880-6403 (USA) louisyuliu321@gmail.com

Work at Werner Sobek New York.PC 2015.07 - 2016.01 Scope of work: Facade design, Facade detailing, CAD drawings Collaborate with: Marco Baur,

This project located in Astana, Kazakhstan. Collborating with Foster&Partners, we worked on external skin systems as facade consultent and finish the SD and DD phase. The whole project includes glazing facades, metal clading facades, skylight systems and canopy.

Overview of External skin system

Flat metal faced panel wall cladding system Aluminium Hanger and connector details

Typical glazing wall system Sky lobby glazing wall system Garden Lobby Storefront glass wall system Upper level Storefront glass wall system Lower level Glazing wall system at Lift core

East elevation Garden lobby glazing facade

South elevation Metal cladding

Glazing & Elevator facade

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE CONTRACTOR POST APPOINTMENT

12 MM TEMPERED 1.52 SGP INTERLAYER

Sizing and spacing of secondary elements connecting the cladding and the primary structure are designed for aluminum panels. In case Stainless Steel is selected as cladding material, secondary elements as shown in WS drawings are invalid and FC has to recalculate the secondary elements.

Maximum panel height 6000mm Maximum panel width 2000mm

133.7

Revised 16/04/01

Revised 16/04/01

BY FACADE CONTRACTOR POST

Horizontal connection at 3m center (carbon steel)

WATERPROOF MEMBRANE

Architect

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE CONTRACTOR POST APPOINTMENT

Sizing and spacing of secondary elements connecting the cladding and the primary structure are designed for aluminum panels. In case Stainless Steel is selected as cladding material, secondary elements as shown in WS drawings are invalid and FC has to recalculate the secondary elements.

Maximum panel height 6000mm Maximum panel width 2000mm TYPICAL DRAWINGS TO BE CONFIRMED

Revised 16/04/01

Revised 16/04/01

VAPOR CONTROL LAYER

Detail 2 F104.5

APPOINTMENT Horizontal connection at 3m center (carbon steel)

Architect

Architect

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE CONTRACTOR POST APPOINTMENT

Structural, Environmental & MEP Engineering

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

92.0

1100 (wind load above 2.5kPa)

Collaborating Architect

Metal cladding

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Metal cladding

Structural, Environmental & MEP Engineering

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Supporting bracket

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE CONTRACTOR POST APPOINTMENT

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Structural, Environmental & MEP Engineering

Intermediate channel (Aluminum)

Column

Back of mullion

Revised 16/04/01

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Intermediate channel (Aluminum)

Revised 16/04/01

Collaborating Architect

KIKLOP DESIGN & ENGINEERING

Typical office tower Architect

Supporting bracket

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

100

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

Collaborating Architect

100

100

Architect

Aluminum transom with steel reinforcement

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Raised floor Ceramic frit

100

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

Structural, Environmental & MEP Engineering

Fire resistant silicon Structural, Environmental & MEP Engineering

STRUCTURAL SILICONE

CERAMIC FRIT

Revised 16/04/01

18.0

STAINLESS STEEL PLATE

12.0 3.0

FINAL TENDER SUBMITTAL Revision

STAINLESS STEEL

10.0

INSULATION

03/24/2016 Date

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

BOTH CONNECTION REQUIRED IN THIS LOCATION

Enclosure Consultant

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul

Client

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

14MM ARGON 90% CAVITY 12MM TEMPERED

Indicative trace heating position

Column

by others Cladding joints

Garden lobby Aluminum Transom with steel reinforcement

80.0

Design Development

6+6 MM HEAT STRENGTHENED LAMINATED WARM EDGE SPACER

14MM ARGON 90% CAVITY

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

All the connections to primary steel must be welded connections

End channel (Aluminum to match in finish)

Center line of channels

Collaborating Architect

Vertical plate to transfer top panel dead load to roof primary steel in case of bottom panel failure

37.0

STRUCTURAL SILICONE

Waterproofing

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

80.0

12.0

Metal cladding

Revised 16/04/01

All the connections to primary steel must be welded connections

Fireproof board

1

Slab edge

TYPICAL VERTICAL SECTION SCALE: 1:50

Vapor barrier

EWS 101 West Glazing/Garden Lobby Horizontal Detail Date

Drawn

TYPICAL HORIZONTAL SECTION AT WEST GLAZING/GARDEN LOBBY BOTTOM PANEL SCALE: 1:2

Scale

Sheet number:

370 MBA/LL

Approved Sheet size

Enclosure Consultant

6+6 MM HEAT STRENGTHENED LAMINATED 14MM ARGON 90% CAVITY 12MM TEMPERED 14MM ARGON 90% CAVITY 15MM TEMPERED PANE

Revised 16/04/01

Client

Revised 16/04/01

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

F-301.2

Project

FINAL TENDER SUBMITTAL Revision

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE CONTRACTOR POST APPOINTMENT

03/24/2016 Date

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

1

Architect

Enclosure Consultant

Client

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE CONTRACTOR POST Structural, Environmental & MEP Engineering APPOINTMENT

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE CONTRACTOR POST APPOINTMENT

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

Revised 16/02/26

Collaborating Architect

Project-No.

Detail 1

800 (wind load below1.5kPa) 1100 (wind load above 1.5kPa

F101.5

REQUIRED DISTANCE FOR VERTICAL MOVEMENT TO BE CONFIRMED

20.0

Detail 1

800 (wind load below1.5kPa) 1100 (wind load above 1.5kPa

F101.5

Corner glass fin plan

Approved Sheet size Scale

VERTICAL SLOT TO ACCOMMODATE CONST. TOLERANCES VERTICAL SLOTAND STRUCTURAL MOVEMENT TO ACCOMMODATE CONST. Connection transfers lateral forces TOLERANCES AND STRUCTURAL only MOVEMENT Connection transfers lateral forces only

95.0

Detail 2

800 (wind load below1.5kPa) 1550 (wind load above 2.5kPa

20.0

F101.4

800 (wind load below1.5kPa) 1100 (wind load 800 above 2.5kPa ) (wind load below1.5kPa) 1100 (wind load above 2.5kPa )

Detail 2 F101.4

STAINLESS STEEL PROFILE BONDED TO GLASS PANEL

95.0

95.0

Hanger

SECTION OF BASE TRANSOM AT SPANDRAL, OFFICE TOWER SCALE: 1:2

Keruen 2 Astana

Reproduction of these drawings, specifications, related documents and designs in whole or in part is Project strictly forbidden without the prior written permission of Werner Sobek.

EWS 104

Title Enclosure Consultant 04/01/2016

Werner Sobek New York P.C.

2

SECTION OF HEAD TRANSOM AT CONNECTOR, OFFICE TOWER SCALE: 1:2

2

SECTION OF HEAD TRANSOM AT CONNECTOR, OFFICE TOWER SCALE: 1:2

SP

375 Hudson Street

Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

FA-OT-129-EWS104-02

2

SECTION OF HEAD TRANSOM AT SPANDRAL, OFFICE TOWER SCALE: 1:2 F-104.2

2

SECTION OF HEAD TRANSOM AT SPANDRAL, OFFICE TOWER SCALE: 1:2

Date

Sheet number: EWS 104 Typical Glazing /Office Tower

Project-No. Drawn Approved

SP

Sheet size

DIN A3

Scale

Scale

AS SHOWN

FA-OT-129-EWS104-02

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Architect

100.0

STAINLESS STEEL PLATE

DIN A3 AS SHOWN

FINAL TENDER SUBMITTAL Revision

Index

04/01/2016

03/24/2016 Date

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

SP

F104.6

Design Development

DIN A3

Index

Revised 16/04/01

Werner Sobek Istanbul Mimarlık Mühendislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Caddesi No:3 Kat: 25 Ofis No: 174 34381 Bomonti- Şişli / Istanbul

FINAL TENDER SUBMITTAL Revision

Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

Revised 16/04/01

Client

03/24/2016 Date

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

Design Development

Back of mullion Werner Sobek Istanbul Mimarlık Mühendislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Caddesi No:3 Kat: 25 Ofis No: 174 34381 Bomonti- Şişli / Istanbul

1

CLADDING ELEVATION OF COLUMN SCALE: 1:50

2

EWS 301 Cladding of column,glazing interface

HORIZONTAL SECTION OF COLUMN CLADDING, GLAZING INTERFACE SCALE: 1:20

Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

Date

04/01/2016

Project-No.

Client

370

Approved

SP DIN A3

Scale

AS SHOWN

Fire resistant silicon

Project

Keruen 2 Astana FA-OT-129-EWS301-03

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Ceramic frit 6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

MBA/LL

Drawn

Sheet number:

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Architect

Aluminum transom with steel reinforcement Raised floor

F-301.3

Structural, Environmental & MEP Engineering

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Index

Title

F-301.4

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

1

CLADDING ELEVATION OF HANGER SCALE: 1:50

2

HORIZONTAL SECTION OF HANGER CLADDING SCALE: 1:10

Collaborating Architect

EWS 301 Cladding of hanger

Date

04/01/2016

Project-No.

Fire resistant silicon

370

Drawn

MBA/LL

Approved

SP DIN A3

Sheet size

Fire proofed and smoke sealed. Scale Fire/smoke separation and intended slab appearance to be coordinated with F+P, arch. design intent. Sheet number:

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADEFINAL TENDER SUBMITTAL 03/24/2016 Revision POST Date CONTRACTOR APPOINTMENT Reproduction of these drawings, specifications, related documents and designs in whole or in part is 6+6 MM HEAT STRENGTHENED LAMINATED

6+6 MM HEAT STRENGTHENED LAMINATED

6+6 MM HEAT STRENGTHENED LAMINATED

14MM ARGON 90% CAVITY

Architect ARGON 90% CAVITY 14MM

12MM TEMPERED

12MM TEMPERED

14MM ARGON 90% CAVITY

14MM ARGON 90% CAVITY

14MM ARGON 90% CAVITY

15MM TEMPERED PANE

15MM TEMPERED PANE

15MM TEMPERED PANE

Enclosure Consultant

Project

Keruen 2 Astana

Title

Title

20.0

20.0

20.0

20.0

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

F-104.1

04/01/2016

Project-No.

370

Sheet size Scale

AS SHOWN

FA-OT-129-EWS104-01

Project-No.

Approved

SP DIN A3

Scale

TYPICAL MULLION, OFFICE FLOORS (EXCEPT EXECUTIVE TYPICAL MULLION, FLOORS,OFFICE WIND LOAD FLOORS BELOW (EXCEPT 2kpa)EXECUTIVE TYPICAL FLOORS, MULLION, WINDOFFICE LOAD BELOW FLOORS 2kpa) (EXCEPT EXECUTIVE TYPICAL MULLION, FLOORS,OFFICE WIND LOAD FLOORS ABOVE (EXCEPT 2kpa) EXECUTIVE FLOORS, WIND LOAD ABOVE 2kpa) SCALE: 1:2 SCALE: 1:2 SCALE: 1:2 SCALE: 1:2 Sheet number:

Date

Drawn

MBA/LL

Approved

2

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

Date

Sheet size

2

Back of mullion

Index

Sheet number:

FA-OT-129-EWS104-01

Archi

Aluminum transom with steel reinforcement

EWS 104 Typical Glazing /Office Tower

Collaborating Architect

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

Drawn

1

TYPICAL VERTICAL SECTION SCALE: 1:50

F-104.1

EWS 104 Typical Glazing /Office Tower

KIKLOP DESIGN & ENGINEERING

03/24/2016 Date

1

1

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

Structural, Environmental & MEP Engineering

15MM TEMPERED PANE

Keruen 2 Astana

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly the prior written permission of Werner Sobek. FINAL forbidden TENDER without SUBMITTAL 03/24/2016 Revision Date

Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Client

14MM ARGON 90% CAVITY

Project

Index

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul

Architect ARGON 90% CAVITY 14MM

12MM TEMPERED

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

Structural, Environmental & MEP Engineering

AS SHOWN

FA-OT-129-EWS301-04

strictly forbidden without the prior written permission of Werner Sobek.

Design Development

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Mineral wool insulation

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADEFINAL TENDER SUBMITTAL 03/24/2016 Revision POST Date CONTRACTOR APPOINTMENT Reproduction of these drawings, specifications, related documents and designs in whole or in part is

6+6 MM HEAT STRENGTHENED LAMINATED

Design Development Enclosure Consultant

14MM ARGON 90% CAVITY 12MM TEMPERED

04/01/2016 370 MBA/LL SP

Raised floor

DIN A3 AS SHOWN

Ceramic frit

Index

FINAL TENDER SUBMITTAL Revision

Ceramic frit

CONCRETE TBC BY OTHERS

130.0

CONCRETE TBC BY OTHERS

VAPOR CONTROL LAYER

WATERPROOF MEMBRANE

Client

STRUCTURAL SILICONE SEALING

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

STRUCTURAL SILICONE SEALING

10.0

WARM EDGE SPACER

WARM EDGE SPACER

EPDM

Project Title

Keruen F-101.42 Astana

EPDM

6+6 MM HEAT STRENGTHENED LAMINATED

6+6 MM HEAT STRENGTHENED LAMINATED

14MM ARGON 90% CAVITY

14MM ARGON 90% CAVITY

EWS 101 North, South, East and West Glazing/Garden Lobby Vertical Section

Title

F-101.4

Date

04/01/2016

EWS 101 Project-No. North, South, East and West Glazing/Garden Lobby Vertical Section370 Drawn Date Approved Project-No. Sheet size Drawn Scale Approved

3 3

TYPICAL BASE SECTION SCALE: 1:5 TYPICAL BASE SECTION SCALE: 1:5

Garden lobby glazing section

Sheet size Scale

12MM TEMPERED

12MM TEMPERED

14MM ARGON 90% CAVITY

14MM ARGON 90% CAVITY

15MM TEMPERED PANE

MBA/LL 04/01/2016 SP

10.0 STRUCTURAL SILICONE SEALING

6+6 MM HEAT STRENGTHENED LAMINATED 14MM ARGON 90% CAVITY 12MM TEMPERED 14MM ARGON 90% CAVITY

CERAMIC FRIT

CERAMIC FRIT

MAX. 1300 TO NEXT GLASS FIN

10.0

STRUCTURAL SILICONE SEALING

22.0 6+6 MM HEAT STRENGTHENED LAMINATED 14MM ARGON 90% CAVITY 12MM TEMPERED 14MM ARGON 90% CAVITY

15MM TEMPERED PANE

15MM TEMPERED PANE

CERAMIC FRIT

DIN370 A3

10.0

MAX. 1300 TO NEXT GLASS FIN

40

15MM TEMPERED PANE

22.0 CERAMIC FRIT MAX. 1300 TO NEXT GLASS FIN

FINAL TENDER SUBMITTAL Revision

03/24/2016 Date

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

Design Development Enclosure Consultant

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul

Client

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

22.0

Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

Project

Keruen 2 Astana

40

Title

F-104.4

SP DIN A3 AS SHOWN

FA-OT-129-EWS101-04

Index

Sheet number:

FA-OT-129-EWS101-04

Index

Drawn

Sheet size

1

1

2

TYPICAL CORNER HORIZONTAL SECTION OPTION TYPICAL 1 CORNER HORIZONTAL SECTION OPTION 1 SCALE: 1:2 SCALE: 1:2

2

Scale

TYPICAL CORNER HORIZONTAL SECTION OPTION TYPICAL 2 CORNER HORIZONTAL SECTION OPTION 2 SCALE: 1:2 SCALE: 1:2 Sheet number:

Center line of edge beam

FA-OT-129-EWS104-04

Client

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

Colla

Keruen 2 Astana Title

F-104.6

04/01/2016

EWS 104 Typical vertical section detail at spandrel

Vertical hanger

Date

370

Project-No.

MBA/LL

Drawn Approved

SP DIN A3

Sheet size Scale

AS SHOWN

Index

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul

Project

Fire proofed and smoke sealed

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

Title

EWS 104 Typical corner horizontal section

Date

Project-No.

Approved

Office floor stick system facade & Elevator facade

03/24/2016 Date

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

Client

Project

Keruen 2 Astana F-104.4

EWS 104 Typical corner horizontal section

22.0 MAX. 1300 TO NEXT GLASS FIN

MBA/LL AS SHOWN

Sheet number:

FINAL TENDER SUBMITTAL Revision

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

Design Development Enclosure Consultant

Enclosure Consultant

required insulation thickness of 50mm required Metal cladding around connector element. Trace heating by others Center line of hanger plates 1.7% Connector element

New York, NY 10014. Werner Sobek New York P.C. Tel:Spring +1.212.229.6000 138 Street 2nd Floor Fax:+1.212.229.6418 New York, NY 10012 www.turnerconstruction.com

Client Project

Keruen 2 Astana

MAX. 1300 TO NEXT GLASS FIN

130.0 250.0

Struc

Design Development

Fire resistant silicon

MAX. 1300 TO NEXT GLASS FIN

F101.4

I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul Werner Sobek New York P.C. 138 Spring Street 2nd Floor Werner Sobek Istanbul New York, NY 10012 Mim arlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli Istanbul 375 Hudson/ Street

Enclosure Consultant

03/24/2016 Date

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

strictly forbidden without the prior written permission of Werner Sobek. Werner Sobek Istanbul Enclosure Consultant Mim arlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti.

Design Development

MAX. 1300 TO NEXT GLASS FIN

F101.4

Detail 3

SETTING BLOCK (FOR HEAVY UNITS) WATERPROOF MEMBRANE

MAX. 1300 TO NEXT GLASS FIN

Detail 3

SETTING BLOCK (FOR HEAVY UNITS)

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

Metal panel

Non combustible rockwool

Detail 2 F104.5

FINAL TENDER SUBMITTAL Revision

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE CONTRACTOR POST APPOINTMENT

Detail 2

370 MBA/LL

AS SHOWN

Sheet size

Collaborating Architect

1 1

FA-OT-129-EWS104-03

Design Development Reproduction of these drawings, specifications, related documents and designs in whole or in part is

VAPOR CONTROL LAYER

250.0

Garden lobby

Slab edge

Collaborating Architect Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

50.0

TRENCH HEATING TBC BY OTHERS 800 (wind load below1.5kPa) 1550 (wind load above 2.5kPa

FA-OT-129-EWS104-05

All the connections to primary steel must be welded connections

Fireproof board

Slab edge

Structural, Environmental & MEP Engineering

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Collaborating Architect

50.0

800 (wind load below1.5kPa) 1550 (wind load above 2.5kPa

TYPICAL VERTICAL SECTION SCALE: 1:50 TYPICAL VERTICAL SECTION SCALE: 1:50

Sheet number:

Vapor barrier

SP

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Structural, Environmental & MEP Engineering

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

Scale

TYPICAL VERTICAL SECTION AT CONNECTOR OF HANGER SCALE: 1:10

370 MBA/LL

Architect

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

& ENGINEERING

SILICONE

SILICONE

Sheet size

2

Title

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE CONTRACTOR POST APPOINTMENT

strictly forbidden without the prior written permission of Werner Sobek.

TRENCH HEATING TBC BY OTHERS

Approved

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

Enclosure Consultant

Client

GLASS FiIN BOTTOM SUPPORTED

Drawn

Intermediate channel KIKLOP (Aluminum)

Lines indicate welded bolt on the primary structure

Keruen 2 Astana TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE CONTRACTOR POST APPOINTMENT

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP Collaborating Architect DESIGN

Project-No.

Indicative trace heating position by others

Enclosure Consultant

Sheet number:

Index

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Structural, Environmental & MEP Engineering

Date

Collaborating Architect

100

All the connections to primary steel must be welded connections

Project

Architect

EWS 104 Typical Glazing/Office Tower

04/01/2016

Revised 16/04/01

SILICONE

GLASS FiIN BOTTOM SUPPORTED

FA-OT-129-EWS104-03

Date

370 MBA/LL

Approved Sheet size

Connection transfers CERAMIC FRIT lateral forces only

STAINLESS STEEL PLATE

Sheet size Scale

F-104.3

04/01/2016

Project-No. Drawn

F-104.5

Title

EWS 104 Typical Glazing /Office Tower

TO ACCOMMODATE CONST. TOLERANCES VERTICAL SLOTAND STRUCTURAL MOVEMENT TO ACCOMMODATE CONST. Connection transfers lateral forces TOLERANCES AND STRUCTURAL only MOVEMENT

100.0

Title

Index

Title

Sheet number:

Project

Keruen 2 Astana

Fax:+1.212.229.6418

Approved Project

Sheet number:

375 Hudson Street New York, NY 10014.

Project-No. Tel: +1.212.229.6000

Drawn www.turnerconstruction.com

Keruen 2 Astana

Keruen 2 Astana

Aluminum Transom with steel reinforcement

Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

Date

Client

DIN A3 AS SHOWN

Project

CERAMIC FRIT

SILICONE

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul

EWS 104 Typical Glazing /Office Tower

370 MBA/LL

Approved Sheet size New York, NY 10014. Scale

F-104.3

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381

Spring Street 2nd Floor Drawn 138 New York, NY 10012

End channel (Aluminum to match in finish)

Center line of channels

Supporting bracket

Design Development

Date

Bomonti-Şişli / Istanbul Project-No.

Client

Mullion & transom & Corner Detial

Center line of channels

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 03/24/2016 Fax:+1.212.229.6418 www.turnerconstruction.com Date

Keruen 2 Astana

F-104.2

Enclosure Consultant

Collaborating Architect

6+6 MM HEAT STRENGTHENED LAMINATED 14MM ARGON 90% CAVITY 6+6 MM HEAT STRENGTHENED 12MM TEMPERED LAMINATED 14MM ARGON 90% CAVITY 14MM TEMPERED ARGON 90% CAVITY 15MM PANE 12MM TEMPERED 14MM ARGON 90% CAVITY VERTICAL SLOT 15MM TEMPERED PANE

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

FINAL TENDER SUBMITTAL Revision

Reproduction of these drawings, specifications, related documents and designs in whole or in part is Title strictly forbidden without the prior written permission of Werner Sobek.

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE TYPICAL DRAWINGS CONTRACTOR POST TO BE CONFIRMED APPOINTMENT BY FACADE

Waterproofing

03/24/2016 Date

Enclosure Consultant

03/24/2016 Date

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

Center line of hanger plates

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

Revised 16/04/01 FINAL TENDER SUBMITTAL Revision

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

Design Development

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

Client

Architect

100

03/24/2016 Date

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul

Client

Center line of edge beam

Index

FA-OT-129-EWS301-02

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

DESIGN & ENGINEERING

FINAL TENDER SUBMITTAL Revision

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

Structural, Environmental & MEP Engineering

INTER SPACE BETWEEN TWO CONNECTIONS <1.6M CONNECTIONS REQUIRED ALL ALONG THE VERTICAL JOINT

STAINLESS STEEL PROFILE BONDED TO GLASS PANEL

1

SECTION OF BASE TRANSOM AT CONNECTOR, OFFICE TOWER SCALE: 1:2

Index

FINAL TENDER SUBMITTAL Revision

INTER SPACE BETWEEN TWO CONNECTIONS <1.6M CONNECTIONS REQUIRED ALL ALONG THE VERTICAL JOINT

20.0

1

Client Sheet number:

Structural, Environmental & MEP Engineering

Collaborating Architect

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Typical office tower

SP DIN A3

Project

CONTRACTOR POST APPOINTMENT

800 (wind load below1.5kPa) 1550 (wind load above 2.5kPa

370 MBA/LL

Enclosure Consultant

FA-OT-129-EWS101-05

Design Development Typical Glazing /Office Tower

TYPICAL SECTION AT HORIZONTAL JOINT SCALE: 1:5 TYPICAL SECTION AT HORIZONTAL JOINT SCALE: 1:5

95.0

04/01/2016

AS SHOWN

Design Development

Sheet number:

SILICONE SETTING SEALANT BLOCK BACKER ROD WARM EDGE SPACER SETTING BLOCK HORIZONTAL JOINT ALIGNED WARM EDGE SPACER WITH HORIZONTAL JOINT OF 2ND FLOOR RETAIL HORIZONTAL JOINT ALIGNED FACADE WITH HORIZONTAL JOINT OF 2ND FLOOR RETAIL FACADE

20.0

2 2

Drawn

6+6 MM HEAT STRENGTHENED LAMINATED 14MM ARGON 90% CAVITY 6+6 MM HEAT STRENGTHENED 12MM TEMPERED LAMINATED 14MM ARGON 90% CAVITY 14MM 90% CAVITY 15MM ARGON TEMPERED PANE 12MM TEMPERED 14MM ARGON 90% CAVITY 15MM TEMPERED PANE SILICONE SEALANT BACKER ROD

Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Metal cladding Supporting bracket

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Bomonti-Şişli / Istanbul

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

AS SHOWN

Corner channel (Aluminum)

Index

Revised 16/04/01

03/24/2016 Date

Enclosure Consultant

SP DIN A3

Sheet size Scale

Revised 16/04/01

AS SHOWN

FA-OT-129-EWS301-03

FINAL TENDER SUBMITTAL Revision

Reproduction of these drawings, specifications, related documents and designs in whole or in pa strictly forbidden without the prior written permission of Werner Sobek.

Design Development

Back of mullion

MBA/LL

Approved

Trace heating: A draining system has be implemented as a safety measure to drain water away from the internal parts of the connector elements towards the outside, part of system providers scope. The exact strategy of trace heating application and maintenance has to be developed by the system provider through detail drawings and a report. The system provider must verify the functionality of the system via simulation.

Structural, Environmental & MEP Engineering

Intermediate channel (Aluminum)

Column

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

370

Drawn

Architect

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

Joint sealed with Silicon

5mm gap to accommodate vertical movement 6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane Ceramic frit

Fire proofed and smoke sealed

04/01/2016

Project-No.

APPOINTMENT

Scale

Sheet number:

Metal cladding Supporting bracket

Structural, Environmental & MEP Engineering

SECTION OF BASE TRANSOM AT SPANDRAL, OFFICE TOWER SCALE: 1:2 Collaborating Architect

Date

800 (wind load below1.5kPa) 1100 (wind load 800 above 2.5kPa ) (wind load below1.5kPa) 1100 (wind load above 2.5kPa )

REQUIRED DISTANCE FOR VERTICAL MOVEMENT TO BE CONFIRMED

at 3m center (carbon steel)

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Structural, Environmental & MEP Engineering

1

Date

Architect

Revised 16/04/01

Revised 16/04/01

Riverside, 22 Hester Road Kiklop ım4AN Sanat Yay ıncılık San. ve Tic. LondonTasar SW11 Ltd. Mahallesi Tel: Şti.Gümü +44 (0)20şsuyu 7738 0455 Miralay Şefik Bey Sokak 9/2 34437 - Taksim www.fosterandpartners.com / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

SECTION OF BASE TRANSOM AT CONNECTOR, OFFICE TOWER SCALE: 1:2

F-101.5

EWS 101 North, South, East and West Glazing/Garden Lobby Vertical Section

REQUIRED DISTANCE FOR VERTICAL MOVEMENT TO BE CONFIRMED

HORIZONTAL SECTION AT COLUMN CLADDING Title F-301.3 SCALE: 1:20 Sizing and spacing of secondary elements connecting the cladding EWS 301 and spacing of secondary elements connecting the cladding and the primary structure are designed forSizing aluminum panels. MaximumCladding panel ofheight 6000mm column,glazing interface In case Stainless Steel is selected as cladding material, secondary andandthe structure are designed for aluminum panels. elements as shown in WS drawings are invalid FC hasprimary to 04/01/2016 panel width 2000mm recalculate the Date secondary elements. TYPICAL DRAWINGS In case370Stainless Steel is selected as cladding material, secondary Project-No. TO BE CONFIRMED MBA/LL as shown in WS drawings are invalid and FC has to Drawn elements BY FACADE Approved SP CONTRACTOR POST recalculate the secondary elements. Horizontal Revised connection 16/04/01 DIN A3 Sheet size

Maximum panel height 6000mm Maximum panel width Maximum 2000mm

Architect Collaborating Architect

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

Architect

1

Title

TYPICAL HEAD SECTION SCALE: 1:5

2

CLADDING ELEVATION OF COLUMN SCALE: 1:50

HORIZONTAL SECTION OF COLUMN CLADDING, GLAZING INTERFACE SCALE: 1:20

Collaborating Architect

Project

Keruen 2 Astana

REQUIRED DISTANCE FOR VERTICAL MOVEMENT TO BE CONFIRMED

2

Architect

Structural, Environmental & MEP Engineering

Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

GLASS FIN BOTTOM SUPPORTED

1

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE CONTRACTOR POST APPOINTMENT

CLADDING ELEVATION OF COLUMN SCALE: 1:50

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul

Fire resistant silicon

EWS 301 Cladding of the column

Keruen 2 Astana

800 (wind load below1.5kPa) 1100 (wind load above 1.5kPa )

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE CONTRACTOR POST APPOINTMENT

Keruen 2 Astana Title

Design Development

Trace heating by others

1.7%

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

Project

Revised 16/04/01

EPDM

Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

Client

Werner Sobek Istanbul Mimarlık Mühendislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Caddesi No:3 Kat: 25 Ofis No: 174 34381 Bomonti- Şişli / Istanbul Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

Revised 16/04/01

VERTICAL SLOT TO ACCOMMODATE CONST. TOLERANCES AND STRUCTURAL MOVEMENT Connection transfers lateral forces only

95.0

Werner Sobek Istanbul Mim arlık Mühendislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti- Şişli / Istanbul

Galvanized steel plate fire proofed and smoke sealed

Enclosure Consultant

Index

Design Development

Design Development

80.0

SP DIN A3 AS SHOWN

FA-OT-129-EWS101-03

03/24/2016 Date

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

INSULATED AND SEALED PANEL

04/01/2016

Project-No. 80.0

1

03/24/2016 Date

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

FINAL TENDER SUBMITTAL Revision

F-101.3

Typical glass fin plan

KIKLOP DESIGN & ENGINEERING

Fire proofed and smoke sealed FINAL TENDER SUBMITTAL Revision

Project

Title

1

Kiklop Tasar ım Sanat Yay ın Ltd. Şti.Gümü şsuyu Mahalle Miralay Şefik Bey Sokak 9/2 / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

Vertical hanger

Glazing of first office floor

Keruen 2 Astana

20.0

Collaborating Architect

Fire proofed and smoke sealed

Glazing of first office floor

CERAMIC FRIT 15MM TEMPERED PANE SILICONE

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

required insulation thickness of 50mm required around connector element. Trace heating by others

Connector element

1.7%

Indicative trace heating position by others

Column

Fireproof board

Slab edge

HEATING TBC BY OTHERS

Waterproofing

Center line of channels

Sheet number:

FA-OT-129-EWS104-04

Date

04/01/2016

04/01/2016

370

Project-No.

MBA/LL

370

SP DIN A3 AS SHOWN

Index

2

Drawn

TYPICAL VERTICAL SECTION DETAIL AT SPANDREL SCALE: 1:10 Fire proofed and smoke sealed

Approved

1 Aluminium cladding details for Hanger and connectors TYPICAL VERTICAL SECTION SCALE: 1:50

Sheet size Scale

Sheet number:

Fire proofed and smoke sealed

Fire resistant silicon

Back of mullion

5mm gap to accommodate vertical movement 6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane Ceramic frit

MBA/LL SP DIN A3 AS SHOWN

Index

Trace heating by others

1.7%

EPDM

Galvanized steel plate fire proofed and smoke sealed

FA-OT-129-EWS104-06

Joint sealed with Silicon Trace heating: A draining system has be implemented as a safety measure to drain water away from the internal parts of the connector elements towards the outside, part of system providers scope. The exact strategy of trace heating application and maintenance has to be developed by the system provider through detail drawings and a report. The system provider must verify the functionality of the system via simulation.

FINA Revis

Repro strictl

Des

Enclo


[Project 1. KERUEN II OFFICE&SHOPPING MALL]

Yu (Louis) Liu

+1 213-880-6403 (USA) louisyuliu321@gmail.com

Work at Werner Sobek New York.PC 2015.07 - 2016.1 Scope of work: Facade design, Facade detailing, CAD drawings Collaborate with: Marco Baur,

Shopping mall glazing system

Horizontal Structure cladding facade

Metal cladding

1.75%

Rigid insulation U value 0.27 W/m ²K

Vapor barrier

Mineral wool insulation U value 0.27 W/m ²K

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE CONTRACTOR POST APPOINTMENT

Rigid insulation U value 0.27 W/m ²K

Waterproofing membrane

Back of Aluminum Mullion

Mineral wool insulation U value 0.27 W/m ²K

Drip hole

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane X1: Distance between grid line of edge beam and grid line of truss primary beam may vary according to F+P structural drawings.

Detail 2

Primary beam geometry might also vary according to F+P structural drawings. WS glazing and support system is not affected by those variations. WS cladding system can be adapted to various dimensions of X1 and geometies of primary beam.

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE CONTRACTOR POST APPOINTMENT

Metal cladding

1.75%

Vapor barrier 1.75%

Aluminum Transom

Metal cladding

1.75%

F104B.3

1.75%

Waterproofing membrane

Aluminum Transom Back of Aluminum Mullion

Architect

Detail 2

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

X1: Distance between grid line of edge beam and grid line of truss primary beam may vary according to F+P structural drawings.

Rigid insulation U value 0.27 W/m ²K

F104C.4

Primary beam geometry might also vary according to F+P structural drawings.

Metal cladding

1.75%

Architect

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

WS glazing and support system is not affected by those variations.

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

WS cladding system can be adapted to various dimensions of X1 and geometies of primary beam.

Rigid insulation U value 0.27 W/m ²K

Structural, Environmental & MEP Engineering

Structural, Environmental & MEP Engineering

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Vapor barrier

Collaborating Architect

Mineral wool insulation U value 0.27 W/m ²K

KIKLOP Vapor DESIGN & ENGINEERING

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

Mineral wool insulation U value 0.27 W/m ²K

barrier

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

Collaborating Architect

Metal panel

Trench heater by F+P

Non combustible rockwool Fire resistant silicon

Ceramic frit

finish acc. to F+P drawings

Fire proofed and smoke sealed. Fire/smoke separation and intended slab appearance to be coordinated with F+P, arch. design intent.

Aluminum Transom with steel reinforcement 6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

Back of Aluminum Mullion

Aluminum Transom with steel reinforcement

Revised 16/04/01

Metal cladding

Aluminum Transom with steel reinforcement

Rigid insulation U value 0.27 W/m ²K

Mineral wool insulation U value 0.27 W/m ²K

Vapor barrier

Aluminum Transom

Drip hole

Back of Aluminum Mullion

FINAL TENDER SUBMITTAL Revision

1.75%

Aluminum Transom

Waterproofing membrane

Drip hole FINAL TENDER SUBMITTAL Revision

Back of Aluminum Mullion

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

03/24/2016 Date

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

Back Development of Aluminum Design Enclosure Consultant

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul

Client

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

Metal cladding

Rigid insulation U value 0.27 W/m ²K

Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

X1: Distance between grid line of edge beam and grid line of truss primary beam may vary according to F+P structural drawings.

Mineral wool insulation U value 0.27 W/m ²K

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

Primary beam geometry might also vary according to F+P structural drawings. Rigid insulation U value 0.27 W/m ²K

Fire proofed and smoke sealed. Fire/smoke separation and intended slab appearance to be coordinated with F+P, arch. design intent.

WS glazing and support system is not affected by those variations. Mineral wool insulation U value 0.27 W/m ²K

1.75%

F-104B.3

WS cladding system can be adapted to various dimensions of X1 and geometies of primary beam.

Fire resistant silicon

Fire proofed and smoke sealed. Fire/smoke separation and intended slab appearance to be coordinated with F+P, arch. design intent.

Date

Metal panel

370

Drawn

2

VERTICAL SECTION AT EXECUTIVE FLOORS SCALE: 1:50

Fire resistant silicon

Scale

370 MBA/LL

Drawn Approved

SP DIN A3

Sheet size Scale

AS SHOWN

AS SHOWN Sheet number:

Sheet number:

04/01/2016

Date Project-No.

SP DIN A3

Sheet size

HEAD CONNECTION TO TOP CHORD SCALE: 1:10

Trench heater by F+P

Non combustible rockwool

EWS 104C Vertical section at executive floors

MBA/LL

Approved

1

F-104C.4

WS cladding system can be adapted to various dimensions of X1 and geometies of primary beam.

04/01/2016

Project-No.

HEAD CONNECTION TO TOP CHORD SCALE: 1:10

Title

WS glazing and support system is not affected by those variations.

EWS 104B Vertical section at level 12 and 13

1.75%

2

VERTICAL SECTION AT LEVEL 12 AND 13 SCALE: 1:50

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

Keruen 2 Astana

Primary beam geometry might also vary according to F+P structural drawings.

Title Metal panel Non combustible rockwool

1

Client

Project

Project

Keruen 2 Astana

Vapor barrier

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

X1: Distance between grid line of edge beam and grid line of truss primary beam may vary according to F+P structural drawings.

Metal cladding

1.75%

Fire resistant silicon

Design Development Enclosure Consultant

Mullion

1.75%

Vapor barrier

Metal panel Non combustible rockwool

03/24/2016 Date

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

1.75%

Waterproofing membrane

Aluminum Transom

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

FA-OT-129-EWS104C-04

Index

Index

FA-OT-129-EWS104B-03

Ceramic frit

finish acc. to F+P drawings

Metal cladding

1.75%

Rigid insulation U value 0.27 W/m ²K

INSULATION Vapor barrier

INSULATION

Mineral wool insulation U value 0.27 W/m ²K

INSULATION

Fire proofed and smoke sealed. Fire/smoke separation and intended slab appearance to be coordinated with F+P, arch. design intent.

INSULATION Waterproofing membrane

19+19 MM HEAT STRENGTHENED LAMINATED 19+19 MM HEATMM STRENGTHENED 19+19 LAMINATED HEAT STRENGTHENED WARM EDGE SPACER LAMINATED 19+19 MM

Drip hole

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane X1: Distance between grid line of edge beam and grid line of truss primary beam may vary according to F+P structural drawings.

Detail 2 F107.3 Detail 2 F107.32 Detail F107.3

Detail 3 F107.3 Detail 3 F107.33 Detail F107.3

Detail 2 F107.3

3 33

Detail 5 F107.3 Detail 5 F107.35 Detail F107.3

Detail 3

REINFORCEMENT PLATE REQUIRED EVERY 2.5M REINFORCEMENT PLATE ALONG THE FACADE REINFORCEMENT REQUIRED EVERYPLATE 2.5M REQUIRED EVERY 2.5M ALONG THE FACADE REINFORCEMENT PLATE ALONG THE FACADE REQUIRED EVERY 2.5M SHOPPING ALONGMALL THE FACADE

F107.3

Detail 5 F107.3

Rigid insulation U value 0.27 W/m ²K

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE CONTRACTOR POST TYPICAL DRAWINGS APPOINTMENT TO BE CONFIRMED BY FACADE CONTRACTOR POST APPOINTMENT

TYPICAL DRAWINGS TO BE CONFIRMED TYPICAL DRAWINGS BY FACADE TYPICAL DRAWINGS TO BE CONFIRMED CONTRACTOR POST TOBY BEFACADE CONFIRMED APPOINTMENT TYPICAL DRAWINGS BY FACADE CONTRACTOR POST TO BE CONFIRMED CONTRACTOR POST APPOINTMENT BY FACADE APPOINTMENT CONTRACTOR POST APPOINTMENT

SILICONE SILICONE SILICONE

TYPICAL SECTION 12MM TEMPERED SILICONE 1:2 SECTION SCALE: TYPICAL TYPICAL SECTION SCALE: 1:2 1:2 SCALE: TYPICAL SECTION SCALE: 1:2

Architect

1 11 Retail facade plan 1

Structural, Environmental & MEP Engineering Collaborating Architect

KIKLOP

Structural, Environmental & MEP Engineering

2 2

36.0

100.0

36.0

760.0

140.0

55.0

115

140.0

55.0

115

FINAL TENDER SUBMITTAL Revision

STEEL TRANSOM RHS 140X60X6

146.8 170 INSECT MESH Indicative

STEEL MULLION

RHS 140X60X6 THERMALLY BROKEN CONNECTION

STEEL TRANSOM RHS 140X60X6

146.8

THERMALLY BROKEN CONNECTION

72.4

Design Development

WARM EDGE SPACER

1 2 22 2

TYPICAL DRAWINGS Enclosure Consultant Client TO BE CONFIRMED BY FACADE Client Project CONTRACTOR POST Client Keruen 2 Astana APPOINTMENT Project Client

WATERPROOFING

800 1154

60.0 16.5

60.0 90.0

Detail90.0 2

ALUMINUM EXTRUSION 90.0 F107.4 -FINISH ACCORDING TO WARM EDGE SPACER ARCHITECTURAL SPECIFICATION ALUMINUM EXTRUSION

60.0 70.0

19+19 MM HEAT STRENGTHENED LAMINATED 16MM 19+19 MM ARGON 90% CAVITY HEAT STRENGTHENED 12MMLAMINATED TEMPERED 19+19 MM HEAT 16MM STRENGTHENED LAMINATED ARGON 90% CAVITY 16MM 12MM TEMPERED 19+19 MM ARGON 90% CAVITY HEAT STRENGTHENED 12MM TEMPERED LAMINATED

16.5

2506

70.0 60.0

CAPPING SYSTEM 70.0 FOR GLASS RETENTION

16.5

16.5

CAPPING SYSTEM

70.0 90.0 -FINISH ACCORDING TO FOR GLASS RETENTION TYPICAL HORIZONTAL SECTION ALUMINUM EXTRUSION ARCHITECTURAL SPECIFICATION CAPPING SYSTEM -FINISH ACCORDING TO FOR GLASS RETENTION ARCHITECTURAL SPECIFICATION SCALE: N.T.C ALUMINUM EXTRUSION CAPPING SYSTEM -FINISH ACCORDING TO FOR GLASS RETENTION ARCHITECTURAL SPECIFICATION HORIZONTAL SECTION AT METAL CLADDING SCALE: 1:5 HORIZONTAL SECTION AT METAL CLADDING HORIZONTAL SECTION AT METAL CLADDING SCALE: 1:5 SCALE: 1:5 HORIZONTAL SECTION AT METAL CLADDING SCALE: 1:5

WARM EDGE SPACER

2506

16.5

2506

Detail 3

WARM EDGE SPACER ALUMINUM EXTRUSION -FINISH ACCORDING TO F107.4 ARCHITECTURAL SPECIFICATION WARM EDGE SPACER ALUMINUM EXTRUSION -FINISH ACCORDING TO ALUMINUM EXTRUSION ARCHITECTURAL SPECIFICATION -FINISH ACCORDING TO ARCHITECTURAL SPECIFICATION

16MM ARGON 90% CAVITY 12MM TEMPERED

5 55

60.0 70.0

90.0 90.0 90.0

90.0

CAPPING SYSTEM 70.0 60.0 FOR GLASS RETENTION 70.0 CAPPING SYSTEM FOR GLASS RETENTION CAPPING SYSTEM 70.0 FOR GLASS RETENTION

16MM 19+19 MM ARGON 90% CAVITY HEAT STRENGTHENED 12MMLAMINATED TEMPERED 19+19 MM HEAT16MM STRENGTHENED LAMINATED ARGON 90% CAVITY 16MM 12MM TEMPERED 19+19 MM ARGON 90% CAVITY HEAT STRENGTHENED 12MM TEMPERED LAMINATED

Revised 16/04/01VENT. INWARD OPERABLE MECHANICAL LOCATION AND OPENING SIZE TO BE CONFIRMED BY FACADE CONTRACTOR

Metal panel

Non combustible rockwool Fire resistant silicon FINAL TENDER SUBMITTAL Revision

F-107.3

153.0 MINERAL WOOL CERAMIC FRIT

Enclosure Consultant

F-104C.2

Project-No.

EWS 104C Executive floors /Office Tower

Rigid insulation U value 0.27 W/m ²K

Approved

Mineral wool insulation U value 0.27 W/m ²K

14MM ARGON 90% CAVITY

MBA/LL

Drawn Approved

1

Drawn Project-No. Sheet size

Sheet number:

Approved

KIKLOP DESIGN & ENGINEERING

F107.1

130

Collaborating Architect

STEEL BEAM IPE 220

ALUMINUM CLADDING PANEL -FINISH ACCORDING TO ARCHITECTRUAL SPECIFICATION

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

2

KIKLOP DESIGN & ENGINEERING

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

Vapor barrier

Mineral wool insulation U value 0.27 W/m ²K

Waterproofing membrane

FA-SM-129-EWS107-03

Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 Sheet number: FA-SM-129-EWS107-03 FAX: +(90) 212 - 243 70 96

F-104C.5 Sheet number:

EWS 104C Vertical section at executive floors

Index

FA-OT-129-EWS104B-04

Metal panel Non combustible rockwool Fire resistant silicon

Fire proofed and smoke sealed. Fire/smoke separation and intended slab appearance to be coordinated with F+P, arch. design intent.

1

VERTICAL SECTION AT EXECUTIVE FLOORS SCALE: 1:50 Detail 2

1

VERTICAL SECTION AT EXECUTIVE FLOORS SCALE: 1:50

1.75%

2

BASE CONNECTION TO BOTTOM CHORD, TRANSOM SCALE: 1:10

2

BASE CONNECTION TO BOTTOM CHORD, TRANSOM SCALE: 1:10

X1: Distance between grid line of edge beam and grid line of truss primary beam may vary according to F+P structural drawings.

WS glazing and support system is not affected by those variations.

FINAL TENDER SUBMITTAL Revision

WS cladding system can be adapted to various dimensions of X1 and geometies of primary beam.

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

03/24/2016 Date

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

Design Development Enclosure Consultant

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul

Client

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

Architect

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

SECTION OF BASE TRANSOM SCALE: 1:2

Metal cladding 1.75%

Structural, Environmental & MEP Engineering

Project

DIN A3

Keruen 2 Astana F-104C.3

EWS 104C Executive floors /Office Tower

370

Drawn TYPICAL DRAWINGS Approved TO BE CONFIRMED Sheet size BY FACADE Scale CONTRACTOR POST APPOINTMENT

Sheet number:

Collaborating Architect

04/01/2016

Date Project-No.

Index

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Rigid insulation U value 0.27 W/m ²K

Title

Index Index

MBA/LL

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

SP DIN A3 AS SHOWN

Vapor barrier Index

FA-OT-129-EWS104C-03

Metal panel

Trench heater by F+P

Non combustible rockwool

2 2

Fire resistant silicon

HEAD DETAIL AT GROUND FLOOR SCALE: 1:10 HEAD DETAIL AT GROUND FLOOR SCALE: 1:10

Ceramic frit

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Collaborating Architect

Rigid insulation U value 0.27 W/m ²K

REINFORCEMENT PLATE REQUIRED EVERY 2.5M ALONG THE FACADE

F107.1

FINAL TENDER SUBMITTAL Revision

03/24/2016 Date

REINFORCEMENT PLATE REQUIRED EVERY 2.5M ALONG THE FACADE

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

Design Development Enclosure Consultant

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul

Client

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

120

SILICON

120

Aluminum Transom

Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

Enclosure Consultant Client

SILICON

SILICON STAINLESS STEEL PLATE STEEL SETTING BLOCK GROUND BUILD UP (TBC) WELDED TO TRANSOM (FOR HEAVY UNITS)

100

GROUND BUILD UP (TBC)

FINAL TENDER SUBMITTAL Revision

Tel: +1.212.229.6000 Werner Sobek New York P.C. Fax:+1.212.229.6418 138 Spring Street 2nd Floor www.turnerconstruction.com New York, NY 10012

Client Project

FINAL TENDER SUBMITTAL Revision

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

Keruen 2 Astana

Keruen 2 Astana

16.5

WARM EDGE SPACER 90.0

70.0

19+19 MM HEAT STRENGTHENED LAMINATED

WATERPROOFING

12MM TEMPERED

CAPPING SYSTEM FOR GLASS RETENTION

Retail facade connection with secondary structure 2 3 HORIZONTAL SECTION AT FIRST FLOOR SCALE: 1:5

VAPOR CONTROL LAYER

Title

16MM ARGON 90% CAVITY

ALUMINUM EXTRUSION -FINISH ACCORDING TO ARCHITECTURAL SPECIFICATION

HORIZONTAL SECTION AT FIRST FLOOR SCALE: 1:5

1 1

TYPICAL VERTICAL SECTION SCALE: 1:100 TYPICAL VERTICAL SECTION SCALE: 1:100

F-107.4

3 3 Retail facade section

BASE CONNECTION AT GROUND FLOOR SCALE: 1:10 BASE CONNECTION AT GROUND FLOOR SCALE: 1:10 Date

Drawn

Approved

Sheet size Scale

Sheet number:

FA-SM-129-EWS107-04

04/01/2016

AS SHOWN

Index

Client

Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

Mineral wool insulation U value 0.27 W/m ²K

1

WATERPROOF MEMBRANE SEALED TO STRUCTURE MEMBRANE

Approved Sheet size Sheet number:

Fire resistant silicon

Fire proofed and smoke sealed. Fire/smoke separation and intended slab appearance to be coordinated with F+P, arch. design intent.

Scale FA-SM-129-EWS107-01

370 AS SHOWN MBA/LL

Title

Project

F-104C.1

EWS 104C Executive floors

15MM TEMPERED PANE

Keruen 2 Astana Date Project-No. Drawn

1.75%

Approved Sheet size

Detail 2

FA-SM-129-EWS107-01

Scale

04/01/2016 370 MBA/LL SP DIN A3 AS SHOWN

Title

F-104B.5

EWS 104B Vertical section at level 12 and 13

F104B.5 Sheet number:

FA-OT-129-EWS104C-01

Index

Date Project-No.

SP

Drawn Approved

DIN A3

Sheet size

AS SHOWN Index

1

Scale

VERTICAL SECTION AT LEVEL 12 AND 13 SCALE: 1:50

Typical Mullion & Transom sections Sheet number:

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

Keruen 2 Astana

Non combustible rockwool

370

20.0

MBA/LL SP SECTION OF EXECUTIVE 04/01/2016FLOORS MULLION SCALE: 1:2 DIN A3

Client

Project

12MM TEMPERED 14MM ARGON 90% CAVITY

Approved Date Sheet size Project-No. Scale Drawn

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

Rigid insulation U value 0.27 W/m ²K

Vapor barrier

Metal panel

04/01/2016

Date

EWS 107 Project-No. Shop front Glass/Shopping Mall ground system Drawn

MBA/LL

SP

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul

1.75%

1.75%

14MM ARGON 90% CAVITY

EWS 107 Shop front Glass/Shopping Mall ground system

370

DIN A3

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

6+6 MM HEAT STRENGTHENED LAMINATED

F-107.12 Astana Keruen

EWS 107 Shop front Glass/Shopping Mall Upper floor system

Project-No.

Design Development Enclosure Consultant

Enclosure Consultant

Metal cladding

F-107.1

WATERPROOF MEMBRANE SEALED TO STRUCTURE MEMBRANE

03/24/2016 Date

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

03/24/2016 Date

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

Design Development 6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

Project Title

Title

VAPOR CONTROL LAYER

Project

60.0

Fire proofed and smoke sealed. Fire/smoke separation and intended slab appearance to be coordinated with F+P, arch. design intent.

Drip hole

Back of Aluminum Mullion

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza 375 Hudson Street Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul New York, NY 10014.

STEEL SETTING BLOCK WELDED TO TRANSOM (FOR HEAVY UNITS)

100

STAINLESS STEEL PLATE 300

Fire resistant silicon

I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul

Design Development

16MM ARGON 90% CAVITY TRENCH HEATING TBC BY OTHERS 12MM TEMPERED SILICON GRILLE MUST EXTEND TO GLAZING INSULATION TRENCH HEATING TBC BY OTHERS GRILLE MUST EXTEND 300TO GLAZING

Non combustible rockwool

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.Werner Sobek Istanbul Enclosure Consultant Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti.

16MM ARGON 90% CAVITY 12MM 19+19 TEMPERED MM HEAT STRENGTHENED LAMINATED INSULATION

Detail 3 100.0

Metal panel Mineral wool insulation U value 0.27 W/m ²K

Vapor barrier

Design Development

19+19 MM HEAT STRENGTHENED LAMINATED

F107.1

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

Metal cladding

Aluminum Transom with steel reinforcement

Detail 3

INSULATION

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Structural, Environmental & MEP Engineering

VAPOR BARRIER

100.0

Aluminum Transom with steel reinforcement 6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

03/24/2016 Date

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek. FINAL TENDER SUBMITTAL 03/24/2016 Revision Date

POSITION OF THE PANEL WHEN OPEN FOR CLEANING AND MAINTAINING

Mineral wool insulation U value 0.27 W/m ²K

Architect finish acc. to F+P drawings

Fire proofed and smoke sealed. Fire/smoke separation and intended slab appearance to be coordinated with F+P, arch. design intent.

FINAL TENDER SUBMITTAL Revision

Index

Sheet number:

F104C.5

AS SHOWN

Sheet number: Kiklop Tasar ımFA-SM-129-EWS107-03 Sanat Yay ıncılık San. ve Tic.

Title

F104C.5

Drip hole

SP

Index

Keruen 2 Astana

AS SHOWN

Detail 2

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

Primary beam geometry might also vary according to F+P structural drawings.

1

370

Mineral wool insulation U value 0.27 W/m ²K

1.75%

Aluminum Transom Back of Aluminum Mullion

EWS 104C Vertical section at executive floors

Project

SP DIN A3

Sheet size Scale

Rigid insulation U value 0.27 W/m ²K

1.75%

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE CONTRACTOR POST APPOINTMENT

04/01/2016 MBA/LL

DIN SP A3

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

F-104C.5

MBA/LL

Approved

Drip hole

1.75%

Vapor barrier

Rigid insulation U value 0.27 W/m ²K

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

Metal cladding

Fire proofed and smoke sealed. Fire/smoke separation and intended slab appearance to be coordinated with F+P, arch. design intent.

Client Title

370

Metal cladding

1.75%

KIKLOP DESIGN & ENGINEERING

04/01/2016

Project-No. Drawn

Fire resistant silicon

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Back of

Collaborating Architect

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

04/01/2016 SP 370

AS SHOWN

Sheet size FA-SM-129-EWS107-03

Sheet number:

Collaborating Architect

AS DINSHOWN A3 MBA/LL

Drawn

Scale Collaborating Architect

130

MBA/LL SP 04/01/2016 AS SHOWN

Sheet size Approved Project-No.

Keruen 2 Astana 1.75% Date

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

Metal panel Non combustible rockwool

Structural, Environmental & MEP Engineering

HEAD AND BASE CONNECTION TO BRACING, TRANSOM SCALE: 1:10

370 DINMBA/LL A3

ApprovedDate Drawn Scale

Scale

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Aluminum Transom

12MM TEMPERED 14MM ARGON 90% CAVITY 6+6 MM HEAT STRENGTHENED LAMINATED

VERTICAL SECTION AT LEVEL 12 AND 13 SCALE: 1:50

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

370

Date Drawn

Riverside, 22 Hester Road London SW11 4AN Scale Sheet size Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Project

EWS 104B Vertical section at level 12 and 13

Mineral wool insulation U value 0.27 W/m ²K

14MM ARGON 90% CAVITY

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Structural, Environmental & MEP Engineering

ALUMINUM CLADDING PANEL -FINISH ACCORDING TO ARCHITECTRUAL SPECIFICATION

Enclosure Consultant

F-104B.4 Metal cladding

1.75%

Client

Design Development

Title 6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

Architect

STEEL BEAM IPE 220

1200.0

Reproduction of these drawings, specifications, related docume strictly forbidden without the prior written permission of Werner

1.75%

Index

Vapor barrier

CERAMIC FRIT

Enclosure Consultant FINAL TENDER SUBMITTAL Revision

Keruen 2 Astana

TYPICAL DRAWINGS TO BE CONFIRMED Sheet number: FA-OT-129-EWS104C-02 BY FACADE CONTRACTOR POST APPOINTMENT

1.75%

15MM TEMPERED PANE

Reproduction of these drawings, specifications, related docume strictly forbidden without the prior written permission of Werner

Design Development

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

Project

Fire resistant silicon

Fire proofed and smoke sealed. Fire/smoke separation and intended slab appearance to be coordinated with F+P, arch. design intent.

Werner Sobek Istanbul Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Bomonti-Şişli / Istanbul Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

SP

DIN A3 Sheet size Index Sheet number: FA-OT-129-EWS104C-02 Scale AS SHOWN

15MM TEMPERED PANE

Metal panel

SP DIN A3 04/01/2016 AS SHOWN 370

Sheet size

Scale Project-No.

Vapor barrier

Fire proofed and smoke sealed. Fire/smoke separation and intended Client slab appearance to be coordinated with F+P, arch. design intent.

370 MBA/LL

Drawn

Date

12MM TEMPERED 15MM TEMPERED PANE

Non combustible rockwool

04/01/2016

Date

Title

Metal cladding

1.75%

FINAL TENDER SUBMITTAL Revision

Design Development Fire resistant silicon with F+P, arch. design intent.

Project F-104C.2 EWS 104C Keruen 2 Astana Executive floors /Office Tower

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

12MM 6+6 MMTEMPERED HEAT STRENGTHENED LAMINATED 14MM ARGON CAVITY 14MM ARGON 90%90% CAVITY

1 1

153.0 MINERAL WOOL WATERPROOF MEMBRANE SEALED TO STRUCTURE MEMBRANE

220.0

04/01/2016

www.fosterandpartners.com

03/24/2016 Date

Fire proofed andofsmoke sealed. Reproduction these drawings, specifications, related documents and designs in whole or in part is Metal panel strictly forbidden without the prior written permission of Werner Sobek. Fire/smoke separation and intended Non combustible slabrockwool appearance to be coordinated

375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

Keruen 2 Astana Title

6+6 MM HEAT STRENGTHENED LAMINATED 14MM ARGON 90% CAVITY

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE TYPICAL DRAWINGS SECTION OF INTERMEDIATE TRANSOM CONTRACTOR POST SCALE: 1:2 BE CONFIRMED TO APPOINTMENT SECTION OF INTERMEDIATE BY FACADE TRANSOM SCALE: 1:2 CONTRACTOR POST APPOINTMENT

1200.0

EWS 107 Project-No. Approved Shop front Glass/Shopping MallDate ground system Structural, Environmental & MEP Engineering

Detail 2

SCALE: 1:5

Mineral wool insulation U value 0.27 W/m ²K

Revised 16/04/01

Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

375 Istanbul Hudson Street Werner Sobek Mimarlık Mühe Danışmanlık Newndislik York,veNY 10014. Tic. Ltd. Şti. I Tower Plaza Tel: +1.212.229.6000 Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Fax:+1.212.229.6418 Bomonti-Şişli / Istanbul

Project Client

INWARD OPERABLE MECHANICAL VENT. LOCATION AND OPENING SIZE TO BE CONFIRMED BY FACADE CONTRACTOR WATERPROOF MEMBRANE SEALED TO STRUCTURE MEMBRANE

Architect

Title

12MM TEMPERED

SPECIFICATION HORIZONAL SECTION ARCHITECTURAL AT METAL CLADDING, MOVEMENT JOINT SCALE: 1:5 HORIZONAL SECTION AT METAL CLADDING, MOVEMENT JOINT Detail 2 HORIZONAL SECTION AT METAL CLADDING, MOVEMENT JOINT F107.1 SCALE: 1:5 SCALE: 1:5 HORIZONAL SECTION AT METAL CLADDING, MOVEMENT JOINT

5

Fax:+1.212.229.6418 www.turnerconstruction.com 375 Hudson Street New York, NY 10014. Tel: +1.212.229.6000 Fax:+1.212.229.6418 www.turnerconstruction.com

EWS Title 107 Shop front Glass/Shopping Mall ground system Keruen 2 Astana F-107.3 EWS 107 F-107.3 Datesystem Shop front Glass/Shopping MallRiverside, ground 22 Hester Road EWS 107 Title London SW11 4AN Project-No. Shop front Glass/Shopping Mall ground system Tel: +44 (0)20 7738 0455

Architect

16MM ARGON 90% CAVITY

CAPPING SYSTEM FOR GLASS RETENTION

ALUMINUM EXTRUSION -FINISH ACCORDING TO

Aluminum Transom with steel reinforcement

Bomonti-Şişli / Istanbul

Structural, Environmental & MEP Engineering

Bomonti-Şişli / Street Istanbul 138 Spring Street 2nd Floor 375 Hudson New York, NY 10012 New York, NY 10014. Werner Sobek Istanbul Werner Sobek New York P.C. Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti. Tel: +1.212.229.6000 138 Spring Street 2nd Floor I Tower Plaza Fax:+1.212.229.6418 New York, NY 10012 Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 www.turnerconstruction.com 375 Hudson Street Bomonti-Şişli / Istanbul New York, NY 10014. Werner Sobek New York P.C. Tel: +1.212.229.6000 375 Hudson Street138 Spring Street 2nd Floor Fax:+1.212.229.6418 New York, NY 10014. New York, NY 10012 www.turnerconstruction.com Tel: +1.212.229.6000

Project Keruen 2 Astana Title Keruen 2 Astana F-107.3 Project

19+19 MM HEAT STRENGTHENED LAMINATED

60.0

WARM EDGE SPACER

INSECT MESH Indicative

STEEL TRANSOM RHS 140X60X6

138 Spring Street 2nd Floor I Tower Plaza Werner Sobek Istanbul New York, NY 10012 Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 Mimarlık Mühe ndislik/ ve Danışmanlık Tic. Ltd. Şti. Bomonti-Şişli Istanbul I Tower Plaza MerkezWerner Mah. Akar Cadd esiYork No:3 Kat: 25 Ofis No: 174 34381 Sobek New P.C.

Enclosure Consultant

STEEL MULLION

WARM EDGE SPACER

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

Back of Aluminum Mullion

Vapor barrier

03/24/2016 Date

Werner Sobek Istanbul Enclosure Consultant Mimarlık Mühe ndislik Reproduction of these drawings, specifications, related documents and designs in whole orveinDanışmanlık part is Tic. Ltd. Şti. I Tower Plaza Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381 strictly forbidden without the prior written permission of Werner Sobek.

Werner Sobek New York P.C. 138 Spring Street 2nd Floor New York, NY 10012

Merkez Mah. Akar Cadd esi No:3 Kat: 25 Ofis No: 174 34381

STEEL MULLION WATERPROOFING

WARM EDGE SPACER

Vapor barrier

Revised 16/04/01

Mineral wool insulation U value 0.27 W/m ²K

03/24/2016 Date

FINAL TENDER SUBMITTAL Design Development Revision

F104B.4

Client Enclosure Consultant

220.0

Bomonti-Şişli / Istanbul strictly forbidden without the prior written permission of Werner Sobek. Design Development Werner Sobek Istanbul Enclosure Consultant WernerMimarlık Sobek New York P.C.ve Danışmanlık Tic. Ltd. Şti. Mühe ndislik

STEEL MULLION WATERPROOFING

WATERPROOFING

FINAL TENDER SUBMITTAL Revision

Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

Detail 2

Drip hole

Back of Aluminum Mullion

Design Development

DesignReproduction Development I Tower Plaza of these drawings, specifications, related documents and designs in whole or in part is

100

60.0

KIKLOP DESIGN & ENGINEERING

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

Mineral wool insulation U value 0.27 W/m ²K

ALUMINUM TRANSOM WITH STEEL REINFORCEMENT

Revision Date strictly forbidden without the prior written permission of Werner Sobek. Werner Sobek Istanbul Enclosure Consultant Mimarlık Mühe ndislik ve Danışmanlık Tic. Ltd. Şti.

STEEL MULLION

1154

03/24/2016 Date

KIKLOP DESIGN & ENGINEERING

Collaborating Architect

Mineral wool insulation U value 0.27 W/m ²K

Metal cladding

12MM TEMPERED 16MM ARGON 90% CAVITY 19+19 MM HEAT STRENGTHENED LAMINATED

FINAL TENDER SUBMITTAL 03/24/2016 Reproduction of these drawings, specifications, related documents and designs in whole or in part is Revision Date strictly the prior written permission of Werner Sobek. FINAL forbidden TENDER without SUBMITTAL 03/24/2016 STEEL PLATE CAST Revision Date IN CONCRETE Reproduction of these drawings, specifications, related documents and designs in whole or in part is strictly forbidden without the prior written permission of Werner Sobek.

Collaborating Architect Structural, Environmental & MEP Engineering

www.turnerconstruction.com

STEEL PLATE CAST IN CONCRETE

FINAL TENDER SUBMITTAL 03/24/2016 Design Development Reproduction of these drawings, specifications, related documents and designs in whole or in part is

Rigid insulation U value 0.27 W/m ²K

Rigid insulation U value 0.27 W/m ²K

Vapor barrier

ALUMINUM TRANSOM WITH STEEL REINFORCEMENT

Structural, Environmental & MEP Engineering Architect

Metal cladding

Metal cladding

Back of Aluminum Mullion

TYPICAL DRAW TO BE CONFIR BY FACADE CONTRACTOR APPOINTMENT

Architect

1.75%

Rigid insulation U value 0.27 W/m ²K

VAPOR BARRIER INSULATION

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

Rigid insulation U value 0.27 W/m ²K

Architect

VAPOR BARRIER INSULATION VAPOR BARRIER INSULATION 2632

800

Collaborating Architect

X1: Distance between grid line of edge beam and grid line of truss primary beam may vary according to F+P structural drawings.

WS glazing and support system is not affected by those variations. WS cladding system can be adapted to various dimensions of X1 and geometies of primary beam.

Aluminum Transom with steel reinforcement

ARCHITECTURAL METAL PANEL

72.4

VAPOR BARRIER INSULATION

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 1.75% 14mm argon 90% cavity 15mm tempered pane

1.75%

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

Aluminum Transom with steel reinforcement

ARCHITECTURAL METAL PANEL Revised 16/04/01

STEEL TRANSOM RHS 140X60X6

STEEL MULLION

WATERPROOFING

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Waterproofing membrane

Aluminum Transom Back of Aluminum Mullion

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

Rigid insulation U value 0.27 W/m ²K

170

STEEL MULLION RHS 140X60X6

TYPICAL SECTION AT CORNER SCALE: 1:2 SECTION AT CORNER TYPICAL TYPICAL SECTION AT CORNER SCALE: 1:2 SCALE: 1:2 TYPICAL SECTION AT CORNER

WATERPROOFING STEEL MULLION WATERPROOFING

Aluminum Transom with steel reinforcement

Aluminum Transom with steel reinforcement

760.0

WATERPROOF MEMBRANE

VAPOR BARRIER

STEEL MULLION WATERPROOFING STEEL MULLION

Structural, Environmental & MEP Engineering

Primary beam geometry might also vary according to F+P structural drawings. WS glazing and support system is not affected by those variations. WS cladding system can be adapted to various dimensions of X1 and geometies of primary beam.

Metal cladding

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

Aluminum Transom

100.0

MINERAL WOOL

100

Mineral wool insulation U value 0.27 W/m ²K

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. Ltd. Şti.Gümü şsuyu Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) 212 - 243 70 95 FAX: +(90) 212 - 243 70 96

KIKLOP DESIGN & ENGINEERING

Vapor barrier

FIREPROOF BOARD VAPOR BARRIER

SCALE: 1:2

Fire proofed and smoke sealed. Fire/smoke separation and intended slab appearance to be coordinated with F+P, arch. design intent.

12MM TEMPERED 16MM ARGON 90% CAVITY 19+19 MM HEAT STRENGTHENED LAMINATED

FIREPROOF BOARD

2536

SECTION OF HEAD TRANSOM SCALE: 1:2

finish acc. to F+P drawings

SECTION OF HEAD TRANSOM SCALE: 1:2

MINERAL WOOL WATERPROOF MEMBRANE

2632

Vapor barrier

Primary beam geometry might also vary according to F+P structural drawings.

J

INSULATION

Back of Aluminum Mullion

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Collaborating Architect

Ceramic frit

J

INSULATION VAPOR BARRIER

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

Collaborating Architect

Trench heater by F+P

Fire resistant silicon

FAX: +(90) 212 - 243 70 96

4 glazing detail Corner 44 4

Rigid insulation U value 0.27 W/m ²K

1.75%

Structural, Environmental & MEP Engineering

Metal panel Non combustible rockwool

& ENGINEERING KIKLOP & ENGINEERING DESIGN & ENGINEERING TEL: +(90) 212 - 243 70 95 Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. FAX: +(90) 212 - 243 70 96 Ltd. Şti.Gümü şsuyu Mahallesi KIKLOP Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL DESIGN & ENGINEERING TEL: +(90) 212 - 243 70 95

DESIGN Collaborating Architect KIKLOP

Revised 16/04/01 Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

X1: Distance between grid line of edge beam and grid line of truss primary beam may vary according to F+P structural drawings.

Riverside, 22 Hester Road London SW11 4AN Kiklop Tasar ım Sanat Tic. Tel:Yay +44ıncılık (0)20San. 7738ve 0455 Ltd. Şti.Gümü şsuyuwww.fosterandpartners.com Mahallesi Miralay Şefik Bey Sokak 9/2 34437 - Taksim / ISTANBUL TEL: +(90) - 243 95 Yay ıncılık San. ve Tic. Kiklop212 Tasar ım70 Sanat FAX: +(90) 212 - 243şsuyu 70 96Mahallesi Ltd. Şti.Gümü Miralay Şefik Bey Sokak 9/2 34437 - Taksim Kiklop Tasar ım Sanat Yay ıncılık San. ve Tic. / ISTANBUL Ltd. Şti.Gümü şsuyu Mahallesi TEL: +(90) 212 - 243 70 95 Miralay Şefik Bey Sokak 9/2 34437 - Taksim FAX: +(90) 212 - 243 70 96 / ISTANBUL

Collaborating Architect

Collaborating Architect DESIGN

1.75%

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 Riverside, 22 Hester Road www.fosterandpartners.com London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 Riverside, 22 Hester Road www.fosterandpartners.com London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Structural, Environmental & MEP Engineering

TYPICAL PLAN AT GROUND FLOOR 1:50PLAN AT GROUND FLOOR SHOPPING MALL SCALE: TYPICAL TYPICAL PLAN AT GROUND FLOOR SHOPPING MALL SCALE: 1:50 1:50 PLAN AT GROUND FLOOR SHOPPING MALL SCALE: TYPICAL SCALE: 1:50

Aluminum Transom with steel reinforcement

Waterproofing membrane

Aluminum Transom

Architect

Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com Riverside, 22 Hester Road London SW11 4AN Tel: +44 (0)20 7738 0455 Riverside, 22 Hester Road www.fosterandpartners.com London SW11 4AN Tel: +44 (0)20 7738 0455 www.fosterandpartners.com

Architect

Architect

Metal cladding

Architect

KIKLOP DESIGN & ENGINEERING

Architect Architect

Structural, Environmental & MEP Engineering

INSULATION VAPOR BARRIER

TYPICAL DRAW TO BE CONFIR BY FACADE CONTRACTOR APPOINTMENT

Mineral wool insulation U value 0.27 W/m ²K

Vapor barrier

3

VAPOR BARRIER INSULATION

6+6 mm heat strengthened laminated 14mm argon 90% cavity Revised 16/04/01 12mm tempered 14mm argon 90% cavity 15mm tempered pane

Metal cladding

1.75%

WS glazing and support system is not affected by those variations. WS cladding system can be adapted to various dimensions of X1 and geometies of primary beam.

Structural, Environmental & MEP Engineering

VAPOR BARRIER

TYPICAL DRAWINGS TO BE CONFIRMED BY FACADE

Back of Aluminum Mullion Aluminum Transom CONTRACTOR POST with steel reinforcement APPOINTMENT

Primary beam geometry might also vary according to F+P structural drawings.

HEATEDGE STRENGTHENED WARM SPACER

16MM LAMINATED WARM EDGE SPACER ARGON 90% CAVITY 16MM WARM EDGE SPACER ARGON 90% CAVITY 12MM TEMPERED 16MM ARGON 90% CAVITY 12MM TEMPERED 16MM 12MMARGON TEMPERED 90% CAVITY

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

Back of Aluminum Mullion

6+6 mm heat strengthened laminated 14mm argon 90% cavity 12mm tempered 14mm argon 90% cavity 15mm tempered pane

1.75%

Aluminum Transom Back of Aluminum Mullion

Aluminum Transom with steel reinforcement

2

HEAD CONNECTION TO BOTTOM CHORD SCALE: 1:10

Sheet number:

FA-OT-129-EWS104B-05

Cladding section of enclosed structure

04/01/2016 370 MBA/LL SP DIN A3 AS SHOWN

Index

Sheet number:


[Project 2. Lakhta Center ETF Roof & Sphere facade design]

Yu (Louis) Liu

+1 213-880-6403 (USA) louisyuliu321@gmail.com

Work at Werner Sobek New York.PC 2015.07 - 2016.1 Scope of work: Facade design, Facade detailing, CAD drawings Collaborate with: Viola Kosseda, 1

2

1 Typical Section at

T

3

oo /Типово

а

е

T

к

4

5

6

7

8

Северный блок/ 1 North block

и

1

SCALE: 1:20

H

Being the tellest building in Russia, this project located in 90 miles away from St Persburg. Our main responsiblity includes facade detail design of the 1: ETEF roof system. 2: Panelization and detailing of a half-sphare interior glazing curtain wall system in shopping mall. This page present the ETEF details and 3D model.

etail at

2

oo 2

SCALE: 1:5

3

arapet/ еталь па апета к

4

5

6

7

8

Севе No

и

H

1

4

3

Detail Деталь G

Юж So 12-

Южный блок/ Арка/Arch South block 1 - Здание Башня/Tower 2 - Многофункциональное здание, состоящее из южного и северного блоков, объединенное крытым двором/Multifunctional building consisting of north and south block unified with covered precinct 3 - Стилобатная часть, включающая северную и южную площадь/Podium consisting of north and south square 4 - Арка главного входа/Arch of the main entrance

G

F002_05

3-

4-

ETFE Cushion а а ти ато

Note / Примеч F

Note / Примечания:

F

E

AFT ION DR T RY UC INA NSTR ект про ELIM CO PR ый а OR льн ьств TF те л NO и р оите два Пре ля стр д не

ETFE Air Supply Duct ETFE поставка во д а ка ал

E PR NO

П

E

Project Name :

Roof parapet Section

Project Name :

Mixed-use Complex

D

Employer:

"Lakhta Center"

D

Employer:

2 Typical Section at ETFE Roof SCALE: 1:20

АКЦИОНЕРНОЕ ОБЩЕСТВО «Многофункциональный комплекс «Лахта центр»

General Design

General Designer :

14, Seocho-dear C

Detail деталь

SAMSUNG C&T

Design Consulta

14, Seocho-dearo 74gil,Seocho-Gu,Seoul 137-956, Korea. www.secc.co.kr

F002_03

C

Design Consultant :

Design Consulta

Согласовано

B

Design Consultant :

е

T

к

5

6

7

8

и

Инв. N подл.

H

Взам. инв . N ГЛ_СПЕЦENG

Date

F002_5

A

11/12/2015

THOMAS_WINTERSTETTER

Sheet Doc.No Signature

GIP

0.000=0.000 -

Designed

VIOLA_KOSSEDA

11/12/2015

Checked

SILVIA_PRANDELLI

11/12/2015

Approved

IVAN_TOMOVIC

Stage

Sheet

T

F002_02

Detail at roof parapet

-

A

002_ETFE_ROOF 1

ГЛ_СПЕЦENG

THOMAS_WINTERSTETTER

11/12/2015

Designed

VIOLA_KOSSEDA

11/12/2015

Checked

SILVIA_PRANDELLI

11/12/2015

Approved

IVAN_TOMOVIC

11/12/2015

Sheets

11/12/2015

2

2

3

4

5

6

7

8

Изм. Кол.уч. Лист

N док.

Подпись

Дата

F002_5 ГИП ГЛ_СПЕЦ

THOMAS_WINTERSTETTER

11/12/2015

Разработал

VIOLA_KOSSEDA

11/12/2015

Проверил

SILVIA_PRANDELLI

11/12/2015

Н.контр.

IVAN_TOMOVIC

11/12/2015

1

Изм. Кол.уч. Лист

4

N док.

Подпись

Дата

F002_02 ГИП

3

Южный блок/ Арка/Arch South block 1 2 1 - Здание Башня/Tower 2 - Многофункциональное здание, состоящее из южного и северного блоков, объединенное крытым двором/Multifunctional building consisting of north and south block unified with covered precinct 3 - Стилобатная часть, включающая северную и южную площадь/Podium consisting of north and south square 4 - Арка главного входа/Arch of the main entrance

Detail Деталь F002_05

G

ВЗАМ_ИНВ_НОМЕР

F002_02 GIP

Северный блок/ North block

Подп. и дата

Взам. инв . N

4

ВЗАМ_ИНВ_НОМЕР

3

а

Инв. N подл.

oo /Типово

Подп. и дата

2

T

SCALE: 1:20

ИНВ._№_ПОДЛ.

1

1 Typical Section at

Modif.

Date

Sheet Doc.No Signature

Modif.

ИНВ._№_ПОДЛ.

Согласовано

B

3

4

5

6

7

8

ГЛ_СПЕЦ

THOMAS_WINTERSTETTER

11/12/2015

Разработал

VIOLA_KOSSEDA

11/12/2015

Проверил

SILVIA_PRANDELLI

11/12/2015

Н.контр.

IVAN_TOMOVIC

11/12/2015

Стадия

Лист

Листов

T

F002_02

-

Формат A1

1

1 Typical

Note / Примечания:

2

lan at T

3

oo /Типово пла

T

к

4

5

6

7

2

и

SCALE: 1:50

F

H

FT N RA TIO YD UC AR MIN ONSTR оект ELI й пр RC PR ьны тва T FO NO ител ельс двар роит Пре я ст дл не

pan ion oint at T

8

oo /Те пе ат

Северный бло North block

ов T

к

и

SCALE: 1:50

ETFE roof plan with Expansion Joint

ETFE Middle panel: ETFE Edge panel

Южный блок South block 1 - Здание 2 - Многоф из южно объедин consisti precinct 3 - Стилоба и южную square 4 - Арка гл

E

Project Name :

G

Mixed-use Complex "Lakhta Center" D

2

Employer:

Typical Section at ETFE Roof SCALE: 1:20

АКЦИОНЕРНОЕ ОБЩЕСТВО «Многофункциональный комплекс «Лахта центр» General Designer :

SAMSUNG C&T

Double curved ETEF roof model

Detail деталь

Note / Примечания:

14, Seocho-dearo 74gil,Seocho-Gu,Seoul 137-956, Korea. www.secc.co.kr

F002_03

C

F

Design Consultant :

IN ELIM PR O TF NO едв р П дл не

Design Consultant :

Согласовано

B

1

1

2

3

4

5

6

7

8

Северный блок/ 1 North block

Взам. инв . N

5

6

7

8

2

2

4

Modif.

Sheet Doc.No Signature

1

Date

F002_02

3

Южный блок/ Арка/Arch South block 1 - Здание Башня/Tower 2 - Многофункциональное здание, состоящее из южного и северного блоков, объединенное крытым двором/Multifunctional building consisting of north and south block unified with covered precinct 3 - Стилобатная часть, включающая северную и южную площадь/Podium consisting of north and south square 4 - Арка главного входа/Arch of the main entrance

G

ГЛ_СПЕЦENG

THOMAS_WINTERSTETTER

11/12/2015

Designed

VIOLA_KOSSEDA

11/12/2015

Checked

SILVIA_PRANDELLI

11/12/2015

Approved

IVAN_TOMOVIC

11/12/2015

Sheet

Sheets

T

F002_02

-

4

A

E

Южный блок/ Арка/Arch South block 1 - Здание Башня/Tower 2 - Многофункциональное здание, состоящее из южного и северного блоков, объединенное крытым двором/Multifunctional building consisting of north and south block unified with covered precinct 3 - Стилобатная часть, включающая северную и южную площадь/Podium consisting of north and south square 4 - Арка главного входа/Arch of the main entrance

002_ETFE_ROOF Изм. Кол.уч. Лист

N док.

Подпись

Дата

F002_02 Инв. N подл.

Stage

3

GIP

G

ГИП

ИНВ._№_ПОДЛ.

Северный блок/ North block

SCALE: 1:2

H

1

ВЗАМ_ИНВ_НОМЕР

4

1 Typical Section at Gutter/Типовая деталь водостока

SCALE: 1:2

H

Подп. и дата

3

2

0.000=0.000

Typical Section at Expansion Joint/Типовая деталь деформационного шва

ГЛ_СПЕЦ

Note / Примечания: F

F

1

2

3

4

5

T AF N DR TIO RY UC кт INA NSTR прое ELIM R CO PR ьный тва T FO ьс NO рител тел едва строи Пр для не

6

4 Layers ETFE Cushion See Architectural Drawings for Detail 4 слоя ЭКП прокладки см. Деталированые архитектурные чертежи E

7

8

THOMAS_WINTERSTETTER

11/12/2015

Разработал

VIOLA_KOSSEDA

11/12/2015

Проверил

SILVIA_PRANDELLI

11/12/2015

Н.контр.

IVAN_TOMOVIC

11/12/2015

Стадия

Лист

Листов

T

F002_02

-

Project Name :

M

Note / Примечания:

T AF N DR TIO RY UC кт INA NSTR прое ELIM R CO PR ьный тва T FO ьс NO рител тел едва строи Пр для не

Формат A1

Employer:

E

D

Project Name :

А

Project Name :

Mixed-use Complex

Mixed-use Complex

"Lakhta Center"

"Lakhta Center"

Employer: D

Employer:

D

АКЦИОНЕРНОЕ ОБЩЕСТВО «Многофункциональный комплекс «Лахта центр»

АКЦИОНЕРНОЕ ОБЩЕСТВО «Многофункциональный комплекс «Лахта центр»

General Designer :

Design C

General Designer :

General Designer :

SAMSUNG C&T

SAMSUNG C&T

14, Seocho-dearo 74gil,Seocho-Gu,Seoul 137-956, Korea. www.secc.co.kr C

14, Seocho-dearo 74gil,Seocho-Gu,Seoul 137-956, Korea. www.secc.co.kr

Consultant :

Design Consultant :

Design Consultant :

Design Consultant :

C

B

6

Typical section at expansion joint

7

8

VIOLA_KOSSEDA SILVIA_PRANDELLI IVAN_TOMOVIC

T

F002_04

GIP

-

ГЛ_СПЕЦENG Designed

11/12/2015 11/12/2015

Подпись

11/12/2015

THOMAS_WINTERSTETTER

SILVIA_PRANDELLI

Approved

IVAN_TOMOVIC

T

F002_03

Snow Cable -Layout to be finalized by Facade Contractor upon appointment ле е т есткости ла дол е ть аве под яд ика

11/12/2015

002_ETFE_ROOF Изм. Кол.уч. Лист

Стадия

Лист

Листов

T

F002_04

-

ГЛ_СПЕЦ Разработал

11/12/2015

1

2

3

4

Typical section at Gutter Формат A1

N док.

Подпись

Дата

F002_03 ГИП

11/12/2015

11/12/2015

-

11/12/2015

-

11/12/2015

Sheets

11/12/2015

VIOLA_KOSSEDA

Checked

Sheet

002_ETFE_ROOF A

Дата

Инв. N подл.

THOMAS_WINTERSTETTER

Проверил Н.контр.

Stage

5

6

7

8

THOMAS_WINTERSTETTER

11/12/2015

VIOLA_KOSSEDA

11/12/2015

SILVIA_PRANDELLI

11/12/2015

Проверил Н.контр.

IVAN_TOMOVIC

11/12/2015

Стадия

Лист

Листов

T

F002_03

-

Substructure and Gutter

Формат A1

Maintenance Walkway Cushion drained via Gutter below See Architectural Drawings о сл ива ая до о ка for Details ос а е ая водостоко в и п окладка с а итект е е те и е по а

а е и

е а

ETFE Cushion Fixing Profile Фторопластая фиксирующая прокладка

14, Seocho-dearo 74gil,Seo

Design Consultant :

ETFE Cushion Fixing Profile икси и а а ти и и п о ил ETFE Cushion See Architectural Drawings for Details п окладка с а итект е е те и

Snow Cable -Layout to be finalized by Facade Contractor upon appointment ле е т есткости ла дол е ть аве е по а а е и Maintenance Walkway под яд ика drained via Gutter below о сл ива ая до о ка с водостоко и е

Design Consultant :

B

Согласовано

5

ИНВ._№_ПОДЛ.

Инв. N подл.

ИНВ._№_ПОДЛ.

4

Date

Modif.

Взам. инв . N

N док.

F002_04 ГЛ_СПЕЦ Разработал 3

Sheet Doc.No Signature

F002_03

Sheets

11/12/2015

VIOLA_KOSSEDA SILVIA_PRANDELLI IVAN_TOMOVIC

Изм. Кол.уч. Лист ГИП

2

Sheet

ВЗАМ_ИНВ_НОМЕР

11/12/2015

THOMAS_WINTERSTETTER

Checked

A

1

0.000=0.000 Modif.

Stage

дата

Согласовано

Взам. инв . N

ГЛ_СПЕЦENG Designed Approved

0.000=0.000 Date

ВЗАМ_ИНВ_НОМЕР

Взам. инв . N

ВЗАМ_ИНВ_НОМЕР

Подп. и дата

Sheet Doc.No Signature

F002_04

Подп. и дата

Согласовано

B

Modif. GIP

Expansion Joint а ио ов

Sheet Doc.No Signature

Date

F002_01 GIP ГЛ_СПЕЦENG

THOMAS_WINTERSTETTER

11/12/2015

Designed

VIOLA_KOSSEDA

11/12/2015

Checked

SILVIA_PRANDELLI

11/12/2015

Approved

IVAN_TOMOVIC

11/12/2015


[Project 2. Lakhta Center ETF Roof & Sphere facade design]

Yu (Louis) Liu

+1 213-880-6403 (USA) louisyuliu321@gmail.com

Work at Werner Sobek New York.PC 2015.07 - 2016.1 Scope of work: Facade design, Facade detailing, CAD drawings Collaborate with: Viola Kosseda,

Sphare panelization study Inside the shopping mall, The half-sphere interior glazing curtain wall system is around a sphere planetarium. They are stick system. After the panelization study, we come up a cost-effective strategy that has the most repetitive of the same size single curved glazing panel. The scope of work includes glazing curtain system, door system, and substructure design.

1

H

1

2

Ring surface study

3

4

5

6

2

OVERVIEW ELEVATION SPHERE/Обзор вида сферы SCALE: 1:100

7

8

Северный блок/ North block

2

TYPICAL SECTION B-B/Типовой разрез В-В SCALE: 1:10

1

4

+33,600 3 1

3

B

A

2

5

B

1 OVERVIEW ELEVATION SPHERE/Обзор вида сферы

H

4

6

C

+29,400

8

+29,400

C1

2 TYPICAL SECTION B-B/Типовой разрез В-В

Южный блок/ Северный блок/ Арка/Arch South block North block 1 - Здание Башня/Tower 2 - Многофункциональное здание, состоящее 2 из южного и северного блоков, 2 объединенное крытым двором/Multifunctional building consisting of north and south blockплиты unified with covered ETAIL AT SLAB/Типовая детать precinct 3 - Стилобатная часть, включающая северную 1 и южную площадь/Podium consisting of north and4south square 4 - Арка главного входа/Arch of the main entrance

C2

1

5 TYPICAL

SCALE: 1:10

SCALE: 1:100

G

7

SCALE: 1:2

H

+33,600

3

4

5

Южный блок/ Арка/Arch South block 1 - Здание Башня/Tower 2 - Многофункциональное здание, состоящее из южного и северного блоков, объединенное крытым двором/Multifunctional building consisting of north and south block unified with covered precinct 3 - Стилобатная часть, включающая северную и южную площадь/Podium consisting of north and south square 4 - Арка главного входа/Arch of the main entrance

+25,200

B

+29,400

B

+29,400

Custom Steel Profile- Powder Coated according to Architect

G

G

обы ный стальной профиль с поро ковым Note / Примечания: покрытием в соотв с ар итект рными казаниями

+21,000

F

B +16,800

Setting Block становка блока

F

F-001-02A +21,000

4 A

E

1

TYPICAL

2

ETAIL AT

3

4

5

6

A

2.26

2.25

Schematic /Design / SCT Принципиальные решения Gorproject center Data Изменение/Change FT

Дата / Data

E

F-001-02A

4

LIM

Дата / Data

Employer: F

№ изменения

Изменение/Change

АКЦИОНЕРНОЕ ОБЩЕСТВО «Многофункциональный Mixed-use Complex ПЕРЕДАЧА ЧЕРТЕЖЕЙ / ISSUE DRAWINGS комплекс «Лахта центр» Дата

Project Name :

Drawings is not for the construction and ordering of materials / Чертежи не для строительства и заказа материалов

"Lakhta Center"

2.24

/ Data

SAMSUNG C&T

АКЦИОНЕРНОЕ «Многофункциональный Дата / комплекс «Лахта центр» Data

C

Lakhta center

SCT

Detail 4 Деталь

Single Glazed Unit (SGU) Одино ный блок застекленный

Gasket прокладка

Aluminum Adapter Profile to receive Toggle Ал миниевый профиль для для перекл ения риле

D

"Lakhta Center"

C

ETAIL / Вер дверной детали

H

Symmetry

Инв. N подл.

SCALE: 1:5

PPC Coated Aluminum Cladding Panel 2mm Min. Thickness покрытая П алл минивая обли ово ная панел 2мм мин. тол 3 ина

2

4 G G

Steel Profile at Portal Framing тальной профиль на в оде

1

2

3

Flat area

4

Действ е блок - Ал миниевый дверь Обрамление

4B

RA E

OOR

Подп. и дата

ИНВ._№_ПОДЛ.

11/12/2015

IVAN_TOMOVIC

11/12/2015

Северный блок/ North block Северный блок/ North block

ГЛ_СПЕЦ

THOMAS_WINTERSTETTER

VIOLA_KOSSEDA

Проверил 6

SILVIA_PRANDELLI

Н.контр.

IVAN_TOMOVIC

11/12/2015

IVAN_TOMOVIC

11/12/2015

7

E

4B 4B

Дата / Data

4

Lakhta5 center

SCT

11/12/2015

8

11/12/2015

N док.

Подпись

ГЛ_СПЕЦ

11/12/2015

Разработал

VIOLA_KOSSEDA

11/12/2015

Проверил

SILVIA_PRANDELLI

11/12/2015

Н.контр.

IVAN_TOMOVIC

11/12/2015

+16,800 +16,800

F

Ревизия/6 Revision

Gorproject

7

8

№ изменения / change

Изменение/Change

E

Project Name :

Detail 1 Деталь

Section of the sphare

5C

5C 5C

F-001-08

D

Согласовано Согласовано Cladding Panel Fixing Profile - Aluminum Extrusion репление профиля обли ово ной панели -Алл миневый профиль

Details at the opening 1

Door Handle refer to Architectural Drawings for Detail Steel Round Hollow Section Дверная Р ка Powder Coated, Ø 219 mm см ар итект рные ертежи SteelbyRound Hollow Section SGU -to be confirmed Facade Contractor для деталя х Powder Coated, Ø 219 mm Одино ный блок застекленный upon appointment -to be confirmed by Facade стальная кр лая полая Contractor тр ба с upon appointment поро ковым покрытием Ø 219мм кр лая ба с A стальная подтвердить пополая назна тр ени Operable Unit Operable Unit поро ковым покрытием Ø 219 мм фасадно о подряд ика - Door Framing Aluminum Extrusion - Door FramingA Aluminum Extrusion подтвердить по назна ени Действ е блок Действ е блок фасадно о подряд ика - Ал миниевый дверь Обрамление - Ал миниевый дверь Обрамление

Single Glazed Door Side Light стекленная дверь боковой све

Steel Round Hollow Section Powder Coated, Ø 219 mm -to be confirmed by Facade Contractor upon appointment стальная кр лая полая тр ба с поро ковым покрытием Ø 219мм A подтвердить по назна ени фасадно о подряд ика

2

D

3

4

1

Single Glazed Door Side Light стекленная дверь боковой све Single Glazed Door Side Light SGU стекленная дверь боковой све Oдино ный стекла

5D 5D

SCALE: 1:5

Изменение/Change

5

6

THOMAS_WINTERSTETTER ГЛ_СПЕЦENG см ар итект рные ертежи для деталяVIOLA_KOSSEDA х Designed

Checked

Operable ApprovedUnit - Door Framing Aluminum Extrusion Operable Unit Действ е блок - Ал миниевый Обрамление - Door Framingдверь Aluminum Extrusion

Действ е блок - Ал миниевый дверь Обрамление

Действ е блок - Ал миниевый дверь Обрамление

АКЦИОНЕРНОЕ ОБЩЕСТВО «Многофункциональный АКЦИОНЕРНОЕ ОБЩЕСТВО комплекс «Лахта центр» «Многофункциональный комплекс «Лахта центр»

6

Unitized Facade System (by others) омлексная истема фасада( др и )

Facade Bracket (by others) фасадная скоба др и )

Secondary Steel Structure (by others - dimensions indicative only) Втори ная

2

11/12/2015

IVAN_TOMOVIC

11/12/2015

Изм. Кол.уч. Лист

N док.

Подпись

Дата

F001_06

5

8

ГЛ_СПЕЦ

THOMAS_WINTERSTETTER

Разработал

VIOLA_KOSSEDA

Проверил

SILVIA_PRANDELLI

Unitized Facade System (by others) омлексная истема фасада( др и )

for movement -to be confirmed by Facade Contractor

ПЕРЕДАЧА ЧЕРТЕЖЕЙupon / appointment ISSUE DRAWINGS

11/12/2015

Н.контр.

IVAN_TOMOVIC

11/12/2015

6

T

F001_06

7

SCT

Дата / Data

№ изменения / change

Изменение/Change

Project Name :

Structural Silicone онстр ктивный силикон Aluminum Adapter Profile to receive Toggle Ал миниевый профиль для для перекл ения риле Gasket прокладка Employer:

Mixed-use Complex Facade Bracket (by others) фасадная скоба др и )

"Lakhta Center"

B

ГЛ_СПЕЦENG GIP Designed ГЛ_СПЕЦENG Checked Designed Approved Checked Approved

Sheet Doc.No Signature

F001_06

Sheet Doc.No Signature

F001_06

11/12/2015

VIOLA_KOSSEDA

11/12/2015 11/12/2015 11/12/2015 11/12/2015 11/12/2015 11/12/2015

THOMAS_WINTERSTETTER

SILVIA_PRANDELLI VIOLA_KOSSEDA IVAN_TOMOVIC SILVIA_PRANDELLI IVAN_TOMOVIC

N док.

F001_06

Изм. Кол.уч. Лист ГИП ГЛ_СПЕЦ ГИП Разработал ГЛ_СПЕЦ Проверил Разработал Н.контр. Проверил

Date

THOMAS_WINTERSTETTER

Изм. Кол.уч. Лист

-

Date

Согласовано

ВЗАМ_ИНВ_НОМЕР

Взам. инв . N Подп. и дата

тальная констр к ия

др и -только ориентирово ные размеры

N док.

F001_06

11/12/2015

Подпись Подпись

Дата

Н.контр.

11/12/2015

VIOLA_KOSSEDA

11/12/2015 11/12/2015 11/12/2015 11/12/2015 11/12/2015 11/12/2015

THOMAS_WINTERSTETTER

SILVIA_PRANDELLI VIOLA_KOSSEDA IVAN_TOMOVIC SILVIA_PRANDELLI IVAN_TOMOVIC

Modif.

Sheets

001_SPHERE 001_SPHERE

Sheet Doc.No S

F001_08 GIP ГЛ_СПЕЦENG

THOMAS_WINTERSTETTER

Designed

VIOLA_KOSSEDA

Checked

SILVIA_PRANDELLI

Approved

IVAN_TOMOVIC

Single Glazed Unit (SGU) Одино ный блок застекленный 14, Seocho-dearo 74gil,Seocho-Gu,Seoul 137-956, Korea. www.secc.co.kr

A

Design Consultant : Стадия Стадия T

T

Лист

Изм. Кол.уч. Лист

Листов

Лист F001_06

2

3

4

5

Detail at connection to secondary steel

Формат Design A1 Consultant :

11/12/2015

Формат A1

Modif.

Sheet Doc.No Signature

Date

F001_07

Stage

GIP ГЛ_СПЕЦENG

THOMAS_WINTERSTETTER

11/12/2015

Designed

VIOLA_KOSSEDA

11/12/2015

Checked

SILVIA_PRANDELLI

11/12/2015

Approved

IVAN_TOMOVIC

T

Sheet

F001_07

Sheets

-

11/12/2015

001_SPHERE A

Изм. Кол.уч. Лист

N док.

Подпись

Дата

F001_07 ГИП ГЛ_СПЕЦ

THOMAS_WINTERSTETTER

11/12/2015

Разработал

VIOLA_KOSSEDA

11/12/2015

Проверил

SILVIA_PRANDELLI

11/12/2015

N док.

F001_08 ГИП

Листов -

F001_06

1

Section at Connection to Atruim 8

Sheet

SAMSUNG C&T

Дата

THOMAS_WINTERSTETTER

АКЦИОНЕРНОЕ ОБЩЕСТВО

Custom Steel Profile«Многофункциональный Powder Coated according комплекс «Лахта центр» to Architect обы ный стальной профиль с Sheet TStage F001_06 -Sheets поро ковым General Designer : покрытием в соотв с T F001_06 ар итект рными казаниями

Stage

0.000=0.000

ИНВ._№_ПОДЛ.

Втори ная

Aluminum Extrusion - based on Schuco FW 80+ or equivalent alternative 0.000= 0.000 Алл миневый профил основаный на Schuco FW 80+ или подобное

Формат A1

Инв. N подл.

Secondary Steel Structure (by others - dimensions indicative only)

0.000= 0.000

Modif.

B

Opening detail in plan

Steel Round Hollow Section Powder Coated, Ø 219 mm -to be confirmed by Facade Contractor upon appointment тальная кр лая полая тр ба с поро ковым покрытием Ø 219мм подтвердить по назна ени фасадно о подряд ика

Ревизия/ Revision

Schematic Design / Принципиальные решения

8 7

Покладка обеспе ива ая Lakhta Gorproject center движение подтвердить по казани фасадно о подряд ика

T AF TION оект Y DRTRUC й пр ны тва INARSuction NS CO Discритель ельс ELIM Вставной диск PR T FOR ва роит едBlock Setting NO Пр я ст становка блока дл не

Design Consultant :

Stage Sheet Single Glazed Door SideSheets Light стекленная дверь боковой свет T F001_06 - Light Single Glazed Door Side стекленная дверь боковой свет SGU Одино ный блок застекленный SGU Одино ный блок застекленный 001_SPHERE Cladding Panel Fixing Profile - Aluminum Extrusion Cladding Panel Fixing Profile репление профиля Aluminum Extrusion обли -ово ной панели реплениепрофиль профиля -Алл миневый ово ной Листов панели СтадияоблиЛист -Алл миневый профиль

11/12/2015

6 11/12/2015

4

Drawings is not for the construction and ordering of materials / Gasket to allow Чертежи не для строительства и заказа материалов

C

Modif. GIP

SGU Oдино ный стекла SGU Oдино ный стекла

тальная констр к ия

др и -только ориентирово ные размеры 1

3

Note / Примечания:

Дата / Data

Design Consultant :

Date

11/12/2015 11/12/2015

SILVIA_PRANDELLI

ГИП 5

4

7

8

из южного и северного блоков, объединенное крытым двором/Multifunctional building consisting of north and south block unified with covered precinct 3 - Стилобатная часть, включающая северную и южную площадь/Podium consisting of north and south square 4 - Арка главного входа/Arch of the main entrance

SCALE: 1:5

Steel Round Hollow Section Powder Coated, Ø 219 mm Steel Round Section -to be Hollow confirmed by Powder Facade Coated,Contractor Ø 219 mm -to beappointment confirmed by upon стальная кр лаяFacade полая Contractor тр ба с upon appointment поро ковым покрытием Ø 219мм стальная кр лая ба с подтвердить пополая назна тр ени поро ковым покрытием Ø 219 мм 0.000 0.000= фасадно о подряд ика подтвердить по назна ени фасадно о подряд ика

Door Handle Modif. for Detail Sheet Doc.No Signature refer to Architectural Drawings Door Handle Дверная Р ка - F001_06 см ар итект рные for ертежи refer to Architectural Drawings Detail GIP для деталя хДверная Р ка

Operable Unit - Door Framing Aluminum Extrusion OperableеUnit Действ блок - Door Framingдверь Aluminum Extrusion - Ал миниевый Обрамление

4 3

5

Формат A1

Design Consultant :

PPC Coated Aluminum Cladding Panel 2mm Min. Thickness PPC Coated Aluminum Cladding Panel покрытая PPC алл минивая обли 2mm ово Min. наяThickness панел покрытая 2мм PPCмин. алл тол минивая ина обли ово ная панел 2мм мин. тол ина

/План на соединении с атри мом

Cladding Panel Fixing Profile - Aluminum Extrusion репление профиля обли ово ной панели -Алл миневый профиль 3

2

Steel Round Hollow Section Powder Coated, Ø 219 mm -to be confirmed by CONNECTION TO ATRI Facade Contractor upon appointment стальная кр лая полая тр ба с поро ковым покрытием Ø 219мм подтвердить по назна ени фасадно о подряд ика

SGU Одино ный блок застекленный

7

14, Seocho-dearo 137-956, Korea. www.secc.co.kr Design Consultant 74gil,Seocho-Gu,Seoul :

OOR ETAIL / дверной детали OOR ETAIL / дверной детали

SCALE: 1:5

Design Consultant :

SGU Одино ный блок застекленный Single Glazed Door Side Light SGU стекленная дверь боковой свет Одино ный блок застекленный

Cladding Panel Fixing Profile C - Aluminum Extrusion Cladding Panel Fixing Profile репление профиля - Aluminum Extrusion обли ово ной панели репление профиля -Алл миневый профиль обли ово ной панели -Алл миневый профиль 2

1

SCALE: 1:20

7

изменения Южный блок/ Арка/Arch № South block / change изменения1 - Здание Башня/Tower / change 2 - Многофункциональное здание, состоящее

SAMSUNG C&T SAMSUNG C&T

14, Seocho-dearo 74gil,Seocho-Gu,Seoul 137-956, Korea. www.secc.co.kr

OOR ETAIL / дверной детали Design Consultant : OOR ETAIL / дверной детали

SCALE: 1:5

PPC Coated Aluminum Cladding Panel 2mm Min. Thickness покрытая PPC алл минивая обли ово ная панел 2мм мин. тол ина

3 PLAN AT

B

Инв. N подл. Подп. и дата Взам. инв . N Инв. N подл. Подп. и дата Взам. инв . N ИНВ._№_ПОДЛ. ВЗАМ_ИНВ_НОМЕР ИНВ._№_ПОДЛ. ВЗАМ_ИНВ_НОМЕР

ВЗАМ_ИНВ_НОМЕР

Взам. инв . N Подп. и дата Инв. N подл.

ИНВ._№_ПОДЛ.

Согласовано

B

6

Revision Ревизия/ Северный блок/ Revision North block

General Designer :

+12,600

B

5

-

14, Seocho-dearo 74gil,Seocho-Gu,Seoul 137-956, Korea. www.secc.co.kr

OOR ETAIL / дверной детали OOR ETAIL ETAIL / дверной детали OOR / дверной детали

SCALE: 1:5

SCALE: SCALE: 1:51:5

PPC Coated Aluminum Cladding Panel PPC Min. Coated 2mm Thickness Aluminum PPC Cladding покрытая алл Panel минивая 2mm Min. обли ово Thickness ная панел покрытая PPCина алл минивая 2мм мин. тол обли ово ная панел 2мм мин. тол ина

4

Employer:

+16,800

5B 5D

E

SCALE: 1:5

3

-

Листов

Листов

General Designer :

Согласовано

SCALE: 1:5

Sheets

Лист

001_SPHERE

Mixed-use Complex Mixed-use Complex "Lakhta Center" "Lakhta Center"

ВЗАМ_ИНВ_НОМЕР

5A

Sheet

F001_02

001_SPHERE

Стадия

Employer:

АКЦИОНЕРНОЕ ОБЩЕСТВО «Многофункциональный комплекс «Лахта центр»

Взам. инв . N

OOR SCALE: 1:5

PPC Coated Aluminum Cladding Panel 2mm Min. Thickness покрытая PPC алл минивая обли ово ная панел 2мм мин. тол ина

-

Арка/Arch

Изменение/Change

/ Дата Data / Data

Подп. и дата

5B

ETAIL /дверной детали

T

Sheets

F001_01

Дата

N FT оект RA CTIO Y D TRAUFT ONй пр аоект AR NS R CTI ьны й тв пр MIN CR OY D TRUел ыьс а ит ьн ELI IN R A NSар ител ьств PR TLIFO M COдв ел ро E ел стит PNRO T FORПре дл двяарстроит O ре не NSchematic П Design / Принципиальные решения для не/ Принципиальные решения № Schematic Design Дата

/Разрез на соединении с атри мом

ИНВ._№_ПОДЛ.

OOR SCALE: 1:5

11/12/2015

/ ISSUE DRAWINGS Ревизия/

Инв. N подл.

5A

Flat area

11/12/2015

IVAN_TOMOVIC

Чертежи не для строительства и заказа материалов

SAMSUNG C&T

SCALE: 1:5

11/12/2015

SILVIA_PRANDELLI

Листов Подпись

F Дата ПЕРЕДАЧА ЧЕРТЕЖЕЙ Lakhta Gorproject / SCT center Дата Data Lakhta Gorproject / SCT center Data

"Lakhta Center"

Steel L-Profile supporting Door Framing - to allow for tolerances SteelLL-Profile supporting Door Framing тальной - профиль для поддержки allow for tolerances двери Обрамление -- to Для обеспе ения тальной L - профиль для поддержки доп сков двери Обрамление - Для обеспе ения +21,000 доп сков

Opening detail in section 5B 5A

OOR ETAIL /дверной детали детали ETAIL / дверной детали OOR ETAIL /дверной OOR ETAIL / дверной детали C

Дата

11/12/2015

VIOLA_KOSSEDA

Н.контр.

4 N док.

Project Name :

Ring C

Подпись

THOMAS_WINTERSTETTER

Проверил

Note / Примечания:

General Designer :

C

N док.

ГЛ_СПЕЦ Разработал

Note /Drawings Примечания: is not for the construction and ordering of materials /

Mixed-use Complex

Employer:

D

8

Формат A1

Дата

THOMAS_WINTERSTETTER

Project Name :

D

Steel L-Profile supporting Door Framing - to allow for tolerances тальной L - профиль для поддержки двери Обрамление - Для обеспе ения доп сков

7

11/12/2015

T

4

Лист 3 F001_02 F001_01

ГИП Южный блок/ 11/12/2015 ГЛ_СПЕЦ South block блок/ Арка/Arch 11/12/2015 VIOLA_KOSSEDA Разработал 1 Южный - Здание Башня/Tower block SILVIA_PRANDELLI Проверил 2 -South Многофункциональное здание, состоящее 11/12/2015 11/12/2015 IVAN_TOMOVIC Н.контр. 1 -изЗдание южногоБашня/Tower и северного блоков, 2 -объединенное Многофункциональное здание, состоящее building крытым двором/Multifunctional из южногоofи north северного блоков, consisting and south block unified with covered объединенное крытым двором/Multifunctional building precinct consisting of часть, north and south block unified with covered 3 - Стилобатная включающая северную Стадия Лист и precinct южную площадь/Podium consisting of north and south 3 -square Стилобатная часть, включающая северную иGюжную площадь/Podium of north F001_01 and south 4 - Арка главного входа/Arch consisting of the main T entrance square 4 - Арка главного входа/Arch of the main entrance

11/12/2015

F001_01

2

онстр ктивный силикон Structural Silicone онстр Finishedктивный Floor (byсиликон others) Отделанный пол др и Finished Floor (by others) +25,200 пол др и Отделанный

D

Stage 11/12/2015 Sheet

IVAN_TOMOVIC

1

T

11/12/2015 7

Изм. Кол.уч. Лист

N FT кт RA CTIO прое U Y D SECTION AT TO ATRI ыйCONNECTION AR STR 1:10ьн тва MIN CON SCALE:ел ит ELI ельс PR T FOR двар роит NO Пре я ст дл не/ Принципиальные решения Schematic Design

/Разрез на соединении с атри мом

by others др и

Действ е блок - Ал миниевый дверь Обрамление Structural Silicone

Structural Silicone онстр ктивный силикон Finished Floor (by others) Отделанный пол др и

3

Operable Unit - Door Framing Aluminum Extrusion +29,400 Operable Unit Действ е блок - Ал миниевый Обрамление - Door Framingдверь Aluminum Extrusion

G

Stage

2

11/12/2015 11/12/2015

VIOLA_KOSSEDA SILVIA_PRANDELLI

6

ПЕРЕДАЧА ЧЕРТЕЖЕЙ / ISSUE DRAWINGS

Дата / Data

RA E OOR ETAIL / Деталь дверной рамы RA E OOR ETAIL / Деталь дверной рамы

SCALE: 1:5

F001_02

THOMAS_WINTERSTETTER

5

Формат A1

SCALE: 1:5

Действ е блок - Ал миниевый дверь Обрамление

11/12/2015

Drawings is not for the construction and ordering of materials / Чертежи не для строительства и заказа материалов

таж 9/floor Одино ный блок9 застекленный SGU Одино ный блок застекленный

Operable Unit - Door Framing Aluminum Extrusion

11/12/2015

IVAN_TOMOVIC

ETAIL AT CONNECTION TO SECON ARY STEEL/Деталь на соединении дополнительной стали

Стадия3

ПЕРЕДАЧА ЧЕРТЕЖЕЙ / ISSUE DRAWINGS

блок +33,600 Действ еSGU - Ал миниевый дверь Обрамление

ETAIL / Деталь дверной рамы

11/12/2015

SILVIA_PRANDELLI

Date

1

001_SPHERE

2 Checked

Approved

SCALE: 1:2 1

Изм. Кол.уч. Лист

ГИП

8

11/12/2015

VIOLA_KOSSEDA

Approved

ГИП

0.000=0.0004

3

0.000=0.000 Sheet Doc.No Signature

Modif.

H

Drawings is not for the construction and ordering of materials / Чертежи не для строительства и заказа материалов

Structural Silicone онстр ктивный силикон Structural Silicone Operable Unit онстр ктивный силикон - Door Framing Aluminum Extrusion Operable Unit Действ е блок - Door Framingдверь Aluminum Extrusion - Ал миниевый Обрамление

E

-

Designed

1

11/12/2015 11/12/2015

SILVIA_PRANDELLI

Note / Примечания:

Single Glazed Door Side Light стекленная дверь боковой свет Single Glazed Door Side Light 2 стекленная дверь боковой свет

1

Sheets

F001_01

2ГЛ_СПЕЦENG

Date

F001_01

VIOLA_KOSSEDA

Approved

Sheet

T

Typical top detail in section

Sheet Doc.No Signature

Modif.

ГЛ_СПЕЦENG THOMAS_WINTERSTETTER N док. Подпись Дата Designed

Разработал

THOMAS_WINTERSTETTER

Checked

F001_02A

Stage

2

GIP

Южный блок/ Арка/Arch South block 5 1 - Здание Башня/Tower 2 - Многофункциональное здание, состоящее 8 из южного и северного блоков, объединенное крытым двором/Multifunctional building consisting of north and south block unified with covered precinct 3 - Стилобатная часть, включающая северную и южную площадь/Podium consisting of north and south square 4 - Арка главного входа/Arch of the main entrance

4

Single Glazed Door Side Light стекленная дверь боковой свет Single Glazed Door Side Light стекленная дверь боковой свет

SCALE: 1:100

SCALE: 1:5

+16,800

SILVIA_PRANDELLI

1

THOMAS_WINTERSTETTER

Steel Round Hollow Section 3 Powder Coated, mm 7 Ø 219 Round Hollow -toSteel be confirmed by Section PowderContractor Coated, Ø 219 mm Facade -to be confirmed by upon appointment Facade Contractor репление профиля upon ово appointment обли ной панели репление профиля -Алл миневый профиль обли ово ной панели -Алл миневый профиль

2

1 SECTION AT CONNECTION TO ATRI

H

SGU Одино ный блок застекленный

E

Checked 8 Approved

F001_01 Checked

Date

ГЛ_СПЕЦENG Designed

Изм. Кол.уч. Лист

11/12/2015

ГИП

Sheet Doc.No Signature

F001_02A GIP

Design Consultant :

11/12/2015

VIOLA_KOSSEDA

Изм. Кол.уч. Лист

4

Modif.

Suspended Ceiling (by others) Подвесной Потолок ( др и )

Date

THOMAS_WINTERSTETTER

Aluminum PPC coated Алл миний покрытый PPC Aluminum PPC coated Алл миний покрытый PPC

F

Operable Unit - Door Framing Aluminum Extrusion

Ring

A

ГЛ_СПЕЦENG

+25,200 1

Design Consultant :

SAMSUNG C&T 14, Seocho-dearo 74gil,Seocho-Gu,Seoul 137-956, Korea. www.secc.co.kr

Design Consultant :

Designed 8

7

Северный блок/ North block

3

6

Cladding Panel Fixing Profile - Aluminum Extrusion Cladding Panel Fixing Profile репление профиля - Aluminum Extrusion обли ово ной панели репление профиля -Алл миневый профиль обли ово ной панели -Алл миневый профиль

Single Glazed Door Side Light F стекленная дверь боковой свет

Single Glazed Door Side Light стекленная дверь боковой свет

Top leaf

7 6

2

5

Structural Silicone онстр ктивный силикон

Bottom leaf

Typical detail in plan

Steel Profile at Portal Framing Steel Profile at тальной Portal Framing профиль на в оде тальной профиль на в оде

Aluminum PPC coated Алл миний покрытый PPC

Cladding Panel Fixing Profile - Aluminum Extrusion репление профиля обли ово ной панели -Алл миневый профиль

F

6 5

8

Suspended Ceiling (by others) Подвесной потолок др и A Suspended Ceiling (by others) Подвесной потолок др и PPC Coated Aluminum Cladding Panel 2mm Min. Thickness покрытая П PPC Coated Aluminum Cladding Panel алл минивая 2mm ово Min. Thickness покрытая П обли ная панел аллмин. минивая 2мм тол ина 1 обли ово ная панел 2мм мин. тол ина 6

5

Steel Round Hollow Section Powder Coated, Ø 219 mm -to be confirmed by Facade Contractor upon appointment репление профиля обли ово ной панели -Алл миневый профиль

5 4

7

Перви ная стр кт ра плиты перекрытия ( др и )

тальная кр лая полая тр ба с поро ковым покрытием мм подтвердить по назна ени фасадно о подряд ика

0.000=0.000

GIP

SCALE: 1:5

Suspended Ceiling (by others) Подвесной потолок др и

A

Согласовано Взам. инв . N

OOR ETAIL / Вер дверной детали OOR ETAIL / Вер дверной детали

4

ВЗАМ_ИНВ_НОМЕР

3

6

Инв. N подл.

Подп. и дата

1

O 4A TOP 4A TOP O

3 2

5

Подп. и дата

ВЗАМ_ИНВ_НОМЕР

Взам. инв . N

H

OOR

2 1

ИНВ._№_ПОДЛ.

Согласовано

1

SCALE: 1:5

G

Sphare

F001_01 GIP

4

АКЦИОНЕРНОЕ ОБЩЕСТВО «Многофункциональный комплекс «Лахта центр»

General Designer :

Design Consultant :

Sheet Doc.No Signature

Modif.

+25,200 B

ИНВ._№_ПОДЛ.

Согласовано

ВЗАМ_ИНВ_НОМЕР

Взам. инв . N Подп. и дата

тальная кр лая полая тр ба с поро ковым покрытием Ø 219мм подтвердить по назна ени фасадно о подряд ика

ИНВ._№_ПОДЛ.

Инв. N подл.

Steel Round Hollow Section Powder Coated, Ø 219 mm -to be confirmed by Facade Contractor upon appointment

3

Design Consultant : Design Consultant :

Взам. инв . N

F-001-02

B

Steel Round Hollow Section Powder Coated, Ø 219 mm -to be confirmed by Facade Contractor upon appointment

Employer:

14, Seocho-dearo 74gil,Seocho-Gu,Seoul 137-956, Korea. www.secc.co.kr

B

Согласовано

Detail 4 Деталь

C

Primary Structure at Floor Slab (by others)

SAMSUNG C&T

Gasket прокладка

Custom Steel ProfilePowder Coated according to Architect обы ный стальной профиль с поро ковым покрытием в соотв с ар итект рными казаниями

B

Sphere A-A section

14, Seocho-dearo 74gil,Seo

Design Consultant :

№ изменения / change

Изменение/Change

Mixed-use Complex

Structural Silicone онстр ктивный силикон Toggle риле

Aluminum Extrusion - based on Schuco FW 80+ or equivalent alternative Алл миневый профил основаный на Schuco FW 80+ или подобное

ВЗАМ_ИНВ_НОМЕР

F-001-02

2

АК

General Designer :

Project Name :

Design Consultant : General Designer :

Инв. N подл.

SCALE: 1:10

M

Employer:

Galvanized Steel Panel Min. Thickness 2mm О инкованная стальная панель иним м Тол ина 2 мм

Schematic Design / Принципиальные решения

14, Seocho-dearo 74gil,Seocho-Gu,Seoul 137-956, Korea. www.secc.co.kr

3

Project Name :

Mineral Wool Insulation for Fire Proofing Теплоизоля ия из минерольной ерсти для противопожарной за иты

Ревизия/ Revision

Gorproject

T AF TION оект Y DR UC й пр INAR NSTR льны тва ьс ELIM CO рите ител PR T FOR едва стро NO Пр для ОБЩЕСТВО не

Employer:

Sphere B-B section

E

Дата / Data

PPC Coated Aluminum Cladding Panel 2mm Min. Thickness покрытая PPC алл минивая обли ово ная панел 2мм мин. тол ина

/ change Note / Примечания:

General Designer :

2.25

Schematic Des

Fire Resistant Silicone о не стой ивый иликон

Fire Proofing and Smoke Seal противопожарная за ита и Дым Пе ать Galvanized Steel Panel Min. Thickness 2mm О инкованная стальная Панель ин Тол ина 2 мм

Schematic Design / Принципиальные решения

+8,400

TYPICAL SECTION A-A/Типовой A-A разрез A-A

Sleeve Steel Plate at Mullion Splice Connection Р кава стальной плиты оединительные в средник Silicone Jointing allowing for vertical expansion обработка силиконом позволяет рас ирение по вертикали

Пр ля с д "Lakhta Center" не

D

3D model

SCT

A MIN ELI PR T FOR NO

N

2.24

2.26

1

3

Revision Южный блок/ Арка/Arch South block 1 - Здание Башня/Tower 2 - Многофункциональное здание, состоящее из южного и северного блоков, объединенное крытым двором/Multifunctional building consisting of north and south block unified with covered precinct 3 - Стилобатная часть, включающая северную и южную площадь/Podium consisting of north and south square 4 - Арка главного входа/Arch of the main entrance

E ар ите PR T FOR Complex Mixed-use едв тро O

SCALE: 1:10

2.27

ПЕРЕДАЧА Ч Дата / Data

изменения N A ект / change DR UCTIO про R RY ый а INA ONST льн ьств C л ите

Project Name :

A-A разрез A-A 3 TYPICAL SECTION A-A/Типовой D

Drawings is not for the Чертежи не для строи

Северный блок/ North block

+12,600

2.27

Note / Примечания:

Oдино ный стекла

8

G

4A TOP O

железобетон Толерантность перекрытия +/- 25 мм должен быть подтвержден

Ревизия/ Revision

N Note / Примечания: AFT кт R TIO рое Y D TRUC й п ofаmaterials / R Drawings is not forSthe construction and INAне ьныordering тв Чертежи материалов OдляNстроительства тели заказа льс ELIM C ари ите PR T FOR едв стро NO ПЕРЕДАЧА Пр ляЧЕРТЕЖЕЙ / ISSUE DRAWINGS д е н Дата Lakhta Ревизия/

+8,400

E

H

железобетон Толерантность перекрытия +/- 50 мм должен быть подтвержден

Южный блок South block 1 - Здание 2 - Многофу из южно объедин consistin precinct 3 - Стилоба и южную square 4 - Арка гл

2

Detail 5 Деталь

+16,800

Structural Silicone Lakhta онстр ктивный сликонGorproject center SGU

SCT

7

LLION/Типовая деталь средника

SCALE: 1:2

+12,600

A

Reinforced Concrete Slab Tolerances +/- 25mm at Top (to be confirmed by Structural Engineer)

Вставной диск

Дата / Data

H

1

Северный бло North block

ПЕРЕДАЧА прокладка ЧЕРТЕЖЕЙ / ISSUE DRAWINGS Suction Disc

Detail 5 Деталь

F

C

8

Gasket

A

D

7

Reinforced Concrete Slab Tolerances +/- 50mm at Front (to be confirmed by Structural Engineer)

Facade Fixing Bracket коба фасадно о крепления Galvanized Steel Panel Min. Thickness 2mm О инкованная стальная Панель иним м Тол ина 2 мм

Drawings is not for the construction and ordering of materials / Чертежи не для строительства и заказа материалов

+25,200

A

C3

6

Finished Floor (by others) Отделанный пол др и

3

Стадия

Лист

Листов

T

F001_07

-

6

7

8

ГЛ_СПЕЦ

THOMAS_WINTERSTETTER

Разработал

VIOLA_KOSSEDA

Проверил

SILVIA_PRANDELLI

Н.контр.

IVAN_TOMOVIC


[ Project 3. Confidential International Airport]

Yu (Louis) Liu

+1 213-880-6403 (USA) louisyuliu321@gmail.com

Work at Werner Sobek New York.PC 2016.11 - 2018.01 Scope of work: BIM coordination. BIM facade modeling. Data & Parameter managing (Revit API) Collaborate Architect: Foster + Partners

Start at construction design phrase,we are incharge of making BIM coodination model for clash detection purpose. It includes Glazing facade, Apron louver facade, bridge metal cladding facade and serves road louver facade system. It contains 122 facade types including: Glazings panel, Louvers panel, Door, Plentm box, Insulation panel, Aluminum cladding, Panel and Cladding Profiles. Parameters: Total family types: 112 Curtain walls: 45,595m2 Apron faรงade: 1,712m2 Doors: 2,000m2 Bridge facade: 69,531m2

Plan Apron facade

Plan

Apron facade

Adaptive Louver families

Sand louver & Plenum box families


[ Project 3. Confidential International Airport]

Yu (Louis) Liu

+1 213-880-6403 (USA) louisyuliu321@gmail.com

Work at Werner Sobek New York.PC 2016.11 - 2018.01 Scope of work: BIM coordination. BIM facade modeling. Data & Parameter managing (Revit API) Collaborate Architect: Foster + Partners

ADAPTIVE FAMILY LIBRARY

2D DETAILS

Window Louver Panel

Window louvers families

Window Box

Door families

Twin revolving door Glazing families

Window box families 6 Edges Louver panel

ADAPTIVE FAMILY

FAMILY INTERNAL PARAMETERS


[ Project 3. Confidential International Airport]

Yu (Louis) Liu

+1 213-880-6403 (USA) louisyuliu321@gmail.com

Work at Werner Sobek New York.PC 2016.11 - 2018.01 Scope of work: BIM coordination. BIM facade modeling. Data & Parameter managing (Revit API) Collaborate Architect: Foster + Partners

Dynamo plays an important role in attaching prepared adaptive glazing families on to the single curved facade surface: Glazing facade and the Airplane Bridge facade. The modeling process is been large speedup by using by Dynamo tool auto-detect the reference points and attached the heavy family type onto the facade precisely and efficiently.

GLAZING FACADE

Glazing vertical detail

Multiple point adaptive family

Single curved glazing facade

Dynamo script Bridge and Glazing facade BRIDGE FACADE Facade substructure

Single curve cladding

Insulation

Facade vertical detail

Section model

Dynamo script

Liner substructure

Single cruved bridge facade


[Project 4.Confidencial Musesum Project]

Yu (Louis) Liu

+1 213-880-6403 (USA) louisyuliu321@gmail.com

Work at Werner Sobek New York.PC 2014.12 - 2015.06 Scope of work: Complex Facade Rationalization, facade detail design, Rhino (Grasshopper) modelling

In this project, my responsibility in team is facade surface panelization. It includes proposing the rationalized facade division options to make facade geometry cost effective for production, as well as to achieve acceptable visual effects. Final Grasshoper defination contain many auto-generation logic(Figure1-4 panelization. Fiture 5-7 optimization.)

Mockup location

Detail of facade panel

Overall view

89%Flat panels

Grasshopper defination to subdivide the surface

11%Curved panels

5. Auto-detect system combining edge panels

1

2

3

4

6. Auto-Alignment for vertical clusters

1:1 Mockup on the site


[Project 5. Capital crossing southern block]

Yu (Louis) Liu

+1 213-880-6403 (USA) louisyuliu321@gmail.com

Work at Werner Sobek New York.PC 2016.07 - 2016.11 Scope of work: Facade detail design, BIM facade modeling, 2D drafting

This an office building project located in Washington DC. We worked on facade design and BIM modelling. It includes unitized glazing system, skylight glazing system, trellis solar shade system, wind needle glazing system.

3 2

1 1

2

Facade system families 1

3

7

7

6

6

4

Skylight glazing detail

2

5

North side top opaque detail

3

4

Trelis solar shade detail

5

6

7

Wind needle glazing facade detail Elevetor base glazing detail

Elevetor typical glazing detail

Interior lobby glazing system


[Project 5. Capital crossing southern block]

Yu (Louis) Liu

+1 213-880-6403 (USA) louisyuliu321@gmail.com

Work at Werner Sobek New York.PC 2016.07 - 2016.11 Scope of work: Facade detail design, BIM facade modeling, 2D drafting

SKYLIGHT FACADE SYSTEM

Skylight top typical detail

Skylight 3D model

Skylight section

Skylight corner typical detail

Skylight side wall typical detail


[Project 6. Chinese Classics Culture Center]

Yu (Louis) Liu

+1 213-880-6403 (USA) louisyuliu321@gmail.com

Internship work at LXG Atelier, China Architectural Institute of Design and Research, 2010.11-2011.2 Team: Xinggang Li, Zhe Li, Yuting Zhang, Xu Liang Role: Facade Modeling(grasshopper), Facade analysis, Diagram, phycial model

As an international competition located in Beijing Olympic Park, the Chinese Classics Culture Center make up by its tile facade which is an important element at Chinese traditional architecture. In a team of five, my responsibility includes concept design, plan , sections and facade parametric design.

Wall system analysis

Standard 1000*1000 Type 1

Standard 1000*750 Type 2

Standard 500*1000 Type 3

Physical model

Customize X*X Type 4

Roof Corner Tile Type 5

Wall Corner tile Type 6


[Project 6. Chinese Classics Culture Center] Internship work at LXG Atelier, China Architectural Institute of Design and Research, 2010.11-2011.2 Team: Xinggang Li, Zhe Li, Yuting Zhang, Xu Liang Role: Facade Modeling(grasshopper), Facade analysis, Diagram, phycial model 设计图纸——城市 | 设计图纸——建筑 | 透视图 | 模型照片

设计图纸——城市 | 设计图纸——建筑 | 透视图 | 模型照片

中国国学中心(国学研究与国际交流中心)概念性建筑设计方案征集——应征设计方案

四层平面图

0

5 1

20m 10

72

Perspective section 设计图纸——城市 | 设计图纸——建筑 | 透视图 | 模型照片

中国国学中心(国学研究与国际交流中心)概念性建筑设计方案征集——应征设计方案

Plan

中国国学中心(国学研究与国际交流中心)概念性建筑设计方案征集——应征设计方案

层平面图

层平面图

0

5 1

0

20m 10

5 1

Physical study model 20m

10

73

74

Yu (Louis) Liu

+1 213-880-6403 (USA) louisyuliu321@gmail.com


[Project 7. Senior Apartment Design] Acadamic Fund For national university students 2009 fall Instructor: Shujing Wang Individual work

By doing this project, I aimed to study the current condition of the apartment for senior people in Beijing in 2009, and then seek to make a new strategy, which bring more courtyard into the building. By doing so, more intersections will be created between the life of people from the community and the old people inside this apartment. This project is selected by the Academic Fund for National University Students 2009, and the final result exhibit at Southeast University in 2009 fall.

Yu (Louis) Liu

+1 213-880-6403 (USA) louisyuliu321@gmail.com


[Project 7. Senior Apartment Design]

Design process of the residencial building

Tradition apartment

Barrier free egress

Modularization by units

Physical model South side Separate out units for public space

Embed helical circulation as corridor

Yu (Louis) Liu

+1 213-880-6403 (USA) louisyuliu321@gmail.com

Acadamic Fund For national unviersity students 2009 fall Instructor: Shujing Wang

Link public spaces with helical circulation

public balcony for elderly

Physical model courtyards and residential buidlign

Physical model North side


[Project 8. Residential building in Manhattan]

This project is a luxury residential building located in midtown Manhattan. Collaborating with HTO architects, our company in charge of the facade and structure design for this building. My responsibility is coordinate with the structure team, to create the BIM structural model, plans and sections.

Yu (Louis) Liu

+1 213-880-6403 (USA) louisyuliu321@gmail.com

Work at Werner Sobek New York.PC 2017.07 - 2017.10 Scope of work: BIM drafting for structure drawings

Structural Plans

Revit Model

Structural Sections


[ Project 9. International Communication Center] Academic work in Beijing Univerity of Technology, 2010 Spring Instructor: Ying Sun Team: Zhonglin Wang; Chengwei Liu Role: Plan drawing, Digital Modeling, Rendering

Yu (Louis) Liu

+1 213-880-6403 (USA) louisyuliu321@gmail.com

The project is located on the campus of a university. The form is developed from the open book and curled paper pages. Building function is to provide accommodation and entertainment spaces for international guests and visitors. In addition, to let more students get involved in the building, the main tower links a two-story podium, which provides more public space within the campus.

Secondfloorplan

Undergroundfloorplan

1. Texi office 2. Post office 3. Travel agent 4. Bank 5. Phone Booth 6. Watch office 7. Fire room 8. Chief office 9. Storage 10.Garage 11. Commercial center 12. Working room 13. Storage 14. Meeting room 15. Internet room 16. Lobby 17. Hall bar 18. Main entrance 19. Restroom 20. Chinese Food 21. Spectical restaurant 22. Western Food 23. Kitchen 24. Small restaurant 25. Repairment office 26. The car wash 27. Entrance 28. Parking entrance 29. Ramp entrance 30. Luggage room 31. Front desk

Groundfloorplan


[Project 13. Sustainability and Complex Envelopes ] Geco+Grasshopper facade analysis SCI-arc, AS Advanced building systems 2013 Spring Instructor: Ilaria Mazzoleni Team: Hao Wu This project aims to use parametric way to calculate the optimized facade for a winery based on certain solar radiation data and daylight requirements. During the process, grasshopper and Ecotect were used o make the variable parameter influence the number, shape, and the size of the window in a calculating part. Then, Galapagos was applied to compare each feasible parameter and filtered the optimized result.

This board on the right is showing three main aspects of this experiment: 1. The grasshopper definition of parametric process. 2. The compare of the possible values. 3. the optimized result of the whole calculations

Yu (Louis) Liu

+1 213-880-6403 (USA) louisyuliu321@gmail.com


[ Project 10. Concert Hall Design ]

Yu (Louis) Liu

+1 213-880-6403 (USA) louisyuliu321@gmail.com

SCI-Arc, Design Development/Document Seminar 2014 Spring Instructors: Tom Wiscombe, Herwig Baumgartner Team: Hao Wu, Shuangzhi Sheng, Yan Chen Role: Theatre modeling(with grasshoper), HAVC modeling, Facade modeling In this Theater design, we apply the rainbow and colour pattern on the facade creating fusionary imagine for the audiences from outside of the building. 3D model is in Design Development detail level. Trying to represent in a more streightforward and aggressive way, we used a tear-up style to show the section persective of the interiors.

Main structure Sub structure Profiled steal sheet Theater truss Main structure Hang truss

CURTAIN CHUNK

Adaptng Piece Aluminum Board

Fritted glass(3 layers) Water proof

THEATER CEILING Theater ceiling

Thermal insolation

Support

Window frame Silicon Secondery structure Insolation

Steel sheet

THEATER TheaterSECTION section Surface unroll

THEATERCHUNK Decorative laminates Main Structure

ENVELOP CHUNK

Sub Structure Aluminum Board Supply air duct Aluminum Board

Fritted glass(3 layers) Window frame

Sub truss

Waterproof and thermal insolation layers

Main truss Interioral decoration board

Structure unroll Interor floor finish Profiled steel sheet Floor structure HAVC system Hanging ceiling

FLOOR HITTING ENVELOP CHUNK

Main structure

Sub structure

Entrance

STRUCTURE SYSTEM


[Project 11. Advanced Techtonic]

Yu (Louis) Liu

lastic bre abrication

+1 213-880-6403 (USA) louisyuliu321@gmail.com

SCI-Arc, AS, Reflexive Formal Assemblies - Material to System 2012 Fall Instructor: Marcelo Spina Team: Lungchi Chang, Nanyan Chen, Ou Liu, Lu Fan

Working process In this course, we explore the new material of architects to design, development and produce structural assemblies for highly specific performances and applications. New materials and integral manner of building systems and structure are produced. For design idea to fabrication and erection fits precisely our specification and to provide optimized performance. We assemble work boards as a jig and map all the endpoints of carbon fibres. After the carbon fibre is threaded through the correct hole, Layers of resin are applied. The final model is finished as expected. CNC milled foam board

Completed fiber wall


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.