Pham Anh Tuan Portfolio 2015-2020

Page 1

ARCHITECTURE PORTFOLIO Pham Anh Tuan selected work from 2015-2020


Tuan Pham Phone Email Facebook Languages

0933831891 tuananhphamkts@gmail.com https://www.facebook.com/hoangkhuong33424323 Vietnamese, English

Through my experiences working in various professional projects, I have gained in-depth understanding of clients’ preferences as well as sharpened people management skills, to ensure smooth co-operation among suppliers, contractors, and architects.My target is passive design with high comfort and less impact, which is achieved through analyzing the contemporary Vietnamese residential and modern lifestyle.

EDUCATION Bachelor degree in Architecture ( 2009 - 2014 ) of Ho Chi Minh Univeristy of Architecture Good grade certificate

WORK EXPERIENCE 4 / 2011 - 4 / 2012

VN ARC ART COMPANY + VTN COMPANY Intern Architect Main person in charge to design Vietnamese Beer Restaurant in Germany Draw the 3d plan to analyze the surrounding impact Develop the initial concepts to adapt to 2 distinct seasons: hot and cold Work closely and deligently with Architects in Germany to complete the task

On+ Studio Architect

2 / 2015 - 10 / 2015

Main architect to design renovation house in Dist. 2, VN Do site check Draw the 3d plan to analyze the surrounding impact Complete the concept and implementary construction documents Directly deal with clients Main architect to design Greenary Office in Bien Hoa, VN Do site check Draw the 3d plan to analyze the surrounding impact Complete the concept and implementary construction documents Directly deal with clients Design facade concept for Vung Tau Hotel in Vung Tau, VietNam Use Grasshopper to make variety of facade which fit to the salt windy climate of the site Design Glazing Bar in Da Nang, Vietnam Create the initial concept

Sanuki Daisuke Architect - SDA Project Architect

11 / 2015 - 11 / 2017

Main architect to design Greenary apartment in Dist 7, Vietnam Do site check Draw the 3d plan to analyze the surrounding impact Complete the concept and implementary construction documents Directly deal with clients Main architect to design Devyt Office in Ha Noi, VietNam Do site check Draw the 3d plan to analyze the surrounding impact Study and research sustainable facade (more than 100 options) to optimize energy consumption Complete the concept and implementary construction documents

Truong An Architect Senior Architect Main architect to design a variety of projects Dong Nai Kindergarten Bac Lieu Villa Villa in District 9 Townhouse in Tan Binh District Inovation office in Tan Binh District Inovation interior office in Vinh Long

02 / 2018 - 11 / 2018


SOFT SKILLS Presentation Team work Independent work Research and study Model making Communication

Nha Cong Sinh Senior Architect - Team Leader

Team leader in designing a variety of projects NCC Masion Shome Serviced Apartment DKD canopies AKYN OFFICE

Advanced Medium Advanced Advanced Basic Advanced

11 / 2018 - 8 / 2019

Team leader in designing a variety of projects Nha Trang Showroom D2 Villa Nha Trang Villa

Me+ Architect Senior Architect - Team Leader

SOFTWARE Autocad Revit Architecture Sketchup Grasshopper Vray - 3dsmax Ecotect Adobe Illustrator Photoshop Microsoft Office Enscape

Advanced Advanced Advanced Medium Advanced Basic Medium Advanced Medium Advanced

HOBBIES

VOLUNTEER WORKS

Martial Arts Photography Code-Computer Guitar - Playing Variety of sport such as : Soccer, Volleyball Study Architectural theories

2 Green Summer Campaigns 2012 - 2013 2 Charity JailBreak 2015 - 2016

ACHIEVEMENTS

REFERENCE

Consolation prize in Holcim Sustainable Competition (Vertical garden for high school ) Consolation prize in Toa color design competition 4 times get University Scholarship

Sanuki Daisuke - Director of Sanuki Daisuke Architects (SDA) Email : sanumatu@yahoo.co.jp

8 / 2019 - 09 / 2020


CONTENT ACADEMIC PROJECTS 1 ORGANIC KINDERGARTEN 2 SPORT HALL PROFESSIONAL PROJECTS 3 4 5 6 7 8 9 10

TIM PENHOUSE DEVYT OFFICE MANH HOUSE KHOA HOUSE BINH OFFICE CONDAO RESTAURANT SHOME NCC MANSION

OTHERS 12 OTHER PROJECTS



1 Location Phase Budget Role Year

ORGANIC KINDERGARTEN

Tuan Pham Portfolio l 2015-2019 l Acadamic Project

Binh Thanh, HCMC, VietNam Concept No Conceptual Architect 2013 - 2014

MODEL The model shows how architecture harmonizes with its surrounding


1

ORGANIC KINDERGARTEN

1ST FLOOR

GROUND FLOOR

FLOW AND FORM

STREET OF LEARNING (FLA) The shape and form of each block is designed by analyzing the wind flow in order to reduce the gain heat into each building and create comfort in street learning

COURTYARD

COURTYARD Street of learning is the new defination of education which mean student can learn outside class-room and there are a lot of activities hap-pen in street

FLA

COURTYARD

Each block have 1 private courtyard. They are connected by view and activities of children

FLA

COURTYARD



2 Location Phase Budget Role Year

SPORT HALL Binh Thanh, HCMC, VietNam Concept No Conceptual Architect 2013 - 2014

TRANSPARENT BUILDING I try to create the transparent building which is harmonize with its surrounding and make it more pucblic spaces to connect people

Tuan Pham Portfolio l 2015-2019 l Acadamic Project


2

SPORT HALL

Tuan Pham Portfolio l 2015-2019 l Acadamic Project

PARAMETRIC FACADE The facade is designed by parametric software, each panel is different to each other in order to create the moevement facade.The material of facade is mesh to create the transparent buillding which reflect to changed enviroment


2

SPORT HALL

Tuan Pham Portfolio l 2015-2019 l Acadamic Project

FIRST FLOOR

SECOND FLOOR

BASEMENT 1

BASEMENT 2


2

SPORT HALL

Tuan Pham Portfolio l 2015-2019 l Acadamic Project

PUBLIC SPACE The building is not separated to surrounding and people. I try to enhance more public space by create the greenroof and facilities in the basement which connect groundfloor

LANDSCAPE PLAN

BASEMENT PERSPECTIVE



3

TIM PENTHOUSE Location Phase Budget Role Year

Happy Valley, HCMC, VietNam complete 200.000 USD Main Architect 2016 - 2017

OPEN PENTHOUSE This is reality project and we try to apply the new concept of open space in apartment. Open space is mean to reduce the wall and closed space.

FLOW SPACE Concept of designing interior is creating the smooth corner and conect all of actions of apartment from bedroom to livingroom . The void and solid program early defined, solid consist of bedrooms and wc and void consist of living kitchen and empy space.Greenary spaces are created to bring relaxing mosphere and comfortable for this apartment

EXISTING SITE The penthouse is located on the top of block A HAPPY VALLEY. Therefore, there are many beautifull scenses we can see from the top.On the other hand, the existing height of the apartment is not so high ( just only 2.7m ) so we want to keep the height as high as poosible, especially empty space we do not make a additional ceiling in order to keep orginial height.


3

TIM PENTHOUSE

GREENARY WITH TROPICAL MATERIAL We try to create the greenary space in penthouse which lack of plants and tree. The selective plants on steel pots will provide good air and make space more interesting. We pay attention on material and choose many brutal material such as mortal, oak wood and terrazzo.


3

TIM PENTHOUSE

GREENARY WITH TROPICAL MATERIAL WOODEN STORAGE AS DECORATED WALL We try to create the greenary space in penthouse which lack of plants and tree. The selective plants on steel pots will provide good make space Weneed pay the attention on material andtheir choose many brutal material suchso aswe mortal, Its air the and apartment meet more client interesting. request. They afforable storage for memories and their luagges, createoak the wood and terrazzo. patterned wooden storage which can use for storing and decorating. The kid’s room is designed with movable sliding doors which ca n easily to open all or closed ( when we want to create open feeling ).The Stacking greenary pods are placed near to windows of apartment to create the greenary space which is lack of.

HIDDEN DOORS we try to hide all the wooden door in order to create the seamless beautifull surface for storage. The hiden wooden door need to pay attention on detail and how to make it.


3

TIM PENTHOUSE

FLEXIBLE SPACE We try to create flexible space by motivable doors in bedroom. We can create private space by closing all sliding doors and create open space by opening all sliding doors.



4

DEVYT OFFICE Location Phase Budget Role Year

Cau Giay Dist, Ha Noi City, VietNam Complete 2.000.000 USD Main Architect 2017 - 2018

CONNECTING OPEN OFFICE

Executive / VIP zone Public zone W orks

The project site is located on the part of elementary school of Devyt. The original building was not for office space, designed for the gymnasium with indoor swimming pool. So the scale of the space of original building is not fit to the office dimension. However we thought it could be very interesting and challenging project by conversion from gymnasium to Office space. <Connecting by Floor void> At the first, we focused on the big ceiling space. The space of gymnasium is very wide and has high ceiling. We would like to keep this open with high ceiling as much as possible, and try to connect each floor with the Void of floor. We cut 1F floor and make sunken garden for the air ventilation, at the same time, we connect to the Ground floor from Basement floor. Secondly, We keep original floor Void and visually connect from the Entrance hall to MF working space. Thirdly, 2F had very high ceiling. So we designed to set additional floor on part of 2F as like loft, and keep a big lounge space for connecting all of second floor function. The original large scale building makes very special and unique office space. And through the void, the people can see each activity and feel very open. <Clear Zoning> The planning has clear zoning. BF and MF is workspace. Between the workspace, 1F, is public function like the entrance hall, conference hall, showroom space, and recreation space for staff. And 2F and mezzanine of 2F is for executive officer and VIP lounge area. Each zone has characteristic spaces, and this design has a verity of the space with the big scale space.

EXISTING SITE If we use the basement for office space, we nee to prepare the outside courtyard for getting natural- daylight, and Ventilation. *But we need to solve fire protection issue again. In the Japanese regulation, we need to make dry area for the working, house on BF. Because if we don’ t have dry area, high humid make damage everything, and people cannot stay long time.

COURTYARD TYPE OPTIONS We have two options for the BF, 1F layout. Both options have the big Void in the first floor and the basement space have courtyard as like sunken garden. We strongly recommend that we must to put this courtyard, because we need to keep the ventilation for solving the high humidity of the basement floor. In addition, we would like to take the daylight by this courtyard, for your company’ s people to work comfortably.


4

DEVYT OFFICE

BF- Workspace 1 Plan Original BF was big area for the car parking. We tried to make Sunken garden for getting natural light and ventilation for the working space. We tried to reduce the wall as less as possible for making open

1F- Entrance hall + Conference Plan First floor is public space of the company. It was contained the entrance hall, conference hall, showroom area, and recreation space for staff. From the entrance to the Elevator hall is connected by the corridor


4

DEVYT OFFICE

MF- Workspace 2 Plan MF is working area. We have one room working space, big meeting space, the pantry area, and roof terrace for staff recreation.

2F- VIP Rounge & CEO room Plan We try to create flexible space by motivable doors in bedroom. We can create private space by closing all sliding doors and create open space by opening all sliding doors.


4

DEVYT OFFICE

Facade Option 1 : Louver Option1 We tried to use the vertical louver for the building envelope. In this design, the louver is separated as layer, and each layer has different angle, distance louvers according with the function and room usage. Sometimes there are empty hole and from inside can see through the View. The material is galvanized steel with paint.

Facade Option 2 : Louver Option2 This option was updated from Option1. We tried to combine the material of Alu plate / steel and frosted glass, and mirror. The feeling from the indoor will be more interesting and we can make many place. We imaged that these two options from Devyt Logo mark.

Facade Option 3 : Patterned Panel Option We tried to use the vertical louver for the building envelope. In this design, the louver is separated as layer, and each layer has different angle, distance louvers according with the function and room usage. Sometimes there are empty hole and from inside can see through the View. The material is Aluminum plate or galvanized steel with

Facade Option 4 : Square Panel Option We use the square flame with mesh and covered in the building envelope. There are two layer of this square mesh, and each layer overwrapping together. This surface will be very unique and become like Skin surface. Each panel has different angle, so the appearance from the indoor will be changed according with solar moving


4

DEVYT OFFICE

REALITY After nearly 1 year constructioc. We can see the differences from concept to reality, Nearly 80% close to concept due to request of client



6

MANH HOUSE Location Phase Budget Role Year

Tan Binh Dist, HCMC, VietNam underconstruction 300.000 USD Main Architect 2018 - now

WOODEN HOUSE In this project i try to solve typical problem of row house in Vietnam. As we know row house is very popular in Vietnam. The wekaness of row house is lack of lighting and ventilation which play as important role in comfortable condition. I try to create the curtain wall in between each bedroom in order to create lighting form skylight and get ventilation. As client request, he realy like woods and do bussiness related to wood, so I try to use as much as possbile wooden material in this building. The Facade is mixing of wood and stone material.The interior is mixing of variety kind of wood.


6

MANH HOUSE

GF- Ground Floor The height of first floor is very low ( 2.5m ) . Therefore, we try tro get maximum skylight by create the lightweight steel stiar with glazing handrail. The granite stone try to connect all the function of the room

1F- First Floor The Granite stone connect all the function room from the ground floor to first floor.


MANH HOUSE

2F- Second Floor Second floor is room used for bedroom, as we say before due to weakness of row house we dont have enough lighting into bedroom and ventilation, so i try to create the wooden curtain wall combine door in order to get lighting and ventilation for all bedroom and make the space bigger

TF- Top floor Top floor is used for mediation space, so i try to get the skylight from the top of building to create holy spirit atmosphere. CTY CỔ PHẦN TƯ VẤN THIẾT KẾ

6



7

KHOA HOUSE Location Phase Budget Role Year

4 Dist, HCMC, VietNam underconstruction 200.000 USD Main Architect 2018 - now

BIG GARDEN WITH ENCLOSED DECORATED MESH The Project is located on crossroad, and there is no good view to see. My concept is to create the building inside garen with enclosed decorated mesh.As you know, Row house in Ho Chi Minh city is poor - lighting and ventilation quality. They try to build maximumly the area so we dont have anough space for lighting and ventilation. Greenary is also the problem of row house in HCMC. Because of these issues, I try to add more plants and green layer into building and set up variety void into catch wind and lighting into building. The client request the big space of living room, so i try to crea the semi-private living room which you can easily change the are of living from private into option living with greenary surrounding, we call it as Flexible space In that project, i try to use new kind of material metal mesh and rustic steel.

DECOREATED MESH The lighting will create the miracle atmosphrere. With the metal mesh, the building can melt into environement and cannot be dorminant in to another building. It’s the new idea of how lighting and greenary can combine togerther in order to create the new experience architecture. There are many reference of this concept such as Opical glass house by Hiroshi Nakamaura or Skacking green by Sanuki Daisuke.


7

KHOA HOUSE

hoà nöôùc

phoøng nghæ

saân trong

BEÁP

phoøng thôø

VS

PHOØNG KHAÙCH PHOØNG ĂN

saøn ngoaøi trôøi

ẦNG 1

First Floor The client request the big space of living room, so i try to crea the semi-private living room which you can easily change the are of living from private into option living with greenary surrounding, we call it as Flexible space

void

wc

tủ quần áo

void

PHOØNG NGUÛ wc ban coâng PHOØNG NGUÛ void

ban coâng

void

1000

2970

6630

5200

6500

Second Floor Sendconf floor is used for bedrooms. I try to create variety void in order to create ẦNG the exciting circulation 2 and catch wind and lighting into building.



8

BINH OFFICE Location Phase Budget Role Year

12 Dist, HCMC, VietNam underconstruction 500.000 USD Main Architect 2018 - now

STONE OFFICE The Project is locaed in the rural area far away from center of HCMC. This is the office for industrial working where is very polluted and noisy. As client request, they want to create the natural building with natural material. Therefore, I try to use as much as possible stone material in this building in order to create natural feeling not artifical feeling. The stone is cutting stacked granite natural stone which is cheap and beautifull in VietNam, we can import material easily becuase it’s local material with reasonable price. I try to create waterfall and pool as entrance to create the welcome signature for building and contribute to landscape of building The cutting stacked granite natural stone is main material. It’s used for wall, gate and facade material

SHADING FACADE The building facde to the west where the building gain a lot of heat and poor - quality ventilation, therefore i try to create many big louvers to cut the light to reduce the heating into building. Furthure more, by putting many good plants in front of building we can reduce a lot of heating into building and catch a good ventilation.


Second Floor Second floor is used for working space, where we need open space and comfortable feeling. By creating the void-garden in front of building and back of building, we can make office is more “ green ” and people who work here can easily relax after long hour working.

kt-01

4

200

250

P/S

200

250

200

400

1600

2200 1200

100 11350 600 1515

1700

100

200

900

1

kt-01

1700

100

1400

-0.050

200

800

-0.100

400 400

P.PHOÙ GIAÙM ÑOÁC +0.000

2810

P.KEÁ TOAÙN +0.000

P.KINH DOANH +0.000

7800

P.GIAÙM ÑOÁC +0.000

3400

3400

200

4495

2690

1900 200

SAÂN VÖÔØN

+0.000

P.HOÏP

800

400

2750

200

400

300

COPY

250

450

2700

245 1650

400

400 400 400

-0.030

400 1750

5900

cửa lam nhôm mở cách sàn 900 để thoát hơi

4150

100 1750

1750

-0.030

2

kt-01

1700

1100

200

300300

300300

300

100

P/S

1100 21

01

19

03

2680

11

1500

3

kt-01

3880

SAÛNH THANG 280 -0.050

1500

3280

THOÂNG TAÀNG

KHO

WC

WC

15 2480 13

17

09

07

05

160

p/s

200

200

P/S

200

300

thông lên tầng 1 để thoát hơi tầng hẩm

6000

-0.050

450

700 400

-0.100 SAÂN VÖÔØN

kt-01

ảo vệ

200

550

750

C/B

P/S

250

200

P/S

200 300

LOÁI VAØO

900

900

100

100 14080

2690

1

kt-01

-0.500 ẶT BẰNG THANG TẦNG 1 TL 1/50

-0.250

3660

ramp doác

3660

+0.000

Ế CTY CỔ PHẦN TƯ VẤN THIẾT KẾ

+0.000

BAÕI XE

10280

2

kt-01

+0.250 +0.300

01

03

05

+0.200

hoà nöôùc

3

kt-01

1350

+0.050 +0.300

3780

3100

2500

SAÂN VÖÔØN -0.100

4780

+0.300

saøn goã +0.350

baøn thôø

2400

200 1000 100 850 350 1250

P/S

First Floor We try to create the big garden in first floor and well- designed pool for waterfall. as you know, the first floor is used for carpark therefore it’s very dark and poor ventilation, with the big-void garden we can get natural lighting and ventilation for car park. 4

400 16800 600

1400 4100 4150 1395

2950 600 1700

21

1800

19

305

6800 100

4000 4000 6000 2780

17

1700

15

1300

13

1800

23

200 500

11 25

1355

07

07 05

27

09

03

29

01

P/S

1000 200

300

900

thaùc nöôùc

200

8 BINH OFFICE


8

BINH OFFICE

REALITY There is many changes from the origin of design such as the stone material concrete of facade. However wen still keep as much as possible layout and space.



9

CONDAO RESTAURANT Location Phase Budget Role Year

Con Dao, Phu Quoc, VietNam Concept 500.000 USD Main Architect 2019 - now

MOUNTAIN ROOF

How to experience cloud on the top of the mountain ?

STRUCTURE

CLOUD

A Cloud-Like Foam. KOHEI NAWA

Crystal Cloud. ANDY CAO

TRANSLUCENT CURTAINS SOFT

LAYER


9

CONDAO RESTAURANT

The project located on the top of building. The feeling when i first steped on the site is like reach the peak of mountain and we see the cloud around us. Therefore, i want to create that atmosphere with architecture. By creating the different height reflection metal pyramid. I hope that people can feel “ the cloud�

Another options In order to archive cloud feeling we try to cut out the ceiling, furniture, counter bar.... by invisible cloud shapes. This concept is very interesting, however there is many drawbacks and over budget



10

SHOME

Main Concept This is serviced apartment located in PhuNHuan. The client request classical architecture due to his interest and request from CityHouse which manage building after completion. But i want to create the Neo-classical architecture not classical architecture, so we try to simplize details and add modern elements on the top of building. Location Phase Budget Role Year

Phu Nhuan Dist, HCMC, VietNam underconstruction 1.000.000 USD Main Architect 2019 - now


10

SHOME

Perspective of Lobby The interior is following the main concept by simplizing details and installing modern element which harmonize with surrounding


10

SHOME

Perspective of Unit The interior is following the main concept by simplizing details and installing modern element which harmonize with surrounding


10

SHOME

BASEMENT

SECOND FLOOR

FIRST FLOOR

ROOFTOP



11 Location Phase Budget Role Year

Nguyen Canh Chan Mansion How can a person experiment more in a villa? A mansion is a home with high-class HOSPITALITY FUNCTIONS According the request of client we create a lot of model which deal with the issues. We finalize 3 model which almost solve the problem and after discussing with client we finalize 2 option. First one is cut-out sculpture and the second one is layerscpae

1 Dist, HCMC, VietNam Concept 2.000.000 USD Main Architect 2019 - now

OPTION 1 DEVLELOPMENT : CUTOUT SCULPTURE

p r i v a t e

All first option models

g a t h e r i n g

h a r m o n y

The building is like a sculpture in which the open areas were cut out and the closed spaces were kept Feeling the closed and open spaces in the building is like enjoying 4D art masterpiece (lighting, form and time) The building which is closed to the outdoor and open towards the inside, provides a high level of privacy The building’s design follows the minimalism but it is still lively and attractive. The closed spaces ( bedrooms, movie theatre,...) are connected together via a continuous open area ( grand living room, common space,.. ) which have strong link to the nature Each space has their own features although the building is unified as the whole


11

Nguyen Canh Chan Mansion

OPTION 2 DEVELOPMENT : LAYERSPACE A blur lighting box, like a lantern at night, makes the building lively and attractive. This box is also the boundary to keep privacy for the whole family Common spaces are connected together and to the nature via the rooftop. Therefore the family members can approach these spaces and gather together easily Locating the bedrooms in some separated blocks enhance the privacy of each small group in a big and extended family

OPTION 1 CUTOUT SCULPTURE

OPTION 2 LAYERSPCACE


12

ANOTHER PROJECT


Thank you tuananhphamkts@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.