RENDERS
SKYLIGHT 1
SEALANT TO FIX GLASS TO THE FRAMEWORK 12 MM THK. TOUGHENED GLASS
E'
E'
60 MM X 60 MM MS BOX SECTION
E'
PARAPET WALL 2 MM THK. TOUGHENED GLASS ABOVE 12 MM THK. TOUGHENED GLASS
230 MM PARAPET WALL
PARAPET WALL BELOW
DETAIL A SCALE 1:5
SECTION EE'
FLOOR LEVELS: FINISHED ROAD LVL @+102.00 FRL GROUND FLOOR LVL @+102.60FFL FIRST FLOOR LVL @+106.35FFL SECOND FLOOR LVL @+110.10FFL THIRD FLOOR LVL @+113.85FFL TERRACE FLOOR LVL @+116.85FFL
2 MM THK. TOUGHENED GLASS SEALANT 12 MM THK. TOUGHENED GLASS 60 MM X 60 MM MS BOX SECTION
C
C
B
B
A
A'
PARAPET WALL
ARCHITECT :
CHETAN .G .B
ARCHITECT SIGN:
PARAPET WALL
CHECKED BY
CHETAN .G .B
DRAWN BY
ANSHUL
ISOMETRIC VIEW - SKYLIGHT
SECTION DD'
60 MM X 60 MM MS BOX SECTION 2 MM THK. TOUGHENED GLASS
60 MM X 60 MM MS BOX SECTION
60 MM X 60 MM MS BOX SECTION
PARAPET WALL
PARAPET WALL
PARAPET WALL
shuonya nava
ISOMETRIC VIEW - SKYLIGHT
Designs Pvt Ltd
ISOMETRIC VIEW - FRAMEWORK
ISOMETRIC VIEW - FRAMEWORK
Bangalore Address: Chetana house, 1st floor 10th cross,Vasanthnagar Bengaluru -560 052, Karnataka, India. Tel: +91 80 22340405 -06 Email: design@shuonya.com
PROVISIONS MADE 50.0000
50.0000
50.0000
NO. DESCRIPTION
NOS
+118.83 m FFL
+118.83 m FFL
7 8 9 10 11 12 13 14 15
+118.83 m FFL
COMMON TOILET (PU HOSTEL)
LIBRARY & DIGITAL LIBRARY WAITING LOBBY & INFO DESK GAMES ROOM MULTI PURPOSE HALL WASHING AREA RECORDS & STORE ROOM ENTRY
COURT
NET
SHORT SERVICE LINE
EDGE OF BACK PAVEMENT BOUNDARY LINE
RIGHT HALF
LEFT HALF COURT
CENTER LINE
RIGHT HALF COURT
LEFT HALF
COURT
POST
LONG SERVICE LINE (DOUBLES)
EDGE OF PAVEMENT BACK BOUNDARY LINE
RIGHT HALF
CENTER LEFT COURT HALF LINE
SIDE BOUNDARY COURT LINE (SINGLES)
SHORT SERVICE LINE
SICK ROOM WITH HANDICAPPED TOILET 3 WARDEN'S ROOM 3 ROOMS(3 BUNKER BEDS PER ROOM)(MS) 56 ROOMS(4 BEDS PER ROOM)(HS) 119 ROOMS(3 BEDS PER ROOM)(PU) 107 COMMON TOILET (MIDDLE SCHOOL) 8 COMMON TOILET (HIGH SCHOOL) 8
SIDE BOUNDARY LINE (DOUBLES)
RIGHT HALF COURT
NET
LEFT HALF COURT
SIDE BOUNDARY LINE (SINGLES)
SIDE BOUNDARY LINE (DOUBLES) POST
1 2 3 4 5 6
LONG SERVICE LINE (DOUBLES)
TYPICAL LIST FOR HIGH SCHOOL MIDDLE SCHOOL AND PU BOYS HOSTEL
+ 681.55 LVL
8 2 2 2 6 25 2 5
DINING HALL +115.08 m FFL
+115.08 m FFL
16 17
+115.08 m FFL
18 19 20
+111.33 m FFL
DETAIL F
DETAIL E
+111.33 m FFL
21 22 23 24 25 26
+111.33 m FFL
DINING AREA HANDWASH KITCHEN PANTRY DISH WASH UTENSIL STORE
STORE DAY STORE WATER STORAGE FUEL STORE TOILET
3 3 1 1 1 1 2 1 2 1 1
- 230mm MASONRY WALL - 3750mm X 115mm MASONRY WALL
- 2100mm X 115mm MASONRY WALL - JALI WALL - BRICK CLADDING 115mm THK
DETAIL E
+107.58 m FFL
+107.58 m FFL
+107.58 m FFL
ALL FLOOR LEVELS:
GROUND LEVEL
-
107.15 M FGL
GROUND FLOOR LEVEL -
107.60 M FFL
FIRST FLOOR LEVEL
-
111.35 M FFL
SECOND FLOOR LEVEL -
115.10 M FFL
-
118.85 M FFL
THIRD FLOOR LEVEL
TERRACE FLOOR LEVEL -
122.60 M FFL
1 2 3
+107.60 m FFL +107.58 m FFL
+118.83 m FFL
+118.82 m FFL
252423 2221201918 17161514 1 2 3 4 5 6 7 8 9 101112 13
3 2 1 3 2 1
1 2 3
1415161718 19202122 232425 1312 1110 9 8 7 6 5 4 3 2 1
+118.83 m FFL
+118.82 m FFL
1 2 3
3 2 1
3 2 1
1 2 3
TILE JOINT DETAIL 'E' 1312 1110 9 8 7 6 5 4 3 2 1 1415161718 19202122 232425
1 2 3
1 2 3 4 5 6 7 8 9 101112 13 252423 2221201918 17161514
1 2 3 4 5 6 7 8 9 1011 1213 2524 2322212019 18171615 14
+115.08 m FFL
+115.08 m FFL
+115.07 m FFL
+115.07 m FFL 25 24 1 23 2 22 3 21 4 20 5 19 6 18 7 17 8 16 9 15 10 14 11 12 13
+111.35 m FFL
3 2 1
3 2 1
3 2 1
3 2 1
+111.33 m FFL
TILE JOINT DETAIL 'F' +111.33 m FFL
+111.33 m FFL
+107.58 m FFL
+107.58 m FFL
+111.32 m FFL
+111.32 m FFL
+107.57 m FFL
+107.57 m FFL
SL. NO
2
PLASTERING IN CM 1:4 WITH WALL CARE PUTTY 15MM THICK AND 12 MM THICK GROOVES ALL AROUND INTERNAL THE DOOR FRAMES. IN CM 1:4 WITH SPONGE FINISH EXTERNAL 18MM THICK. IN CM 1:3 WITH PUTTY 12MM CEILING THICK. TREAD = 300MM STAIRCASE RISER = 150MM STAIR WIDTH = 2000MM S.S HANDRAIL AND GRANITE TOP, TO DETAIL . GRANITE STONE FINISH FOR STEPS & LANDING.
+118.82 m FFL
4
+115.07 m FFL
+111.32 m FFL
+107.57 m FFL
+115.07 m FFL
DOOR MAIN DOOR
PROJECT CONSULTANT'S :
TEAK WOOD FRAME WITH 30MM FLUSH DOOR ENGINEERED COIR COMPOSITE SHUTTER CLAD WITH TEAK WOOD VENEER AND EDGE IN 6MM THK TEAK WOOD LIPPING ROOM DOOR SALWOOD FRAME WITH 30mm THK. FLUSH DOOR ENGINEERED COIR COMPOSITE SUTTER.
5
ROOM DOORS
6
TOI & BATH DOORS
WPC SECTION FRAME AND SHUTTER AS PER BOQ.
7
WINDOWS
THREE /TWO TRACK uPVC FRAMES WITH GLAZED uPVC SHUTTERS.
8
FLOORING
19MM THK GRANITE WITH SKIRTING AS PER BOQ .
9
WC & BATH FLOORING
ANTI SKID CERAMIC TILE SIZE 300 X 300 MM OF APPROVED COLOR SCHEME.
10
WC & BATH DADOOING
CERAMIC TILES 300X600 MM 6MM THICK.
11
PLUMBING
AS PER PLUMBING DRAWING AND SPECIFICATIONS IN BOQ.
12
PAINTING
+111.32 m FFL
+107.57 m FFL
230 MM AND 115 MM THICK BURNT BRICK MASONRY WALL WITH 115 THK WIRE CUT BRICK CLADDING & PLASTERED AS PER SPECIFICATION.
WALL
3 +118.82 m FFL
SPECIFICATIONS :-
1
INTERNAL
TWO COATS WITH PLASTIC EMULSION PAINT
EXTERNAL
TWO COATS WITH ANTIFUNGAL PAINT
E:\ABHI\SANGOLLI\HOSTEL\Chetana New Logo.JPG
Z:\CHETAN\SANGOLLI RAYANNA\CAD\WORKING DRAWINGS\HOSTEL\Chetana New Logo.JPG
shuonya nava
Designs Pvt Ltd
Bangalore Address: Chetana house, 1st floor 10th cross,Vasanthnagar Bengaluru -560 052, Karnataka, India. Tel: +91 80 22340405 -06 Email: design@shuonya.com
GOOD FOR CONSTRUCTION
HIGH SCHOOL, MIDDLE SCHOOL, & PU COLLEGE HOSTEL BLOCK TOILET DETAIL
PROVISIONS MADE 50.0000
50.0000
50.0000
NO. DESCRIPTION
NOS
+118.82 m FFL
+118.83 m FFL
+118.83 m FFL
+118.82 m FFL
7 8 9 10 11 12 13 14 15
COMMON TOILET (PU HOSTEL)
LIBRARY & DIGITAL LIBRARY WAITING LOBBY & INFO DESK GAMES ROOM MULTI PURPOSE HALL WASHING AREA RECORDS & STORE ROOM ENTRY
COURT
NET
SHORT SERVICE LINE
EDGE OF BACK PAVEMENT BOUNDARY LINE
RIGHT HALF
LEFT HALF COURT
CENTER LINE
RIGHT HALF COURT
LEFT HALF
COURT
POST
LONG SERVICE LINE (DOUBLES)
EDGE OF PAVEMENT BACK BOUNDARY LINE
RIGHT HALF
CENTER LEFT COURT HALF LINE
SIDE BOUNDARY COURT LINE (SINGLES)
SHORT SERVICE LINE
SICK ROOM WITH HANDICAPPED TOILET 3 WARDEN'S ROOM 3 ROOMS(3 BUNKER BEDS PER ROOM)(MS) 56 ROOMS(4 BEDS PER ROOM)(HS) 119 ROOMS(3 BEDS PER ROOM)(PU) 107 COMMON TOILET (MIDDLE SCHOOL) 8 COMMON TOILET (HIGH SCHOOL) 8
SIDE BOUNDARY LINE (DOUBLES)
RIGHT HALF COURT
NET
LEFT HALF COURT
SIDE BOUNDARY LINE (SINGLES)
SIDE BOUNDARY LINE (DOUBLES) POST
1 2 3 4 5 6
LONG SERVICE LINE (DOUBLES)
TYPICAL LIST FOR HIGH SCHOOL MIDDLE SCHOOL AND PU BOYS HOSTEL
+ 681.55 LVL
8 2 2 2 6 25 2 5
DINING HALL +115.07 m FFL
+115.08 m FFL
+115.08 m FFL
+115.07 m FFL
16 17 18 19 20
+111.32 m FFL
+111.33 m FFL
+111.32 m FFL
+111.33 m FFL DETAIL F
+107.57 m FFL
+107.58 m FFL
21 22 23 24 25 26
DINING AREA HANDWASH KITCHEN PANTRY DISH WASH UTENSIL STORE
STORE DAY STORE WATER STORAGE FUEL STORE TOILET
3 3 1 1 1 1 2 1 2 1 1
- 230mm MASONRY WALL - 3750mm X 115mm MASONRY WALL
- 2100mm X 115mm MASONRY WALL - JALI WALL - BRICK CLADDING 115mm THK
+107.57 m FFL
+107.57 m FFL
ALL FLOOR LEVELS:
GROUND LEVEL
-
107.15 M FGL
GROUND FLOOR LEVEL -
107.60 M FFL
FIRST FLOOR LEVEL
-
111.35 M FFL
SECOND FLOOR LEVEL -
115.10 M FFL
-
118.85 M FFL
THIRD FLOOR LEVEL
TERRACE FLOOR LEVEL -
122.60 M FFL
12 3
3 2 1
+118.82 m FFL
+118.82 m FFL
+118.82 m FFL
25 242322 21201918 17161514 1 2 3 4 5 6 7 8 9 1011 1213
3 2 1 1 2 3
141516 171819 202122 232425 13 121110 9 8 7 6 5 4 3 2 1
+118.83 m FFL
+118.83 m FFL
1 2 3
+118.82 m FFL 3 2 1
3 2 1
1 2 3
13 121110 9 8 7 6 5 4 3 2 1 141516 171819 202122 232425
1 2 3
1 2 3 4 5 6 7 8 9 1011 1213 25 242322 21201918 17161514
1 2 3 4 5 6 7 8 9 10 111213 252423 22212019 18171615 14
+115.08 m FFL
+115.08 m FFL
+115.07 m FFL
+115.07 m FFL
+115.07 m FFL
+115.07 m FFL 25 24 1 23 2 22 3 21 4 20 5 19 6 18 7 17 8 16 9 15 10 14 11 12 13
3 2 1
+111.33 m FFL
DETAIL E
+107.58 m FFL
+111.33 m FFL
+111.32 m FFL
+107.58 m FFL
+107.57 m FFL
+111.32 m FFL
+107.57 m FFL
+111.32 m FFL
+111.32 m FFL
+107.57 m FFL
+107.57 m FFL
SL. NO
+118.82 m FFL
+118.82 m FFL
TILE JOINT DETAIL 'E'
+115.07 m FFL
+115.07 m FFL
2
PLASTERING IN CM 1:4 WITH WALL CARE PUTTY 15MM THICK AND 12 MM THICK GROOVES ALL AROUND INTERNAL THE DOOR FRAMES. IN CM 1:4 WITH SPONGE FINISH EXTERNAL 18MM THICK. IN CM 1:3 WITH PUTTY 12MM CEILING THICK. TREAD = 300MM STAIRCASE RISER = 150MM STAIR WIDTH = 2000MM S.S HANDRAIL AND GRANITE TOP, TO DETAIL . GRANITE STONE FINISH FOR STEPS & LANDING.
4
+115.07 m FFL
+111.35 m FFL
DOOR MAIN DOOR
+111.32 m FFL
+111.32 m FFL
TILE JOINT DETAIL 'F'
+107.57 m FFL
+107.57 m FFL
+107.57 m FFL
PROJECT CONSULTANT'S :
TEAK WOOD FRAME WITH 30MM FLUSH DOOR ENGINEERED COIR COMPOSITE SHUTTER CLAD WITH TEAK WOOD VENEER AND EDGE IN 6MM THK TEAK WOOD LIPPING ROOM DOOR SALWOOD FRAME WITH 30mm THK. FLUSH DOOR ENGINEERED COIR COMPOSITE SUTTER.
5
ROOM DOORS
6
TOI & BATH DOORS
WPC SECTION FRAME AND SHUTTER AS PER BOQ.
7
WINDOWS
THREE /TWO TRACK uPVC FRAMES WITH GLAZED uPVC SHUTTERS.
8
FLOORING
19MM THK GRANITE WITH SKIRTING AS PER BOQ .
9
WC & BATH FLOORING
ANTI SKID CERAMIC TILE SIZE 300 X 300 MM OF APPROVED COLOR SCHEME.
10
WC & BATH DADOOING
CERAMIC TILES 300X600 MM 6MM THICK.
11
PLUMBING
AS PER PLUMBING DRAWING AND SPECIFICATIONS IN BOQ.
12
PAINTING
+111.33 m FFL
+111.32 m FFL
3 2 1
230 MM AND 115 MM THICK BURNT BRICK MASONRY WALL WITH 115 THK WIRE CUT BRICK CLADDING & PLASTERED AS PER SPECIFICATION.
WALL
+107.58 m FFL
3 2 1
SPECIFICATIONS :-
1
3
+107.60 m FFL +118.82 m FFL
3 2 1
INTERNAL
TWO COATS WITH PLASTIC EMULSION PAINT
EXTERNAL
TWO COATS WITH ANTIFUNGAL PAINT
E:\ABHI\SANGOLLI\HOSTEL\Chetana New Logo.JPG
Z:\CHETAN\SANGOLLI RAYANNA\CAD\WORKING DRAWINGS\HOSTEL\Chetana New Logo.JPG
shuonya nava
Designs Pvt Ltd
Bangalore Address: Chetana house, 1st floor 10th cross,Vasanthnagar Bengaluru -560 052, Karnataka, India. Tel: +91 80 22340405 -06 Email: design@shuonya.com
GOOD FOR CONSTRUCTION
HIGH SCHOOL, MIDDLE SCHOOL, & PU COLLEGE HOSTEL BLOCK TOILET DETAIL
PROVISIONS MADE 50.0000
50.0000
50.0000
NO. DESCRIPTION
NOS
RAISED BY 150MM +118.83 m FFL
+118.83 m FFL
7 8 9 10 11 12 13 14 15
+118.83 m FFL
COMMON TOILET (PU HOSTEL)
LIBRARY & DIGITAL LIBRARY WAITING LOBBY & INFO DESK GAMES ROOM MULTI PURPOSE HALL WASHING AREA RECORDS & STORE ROOM ENTRY
COURT
NET
SHORT SERVICE LINE
EDGE OF BACK PAVEMENT BOUNDARY LINE
RIGHT HALF
LEFT HALF COURT
CENTER LINE
RIGHT HALF COURT
LEFT HALF
COURT
POST
LONG SERVICE LINE (DOUBLES)
EDGE OF PAVEMENT BACK BOUNDARY LINE
RIGHT HALF
CENTER LEFT COURT HALF LINE
SIDE BOUNDARY COURT LINE (SINGLES)
SHORT SERVICE LINE
SICK ROOM WITH HANDICAPPED TOILET 3 WARDEN'S ROOM 3 ROOMS(3 BUNKER BEDS PER ROOM)(MS) 56 ROOMS(4 BEDS PER ROOM)(HS) 119 ROOMS(3 BEDS PER ROOM)(PU) 107 COMMON TOILET (MIDDLE SCHOOL) 8 COMMON TOILET (HIGH SCHOOL) 8
SIDE BOUNDARY LINE (DOUBLES)
RIGHT HALF COURT
NET
LEFT HALF COURT
SIDE BOUNDARY LINE (SINGLES)
SIDE BOUNDARY LINE (DOUBLES) POST
1 2 3 4 5 6
LONG SERVICE LINE (DOUBLES)
TYPICAL LIST FOR HIGH SCHOOL MIDDLE SCHOOL AND PU BOYS HOSTEL
+ 681.55 LVL
8 2 2 2 6 25 2 5
DINING HALL RAISED BY 150MM +115.08 m FFL
+115.08 m FFL
16 17
+115.08 m FFL
18 19 20
RAISED BY 150MM +111.33 m FFL
+111.33 m FFL
21 22 23 24 25 26
+111.33 m FFL
DETAIL F
RAISED BY 150MM +107.58 m FFL
STORE DAY STORE WATER STORAGE FUEL STORE TOILET
3 3 1 1 1 1 2 1 2 1 1
- 230mm MASONRY WALL - 3750mm X 115mm MASONRY WALL
- 2100mm X 115mm MASONRY WALL - JALI WALL - BRICK CLADDING 115mm THK
+107.58 m FFL
DETAIL E
+107.58 m FFL
DINING AREA HANDWASH KITCHEN PANTRY DISH WASH UTENSIL STORE
ALL FLOOR LEVELS:
GROUND LEVEL
-
107.15 M FGL
GROUND FLOOR LEVEL -
107.60 M FFL
FIRST FLOOR LEVEL
-
111.35 M FFL
SECOND FLOOR LEVEL -
115.10 M FFL
-
118.85 M FFL
THIRD FLOOR LEVEL
TERRACE FLOOR LEVEL -
122.60 M FFL
12 3
3 2 1
+118.83 m FFL
+118.82 m FFL
+118.82 m FFL
+118.82 m FFL
+118.82 m FFL
25 242322 21201918 17161514 1 2 3 4 5 6 7 8 9 1011 1213
3 2 1 1 2 3
141516 171819 202122 232425 13 121110 9 8 7 6 5 4 3 2 1
+118.83 m FFL
1 2 3
3 2 1
3 2 1
1 2 3
13 121110 9 8 7 6 5 4 3 2 1 141516 171819 202122 232425
1 2 3
1 2 3 4 5 6 7 8 9 1011 1213 25 242322 21201918 17161514
1 2 3 4 5 6 7 8 9 10 111213 252423 22212019 18171615 14
+115.08 m FFL
+115.08 m FFL
+115.07 m FFL
+115.07 m FFL
+115.07 m FFL
+115.07 m FFL 25 24 1 23 2 22 3 21 4 20 5 19 6 18 7 17 8 16 9 15 10 14 11 12 13
3 2 1
+111.33 m FFL
+111.33 m FFL
+111.32 m FFL
+107.58 m FFL
+107.58 m FFL
+107.57 m FFL
+111.32 m FFL
+111.32 m FFL
+111.32 m FFL
+107.57 m FFL
+107.57 m FFL
+107.57 m FFL
SL. NO
+107.60 m FFL
2
PLASTERING IN CM 1:4 WITH WALL CARE PUTTY 15MM THICK AND 12 MM THICK GROOVES ALL AROUND INTERNAL THE DOOR FRAMES. IN CM 1:4 WITH SPONGE FINISH EXTERNAL 18MM THICK. IN CM 1:3 WITH PUTTY 12MM CEILING THICK. TREAD = 300MM STAIRCASE RISER = 150MM STAIR WIDTH = 2000MM S.S HANDRAIL AND GRANITE TOP, TO DETAIL . GRANITE STONE FINISH FOR STEPS & LANDING. DOOR MAIN DOOR
+111.35 m FFL +107.58 m FFL
TILE JOINT DETAIL 'E'
+111.33 m FFL
TILE JOINT DETAIL 'F'
3 2 1
230 MM AND 115 MM THICK BURNT BRICK MASONRY WALL WITH 115 THK WIRE CUT BRICK CLADDING & PLASTERED AS PER SPECIFICATION.
WALL
4
3 2 1
SPECIFICATIONS :-
1
3
3 2 1
PROJECT CONSULTANT'S :
TEAK WOOD FRAME WITH 30MM FLUSH DOOR ENGINEERED COIR COMPOSITE SHUTTER CLAD WITH TEAK WOOD VENEER AND EDGE IN 6MM THK TEAK WOOD LIPPING ROOM DOOR SALWOOD FRAME WITH 30mm THK. FLUSH DOOR ENGINEERED COIR COMPOSITE SUTTER.
5
ROOM DOORS
6
TOI & BATH DOORS
WPC SECTION FRAME AND SHUTTER AS PER BOQ.
7
WINDOWS
THREE /TWO TRACK uPVC FRAMES WITH GLAZED uPVC SHUTTERS.
8
FLOORING
19MM THK GRANITE WITH SKIRTING AS PER BOQ .
9
WC & BATH FLOORING
ANTI SKID CERAMIC TILE SIZE 300 X 300 MM OF APPROVED COLOR SCHEME.
10
WC & BATH DADOOING
CERAMIC TILES 300X600 MM 6MM THICK.
11
PLUMBING
AS PER PLUMBING DRAWING AND SPECIFICATIONS IN BOQ.
12
PAINTING INTERNAL
TWO COATS WITH PLASTIC EMULSION PAINT
EXTERNAL
TWO COATS WITH ANTIFUNGAL PAINT
E:\ABHI\SANGOLLI\HOSTEL\Chetana New Logo.JPG
Z:\CHETAN\SANGOLLI RAYANNA\CAD\WORKING DRAWINGS\HOSTEL\Chetana New Logo.JPG
shuonya nava
Designs Pvt Ltd
Bangalore Address: Chetana house, 1st floor 10th cross,Vasanthnagar Bengaluru -560 052, Karnataka, India. Tel: +91 80 22340405 -06 Email: design@shuonya.com
GOOD FOR CONSTRUCTION
HIGH SCHOOL, MIDDLE SCHOOL, & PU COLLEGE HOSTEL BLOCK TOILET DETAIL
PROVISIONS MADE 50.0000
50.0000
50.0000
NO. DESCRIPTION
NOS
RAISED BY 150MM +118.83 m FFL
+118.83 m FFL
RAISED BY 150MM +115.08 m FFL
+115.08 m FFL
RAISED BY 150MM +118.83 m FFL
RAISED BY 150MM +115.08 m FFL
DETAIL F
7 8 9 10 11 12 13 14 15
19 20
+111.33 m FFL
+107.58 m FFL
RAISED BY 150MM +111.33 m FFL
RAISED BY 150MM +107.58 m FFL
RAISED BY 150MM +107.58 m FFL
COMMON TOILET (PU HOSTEL)
LIBRARY & DIGITAL LIBRARY WAITING LOBBY & INFO DESK GAMES ROOM MULTI PURPOSE HALL WASHING AREA RECORDS & STORE ROOM ENTRY
NET
SHORT SERVICE LINE
COURT
LEFT HALF COURT
CENTER LINE
RIGHT HALF COURT
LEFT HALF
COURT
POST
LONG SERVICE LINE (DOUBLES)
EDGE OF BACK PAVEMENT BOUNDARY LINE
RIGHT HALF
SHORT SERVICE LINE
EDGE OF PAVEMENT BACK BOUNDARY LINE
RIGHT HALF
CENTER LEFT COURT HALF LINE
SIDE BOUNDARY COURT LINE (SINGLES)
SIDE BOUNDARY LINE (DOUBLES)
RIGHT HALF COURT
NET
LEFT HALF COURT
SIDE BOUNDARY LINE (SINGLES)
SIDE BOUNDARY LINE (DOUBLES)
+ 681.55 LVL
8 2 2 2 6 25 2 5
DINING HALL 16 17 18
RAISED BY 150MM +111.33 m FFL
SICK ROOM WITH HANDICAPPED TOILET 3 WARDEN'S ROOM 3 ROOMS(3 BUNKER BEDS PER ROOM)(MS) 56 ROOMS(4 BEDS PER ROOM)(HS) 119 ROOMS(3 BEDS PER ROOM)(PU) 107 COMMON TOILET (MIDDLE SCHOOL) 8 COMMON TOILET (HIGH SCHOOL) 8
POST
1 2 3 4 5 6
LONG SERVICE LINE (DOUBLES)
TYPICAL LIST FOR HIGH SCHOOL MIDDLE SCHOOL AND PU BOYS HOSTEL
21 22 23 24 25 26
DINING AREA HANDWASH KITCHEN PANTRY DISH WASH UTENSIL STORE
STORE DAY STORE WATER STORAGE FUEL STORE TOILET
3 3 1 1 1 1 2 1 2 1 1
- 230mm MASONRY WALL - 3750mm X 115mm MASONRY WALL
- 2100mm X 115mm MASONRY WALL - JALI WALL - BRICK CLADDING 115mm THK
DETAIL E
ALL FLOOR LEVELS:
GROUND LEVEL
-
107.15 M FGL
GROUND FLOOR LEVEL -
107.60 M FFL
FIRST FLOOR LEVEL
-
111.35 M FFL
SECOND FLOOR LEVEL -
115.10 M FFL
-
118.85 M FFL
THIRD FLOOR LEVEL
TERRACE FLOOR LEVEL -
122.60 M FFL
1 2 3
3 2 1
+118.83 m FFL
+118.82 m FFL
+118.82 m FFL
+118.82 m FFL
25242322 21201918 171615 14 1 2 3 4 5 6 7 8 9 1011 1213
3 2 1 1 2 3
1415 16171819 202122 232425 13121110 9 8 7 6 5 4 3 2 1
RAISED BY 150MM +118.83 m FFL
+118.82 m FFL
1 2 3
3 2 1
3 2 1
1 2 3
13121110 9 8 7 6 5 4 3 2 1 1415 16171819 202122 232425
1 2 3
1 2 3 4 5 6 7 8 9 1011 1213 25242322 21201918 171615 14
1 2 3 4 5 6 7 8 9 10 111213 252423 22212019 181716 1514
RAISED BY 150MM +115.08 m FFL
+115.08 m FFL
+115.07 m FFL
+115.07 m FFL
+115.07 m FFL
+115.07 m FFL 25 24 1 23 2 22 3 21 4 20 5 19 6 18 7 17 8 16 9 15 10 14 11 12 13
RAISED BY 150MM +111.33 m FFL
+111.33 m FFL
+111.32 m FFL
+111.32 m FFL
+111.32 m FFL
+111.32 m FFL
+107.57 m FFL
+107.57 m FFL
+107.57 m FFL
+107.57 m FFL
3 2 1
3 2 1
3
2
3 2 1
1
+107.58 m FFL RAISED BY 150MM +107.58 m FFL
SL. NO
2
PLASTERING IN CM 1:4 WITH WALL CARE PUTTY 15MM THICK AND 12 MM THICK GROOVES ALL AROUND INTERNAL THE DOOR FRAMES. IN CM 1:4 WITH SPONGE FINISH EXTERNAL 18MM THICK. IN CM 1:3 WITH PUTTY 12MM CEILING THICK. TREAD = 300MM STAIRCASE RISER = 150MM STAIR WIDTH = 2000MM S.S HANDRAIL AND GRANITE TOP, TO DETAIL . GRANITE STONE FINISH FOR STEPS & LANDING.
4
+111.35 m FFL +107.58 m FFL
TILE JOINT DETAIL 'E'
DOOR MAIN DOOR
PROJECT CONSULTANT'S :
TEAK WOOD FRAME WITH 30MM FLUSH DOOR ENGINEERED COIR COMPOSITE SHUTTER CLAD WITH TEAK WOOD VENEER AND EDGE IN 6MM THK TEAK WOOD LIPPING ROOM DOOR SALWOOD FRAME WITH 30mm THK. FLUSH DOOR ENGINEERED COIR COMPOSITE SUTTER.
5
ROOM DOORS
6
TOI & BATH DOORS
WPC SECTION FRAME AND SHUTTER AS PER BOQ.
7
WINDOWS
THREE /TWO TRACK uPVC FRAMES WITH GLAZED uPVC SHUTTERS.
8
FLOORING
19MM THK GRANITE WITH SKIRTING AS PER BOQ .
9
WC & BATH FLOORING
ANTI SKID CERAMIC TILE SIZE 300 X 300 MM OF APPROVED COLOR SCHEME.
10
WC & BATH DADOOING
CERAMIC TILES 300X600 MM 6MM THICK.
11
PLUMBING
AS PER PLUMBING DRAWING AND SPECIFICATIONS IN BOQ.
12
PAINTING
+111.33 m FFL
TILE JOINT DETAIL 'F'
230 MM AND 115 MM THICK BURNT BRICK MASONRY WALL WITH 115 THK WIRE CUT BRICK CLADDING & PLASTERED AS PER SPECIFICATION.
WALL
3
+107.60 m FFL
SPECIFICATIONS :-
1
INTERNAL
TWO COATS WITH PLASTIC EMULSION PAINT
EXTERNAL
TWO COATS WITH ANTIFUNGAL PAINT
E:\ABHI\SANGOLLI\HOSTEL\Chetana New Logo.JPG
Z:\CHETAN\SANGOLLI RAYANNA\CAD\WORKING DRAWINGS\HOSTEL\Chetana New Logo.JPG
shuonya nava
Designs Pvt Ltd
Bangalore Address: Chetana house, 1st floor 10th cross,Vasanthnagar Bengaluru -560 052, Karnataka, India. Tel: +91 80 22340405 -06 Email: design@shuonya.com
GOOD FOR CONSTRUCTION
HIGH SCHOOL, MIDDLE SCHOOL, & PU COLLEGE HOSTEL BLOCK TOILET DETAIL
PROVISIONS MADE 50.0000
50.0000
50.0000
NO. DESCRIPTION
NOS
+118.83 m FFL
+118.83 m FFL
RAISED BY 150MM +118.83 m FFL
+115.08 m FFL
RAISED BY 150MM +115.08 m FFL
7 8 9 10 11 12 13 14 15
COMMON TOILET (PU HOSTEL)
LIBRARY & DIGITAL LIBRARY WAITING LOBBY & INFO DESK GAMES ROOM MULTI PURPOSE HALL WASHING AREA RECORDS & STORE ROOM ENTRY
COURT
NET
SHORT SERVICE LINE
EDGE OF BACK PAVEMENT BOUNDARY LINE
RIGHT HALF
LEFT HALF COURT
CENTER LINE
RIGHT HALF COURT
LEFT HALF
COURT
POST
LONG SERVICE LINE (DOUBLES)
EDGE OF PAVEMENT BACK BOUNDARY LINE
RIGHT HALF
CENTER LEFT COURT HALF LINE
SIDE BOUNDARY COURT LINE (SINGLES)
SHORT SERVICE LINE
SICK ROOM WITH HANDICAPPED TOILET 3 WARDEN'S ROOM 3 ROOMS(3 BUNKER BEDS PER ROOM)(MS) 56 ROOMS(4 BEDS PER ROOM)(HS) 119 ROOMS(3 BEDS PER ROOM)(PU) 107 COMMON TOILET (MIDDLE SCHOOL) 8 COMMON TOILET (HIGH SCHOOL) 8
SIDE BOUNDARY LINE (DOUBLES)
RIGHT HALF COURT
NET
LEFT HALF COURT
SIDE BOUNDARY LINE (SINGLES)
SIDE BOUNDARY LINE (DOUBLES) POST
1 2 3 4 5 6
LONG SERVICE LINE (DOUBLES)
TYPICAL LIST FOR HIGH SCHOOL MIDDLE SCHOOL AND PU BOYS HOSTEL
+ 681.55 LVL
8 2 2 2 6 25 2 5
DINING HALL
+115.08 m FFL
16 17 18 19 20
RAISED BY 150MM +111.33 m FFL
+111.33 m FFL
+111.33 m FFL
21 22 23 24 25 26
DINING AREA HANDWASH KITCHEN PANTRY DISH WASH UTENSIL STORE
STORE DAY STORE WATER STORAGE FUEL STORE TOILET
3 3 1 1 1 1 2 1 2 1 1
- 230mm MASONRY WALL - 3750mm X 115mm MASONRY WALL
- 2100mm X 115mm MASONRY WALL - JALI WALL - BRICK CLADDING 115mm THK
+107.58 m FFL RAISED BY 150MM +107.58 m FFL +107.58 m FFL
DETAIL E
ALL FLOOR LEVELS:
GROUND LEVEL
-
107.15 M FGL
GROUND FLOOR LEVEL -
107.60 M FFL
FIRST FLOOR LEVEL
-
111.35 M FFL
SECOND FLOOR LEVEL -
115.10 M FFL
-
118.85 M FFL
THIRD FLOOR LEVEL
TERRACE FLOOR LEVEL -
122.60 M FFL
1 2 3
252423 2221201918 17161514 1 2 3 4 5 6 7 8 9 101112 13
3 2 1 3 2 1
1 2 3
1415161718 19202122 232425 1312 1110 9 8 7 6 5 4 3 2 1
1 2 3
3 2 1
3 2 1
1 2 3
1312 1110 9 8 7 6 5 4 3 2 1 1415161718 19202122 232425
1 2 3
RAISED BY 150MM +118.83 m FFL
RAISED BY 150MM +118.83 m FFL
1 2 3 4 5 6 7 8 9 101112 13 252423 2221201918 17161514
+118.82 m FFL
+118.82 m FFL
+118.82 m FFL
+118.82 m FFL
1 2 3 4 5 6 7 8 9 1011 1213 2524 2322212019 18171615 14
25 24 1 23 2 22 3 21 4 20 5 19 6 18 7 17 8 16 9 15 10 14 11 12 13
3 2 1
RAISED BY 150MM +115.08 m FFL
RAISED BY 150MM +111.33 m FFL
DETAIL F
RAISED BY 150MM +115.08 m FFL
+115.07 m FFL
+115.07 m FFL
+115.07 m FFL
+115.07 m FFL
RAISED BY 150MM +111.33 m FFL
+111.32 m FFL
+111.32 m FFL
+111.32 m FFL
+111.32 m FFL
SL. NO RAISED BY 150MM +107.58 m FFL RAISED BY 150MM +107.58 m FFL
+107.57 m FFL
2
PLASTERING IN CM 1:4 WITH WALL CARE PUTTY 15MM THICK AND 12 MM THICK GROOVES ALL AROUND INTERNAL THE DOOR FRAMES. IN CM 1:4 WITH SPONGE FINISH EXTERNAL 18MM THICK. IN CM 1:3 WITH PUTTY 12MM CEILING THICK. TREAD = 300MM STAIRCASE RISER = 150MM STAIR WIDTH = 2000MM S.S HANDRAIL AND GRANITE TOP, TO DETAIL . GRANITE STONE FINISH FOR STEPS & LANDING.
+107.57 m FFL
+107.60 m FFL +107.58 m FFL
4
TILE JOINT DETAIL 'E'
+111.35 m FFL
DOOR MAIN DOOR
ROOM DOOR SALWOOD FRAME WITH 30mm THK. FLUSH DOOR ENGINEERED COIR COMPOSITE SUTTER.
ROOM DOORS
6
TOI & BATH DOORS
WPC SECTION FRAME AND SHUTTER AS PER BOQ.
7
WINDOWS
THREE /TWO TRACK uPVC FRAMES WITH GLAZED uPVC SHUTTERS.
8
FLOORING
19MM THK GRANITE WITH SKIRTING AS PER BOQ .
9
WC & BATH FLOORING
ANTI SKID CERAMIC TILE SIZE 300 X 300 MM OF APPROVED COLOR SCHEME.
10
WC & BATH DADOOING
CERAMIC TILES 300X600 MM 6MM THICK.
11
PLUMBING
AS PER PLUMBING DRAWING AND SPECIFICATIONS IN BOQ.
12
PAINTING
+111.33 m FFL
PROJECT CONSULTANT'S :
TEAK WOOD FRAME WITH 30MM FLUSH DOOR ENGINEERED COIR COMPOSITE SHUTTER CLAD WITH TEAK WOOD VENEER AND EDGE IN 6MM THK TEAK WOOD LIPPING
5
TILE JOINT DETAIL 'F'
3 2 1
230 MM AND 115 MM THICK BURNT BRICK MASONRY WALL WITH 115 THK WIRE CUT BRICK CLADDING & PLASTERED AS PER SPECIFICATION.
WALL
3
3 2 1
SPECIFICATIONS :-
1 +107.57 m FFL +107.57 m FFL
3 2 1
INTERNAL
TWO COATS WITH PLASTIC EMULSION PAINT
EXTERNAL
TWO COATS WITH ANTIFUNGAL PAINT
E:\ABHI\SANGOLLI\HOSTEL\Chetana New Logo.JPG
Z:\CHETAN\SANGOLLI RAYANNA\CAD\WORKING DRAWINGS\HOSTEL\Chetana New Logo.JPG
shuonya nava
Designs Pvt Ltd
Bangalore Address: Chetana house, 1st floor 10th cross,Vasanthnagar Bengaluru -560 052, Karnataka, India. Tel: +91 80 22340405 -06 Email: design@shuonya.com
GOOD FOR CONSTRUCTION
HIGH SCHOOL, MIDDLE SCHOOL, & PU COLLEGE HOSTEL BLOCK TOILET DETAIL
NOTES :
HEADROOM LVL +17.70M FFL
D
C
A
1.Dwgs. to be read in conunction with relevant architectural & structural dwgs. 2.Discrepancies to be immediately brought to the architect's attn. before commencement of work. 3.All dimensions in metres. 4.Do not scale any measurements.
D
C
A
5
8
LOCATION:
KEYPLAN :
TERRACE FLOOR LVL +14.85M FFL
MID LANDING +14.85 m LVL
MID LANDING +14.85 m LVL
MID LANDING +14.85 m LVL
SL. NO
SPECIFICATIONS :230 MM AND 115 MM THICK BURNT BRICK MASONRY WALL PLASTERED AS PER SPECIFICATION.
1 WALL
IN CM 1:4 WITH WALL CARE PUTTY 2 PLASTERING 15MM THICK AND 12 MM THICK GROOVES INTERNAL ALL AROUND THE DOOR FRAMES. IN CM 1:6 WITH SPONGE FINISH 18MM THICK. IN CM 1:3 WITH PUTTY 12MM THICK. TREAD = 300MM RISER = 150MM STAIR WIDTH = 1200MM/1800MM S.S HANDRAIL AND GRANITE TOP, TO DETAIL . GRANITE STONE FINISH FOR STEPS & LANDING. DOOR COLD ROLLED 5 MAIN DOOR MAIN STEEL DOOR. 6 ROOM DOORSROOM DOOR SALWOOD FRAME WITH FLUSH SHUTTER.
EXTERNAL CEILING 4 STAIRCASE 3
FOURTH FLOOR LVL +12.00M FFL
MID LANDING +12.0 m LVL
MID LANDING +12.0 m LVL
MID LANDING +12.0 m LVL
7 TOI & BATH DOORS
TOILET DOOR MS ANGLE FRAME 50MM X50MM X 6MM , SHUTTER OF PVC AS PER BOQ .
8 WINDOWS
THREE /TWO TRACK POWDER COATED ALUMINUM FRAMES WITH GLAZED ALUMINUM SHUTTERS WITH ONE INTERIOR PANEL WITH MOSQUITO MESH.
9 FLOORING
900 MM WIDE GRANITE STONE WITH SKIRTING AS PER BOQ .
10 WC & BATH
ANTI SKID CERAMIC TILE SIZE 300 X 300 MM OF APPROVED COLOR SCHEME.
FLOORING 11 WC & BATH DADOOING 12 PLUMBING
MID LANDING
THIRD FLOOR LVL +9.15M FFL
+9.15 m LVL
MID LANDING +9.15 m LVL
MID LANDING
13 PAINTING INTERNAL EXTERNAL
CERAMIC TILES 300X450 MM 6MM THICK. AS PER PLUMBING DRAWING AND SPECIFICATIONS IN BOQ.
OBD OF SPECIFIED COLOR SCHEME SNOWCEM OF SPECIFIED COLOR SCHEME.
LEGEND
+9.15 m LVL
- SUNKEN SLAB - 230mm MASONRY WALL - 115mm MASONRY WALL
BUILT UP AREA: GROUND FLOOR AREA - 222.67 SQ.MTS FIRST FLOOR, SECOND - 865.12 SQ.MTS (216.28*4) FLOOR, THIRD FLOOR AND FOURTH FLOOR AREA
SECOND FLOOR LVL +6.30M FFL
MID LANDING +6.3 m LVL
MID LANDING +6.3 m LVL
MID LANDING +6.3 m LVL
TERRACE FLOOR AREA - 28.85 SQ.MTS
TOTAL AREA
-1116.64 SQ.MTS
PROJECT :
Z:\CHETAN\BC HOSTELS\FEB 2018 - BC HOSTEL WITH LAYOUT\17 FEB 2018\REVISED WORKING DRAWINGS\KRIES LOGO1.jpeg
FIRST FLOOR LVL +3.45M FFL
MID LANDING +3.45 m LVL
MID LANDING +3.45 m LVL
MID LANDING +3.45 m LVL
CONSTRUCTION OF (SC) POST METRIC BOYS HOSTEL AT DAVANGERE TOWN(BASAPURA), DAVANGERE DISTRICT. HOLALKERE TALUK,CHI TRADURGADI S TRI 2 1CT - ( S T) C) MDRS ,CHI TRAHALLI
ARCHITECT : ARCHITECT SIGN CHECKED BY DRAWN BY
PLINTH LVL +0.60M FFL GROUND LVL ±0.00M FGL
SICK ROOM
SICK ROOM
ANSHUL
DATE 02-07-2018
TITLE :
SHUBHA
WORKING DRAWING
ISSUED AS : SCALE NTS
CHETAN G. B
DRAWING NO: AR-SCH(PO)-02
REV NO: R0
BOYS HOSTEL STAIRCASE DETAIL
PROJECT CONSULTANT'S :
shuonya nava
Designs Pvt Ltd
Bangalore Address: Chetana house, 1st floor 10th cross,Vasanthnagar Bengaluru -560 052, Karnataka, India. Tel: +91 80 22340405 -06 Email: design@shuonya.com
5
A
B
5
8
A
A
B
8
A C
A
B
8
C
C'
NOTES : 1.Dwgs. to be read in conunction with relevant architectural & structural dwgs. 2.Discrepancies to be immediately brought to the architect's attn. before commencement of work. 3.All dimensions in metres. 4.Do not scale any measurements.
LOCATION:
A C
C'
5
C'
KEYPLAN :
SL. NO
C
C
C
SPECIFICATIONS :230 MM AND 115 MM THICK BURNT BRICK MASONRY WALL PLASTERED AS PER SPECIFICATION.
1 WALL
IN CM 1:4 WITH WALL CARE PUTTY 2 PLASTERING 15MM THICK AND 12 MM THICK GROOVES INTERNAL ALL AROUND THE DOOR FRAMES. IN CM 1:6 WITH SPONGE FINISH 18MM THICK. IN CM 1:3 WITH PUTTY 12MM THICK. TREAD = 300MM RISER = 150MM STAIR WIDTH = 1200MM/1800MM S.S HANDRAIL AND GRANITE TOP, TO DETAIL . GRANITE STONE FINISH FOR STEPS & LANDING. DOOR COLD ROLLED 5 MAIN DOOR MAIN STEEL DOOR. 6 ROOM DOORSROOM DOOR SALWOOD FRAME WITH FLUSH SHUTTER.
EXTERNAL CEILING 4 STAIRCASE 3
D
D A'
B'
D A'
B'
A'
B'
7 TOI & BATH DOORS
TOILET DOOR MS ANGLE FRAME 50MM X50MM X 6MM , SHUTTER OF PVC AS PER BOQ .
8 WINDOWS
THREE /TWO TRACK POWDER COATED ALUMINUM FRAMES WITH GLAZED ALUMINUM SHUTTERS WITH ONE INTERIOR PANEL WITH MOSQUITO MESH.
9 FLOORING
900 MM WIDE GRANITE STONE WITH SKIRTING AS PER BOQ .
10 WC & BATH
ANTI SKID CERAMIC TILE SIZE 300 X 300 MM OF APPROVED COLOR SCHEME.
FLOORING 11 WC & BATH DADOOING 12 PLUMBING 13 PAINTING INTERNAL EXTERNAL
CERAMIC TILES 300X450 MM 6MM THICK. AS PER PLUMBING DRAWING AND SPECIFICATIONS IN BOQ.
OBD OF SPECIFIED COLOR SCHEME SNOWCEM OF SPECIFIED COLOR SCHEME.
LEGEND
- SUNKEN SLAB - 230mm MASONRY WALL - 115mm MASONRY WALL
BUILT UP AREA: GROUND FLOOR AREA - 222.67 SQ.MTS FIRST FLOOR, SECOND - 865.12 SQ.MTS (216.28*4) FLOOR, THIRD FLOOR AND FOURTH FLOOR AREA TERRACE FLOOR AREA - 28.85 SQ.MTS
TOTAL AREA
-1116.64 SQ.MTS
PROJECT :
Z:\CHETAN\BC HOSTELS\FEB 2018 - BC HOSTEL WITH LAYOUT\17 FEB 2018\REVISED WORKING DRAWINGS\KRIES LOGO1.jpeg
CONSTRUCTION OF (SC) POST METRIC BOYS HOSTEL AT DAVANGERE TOWN(BASAPURA), DAVANGERE DISTRICT. HOLALKERE TALUK,CHI TRADURGADI S TRI 2 1CT - ( S T) C) MDRS ,CHI TRAHALLI
ARCHITECT : ARCHITECT SIGN CHECKED BY DRAWN BY
ANSHUL
DATE 02-07-2018
TITLE :
SHUBHA
WORKING DRAWING
ISSUED AS : SCALE NTS
CHETAN G. B
DRAWING NO: AR-SCH(PO)-02
REV NO: R0
BOYS HOSTEL STAIRCASE DETAIL
PROJECT CONSULTANT'S :
shuonya nava
Designs Pvt Ltd
Bangalore Address: Chetana house, 1st floor 10th cross,Vasanthnagar Bengaluru -560 052, Karnataka, India. Tel: +91 80 22340405 -06 Email: design@shuonya.com
NOTES :
B 1
2
3
5
4
6
7
8
1.Dwgs. to be read in conunction with relevant architectural & structural dwgs. 2.Discrepancies to be immediately brought to the architect's attn. before commencement of work. 3.All dimensions in metres. 4.Do not scale any measurements.
B
9
1
2
3
5
4
6
7
8
LOCATION:
9
KEYPLAN :
A
A TOILET 2.40x1.31
+0.60 m FFL
SICK ROOM 3.30x3.04
TOILET 2.40x1.50
B
B
R A M P GRADIENT 1:10
C
C
TOILET 2.1x1.2
D
A
E
+5.55 m FFL
TOILET (3 UNITS)
+2.70 m FFL
+0.60 m FFL
D
WARDEN'S ROOM 3.37x4.80
A'
F
A
BATH (3 UNITS)
HOT WATER TAP (2 UNITS)
CAPACITY FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR
TOILET 3.98x7.88 HANDWASH (4 UNITS)
TOTAL
+3.43 m FFL
-
18 Students. 18 Students. 18 Students. 18 Students.
-
72 Students.
A'
E
PROVISIONS MADE NOS
NO. DESCRIPTION
F
TYPICAL LIST FOR BOYS HOSTEL 1
SICK ROOM WITH TOILET
1
2
HANDICAPPED'S TOILET
1
3
WARDEN'S ROOM WITH TOILET
1
+3.45 m FFL
ROOM-1 7.60X4.60
4 ROOMS(6 BEDS PER ROOM)
4
H
+0.60 m FFL
DINING HALL 8.76X7.96
G H
HANDWASH (7 UNITS) 4.60x1.77
- 230mm MASONRY WALL - 115mm MASONRY WALL
BUILT UP AREA: GROUND FLOOR AREA -
DINING HALL
G
- SUNKEN SLAB
12
COMMON TOILETS
5
LEGEND
7
DINING AREA
1
8
PANTRY
1
9
HANDWASH
1
10
KITCHEN
1
11
DISH WASH & UTENSIL STORE
1
12
STORE
1
222.67 SQ.MTS
FIRST FLOOR, SECOND - 865.12 SQ.MTS (216.28*4) FLOOR, THIRD FLOOR AND FOURTH FLOOR AREA TERRACE FLOOR AREA -
TOTAL AREA
28.85 SQ.MTS
-1116.64 SQ.MTS
PROJECT :
Z:\CHETAN\BC HOSTELS\FEB 2018 - BC HOSTEL WITH LAYOUT\17 FEB 2018\REVISED WORKING DRAWINGS\KRIES LOGO1.jpeg
+0.60 m FFL
SCHEDULE OF OPENINGS
PANTRY 4.60x2.0
J
SL. INDEX NO
+3.45 m FFL
J
+3.45 m FFL
ROOM-3 4.60X7.60
ROOM-2 4.60X7.60
+0.60 m FFL
KITCHEN 4.60x5.0 +0.60 m FFL
DISH WASH 2.73x1.94
K
+0.60 m FFL
STORE 1.64x3.97
K
DESCRIPTION
SILL LINTEL
NOS.
SIZE
1
ED1
COLD ROLLED STEEL DOOR
2250
2000 X 2250
1 NO.
2
ED2
COLD ROLLED STEEL DOOR
2250
1500 X 2250
1 NO.
3
D1
SAL WOOD FRAME WITH FLUSH SHUTTER
2100
1200 X 2100
14 NOS.
4
D2
SAL WOOD FRAME WITH FLUSH SHUTTER
2100
900 X 2100
3 NOS.
5
D3
TOILET DOOR M.S. ANGLE FRAME 50MM X 50MM X 6MM, SHUTTER OF PVC AS PER BOQ.
2100
750 X 2100
30 NOS.
6
SD
SLIDING DOOR
2100
900 X 2100
1 NOS.
7
W1
8
W2
HOL AL KE RE T AL UKCHI , T RADURGADIS T RIC T 21 -(S T C)MDRS ) CHI , T RAHAL L I
WINDOW (Aluminium)
900
2100
WINDOW (Aluminium)
900
2100
900 X 1200
9
W3
WINDOW (Aluminium)
900
2100
1800 X 1000 6 NOS.
10
V1
VENTILATOR(Aluminium)
1650
2100
1800 X 450
12 NOS.
11
V2
VENTILATOR(Aluminium)
1650
2100
900 X 450
3 NOS.
SL. NO
1800 X 1200 23 NOS. 44 NOS.
SPECIFICATIONS :-
1 WALL
230 MM AND 115 MM THICK BURNT BRICK MASONRY WALL PLASTERED AS PER SPECIFICATION.
IN CM 1:4 WITH WALL CARE PUTTY 2 PLASTERING 15MM THICK AND 12 MM THICK GROOVES INTERNAL ALL AROUND THE DOOR FRAMES.
EXTERNAL CEILING 4 STAIRCASE 3
GROUND FLOOR PLAN
B'
B' TYPICAL FIRST, SECOND, THIRD AND FOURTH FLOOR PLAN
5 MAIN DOOR
CONSTRUCTION OF (SC) POST METRIC BOYS HOSTEL AT DAVANGERE TOWN(BASAPURA), DAVANGERE DISTRICT.
IN CM 1:6 WITH SPONGE FINISH 18MM THICK. IN CM 1:3 WITH PUTTY 12MM THICK. TREAD = 300MM RISER = 150MM STAIR WIDTH = 1200MM/1800MM S.S HANDRAIL AND GRANITE TOP, TO DETAIL . GRANITE STONE FINISH FOR STEPS & LANDING. MAIN DOOR COLD ROLLED STEEL DOOR.
ARCHITECT :
CHETAN G. B
ARCHITECT SIGN CHECKED BY
SHUBHA
DRAWN BY
KAVIN
ISSUED AS :
WORKING DRAWING
DATE 02-07-2018
SCALE NTS
DRAWING NO: AR-SCH(PO)-02
TITLE :
BOYS HOSTEL GROUND, FIRST, SECOND, THIRD AND FOURTH FLOOR PLAN PROJECT CONSULTANT'S :
6 ROOM DOORSROOM DOOR SALWOOD FRAME WITH FLUSH SHUTTER. 7 TOI & BATH DOORS
TOILET DOOR MS ANGLE FRAME 50MM X50MM X 6MM , SHUTTER OF PVC AS PER BOQ .
8 WINDOWS
THREE /TWO TRACK POWDER COATED ALUMINUM FRAMES WITH GLAZED ALUMINUM SHUTTERS WITH ONE INTERIOR PANEL WITH MOSQUITO MESH.
9 FLOORING
900 MM WIDE GRANITE STONE WITH SKIRTING AS PER BOQ .
10 WC & BATH
ANTI SKID CERAMIC TILE SIZE 300 X 300 MM OF APPROVED COLOR SCHEME.
FLOORING 11 WC & BATH DADOOING 12 PLUMBING 13 PAINTING INTERNAL EXTERNAL
CERAMIC TILES 300X450 MM 6MM THICK. AS PER PLUMBING DRAWING AND SPECIFICATIONS IN BOQ.
OBD OF SPECIFIED COLOR SCHEME SNOWCEM OF SPECIFIED COLOR SCHEME.
REV NO: R0
shuonya nava
Designs Pvt Ltd
Bangalore Address: Chetana house, 1st floor 10th cross,Vasanthnagar Bengaluru -560 052, Karnataka, India. Tel: +91 80 22340405 -06 Email: design@shuonya.com
NOTES : 1.Dwgs. to be read in conunction with relevant architectural & structural dwgs. 2.Discrepancies to be immediately brought to the architect's attn. before commencement of work. 3.All dimensions in metres. 4.Do not scale any measurements.
B 1
2
3
4
5
6
7
8
9
LOCATION:
KEYPLAN :
A
B C CAPACITY
TERRACE
FIRST FLOOR SECOND FLOOR THIRD FLOOR FOURTH FLOOR
D
A
TOTAL
A'
E
-
18 Students. 18 Students. 18 Students. 18 Students.
-
72 Students.
PROVISIONS MADE -
F
NOS
NO. DESCRIPTION TYPICAL LIST FOR BOYS HOSTEL 1
SICK ROOM WITH TOILET
1
2
HANDICAPPED'S TOILET
1
3
WARDEN'S ROOM WITH TOILET
1
+14.85 m FFL
4 ROOMS(6 BEDS PER ROOM)
TERRACE
4
H
- 230mm MASONRY WALL - 115mm MASONRY WALL
BUILT UP AREA: GROUND FLOOR AREA -
DINING HALL
G
- SUNKEN SLAB
12
COMMON TOILETS
5
LEGEND
7
DINING AREA
1
8
PANTRY
1
9
HANDWASH
1
10
KITCHEN
1
11
DISH WASH & UTENSIL STORE
1
12
STORE
1
222.67 SQ.MTS
FIRST FLOOR, SECOND - 865.12 SQ.MTS (216.28*4) FLOOR, THIRD FLOOR AND FOURTH FLOOR AREA TERRACE FLOOR AREA -
TOTAL AREA
28.85 SQ.MTS
-1116.64 SQ.MTS
PROJECT :
Z:\CHETAN\BC HOSTELS\FEB 2018 - BC HOSTEL WITH LAYOUT\17 FEB 2018\REVISED WORKING DRAWINGS\KRIES LOGO1.jpeg
SCHEDULE OF OPENINGS SL. INDEX NO
J
K
DESCRIPTION
SILL LINTEL
NOS.
SIZE
1
ED1
COLD ROLLED STEEL DOOR
2250
2000 X 2250
1 NO.
2
ED2
COLD ROLLED STEEL DOOR
2250
1500 X 2250
1 NO.
3
D1
SAL WOOD FRAME WITH FLUSH SHUTTER
2100
1200 X 2100
14 NOS.
4
D2
SAL WOOD FRAME WITH FLUSH SHUTTER
2100
900 X 2100
3 NOS.
5
D3
TOILET DOOR M.S. ANGLE FRAME 50MM X 50MM X 6MM, SHUTTER OF PVC AS PER BOQ.
2100
750 X 2100
30 NOS.
6
SD
SLIDING DOOR
2100
900 X 2100
1 NOS.
7
W1
8
W2
HOL AL KE RE T AL UKCHI , T RADURGADIS T RIC T 21 -(S T C)MDRS ) CHI , T RAHAL L I
WINDOW (Aluminium)
900
2100
WINDOW (Aluminium)
900
2100
900 X 1200
9
W3
WINDOW (Aluminium)
900
2100
1800 X 1000 6 NOS.
10
V1
VENTILATOR(Aluminium)
1650
2100
1800 X 450
12 NOS.
11
V2
VENTILATOR(Aluminium)
1650
2100
900 X 450
3 NOS.
SL. NO
1800 X 1200 23 NOS. 44 NOS.
SPECIFICATIONS :-
1 WALL
230 MM AND 115 MM THICK BURNT BRICK MASONRY WALL PLASTERED AS PER SPECIFICATION.
IN CM 1:4 WITH WALL CARE PUTTY 2 PLASTERING 15MM THICK AND 12 MM THICK GROOVES INTERNAL ALL AROUND THE DOOR FRAMES.
EXTERNAL CEILING 4 STAIRCASE 3
B'
5 MAIN DOOR
CONSTRUCTION OF (SC) POST METRIC BOYS HOSTEL AT DAVANGERE TOWN(BASAPURA), DAVANGERE DISTRICT.
IN CM 1:6 WITH SPONGE FINISH 18MM THICK. IN CM 1:3 WITH PUTTY 12MM THICK.
CHETAN G. B
ARCHITECT : ARCHITECT SIGN CHECKED BY
SHUBHA
DRAWN BY
KAVIN
ISSUED AS :
WORKING DRAWING
DATE 02-07-2018
SCALE NTS
TITLE :
DRAWING NO: AR-SCH(PO)-03
BOYS HOSTEL TERRACE FLOOR PLAN
PROJECT CONSULTANT'S :
TREAD = 300MM RISER = 150MM STAIR WIDTH = 1200MM/1800MM S.S HANDRAIL AND GRANITE TOP, TO DETAIL . GRANITE STONE FINISH FOR STEPS & LANDING. MAIN DOOR COLD ROLLED STEEL DOOR.
6 ROOM DOORSROOM DOOR SALWOOD FRAME WITH FLUSH SHUTTER.
TERRACE FLOOR PLAN
7 TOI & BATH DOORS
TOILET DOOR MS ANGLE FRAME 50MM X50MM X 6MM , SHUTTER OF PVC AS PER BOQ .
8 WINDOWS
THREE /TWO TRACK POWDER COATED ALUMINUM FRAMES WITH GLAZED ALUMINUM SHUTTERS WITH ONE INTERIOR PANEL WITH MOSQUITO MESH.
9 FLOORING
900 MM WIDE GRANITE STONE WITH SKIRTING AS PER BOQ .
10 WC & BATH
ANTI SKID CERAMIC TILE SIZE 300 X 300 MM OF APPROVED COLOR SCHEME.
FLOORING 11 WC & BATH DADOOING 12 PLUMBING 13 PAINTING INTERNAL EXTERNAL
CERAMIC TILES 300X450 MM 6MM THICK. AS PER PLUMBING DRAWING AND SPECIFICATIONS IN BOQ.
OBD OF SPECIFIED COLOR SCHEME SNOWCEM OF SPECIFIED COLOR SCHEME.
shuonya nava
Designs Pvt Ltd
Bangalore Address: Chetana house, 1st floor 10th cross,Vasanthnagar Bengaluru -560 052, Karnataka, India. Tel: +91 80 22340405 -06 Email: design@shuonya.com
REV NO: R0