Field Evaluation: Site Nº ------------
Page 3 of 3
NIR – Independent Consultants Skvarca – Aguirre & Asoc.
Temperature:
30º C Humidity
86 % Atm. Pres
1014 hPa
August, 18th 2011- Continuation Point 49 50 51 52 53 54 55 56a 56b
Crabb Hill Cell Crabb Hill Tw Jolly Castle Hotel Jolly Beach Golden Gr Sch Grays Hill Cell Grays Hill Cell Antigua Plum Antigua Plum
Electric Field Average V/m
Maximum Exposure Limit V/m
0.10 10
27.5 27.5
0.02 2
Power Maximum Density Power Density Average Limit µW/cm2 µW/cm2 0.002
200
Cell Tower
----
200
Town
200
Cell Tower
27.5 0.55 55
Observations (Freq. Range)
0.110
0.16 16
27.5
0.008
200
500 m
0.10 10
27.5
0.003
200
School
1.30
27.5
0.400
200
10 m
0.54 54
27.5
0.040
200
100 m
1.80
27.5
1.200
200
100 m
0.74 74
27.5
0.16
200
School - 50 m *
Remarks: * Tower needs to be built higher, at least 15 m more. (Precautionary Principle)
Eng. Jorge Skvarca / PAHO Consultant
Date: August, 18th, 2011- Continuation
Field Evaluation: Site Nº ------------
Page 3 of 3
NIR – Independent Consultants Skvarca – Aguirre & Asoc.
Antigua and Barbuda
SITE INFORMATION: August 18th, 2011- Continuation