This proposal is a model for the adaptation of post-war high rise office buildings into mixeduse vertical neighborhoods with the potential to generate more than 15,000 new dwelling units in Manhattan.

CONTEXT

Office Conversion

105

Boornazian | Monge Kaser | Sanchez-Enkerlin

PROTOTYPE

Shutterstock


INTRODUCTION REGULATIONS

Permanent changes in work culture have already rendered a large amounts of architecture outdated for office use. This market-adaptive renovation strategy leans on the addition of shared amenity space to ensure a financially and ecologically sustainable preservation of existing buildings in Manhattan.

CONTEXT

MENITY

Office Conversion

RESIDENTIAL

PROTOTYPE

SIDENTIAL

AMENITY

MARKET

OFFICE MARKET

OFFICE

106

Boornazian | Monge Kaser | Sanchez-Enkerlin


INTRODUCTION REGULATIONS CONTEXT PROTOTYPE

Office Conversion

107

Boornazian | Monge Kaser | Sanchez-Enkerlin


INTRODUCTION

POLICY CHANGE Building Code Chapter 10

REGULATIONS

Amendment for the reduction of means of egress requirements by way of time-based occupancy calculations. Office Occupancy complements Residential Occupancy hours and can lead to the efficient use of the same fire exits. Expand Zoning Code Chapter 5 to Include Midtown Create a special district in Midtown areas covered by C-5 and C-6 that would fall under the same regulations of Chapter 5 - Residential Conversion within Existing Building - exempting the requirement for commercial to be below the lowest floor of residential. This stacking will lead to the efficient use of unsuitable spaces on residential floor plates for public amenities used by both office and residential occupants.

CONTEXT

Impact The total scope of redevelopment could reach up to 115,800,000 square feet. The first sector of redevelopment into mixed-use residential includes 39 PostWar buildings with a centrally located cores, leading to the creation of 25,000,000 SF of additional residential space on Manhattan, or about 15,300 units.

PROTOTYPE

This redevelopment strategy applies to 112 buildings built between 1950-1975 in zones C-5 and C-6 of New York City.

(Sources: CTBUH, Esri Skyscraper Explorer, Skyscraper Center) Office Conversion

108

Boornazian | Monge Kaser | Sanchez-Enkerlin


INTRODUCTION

THE CHANGING NATURE OF WORK CULTURE Work culture has radically changes in the last two decades owing to advances in technology and changes in expectations about the workplace. This has a direct impact of the architecture’s suitability as a place of work. WORKING SPACE

SOCIAL STRUCTURES

HORIZONTAL

CUBICLES

CO-WORKING

INDIVIDUAL SPACE

COMMON AMENITIES

REGULATIONS

HIERARCHICAL

WORK LOCATION

REMOTE WORK

109

150 SF/person + SHARED AMENITY

Boornazian | Monge Kaser | Sanchez-Enkerlin

PROTOTYPE

500 SF/person

Office Conversion

CONTEXT

ON-SITE WORK


INTRODUCTION

FLOOR PLAN CHANGES In the 20th Century, high rise office buildings occupied the perimeter plan with private offices, filling the inner space with cubicles. Today’s office culture calls for open floor plans with reduced square footage per person and more area dedicated to common amenities.

TRENDING OFFICE MODEL

Core Private Offices

REGULATIONS

PAST OFFICE MODEL

Amenity

PRESETN PRESETN DESIRED PRESETN DESIRED OFFICE DESIRED OFFICE MODEL OFFICE MODELMODEL

Office Conversion

2018 Google Office Space, NY

110

Boornazian | Monge Kaser | Sanchez-Enkerlin

PROTOTYPE

1960’s Office Space, NY

CONTEXT

PASTPAST OFFICE OFFICE PAST MODEL OFFICE MODELMODEL


INTRODUCTION

MODERN AMENITIES Increasingly buildings must feature on-site amenities in both residential and office use buildings in order to be competitive. Most of these amenities appear in both use types - screening rooms, game areas, libraries, and fitness areas.

REGULATIONS

Game Room, Via 57 West NY

Library, Via 57 West NY

111

Boornazian | Monge Kaser | Sanchez-Enkerlin

PROTOTYPE

Gym, Google NY

CONTEXT

Office Conversion

Screening room, NY by Gehry


Fewer externalities surround adaptive reuse, making it a more viable option than demolition and new construction. Among the benefits of adaptive reuse are cost and time savings.

DEMOLITION + NEW CONSTRUCTION

INTRODUCTION

REDEVELOPMENT

ADAPTIVE REUSE

REGULATIONS CONTEXT

(Source: The Real Deal New York Real State News)

Office Conversion

112

Boornazian | Monge Kaser | Sanchez-Enkerlin

PROTOTYPE

Chapter 33 of the Building Code dictates the complex regulation surrounding deconstruction, which in the case of the Deutsche Bank Building demolished in 2011 took 1 week per floor, but a total of 4 years due to safety hazards. In today’s dollar this deconstruction cost $177 million (126.50 per SF).


INTRODUCTION

ENVIRONMENTAL IMPACT New construction is one of the leading causes of climate change. Adaptive reuse is more sustainable; reducing waste, air pollution, and energy consumption.

40%

23 %

40%

50 %

23 %

50 %

23 %

50 %

WORLDWIDE ENERGY USAGE AIR POLLUTION WORLDWIDE ENERGY USAGE AIR WORLDWIDE ENERGY USAGE AIRPOLLUTION POLLUTION

WIDE ENERGY USAGE

40%

50 %

CLIMATE CHANGE

CLIMATE CHANGE

CONTEXT

40%

REGULATIONS

40%

50 %

CLIMATE CHANGE

AIR POLLUTION

CLIMATE CHANGE

* U.S. Green Building Council (USGBC)

40% Office Conversion

50 % 113

Building Caused

Core

Other Sources

Private Offices Amenity

Boornazian | Monge Kaser | Sanchez-Enkerlin

PROTOTYPE

LANDFILL WASTES DRINKING WATER DRINKING WATER LANDFILL WASTES DRINKING WATER LANDFILL WASTES POLLUTION POLLUTION POLUTION


INTRODUCTION

PRE-WAR / POST-WAR The use of HVAC systems in post-war buildings allowed floor plates to become deeper than before. This poses a complication in office conversion to residential not generally present in shallower pre-war buildings.

X > X’

Y > Y’

X > X’

PRE-WAR

REGULATIONS

Y > Y’

POST-WAR Y’ Y

Y’

CONTEXT

Y

Office Conversion

X’

PRE-WAR / NATURAL LIGHT & VENTILATION

PROTOTYPE

X’

X

114

X

Boornazian | Monge Kaser | Sanchez-Enkerlin

POST-WAR / HVAC PLANS


INTRODUCTION

CORE CONFIGURATIONS In post-war buildings, side core configurations provide large enough continuous floor space to adapt to the new office model. Central core buildings divide the floor plate into a ring which is more suitable for conversion to residential, making them our primary target. CENTRAL CORE

PERIMETER CORE

CENTRAL CORE

FEASIBLE FOR RESIDENTIAL MIXED-USE

CONTEXT

FEASIBLE FOR NEW OFFICE TYPOLOGY

REGULATIONS

PERIMETER CORE

PROTOTYPE

115

Office Conversion

LARGE OPEN FLOOR

Boornazian | Monge Kaser | Sanchez-Enkerlin

RING SPACE PLAN


INTRODUCTION

TARGET AREAS Highlighted are the areas of New York City which contain high-rise office buildings. This represents zoning types C-5 and C-6. Many of the buildings in these zones were built post-war and are part of the scope of this proposal.

REGULATIONS CONTEXT PROTOTYPE

Office Conversion

116

Boornazian | Monge Kaser | Sanchez-Enkerlin


INTRODUCTION REGULATIONS

BUILDING STOCK Within the C-5 and C-6 zones there are 112 high rise office buildings completed between 1950 and 1975. Of those, 39 have the centrally located cores that we have identified as optimal for near-future adaptation to mixed use.

CONTEXT

Application of our prototype in these buildings would create up to 25,000,000 SF of new residential space in Manhattan, with a potential of expanding into a further 47,000,000 SF in other post-war buildings.

PROTOTYPE

Office Conversion

117

Boornazian | Monge Kaser | Sanchez-Enkerlin


INTRODUCTION

PRECEDENTS OFFICE CONVERSION

REGULATIONS

200’

CONTEXT

80’

125’

170’

110’

110’

70 Pine

488 University Ave

San Fransisco, CA/USA

New York, NY/USA

Toronto, ON/CA

Albert F. Roller, 1974 Solomon Cordwell and Buenz, 2015 480,740 SF 400 Units Office to Residential

Clinton & Marshall,1932 Holton & George, 2016 1,026,454 SF 796 Units Office to Mixed Use

WZMH Architects,1968 Core Architects, 2018 213,323 SF 453 Units Office to Mixed Use

Office Conversion

118

Boornazian | Monge Kaser | Sanchez-Enkerlin

PROTOTYPE

100 Van Ness


INTRODUCTION

REDEVELOPMENT CRITERIA

d

d

d

Building Caused

Core

Other Sources

Private Offices Amenity

CORE TO SHELL DISTANCE CORE TO PARAMETERS SHELL PARAMETERS CORE TODISTANCE SHELL DISTANCE 50’ > d > 20’ 50’50’> >d d>>20’ 20

RECLAIM INWARD RECLAIM OFOF UNIT SPACE MODULE INWARD OF UNIT MODULE RECLAIMSPACE SPACE INWARD UNIT MODULE FOR AMENITY USE

Unit Module Amenity

119

Boornazian | Monge Kaser | Sanchez-Enkerlin

PROTOTYPE

Core

Office Conversion

CONTEXT

d

REGULATIONS

Due to lighting and room size constraints the maximum facade-to-core depth for redevelopment is 50 feet and the minimum 20 feet. By repurposing the central space of the floor plate,beyond the residential unit module, the scheme creates central amenities leveraging excess core.


INTRODUCTION

VERTICAL NEIGHBORHOODS

REGULATIONS CONTEXT PROTOTYPE

Office Conversion

120

Boornazian | Monge Kaser | Sanchez-Enkerlin


INTRODUCTION

SECTIONAL DISTRIBUTION Lower floors that are subject to reduced daylight exposure are better suited for modern office space. The higher floors are converted to residential with amenity cores. Projects are viable when the building is above 30 floors, with more than half of the floors becoming residential.

REGULATIONS

UPGRADE FLOORS WITH TWO EXPOSURES TO MODERN OFFICE SPACE

CONVERT FLOORS WITH FOUR EXPOSURES TO RESIDENTIAL WITH CENTRAL AMENITY CORE

Residential Office Amenity

Office Conversion

121

Boornazian | Monge Kaser | Sanchez-Enkerlin

PROTOTYPE

Fire Stair

CONTEXT

LOWER FLOORS PARTY WALL CONDITION


INTRODUCTION

AMENITY CORE The build out of amenities accessible to residents and office workers, as well as the public is the lifeblood of the mixeduse development.

REGULATIONS

This feature also allows for the efficient redevelopment of the building back-andforth from office to residential according to market demands.

CENTRAL CORE

CENTRAL CORE

MARKET

AMENITY

CENTRAL CORE

CONTEXT

MARKET

OFFICE

RESIDENTIAL

Residential

VERTICAL NEIGHBORHOODS VERTICAL NEIGHBORHOODS

Office Conversion

VERTICAL NEIGHBORHOODS

122

Office AMMENITY SPACE AMMENITY SPACE SHARED BY OFFICE SHARED BY OFFICE Amenity AND RESIDENTIAL TENANTS AND RESIDENTIAL TENANTS AMMENITY SPACE

SHARED BY OFFICE AND RESIDENTIAL Boornazian | MongeTENANTS Kaser | Sanchez-Enkerlin

PROTOTYPE

Fire Stair


INTRODUCTION

LIVE - PLAY - WORK

REGULATIONS CONTEXT PROTOTYPE

Office Conversion

123

Boornazian | Monge Kaser | Sanchez-Enkerlin


INTRODUCTION REGULATIONS

PROTOTYPE W.R. GRACE BUILDING The W.R. Grace exemplifies the standard middle-core office building, making it a viable example for the prototype.

CONTEXT

Built in 1974 Architect: Gordon Bunshaft, SOM 48 Floors 1,478,531 SF

PROTOTYPE

Office Conversion

124

Boornazian | Monge Kaser | Sanchez-Enkerlin


INTRODUCTION

LOBBY SEPARATION

O R O R O R O O

R R R R R R O O

R R R O

A O A O

REGULATIONS

O O O O

S S O O

CONTEXT

Residential Office Amenity

Office Conversion

125

Boornazian | Monge Kaser | Sanchez-Enkerlin

PROTOTYPE

Fire Stair


INTRODUCTION

ELEVATORING The separation of elevators for different uses is a key component to our proposal. Residential and Office elevators are isolated, but amenity elevators are shared. Reclaimed core space in the high rise levels is converted into amenity space. Fire Stair Residential Office

REGULATIONS

Amenity

CONTEXT

Residential Office Amenity

Office Conversion

126

Boornazian | Monge Kaser | Sanchez-Enkerlin

PROTOTYPE

Fire Stair


INTRODUCTION

SECTION A-A

Top of Parapet 630’ Floor 48 607’

REGULATIONS CONTEXT

Floor 17 220’

Residential Office Floor 3 45’

Amenity

Mechanical 20’ Lobby 0’

Office Conversion

127

Boornazian | Monge Kaser | Sanchez-Enkerlin

PROTOTYPE

Fire Stair


INTRODUCTION

SECTION B-B

Top of Parapet 630’ Floor 48 607’

REGULATIONS CONTEXT

Floor 17 220’

Residential Office

Floor 3 45’

Amenity

Mechanical 20’ Lobby 0’

Office Conversion

128

Boornazian | Monge Kaser | Sanchez-Enkerlin

PROTOTYPE

Fire Stair


Location of post-war buildings eligible for redevelopment. Seventy percent of these buildings have a central core and can be converted into mixed-use residential.

R

R

R

R

R

R

INTRODUCTION

SEPARATED CIRCULATION

A

A

R

R

R

R

R

REGULATIONS

R

A

A

CONTEXT

Residential Circulation Amenity Circulation Residential Amenity

Amenity Circulation Residential Amenity

Office Conversion

129

Boornazian | Monge Kaser | Sanchez-Enkerlin

PROTOTYPE

Residential Circulation


INTRODUCTION

TYPICAL MIDRISE PLAN 16 Units 7 Studios

6 650 SF 1 850 SF

213’

1 1-Bedroom 1 850 SF

REGULATIONS

2 2-Bedrooms

2 1,240 SF

6 3-Bedrooms

2 1,790 SF 2 1,930 SF 2 2,250 SF

117’

35’

CONTEXT

24,983 SF Gross 20,882 SF Net 20,000 SF Residential 883 SF Amenity 83.6 % Efficiency

30’

PROTOTYPE

Office Conversion

130

Boornazian | Monge Kaser | Sanchez-Enkerlin


INTRODUCTION

EXTENDED AMENITY MIDRISE PLAN 15 Units

6 Studios 1 1-Bedroom 2 2-Bedrooms 6 3-Bedrooms

24,983 SF Gross

REGULATIONS

20,900 SF Net 18,240 SF Residential 2,660 SF Amenity 83.7 % Efficiency

15 Units

CONTEXT

6 Studios 1 1-Bedroom 2 2-Bedrooms 6 3-Bedrooms

24,983 SF Gross 19,152 SF Net

PROTOTYPE

19,152 SF Residential (1,700) SF Amenity Atrium 77 % Efficiency

Office Conversion

131

Boornazian | Monge Kaser | Sanchez-Enkerlin


INTRODUCTION

TYPICAL HIGHRISE PLAN 16 Units

7 Studios 1 1-Bedroom 2 2-Bedrooms 6 3-Bedrroms

24,983 SF Gross

REGULATIONS

21,960 SF Net 20,000 SF Residential 1,960 SF Amenity 88% Efficiency

CONTEXT PROTOTYPE

Office Conversion

132

Boornazian | Monge Kaser | Sanchez-Enkerlin


INTRODUCTION

EXTENDED AMENITY HIGHRISE PLAN 15 Units

6 Studios 1 1-Bedroom 2 2-Bedrooms 6 3-Bedrooms

24,983 SF Gross

REGULATIONS

21,818 SF Net 18,236 SF Residential 3,582 SF Amenity 87% Efficiency

CONTEXT PROTOTYPE

Office Conversion

133

Boornazian | Monge Kaser | Sanchez-Enkerlin


INTRODUCTION

EXTENDED AMENITY HIGHRISE PLAN 14 Units

5 Studios 1 1-Bedroom 2 2-Bedrooms 6 3-Bedrooms

24,983 SF Gross

REGULATIONS

21,865 SF Net 17,700 SF Residential 4,165 SF Amenity 88% Efficiency

15 Units

CONTEXT

7 Studios 2 2-Bedrooms 6 3-Bedrooms

24,983 SF Gross 22,095 Net 18,575 SF Residential

PROTOTYPE

3,520 SF Amenity 88% Efficiency

Office Conversion

134

Boornazian | Monge Kaser | Sanchez-Enkerlin


INTRODUCTION

MARKETING

REGULATIONS CONTEXT PROTOTYPE

Office Conversion

135

Boornazian | Monge Kaser | Sanchez-Enkerlin


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.