Working Drawing. Truss detail.

Page 1

NOTES 1.

ALL DIMENSIONS ARE IN MM

2.

ALL DIMENSIONS ARE TO BE READ NOT SCALED

3.

WALLS ARE 230 THICK UNLESS OTHERWISE SPECIFIED

4.

ANY DISCRIPENCIES SHALL BE NOTIFIED TO THE ARCHITECT IMMEDIATELY

5.

ALL DIMENSIONS ARE TO BE CLARIFIED BEFORE COMMENCEMENT OF WORK

6.

FINISHES SCHEDULE:

O.B.D. : OIL BASED DISTEMPER P.O.P. : PLASTER OF PARIS SA.S. : SAND STONE ALL DOOR & WINDOW LEVELS ARE WITH RESPECT TO RESPECTIVE FINISHED FLOOR LEVEL FOR ST-01, 02, 03, 04, 05, 06, 07 REFER DRG A-XXX FOR ST-08 REFER DRAWING A-XXX FOR ST-09 REFER DRAWING A-XXX FOR ST-10 REFER DRAWING A-XXX

7. 8.

9.

FOR TOILETS T-01 & T-02 REFER DRAWING A-XXX FOR TOILETS T-03 & T-04 REFER DRAWING A-XXX FOR TOILETS T-05 & T-06 REFER DRAWING A-XXX

4

1

5

3 3 3

3 1

3 3

6 ISSUES

2

1 - RAFTER L 80x80x12

5 - STEEL PLATES

2 - MAIN TIE L 60x60x8

6 - SUPPORT PLATE

3 - STRUT L 50x50x6

7 - HEAD OF THE COLUMN

DATE

NOS.

ISSUED TO / REMARKS

7

TYPICAL TRUSS DETAIL

4 - C 120 DATE

REVISION

REMARKS

REVISIONS PROJECT

MEDICAL COLLEGE HOLY FAMILY HOSPITAL TITLE

MISCELLANEOUS DETAIL

ARCHITECT

ANUSHKA SAXENA III YEAR, B.ARCH. ROLL NO. : 15 SCALE

DATE


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.