The Presidential Streets Master Plan Launching Cape Canaveral Into an Inclusive, Equitable, and Resi

Page 1

MEET THE PANELISTS

Brenda DefoeSurprenant Kelley Klepper, AICP Macy Falcon, AICP, CFM Kyle Harris Zachary Eichholz

VULNERABILITY ASSESSMENT

RECENT FLOODING

EXISTING CONDITIONS: FILLMORE AVE

VULNERABILITY ASSESSMENT COMMUNITY ENGAGEMENT

RECENT FLOODING

RESILIENCY ASSESSMENT

Critical Facilities

Flood Hazards & Storm Surge Risk

Transportation

Characteristics & Facilities

Social Vulnerability

Transportation Improvements

APPROACH TO RESILIENCE

Policy Solutions

TRANSPORTATION INFRASTRUCTURE

FLOOD HAZARDS

Green Infrastructure

SOCIAL VULNERABILITY

CRITICAL FACILITIES

Utilities Improvements

COMMUNITY ENGAGEMENT

PUBLIC WORKSHOP

February 23, 2022

ONLINE SURVEY & MAP

January 3 –

March 11, 2022

COMMUNITY WORKSHOP

THE PRESIDENTIAL STREETS MASTER PLAN ENCOMPASSES:

➢ Heat Mitigation and Adaptation Strategy

➢ Sea Level Rise Mitigation and Adaptation Strategy

➢ Urban Flooding Mitigation and Adaptation Strategy

➢ Air And Water Pollution Reductions

➢ Stormwater Runoff Controls

➢ Pedestrian Safety Improvements

➢ Multi-Modalism

➢ Biodiversity Increases (via LID)

➢ Economic Development

➢ Long-term Risk Reduction and Mitigation

RECOMMENDED FOCUS AREAS

Intersections:

1. Ridgewood Ave at Fillmore Ave

2. N Atlantic Ave at Tyler Ave

3. Magnolia Ave at Tyler Ave

Streets:

4. Fillmore Ave (one-way option, two-way option, and beach end)

5. Poinsettia Ave

2 3 1 4 5

FRAMEWORK PLAN TOOLKIT

Pedestrian/Bicycle Improvements

Roadway Improvements

Intersection and Crossing Improvements

Placemaking Design Improvements

Traffic Calming Tools

Beach Ends

Stormwater Improvements

Resiliency Improvements

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.