In this portfolio I inserted some of the jobs that I was the main person in charge, or I was part of a development team. I worked in general in the Development of Project Design, in the Implementation of BIM Technology, acting as BIM Manager and Development of Technical Drawings for approval with public agencies. I also accompanied the whole process of Planning and Execution of the Works. I present here in general the Digital Prototypes of Projects. 2
3
4
Was the principal of the project. The Developer's interest was to develop a mixed-use Building, with residential/commercial/institutional. I started with the study of Local law, and possession of this information the next step was the Full Development of the project, with its Artistic and technical Designs and your computer model. Also was given the technical and economic feasibility study, to show that the expectations of the entrepreneur, would be being met. Has already been given the entry of Legal project, which is in the process of being approved by the municipality.
5
6
7
8
9
10
11
12
13
Was the principal of the project. Realized the technical feasibility studies, technical drawings and the development of the computer model. Has already been given the entry of Legal project, which is in the process of being approved by the municipality.
14
ACCESSES AND CONNECTIONS
15
STUDY OF LEGISLATION
16
INFRASTRUCTURE
17
INFRASTRUCTURE
18
DIGITAL PROTOTYPE
19
DIGITAL PROTOTYPE
20
DIGITAL PROTOTYPE
21
DIGITAL PROTOTYPE
22
In this Helicentro project, was the architect responsible for all its stages, which were: -Reference Designs study; -Study of the Local Legislation for the implementation of a project with so many quirks and restrictions; -Technical feasibility Study; -Elaboration of a program where needs were met the special needs of such a venture, while continuing to take into account your economic viability; -Development of Draft; -Simplified Legal Project; -Drainage project; Earth moving project; - Digital prototype construction (Mockup); -Planning of the work. For being a project with special features, a change in zoning Law, to restrict construction in your feedback. The land on which is built the Helicentro has passed by Earth moving phase and begins to have the first infrastructure works in progress.
23
ACCESS/PARKING/ED. ADM/HANGARAGE
DIGITAL PROTOTYPE CONSTRUCTION
ADMINISTRATIVE BUILDING
24
CONTROL ROOM/REFUELING STATION/PARKING BAY
DEPLOYMENT
ADMINISTRATION BUILDING/PAINTING HANGAR
25
APPROACH
STOP APPROACH OF AIRCRAFT
APPROACH
26
27
In the design of this Educational Complex, which will satisfy the Child, Fundamental levels l and ll until high school, I was member of a group of three architects, where I developed several tasks, including: - Field survey; - Technical feasibility study, Study and Study neighborhood impact; - Study of educational standards and for scaling buildings; - Preparation of the program of needs.; - Preparation of technical drawings and computer model; - Earth moving project; - Development of planning and schedule of work; - Meetings with employees of complementary projects (electrical, Structure, coverage, fireman, hydraulic) request for Entry of a building permit. Details of the project. The project is in the construction of your first stage, with completion scheduled for the end of this stage 2018.
28
29
30
31
32
33
34
35
36
In the design of this building Multifamily Residential (HIS), were respected all the assumptions imposed by edict of banking competition Planner. The legal restrictions passed where the same would be deployed, your feedback, the amount of housing units that should be contemplated, variations of the type of housing units to the type of material and construction system to be used in your future construction. The design intent was to give '' MOVEMENT '' to all its facades, integrating also the design of the building concepts of sustainability. The work of Legal Study and development of complete project was developed by me and another architect. We were not the chosen by the newsstand, but it was excellent opportunity.
37
38
39
40
41
In the design of this Venture was responsible for part of the technical feasibility Study, 2D and 3D images, and every computer model. The project is at the stage of Incorporation by the owner of the land and one of the Investors.
42
43
44
45
The project of this CHAPEL had the opportunity to work on all fronts work as possible. I was part of a team of Architects where I participated: - Making the field Survey of the land; - Participated in the program Study of needs and project Layout; - I developed the Executive design and Detailing; - I was part of the computer model; - I followed the process of approval with the city; - I was part of the team for planning and monitoring of execution of the Work.
46
47
48
49
50
51
52
53
54
55
56
No projeto deste Edifício Residencial fui responsável por fazer toda a Modelagem do Projeto em REVIT e SKETCHUP Foi modelado todo o projeto de Arquitetura, Estrutura, Hidráulica e seu Terreno Existente. Com esta modelagem fiz todo o Projeto Executivo e seu Detalhamento, também todo o Cálculo de Corte e Aterro de Movimentação de Terra e seu Projeto de Terraplanagem. Foi possível fazer também toda a compatibilização no NAVISWORKS entre as disciplinas de projeto citadas acima e antecipar as possíveis interferências, antes delas acontecerem em obra. Além dos desenhos técnicos, também foi possível obter as imagens internas e externas para a apresentação do projeto. Para isso foram usados softwares como o Lumion, Photoshop e Corel.
EDIFÍCIO COMPATIBILIZADO – MAQUETE ELETRÔNICA
57
PROJECT LOCATION
58
Apartment-Living Room
Apartment-Balcony Gourmet
Apartment-Pool
Coverage – Ballroom
ILLUSTRATIVE IMAGES
59
ACCESS TO THE ARCHIVES – BIM MODELING
60
LEGAL PROJECT
The Legal project, is the first design that the person responsible for compatibility in BIM have, to do the modeling project.
61
COMPLEMENTARY INFORMATION
01-list of project information
02-Descriptive Memorial
03-tables and Notes
62
MODELING AND RENDERING OF THE PROJECT IN REVIT
01-Legal project
02-Modeling in Revit
03- 3D Prototype completed-BIM
63
MODELING AND RENDERING OF THE PROJECT IN REVIT
04-BIM model error to be corrected
05-BIM Model fixed
64
MODELING AND RENDERING OF THE PROJECT IN REVIT
01-Legal project
03- 3D model
02-change in structural design
04 - Interference
05- Solution found
65
Structural Plant-Floor Type According to the phases of the project will evolve, the information and drawings posted at Autodoc for all designers, they come with more and more detailed information that the Legal project, see example above, which enables greater precision in the BIM model.
66
COVERAGE BOTTOM POOL
Superimposition of model Plants BIM, for interference detection and modeling of design disciplines.
TYPE FLOOR
UNDERGROUND PLANIALTIMÉTRICO
67
Some products obtained in modeling and Making BIM.
Tables Digital Prototype
Technical plants and detailing
3D cutting
68
COMPATIBILITY OF THE PROJECT IN AUTOCAD
Compatibility of the disciplines in DWG 69
COMPATIBILITY OF THE PROJECT IN AUTOCAD
Plant overlay– ARQ / ESTR / HID / PAIS
70
COMPATIBILITY OF THE PROJECT IN AUTOCAD
2- Specification of finishing materials of the facade
1 - Compatibility – ARQ/ESTR
3 – Hydraulic specification
4- Specification in the Foundation
71
COMPATIBILITY OF THE PROJECT IN NAVISWORKS
Importing Revit model to the Navis
Quickly and accurately, the Naviswork makes an analysis of all existing disciplines interference in the
72
COMPATIBILITY OF THE PROJECT IN NAVISWORKS
List of Conflicts pointed to by the program
Image finding exactly where the interference.
73
COMPATIBILITY OF THE PROJECT IN NAVISWORKS
List of Conflicts and visualization
Enlarged detail of interference found
74
In the design of this complex, was the architect responsible for the project. Since your feasibility study, until the application for approval of the project at City Hall for your construction. The project was conceived within the BIM TECHNOLOGY. Having his first studies being done in AutoCad, to then be forwarded for modeling in Revit. After the construction of the Digital Prototype in Revit, the template is forwarded to the LUMION, where adjustments were made, for the generation of images that would be used in your presentation.
75
76
77
DEPLOYMENT
78
ESTUDO DE VIABILIDADE E ACESSOS
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137