APOORVA TADIMALLA APOORVA TADIMALLA Architectural Design Portfolio Work Samples apoorva.tadimalla@gmail.com +1(913)-602-3454
Bally’s Medinah
CPS Lawndale Campus
CPS Johnson School of Excellence
Bank of MOntreal @ Madison
Domain - Hotel
Domain - Residential
LeClaire Courts
East Bank Club
Brownstone Renovation
Historic High-Rise Expansion
Penthouse Development
Courthouse Restroom Renovation
Reliance Cafeteria Metro
CONTENTS
Casino Education Education Commercial Hospitality Residential Residential Recreational Residential Residential Residential Interior Renovation Hospitality Urban Development Residential Educational Residential
Station
Public School
Housing 1-2 3-4 5-6 7-8 9 10 11-12 13-14 15-16 17-18 19-20 23-24 25-26 27-28 29-30 21-22
Precinct Villa Housing Community
&
BALLY’S MEDINAH
Casino
Project type : Casino
Location : 600 N Wabash Ave, Chicago, IL.
Scope of work : Construction Administration, Weekly site visits and reports, RFI and Submittal responses, Construction Close out procedures
Bally’s Chicago is excited to be coming to Chicago and opening their initial casino in the landmarked Medinah Temple building. The Medinah Temple building has been a significant part of Chicago and its history for over 100 years and Bally’s is looking to honor that history while celebrating our presence in Chicago.
It is important to protect and celebrate the Medinah Temple and its landmarked architectural features. Bally’s has been working with the building owner who developed the landmarked property as well as reviewing the Medinah Temple Landmark Ordinance to clearly understand and respect those items when developing the plans for the new casino.
Keeping the historical presence of the building as it relates to the fabric of the surrounding neighborhood is critical. Bally’s is looking to maintain those existing relationships with the primary entry on Wabash and simply updating the existing signage.
Inside the building, the casino will focus on the architectural features of the space to celebrate the first casino in Chicago and Bally’s partnership with the City. This will include gaming on multiple floors which will allow patrons to experience the original ceiling domes, proscenium arch, and other wonderful features of Medinah Temple.
Lower Level Second Level Third Level First Level
//Professional Work STL Architects, Chicago, Illinois. PROPOSED PROGRAM PLANS 09 N PROPOSED LOWER LEVEL FLOOR PLAN LOWER LEVEL EMPLOYEE • LOCKERS • LOUNGE/EDR • UNIFORMS • HR OFFICES SUPPORT • IGB OFFICE SUITE • SURV./SECUR. ROOM • IT SERVER ROOM • COUNT ROOM & OFFICE • ACCT/CASHIER OFFICES • SLOT TECH/REPAIR • STORAGE • EXEC OFFICES • HOUSEKEEPING/TRASH • NURSE/FIRST AID • HOLDING CELL • VALET • MDF/IDF LOUNGE 057 FACILITIES 022 TABLE 036 SLOT REPAIR 013 STAIR 003 002 001 CORRIDOR 058 073 BOARD LARGE 031 HR ADMIN EVS 071 FIRST AID STOR. MDF ROOM 048 TABLE MGR. 037 RETENTION 034 TABLE WOMEN'S STAFF CORRIDOR 008 WAREHOUSE ROOM 010 MGR OFFICE 020 MGR OFFICE SMALL SHOP 023 SRUV. 025 STORAGE STORAGE D 015 MAN TRAP NEW CONFERENCE 070 IT AV 049 SECURITY 043 MARKETING 044 SECURITY WORK SPACE 042 OFFICE OFFICE 040 MARKETING OFFICE 038 SECURITY 039 ADMIN OFFICE 026 OFFICES 033 035 HR OFFICE B 064 OFFICE 011 TECH MGR 012 OFFICE 021 WARDROBE 059 OFFICE OFFICE 027 HR OFFICE LACTATION 066 WOMEN'S 061 MEN'S R.R. 060 CORRIDOR 008 STAIR 050 STAIR 047 STAIR 053 ESCALATORS 076 075 016 STAIR 030 3/64" = 1'-0" 1 BASEMENT OCCUPANCY PLAN 62 Bally’s DMA | STLarchitects SOSH Architects Urban Works Medinah Temple Temporary Casino PROPOSED PROGRAM PLANS N PROPOSED FIRST FLOOR PLAN FIRST LEVEL • SLOTS • MAIN BAR GAMING FLOOR WOMEN'S EXISTING HOUSE ENTRY 130 SECURITY 123 EXIT GRAB AND 117 CLOSET PLUMB. 114 TEL. CLOSET ENTRY 129 JANITOR 133 BAR BACK 126 MAIN SECURITY 115 124 BAR STANDING 125 GAME 120 STORAGE 103 BACK OF CORRIDOR 127 122 STAIR SERVICE BACK OF 105 GO PICK UP 119 ATM 118 3/64" = 1'-0" 1 LEVEL 1 OCCUPANY PLAN 09 63 Bally’s DMA STLarchitects SOSH Architects Urban Works Medinah Temple Temporary Casino PROPOSED PROGRAM PLANS N PROPOSED SECOND FLOOR PLAN SECOND LEVEL • SLOTS • TABLE GAMES - CRAPS - BLACKJACK - ROULETTE GAMING FLOOR STAIR 201 STOR. STORAGE 210 HOST/CREDIT 214 CREDIT B.O.H. STOR. 225 SPACE STAIR 245 SPACE WOMEN'S 250 249 GAMING 251 REMOTE SLOTS 229 SERVICE 223 MAIN CAGE MAN TRAP 211 BAR BACK 232 CIRCULATION 227 MAIN BANK CAGE 218 WORK AREA CAGE 212 WOMEN'S 240 217 JANCL S.A 248 ANCLOS.B 37 CORRIDOR 244 SEATING CORRIDOR CORRIDOR 233 SERVICE 208 KITCHEN B.O.H. STOR. 220 HOUSE 221 BAR STOR. CIRCULATION DISPLAY PODIUM PODIUM CIRCULATION S.S. BAR S.S. BAR 3/64" = 1'-0" 1 LEVEL 2_OCCUPANY PLAN 09 UNOCCUPIED SPACE 64 Bally’s DMA | STLarchitects SOSH Architects Urban Works Medinah Temple Temporary Casino PROPOSED PROGRAM PLANS N PROPOSED THIRD FLOOR PLAN THIRD LEVEL • SLOTS • TABLE GAMES - POKER - CRAPS - BLACKJACK • FOOD + BEVERAGE GAMING FLOOR MEN'S R.R. R.R. 340 WOMEN'S 329 SPACE 327 HOUSE 307 SPACE 343 NOODLE KITCHEN 308 CORRIDOR 324 BAR CIRCULATION CIRCULATION 335 BAR 311 MEAL MEAL SERVICE 304 NOODLE SERVICE 314 GAMING STANDING BAR 316 AN 42LOS.A AN LOS.B 28 N.B. STOR. N.B. STOR.C CORRIDOR PODIUM PODIUM 301 STAIR 313 CORRIDOR 317 ESCALATORS 318 302 N.B. STOR. B 310 CORRIDOR 3/64" = 1'-0" 2 LEVEL 3 FLOOR PLAN 09 UNOCCUPIED SPACE UNOCCUPIED SPACE 65 Bally’s DMA STLarchitects SOSH Architects Urban Works Medinah Temple Temporary Casino
Entry Bar Tap Room - Bar
3rd Floor Casino
Atrium
CPS LAWNDALE CAMPUS
1 2 3 EXTERIOR UPGRADES : GOALS EXTERIOR UPGRADES CHICAGO PUBLIC SCHOOLS STLARCHITECTS DEFINITION 2 CORE IDEA APPLICATION HICAGO UBLIC CHOOLS STLARCHITECTS FORM DEFINITION 2 CORE IDEA GRAPHIC INFORMATION DISPLAY 11'-8" 6'2" 5'1" 6'0" 0'-9" Human height for ages between 14 18yrs old FORM DEFINITION 2 CORE IDEA SYSTEM DIMENSIONAL CONSIDERATIONS 2 FORM DEFINITION CORE IDEA ADDITIONAL OPPORTUNITIES LIGHT BEACON CHALMERS
Chalmers Elementary School Before Before Before After After After Collins High School Johnson School of Excellence - Elementary STLarchitects©2023 47 CHICAGO PUBLIC CHOOLS STLARCHITECTS SPECIFIC APPLICATIONS CHALMERS FORM OBJECTS STLarchitects©2023 54 CHICAGO PUBLIC CHOOLS STLARCHITECTS COLLINS FORM OBJECTS STLarchitects©2023 61 CHICAGO PUBLIC CHOOLS STLARCHITECTS COLLINS STLarchitects©2023 49 CHICAGO PUBLIC CHOOLS STLARCHITECTS SPECIFIC APPLICATIONS CHALMERS STLarchitects©2023 55 CHICAGO PUBLIC CHOOLS STLARCHITECTS SPECIFIC APPLICATIONS COLLINS FORM OBJECTS STLarchitects©2023 63 CHICAGO PUBLIC CHOOLS STLARCHITECTS COLLINS STLarchitects©2023 50 CHICAGO PUBLIC CHOOLS STLARCHITECTS SPECIFIC APPLICATIONS CHALMERS FORM OBJECTS STLarchitects©2023 56 CHICAGO PUBLIC CHOOLS STLARCHITECTS COLLINS FORM OBJECTS STLarchitects©2023 64 CHICAGO PUBLIC CHOOLS STLARCHITECTS COLLINS
CPS JOHNSON SCHOOL OF EXCELLENCE
Elementary School Renovation
//Professional Work
STL Architects, Chicago, Illinois.
Project type : Education
Location : 1420 S Albany Ave, Chicago, IL.
Scope of work : Project Coordinator - Conceptual design, Design Development through Construction Documentation, Weekly consultant coordination, Technical Design Development
STEAM Centric Revitalization Plan
Application of the design concept of the STEAM CLUSTER located on the third level
Application of the design concept of the STEAM CLUSTER located on the third level
Exterior intervention guidelines for the Lawndale Schools applied to Johnson
Exterior intervention guidelines for the Lawndale Schools applied toJohnson
CLUSTER| SHARED SPACE -LIVING MUSEUM
Chicago Public Schools | STLarchitects
JOHNSON SCHOOL MEETING GOALS
STEAM
Public Schools | STLarchitects CLUSTER| APPROACH Existing Plan Chicago Public Schools | STLarchitects STEAM CLUSTER| APPROACH 60% Plan Chicago Public Schools | STLarchitects STEAM CLUSTER| NATURAL LIGHT Chicago Public Schools | STLarchitects STLarchitects©2024 JOHNSON SCHOOL STEAM RENOVATION STEAM CLUSTER| NATURAL LIGHT APPROACH SOLID SURFACE SOLID SURFACE SOLID SURFACE SOLID SURFACE AUDIO/VISUAL ALARM DEVICE CONTEMPO TRACK PICTURE RAIL CONTEMPO-TRACK PICTURE RAIL -ALIGNED WITH TOP OF ALCOVE SS-1 SS-1 SS-1 C L 1' - 2 7/8" C L EQEQ C L EQEQ THREE EQ PANELS TWO EQ PANELS THREE EQ PANELS 3' - 0" PT-1 PT-1 C L C L 31 0 " 72 " 6 LIVING MUSEUM -STEAM CLUSTER SOUTH HALL REFER TO 3
JOHNSON
SCHOOL STEAM RENOVATION
STEAM Classroom Typical Classroom
space Typical Corridor RENOVATION Chicago Public Schools | STLarchitects STLarchitects©2024
SCHOOL STEAM RENOVATION STEAM CLUSTER| SHARED SPACE -LIVING MUSEUM Chicago Public Schools | STLarchitects STLarchitects©2024
SCHOOL STEAM RENOVATION LIVING MUSEUM| LAYOUT Chicago Public Schools | STLarchitects STLarchitects©2024 JOHNSON SCHOOL STEAM RENOVATION LIVING MUSEUM| LAYOUT L4 ROOF L3 L2 L1
Break-out
JOHNSON
JOHNSON
STEAM
Chicago Public Schools | STLarchitects
A B C GENERAL NOTE 1. REFER TO SHEET A0.003 FOR KEYNOTES 2. REFER TO SHEET A6.101 FOR PARTITION TYPES. 3. MOUNT INTERIOR DEVICES PER TYPICAL MOUNTING HEIGHTS ON A5.101 UNLESS NOTED OTHERWISE. 4. REFER TO A9 SERIES FOR FINISH MATERIALS AND COLORS. 5. OFFSET DEVICES IN STUD CAVITIES. LEGEND HALF TONE LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. FULL TONE SOLID LINES INDICATE NEW WORK. 2302 SF LIVING MUSEUM 320 19 20 21 22 23 24 E200 A5.109 4 A5.109 5 A7.102 8 1 A7.102 A5.108 2 A5.108 3 A5.108 1 38 2 06 71 1 1 6 E200 VINYL WRAPPED SOFT-SEATING BENCHES VINYL WRAPPED SOFT-SEATING BENCHES W/ BACK SUPPORTS (20%) E200 E200 E200 E200 E200 E200 4 A5.302 A5.302 6 TYP. 04 1 4 0' 1/4" 04 1 4 5 -821/32 " 5 -85/8 5 -821/32 5 -2 5 -2 52 52 59 1 3 2 57 3 4 58 2 1 2 1 -8 1 -8 32 34 A5.304 F406 F405 F403 F404 F402 F401 F401 F402 F401 F402 F401 F406 F403 F402 F405 F406 F404 F405 REUSE EXISTING TABLE REUSE EXISTING TABLE ROOM SIGNAGE SOLID SURFACE SOLID SURFACE SOLID SURFACE SOLID SURFACE SOLID SURFACE AUDIO/VISUAL ALARM DEVICE SOLID SURFACE @ ALCOVE LINTELS CCTV ALIGN, TYP. CONTEMPO TRACK PICTURE RAIL CONTEMPO-TRACK PICTURE RAIL -ALIGNED WITH TOP OF ALCOVE SS-1 SS-1 SS-1 SS-1 C L 1' 2 7/8" C 1' 7/8" C L EQEQ C L EQEQ 3' 0" THREE EQ PANELS TWO EQ PANELS THREE EQ PANELS 3' 0" PT-1 PT-1 C L C L 31 0 72 2' 7 3/4" ROOM SIGNAGE AUDIO/VISUAL ALARM DEVICE SOLID SURFACE @ ALCOVE LINTELS CCTV BOTTOM OF BAFFLES CONTEMPO TRACK PICTURE RAIL CONNECTOR C L C L SOLID SURFACE DOOR HANDLE STOPPER RESILIENT WALL BASE SOLID SURFACE SOLID SURFACE SOLID SURFACE SS-1 SS-1 SS-1 SS-1 PT-1 PT-1 C L CONTEMPO TRACK CONNECTOR 72 31 0 C L C C L EQEQ EQEQ EQEQ TWO PANELS FOUR EQ PANELS FOUR EQ PANELS TWO EQ PANELS 2' 1/8" EQEQ EQEQ 71 0 1 2 42 4 EXIT C L OPEN TO BEYOND 9' 1/4" FOUR EQ PANELS FOUR EQ PANELS 72 31 0 FACE-MOUNTED EXIT SIGN EMERGENCY LIGHTING BOTTOM OF BAFFLES RESILIENT WALL BASE SOLID SURFACE CONTEMPO TRACK PICTURE RAIL CONNECTORS DOUBLE-FACED CLOCK DOUBLE-FACED CLOCK SOLID SURFACE C L C L C L C EQEQ 71 0 2 PT-1 PT-1 EQEQ EQEQ DEPARTMENT OF FACILITIES CAPITAL IMPROVEMENT ARCHITECT OR RECORD STL ARCHITECTS CIVIL ENGINEERS OF RECORD LANDSCAPE STRUCTURE MEPFP LIGHTING ACOUSTICAL AV FOOD SERVICE REVISIONS NO. DATE DRAWN BY: SCALE: FILE: NOTFOR CONSTRUC KEY PLAN WARNING: ASBESTOS-CONTAINING BUILDING PRESENT THIS BUILDING. AN ASBESTOS MANAGEMENT THE SCHOOL FOR REVIEW UPON REQUEST. ASBESTOS-CONTAINING MATERIALS UNLESS ASBESTOS WORKER OR CONDUCTS SUCH SPECIFICATION(S) CONTAINED THE PROJECT WITH ILLINOIS DEPARTMENT OF HEALTH SHEET TITLE As indicated JOHNSON SCHOOL EXCELLENCE 1420 S Albany Ave, Chicago, TERRA ENGINEERING TERRA ENGINEERING RME IMEG CORP N/A SHINER ACOUSTICS N/A ENLARGED FLOOR & ELEVATIONS LIVING MUSEUM IV 6 LIVING MUSEUM -STEAM CLUSTER SOUTH HALL 05/25/2023ISSUED 06/08/202375% SD 8/11/202390% SD 11/29/2023100% SD 02/16/202430% CD 03/18/202460% CD 05/24/2024ISSUE FOR 1/4" = 1'-0" 1 LEVEL 03 PLAN -LIVING MUSEUM AND CORRIDOR 1/4" = 1'-0" 4 LEVEL 3 HALL NORTH ELEVATION 1/4" = 1'-0" 2 LEVEL 3 HALL SOUTH ELEVATION 1/4" = 1'-0" 3 LEVEL 3 HALL CENTER ELEVATION REFER TO 3 REFER TO 2 REFER TO 4 REFER TO 3 END OF WALL (SOUTH) END OF WALL (NORTH) A GENERAL NOTE REFER TO SHEET A0.003 FOR KEYNOTES MOUNT INTERIOR DEVICES PER TYPICAL MOUNTING HEIGHTS ON A5.101 UNLESS NOTED OTHERWISE. REFER TO SERIES FOR FINISH MATERIALS AND COLORS. OFFSET DEVICES STUD CAVITIES. LEGEND HALF TONE LINES INDICATE EXISTING CONSTRUCTION TO EMAIN. FULL TONE SOLID LINES INDICATE NEW WORK. 2302 SF LIVING MUSEUM 320 19 20 21 22 23 24 A5.109 A5.109 A7.102 A5.108 A5.108-VINYL WRAPPED SOFT-SEATING BENCHES VINYL WRAPPED SOFT-SEATING (20%) E200 E200 E200 E200 E200 A5.302 A5.302 TYP.1/4"2 -8582---1 -832 34 F406 F405 F403 F404 F402 F401 F401 F402 F401 F401 F402 F406 F405 REUSE EXISTING TABLE REUSE EXISTING TABLE ROOM SIGNAGE SOLID SURFACE SOLID SURFACE SOLID SURFACE SOLID SURFACE SOLID SURFACE AUDIO/VISUAL ALARM SOLID SURFACE CONTEMPO TRACK CONTEMPO-TRACK PICTURE RAIL -ALIGNED SS-1 SS-1 SS-1 C 7/8" 7/8" C EQEQ EQEQ 0" THREE EQ PANELS TWO EQ PANELS THREE EQ PANELS 0" PT-1 PT-1 C3/4" ROOM SIGNAGE DEVICE SOLID SURFACE ALCOVE LINTELS RAIL CONNECTOR SOLID SURFACE SOLID SURFACE SOLID SURFACE SOLID SURFACE SS-1 SS-1 SS-1 SS-1 PT-1 PT-1 CC EQEQ EQEQ EQEQ TWO PANELS FOUR EQ PANELS FOUR EQ PANELS TWO EQ PANELS 1/8" EQEQ EQEQEXIT OPEN TO 1/4" FOUR EQ PANELS FOUR EQ PANELSFACE-MOUNTED EMERGENCY LIGHTING BOTTOM OF BAFFLES RESILIENT WALL BASE CONTEMPO TRACK PICTURE RAIL CONNECTORS DOUBLE-FACED CLOCK DOUBLE-FACED CLOCK C EQEQPT-1 PT-1 EQEQ EQEQ DEPARTMENT OF FACILITIES CAPITAL IMPROVEMENT PROGRAM ARCHITECT OR RECORD FOOD SERVICE REVISIONS NO. DATE DESCRIPTION SCALE: FILE: NOTFOR CONSTRUCTION KEY PLANSHEET TITLE DRAWING NO. As indicated JOHNSON SCHOOL OF EXCELLENCE 1420 Albany Ave, Chicago, IL 60623 TERRA ENGINEERING TERRA ENGINEERING RME IMEG CORP SHINER ACOUSTICS ENLARGED FLOOR PLANS & ELEVATIONS -INTERIOR LIVING MUSEUM A5.108 6 LIVING MUSEUM -STEAM CLUSTER SOUTH HALL 05/25/2023ISSUED FOR PRICING 02/16/202430% CD 03/18/202460% CD 05/24/2024ISSUE FOR 100% CD 1/4" 1'-0" LEVEL 03 PLAN -LIVING MUSEUM AND CORRIDOR 1/4" 1'-0" LEVEL HALL NORTH ELEVATION 1/4" 1'-0" LEVEL 3 HALL SOUTH ELEVATION 1/4" 1'-0" LEVEL HALL CENTER ELEVATION REFER TO REFER TO END OF WALL (SOUTH) Living Museum - Floor Plan Perspective Break out space - South Elevation 24 1 BAFFLES SHOULD BE CUT ON SITE AND EACH END POINT OF EACH BAFFLE SHALL BE STAGGERED AT RANDOM WITH MINIMAL WASTE. GAPS BETWEEN EACH BAFFLE END WILL BE 1/2" AND USE END CAPS FULL-LENGTH BAFFLES SHALL BE USED AS MUCH AS POSSIBLE. 13 A5.304 11 0 1 8 37 8' 1 23/32" SKYDOME LIGHTS ARE TO BE PLACED BELOW THE BAFFLES AND AT 9' -6" FROM CURVED WALL, O.C. WHEN BAFFLE MEETS PENDANT THERE SHOULD BE 3/4" SPACE BETWEEN BAFFLE END AND PENDANT. 1/2" GAP 0 -61/2 31 GENERAL NOTE 1. REFER TO SHEET A0.003 FOR KEYNOTES 2. REFER TO SHEET A6.101 FOR PARTITION TYPES. 3. MOUNT INTERIOR DEVICES PER TYPICAL MOUNTING HEIGHTS ON A5.101 UNLESS NOTED OTHERWISE. 4. REFER TO A9 SERIES FOR FINISH MATERIALS AND COLORS. 5. OFFSET DEVICES IN STUD CAVITIES. LEGEND HALF TONE LINES INDICATE EXISTING CONSTRUCTION TO REMAIN. FULL TONE SOLID LINES INDICATE NEW WORK. AUDIO/VISUAL ALARM DEVICE PULL STATION -DEVICE CANNOT EXTEND MORE THAN 4" OFF WALL WINDOW MILLWORK TO BE DIVIDED INTO SEGMENTS OF TWO OR THREE FOR ACCESS TO RADIATOR EQ EQ 5' 8 21/32" 5' 7 3/4" 5' 17/32" LEVEL 03 26' - 8" LEVEL 03 27'-2" LEVEL 04 40'-8" OPEN TO BEYOND C L C L PEGBOARD NICHE WITH ELECTRONIC MONITOR DISPLAY -FRAMED IN PT-2 PAINTED GYP PT-1 SS-1 SS-1 SS-1 RB-2 RB-1 RB-1 PEGBOARD CUTOUT FOR MONITOR MOUNT + RECEPTACLE MONITOR 4 A5.302 TWO EQ PANELS THREE EQ PANELS 76 1 2 3/8" PEGBOARD HOLES SPACED 3 1/2" O.C. 0' 0 1/4" 0' 1/4" SS-1 2 A5.301 SS-1 58 RB-1 LEVEL 03 26' - 8" LEVEL 03 27'-2" OPEN TO BEYOND AUDIO/VISUAL ALARM DEVICE 83 1 3 3 2 C L SS-1 RB-1 SOLID SURFACE 76 1 2 SIX EQ PANELS RECESSED FIRE EXTINGUISHER CABINET 0' 0 1/4" SS-1 DRAWN BY: SCALE: FILE: NOT CONS WARNING: ASBESTOS-CONTAINING PRESENT THIS BUILDING. AN THE SCHOOL FOR REVIEW ASBESTOS-CONTAINING MATERIALS ASBESTOS WORKER OR CONDUCTS SPECIFICATION(S) CONTAINED WITH ILLINOIS DEPARTMENT As indicated ENLARGED & ELEVATIONS LIVING A5.109 IV 1/4" = 1'-0" 1 LEVEL 03 RCP -LIVING MUSEUM 05/25/2023ISSUED 06/08/202375% 8/11/202390% 11/29/2023100% 02/16/202430% 03/18/202460% 05/24/2024ISSUE 1/4" = 1'-0" 4 320 WINDOW WALL SOUTH ELEVATION 1/4" = 1'-0" 3 316 HALLWAY ELEVATION 1/4" = 1'-0" 2 316 HALLWAY NORTH ELEVATION Break out space - Center Elevation Break out space - North Elevation Hallway Elevation Hallway Elevation
CLUSTER| SHARED SPACE -LIVING MUSEUM
HC HC PL PE 4 C A5.102 7 6 4 5 HK-02 COAT HOOK @ 3'-6" A.F.F. 3" 4' 0" EQ EQ HK-02 COAT HOOK @ 5' A.F.F. 4' 3/4" HOLD 1' 5" 6' 2 3/4" 1" 3' 6" 709 3' 0" 1' 2"2' 2" 9' 9 3/4" 8' 0 7/8" 2' 6"4" 6" 3'0" 2' 3 7/8" 1" 5' 0" 10' 10 7/8" 4"2' 8" 3' 7 3/4" 2' 8"6" 2' 10" 3' 0" 1' 0" 2' 0" 4 D A5.102 11 10 8 9 5' 0" 1" 4' 8 3/4" HOLD 1' 5" 3' 8 3/8"1" 5' 3" 9' 9 3/4" 5' 6 3/8" 3' 0" 6" HK-02 COAT HOOK @ 3'-6" A.F.F. 2' 2" 710 EQ EQ 1'10" 2' 6" 3' 0" 1' 2" 5"2' 8" 2'3" 3' 0" A5.102 14 13 12 15 6' 11" 9' 9 3/4" 3'7" 3' 0"4" 9' 9 3/4" HOLD 1'5" 708 6' 11 3/4" 2' 6"4" 1' 7" 5' 4" 1' 1" 7 1/2" HK-02 COAT HOOK @ 3'-6" A.F.F. 3' 0" 1' 0" LEVEL 07 70' - 0" TL-5 RP-01 FW-01 TP-01 HK-02 LEVEL 07 70' - 0" TL-5 2' 10"6"2' 11"4" SS-2 PL-4 PL-4 LINEAR LIGHT HK-02 RP-01 GR-01 GR-03 TP-01 GR-02 MR-1 8 A7.103 Sim LEVEL 07 70' - 0" TL-5 GR-01 GR-02 GR-03 HK-02 TP-01 FD-01 GENERAL NOTES 1. REFER TO SHEET G0.002 FOR MOUNTING HEIGHTS NOT SHOWN ON THIS SHEET. 2. FOR ALL POWER AND DATA OUTLETS, REFER TO SHEETS A9.501 & A9.502. 3. FOR FINISHES INFORMATION, REFER TO SHEETS A9.201 & A9.202. PROJECT INFORMATION Project Name Project Address Owner's Name Project Number PROJECT TEAM Architect MEPFP Structural Civil Landscape Parking Lighting Acoustical Exterior Code Security Audio Visual STL Architects STL TEAM INFORMATION Project DirectorProject DesignerTechnical Coordinator Drawn by Design ReviewTechnical Review Revision Date Issue PROFESSIONAL SEAL ISSUED FOR Design ReviewTechnical ReviewCoordinationPricing INTERNAL REVIEWS SHEET INFORMATION BMO MADISON OFFICE RELOCATION PROJECT 1 WEST MAIN ST. MADISON, WI 53703 BMO BANK NA MSA PT JR AT Author DesignerChecker ENLARGED INTERIOR DETAILS 1/2" = 1'-0" 1 ENLARGED FLOOR PLAN -LEVEL 7 WOMEN'S RESTROOM 1/2" = 1'-0" 2 ENLARGED FLOOR PLAN -LEVEL 7 MEN'S RESTROOM 1/2" = 1'-0" 3 ENLARGED FLOOR PLAN -LEVEL 7 ALL GENDER RESTROOM 1/2" = 1'-0" 4 ELEVATION -LEVEL 7 WOMEN'S RESTROOM 1/2" = 1'-0" 8 ELEVATION -LEVEL 7 MEN'S RESTROOM 1/2" = 1'-0" 12 ELEVATION -LEVEL 7 ALL GENDER RESTROOM 2023/09/29 DESIGN DEVELOPMENT 2023/10/27 80% CONSTRUCTION DOCS 2023/11/10 ISSUE FOR PERMIT & BID UP UP 2'-0"4'-0" 8'-0" 16'-0" A 1 2 3 4 5 6 7 8 B C D E F 12' 8" 15' 6" 18' 6" 16' 11 3/4" 17' 1/4" 17' 12' 8" 12' 2 13/16" 15' 3/16" 14' 7/16" 15' 9/16" 13' 4" OPEN WORK STATIONS 614 MEETING ROOM 618 LAN 613 OFFICE 622 OFFICE 623 004 STORAGE 627 629 FOCUS POD 630 MEETING ROOM SHARED CLIENT CENTER 602 STAIR ELEV #3 003 615 AV 612 ELEV #1 001 ELEV #2 002 STORAGE 611 CONNECTION CAFE 604 609 FOCUS BOOTH FOCUS BOOTH FOCUS BOOTH 625 ENTRY LOBBY 601 E. ELEC CLOSET 628 CIRCULATION 600C 600A CIRCULATION 600B OPEN WORK STATIONS 621 WOMEN'S 606 MEN'S RESTROOM 607 CLOSET 617 608 2 HIGH 2 HIGH HIGH HIGH HIGH HIGH HIGH HIGH HIGH HIGH HIGH HIGH HIGH HIGH FOCUS POD 619 FOCUS BOOTH 610 CIRCULATION 600D RE-01 RE-13 RE-23 RE-01 RE-13 RE-01 RE-01 RE-10-3 RE-10-3 EC-02 RE-01 RE-01 RE-05 RE-25 RE-05 RE-25 RE-15 RE-15 RE-14 RE-14 RE-18 RE-18 ST-01B RE-13 RE-13 RE-21 RE-17 RE-17 RE-17 RE-17 RE-17 RE-17 RE-27 LT-02 LT-02 CR-5A RE-20 RE-17 RE-17 RE-17 RE-17 RE-04 RE-17 RE-17 RE-19 RE-02 RE-03 RE-10-2 RE-10-2 EC-02 RE-01 RE-01 RE-01 RE-01 RE-01 RE-01 RE-01 RE-01 RE-01 RE-05 RE-25 RE-25 RE-10-2 RE-01 RE-01 RE-01 RE-01 RE-10-2 RE-01 RE-01 RE-10-2 EC-02 RE-01 RE-01 RE-01 RE-01 RE-10-2 RE-01 RE-17 RE-17 RE-04 RE-25 RE-05 RE-03 RE-03 RE-02 RE-02 RE-19 RE-19 RE-10-3 RE-23 RE-21 RE-26 RE-17 RE-17 RE-17 RE-17 RE-17 RE-17 RE-17 RE-17 RE-17 RE-17 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-05 GENERAL NOTE 1. PLAN FOR REFERENCE ONLY. 2. REFER TO SHEET A8.102 FOR FURNITURE SCHEDULE LEGEND EXISTING WALL TO REMAIN NEW WALL LIMITED OR NO WORK. GENERAL CONTRACTOR TO COORDINATE THE FULL EXTENT OF THE WORK THAT OCCURS THIS AREA(S) DIRECTLY OR INDIRECTLY (PASSING ABOVE OR THRU) WITH THE FINAL MECHANICAL, PROJECT INFORMATION Project Name Project Address Owner's Name Project Number PROJECT TEAM Architect MEPFP Structural Civil Landscape Parking Lighting Acoustical Exterior Code Security Audio Visual STL Architects STL TEAM INFORMATION Project DirectorProject DesignerTechnical Drawn by Design ReviewTechnical RevisionDate PROFESSIONAL SEAL ISSUED FOR Design ReviewTechnical ReviewCoordinationPricing INTERNAL REVIEWS SHEET INFORMATION Sheet Name COPYRIGHT2023 STL ARCHITECTS INC. BMO MADISON OFFICE RELOCATION WEST MAIN ST. MADISON, WI 53703 BMO BANK NA MSA PT JR A9.101 AV/LM JR LEVEL -FURNITURE 1/4" 1'-0" LEVEL 6 -FURNITURE PLAN 2023/08/18 2023/09/29 2023/10/27 2023/11/10 A 1 2 3 4 5 6 7 8 B C D E F 12' 8" 15' 6" 18' 6" 16' 11 3/4" 17' 1/4" 17' 12' 8" 12' 2 13/16" 15' 3/16" 14' 7/16" 15' 9/16" 13' 4" FOCUS POD FOCUS POD OFFICE 723 STAIR #1 001 AV ROOM 712 JANITOR 713 BREAKOUT AREA 722 OPEN WORK STATIONS STAIR #2 002 OFFICE 721 704 703 720 LOBBY 701 FOCUS BOOTH 715 WELLNESS ROOM 716 717 FOCUS POD 718 CIRCULATION 700C STORAGE 714 OPEN WORK STATIONS 719 RESTROOM 708 RESTROOM 709 MEN'S RESTROOM 710 CIRCULATION VESTIBULE ELEV #3 003 ELEV #1 001 ELEV #2 002 CLOSET CLOSET CIRCULATION 700B HIGH HIGH HIGH 2 HIGH HIGH HIGH 2 HIGH 2 HIGH HIGH HIGH HIGH 2 HIGH HIGH 2 HIGH 2 HIGH 2 HIGH HIGH 2 HIGH RE-01 RE-01 RE-01 RE-01 RE-13 RE-13 RE-21 RE-01 RE-01 EC-02 RE-10-2 RE-01 RE-01 RE-17 RE-17 RE-04 RE-04 RE-17 RE-17 RE-17 RE-17 RE-17 RE-19 RE-17 RE-17 RE-17 RE-17 RE-24 RE-18 RE-15 RE-18 ST-01B RE-02 RE-16 RE-03 RE-23 RE-12 RE-21 RE-13 RE-01 RE-01 RE-01 RE-10-2 RE-10-2 RE-16 RE-02 RE-03 RE-19 EC-02 RE-10-2 RE-01 RE-01 RE-01 RE-01 RE-10-2 RE-10-2 RE-01 RE-01 EC-02 RE-10-2 RE-10-2 RE-10-2 RE-01 RE-01 RE-01 RE-01 RE-01 RE-01 RE-10-2 RE-16 RE-04 RE-17 RE-17 RE-17 RE-05 RE-25 CONNECTION CAFE 702 RE-08 RE-08 ST-01 RE-02 RE-02 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 RE-16 2'-0"4'-0" 8'-0" 16'-0" GENERAL NOTE 1. PLAN FOR REFERENCE ONLY. FURNITURE SCHEDULE INFORMATION LEGEND EXISTING WALL TO REMAIN NEW WALL SCOPE OF WORK IN THIS AREA IS LIMITED OR NO WORK. GENERAL CONTRACTOR TO COORDINATE THE FULL EXTENT OF THE WORK THAT OCCURS THIS AREA(S) DIRECTLY OR INDIRECTLY (PASSING ABOVE OR THRU) WITH THE FINAL MECHANICAL, ELECTRICAL OR PLUMBING DESIGNS. PROJECT INFORMATION Project Name Project Address Owner's Name Project Number PROJECT TEAM Architect MEPFP Structural Civil Landscape Parking Lighting Acoustical Exterior Code Security Audio Visual STL Architects STL TEAM INFORMATION Project DirectorProject DesignerTechnical Drawn by Design ReviewTechnical RevisionDate PROFESSIONAL SEAL ISSUED FOR Design ReviewTechnical ReviewCoordinationPricing INTERNAL REVIEWS SHEET INFORMATION Sheet Name BMO MADISON OFFICE RELOCATION WEST MAIN ST. MADISON, WI 53703 BMO BANK NA MSA PT JR A9.102 AV/LM JR/AT LEVEL -FURNITURE 1/4" 1'-0" LEVEL -FURNITURE PLAN 2023/07/28 2023/08/18 2023/09/29 2023/10/27 2023/11/10 Level 6 Floor Plan Level 7 Floor Plan
DOMAIN - HOTEL
Chicago, Illinois.
Project type : Hospitality
Location : 370 S West Temple, Salt Lake City, Utah.
Scope of work : Accessibility regulations, Vertical Circulation, DD through CD construction documentation, Consultant Coordination, Revit Modeling, Interior Architecture //Professional Work
SCB,
EL:1' - 4" C B LEVEL EL:20' - 0" LEVEL EL:31' - 11" LEVEL EL:90' - 5" LEVEL EL:80' - 8" LEVEL EL:70'LEVEL EL:61' - 2" LEVEL EL:51' - 5" LEVEL EL:41' - 8" L 10 STRUCTURE EL:102' - 4" ROOFD A A3.20 A3.20 E-GL-01 E-BR-01 E-MTL-04, E-CLR-02 E-MTL-09 E-CLR-01 E-BR-01 E-MTL-09 E-CLR-01 E-GL-03 E-MTL-02, E-CLR-01 E-MTL-02, E-CLR-01 E-MTL-02, E-CLR-01 E-MTL-01 E-GL-01 C.2 LEVEL 10 INTERIOR EL:103' - 10" A4.20 E-GL-03S E-MTL-02, E-CLR-01 E-MTL-07 E-MTL-04 E-CLR-02 (HIDDEN) E-MTL-06 E-CLR-01 ELEVATION BEYOND; SEE A3.23 A3.30 SIM. A3.20 9 EL:1' - 4" LEVEL EL:20'LEVEL EL:31' - 11" LEVEL EL:90'LEVEL EL:80'LEVEL EL:70'LEVEL EL:61'LEVEL EL:51'LEVEL EL:41'T 10 STRUCTURE EL:102' - 4" GUEST ROOM RESTAURANT GUEST ROOM GUEST ROOM GUEST ROOM GUEST ROOM GUEST ROOM GUEST ROOM ROOFTOP TERRACE B2080.01 TERRACE RAILINGS B3010.02 FLUID-APPLIED ROOF SYSTEM -INSULATED B2020.02 GLAZED ALUMINUM-FRAMED WALL SYSTEM-STICK BUILT B2010.03 BRICK MASONRY VENEER WALL ON CFS WALL A4.10 A4.10 A4.20 LEVEL 10 INTERIOR EL:103' - 10" 6" 7" 2' 11 3/4" 2' 0" 1/4" 8' 0" 11" 8' 8" 1" 8" 8' 8" 1' 1" 8" 1" 1' 1" 8' 8" 1" 8" 0" 3" 6" B2020.01 GLAZED ALUMINUM-FRAMED WALL SYSTEM -UNITIZED A4.20 A4.20 TYP. B2010.04 COMPOSITE METAL WALL B2010.02 COMPOSITE METAL WALL CLADDING ON CFS BACKUP CORRIDOR 203 9 EL:1' - 4" LEVEL EL:20' - 0" TERRACE A4.10 A4.10 B2010.02 COMPOSITE METAL WALL CLADDING ON CFS BACKUP B2020.02 GLAZED ALUMINUM-FRAMED WALL SYSTEM-STICK BUILT B3010.02 FLUID-APPLIED ROOF SYSTEM -INSULATED B2010.04 COMPOSITE METAL WALL CLADDING ON CONCRETE RESTAURANT TO F/GLASS VISION GLASS, -GL-01 LEGEND METAL PANEL, E-CLR-02 METAL PANEL, E-CLR-01 SPANDREL GLASS, -GL-01S EIFS, E-9 LEVEL EL:1' - 4" LEVEL EL:20' - 0" LEVEL EL:31' - 11" LEVEL EL:90' - 5" LEVEL EL:41' - 8" T 10 STRUCTURE EL:102'LEVEL 10 INTERIOR EL:103' - 10" A4.10 GUEST ROOM GUEST ROOM BOARD ROOM A4.10 A4.20 TO F/BRICK PIER SIM. RESTAURANT 5" B2080.01TERRACE RAILINGS B3010.02 FLUID-APPLIED ROOF SYSTEM -INSULATED Drawn By: Checked By: Project Number: Sheet Number: © 2022 Solomon Cordwell Buenz ENLARGED ELEVATION & SECTIONS - EAST 380 S WEST TEMPLE ST SALT LAKE CITY, UT 84101 370 S WEST TEMPLEHOTEL A3.20 AG, CV BCM 2020006 SCALE: 1/4" 1'-0" 1 ENLARGED EAST ELEVATION SCALE: 1/4" = 1'-0" 2 WALL SECTION SCALE: 1/4" 1'-0" 3 WALL SECTION NO.DATE DESCRIPTION 09/10/2021SCHEMATIC DESIGN 04/01/2022DESIGN DEVELOPMENT 05/06/202250% CD 06/03/202280% CD SCALE: 1/4" 1'-0" 4 WALL SECTION
DOMAIN - RESIDENTIAL
//Professional Work
SCB, Chicago, Illinois.
Project type : Residential
Location : 370 S West Temple, Salt Lake City, Utah.
Scope of work : Unit Planning and Design, Accessibility regulations, DD through CD construction documentation, Structural & MEP Coordination, Revit Modeling, Code research,
DN FEC FEC FEC A3.01 1 A A B B C C D D F F A3.02 1 3 3 4 4 5 5 6 6 7 7 8 8 10 10 0" 0" 2' 6" 0" 4' 6" 5' 0" 6" 6" 7' 6" 4' 6" 6" 0" 4' 6" 2' 6" 5' 0" 6" 6" 2' 6" 0" 4' 6" 5' 0" 6" 4' 0" 5' 0" 4' 8" 4' 8" 8" 8" 8" 10" 10" 5' 12' 63' 101' 25' 0" 56' 17' 33' 40' 10" 1' 8" 2' 119' 6" 1/2" 1/2" 6" 6" 3" 5' 0" 3" 4' 0" 5' 0" 6" 9" 11" 11" 11" 11" 11" 11" 11" 11" 11" E E 1 1 11 11 2 2 A3.11 A3.11 A3.04 9 9 ROOM CLOSET X02 SIM ELEV 4 ELEV 1 ELEV ELEV STAIR 2 ELEVATOR LOBBY X00 C04 A5.01 13' 6" 23' 7/8" 1/8" 15' 1/8" 24' 1/8" 3/4" 15' 3" 207' 9" 119' A2.09B A2.09A A4.40 C02 1/4" 1/4" 3/4" B.7 B.7 C.5 C.5 D.2 D.2 D.9 D.9 5.5 5.5 6.8 6.8 8.1 8.1 OPP A4.41 A4.41 A4.40 PLAN LEGEND PLAN KEY INTERIOR DRAWING GENERAL NOTES RESIDENTIAL UNIT PLAN. Drawn By: Checked Project Number: Sheet Number: © 2021 Solomon Cordwell NOT CONSTRUCTI LEVELS 08 OVERALL PLAN 390 S WEST TEMPLE SALT LAKE CITY, 370 S WEST RESIDENTIAL A2.08 JLG 2020006 SCALE: 1/8" 1'-0" 1 LEVELS 08-11 OVERALL FLOOR PLAN NO.DATE 06/14/2021DESIGN 10/15/2021ISSUEDUnit Design and Planning for high-rise residential building
LECLAIRE COURTS Phase 1 Project type : Residential Location : 4400 S. Cicero Ave. Chicago, IL Scope of work : Unit design, Accessibility regulations, Vertical circulation, SD through CD construction documentation, Structural & MEP Coordination, Material research, Revit Modeling, Code research //Professional Work SCB, Chicago, Illinois. LEVEL 02 EL:17' - 0" A 3' 0" 4" 2" 1' 6" 10 7/8" B2020.02 GLAZED ALUMINUM WALL SYSTEM 05 1200 STRUCTURAL STEEL FRAMING 05 1200 STRUCTURAL STEEL FRAMING 10 7/8" B3010.01 SINGLE PLY MEMBRANE ROOFING 5/8" 1/2" 6" 1/2" 6" 1/2" 1/4" 11' 1/4" 10 7/8" 3/8" 07 7100 GUTTER - RS 05 7500 DECORATIVE FORMED METAL A4.10 SIM 05 7500 DECORATIVE FORMED METAL B3080.01 METAL SOFFIT 05 4000 COLD FORMED METAL FRAMING SLOPE 1/4" FT 12' 0" 12' 0" 5' 0" LEVEL 02 EL:17' - 0" A 2' 7/8" 3' 1 7/8" 3/4" 1/2" 2' 4 5/8" 1/2" 2' 5/8" 1/2" A4.10 SIM 3' 0" B2010.03 ALUMINUM SIDING WALL B3080.01 METAL SOFFIT 07 6200 STAINLESS STEEL FLASHINGSMFT TRIM BY SIDING MANUFACTURER 07 9200 SEALANT AND BACKER ROD - JS A 07 2726 TRANSITION MEMBRANE-FMA 11' 3/4" 07 6500 FLEXIBLE FLASHING TAPE 07 6500 STAINLESS STEEL DRIP EDGE-FF 05 7500 DECORATIVE FORMED METAL 07 4210 THERMALLY BROKEN WALL BRACKETS - CSS 07 9200 SEALANT AND BACKER ROD - JS 07 9200 SEALANT AND BACKER ROD - JS 08 9000 FIXED ALUMINUM LOUVER DUCTWORK. SEE MECH. DWGS 08 9000 SILL FLASHING B2020.02 GLAZED ALUMINUM WALL SYSTEM 14' 0" 1/8" FACE OF GLASS 2" Drawn Project Number: Sheet Number: © 2022 ENCLOSURE SECTION 4400 CHICAGO, LECLAIRE BUILDING AG NO.DATE SCALE: 1 1/2" 1'-0" 1 CANOPY @ NORTH ENTRY SCALE: 1/2" = 1'-0" 2 METAL SOFFIT @ L2 SCALE: 3" = 1'-0" 3 L1 VISION / LOUVER Section through Entry Canopy
DN FEC FEC A3.01 A3.02 1 2 3 4 5 6 C D E F G H J K A3.02 B A A3.03 A3.03 A3.03 3/8" 19' 1/2" 26' 1/2" 12' 1/4" 28' 11 3/4" 25' 11 1/2" 32' 3/4" 3/4" 3/4" 26' 1/2" 31' 3/4" 11 1/8" 30' 3/4" 25' 6" 13' 1/2" 30' 1/2" 25' 10" 32' 3/8" 3/4" 7 L TELE/DATA X05 X04 TRASH X02 X03 ST02 ST01 CORRIDOR ELEVATOR LOBBY ELEV. ELEV. EQ EQ EQ EQ EQ EQ 131' 11" 10' 3/4" 40' 26' 1/2" EQ EQ EQ EQ EQ EQ 60' 11" 28' 1/2" 3' 11" 10' 13' 5' 6' 0" 0" 0" 7' 0" 5/8" 0" 7' 0" 11 7/8" Q 5/8" 5/8" 1/8" CANOPY BELOW CANOPY BELOW SINGLE PLY MEMBRANE ROOFING B3010.01 ROOFING RDOD A5.10 AT LEVEL A5.10 A5.10 AT LEVEL 2AT LEVEL A5.20 R2 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 R1 X02 X05 X04 R1 X03 R4 R4 R4 R4 R3 R2 R4 R2 R2 R1 R2 R2 R2 R2 R2 R2 R1 R1 R1 R1 R2 R4 R2 R3 R2 A1ED A1CD M2R A1CD A1CD A1EB A1EB M2R M2R A1EB A1ED A1EB A1EB A1EB A1EB M1R M2R M2R M2R A1CD M2R A1ED M2R A1ED A1ED A1EB A1EB A1CD A1ED A1ED A1ED A1EB A1EB A1ED A1EB F-CJ A1EB A1EB A1EB F-CJ A1ED A1ED A1EB A1ED A1EB A1EB A1EB A1EB A1ED 11" 0" 8' 11 3/4" 0" 11' 10' 0" 19' 3/4" 42' EQ A-CK A1EB A1ED A-CK 2B-B 2B-A 1B-A 1B-A UNITX21 S-B UNIT X20 UNITX16 UNITX19 1B-A UNITX18 UNITX14 UNITX12 UNITX10 UNITX11 1B-B UNITX13 S-A UNITX15 1B-D UNITX17 2B-C UNITX02 UNITX01 UNITX03 UNITX05 UNITX07 1B-A UNITX09 UNIT 1B-E X08 UNITX06 1B-F UNITX04 1B-A A-CB A-CK A-CB A-CK A-CB A-CB A-CB A-CB A-CK A-CB A-CB A-CB R7 R7 R7 R3 R7 R2 R8 R9 R7 R7 R3 R7 R7 R3 R7 R3 R7 R3 R7 R3 R7 R3 R7 R7 R7 R7 R10 R9 R9 R8 R7 R3 R9 R7 R7 R7 R7 R7 R7 R3 R2 R3 R7 R6 R7 R7 R3 R3 R8 R7 R3 R4 R3 R10 R7 R7 R2 R3 R10 R3 R7 R7 R3 R3 R7 R7 A1EB R2 A1EB A1EB R7 R8 R7 R3 F-AJ F-AJ R4 R3 R7 R7 R4 268' 11" 7/8" 14' 3/4" 12' 12' 11 1/4" 13' 1/2" 1/2" 12' 1/2" 1/2" 12' 1/2" 1/2" 12' 1/2" 1/2" 13' 1/2" 12' 1/2" 32' 3/8" 17' 3/4" 11' 3/8" 11' 3/8" 17' 3/4" 10 1/4" 17' 3/4" 11' 3/8" 11' 3/8" 3/4" 10 1/4" 1/4" S1KA S1KA S1KA S1KA F-CJ S1KA S1KA S1KA S1KA S1KA S1KA S1KA S1KA S1KA S1KA S1KA S1KA S1KA S1KA S1KA F-CJ S1KA S1KA S1KA F-CJ S1KA F-CJ F-CJ S1KA S1KA S1KA R7 R9 R9 S1KA A3 A1 A3 A1 A3 A1 A3 B1 A6 A6 A6 A2 C1 A4 D1 B1 A4 B1 A1 A1 A1 A4 A2 B1 B1 A1 D1 A1 A3 A4 A1 R6 R7 RD RD LP: HP: 5/8" HP: HP: 3/8" 16' 3/8" 11 3/8" Drawn By:Checked By: Project Number: Sheet Number: 2022 Solomon Cordwell Buenz PROGRESS SET NOT FOR CONSTRUCTION LEVELS 02 & 04 FLOOR PLAN 4400 S. CICERO AVE. CHICAGO, IL 60632 LECLAIRE COURTS BUILDING A-NORTH A2.02 AG/DC/AT DS/BL 2020010 SCALE: 1/8" 1'-0" 1 LEVELS 02 & 04 FLOOR PLAN SCALE: 1/8"16' 11.22.202250% DESIGN DEVELOPMENT 12.23.2022DESIGN DEVELOPMENT UP UP DN UP DN DN DN UP DN DN UP UP 5 B A5.10 3' 11 1/4" T @ 1 A C 5' 6" 3' 10" 1" 13' 1/4" CLEAR 3'-8 MIN.CLR 7 5/8" 5 1/8" 6' 11 3/8" M2R M2R M2R M2R A5.30 A5.30 GUARD RAIL STAND PIPE 5' 5/8" 1/2" 5/8" 0" CLEAR ST01 5 B A5.10 1" 7" 8T @ 11" EACH 7' 4" 3' 10" 1" 8T @ 11" EACH 16' 11" CLEAR 3'-8"MIN.CLR 1/2" 0" CLEAR 3'-8"MIN.CLR 81/4" M2R M2R M2R M2R A5.30 A5.30 1/8" 5/8"3/4" 7 5/8" 11 7/8" 6' 11 1/8" 7 5/8" ST01 ROOF EL:67' - 0" LEVEL 04 EL:37' - 0" LEVEL 05 EL:47' - 0" LEVEL 06 EL:57' - 0" 9R @ EQ 9R @ EQ 9R @ EQ 9R @ EQ 9R @ EQ 67' 0" GUARD RAIL 2 3/8" 3/4" WALL MOUNTED UNIT HEATER 5 B A5.10 16' 11" CLEAR 0" CLEAR 3'-8"MIN.CLR 1/2" STAND PIPE 3/4" 5' 1/4" @ A 7' 4" 3' 10" 1" 3'-8 MIN.CLR M2R M2R M2R M2R 1/8" 3/4" 5/8" 5/8" 9' 11 7/8" 11 1/8" 5/8" @ A ST01 B A5.10 16' 11" CLEAR 3/4" 5' 1/4" @ A H 7' 4" 10" 1" GUARD RAIL ROOF CURB 10 7/8" A2CD 0" CLEAR ST01 ROOF EL:67' - 0" J LEVEL 04 EL:37' - 0" LEVEL 05 EL:47' - 0" LEVEL 06 EL:57' - 0" 10' 0" 9R @ EQ 5' 0" 9R @ EQ 0" 9R @ EQ 5' 0" 9R @ EQ 5' 0" 9R @ EQ 0" WALL MOUNTED UNIT HEATER 6 J 12 A5.10 10" 6T @ 11" EACH 5' 6" 5" 8T 11" EACH 7' 4" 10" 0" CLEAR STAND PIPE 3'-8"MIN.CLR 3'-8"MIN.CLR DRAIN RISER, SEE FP DWGS 1" 3' 8" 6" 8" 1" 16' 11" 7/8" ST02 M2R M2R 6 J 12 A5.10 16' 11" CLEAR 7/8" 3'-8"MIN.CLR STAND PIPE 3'-8"MIN.CLR 8T @ 11" EA 7' 4" 10" 3/4" 1" 3' 8" 6" 8" 1" DRAIN RISER, SEE FP DWGS ST02 M2R M2R 10" 8T @ 11" EA 7' 4" 5' 1/4" 3/4" 6 J 12 A5.10 16' 11" CLEAR 7/8" 10" 8T 11" EACH 7' 4" 5' 1/4" 3/4" ACCESS LADDER AND ROOF ACCESS HATCH GUARD RAIL 8' 0" CLEAR 1" 3' 8" 6" 8" 1" SEE FP DWGS 3'-8"MIN.CLR 3/4" J 12 A5.10 10" 6T @ 11" EACH 5' 6" 10" 16' 11" CLEAR 7/8" 3' 9" 1" 3' 8" 8 IN.CLR 3'-8" M STAND PIPE DRAIN RISER, SEE FP DWGS 5 B A5.10 1 1/4" 3' 10" T @ 1 1 E C 5' 6" 3' 10" 1" 13' 1/4" CLEAR 1/4" 7' 0 3/4" 6' 11 1/8" 0" CLEAR 3'-8 MIN.CLR 3'-8"MIN.CLR M2R M2R M2R M2R A5.30 A5.30 1 1/4" 3' 10" @ C 5' 6" 3' 10" 1" STAND PIPE 5' 5/8" 1/2" 5/8" Drawn By:Checked Project Number: Sheet Number: 2022 Solomon Cordwell Buenz PROGRESS NOT FOR CONSTRUCTION STAIR 01 & AND SECTION 4400 S. CICERO AVE. CHICAGO, IL 60632 LECLAIRE COURTS BUILDING AA5.10 AT DS/BL 2020010 SCALE: 1/4" 1'-0" 1 STAIR 01 -LEVEL 01 SCALE: 1/4" 1'-0" 3 STAIR 01 -LEVEL 02 NO.DATE 10.21.2022SCHEMATIC 11.22.202250% DESIGN 12.23.2022DESIGN DEVELOPMENT SCALE: 1/4" 1'-0" 4 STAIR 01 -LEVELS 03-05 SCALE: 1/4" 1'-0" 5 STAIR 01 -LEVEL 06 SCALE: 1/4" = 1'-0" 9 STAIR 02 -LEVEL 02 SCALE:1/4" = 1'-0" 10 STAIR 02 -LEVELS 03-05 SCALE: 1/4" = 1'-0" 11 STAIR 02 -LEVEL 06 SCALE: 1/4" 1'-0" 2 STAIR 01 -PLAN @ MID LANDING Unit Design and Planning involving CHA, Market rate, LIHTC. Stair Section UP UP DN UP DN UP DN UP UP 5 B A5.10 3' 11 1/4" 6 @ 1 E C 5' 6" 3' 10" 1" 1" 3' 6" 8" 1" 13' 1/4" CLEAR 3'-8 MIN.CLR 1/4" 7 5/8" 6' 1/8" 6' 11 3/8" M2R M2R M2R M2R A5.30 A5.30 GUARD RAIL STAND PIPE 5/8" 1/2" 5/8" 0" CLEAR ST01 5 B A5.10 1" 5' 7" 8T @ 11" EACH 7' 4" 3' 10" 1" 1" 5' 7" 8T @ 11" EACH 7' 4" 3' 10" 1" STAND PIPE 16' 11" CLEAR 3'-8"MIN.CLR 1/2" 0" CLEAR 1" 8" 6" 3' 1" 3'-8"MIN.CLR 81/4" M2R M2R M2R M2R A5.30 A5.30 1/8" 5/8"3/4" 5/8" 9' 11 7/8" 6' 11 1/8" 5/8" ST01 LEVEL 01 EL:0" ROOF EL:67' - 0" LEVEL 02 EL:17' - 0" LEVEL 03 EL:27' - 0" LEVEL 04 EL:37' - 0" LEVEL 05 EL:47' - 0" LEVEL 06 EL:57' - 0" 10' 0" 9R @ EQ 0" 9R @ EQ 5' 0" 9R @ EQ 5' 0" 9R @ EQ 5' 0" 9R @ EQ 5' 0" 9R @ EQ 5' 0" 9R @ EQ 5' 0" 9R @ EQ 5' 0" 10' 0" 10' 0" 10' 0" 10' 0" 10' 0" 17' 0" 9R @ EQ 5' 1 1/4" 7R @ EQ 3' 11 5/8" 7R @ EQ 11 5/8" 7R @ EQ 3' 11 5/8" 67' 0" 11' 10 13/16" 1/4" 3' 11 19/32" 11" 7' 0" CLR HT GUARD RAIL 2' 2 3/8" 3/4" WALL MOUNTED UNIT HEATER A5.30 A5.30 7' 11 3/16" 5 16' 11" CLEAR 3'-8"MIN.CLR 1/2" T @ A 7' 4" 3' 10" 1" M2R 6' 11 1/8" 5/8" T @ A 7' 4" 3' 10" 1" 6 J 12 A5.10 10" 8T @ 11" EACH 7' 4" 5' 8" 10" 6T @ 11'' EACH 3'-8 MIN.CLR GUARD RAIL 8' 0" 3 3/4" 16' 11" CLEAR 3 7/8" 8' 0" CLEAR M2R M2R M2R M2R 3 3/4" M3R ST02 STAND PIPE DRAIN RISER, SEE FP DWGS LEVEL 01 EL:0" ROOF EL:67' - 0" J LEVEL 02 EL:17' - 0" LEVEL 03 EL:27' - 0" LEVEL 04 EL:37' - 0" LEVEL 05 EL:47' - 0" LEVEL 06 EL:57' - 0" 5' 3/16" 13' 0 13/32" 10' 0" 9R @ EQ 0" 9R @ EQ 5' 0" 9R @ EQ 5' 0" 9R @ EQ 5' 0" 9R @ EQ 0" 9R @ EQ 5' 0" 9R @ EQ 5' 0" 9R @ EQ 5' 0" 7R @ EQ 3' 11 5/8" 7R @ EQ 3' 11 5/8" 7R @ EQ 3' 11 5/8" 9R @ EQ 5' 1/4" GUARD RAIL H E A D L C 7' 0" 10' 0" 10' 0" 10' 0" 10' 0" 17' 0" WALL MOUNTED UNIT HEATER 9' 13/16" 6 J 12 A5.10 10" 6T @ 11" EACH 5" 1" 1" 5' 7" 8T @ 11" EACH 7' 4" 10" 8' 0" CLEAR 3'-8"MIN.CLR 3'-8"MIN.CLR DRAIN RISER, SEE FP DWGS 8' 0" CLEAR 16' 11" 3 7/8" 3/4" ST02 M2R M2R 6 12 A5.10 3'-8"MIN.CLR STAND PIPE 3'-8"MIN.CLR 1" 5' 7" 8T @ 11" EA 7' 4" 10" 3 3/4" 8' 0" CLEAR DRAIN RISER, 3 3/4" ST02 M2R M2R 10" 8T @ 11" EA 7' 4" 1/4" 3/4" 6 J 12 A5.10 3' 10" 6T @ 11" EACH 10" 3' 8" 3' 10" 6T @ 11" EACH 10" 16' 11" CLEAR 3 7/8" 3' 9" 6" 3' 9" GUARD RAIL 8' 0" CLEAR 3/4" M2R M2R 3'-8 MIN.CLR 3'-8"MIN.CLR DRAIN RISER, SEE FP DWGS 5 B A5.10 1/4" 10" T @ 1 A C 6" 3' 10" 1" 13' 1/4" CLEAR 1/4" 3/4" 6' 11 1/8" 0" CLEAR 1" 8" 6" 3' 1" 3'-8 MIN.CLR 3'-8"MIN.CLR M2R M2R M2R M2R A5.30 A5.30 1/4" 10" T @ 1 A C 6" 3' 10" 1" STAND PIPE 5/8" 1/2" 7 5/8" Drawn By:Checked Project Number: Sheet Number: © 2022 Solomon Cordwell Buenz STAIR 01 & AND SECTION 4400 S. CICERO AVE. CHICAGO, IL 60632 LECLAIRE COURTS BUILDING AA5.10 AT DS/BL 2020010 SCALE: 1/4" 1'-0" 1 STAIR 01 -LEVEL 01 SCALE: 1/4" 1'-0" 3 STAIR 01 -LEVEL 02 SCALE: 1/4" 1'-0" 6 STAIR 01 SECTION NO.DATE 10.21.2022SCHEMATIC 11.22.202250% DESIGN 12.23.2022DESIGN DEVELOPMENT SCALE: 1/4" 1'-0" 4 STAIR 01 -LEVELS 03-05 SCALE: 1/4" 1'-0" 7 STAIR 02 -LEVEL 01 SCALE: 1/4" 1'-0" 12 STAIR 02 -SECTION LOOKING EAST SCALE: 1/4" 1'-0" 9 STAIR 02 -LEVEL 02 SCALE:1/4" 1'-0" 10 STAIR 02 -LEVELS 03-05 SCALE: 1/4" 1'-0" 8 STAIR 02 -PLAN @ MID LANDING SCALE: 1/4" 1'-0" 2 STAIR 01 -PLAN @ MID LANDING
Proposed rooftop renovation plan
EAST BANK CLUB
Renovation Project type : Sports Center Location : 500 N Kingsbury St, Chicago, IL Scope of work : Schematic Design, Site survey, Product research for exterior fabrication //Professional Work SCB, Chicago, Illinois.
structure Bar Area Elevations Location plan Open Bar Plan Details
Tensile
BROWNSTONE RENOVATION
//Professional Work
Studio A+H, Brooklyn, New York.
Project type : Residential
Location : Williamsburg, Brooklyn, New York.
Scope of work : Project Architect - SD, DD, CD, Client presentations & meetings, MEP Coordination, Material research, 3D Modeling & rendering, Team lead, Bidding coordination with contractors, construction administration.
10'-0 1 10'-0" 10'-3 1 4 10'-0 2'-8" 37'-3 (IRREGULAR BUILDING) 35'-8 (IRREGULAR REAR YARD) 72'-6" (IRREGULAR LOT 1ST FLOOR EL. 40.52' BASE PLANE EL. 0.0" (36.15') 2ND FLOOR EL. 50.54' 3RD FLOOR EL. 60.54' 4TH FLOOR EL. 70.81' CELLAR EL. 31.57' LOWER ROOF EL. 80.86' HIGHER ROOF EL. 83.53' LOW AREA EL. 33.82' DRAIN LOWER AREA EL. 31.42' PLAT. EL. 40.04' STAIR SW EL. 36.62' S.R.W. EL. 35.72' SW (LOW) EL. 35.68' 8'-11 3 8 BASE PLANE EL. 0.0" (36.15') LOW AREA EL. 0.0" (35.82') DRAIN LOW AREA EL. 0.0" (31.90') YARD EL. 39.70' 1 1 PROPERTY PROPERTY LINE N 3 1 1 3 3 2 2 4 2 HALL ±35 SF VESTIBULE ±48 SF BATHROOM ±48 SF LAUNDRY 6 SF EXIST.DOOR DN EXIST. STAIRS DN EXIST. STAIRS DN EXIST. STAIRS EXIST. STAIRS UP EXIST. STAIRS DN MILLWORK BEDROOM 118 SF LIVING ROOM 150 SF HALL 82 SF 2 2 Floor Plan Section
Axonometric - Entry Vestibule Render - Entry Vestibule
Perspective render of Kitchen with apartment Millwork wall
Axonometric view of kitchen frame with concealed HVAC unit
Section through frame & countertops
REF. 7'-9" 4" 2" 1'-2" 4'-2" 6" 3'-0" 9'-0" SUPPLY RETURN SUPPLY KITCHEN BEDROOM CLOSET BEDROOM 8'-5" 4" CEILING SUSPENDED UNIT ABOVE 2'-1" 1'-0" 2'-0" 1'-6" 1'-10" TRASH DW 2'-0" 1'-1" 2'-0" 1'-2" 1'-1" 1'-1" COOKTOP+ OVEN+MIC. 1 1 2'-6" MILLWORK ABOVE 2'-0" COUNTERTOP 3'-4" 2'-0" 3'-8" FRAME+COUNTERTOP 1'-8" RAISED COUNTER 9'-0" CEILING SUSPENDED UNIT ABOVE KITCHEN PLAN SECTION 1 - THROUGH FRAME & COUNTERTOPS (N) 3"Ø WASTE LINE (N) 3"Ø WASTE LINE
HISTORIC HIGH-RISE BUILDING
PENTHOUSE RENOVATION
//Professional Work
Studio A+H, Brooklyn, New York.
Project type : Residential
Location : Brooklyn Heights, Brooklyn, New York.
Scope of work : Project Architect - Complete Construction documentation drawing set, client presentations, MEP Coordination, construction administration.
view - Rooftop
30th Floor Plan
31st Floor Roof Plan
T.O. (2) FLUE EXTENSIONS +28'-4" T.O. NEW ROOF GARDEN +2'-4" T.O. NEW PLATFORM +0'-3" T.O. NEW CONVENIENCE STAIR BULKHEAD +11'-9" T.O. NEW ELEVATOR MACHINE ROOM BULKHEAD +28'-4" T.O. NEW RAISED FLOOR DECK +8'-3" T.O. NEW RAISED DECK RAILING +11'-9" T.O. NEW GREEN ROOF +11'-6" NE SW 6 7 A B C D E F 2 4 1 3 55.1 C.6 1.5 3.5 5.5 6.5 5.9 B.4 B.7 A.3 3.4 D W D/W E.C.T. E.O. F.REF. (N) EGRESS STAIR C MECH. UP OPEN KITCHEN BACK KITCHEN MASTER BEDROOM MASTER BATHROOM LIVING DINING AREA STAIR NEW OPEN TO BELOW SHELVES UP STAIR STAIR (N) ELEVATOR SHAFT PRIVATE CAB DOOR X6 CLOSET C D B (E) 8" Ø DOMESTIC (DN) 5" Ø STORM WATER (DN) NEW LOCATION 8" SPRINKLER LINE (DN) NEW LOCATION SUPPLY RISER (UP) VENT TO OFF-SET TO ROOF EXISTING FLUES NEW STAIR 18 R. @ 8-1/4" EACH 17 @ 11" EACH ISLAND APPLIANCES -SINK -ELECTRIC COOKTOP 21 R. @ 8-1/4" EACH 20 T. @ 10-1/4" EACH (N) RAILING 2'-10" HIGH WINDOWS NOTE: ALL EXISTING WINDOWS TO TO BE DISTURBED BACK OF KITCHEN APPLIANCES -WASHER -ELECTRIC DRIER -DISHWASHER MEP 8" VENT PIPESF.A.I. DUCTRETURN DUCTMASTER BATHROOM FIXTURES -TOILET -STALL SHOWER -LAVATORY (N) CEILING FRAMING BEAMS ABOVE (SEE S-331.00) (E) CEILING FRAMING BEAMS ABOVE (SEE S-331.00) NEW METAL STAIR 20 R. @ 3/8" EA. 17T. @ 11" EA. METAL HANDRAIL 2'-10" HIGH (TYP.) BATHROOM FIXTURES TOILETLAVATORYBOTTOM OF BEAMS ABOVE FINISH FLOOR (TYP.) BOTTOM OF CELING ABOVE FINISH FLOOR (TYP.) 12'- 11 1/2" (N) MILLWORK (N) MILLWORK 3'-0" 6'-4" 7'-0" 6'-4" 6'-10 7'-3" 35'-3" 37'-6 52'-2" 3'-1" 10'-5" 65'-8" 10" 17'-6" 16'-10" 14'-9" 3'-1" 10'-5" 53'-7" 3'-0" 3'-5 3'-0" 2 4'-0" 2'-4" 10" 10" 11" 3'-0" 30'-7" KITCHEN FREEZERREFRIGERATORUP EARTH FILL POOL EQUIPMENT +2'-4 1/2" POOL SPRINKLER TANK 5,011.4 5000 DOMESTIC TANK 6,014 6000 UP +2'-4 1/2" +4'-0" +2'-0" +2'-4 1/2" A B 1 3 55.1 A.3 3.4 T.O.P. 8.62' (N) ELEVATOR SHAFT PRIVATE CAB DOOR 3 X6 (N) 6X6 HSS (UP) PULL DOWN LADDER ABOVE FAKRO LMP MODEL (N) METAL PANEL (N) 4x4 HSS 4x4 HSS (E) PARAPET WALL (E) PARAPET WALL (N) SMOKE VENT ABOVE (E) COLUMNS BELOW (N) PICTURE WINDOW (N) 6X6 HSS (UP) (N) SMOKE VENT ABOVE 8" SPRINKLER LINE (DN) 8" Ø SUPPLY RISER -8" VENT PIPES -F.A.I. DUCT -RETURN DUCT -BLDG ELEVATOR SMOKE VENT (N) BULKHEAD FRAMING BEAMS ABOVE (SEE S-332.00) FLUES VERTICAL EXTENSION TUBES(SEE S-412.00) GLASS WALL BULKHEAD PERIMETER ABOVE ALUMINUM PANEL (N) METAL STAIR 21 R. @ 8-1/4" EACH 20 T. @ 10-1/4" EACH (N) METAL RAILING 2'-10" HIGH (TYP.) (N) METAL STAIR 23 R. @ 1/2" EA. 21T. @ 11" EA. (N) METAL HANDRAIL 2'-10" HIGH (TYP.) MECHANICAL ROOM 35'-3" 37'-6 3'-6" 9'-10 7'-6 5'-10 7'-3" 1'-6 5'-3 1 26'-8 8'-9" 4'-8" 8'-9" 13'-5" 13'-1" (V.I.F.) 53'-11 8'-3" 3'-6" 65'-8" 40'-6" G
Axonomteric
2'-5" 9'-10" 1'-5 1 2 12'-11 1 2 1'-4" 11'-0" 1'-4" 1'-4" 10'-7 1 2 5'-7 1 2 T.O. PARAPET T.O. 31ST FLOOR T.O. BULKHEAD B.O.C. 31ST FLOOR T.O. 30TH FINISHED FLOOR B.O.C 30TH FLOOR T.O. 29TH FINISHED FLOOR B.O.C 29TH FLOOR B.O.C. 31ST FLOOR FLUES HEIGHT T.O. E.M.R. T.O. 28TH FLOOR 11'-2" EXIST. COLUMN (TYP.) EXIST. WINDOW (TYP.) 7-1/2" Ø STORM WATER (DN) 8" Ø SUPPLY (DN) EXIST. PARAPET EXTENSION FLUE EMR ENCLOSURE EXIST. COLUMN (TYP.) 18x24 SMOKE VENT 8" Ø WASTE LINE (DN) EXIST. ROOF DRAIN 3" Ø SPRINKLER 1" Ø SPRINKLER 1" Ø COLD WATER TO BEDROOM UNIT 1" Ø HOT WATER TO BEDROOM UNIT NO WORK IN THIS AREA EXISTING RESIDENTIAL UNIT 2ND FLOOR OF EXISTING DUPLEX 3" Ø SPRINKLER 5-7/16" Ø VENT FROM BLDG TO ROOF (UP) 1-1/2" Ø WASTE (DN) 1-1/2" Ø HOT WATER (DN) 1-1/2" Ø COLD WATER (UP) 4" Ø STORM WATER (DN) 5-11/16" Ø VENT TO ROOF (UP) 4X8 FAI DUCT 1" Ø SPRINKLER 3" Ø WASTE (DN) BEDROOM HALLWAY E.E.C VESTIBULE LIVING AREA KITCHEN HALLWAY EGRESS STAIR C EGRESS STAIR C EGRESS STAIR C EGRESS STAIR C EMR EMR HALF BATHROOM MECH. BULKHEAD 3'-6" 2'-5" 9'-10" 1'-5 1 2 12'-11 1 2 1'-4" 11'-0" 1'-4" 1'-4" 10'-7 1 2 5'-7 1 2 T.O. PARAPET T.O. 31ST FLOOR T.O. BULKHEAD B.O.C. 31ST FLOOR T.O. 30TH FINISHED FLOOR B.O.C 30TH FLOOR T.O. 29TH FINISHED FLOOR B.O.C 29TH FLOOR B.O.C. 31ST FLOOR FLUES HEIGHT T.O. E.M.R. T.O. 28TH FLOOR 11'-2" EMR ENCLOSURE -RECLAIMED WATERTOWER CEDAR/REDWOOD VERTICAL PLANKS; CONNECTED TO WALL WITH GALVANIZED STEEL ANGLE AT 24" INTERVALS -CONTINUOUS GALVANIZED STEEL MOUNTING STRAP WITH BACKING FRAMING -WATERPROOFING -LIGHT GAUGE STEEL FRAME WALL; 4" WITH 5 8 BOARD BOTH SIDES -SEE DRAWING S-411.00 -SEE DETAIL 13/S-602.00 POOL METAL RAILING METAL STAIR 23R. @ 7 1/2" EA. 21T. @ 11" EA. METAL STAIR 20R. @ 7 3/8" EA. 17T. @ 11" EA. METAL STAIR 20R. @ 7 3/8" EA. 17T. @ 11" EA. REFER TO INTERIOR FINISH NOTES ON CEILING FINISH REFER TO INTERIOR FINISH NOTES ON FLOOR BUILD-UP/ FINISH REFER TO INTERIOR FINISH NOTES ON INTERIOR FINISH - BUILDING PERIMETER WALLS REFER TO INTERIOR FINISH NOTES ON FLOOR BUILD-UP/ FINISH REFER TO INTERIOR FINISH NOTES ON CEILING FINISH PULL DOWN LADDER EMR ROOF -CONTINUOUS GALVANIZED STEEL MOUNTING STRAP -WATERPROOFING -LIGHT GAUGE STEEL FRAME BLOCKING AS NEEDED -SEE PLAN S-334 FOR ROOF FRAMING -CONTINUOUS GUTTER -DRAIN PLANTER BOXES 2" OF TOP SOIL Section through proposed bulkhead Section through Apartment & rooftop
PENTHOUSE DEVELOPMENT
Project type : Residential Location : New York Scope of work : Design development, 3D modeling and rendering, Material research, Construction administration. //Professional Work Jonathan Schloss Architects, New York, New York.
Penthouse Development - Level 07
Penthouse Development - Level 06
Kitchen View
Study
Entry
Lobby
way with skylight
Master Bathroom
Master Bathroom - Plan ENLARGED PLAN - MASTER BATH 210 1 N
Detail drawing at a custom shower glass door
PUBLIC SCHOOL & HOUSING
//Professional Work
Nelligan White Architects, New York, New York.
Project type : Public Schools (NYCSCA) & Public Housing (NYCHA)
Location : New York
Scope of work : Design development, 3D and render coordination, Graphics, Consultant coordination, construction documents, construction administration.
A1 SITE PLANPLAY YARD 1'-8" 1'-0" A9 SCHEDULE OF COLORS
Typical wall section details @ Public School, Manhattan, New York.
Top: Playground design @ Public School, Manhattan, New York.
Right: Proposed renovation design @ Public Housing, Brooklyn, New York.
Exterior view
Copyrights: Nelligan White Architects, PLLC.
Kitchen
Lobby entrance
Living room+ kitchen
COURTHOUSE RESTROOM RENOVATION
//Professional Work
Jordan Parnass Digital Architecture, Brooklyn, New York.
Project type : Public Building (DDC)
Location : Manhattan, New York.
Scope of work : CD 50% Drawing set, Material Study, Modeling, Revisions on drawings and product specifications, Renders.
Terrazzo skirting Terrazzo flooring Wall cladding
Partition wall
Entrance view
Restroom view
Remove Existing Strobe Remove Existing Floor Drain Remove Existing Vent Remove walls, doors and finishes in hallway in this area FD Remove Existing Vent Remove all fixtures + finishes (typ.) Hallway Remove Existing Vent C04-A L1 L1 L1 R2 R2 R2 R2 Strobe R2 R2 R2 R2 R2 Strobe New GWB ceiling R2 R2 R2 R2 R2 R2 R2 Hallway R3 L1 R3 R3 L1 M-2 metal strip to be installed under entryway PRVestibule 0401 PRSINGLE 0402 PRMen 0403 +9'-0" AFF +9'-0" AFF +9'-0" AFF +10'-0" AFF +10'-0" AFF +10'-0" AFF +9'-6" AFF C04-A Ceiling Walls Floor Base T-1 T-2,T-3 GWB T-1 Ceiling Walls Floor Base T-1 T-2,T-3 GWB T-1 Ceiling Walls Floor Base T-1 GWB T-2,T-3 T-1 Hallway Transition line of new terrazzo floor to existing flooring New Linear Drain under sink see 8/A-520 PRMen 0403 PRVestibule 0401 PRSINGLE 0402 Linear Drain at Thresholds C04-A Precast cove base (typ.) 1% Floor slope to drain 1% Floor slope to drain Embedded Anchors for Stall Partitions See 8/A-521 5" 7'-4" 15'-3 1/4" 10" 0402 0403 0401 ADA Turning Radius 5' New interior finishes at all walls, ceiling and floors ADA stall Continuous linear floor drain underneath the sinks E7 E3 E8 E8 E11 E11 Hallway ADA Turning Radius 5' New wall mtd metal bench E14 E6 E14 5 5 3 2 3 3 2 E21 E18 P3 P3 P1 P1 E9 P1 E9 P2 P8 P5 PRVestibule 0401 PRMen 0403 PRSINGLE 0402 P8 P2 P8 P2 C04-A New solid surface toilet partitions and doors New metal blade sign New entrance cladding P14 E22 E22 E22 6'-10" 13'-4 1/4" 8'-9" 6'-8 3/4" 4'-9" 1'-9 1/2" 02 A-042 04 03 A-042 08 07 06 05 A-042 13 10 09 A-042 12 11 A-042 P9 P10 Install New Drinking Fountains. Install new finishes and repair surrounding stone as req. 8 3'-0 1/2" NEW TERRAZZO EXISTING STONE TILE T-2 GLASS TILE T-5 TILE T-4 TILE T-8 TILE T-6 TILE T-7 SOLID SURFACE EXISTING STONE NEW STONE Remove existing drinking fountain, access panel, and surrounding wall finishes. 4TH FLOOR MEN'S PLANS PS/MH DEMOLITION PLAN 01 CONSTRUCTION PLAN 02 REFLECTION CEILING PLAN 03 FINISH PLAN 04 PROJECT FMS ID: PROJECT PHASE SCALE DATE REVISED DRAWN/CHECKED SHEET SIZE PROJECT 24" X 36" 100 Centre St, New York, DRAWING TITLE ARCHITECT'S STAMP AND SIGNATURE REV DATE DESCRIPTION 16007 C0283TOIL PROJECT: FOR THE: NYC Department of Design 08/23/2019 AS NOTED DOB APPROVAL STAMP & STICKER AREA CALCULATIONS - FOURTH FLOOR MEN'S RESTROOM Copyrights: Jordan Parnass Digital Architecture, PLLC. PR-0401 VESTIBULE - W. ELEV. 03 PR-0401 VESTIBULE - E. ELEV. 04 HALLWAY - S. ELEV. 01 0401 0403A T-3 T-2 T-3 GL-1 GL-1 T-1 S-10 T-2 T-3 T-1 0402 S-10 S-11 T-3 P9 EXS M-1 T-3 T-2 E6 New Metal Blade Sign Continuous Metal Frame M-2 Continuous metal frame Engraved metal signage T-3 Existing base finish E6 P10 Integrated door vent, typ. GL-1 GL-1 GL-1 GL-1 T-3 T-1 HALLWAY - S. ELEV. 02 Existing Stone T-2 New Metal Blade Sign Existing Ceiling in Hallway New Stone to match Existing New Stone to match Existing T-3 T-3 T-2 T-1 T-1 T-3 T-2 M-2 M-2 T-2 T-3 T-1 T-1 T-2 T-3 M-2 2'-7 1/2" 1'-11 1/2" 6" 2' 6'-6" 6" 9' Min Ceiling Height Min Ceiling Height 9' T-3 T-3 T-3 T-3 10/A-510 5/ A-512 3/ A-512 3/ A-510 7/ A-512 13/A-510 12/A-510 9/ A-510 4/ A-510 6/ A-511 1/ A-511 2/ A-511 3/ A-510 2/ A-512 1/ A-500 11/A-511 8/ A-510 1/ A-500 2/ A-500 2/ A-500 PR-0401 VESTIBULE - W. ELEV. 03 PR-0401 VESTIBULE E. ELEV. 04 HALLWAY S. ELEV. 01 0401 0403A T-3 T-2 T-3 GL-1 GL-1 T-1 S-10 T-2 T-3 T-1 0402 S-10 S-11 T-3 P9 EXS M-1 T-3 T-2 E6 New Metal Blade Sign Continuous Metal Frame M-2 Continuous metal frame Engraved metal signage T-3 Existing base finish E6 P10 Integrated door vent, typ. GL-1 GL-1 GL-1 GL-1 T-3 T-1 HALLWAY S. ELEV. 02 Existing Stone T-2 New Metal Blade Sign Existing Ceiling in Hallway New Stone to match Existing New Stone to match Existing T-3 T-3 T-2 T-1 T-1 T-3 T-2 M-2 M-2 T-2 T-3 T-1 T-1 T-2 T-3 M-2 2'-7 1/2" 1'-11 1/2" 6" 2' 6'-6" 6" 9' Min Ceiling Height Min Ceiling Height 9' NEW GWB SOFFIT NEW TERRAZZO T-1 EXISTING STONE NEW CONSTRUCTION TILE T-2 GLASS TILE T-5 TILE T-4 TILE T-8 TILE T-6 TILE T-7 SOLID SURFACE COUNTERTOP EXISTING STONE - BASE NEW STONE PR-0403 MEN - S. ELEV. 09 T-2 P2 P8 T-3 GL-2 T-3 T-1 T-1 T-3 T-3 P2 P8 T-3 E18 1/8" Reveal around mirror M-3 S-2 3'-11 1/4" 3'-1" Min Ceiling Height 9' 4" PR-0403 MEN - E. ELEV. 13 PR-0403 MEN - W. ELEV. 10 PR-0403 MEN - W. ELEV. 11 PR-0403 MEN - N. ELEV. 12 P2 T-2 T-2 P2 S-1 S-1 T-4 T-1 T-2 T-3 T-3 T-1 T-3 T-3 T-3 T-3 T-3 0403A S-10 T-4 E14 E7 E9 P1 S3 S3 P3 E3 T-4 T-3 S3 P3 T-3 S-1 T-1 T-1 S-1 S-1 S-1 P1 E8 E8 S3 E11 P1 S3 E3 E3 E3 M-3 S-2 M-3 S-2 T-3 T-1 T-3 T-1 T-1 T-1 T-4 T-2 T-3 T-1 T-1 T-1 T-2 T-3 T-1 PR-0402 SINGLE - E. ELEV. 08 PR-0402 SINGLE - S. ELEV. 05 PR-0402 SINGLE - W. ELEV. 06 PR-0402 SINGLE - N. ELEV. 07 P2 P1 P1 T-2 P2 P5 P5 P8 T-3 T-1 T-3 T-3 T-2 T-3 T-1 T-1 T-3 T-2 T-3 T-1 0402 S3 GL-2 T-2 S-10 E11 E14 E8 E9 E11 E8 E14 E9 S3 M-3 S-2 M-3 S-2 T-3 T-3 3'-11 1/4" 2'-11" 6" Min Ceiling Height 9' 4TH FLOOR MEN'S PUBLIC RESTROOM ELEVATIONS PS/MH 16 A-042 PROJECT FMS ID: PROJECT PHASE DWG NO PAGE SCALE DATE REVISED DRAWN/CHECKED BY SHEET SIZE PROJECT NO. 24" X 36" 100 Centre St, New York, NY 10013 DRAWING TITLE ARCHITECT'S STAMP AND SIGNATURE REV DATE DESCRIPTION 16007 KEY PLAN BAXTER STREET CENTRE STREET N N TRUE PROJECT C0283TOIL PROJECT: FOR THE: NYC Department of Design & Construction LEGEND 08/23/2019 AS NOTED DOB APPROVAL STAMP & STICKER OF 10/A-510 5/ A-512 3/ A-512 3/ A-510 7/ A-512 13/A-510 12/A-510 9/ A-510 4/ A-510 6/ A-520 11/A-520 1/ A-520 11/A-520 4/ A-521 6/ A-511 1/ A-511 2/ A-511 3/ A-510 2/ A-512 16/A-520 18/A-520 6/ A-520 11/A-520 6/ A-520 3/ A-521 7/ A-520 6/ A-520 1/ A-520 1/ A-500 11/A-511 8/ A-510 1/ A-500 2/ A-500 2/ A-500 2/ A-500 2/ A-500 2/ A-500 2/ A-500 1/ A-520
Project type : Recreational - Undergrad Internship.
Location : Navi Mumbai, Maharashtra.
Scope of work : Design development, 3D modeling, Graphical Presentation.
RELIANCE CAFETERIA
//Professional Work
FHD Group, India
The objective is to create a cafeteria for the employees of Reliance Group from the existing factory building. Consider the possibility of adaptive-re-use and to suggest usage for landscape area around the factory. A built environment that stands as a strong symbol of sustainability and environment harmony.
Top View
Aerial view of the cafeteria showing central zone
EVOLUTION AND USER GROUP EXPERIENCE Exploded isometric view
Design Development Stages
Project type : Residential Professional work Location : Hyderabad, India. Scope of work : Design development, 3D and BIM modeling, Graphics, Consultant coordination, construction documents.
The objective is to create a new typology of vertical living. An aim to create a self sufficient residential building that is more empathetic to people than markets with long term sustainable focus instilling “Togetherness”
TOGETHER-MENTS
Top View
//Professional Work FHD Group, India Program Distribution Volume Distribution Green Distribution
Aerial view of the entire project
SPACE OPTIMIZATION OPTIONS - TRANS FORMATIVE SPACES
Radiant simulation and the daylight coefficient method is been used to efficiently calculate luminance distributions under all appearing sky conditions in a year (Dynamic Simulation)
External shading provided on exposed windows with due east and due west orientation for a period between 9 am to 4 pm from April to September. The shading projects 2m in both the directions.
Studies were made on how natural ventilation can be brought about in the living spaces of apartments. As the location and orientation of the project provides an opportunity for Natural ventilation to be positively utilized, shading over fenestrations or using appropriate location and size for the fenestrations were made in order to maximize the effect of natural ventilation.
Day lighting
PASSIVE SUSTAINABLE STRATEGIES
Children’s room
Master Bedroom
The project brief describes of designing a metro station between the cross junctions of the major traffic zones in the capital city of Delhi. Pedestrian friendly, green corridors have to be incorporated which are segregated from the main chaos. The vehicular traffic and pedestrian circulation must be taken into account.
- Redesigning of residential areas by introduction of dedicated green belt towards the metro station and other transport points on the site.
- Simplifying road network so as to minimize vehicle use and maximize nonmotorized transport means such as cycles and rickshaws.
- Redesigning of interior residential greens by providing large open playgrounds.
Urban Design METRO STATION PRECINCT //Undergrad
Summer 2014
Precinct Ground floor plan
Precinct Concourse level plan
Precinct Concourse Roof level plan
Section through Metro station (detail)
Section through Multipurpose hall
Section through Metro station
VILLA HOUSING COMMUNITY - KMV TERRACE FLR. LVL. FIN.GROUND LVL. GROUND FLR. LVL. FIRST FLR. LVL. SECOND FLR. LVL. D1 BALCONY BALCONY RAILING AS/DETAIL RAILING AS/DETAIL PERGOLA AS/DETAIL PARKING JALI AS/DETAIL STRUCTURAL BEAM AS/DETAIL WALL SECTION 1 1:100 OPTION-B100MM P.C.C BED GROUND FLR. LVL. FIRST FLR. LVL. SECOND FLR. LVL. TERRACE FLR. LVL. GL7 GLAZING AS/DETAIL JALI AS/DETAIL RAILING AS/DETAIL PERGOLA IN MS AS/DETAIL BALCONY BALCONY PARKING FIN.GROUND LVL. STRUCTURAL BEAM AS/DETAIL SD2 2 WALL SECTION 2 1:100 OPTION-B100MM P.C.C BED GLAZING AS/DETAIL GLAZING AS/DETAIL STRUCTURAL BEAM AS/DETAIL RAILING AS/DETAIL SKYLIGHT AS/DETAIL GL8 GL9 LANDSCAPE CUTOUT FAMILY LOUNGE GL5 GROUND FLR. LVL. FIRST FLR. LVL. SECOND FLR. LVL. TERRACE FLR. LVL. FIN.GROUND LVL. WALL SECTION - 3 1:100 OPTION-BWall Sections FIRST FLR. LVL. GROUND FLR. LVL. 1 SECTION - S1 1:100 OPTION-BD3 GD D2 SECOND FLR. LVL. FIN.GROUND LVL. TERRACE FLR. LVL. TOILET LVL -0.112 M DRAWING ROOM FOYER TOILET LOBBY LOBBY PDRM TERRACE PD1 PUJA A B C D E SETBACK SETBACK GL3 1WB GL2 1WB V2 1WB GL5 1WB GL5 1WB V4 1WB //Professional Work FHD Group, India Project type : Residential Professional Work Scope of Work: Interior working drawings, Construction documents, Co-ordination with various consultants. Location : Vijayawada, India.
BEDROOM INTERIORS
The complete set of interior drawings have been developed individually according to the required design chosen by the client.
Material selection, sizes and electrical fixtures have been decided the same way.
The sample of bedroom has been added on the portfolio.
apoorva.tadimalla@gmail.com +1(913)-602-3454