Luca Arcari - Architecture Portfolio

Page 1

portfolio Selected projects 2021

Arcari Luca



LUCA ARCARI

SOFTWARES

CREATIVE DETERMINED RESOURCEFUL

A UTOCAD; RHINOCEROS + V-RAY; SKETCHUP + V-RAY; REVIT; OFFICE SUITE; ADOBE SUITE; PHOTOSHOP;ILLUSTRATOR; INDESIGN; LIGHTROOM.

lukarcari@hotmail.it (Pt) +63 9999136599 (Ita) +39 3482484575

LANGUAGES ITALIAN NATIVE - PORTUGUESE PROFICIENT ENGLISH PROFICIENT - SPANISH BASIC FRENCH BASIC

SKILLS Freehand drawing; Portrait painting; plastic modelling with clay and plaster; Study models with whatever material; Photography skills. Good autonomy in working alone; Ability to work in cross functional team and in multicultural work context. Ability to work in stressful situations and under a high workload. Interest and ability to lead activities running parallel to working field. Capability to approach different projects on various topics: composition, functional questions, technological solutions. Ability to ideate constructive details. Effective Customer Handling Skills Helpful Attitude and Problem-Solving Skills Excellent Two-Way Communication Skills Attentiveness and Patience

EDUCATION 2014 - 2017 Universidade de Lisboa, Lisbon, Portugal Faculdade de Arquitectura Master of Architecture degree (M.Arch.) 2010 - 2013 Politecnico di Milano, Milan, Italy School of Architecture and Society Architecture Science Laurea (bachelor of science) 2003 - 2009 Liceo Artistico Collegio Rotondi, Italia Artistical high school diploma

WORK EXPERIENCE May 2012 - Oct 2013 Caccia Dominioni – Zucca e associati. Milano, Italia Architecture and Design Studio July 2016 - Jan 2018 Arch. assistant and private projects. Lisbon, Portugal Nov 2018 - nov 2019 Junior Architect at Filo design co.lt. Jinhua, China Nov 2019 - present Senior Architect at WTA Architecture. Manila, Philippines


Manila Emergency Quarantine Facilities.




What is EQF? • The Emergency Quarantine Facilities are temporary structures meant to augment and increase the capacity of our hospitals. It is meant to house PUIs to keep them from spreading the infection. The idea is to be able to build enough facilities to house all PUIs and allow the virus to die out. This will also prevent our hospitals from being overwhelmed and allow us to flatten the curve of the pandemics growth. • With the growth of the virus being so fast. The main need we see is speed and scalability. The structure has to be simple enough that it can be built quickly in 5 days. It has to use materials that are readily available and understood so most workers can work with it and it can be scaled up not just throughout the city but nationwide. What are the features of an EQF? • Height: 3.1 meters • Width: 6 meters • Capacity: 15 beds Each facility measures 6x26m and will have 15 beds and two toilets. Patients and healthcare workers will have different entrances with doctors having their own external testing box to check patients without having to go inside the facility. Airflow is directed one way from front to rear with side vents that discharge air away from each bed and prevent recirculation.


BENCH NURSE ENTRANCE NURSE LOUNGE

STORAGE

PATIENT ENTRANCE

UV EXHAUST FAN

SERVICE EXIT DOFFING

SHOWER

SHOWER

SHELVES

REF

NURSE STATION

SHELVES WINDOW ACU

CLEAR PE WINDOW

PE CURTAIN ACU

LINEN BASKET

quarantine beds ACU

COMFORT ROOM

PVC DOOR

donning SHELVES

UV EXHAUST FAN


PHILIPPINE NAVY HEADQUARTERS




XXX Presidential Center.



PHASE 04 - RETAIL

PHASE 03 - FUTURE ARCHIVE

THE MASTERPLAN


PHASE 01 -

PAVILION LIBRARY DISPLAY AREA CAFE GIFT WORKSHOP ROOM THEATRE

PHASE 02 - PRESIDENTIAL MUSEUM - GRAND HALL

A NEW PUBLIC SPACE Creating a dynamic public space for the Presidential Library in the heart of San Juan was a particular challenge. The dense urban landscape of Green Hills, a seemingly solid physical barrier around the site. The existing boundary has been moved backwards, creating an open public space, easily accesible from the main road.


TBM EXISTING PARKING AREA

STAFF ROOM

GF 21

GF 16

MAUDE

STORAGE

G

D

J

N

M

K

1

TOILET 4

ST.

GF 15

UTILITY ROOM

THEATRE

GF 19

CAFE

GF 08

GF 10

STORAGE

3

KITCHEN GF 17

CAR SHOWCASE AREA

2

GF 18

SERVICE AREA GF 20

ST 3

4 LANDSCAPE

WORKSHOP

COURTYARD

GF 09

GF 11

SEATING AREA

EXPO

GF 07

GF 06

5

ST 3 LANDSCAPE

6

8

ATRIUM

7

PWD LIFT 1

GF 04

TOILET 3 GF 14

9

PAVILION GIFT SHOP GF 05

10

ST 2

FRONT LANDSCAPE

TOILET 2

GF 01

GF 13

FOYER

11

GF 03

12 LOWEST POINT

TOILET 1

FRONT ENTRANCE DECK

GF 12

TBM

GF 00

DROP OFF AREA

WATER CASCADE

HIGHEST POINT

GF 02

TBM A

B

C

E

F

H

I

L

VARA

E P. GU

T

STREE

TBM


PHASE ONE


Bohol Balai Luce.





Lubas Cliffside Homes.





Lamba Misibis Bay Resort.





Supima Sport Center.





12 Gardens Residential Tower.





Binan Toll Plaza.





D Heights Lagoon and Casino.





Miscellaneous.




INTERIORS


424.2

OFFICES

GALLERIES


BOOTH DESIGN

80

10

470

50

358.2

85

45

30.3

152.4

87 10.1 474.6

10.1

290.9 30.3

354.7

10

332.4

420.1

390

80 410


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.