\\ 2
6
Im pianti stica Instal lations
ARCA ENGINEERING /
14
Architet tura e Edilizia Architec ture and Building
\\ 3
19
Edilizia soste nibile Green Building
ARCA ENGINEERING /
24
Servizi per l’inge gneria Engine ering services
\\ 4
A team of experts, professionals and specialists In 1994 Giuseppe Grisenti, Michele Groff and Gianluca Valentini founded the engineering firm Arca to operate in the field of technological systems in the civil sector, hospitals, industries and the hospitality sector. At the same time, the civil sector, which was dedicated to new residential and artisan building design and building recovery interventions, developed. More than 10 years of experience led, in 2004, to the founding of ARCA Engineering s.r.l. in order to offer clients the considerable know-how that had been acquired, supported by constant professional training and optimised by means of the ISO 9001:2008 Quality Management System. Today, ARCA Engineering s.r.l. applies its expertise to areas such as: 路 Installations 路 Architecture and Building 路 Green Building 路 Engineering Services Experience and Professionalism stand for Quality
ARCA ENGINEERING /
\\ 5
Un team esperto, professionale, specializzato Giuseppe Grisenti, Michele Groff e Gianluca Valentini, nel 1994, fondano lo Studio Tecnico Arca operante nel settore degli impianti tecnologici in ambito civile, ospedaliero, industriale e ricettivo. Parallelamente si sviluppa il settore civile dedicato a progettazioni di nuova costruzione residenziale e artigianale e a interventi di recupero edilizio. Oltre 10 anni di esperienze accumulate portano, nel 2004, alla fondazione della società ARCA Engineering s.r.l., al fine di offrire al cliente le notevoli conoscenze acquisite, supportate da una costante formazione professionale e ottimizzate grazie a un sistema gestionale di qualità. Oggi, la società ARCA Engineering s.r.l. applica le proprie competenze in aree come: · Impiantistica · Architettura ed edilizia · Edilizia sostenibile · Servizi per l’ingegneria Professionalità ed esperienza sinonimo di qualità.
ARCA ENGINEERING /
\\ 6
Im pianti stica Soluzioni adeguate a ogni esigenza La varietà dei casi affrontati insieme alla ricerca continua di materiali e tecnologie innovative garantiscono al cliente l’individuazione di soluzioni tecniche efficienti, economicamente sostenibili e adeguate alle specifiche esigenze. In quest’area Arca Engineering si occupa anche della progettazione di: • impianti di energia rinnovabile provenienti da fonti geotermiche, solari e fotovoltaiche
Solutions tailored to your needs The variety of cases dealt with together with a continuous search for innovative and technological materials guarantees that efficient technical solutions, which are economically sustainable and adapted to specific needs, are found for each client. In this area Arca Engineering also designs: • renewable energy installations from geothermal, solar and photovoltaic energy sources
• impianti di cogenerazione, trigenerazione e teleriscaldamento
• cogeneration and trigeneration plants and district heating
L’esperienza maturata nel corso degli anni consente ad Arca Engineering di vantare un ampio curriculum nel settore.
Due to the experience it has acquired over the years, Arca Engineering can boast unrivalled expertise in the industry.
\\ 7
Nuovo Centro Polifunzionale “Area 22” a Rovereto (Tn) New Multipurpose Centre “Area 22” in Rovereto (Tn) PROJECT / Multipurpose centre Area 22 CLIENT / Area 22 S.r.l. SERVICES / Project execution plan and management of operations for electrical and mechanical systems VALUE OF WORKS DESIGNED / € 7,300,000.00 YEAR CARRIED OUT / 2006 - 2009 PROJECT WORK RESPONSIBILITY / 100% CURRENT STATUS / Completed, hotel inaugurated in January 2009
Progetto per la realizzazione di un centro polifunzionale contenente aree ricettive, aree commerciali e showroom, aree direzionali e servizi. La progettazione impiantistica comprende l’installazione di ca. 960 mq di pannelli fotovoltaici per la produzione di 115 kW picco. Project for the construction of a multipurpose centre containing hospitality areas, shopping areas and showrooms, management areas and services. The systems design includes the installation of approximately 960 m2 of photovoltaic panels for a maximum production of 115 kW.
ARCA ENGINEERING / IMPIANTISTICA /
\\ 8
aNew Auditorium in Aquila
PROJECT / New auditorium in Aquila CLIENT / Collini Lavori S.p.A. SERVICES / Project execution plan, electrical and mechanical systems and advice for fire prevention VALUE OF WORKS DESIGNED / € 1,300,000.00 YEAR CARRIED OUT / 2006 - 2012 PROJECT WORK RESPONSIBILITY / 100% CURRENT STATUS / Completed; auditorium inaugurated in October 2012
Nuovo auditorium progettato dall’arch. Renzo Piano e finanziato dalla Provincia Autonoma di Trento costruito con elementi prefabbricati in legno. Arca Engineering ha curato la progettazione esecutiva impiantistica e ha fornito la consulenza per la prevenzione incendi. New auditorium designed by architect Renzo Piano, financed by the Autonomous Province of Trento and built with a prefabricated wooden frame. Arca Engineering took care of the construction and installation design and provided advice for fire prevention.
ARCA ENGINEERING / IMPIANTISTICA /
\\ 9
Restauro del Castello di S.Michele all’Adige (Tn) Restoration of the Castle in San Michele All’adige (Tn) PROJECT / Restoration of the Castle in San Michele all’Adige CLIENT / Autonomous Province of Trento SERVICES / Project execution plan for the electrical and mechanical systems VALUE OF WORKS DESIGNED / € 840,000.00 YEAR CARRIED OUT / 2002-2004 PROJECT WORK RESPONSIBILITY / 100% CURRENT STATUS / Completed
Progettazione per l’intervento di restauro del castello di S. Michele all’Adige, per la realizzazione degli uffici amministrativi dell’Istituto Agrario. Design for the restoration of the castle in San Michele all’Adige for the construction of the administrative offices of the Agrarian Institute.
ARCA ENGINEERING / IMPIANTISTICA /
\\ 10
Ristrutturazione e ampliamento dell’Ospedale S. Chiara di Trento Renovation and extension of Santa Chiara Hospital in Trento
PROJECT / Renovation and extension of Santa Chiara Hospital in Trento CLIENT / Manens-Tifs S.p.A. on behalf of Azienda Provinciale per i Servizi Sanitari di Trento SERVICES / Project execution plan and management of operations for the electrical systems YEAR CARRIED OUT / 2006 - 2009 Project execution plan and assistance in the management of operations for the electrical systems VALUE OF WORKS / € 6,500,000.00 PROJECT WORK RESPONSIBILITY / 100% CURRENT STATUS / Completed
Collaborazione in corso con TIFS INGEGNERIA (PD) e SAI TRE (TN) per la progettazione impiantistica e assistenza alla direzione lavori impianti elettrici. Collaboration with Manens-Tifs S.p.A. (PD) on the installations design and assistance in the management of operations regarding the electrical systems.
ARCA ENGINEERING / IMPIANTISTICA /
\\ 11
“Palazzo della ricerca e della Conoscenza” a San Michele All’Adige (Tn)
PROJECT / New university campus in San Michele all’Adige (TN) CLIENT / Agrarian Institute in San Michele all’Adige SERVICES / Final design, project execution plan for mechanical systems and assistance in the operations management VALUE OF WORKS DESIGNED / € 2,570,000.00 YEAR CARRIED OUT / 2004 – 2012 PROJECT WORK RESPONSIBILITY / 100% CURRENT STATUS / Completed
Progetto per la realizzazione di un nuovo edificio per la sede della Facoltà di Ingegneria di Trento, corso di laurea in Viticoltura, Enologia e Biotecnologie verdi, presso la Fondazione Edmund Mach di San Michele all’Adige (TN). Arca Engineering ha fornito la progettazione definitiva ed esecutiva degli impianti meccanici (sul progetto architettonico degli architetti Bertolotto e Vacchelli) dei locali scolastici e dei laboratori dotati di impianti aspiranti a cappa con volume variabile. Project for the construction of a new building for the Faculty of Engineering of Trento, degree course in Viticulture, Enology and Green Biotechnologies, at the Edmund Mach Foundation in San Michele all’Adige (TN). Arca Engineering provided the final design and project execution plan for the mechanical systems (according to the architectural design by architects Bertolotto and Vacchelli) of the school premises and the laboratories, which are equipped with variable air volume suction systems with hoods. ARCA ENGINEERING / IMPIANTISTICA /
\\ 12
Realizzazione nuovo edificio industriale e amministrativo a Spini di Gardolo (TN). New building for autotrasporti multipli arcese in Spini Gardolo (TN) PROJECT / Construction of a new industrial building with offices in Spini Gardolo (Tn) SERVICES / / Final architectural design, final mechanical and electric systems design, support for the management of operations YEAR CARRIED OUT / 2008 Project execution plan and assistance in the management of operations for the electrical systems VALUE OF WORKS / / € 9,000,000.00 PROJECT WORK RESPONSIBILITY / 100% CURRENT STATUS / Completed
Realizzazione di un edificio industriale su progetto dell’arch. Roberto Faccio dotato di uffici amministrativi e officina per l’assistenza degli autotreni, nonché del magazzino per deposito e smistamento merci. È dotato di impiantistica speciale quale distribuzione gasolio ed urea, impianto lavaggio automezzi con relativo depuratore, impianti aria compressa e olio centralizzati. La palazzina uffici è dotata di riscaldamento con ventilconvettori, trattamento e ricambio dell’aria, impianto solare per la produzione di acqua calda sanitaria, impianto di recupero dell’acqua piovana dei tetti per lavaggio degli automezzi. Construction of an industrial building with offices, trucks repair shop and goods storage, designed by architect Roberto Faccio. It has particular systems: diesel oil and urea distribution, washing plant for trucks with a water depuration system, centralized systems of compressed air and oil distribution. The offices are equipped with fan coil heating system, mechanical air treatment units, solar collectors for the hot water production, rain water collection used for the trucks washing.
ARCA ENGINEERING / IMPIANTISTICA /
\\ 13
Nuova sede cantine Nosio a Mezzocorona Winery “Nosio” in Mezzocorona (Tn) PROJECT / New winery “Nosio” in Mezzocorona (Tn) CLIENT / Architect Paolo Margoni SERVICES / Final mechanical and electric systems design VALUE OF WORKS DESIGNED / € 2,240,000.00 YEAR CARRIED OUT / 2006 PROJECT WORK RESPONSIBILITY / 100% CURRENT STATUS / Completed
Nuova cantina per l’azienda Nosio s.p.a. a Mezzacorona (TN) con linea di imbottigliamento a grande capacità produttiva (15.000 bott./ ora) e impianto produzione vapore per riscaldamento e sterilizzazione bottiglie. È inoltre installato un impianto a pannelli solari di ca. 400 mq per integrazione acqua calda per cicli di lavorazione. Arca engineering ha fornito la progettazione esecutiva degli impianti elettrici e meccanici su progetto architettonico dell’ Arch. Paolo Margoni. New winery of Nosio S.p.a. in Mezzocorona (Tn) with a high capacity bottling line (15000 bottles per hour), steam production system used for the heating system and for the bottles sterilization. The hot water production is produced by 400 square meters of solar collectors. Arca Engineering srl developed final design of electric and mechanical systems, according to the architectural design by architect Paolo Margoni.
ARCA ENGINEERING / IMPIANTISTICA /
\\ 14
Architet tura e Edilizia ARCA ENGINEERING / ARCHITETTURA /
In quest’area, Arca Engineering si occupa di progettazione e consulenza in ambito edile. Per ogni iniziativa edilizia, le attività svolte riguardano: • lo studio di fattibilità • la progettazione ai fini autorizzativi e la progettazione esecutiva • la consulenza per la raccolta delle offerte e la redazione dei contratti d’appalto • la Direzione Lavori per la realizzazione delle opere
In this area, Arca Engineering specialises in building design and consultancy. It carries out the following activities for each building project: • the feasibility study • planning for authorisation purposes and the project execution plan • consultancy for gathering bids and the drafting of tender contracts • operations management for project realisation
Negli ultimi anni, grazie anche alla collaborazione di professionisti specializzati in urbanistica e architettura, Arca Engineering ha portato a conclusione iniziative di progettazione integrale e coordinata di edilizia residenziale e commerciale. Con i progetti realizzati, compresi quelli ancora in corso, hanno preso forma circa 70.000 mc di fabbricati a destinazione residenziale.
In recent years, thanks also to the collaboration of professionals specialising in urban planning and architecture, Arca Engineering has taken care of coordinated integral planning for residential and commercial construction. Approximately 70,000 cubic metres of buildings for residential use have been built if one considers completed projects and projects that are still underway.
\\ 15
Palazzina “Giuditta” Edificio Residenziale A Povo (Tn) “Giuditta” Apartment House Residential Building In Povo (TN) PROJECT / "Residenza Giuditta" in Povo (TN) CLIENT / Edilbeton Trento S.p.A. SERVICES / Preliminary design, final design and project execution plan, management of operations and safety coordination at all stages of the project VALUE OF WORKS DESIGNED / € 2,200,000.00 YEAR CARRIED OUT / 2010 - 2013 PROJECT WORK RESPONSIBILITY / 100% CURRENT STATUS / Under construction Architectural project realised in collaboration with architect Cristiano Zattara
L’edificio residenziale plurifamiliare è composto da 13 unità abitative. La società Arca Engineering ha eseguito la progettazione architettonica in collaborazione con l’Arch. Cristiano Zattara, la progettazione definitiva ed esecutiva degli impianti e il coordinamento della sicurezza in fase di progettazione ed esecuzione. L’edificio ha ottenuto la certificazione CasaClima B. The multi-family residential building consists of 13 residential units. Arca Engineering realised the architectural design in collaboration with architect Cristiano Zattara, the final design and project execution plan of the installations, and was responsible for safety coordination at all stages of the project. The building has been awarded CasaClima B certification.
ARCA ENGINEERING / ARCHITETTURA E EDILIZIA /
\\ 16
Complesso Residenziale “Oasi” a Melta di Gardolo (Tn) Residential Complex “Oasi” in Melta di Gardolo (Tn) PROJECT / Residential complex "Oasi" CLIENT / Cooperativa Edilizia Obiettivo Prima Casa - Trento SERVICES / Preliminary design, final design and project execution plan, building works and installation works, energy design VALUE OF WORKS DESIGNED / € 13,975,000.00 YEAR CARRIED OUT / 2004 - 2009 PROJECT WORK RESPONSIBILITY / 100% CURRENT STATUS / Completed Architectural project realised in collaboration with architect Lanfranco Fietta
Nuovo Complesso Residenziale a Melta di Gardolo per la realizzazione di 93 alloggi. La società Arca Engineering ha eseguito la progettazione architettonica in collaborazione con l’Arch. Lanfranco Fietta. La progettazione è improntata sull’utilizzo di materiali a basso impatto ambientale, di moderne tecnologie per il risparmio energetico e di recupero dell’aria ambiente, dell’utilizzo di fonti rinnovabili (solare, termico e fotovoltaico), di tecnologia domotica all’interno degli alloggi. Gli edifici hanno ottenuto la certificazione CasaClima A. New residential complex in Melta di Gardolo for the construction of 93 homes. Arca Engineering realised the architectural design in collaboration with architect Lanfranco Fietta. The design is characterized by the use of low environmental impact materials, energy-saving modern technology and energy recovery ventilation, as well as the use of renewable energy sources (solar, thermal and photovoltaic) and home automation technology inside the homes. The buildings have been awarded CasaClima A certification. ARCA ENGINEERING / ARCHITETTURA E EDILIZIA /
\\ 17
Nuovo Centro per la Protezione Civile a Coredo (Tn) New Centre for the Civil Protection Unit in Coredo (Tn) PROJECT / Construction of new centre for the Civil Protection Unit in Coredo (TN) CLIENT / Municipality of Coredo SERVICES / Final design, project execution plan and management of operations for building works and installation works VALUE OF WORKS DESIGNED / € 1,860,000.00 YEAR CARRIED OUT / 2006 - 2010 PROJECT WORK RESPONSIBILITY / 100% CURRENT STATUS / Completed Architectural project realised in collaboration with architect Lanfranco Fietta
Progetto per la realizzazione del nuovo centro per la Protezione Civile di Coredo, Val di Non (TN). L’edificio ospita la sede dei Vigili del Fuoco Volontari e della Croce Rossa. Arca Engineering ha curato la redazione dell’intero progetto definitivo ed esecutivo, in collaborazione con l’Architetto Lanfranco Fietta, e la direzione lavori. Project for the construction of a new centre for Coredo’s Civil Protection Unit in Val di Non (TN). The building houses the headquarters of the Volunteer Fire Brigade and the Red Cross. Arca Engineering oversaw the drafting of the entire final design and project execution plan in collaboration with architect Lanfranco Fietta, and was responsible for the management of operations.
ARCA ENGINEERING / ARCHITETTURA E EDILIZIA /
\\ 18
Piano di recupero del nucleo residenziale storico nel Comune di Lona Lases (Tn) Recovery plan for historic residential nucleus in the Municipality of Lona Lases (Tn) PROJECT / Recovery of residential building in Lona-Lases (TN) CLIENT / Provincial Housing Consortium "G. Veronesi" - Trento SERVICES / Project implementation, final design, project execution plan and management of operations or building works, structural works and installation works VALUE OF WORKS DESIGNED / € 1,000,000.00 YEAR CARRIED OUT / 2004 - 2008 PROJECT WORK RESPONSIBILITY / 100% CURRENT STATUS / Completed Architectural project realised in collaboration with architect Massimo Furlan
Progetto attuativo del piano di recupero in una zona ubicata nel centro storico dell’abitato del Comune di Lona Lases, per la realizzazione di un edificio integrato, composto da nove alloggi di varia metratura, finalizzati all’edilizia agevolata per anziani e per extracomunitari prevista dalle normative provinciali vigenti. Implementation of a recovery plan in an area located in the historic centre of the built-up area of the Municipality of Lona Lases for the realisation of an integral building; the building consists of nine homes of various sizes to serve as assisted housing for the elderly and for non-EU citizens as provided for by provincial legislation in force.
ARCA ENGINEERING / ARCHITETTURA E EDILIZIA /
Edilizia soste nibile Risparmio energetico e sostenibilità ambientale sono i criteri fondamentali su cui si basa la progettazione degli edifici di nuova generazione. Arca Engineering ha da anni sposato la linea dell’edilizia sostenibile, promuovendola nei più svariati settori, dalla fase di progettazione fino al controllo costruttivo. È in questa delicata fase che le idee si concretizzano e si determina la qualità del manufatto. Sensibilità e cultura verso un’edilizia a misura d’uomo sono inoltre le nostre linee guida per la progettazione e la realizzazione di edifici in legno. Arca Engineering può contare su personale tecnico e software di avanguardia per l’analisi energetica degli edifici, su consulenti specializzati con esperienza ultra decennale per il dimensionamento di strutture in legno. Ciò garantisce al cliente la necessaria competenza per affrontare con serenità e sicurezza le opportunità di comfort e risparmio energetico che questa tecnologia può offrire. Alcune delle progettazioni realizzate in ambito edile hanno ottenuto la certificazione secondo i protocolli CasaClima Bolzano e Leed GBC Italia.
Energy saving and environmental sustainability are the main criteria on which the latest building designs are based. Arca Engineering has for years embraced the ethics of green building, promoting it in the most varied of sectors, from the design phase up to the construction inspection. It is at this delicate stage that ideas materialise and the quality of the product is determined. Furthermore, sensitivity and a culture that revolves around human scale construction are the Company’s guidelines for designing and realising wooden buildings. Arca Engineering relies on technical personnel and advanced software to carry out energy analyses of buildings, and on specialist consultants with more than ten years of experience for proportioning timber buildings. This guarantees clients the expertise needed in order to deal with the comfort and energy efficiency opportunities offered by this technology both calmly and positively.Some of the projects carried out in the construction industry have obtained certification according to protocols CasaClima Bolzano and LEED GBC Italia.
\\ 20
Nuovo Istituto Scolastico a Romarzollo (Tn) New School Complex in Romarzollo (Tn) PROJECT / New school complex in Romarzollo di Arco (TN) CLIENT / Municipality of Arco SERVICES / Project execution plan and management of operations for electrical systems – advice for LEED for Schools certification YEAR CARRIED OUT / 2006 - 2007 VALUE OF WORKS DESIGNED / € 550,000.00 PROJECT WORK RESPONSIBILITY / 100% CURRENT STATUS / Completed
Il nuovo complesso scolastico di Romarzollo comprende un ciclo di leve scolastiche costituito dalla scuola elementare e dalla scuola secondaria di primo grado. La costruzione ha ottenuto la certificazione Leed PLATINUM GBC Italia. The new school complex in Romarzollo consists of the primary school and middle school. The building has been awarded Leed PLATINUM GBC Italia certification.
ARCA ENGINEERING / EDILIZIA SOSTENIBILE /
\\ 21
Edificio Residenziale a Sternigo (Tn) Residential Building in Sternigo (Tn) PROJECT / Residential wooden building in Sternigo (TN) CLIENT / Private citizen SERVICES / Final design, project execution plan and management of operations for building works and installations YEAR CARRIED OUT / 2010 – 2011 VALUE OF WORKS DESIGNED / € 600,000.00 PROJECT WORK RESPONSIBILITY / 100% CURRENT STATUS / Completed Architectural project realised in collaboration with architect Giovanni Pallaver
Edificio residenziale unifamiliare con struttura in legno e tecnologia monoparete tipo x-lam, realizzato a Sternigo (TN). Arca Engineering ha curato la progettazione e la direzione dei lavori. L’edificio ha raggiunto un’attestazione di prestazione energetica secondo il protocollo della Provincia Autonoma di Trento di Classe A+. Single-family residential building with wooden frame and X-lam type single wall technology in Sternigo (TN). Arca Engineering oversaw the design and management of operations. The building has been awarded a Class A+ energy performance certificate according to the building protocol of the Autonomous Province of Trento.
ARCA ENGINEERING / EDILIZIA SOSTENIBILE /
\\ 22
Asilo Nido Aziendale Azienda Provinciale per i Servizi Sanitari Trento Company Nursery Azienda Provinciale per i Servizi Sanitari Trento PROJECT / New company nursery for local healthcare provider in Trento CLIENT / Architect Valentino Cristofolini SERVICES / Project execution plan for electrical and mechanical systems and energy – advice on ITACA YEAR CARRIED OUT / 2010 VALUE OF WORKS DESIGNED / € 430,000.00 PROJECT WORK RESPONSIBILITY / 100% CURRENT STATUS / Completed
Realizzazione del nuovo Asilo nido aziendale per l’Azienda Sanitaria Provinciale di Trento. Arca Engineering ha fornito la progettazione energetica ed esecutiva degli impianti elettrici e meccanici. Adeguamento al Protocollo ITACA della P.A.T. per l’Edilizia Sostenibile. Progettazione architettonica Arch. Valentino Cristofolini. Construction of a new company nursery for the local healthcare provider in Trento. Arca Engineering provided the energy design and project execution plan for the electrical and mechanical systems. Compliance with ITACA Protocol of the P.A.T. for Sustainable Building. Architectural design by architect Valentino Cristofolini.
ARCA ENGINEERING / EDILIZIA SOSTENIBILE /
\\ 23
Edificio Residenziale a Levico Terme Residential Building in Levico Terme PROJECT / New multi-family residential building in Levico Terme (TN) CLIENT / Private citizen SERVICES / Final design and project execution plan of the electrical and mechanical systems – advice for CasaClima certification YEAR CARRIED OUT / 2006 - 2007 VALUE OF WORKS DESIGNED / € 500,000.00 PROJECT WORK RESPONSIBILITY / 100% CURRENT STATUS / Completed
Progetto definitivo ed esecutivo della parte energetica e impiantistica su progetto architettonico degli architetti Massimo Furlan e Giuseppe Cavaleri; consulenza per l’ottenimento della certificazione CasaClima. L’edificio ha ottenuto certificazione CasaClima B. Final design and project execution plan of the part relating to energy and installations following the architectural design by architects Massimo Furlan and Giuseppe Cavaleri; advice for obtaining CasaClima certification.
ARCA ENGINEERING / EDILIZIA SOSTENIBILE /
Servizi per l’inge gneria La filosofia di Arca Engineering è di offrire al cliente un servizio onnicomprensivo, che concentri in un’unica figura lo svolgimento di tutti gli adempimenti tecnici necessari per intervenire sul patrimonio edilizio. Di conseguenza, le attività professionali prestate spaziano da consulenze tecniche, stime e perizie, rilievi topografici, creazione di modellazioni e rendering 3D, fino alla docenza in corsi di specializzazione professionale. In modo specifico, i servizi prestati riguardano: • consulenza, coordinamento, progettazione, sicurezza • operazioni topografiche e rilievi • verifiche e analisi energetiche • verifiche e studi illuminotecnici • progettazioni e certificazioni antincendio • consulenza su procedure di certificazioni Leed
Arca Engineering’s philosophy is to offer clients a full service that encompasses the full spectrum of technical requirements to carry out work on building stock. As a result, the professional services provided by the Company range from technical advice, evaluations and reports, land surveying, the creation of models and 3D rendering through to teaching professional specialisation courses. The specific services provided are: • consultancy, coordination, design, safety • land survey operations • energy audit and analyses • lighting audits and studies • design and fire safety certification • advice on LEED certification process
\\ 25
Chiesa Ss Pietro e Andrea Parrocchia di Povo, Trento Saints Peter and Andrew Church Parish of Povo, Trento PROJECT / Restoration of the Saints Peter and Andrew Church in Povo - Trento CLIENT / Parish of Povo SERVICES / Final design in collaboration with architect Stefania Wegher and safety coordination at all stages of the project YEAR CARRIED OUT / 2012-2014 VALUE OF WORKS DESIGNED / € 965,000.00 PROJECT WORK RESPONSIBILITY / 100% CURRENT STATUS / under construction
Restauro della chiesa parrocchiale SS Pietro e Andrea di Povo – Trento. Arca Engineering ha coordinato la progettazione in collaborazione con l’architetto Stefania Wegher e svolto la sicurezza sul luogo di lavoro. Restoration of the Saints Peter and Andrew Church, Parish of Povo in Trento. Arca Engineering provided the final design in collaboration with architect Stefania Wegher and was responsible for safety coordination at all stages of the project.
ARCA ENGINEERING / EDILIZIA SOSTENIBILE /
\\ 26
Collaborazioni particolari Studio preliminare per l’impianto di teleriscaldamento del comune di Malè in Val di Sole (TN), con produzione di energia da impianti a biomassa, gassificazione a cippato, biodigestore - reattore a letame bovino, cogeneratore a olio vegetale. Consulenza per la redazione dei documenti tecnici per alcune gare di appalto integrato, tra le quali le più significative: • procedura per l’affidamento della concessione per costruzione e gestione del N.O.T. - NUOVO OSPEDALE DEL TRENTINO, di cui ci siamo occupati in quota parte degli impianti elettrici ed elettrici speciali • realizzazione dei lavori di ricostruzione del Presidio Ospedaliero di Mezzolombardo (TN) per la parte relativa agli impianti meccanici.
Special partnerships Preliminary study for a district heating system in the Municipality of Malè in Val di Sole (TN) with energy produced from biomass systems, the gasification of wood chips, a biodigester – cattle manure reactor, and a vegetable oil cogenerator. Consultancy for the preparation of technical documents for some integrated works contracts, amongst which the most important are: • procedure for the entrusting of the concession for the construction and management of the NHT (NEW HOSPITAL OF TRENTINO); the Company has already taken care of the part assigned to it under the contract, consisting of the electrical systems and special electrical systems of the hospital. • reconstruction work on the Hospital Centre in Mezzolombardo (TN) for the part relating to the mechanical systems.
ARCA ENGINEERING / REFERENZE/
\\ 27
Refe renze
Provincia Autonoma di Trento Azienda Provinciale per i Servizi Sanitari di Trento Comune di Trento Comune di Rovereto Comune di Arco Comune di Avio Comune di Bedollo Comune di Bleggio Superiore Comune di Coredo Comune di Cunevo Comune di Folgaria Comune di Fornace Comune di Malè Comune di Mezzolombardo Comune di Ragoli Comune di Scurelle Collini S.P.A. Edilbeton Trento S.P.A. Ediltione S.P.A. Impregilo S.P.A. Oberosler S.P.A. F.lli Poli S.P.A.
ARCA ENGINEERING / REFERENZE /
Costruzioni Casarotto S.R.L. Costruzioni Grosselli S.R.L. Costruzioni Martinelli Luigi & C. S.N.C. Costruzioni Rossaro S.R.L. Impresa di Costruzioni Tre H S.R.L. Inco S.R.L. Libardoni Costruzioni S.R.L. Mak Costruzioni S.R.L. Adige Sys Adige S.P.A. Gruppo Finestre S.R.L. Gruppo Giovannini S.R.L. Autotrasporti Multipli Arcese S.P.A. Best Western - H.N.H. Hotel S.R.L. Birreria Forst S.P.A. Cartotrentina S.R.L. Fam. Cooperativa di Povo Fam. Cooperativa Paganella Brenta Fam. Cooperativa Alta Valsugana aPremetal S.P.A. P.V.B. Solutions S.P.A. Roncegno Acque Minerali S.R.L. Siram S.P.A. Travisud S.P.A.
ARCA ENGINEERING srl Viale Verona 190/8 - 38123 Trento tel. 0461/391522 - fax. 0461-396784 info@arcatn.it www.arcaengineering.tn.it