AQUATIC CENTER 4-15 -DEVELOPING A LANGUAGE -FINAL DESIGN
KATSURA IMPERIAL VILLA 16-25 -PLANS, ELEVATIONS, AND HISTORY -JOINERY ANALYSIS
HOUSING FOR HOMELESS VETERANS
26-35
-RESEARCH AND DESIGN DEVELOPMENT -FINAL DESIGN
SHOP DRAWINGS EXAMPLES 36-37
RENDER EXAMPLES 38-41
AQUATIC CENTER DEVELOPING A LANGUAGE In this exercise our professor tasked us to use a list of words that were given to create models that helped us in the design process. The first phase of this exercise was to work individually, creating different models using different sentences. It was time for the studio to partner up and create these forms with one another as a team. My partner and I decided what worked best between our individual models were the fluted parts of their form. We dawned the task to create models with the use to a subtractive process, this was new to me so we thought of different ways to create the model that would make the most sense and how we can apply this form into our future aquatic center design. CONEY ISLAND The project from here on out was to set the focus on the aquatic center that the teams of 2 were suppose to develop for the rest of the semester. The site of the project is set on Coney island, Brooklyn New York. After conducting a site visit the most prominent piece if information coming out of that trio was that the board walk was right against the site and it gave a lot of us the opportunity to use it to our advantage when thinking about design and circulation. By looking back at our pink foam models we looked at the strongest set of qualities and how they gave us the forms we intended to create. This outlook further advanced the discussion on how we should design the aquatic center, and what rules are going to be applied to our initial design and how to we iterate going forward. The program consists of two large pools, a competition pool and a training pool all with specific area of measurement. Other programs that had to be put into the project later on were the mechanical rooms, storage rooms, bathrooms, changing rooms, circulation areas, stands and offices. Going into the first step of design we had to think about how to make our pink foam models into massing models, that could fit two pools inside. We kept the language in our most successful models intact and brought it over into the first stages of the aquatic center.
PROJECT PARTNER: MAHDI ALKAIFI
4
HENRY GROSMAN SPRING 2019
“A fluted and lumpy box with bumps�
“A fluted and lumpy box with bumps”
“A fluted and lumpy box with bumps”
5
SUBTRACTIVE PROCESS During the process of subtraction, we started to discover some gaps and openings that derived from this process made us understand our process more, and what we needed to carry forward into the aquatic center design. The concept of rib and remnant came from this process, we decided to make it a system with two rules of rib and remnant. The rib is what is what is left over from the subtractive process and the remnant is what the ribs are connected to, holding the whole model together.
6
ADDITIVE PROCESS After long discussions about our subtractive process, our goal as architects is to ultimately design a building that is going to be built with the additive process. This made us think how can we recreate the subtractive model to incorporate two pools with the additive process? It came to the conclusion that the ribs had to be cut out and manually put together with a construction based mind set. Where the important rooms and hallways will go, as well as the entrance.
7
D3
FINAL DESIGN
OFFICE
OFFICE
MEN'S STAFF LOCKER ROOM
D1
OFFICE BATH DOWN
DOWN WOMEN'S STAFF LOCKER ROOM
BATH
D2
TRAINING POOL 2000 SQ FEET
SECOND FLOOR 8'
DOWN
DOWN TRAINING AREA DOWN
DOWN FIRST FLOOR 6'
WEST ENTRANCE
LOUNGE AREA
LOUNGE AREA
GROUND 0'
MIDDLE COLONNADE STANDS
STANDS
POOL LEVEL -10'
COMPETITION POOL 50' X 100'
D3 STANDS
SECTION D
D
SCALE: 1/16"=1'-0"
SECTION C SCALE: 1/16"=1'-0"
SEC.
SECTIO
C
SCALE: 1/16"=1
SEC. A SEC.
COLONNADE
COLONNADE COMPETITION POOL 100' X 50'
D1
BATH
DOWN
BATH
BATH DOWN
B SEC.
OFFICE INTERIOR ENTRANCE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
BOARD WALK ENTRANCE COLONNADE EXTENDED BOARD WALK
SECOND FLOOR 8'
EXISTING BOARD WALK
COMPETITION POOL 50' X 100'
80' WIDE
FIRST FLOOR 6'
GROUND 0'
POOL LEVEL -10'
SECTION A SCALE: 1/16"=1'-0"
8
A SEC.
D SEC.
C SEC.
SECTION C SCALE: 1/16"=1'-0"
SECOND FLOOR 8'
FIRST FLOOR 6'
GROUND 0'
POOL LEVEL -10'
D3
SECTION D
D
SCALE: 1/16"=1'-0"
SEC.
D1
D2
SECOND FLOOR 8'
FIRST FLOOR 6'
GROUND 0'
POOL LEVEL -10'
COMPETITION POOL 50' X 100'
SECTION C SCALE: 1/16"=1'-0"
C SEC.
SECTION A SCALE: 1/16"=1'-0"
A SEC.
9
STRUCTURAL TEE STEEL HANGER PLATE GLULAM EATING AREA
STEEL HANGER PLATE FOR STRINGER UP
UP
STRINGER TRAINING POOL 2000 SQ FEET
KNIFE PLATE INSERTION
WOODEN STANDS
2" BOLTS
KNIFE PLATE
DOWN
DOWN TRAINING AREA DOWN UP
DOWN
UP
WEST ENTRANCE MEN'S BATHROOM
MEN'S CHANGING ROOM
MECHANICAL ROOM
STORAGE ROOM
WOMEN'S CHANGING ROOM
MIDDLE COLONNADE
WOMEN'S BATHROOM
MIDDLE COLONNADE
HALLWAY
MIDDLE COLONNADE
HALLWAY
HALLWAY
RIB TO FOUNDATION DETAIL 3 SCALE: 1/2"=1'-0"
A SEC.
HALLWAY
HALLWAY
D3 DETAIL
COLONNADE
COLONNADE COMPETITION POOL 100' X 50'
COMPETITION POOL 100' X 50'
D1
UP
UP
glulam rib UP
B HALLWAY
COLONNADE
SEC.
MEN'S BATHROOM
steel water gutter embedded into glulam
UP
COLONNADE
mullion embedded into glulam
INTERIOR ENTRANCE
WOMEN'S BATHROOM
etfe enclosure
STORAGE ROOM
EATING LOUNGE
COMP. POOL MECHANICAL ROOM
BOARD WALK ENTRANCE COLONNADE EXTENDED BOARD WALK MEN'S CHANGING ROOM
WOMEN'S CHANGING ROOM
EXISTING BOARD WALK 80' WIDE
air tube feeding to the etfe
metal string tie down BASEMENT PLAN SCALE: 1/16"=1'-0"
reflective film
0 PLAN
led lights inside etfe
D SEC.
C SEC.
ETFE TO GLULAM DETAIL SCALE:
GROUND FLOOR PLAN SCALE: 1/16"=1'-0"
10
1 PLAN
3"=1'-0"
D1 DETAIL
glulam rib tie bolt steel plate steel angle bent steel plate tension rod tension cap steel plate welded to hss sealant
steel tension rod tension rod cap
expansion joint
hss 6" x 6"
splice connection
poured in place concrete corrugated steel decking 2" rigid insulation finished panel clips
water proofing 3 8"
sheathing
hat channel slate panel finish
steel plate welded to hss
rib to floor and roof detail SCALE: 1-1/2"=1'-0"
D2 DETAIL
11
12
13
14
15
KATSURA IMPERIAL VILLA HISTORY
KATSURA IMPERIAL VILLA Katsurachō, Kyoto, Japan 1615 -1663 A.D
In this studio we are introduced into analysis with in the structures and architecture of the past. I was assigned the Katusra Imperial Villa. The first part of the project was to work in groups and find the drawings for the Villa in books, and other media. Then we split after the group work and find a particular part of the villa that we find interesting and further Analyze those components architecturally.
BOUNDERIES IN NATURE “The wood-carver can fashion whatever he will. Yet his products are but toys of the moment, to be glanced at in jest, not fashioned according to any precept or law. When times change, the carver too will change his style and make new trifles to hit the fancy of the passing day. But there is another kind of artist, who sets more soberly about his work, striving to give real beauty to the things which men actually useand to give to them the shape which tradition has ordained. This maker of real things must not for a moment be confused with the maker of idle toys.” Murasaki Shikibu, The Tale of Genji
Partner work: Marylin Pena
16
NANDINI BAGCHEE SPRING 2018
SHOIKEN
GEPPARO
SHOKINTEI
SHOKATEI
ONRINDO
Partner work: Marylin Pena
SCALE 1/8”= 1’
17
KATSURA PLANS
18
Partner work: Conor Incledon
19
KATSURA EAST WEST ELEVATION
OLD SHOIN EAST WEST SECTION
20
SERVANTS QUARTERS EAST WEST SECTION
SERVANTS QUARTERS EAST WEST SECTION
OLD SHOIN NORTH SOUTH SECTION
NEW GOTAN NORTH SOUTH SECTION
21
JOINERY ANALYSIS OLD SHOIN AT KATSURA IMPERIAL VILLA JOINERY ANALYSIS
ROOF STRUCTURE CONNECTION 2
ROOF STRUCTURE CONNECTION 1
ROOF STRUCTURE CONNECTION 2
ROOF STRUCTURE CONNECTION 1
RAFTER TO ROOF CONNECTION 1
RAFTER TO ROOF CONNECTION 1
RAFTER TO ROOF CONNECTION 2
RAFTER TO ROOF CONNECTION 2
FLOOR TO STILT CONNECTION
FLOOR TO STILT CONNECTION
DOORS
ROOF STRUCTURE CONNECTION 2
ROOF STRUCTURE CONNECTION 1
RAFTER TO ROOF CONNECTION 1
RAFTER TO ROOF CONNECTION 2
FLOOR TO STILT CONNECTION
TATAMI MATS
INTERIOR DOORS
DOORS INTERIOR DOORS TATAMI MATS
SLIDING DOORS TRACK EXTERIOR DOORS TATAMI MATS
SLIDING DOORS TRACK
EXTERIOR DOORS
SLIDING DOORS TRACK
VERNDA DOORS
OORS
INTERIOR DOORS
VERNDA DOORS
22 FLOOR STRUCTURE AXONOMETRIC
WALL JOINERY CONNECTION DETAIL
WALL JOINERY CONNECTION DETAIL
FLOOR STRUCTURE AXONOMETRIC
ROOF STRUCTURE
HANGING CEILING
ROOF STRUCTURE CONNECTION TO PARTITION
WALL JOINERY CONNECTION DETAIL
FLOOR STRUCTURE AXONOMETRIC
WALLS
HOIN EAST WEST SECTION
OPEN EXO. WALL AXONOMETRIC
ROOF STRUCTURE
TATAMI MATS
FLOOR STRUCTURE
HANGING CEILING
RE CONNECTION TO PARTITION
STILTS / PARTITIONS
WALLS
SECOND ROOM EXPLODED AXONOMTERIC
OPEN EXO. WALL AXONOMETRIC
23
MODELS
24
25
70'
100'
HOUSING FOR THE HOMELESS BATHROOM
KITCHEN
CLOSET
FIRST FLOOR 1/16" = 1'-0"
CLOSET
72'
26'- 4"
RESEARCH AND DESIGN DEVELOPMENT BEDROOM
LIVING ROOM
Housing projects are always a difficult task for architects and developers. But, throughout the years homelessness has gone up throughout the 5 boroughs to an all time high. As architects we can help design for a specific group of people in need and in school a project of this caliber is always helpful to set us students towards the right direction on terms of housing and afford-ability. THIRD FLOOR 1/16" = 1'-0"
19' - 11"
UNIT FLOOR PLAN
1/4" = 1'-0"
AXONOMETRIC VIEW
FOURTH FLOOR 1/16" = 1'-0"
In this studio our professor assigned two sites, we split the class in half. Half in Bed-sty in Brooklyn and the other half set in east Harlem. The projects were individual and each student followed all the FAR rules and regulations set in their site. The professor made the studio feel real with process and practicality.
THE LOOP PROCESS
BATHROOM
KITCHEN
CLOSET
24'- 6"
BEDROOM
Another important note is that each student chose a homeless user a specific type of homeless group. For example, drug abusers, homeless mothers, homeless immigrants etc. The user that I went with was homeless veterans. It started with research and based on the data I based by design on what I felt was best for homeless veterans. Including a program that is integrated into the housing structure. LIVING ROOM
FIFTH FLOOR 1/16" = 1'-0"
20' - 9"
UNIT FLOOR PLAN 2
1/4" = 1'-0"
SIXTH FLOOR 1/16" = 1'-0"
INFINITI LOOP
CIRCULATION
Designing the recreational space to circulate within where the user can walk around and come back to where the started and not interfere with the housing.
The recreational center can be accessed from the first floor and can extends to the sixth floor, so that the space does not interfere with the housing.
5'
36"
EXPLODED AXONOMETRIC
12"
34'-1" 24'
UNRAVEL THE LOOP By unraveling the loop, the decisions for the different areas can be made with the zoning laws and other dimensions.
MASS RENDER
UNIT MASSING the units are integrated around the loop, making for interesting sectors. a set back to every other unit for a balcony space.
elevators egress stairs recreational centers main stairs housing
PROGRAMING AXONOMETRIC VIEW
N SITE PLAN 1/64" = 1'-0"
26
FABIAN LLONCH FALL 2019
the units are integrated around the loop, making for interesting sectors. a set back to every other unit for a balcony space.
elevators egress stairs recreational centers main stairs housing
RECREATIONAL CENTER
tors.
8" = 1'-0"
HOUSING UNITS
CIRCULATION EXPLODED AXONOMETRIC
AXONOMETRIC HOUSING UNITS SURROUNDS THE LOOP
27
section 1
BEDROOM
BEDROOM
CLOSET
CLOSET
KITCHEN
BATHROOM
KITCHEN BATHROOM BEDROOM
BEDROOM
CLOSET
CLOSET
ONE BEDROOM UNIT 3/32" = 1'-0"
ONE BEDROOM UNIT WITH BALCONY 3/32" = 1'-0" KITCHEN
BATHROOM
KITCHEN
up
BATHROOM
EGRESS up
up
up ONE BEDROOM UNIT 3/32" = 1'-0"
ONE BEDROOM UNIT WITH BALCONY 3/32" = 1'-0"
up
EGRESS up
BEDROOM
up
down
up
up BEDROOM
CLOSET
CLOSET
BEDROOM
up
down
BEDROOM
KITCHEN
BATHROOM
KITCHEN
up
BATHROOM CLOSET
CLOSET
meditation/ yoga area KITCHEN
BATHROOM
KITCHEN
up
BATHROOM
meditation/ yoga area
ONE BEDROOM UNIT 3/32" = 1'-0"
WORK OUT GYM down
ONE BEDROOM UNIT WITH BALCONY 3/32" = 1'-0"
ONE BEDROOM UNIT 3/32" = 1'-0"
WORK OUT GYM
ONE BEDROOM UNIT WITH BALCONY 3/32" = 1'-0"
janitor closet
maintenance room
down
janitor closet
maintenance room desk area
maintenance room
up up
up up
ENTRANCE
CORE elev.
CORE elev.
elev.
elev.
CLOSET
maintenance room
FULTON STREET
FULTON STREET
desk area
down
BATHROOM
down
up
open to below
CORE
BATHROOM BATHROOM
up
down
up
CLOSET CLOSET
BATHROOM
up
down
ENTRANCE
CLOSET
down
open to below
CORE
CORE
down
CORE KITCHEN KITCHEN
elev.
elev.
elev.
elev.
up down
up
elev.
elev.
elev.
KITCHEN
KITCHEN
elev.
down
down
down
CORNER CONDITION UNIT 3/32" = 1'-0"
CORNER CONDITION UNIT 3/32" = 1'-0"
CORNER CONDITION UNIT 3/32" = 1'-0"
up
CORNER CONDITION UNIT 3/32" = 1'-0"
up
SECTION 2
SECTION 2 CLOSET
CLOSET
BATHROOM
BATHROOM STUDIO ROOM
STUDIO ROOM
CLOSET
CLOSET
BATHROOM
BATHROOM STUDIO ROOM
STUDIO ROOM KITCHEN KITCHEN
OPEN GYMNASIUM KITCHEN
open to below
open to below
KITCHEN
CORNER CONDITION UNIT WITH BALCONY 3/32" = 1'-0"
CORNER CONDITION UNIT WITH BALCONY 3/32" = 1'-0"
OPEN GYMNASIUM open to below
open to below
CORNER CONDITION UNIT WITH BALCONY 3/32" = 1'-0"
CORNER CONDITION UNIT WITH BALCONY 3/32" = 1'-0"
KITCHEN
KITCHEN
STUDIO ROOM
STUDIO ROOM
BATHROOM
BATHROOM
CLOSET
CLOSET
KITCHEN
KITCHEN
up
EGRESS
EGRESS
BALCONY
BALCONY
EGRESS
STUDIO ROOM
STUDIO ROOM
BATHROOM
CORNER CONDITION UNIT WITH BALCONY 3/32" = 1'-0"
BATHROOM
CORNER CONDITION UNIT WITH BALCONY 3/32" = 1'-0"
CLOSET
GROUND FLOOR PLAN 1/16" = 1'-0"
2ND FLOOR FLOOR PLAN 1/16" = 1'-0"
up
EGRESS
SARATOGA AV.
EGRESS
CLOSET
3RD FLOOR PLAN 1/16" = 1'-0" BALCONY
BALCONY
EGRESS
KITCHEN
KITCHEN
28
CORNER CONDITION UNIT WITH BALCONY 3/32" = 1'-0" STUDIO ROOM
BATHROOM
CORNER CONDITION UNIT WITH BALCONY 3/32" = 1'-0" STUDIO ROOM BATHROOM
1/16" = 1'-0"
1/16" = 1'-0"
1/16" = 1'-0"
2ND FLOOR FLOOR PLAN 1/16" = 1'-0"
GROUND FLOOR PLAN 1/16" = 1'-0"
SARATOGA AV.
3RD FLOOR PLAN 1/16" = 1'-0" KITCHEN
KITCHEN
SARATOGA AV. KITCHEN
KITCHEN STUDIO ROOM
BATHROOM
STUDIO ROOM
BATHROOM
CLOSET
CLOSET
STUDIO ROOM
BATHROOM
STUDIO ROOM
BATHROOM
CLOSET
CLOSET
down
POOL
CORNER CONDITION UNITS 3/32" = 1'-0"
open to below
open to below
CORNER CONDITION UNITS 3/32" = 1'-0"
down
POOL
CORNER CONDITION UNITS 3/32" = 1'-0"
open to below
open to below
down
down
CORNER CONDITION UNITS 3/32" = 1'-0"
down
up
BATHROOM
KITCHEN
down
down
KITCHEN
BATHROOM
down
up CLOSET
CLOSET
down
EGRESS
BATHROOM
KITCHEN
up
up
up
KITCHEN
BATHROOM
BEDROOM
LIVING ROOM BEDROOM
LIVING ROOM
CLOSET
CLOSET
down
EGRESS up
up
up
BEDROOM LIVING ROOM BEDROOM
LIVING ROOM
ONE BEDROOM UNIT 3/32" = 1'-0"
ONE BEDROOM UNIT WITH BALCONY 3/32" = 1'-0"
ONE BEDROOM UNIT 3/32" = 1'-0"
open to below
ONE BEDROOM UNIT WITH BALCONY 3/32" = 1'-0"
BATHROOM
open to below
CLOSET
CLOSET
down down
up
LIVING ROOM
down
BATHROOM
up
up
down
CORE
CORE elev.
elev.
elev.
down
elev.
elev. up
up
elev. LIVING ROOM
down up
down
LIVING ROOM
CORE
CORE elev.
CLOSET
CLOSET
down
elev.
LIVING ROOM
elev.
ONE BEDROOM UNIT WITH BALCONY 3/32" = 1'-0"
ONE BEDROOM UNIT 3/32" = 1'-0"
elev.
elev.
elev.
ONE BEDROOM UNIT 3/32" = 1'-0"
ONE BEDROOM UNIT WITH BALCONY 3/32" = 1'-0"
CLOSET
CLOSET
BATHROOM
BATHROOM
CLOSET
CLOSET
CLOSET CLOSET
BATHROOM
BATHROOM BEDROOM 2
KITCHEN BEDROOM 1
LIVING ROOM
CLOSET
CLOSET BEDROOM 2
BALCONYKITCHEN
BEDROOM 1
LIVING ROOM
CLOSET
CLOSET
BALCONY
BATHROOM
BATHROOM
CLOSET
CLOSET CLOSET BEDROOM 2
KITCHEN BEDROOM 1
LIVING ROOM
EGRESS
EGRESS
CLOSET
BATHROOM
BATHROOM
EGRESS CLOSET
CLOSET
BALCONY
BEDROOM 2
KITCHEN
LIVING ROOM
4TH FLOOR PLAN 1/16" = 1'-0"
EGRESS
5TH FLOOR PLAN 1/16" = 1'-0"
EGRESS
6TH FLOOR PLAN 1/16" = 1'-0"
EGRESS
BEDROOM 1
MARKET RATE UNITS 1/8" = 1'-0"
BALCONY
4TH FLOOR PLAN 1/16" = 1'-0"
5TH FLOOR PLAN 1/16" = 1'-0"
6TH FLOOR PLAN 1/16" = 1'-0"
MARKET RATE UNITS 1/8" = 1'-0"
29
-BEAMS -ETFE CURTAIN WALL MULLIONS -STRUCTURAL TRUSSES -ETFE PILLOWS
detail = 1'-0"
SARATOGA AV.
louis place
dewey place
BEDFORD-STUYVESANT SITE PLAN
1/32" = 1'-0"
N BEDFORD-STUYVESANT SITE PLAN
1/128" = 1'-0"
S 1
BEDFORD-STUYVESANT SITE PLAN
1/32" = 1'-0"
roof
sixth floor
fifth floor
forth floor
section 1
1/16" = 1'-0"
third floor
second floor
N
ground floor
ELEVATION 1
1/16" = 1'=0"
BEDFORD-STUYVESANT SITE PLAN
1/128" = 1'-0"
section 2
1/16" = 1'-0"
S 1
roof
S 2
sixth floor
roof
fifth floor sixth floor
forth floor
fifth floor
forth floor
third floor third floor
second floor second floor
ground floor
ground floor
ELEVATION 2
30
1/16" = 1'=0"
ELEVATION 1
1/16" = 1'=0"
ROOF
herkimer street
hull
t stree
FULTON STREET
GLASS
roosevelt place
COLUMNS AND MAIN TRUSSES
CURTAIN WALL MULLIONS ROOF BEAMS
ETFE PILLOWS
6TH FLOOR BEAMS
SARATOGA AV.
SARATOGA AV.
5TH FLOOR BEAMS
V. GA A
TO SARA
MAIN STRUCTURE AXO.
S 1
4TH FLOOR BEAMS
S 2
3RD FLOOR BEAMS
brick tie backs double glazing
standard brick custom brick veneer
ground floor
second floor
third floor
forth floor
fifth floor
roof
hull
sixth floor
BEAM AND COLUMN LAYOUT PLAN
stree
t
louis place
2ND FLOOR BEAMS
window sill
finish floor
Window mullion
5" concrete flooring
AS THE FACADE MOVES UP THE SPACING BETWEEN THE BRICKS GET LARGER FROM FLOOR TO FLOOR
batting insulation
FULTON STREET
5" beam steel angle hss tube
air tube
12" beam etfe pillow
4th and 5th floors the brick starts to expose the back
reflective film
truss 5' deep
the 6th floor the bricks are at their furthest point
wall detail 1-1/2" = 1'-0"
ground floor
second floor
third floor
forth floor
fifth floor
1/16" = 1'=0" MAIN STRUCTURE AXO. -COLUMNS -BEAMS -ETFE CURTAIN WALL MULLIONS -STRUCTURAL TRUSSES -ETFE PILLOWS
ELEVATION 2
1/16" = 1'=0" ELEVATION 1
N
2nd and 3rd floor bricks start to separate
sixth floor
1/128" = 1'-0" BEDFORD-STUYVESANT SITE PLAN
roof
1/32" = 1'-0"
16" column
BEDFORD-STUYVESANT SITE PLAN
herkimer street
dewey place
N
steel angle
air tube etfe mullion
31
32
33
34
35
PERSONAL WORK SHOP DRAWINGS 1" 12
11" 316
1" 94
7"
SHOP DRAWINGS
S 1
11" 316 7"
1'
1" 12
ALIGN
FP
EQ
ALIGN
ALIGN
REVEAL
GAS MITER IN CABINET
STORAGE CABINET BEHIND THE DOOR
1" 12
HOOD EXHAUST XOI3315S
1" 12
1" 12
1" 12
1" 1'-64
1" 12
EQ
1 4"REVEAL
S 2
VERTICAL DIVIDERS CENTER 6 INCH CLEAR
3"
OUTLETS
EQ
1" 14
EQ 97"
4"
32"
97"
EQ
FAKE BUTT JOINT
1" 12
42" 12
FAKE BUTT JOINT
1" 12 6"
ALIGN
RF 36 INCH MIELE KFNF 9955iDE
GRANITE
EQ
18-3/4"
26-1/4"
1" 1" 12 UNDER CABINET LIGHT
OUTLET INSIDE CABINET
30"
97"
TILE BACK SPLASH
32-1/2"
VERTICAL LIFT SYSTEM FROM RICHELIEU HARDWARE
3 32"
3"
BUFFET ELEVATION 3
E3
17" +/-
8"
1" = 1'-0"
1" 12
27-1/2"
1" 12
40" +/-
11" 316
BUFFET ELEVATION 1
1" = 1'-0"
11" 316
1" 12
18-1/2"
7" 3 32"
2"
7" 8
1" 112
EQ
EQ
3 32"
3" RECESSED BASE
1" 12
76"
RECESSED LED LIGHT
TILE
6"
3 32"
30-1/2"
1" 12
E1
STONE TOP
1" 14
OUTLET
3
3" RECESSED BASE
4"
3"
ALIGN
GLASS SHELF SUPPORT FROM HAFELE 282.13.712 BRASS FINISH
GLASS DOOR WITH DIVIDERS
13"
23-1/2"
ROLL OUT CABINET
WOLF GR366 GAS RANGE
EQ ALBA WOODWORKING.INC 1710B FLUSHING AVENUE RIDGEWOOD, NEW YORK 11385
PULL OUT SHELF
EQ 1" 14
4" 1" 12
17-1/4"
36"
1" 12
17-1/4"
1" 12
17-1/4" 1" 12
36"
1" 12
1" 12
6"
3 32"
3 32"
97"
5" 7'-916
GRANITE
WWW.ALBAWOODWORKINGINC.COM
2-1/2"
3" 4
1 2"
1" 22
1"
BRASS
KITCHEN ELEVATION 1
E1
3 32"
4"
1-1/2" = 1'-0"
3"
3" 4
1 4"
1" 12
42"
1" 12
1" 12
3"
4"
4"
BUFFET UNIT SECTIONS AND ELEVATIONS
SEPTEMBER 14TH, 2019
3" RECESSED BASE
4"
1" 12
3"
3" 4
REVEAL
1 2" 3 32"
4"
HARTWELL RESIDENCE 340 RIVERSIDE DRIVE #11A NEW YORK, NY 10025
ADJ. SHELVES
3 32"
BRASS FINISH PINS
1" 14
1" 12
1" 12
ADJ. SHELVES
PULL OUT PANTRY FROM RICHELIEU HARDWARE
3 32"
3 32"
1" 12
19-3/4"
1" 12
1" 12
2"
3"
1 2"
1" 12
76"
27-1/2"
1" = 1'-0" ARLIND PULASHI
S2
BUFFET SECTION 2
S1
1" = 1'-0"
BUFFET SECTION 1
D1
1" = 1'-0"
DETAIL OF GLASS DOOR
E2
2" = 1'-0"
CANDIDATE AT THE BERNARD AND ANNE SPITZER SCHOOL OF ARCHITECTURE AT THE CITY COLLEGE OF NEW YORK ARLIND PULASHI
BUFFET ELEVATION 2
1" = 1'-0"
SHOP DRAWINGS
S 2
SHOP DRAWINGS
S 1
12"
16"
1 8"
12"
16"
1" 112
1 8"
3"
3"
3" 3" 4
3" 4
3" FRAME 4
ADJ. SHELF
WINDOW
20-1/4"
61-1/4"
48"
1 2"
60-3/8"
CORIAN TOP
1 2"
1" 72
1"
1" 1 2"
1"
1" 1'-14
1"
1" 12
1" 72 96-1/2"
1 2"
1 2"
1 2"
1 2"
1 2"
9" RADIATOR
16"
1" 12
42-3/4"
3" 4
16"
48"
3" 96-1/2"
3"
1"
16"
3"
1" 22
96-1/2"
3"
1 2"
42-1/8"
3 32"
25-3/4"
3 32"
1" 22
25-34" 1" CORRIGAN TOP
METAL GRILL
ALIGN
S 4
1"
1"
13 4"
26-3/4"
8"
1 8" 4"
1" 12
60"
3" 4
57-1/4"
1" 12
3" 4
8"
3" 4 3" 4
3" 4
1" 34
57-1/4"
57-1/4"
1 4"
7" BASE
2"
4"
3" 4
57-1/4"
26-3/4"
AC
8"
16"
1" 52
13
12"
3" E2
MASTER BEDROOM 105 SECTIONAL ELEVATION 2
E3
3/4" = 1'-0"
MASTER BEDROOM 105 SECTIONAL ELEVATION 3
E1
3/4" = 1'-0"
MASTER BEDROOM 105 NOTCH CABINET ELEVATION
1" 72
3/4" = 1'-0"
1'-1"
103 8"
25 8"
CORIAN TOP
METAL GRILL
38" S 3
13"
25-3/4"
25"
12"
13"
12"
48"
1" 112
WINDOW
1 2" 3-1/2"
63"
AC
12"
13"
14"
12"
16"
3"
D1
DETAIL 1
1" = 1'-0"
3"
12"
1" 52
6"
3"
3"
96-3/4"
5 16"
96-3/4"
1 4"
1 2"
1 2"
1 2"
1" 8'-02
1 2"
96-1/4"
3" 4
1" 12
1" CORRIGAN TOP
5 16"
1" 12
1 2"
26-3/4" 8"
3" 4
25"
3" 4
43"
48"
43"
3" 4
24-1/4"
1" 22
8"
8"
36
MASTER BEDROOM 105 SECTIONAL ELEVATION 4
3/4" = 1'-0"
S1
135" 3" 4
26"
ALBA WOODWORKING.INC 1710B FLUSHING AVENUE RIDGEWOOD, NEW YORK 11385 WWW.ALBAWOODWORKINGINC.COM
HARTWELL RESIDENCE 340 RIVERSIDE DRIVE #11A NEW YORK, NY 10025
3" 4
MASTER BEDROOM #105 SECTIONS & ELEVATIONS
3 32"
MASTER BEDROOM 105 NOTCH CABINET SECTION
3/4" = 1'-0"
S2
3" 4
MASTER BEDROOM 105 SECTION 2
MASTER BEDROOM 105 PLAN
8"
3" 4
AUGUST 26, 2019
3" 4
3/4" = 1'-0" E4
LINE OF B.B.
TOUCH LATCH HARDWARE
3" 4
13" 3" 4
3" 4
1" 1'-54
1 2"
HARTWELL RESIDENCE 340 RIVERSIDE DRIVE #11A NEW YORK, NY 10025
1"
STORAGE CAB
3" 4
8" 4"
13"
1 2"
3" 4
WWW.ALBAWOODWORKINGINC.COM
3" 4
1"
3" 4
96-1/4"
1" 1"
13"
ALBA WOODWORKING.INC 1710B FLUSHING AVENUE RIDGEWOOD, NEW YORK 11385
1" 34
1'-4"
3/4" = 1'-0"
S3
MASTER BEDROOM 105 SECTION 3
3/4" = 1'-0"
P
MASTER BEDROOM #105 PLAN
1" = 1'-0"
SEPTEMBER 21ST, 2019 1" = 1'-0"
ARLIND PULASHI
ARLIND PULASHI
CANDIDATE AT THE BERNARD AND ANNE SPITZER SCHOOL OF ARCHITECTURE AT THE CITY COLLEGE OF NEW YORK ARLIND PULASHI
CANDIDATE AT THE BERNARD AND ANNE SPITZER SCHOOL OF ARCHITECTURE AT THE CITY COLLEGE OF NEW YORK ARLIND PULASHI
SHOP DRAWINGS 1" 72
S 1
S 2
1" 72
16"
16"
1 2"
43 4"
5 16"
3" 12"
12"
1" 12
25-3/4"
27"
3 4"
1" 32
7"
3" 1 2"
ADJ. SHELVES
113 4"
1"
1"
3 4"
1" 1 2" ADJ. SHELVES
1"
1"
1" 1" 12
ADJ. SHELVES
93-3/4"
ADJ. SHELVES
FRAME DETAIL
93-1/4" 1"
1 2"
1" 1" COUNTER TOP 12
ADJ. SHELVES
3" 5'-0" OR 5'-6"
59-3/8"
43-1/2"
TO CONFIRM
1 8"
30"
1"
1" 22
2-1/2"
1" 22
15-1/4"
3 8"
23"
1"
3" 4
STONE PULL OUTS
7"
13"
8"
OPEN BASE
8"
OPEN BASE
4"
3" 4
BB-1
4"
44-1/2"
33-1/2"
1" 12
41-1/2"
1" 12
3" 4
1" 12
3" 4
1" 2'-84
3"
1" 2'-84
1" 12
3"
3" 4
OUTLETS PULL OUTS
DOOR DETAIL
25"
97"
STONE
E2
LIVING ROOM ELEVATION 2
E3
3/4" = 1'-0"
LIVING ROOM ELEVATION 3
3/4" = 1'-0"
7"
1" 14
SPEED WALL OVEN
18"
9"
52-3/4"
3" 4 16"
1" 12 42"
E 1
40"
7" 916
73"
4"
9"
1" 12
1" 12
53-5/8"
1" 12
1" 12
3" 1"
16-3/4"
1"
4"
5" 916
73" 3"
1" 32
1" 12
1"
2" RECESSED BASE
1" 12
7"
ALBA WOODWORKING.INC 1710B FLUSHING AVENUE RIDGEWOOD, NEW YORK 11385
93-3/4"
1" 12
52-3/4"
7"
WWW.ALBAWOODWORKINGINC.COM EQA
EQA
EQB
EQB
EQB
EQC
EQC
HARTWELL RESIDENCE 340 RIVERSIDE DRIVE #11A NEW YORK, NY 10025
OVEN UNIT AT KITCHEN ELEVATION
E1
EQA
1-1/2" = 1'-0"
8"
OUTLET
1" 12
1" 32
OUTLET
1" 12
1" 12
4"
BB-1
1" 12
78-1/2"
1" 12
4"
78"
LIVING ROOM ELEVATIONS
1" 32
52-5/8"
SEPTEMBER 13TH, 2019
P
OVEN UNIT AT KITCHEN PLAN
E1
1-1/2" = 1'-0"
LIVING ROOM ELEVATION 1
3/4" = 1'-0" 3/4" = 1'-0"
ARLIND PULASHI CANDIDATE AT THE BERNARD AND ANNE SPITZER SCHOOL OF ARCHITECTURE AT THE CITY COLLEGE OF NEW YORK ARLIND PULASHI
SHOP DRAWINGS
SHOP DRAWINGS S 2
59-1/4"
1" 12 1" 12
3 32"
3 32"
1" 12
17-1/16"
3 32"
17-3/16"
3 32"
3 32"
3 32"
17-3/16"
26"+/-
14"
SCRIBE TO THE WALL
3 32"
17-1/16"
3 32"
16-5/16"
1" 12
1 4"
17-3/4"
SCRIBE TO THE WALL
1" 12
5"
1" 12
1" 12
S 1
16-1/2"
20"
17-3/4"
14" 32"
32-1/2"
32-1/2"
12-1/2"
32"
1" 12
SCRIBE TO THE WALL
E 1
MITER CORNER
10"
31" 1" 12
3-1/2"
113-1/4"
18"
FINISHED WALL
118-1/4"
18-1/2"
SIM
13 4"
1" 12
S 3
2"
1" 14
REVEAL
1 4"
14"
1" 42
FIX PANEL
1" 14
30-1/2" 29-1/2"
5"
RF 36 INCH MIELE KFNF 9955iDE
CENTER LINE
1'-8"
ALIGN
SIM
1" 12
CENTER LINE
1" 12
30-1/2"
1" 22 55"
30"
14-1/2"
6"
EQ
EQ
29-1/2"
EQ
1" 14 13 4"
39"
P
PLAN OF W.I.C 1
1-1/2" = 1'-0"
1" 12
2"
ALIGN
1 4"
1" 22
106-1/4"
8-1/2"
12"
1"
14" 13 4"
2"
1" 14
30-3/4" 22-3/4"
AC
2"
87-3/4"
EQ
EQ
EQ
1 2"
12"
METAL SUPPORT
71-3/8"
43-3/8"
39"
4"
106-1/4" BB
3 32"
1" 12
E4
KITCHEN ELEVATION 4
17-13/16"
3 32"
FLUSH WITH REVEAL
3 32"
37-7/16"
3 32"
19-3/8"
3 32"
37-7/16
ALBA WOODWORKING.INC 1710B FLUSHING AVENUE RIDGEWOOD, NEW YORK 11385
3 32"
17-13/16"
20" +/1" 12
2"
WWW.ALBAWOODWORKINGINC.COM
HARTWELL RESIDENCE 340 RIVERSIDE DRIVE #11A NEW YORK, NY 10025
E1
ELEVATION 1 OF W.I.C ALL MEASUREMENTS HAVE BEEN VERIFIED BY US
KITCHEN ELEVATION 4
FINISHED WALL
WALK IN CLOSET PLAN AND ELEVATIONS
ALIGN
1 4"REVEAL
1" 12
SEPTEMBER 14TH, 2019
FLUSH BB
OCTOBER 9TH, 2019
4" 5"
32-1/2"
30-1/2"
ARLIND PULASHI CANDIDATE AT THE BERNARD AND ANNE SPITZER SCHOOL OF ARCHITECTURE AT THE CITY COLLEGE OF NEW YORK ARLIND PULASHI
HARTWELL RESIDENCE 340 RIVERSIDE DRIVE #11A NEW YORK, NY 10025
1" 12
1" = 1'-0"
WWW.ALBAWOODWORKINGINC.COM
12"
METAL SUPPORT
118-1/4"
1-1/2" = 1'-0"
1-1/2" = 1'-0"
ALBA WOODWORKING.INC 1710B FLUSHING AVENUE RIDGEWOOD, NEW YORK 11385
14" ADJ SHELF
5"
1" = 1'-0" ARLIND PULASHI
S3
SECTION 3 OF W.I.C
CANDIDATE AT THE BERNARD AND ANNE SPITZER SCHOOL OF ARCHITECTURE AT THE CITY COLLEGE OF NEW YORK ARLIND PULASHI
1" = 1'-0"
37
RENDERS LUMION AND VRAY
38
39
40
41
CONTACT INFORMATION EMAIL: APULASHI@GMAIL.COM
PHONE: (646) 573 -3639
WEBSITES: WWW.ALBAWOODWORKINGINC.COM WWW.ISSUU.COM/ARLINDPULASHI
THANK YOU!
KATSURA EAST WEST ELEVATION
OLD SHOIN EAST WEST SECTION
ALL RIGHTS RESERVED