Armand F Damari Architecture Portfolio 2019
2
Concept rendering for the Skytop Renovation at Syracuse University
Professional Work 04
Patient Tower Addition
12
N o r e e n Real e Fal con e L ib rary
18
M o f f e t Ce n t er
20
T r a n s f ormat ion G ran t Proj ect
21
P r o f e s sion al Ren d erin g s
Highland Hospital | Rochester, NY
Le Moyne College | Syracuse, NY
Cortland University | Cortland, NY
Schuyler Hospital | Montour Falls, NY
Higher Education & Healthcare
3
PATIENT TOWER ADDITION Highland Hospital - Rochester, NY Addition and renovation | Schematic design completed March 2019 HOLT Architects Role: Designer - Lead interior design vision and unit core layout | Assisted in exterior design vision | Assisted in code documentation
4
University of Rochester and Highland Hospital chose HOLT to help move from primarily semiprivate patient rooms for surgical recovery to private rooms. A vertical expansion was proposed to house the increase of rooms. We used evidence-based design to create a unit that will work well for both the staff and the patients by optimizing program location throughout the unit, pushing our patient room layout, and creating interactive elements and nodes for patients and their visitors that are reminiscient of the Highland neighborhood. I assisted in the project from concept design to construction documentation, working mostly on the interior layout and design.
Concept Rendering by Abbey Woods: Revit & Photoshop
5
RADIOLOGY
THERAPY SUITE
CONSULT/ MEDITATION
WER ADDITION
AND HOSPITAL
enue, Rochester, New York 14620
01/31/19
FLOW DIAGRAM - PATIENT
Patient Flow
LEGEND
As indicated
SITOR TIENT URSING INICAL SUPPORT AFF UILIDING SUPPORT
PATIENT/ STAFF ELEVATOR
PATIENT TRANSPORT
PATIENT ROOM
PT/OT THERAPY SUITE
RADIOLOGY
CONSULT/ MEDITATION
SUN ROOM
As indicated 2015080
AP100B
DN
VISITOR PATIENT NURSING CLINICAL SUPPORT STAFF BUILIDING SUPPORT
THERAPIST & PATIENT
01/31/19
FLOW DIAGRAM - FAMILY
1000 South Avenue, Rochester, New York 14620
PROGRAM LEGEND
CORRIDOR DESTINATIONS
DN
HIGHLAND HOSPITAL
WHEELCHAIR OR STRETCHER IF USED PACU/ PHASE II RECOVERY
AP100A
2015080 PATIENT TOWER ADDITION
STRETCHER ALCOVE
SUN ROOM
FAMILY / VISITORS
VISITOR ELEVATOR
PACU/ PHASE II RECOVERY
CORRIDOR DESTINATIONS
PATIENT ROOM
UNIT SECRETARY
CONSULT/ MEDITATION
CAFETERIA
SUN ROOM
OPTION 1
VISITOR LOUNGE
NOURISHMENT?
OPTION 2
DN
WER ADDITION
AND HOSPITAL
venue, Rochester, New York 14620
M LEGEND
DN
Visitor Flow
SITOR ATIENT URSING LINICAL SUPPORT TAFF UILIDING SUPPORT
01/31/19
FLOW DIAGRAM - FAMILY
AP100B
As indicated PATIENT TOWER ADDITION 2015080
DN
HIGHLAND HOSPITAL PROGRAM LEGEND
FAMILY / VISITORS
VISITOR ELEVATOR
PACU/ PHASE II RECOVERY
CONSULT/ MEDITATION
CAFETERIA
DN VISITOR PATIENT NURSING CLINICAL SUPPORT STAFF BUILIDING SUPPORT
PATIENT ROOM
UNIT SECRETARY
SUN ROOM
VISITOR LOUNGE
PATIENT/ STAFF ELEVATOR
HOSPITAL ENTRANCE
STAFF LOCKERS/ LOUNGE
TIME CLOCK?
NURSE MANAGERS
NURSES
OFFICES
NURSE STATIONS
CLEAN WORKROOM
EQUIPMENT STORAGE
STAFF SHOWERS/ CHANGING
NOURISHMENT?
NURSE SERVER OPTION 1
DN
AND HOSPITAL
enue, Rochester, New York 14620
M LEGEND
DN
01/31/19
FLOW DIAGRAM - NURSES & AIDS Nurse & Aid Flow PATIENT/ STAFF ELEVATOR
HOSPITAL ENTRANCE
SITOR ATIENT URSING LINICAL SUPPORT TAFF UILIDING SUPPORT
TIME CLOCK?
NURSE MANAGERS
NURSES
OFFICES
NURSE STATIONS
CLEAN WORKROOM
NURSE SERVER
As indicated
AP100C
HIGHLAND HOSPITAL
NOURISHMENT
MULTIPURPOSE ROOM
NOURISHMENT
DN VISITOR PATIENT STAFF WORK NURSING AREA CLINICAL SUPPORT STAFF BUILIDING SUPPORT
CENTRAL CLEAN WORKROOM
SOILED NURSE SERVER
01/31/19
DN
FLOW DIAGRAM - CLEAN & SOILED
As indicated
NURSE STATION
CENTRAL CLEAN WORKROOM
SOILED HOLDING
NURSE STATION
CLEAN WORKROOM
PATIENT ROOM
NURSE
OPTION 1
OPTION 2
A
PHARMACY
MEDS
PNUEMATIC TUBE
B
SOILED SUPPLIES
NURSE UNIT SECRETARY
NOURISHMENT?
PATIENT ROOM
PHARMACY
PHARMACY STAFF
PATIENT / STAFF ELEVATOR
NURSE
CLEAN WORKROOM
NOURISHMENT?
PATIENT ROOM
OPTION 2
01/31/19 As indicated 2015080
AP100D
DN
M LEGEND
PHARMACY
MEDS
PNUEMATIC TUBE
NURSE UNIT SECRETARY
CLEAN WORKROOM
NOURISHMENT?
PATIENT ROOM
CLEAN WORKROOM
NOURISHMENT?
PATIENT ROOM
DN
WHO BRINGS MEDS FROM TUBE TO THERES PROPER STORAGE SPACE?
B
PHARMACY
PHARMACY STAFF
PATIENT / STAFF ELEVATOR
NURSE
OPTION 1
OPTION 2
OPTION 1
DN
Program blocks organized by User groups DN
OPTION 1
6
OPTION 2
Diagrams: Foam Core & Revit
2015080
CLEAN WORKROOM
OPTION 2
Medication FlowFLOW DIAGRAM - MEDICATION A
As indicated
WHO BRINGS MEDS FROM TUBE TO THERES PROPER STORAGE SPACE?
DN
SITOR ATIENT URSING LINICAL SUPPORT TAFF UILIDING SUPPORT
01/31/19
FLOW DIAGRAM - MEDICATION
OPTION 1
enue, Rochester, New York 14620 DN
NURSE SERVER
SOILED SUPPLIES
DN
DN VISITOR PATIENT NURSING CLINICAL SUPPORT STAFF BUILIDING SUPPORT
NURSE SERVER
SOILED NURSE SERVER
PATIENT ROOM
PROGRAM LEGEND
PATIENT/ STAFF ELEVATOR
CLEAN SUPPLIES NURSE STATION
AP100E
AP100E
HIGHLAND HOSPITAL
1000 South Avenue, Rochester, New York 14620
SITOR DN ATIENT URSING LINICAL SUPPORT TAFF UILIDING SUPPORT
CLEAN WORKROOM
NURSE
2015080 PATIENT TOWER ADDITION
LEGEND
2015080
SOILED HOLDING
PATIENT/ STAFF ELEVATOR
CLEAN SUPPLIES
NURSE STATION
SOILED
Clean & Soiled Supply Flow
01/31/19 As indicated
PROGRAM LEGEND
PATIENT OPTION 2 ROOM
WER ADDITION
AND HOSPITAL
STAFF WORK AREA
SOILED
FLOW DIAGRAM - CLEAN & SOILED
OPTION 1
WER ADDITION
AP100C
SHIFT CHANGES?
MULTIPURPOSE ROOM
DN
PATIENT TOWER ADDITION 2015080
SHIFT CHANGES?
EQUIPMENT STORAGE
OPTION 1
enue, Rochester, New York 14620
2015080
OPTION 2 PATIENT ROOM
1000 South Avenue, Rochester, New York 14620
STAFF LOCKERS/ LOUNGE STAFF SHOWERS/ CHANGING
AND HOSPITAL
As indicated
OPTION 2
OPTION 1
WER ADDITION
01/31/19
FLOW DIAGRAM - NURSES & AIDS
1000 South Avenue, Rochester, New York 14620
OPTION 2
AP100D
PATIENT TOWER ADDITION
HIGHLAND HOSPITAL
12/14/18
TRAVEL DISTANCE DIAGRAM - OPTION 1
1000 South Avenue, Rochester, New York 14620
1/16" = 1'-0" 2015080
AP105A
SOILED / TRASH EQUIPMENT STORAGE TRAVEL TO ELEVATOR
FREQUENCY ASSUMPTIONS: • 10 HOUR NURSING SHIFTS • 5 PATIENT ROOMS PER NURSE/AID • 5 SUPPORT ROOM VISITS PER HOUR • SUPPORT ROOMS STOCKED 2 TIMES PER SHIFT
OPTION 1
NOURISHMENT
143 FT. FREQ. - 286 FT.
DISTANCE TO NURSE STATIONS:
MIN. - 63 FT. MAX. - 112 FT. AVG. - 87 FT. FREQ. - 4,350 FT.
MIN. - 56 FT. MAX. - 124 FT. AVG. - 90 FT. FREQ. - 4,500 FT.
DISTANCE TO PATIENT ROOMS:
MIN. - 40 FT. MAX. - 163 FT. AVG. - 108 FT. FREQ. - 5,400 FT.
MIN. - 33 FT. MAX. - 157 FT. AVG. - 92 FT. FREQ. - 4,600 FT. (800 FT. LESS PER SHIFT)
OPTION 1
VISITOR TOILET
ELEVATOR #1
STAIR #1
DISTANCE TO NURSE STATIONS:
MIN. - 56 FT. MAX. - 124 FT. AVG. - 90 FT. FREQ. - 4,500 FT.
MIN. - 55 FT. MAX. - 118 FT. AVG. - 87 FT. FREQ. - 4,350 FT.
DISTANCE TO PATIENT ROOMS:
MIN. - 33 FT. MAX. - 157 FT. AVG. - 92 FT. FREQ. - 4,600 FT.
MIN. - 26 FT. MAX. - 145 FT. AVG. - 87 FT. FREQ. - 4,350 FT. (150 FT. LESS PER SHIFT)
PATIENT ACCESS
ELEVATOR #2
NURSE STATION
149 FT. FREQ. - 298 FT.
OPTION 1
DN
VISITOR LOUNGE
PUBLIC ACCESS
DN
OPTION 2
DISTANCE TO ELEVATOR: 93 FT. 143 FT. FREQ. - 286 186 FT.
EQUIPMENT STORAGE
ACCOMMODATES APPROX 8 STAFF AT A TABLE, KITCHENETTE AND SMALL LOUNGE AREA
CONSULT / MEDITATION
DISTANCE TO ELEVATOR: 38 FT. FREQ. - 76 FT.
SOILED / TRASH
ACCOMMODATES APPROX 10 VISITORS, VISITOR COMMUNICATIONS ALCOVE, SMALL CHILDRENS AREA
OPTION 2
ELEVATOR #3
UNIT SECRETARY
HVAC SHAFT
CLEAN WORKROOM
NOURISHMENT
STAFF WORK AREA
OFFICE SHARED
OFFICE NURSE MNGR. EQUIPMENT STORAGE
CLEAN WORKROOM
HVAC SHAFT MULTIPURPOSE ROOM
SOILED / TRASH
NURSE STATION
NURSE STATION
EVS
TOILET
TOILET
NURSE STATION
ELEC
IT
2' - 4" 4"
NOURISHMENT
3'
TRAVEL DISTANCE LEGEND
OPTION 2
DISTANCE TO ELEVATOR: 57 FT. FREQ. - 114 FT.
136 FT. FREQ. - 272 FT.
DISTANCE TO NURSE STATIONS:
MIN. - 54 FT. MAX. - 127 FT. AVG. - 90 FT. FREQ. - 4,500 FT.
MIN. - 44 FT. MAX. - 136 FT. AVG. - 90 FT. FREQ. - 4,500 FT.
DISTANCE TO PATIENT ROOMS:
MIN. - 33 FT. MAX. - 162 FT. AVG. - 108 FT. FREQ. - 5,400 FT.
MIN. - 29 FT. MAX. - 165 FT. AVG. - 92 FT. FREQ. - 4,600 FT. (800 FT. LESS PER SHIFT)
N
EBD FACTORS AND INTERIOR CONCEPT
0'
4'
8' 16'
32'
Provide a wayfinding strategy that clearly communicates with patients, families and staff Design supporting interaction between patients and staff
The Center for Healthcare Design, Best Practices
Noise reduction measures
Introduce color, texture and graphics to guide patients and families to where they need to be, and provide landmarks at main circulation points like stairs and elevators
“Ninety-five percent of those surveyed identified wayfinding as being “extremely important” to the patient and visitor experience. When well executed, wayfinding has been shown to reduce patient and visitor stress, reinforce institutional branding, and improve operational efficiency.” -Can better wayfinding improve the patient, visitor, and staff experience in healthcare settings? Gensler Research Institute, An Easier Hospital
Use non-institutional looking products throughout the unit and use smaller spaces as destination points by highlighting them with different and interesting materials.
“Overall, patients in appealing rooms did, relative to patients in typical rooms, rate the hospital more favorably, had stronger intentions to use the hospital again, and would recommend the hospital to others.” -Do appealing hospital rooms increase patient evaluations of physicians, nurses, and hospital services? Health Care Management Review
Non-institutional looking finish materials, fixtures, and furniture
Project Vision Statement – Provide an environment of care dedicated to quality and safety through a focus on standardization, facilitates good infection control practices and is sustainable.
“…staff felt fewer demands and less irritation during the “good” acoustics period. The incidence of re-hospitalization was higher for the bad acoustics group and was statistically significant at the three-month period. Patients treated during the good acoustics period considered the staff attitude to be much better than during the bad acoustics period.” -Influence of intensive coronary care acoustics on the quality of care and physiological state of patients. International Journal of Cardiology Provide sound absorbing materials, focused on areas where people gather, like Nurse Stations. Geometric ceiling tiles, wall tiles and art can be used in these locations to dampen noise and provide color, dimension and texture.
Include corridor markers and benchmarks “To best support care, environments must also draw patients out of their rooms, preventing isolation and promoting involvement with the greater patient community—a critical component of the rehab healing process.” - The Home Stretch: Designing Rehab Centers, Healthcare Design Magazine Markers and graphics to establish benchmarks and goals for orthopedic and bariatric patients activity.
Healthcare Quality Improve overall healthcare quality
Patient Safety Improve patient safety and quality of care
Patient Stress Reduce stress, improve quality of life and healing for patients and families
Staff Stress Reduce stress staff/fatigue, increase effectiveness in delivering care
Mock-Up: Stud walls by contractor; Cardboard casework & equipment mounting by HOLT
7
Exterior Concepts | Balance of site considerations, including sun path, adjacent hospital buildings and private residents, and outward views
Interior Concepts | Images represent individual unit theme, one per floor, to assist wayfinding Highland Arboretum Concept
Natural Rochester Concept
Rochester Neighborhood Concept
8
Concepts developed in collaboration with Abbey Woods
Wooden Feature Elements
Color Accents & Graphics
Flooring Design
Ceiling Accents
9
6
7
8
9
10
11
NOTE: NOT ALL MAY APP LOCATION OF EXITS
FIRE EXTINGUISHER
STAIR N 1199-E NO 48 INCHES 80 120 MIN 1199-E 44 INCHES 88 90 MIN
FB-1HR
VISITOR TOILET
PATIENT ROOM (TYPE 1)
PATIENT ROOM (TYPE 1)
STAFF LOCKERS / LOUNGE
VISITOR LOUNGE
STAFF SHOWER
FP-1HR
SE-2HR
FP-1HR
SE-2HR
VESTIBULE
SE-2HR UP
CONSULT / MEDITATION
SP-0HR
FB-1HR
SB-1HR
FP-1HR
FB-2HR
SP-0HR
NURSE STATION
PATIENT ROOM (TYPE 2)
CLEAN WORKROOM
SP-0HR
D
SB-1HR
UNIT SECRETARY
FB-1HR
PATIENT ROOM (TYPE 2)
SB-1HR
DEAD END CORRIDOR (DE) PATIENT ROOM (TYPE 2)
E
T EE 4F 18 = 2
SE-2HR HVAC SHAFT
FB-1HR
TOILET
CER
FB-1HR
TOILET
SP-0HR
MULTIPURPOSE ROOM
1 HOUR FIRE BARRIER
SP-0HR
1 HOUR SHAFT/STAIR ENCLOSUR
SP-0HR SB-1HR
1 HOUR SHAFT/STAIR ENCLOSUR DE = 15 FEET
EATD = 140 FEET
SP-0HR
1 HOUR FIRE PARTITION - EXISTIN
SUN ROOM
1 HOUR FIRE PARTITION
PATIENT ROOM (TYPE 1)
PATIENT ROOM (TYPE 1)
PATIENT ROOM (TYPE 1)
PATIENT ROOM (TYPE 1)
4
CPET = 39 FEET
SP-0HR
PATIENT ROOM (TYPE 1) (ISOLATION)
3
1 HOUR FIRE BARRIER - EXISTING
PATIENT ROOM (TYPE 2)
NURSE STATION
SP-0HR
2
2 HOUR SHAFT/STAIR ENCLOSUR
2 HOUR SHAFT/STAIR ENCLOSUR
FB-1HR
SOILED / TRASH
SP-0HR
2 HOUR FIRE BARRIER PATIENT ROOM (TYPE 2)
CLEAN WORKROOM
ELEC
EVS
SP-0HR
NURSE STATION
OFFICE NURSE MNGR.
FB-1HR
HVAC SHAFT
2 HOUR FIRE WALL
2 HOUR FIRE BARRIER - EXISTING SP-0HR
SE-2HR
STAFF WORK AREA
2 HOUR FIRE WALL - EXISTING
PATIENT ROOM (TYPE 2)
SP-0HR
NOURISHMENT
OFFICE SHARED
NURSE STATION
DE = 21 FEET
CONTRACT LIMIT LINE 3 HOUR FIRE WALL - EXISTING 3 HOUR FIRE WALL
EQUIPMENT STORAGE
STAFF WORK ROOM
SB-1HR
5
6
1 HOUR SMOKE BARRIER - EXISTI
POS PATIENT ROOM (TYPE 3)
1 HOUR SMOKE BARRIER
POS PATIENT ROOM (TYPE 3)
POS PATIENT ROOM (TYPE 3)
1/2 HOUR FIRE PARTITION - EXIST
POS PATIENT ROOM (TYPE 3)
POS PATIENT ROOM (TYPE 3)
1/2 HOUR FIRE PARTITION
0 HOUR SMOKE PARTITION - EXIS
7
8
9
0 HOUR SMOKE PARTITION 11
10
12
GENERAL NOTES
HORIZONTAL ASSEMBLY (HA) 1 DIMENSIONS NOTES "EQ" ARE EQUAL TO EACH OTHER ONLY (SHOWN PLAN) THE SAMEIN DIMENSION STRING AND IN THE SAME ROW. 2
I
3
B2
1.4
A412
5
0.7 0.9
1
2
2.8
3
3.2
5
5.5
5.8
6
7.5
8
6 7 8
FF
CONSULT / MEDITATION SE6151
A302 B2
VISITOR TOILET SE6107
VISITOR LOUNGE SE6106
COAT RACK
PT / OT THERAPY SUITE SE6110
STORAGE SE6112
STAFF LOCKERS / LOUNGE SE6102
9
PATIENT ROOM (TYPE 1) SE6148
PATIENT ACCESS
WHEELCHAIRS
10' - 10"
OFFICE NURSE MNGR. SE6174
7' - 2"
2' - 8"
POS PATIENT ROOM (TYPE 3) SE6124
POS PATIENT ROOM (TYPE 3) SE6126
2' - 3" 5' - 9"
B2 2A
11' - 10"
PATIENT ROOM (TYPE 1) SE6128
5' - 2" 3' - 8"
EVS SE6168
10' - 1"
2A
6' - 8"
ELEC SE6169
4' - 5"
3' - 6" 3' - 6" 3' - 6" 9' - 1"
5' - 6 1/2"
TOILET SE6167
NURSE STATION SE6171
10' - 10"
PATIENT ROOM (TYPE 1) SE6132
PATIENT ROOM (TYPE 1) SE6134
7' - 7"
B BENCH
SUN ROOM SE6140
PATIENT ROOM (TYPE 1) SE6136
PATIENT ROOM (TYPE 1) SE6138 C
D
SEVENTH FLOOR OF EXISTING HOSPITAL
C1
06 - SIXTH FLOOR PLAN 1/8" = 1'-0"
10 Plans: Revit
B2 A304
A411
ELECTIC PANEL
ELEC
EMERGENCY GAS SHUTOFF CABINET
EMGS
FIRE EXTINGUISH CABINET/BRACKET
FEC
AUTOMATIC DOOR OPERATOR PUSH PL
FLOOR DRAIN
INTERCOM, REFER TO ELECTRICAL
INT
CARD READER, REFER TO ELECTRICAL
CR
FLOOR CLEAN OUT
FLOOR RECEPTACLE
KEYED CONSTRUCTION NOTES ALCOVE
9' - 10"
2A
PATIENT ROOM (TYPE 1) SE6130
A303
PATIENT ROOM (TYPE 2) SE6142
5' - 7"
SOILED / TRASH SE6166
PROVIDE ACCESS PANELS AS REQUIRED AT ALL WALLS AND ALL VALVES, DAMPERS, CONCEALED JUNCTION BOXES, AND EQUIPMENT REQUIRING MAINTENANCE, ADJUSTMENTS OR S PATCH WALLS TO RECEIVE SCHEDULED FINISHES
B2
PATIENT ROOM (TYPE 2) SE6144
9' - 7"
7C
CLEAN WORKROOM SE6172
10' - 1"
13' - 7"
MULTIPURPOSE ROOM SE6170
7C
EXISTING WALL RATINGS S SHOWN ON EXISTING DOC ARCHITECT. COORDINATE CONSTRUCTION PLANS.
BB
A
EQUIPMENT STORAGE SE6175
7C
HVAC SHAFT SE6S2
ALL WOOD COMPONENTS, ROUGH AND FINISHED, IN CORRID STAIRS, AND LOBBIES SHALL RECEIVE FIRE RETARDING TRE CONTRACTOR SHALL PROVIDE BLOCKING OR PROVISIONS F ANCHORAGE AT WALL AND CEILING MOUNTED EQUIPMENT A ACCESSORIES PROVIDED UNDER THIS CONTRACT AND EQU PROVIDED BY THE OWNER MAINTAIN EXISTING FIRE PROOFING AND FIRE RATED CONS PATCH AS NEEDED TO MEET REQUIREMENTS AS PER CODE DRAWINGS REFER TO CODE CONFORMANCE DRAWINGS FOR REQUIRED CONSTRUCTION. PROVIDE EXPANSION JOINT COVERS AT ALL EXPOSED INTE EXTERIOR JOINTS. NOTES ON ONE DETAIL OR DRAWING APPLY TO ALL SIMILAR DRAWINGS. ALL DIMENSIONS ARE TO FACE OF FRAMING, FACE OF MASO FINISHED FACE OF EXISTING CONSTRUCTION. VERIFY ALL DIMENSIONS IN THE FIELD. NOTIFY THE ARCHIT DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND FI EXTEND ALL PARTITIONS FROM FLOOR TO UNDERSIDE OF D UNLESS OTHERWISE INDICATED. MAKE THIS JOINT SMOKE T FIRESTOP AT RATED PARTITIONS. DOCUMENTS ARE BASED UPON ORIGINAL CONSTRUCTION D EXISTING CONDITIONS MAY VARY. CONTACT ARCHITECT IF ARISE. PROTECT ALL EXISTING FINISH SURFACES TO REMAIN. PAT CONSTRUCTION TO MATCH ADJACENT FINISHES TO REMAIN REMOVALS AND AS REQUIRED BY NEW WORK (IE: PIPE PENE CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGE RESULTIN WORK, WHETHER INSIDE OR OUTSIDE CONTRACT LIMIT LINE
FRZ
NURSE STATION SE6173
FRZ
10' - 1"
COFFEE
7C
STAFF WORK ROOM SE6182
13' - 8"
2A
TOASTER
FRZ
PATIENT ROOM (TYPE 1) SE6122
ICE MACHINE
FRZ
FRZ
PATIENT ROOM (TYPE 1) (ISOLATION) SE6120
NOURISHMENT SE6176 8' - 5 1/2"
STAFF WORK AREA SE6180
3' - 7"
13' - 5"
10' - 1"
CHART CART
3A
D
2A
FRZ
3' - 4"
7' - 2"
CER SE6165
7C
2A
COPIER
FRZ
7' - 3"
2' - 8"
OFFICE SHARED SE6184
7C
TOILET SE6164
LABEL PRINTER
3' - 6"
ALCOVE
E
7' - 8" 9 1/2"
5' - 9"
7C
NURSE STATION SE6163 BENCH
HVAC SHAFT SE6S1
5' - 2"
CLEAN WORKROOM SE6162
2' - 3"
B3
PATIENT ROOM (TYPE 2) SE6117
7C
PRINTER
5' - 0"
2A
A301
TUBE
UNIT SECRETARY SE6183
6' - 5"
NURSE STATION SE6161
9' - 7"
F
11' - 1"
BENCH
PATIENT ROOM (TYPE 2) SE6115
2' - 3"
F5 A461
12' - 2"
15
CC
AA 2A
CORRIDOR SE6196
2' - 3"
STAIR VESTIBULE SE6114
14
DD
PATIENT ROOM (TYPE 1) SE6146
WHEELCHAIRS
CORRIDOR SE5191 2A 3' - 0" 9' - 10"
12' - 0"
STAIR N SE6SWN
12 13
FRZ
ALCOVE
PUBLIC ACCESS
TOILET SE6111
BENCH
8' - 3"
G
05 - FIFTH FLOOR CODE PLAN 1/16" = 1'-0"
VESTIBULE SE6101
11
EE
BENCH
VESTIBULE SE6105
A1 A465
10
G1 A461
STAIR VESTIBULE SE6150
PATIENT ROOM (TYPE 2) SE6152
PATIENT ROOM (TYPE 2) SE6154
STAFF SHOWER CHANGING SE6103 ROOM SE6104
STAIR L SE6SWL
DN
2' - 0" 4' - 0"
H
C
DO NOT SCALE DRAWINGS TO OBTAIN DIMENSIONS. REFER FOR DIMENSIONS. REQUIRED CRITICAL DIMENSIONS NOT FO FIELD VERIFIED OR OBTAINED FROM ARCHITECT. CONTRAC VERIFY ALL DIMENSIONS AND CONDITIONS IN FIELD (EXISTIN
PROPOSED CODE CONSTRUCTION) AND BRING ANY DISCREPANCI GENERAL NOTES IMMEDIATE ATTENTION OF THE ARCHITECT
0.8
E1
EXIT
BUILDING DIA
FB-2HR
FP-1HR E
REMOTENESS OF EXITS
SE-2HR
VESTIBULE
DN
3/11/2019 5:05:26 PM
COMMON PATH OF EGRESS TRAV
SP-0HR
ET 22 FE D1 = 1
SE-2HR
EXIT ACCESS TRAVEL DISTANCE DISTANCE TO EXITS FROM THE M REMOTE POINT IN THE MOST REM ROOM ON THE FLOOR
PATIENT ROOM (TYPE 2)
PATIENT ROOM (TYPE 2)
SB-1HR
CHANGING ROOM
SE-2HR
1
STAIR L 1199-E NO 48 INCHES 80 120 MIN 1199-E 44 INCHES 88 90 MIN
STAIR NAME STAIR # EXISTING (Y/N) STAIR WIDTH STAIR CAPACITY STAIR RATING DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING
3'
STAIR NAME STAIR # EXISTING (Y/N) STAIR WIDTH STAIR CAPACITY STAIR RATING DOOR # DOOR WIDTH DOOR CAPACITY DOOR RATING
Concept Renderings: Revit & Photoshop
11
NOREEN REALE FALCONE LIBRARY Le Moyne College - Syracuse, NY Phase II renovation | Construtction completed September 2018 HOLT Architects Role: Designer - Contributed to design of interior layout | Lead design of interior feature elements and exterior renovation studies | Completed construction documents
12 Plans & Interior Elevations: Revit
HOLT Architects was selected by Le Moyne College to design phase II of their main library’s renovation. The scope of the phase included the more popular stacks and their support spaces, computer clusters and IT support spaces, and the general library commons. We designed the project to take advatage of its interesting existing form in order to optimize natural light and views outward, creating an inviting library commons and engaging nodes throughout. I assisted with the design and documentation, from concept design through construction documentation and addenda.
Photography: Revette Photography
13
NOREEN REALE FALCONE LIBRARY - PHASE II
LE MOYNE COLLEGE
SYRACUSE, NY
11/13/17
OPTION 3
1/16" = 1'-0" 2017080
NOREEN REALE FALCONE LIBRARY - PHASE II
LE MOYNE COLLEGE
SYRACUSE, NY
Site & Flow
11/13/17
OPTION 3
1/16" = 1'-0" 2017080
NOREEN REALE FALCONE LIBRARY - PHASE II
LE MOYNE COLLEGE
SYRACUSE, NY
Initial Layout
14 Site Plan: Google Maps & Photoshop | Diagrams drawn by Lily Tsay
AP-08
OPTION 3
AP-08
OP
Exterior Renovation Studies | To be completed at later date NOREEN REALE FALCONE LIBRARY
NOREEN REALE FALCONE LIBRARY
01/26/18
LE MOYNE COLLEGE
EXTERIOR STUDY
EXTERIOR STUDY
01/26/18
LE MOYNE COLLEGE
AP-05
SYRACUSE, NEW YORK 13202
2017080
EXTERIOR CONCEPT 1 - WRAPPER
NOREEN REALE FALCONE LIBRARY
01/26/18
LE MOYNE COLLEGE
AP-04
SYRACUSE, NEW YORK 13202
EXTERIOR STUDY
AP-06
SYRACUSE, NEW YORK 13202
2017080
2017080
EXTERIOR CONCEPT 3 - DATUM
EXTERIOR CONCEPT 2 - ANCHOR
Circulation & IT Desk Studies
Interior Elevations 1
2
3
4
5
6 3'-3"
7 3'-0"
3'-0"
3'-0"
8
9
10
3'-0"
WOOD VENEER PANEL WOOD VENEER PANEL REVEALS
Architecture Planning Interior Design RESILIENT BASE, B1
F1
WOOD VENEER PANEL
400 36" 16" 86"
MEDIA ROOMS - NORTH 1/4" = 1'-0"
F
302M 42" 13" 32"
302M 42" 13" 32"
F5 302M 42" 13" 30"
302M 32" 13" 32"
400 36" 16" 86"
400 36" 16" 86"
400 36" 16" 86"
619 W. State Street Ithaca, New York 14850
400
132 E. Jefferson Street Syracuse, New York 13202
36" 16" 86"
MEDIA SPACE - EAST 1/4" = 1'-0"
p 607 273 7600
302M 42" 13" 30"
2'-6" 2'-1 1/8"
PLASTIC-LAMINATE-CLAD COUNTERTOP
3' - 2"
WALL MOUNTED MONITOR, N.I.C.
PLASTIC-LAMINATE-CLAD COUNTERTOPS
2'-0"
E1
222
222
222
42" 24" 34"
42" 24" 34"
32" 24" 34"
RESILIENT BASE, B1
162
162 42" 24" 29"
42" 24" 29"
OPERATIONS WORKROOM - EAST 1/4" = 1'-0"
E3
WARNING: It is a violation of N York State Law for any perso unless acting under the directio a licensed Architect, to alter th document in any way. If a document bearing the seal of Architect is altered, the alterin Architect shall affix to such document his seal and the nota "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.
COUNTERTOP SUPPORT
END PANEL
OPEN
EQ
E
NOT FOR CONSTRUCTION OR BIDDING
PLASTIC-LAMINATE-CLAD COUNTERTOP END PANEL
+/-
2'-8"
PLASTIC-LAMINATE-CLAD COUNTERTOPS
COPY/SCAN ROOM - SOUTH 1/4" = 1'-0"
E5
www.holt.co
PROGRESS PRINT ALIGN
END PANEL
1'-8"
EQ
EQ
EQ
162 42" 24" 29"
COPY/SCAN ROOM - WEST 1/4" = 1'-0"
E6
REVISION SCHEDUL
IT STORAGE - SOUTH 1/4" = 1'-0"
NAME
DATE
WOOD VENEER SOFFIT SOLID SURFACE COUNTERTOP, SS1 ALIGN
BULLETIN BOARD
OPEN BEYOND
VD1
SS1
VENDING MACHINE, N.I.C.
BASE, PL4
902
D1
42" 24" 34"
OPERATIONS/IT - EAST 1/4" = 1'-0"
WOOD VENEER SOFFIT
RESILIENT BASE, B1
PL1 B1
SISAL, WC1
PHASE II RENOVATIONS
C METAL COLUMN COVER
SOLID SURFACE COUNTERTOP, SS1
WOOD VERNEER PANEL
WOOD VENEER PANEL
RETURN GRILL
B
B1
BASE, PL4
METAL COLUMN COVER
WOOD VENEER PANEL SOLID SURFACE COUNTERTOP, SS1
OPERATIONS/IT - WEST 1/4" = 1'-0" GYPSUM BOARD WOOD VENEER SOFFIT WOOD VENEER PANEL
SOLID SURFACE COUNTERTOP, SS1
COUNTERTOP SUPPORT
METAL COLUMN COVER
SISAL, WC1
MEDIA RETURN
OPEN BEYOND
COVER PANEL TO MATCH CABINETS
COVER PANEL TO MATCH CABINETS, PL1
A
RESILIENT BASE, B1
END PANEL
COPIER, N.I.C.
RETURN GRILL
COUNTERTOP SUPPORT
OPERATIONS/IT - NORTH 1/4" = 1'-0"
1
2
3
METAL BASE
902 32" 24" 30"
4
902 42" 24" 34"
SOLID SURFACE COUNTERTOP, SS1 WOOD VENEER PANEL
A7
5
6
DATE:
8 MARCH 2018
PROJECT:
2017080
OTHER: SOLID SURFACE COUNTERTOP, SS1
BOOK RETURN
A1
LE MOYNE COLLEGE
D
NOREEN REALE FALCONE LIBRARY
3/14/2018 3:35:03 PM
SHELVING, N.I.C.
G
7
102 36" 24" 34"
102 36" 24" 34"
BERNAT MEETING ROOM - EAST 1/4" = 1'-0"
8
102 36" 24" 34"
102 36" 24" 34"
DRAWN BY: Author
INTERIOR ELEVATIONS
902 42" 24" 34"
A251 9
10
Plans, Exterior Diagrams, & Interior Elevations: Revit
15
2
3
4
5
6
7
8
9
10
G
G
Architecture Planning Interior Design 619 W. State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600
STORAGE 150G
1
3' - 1"
DSS STAFF ASSISTANT OFFICE 150B
10'-9" 150A
WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.
1
TESTING ROOM 150F
1
DISABILITY SUPPORT SERVICES 150
8' - 0"
1
CLEAR
1 150E
ALIGN
ALIGN
1
150G
EQ
150D
B9 A552
150F 1
NAME
SIM
12 '-3 "
21 '-5 "
A251
A4 A552
A251
ALIGN
ALIGN
2
11 '-6 "
165
1
1'-4"
SHELVING 175 19 '-2 "
A251
F1
2 175
2
2
144
C7 A401
8'-0"
ON CALL LIBRARIAN OFFICE 172
143
E6 A552
174
ALIGN MEDIA ROOM 144
MEDIA ROOM 1 143
7'-5"
1
ALIGN
WAYNE'S OFFICE 174
LEARNING COMMONS 150J
1
GROUP STUDY 1 176
D
MEDIA ROOM 145
1
1 A6
ACCESS SERVICES 167
172
10 "
ALIGN
A251 E1
'-
3
150K 4
10'-9" 173
A402
A1
2
A251
15 '-5 "
2
7'
176
B
9'-
7"
-9
1/2 "
1
2
DATE
VESTIBULE 150K 150K
145
PATTI'S OFFICE 173
DIRECTOR'S OFFICE 171
STORAGE 169
10 '-3 " OFFICE 165
164
11'-0" EQ
E6
11 '-2 " STORAGE 164
2
D1 B9 A552
WORKROOM 167A
14 '-4 "
C
43
11 '-0 "
OFFICE 163A A1 A552
CENTER PARTITION ON MULLION
+/-
1
COMPUTER CLUSTER 168
10'-7"
1'-4 3/4"
150K 2
A402
8'-0"
163A
11'-0"
3/4 "
150K 1
150I 2
150I 4
5'-6"
10 '-8 "
4
10
EQ
OFFICE 170
5' - 4"
7"
IT SERVICES 162
CENTER PARTITION ON MULLION
3'-4"
170
CLEAR
A4
150I 1
150I 3
C6 A552
171
2
CLEAR
4' - 1"
4
TECH LAB 161
4
A7
C3 A552
B1
1'-4"
4
A251
3'2 3/4 CL " EA R
A251
C8 A552
2 1'-5"
161
A7 A401
ALIGN
6 3/4"
D
D3 A552
160
BERNAT SPECIAL EVENTS ROOM 160
MAIN STREET 150I
9'-1"
1
30'-4"
SIM
0"
C6 A552
9'-
A7 A451
15'-1 1/4"
ALIGN 150
18'-10"
1
E
REVISION SCHEDULE
1 150F 2
DIRECTOR'S OFFICE 150A
6'-10"
CENTER PARTITION ON MULLION
TESTING ROOM 1 150E
1
CLEAR
1
E
EQ
A3 A552
LE MOYNE COLLEGE SYRACUSE, NEW YORK 13202
TESTING ROOM 2 150D
A251
F
NOT FOR CONSTRUCTION OR BIDDING
PHASE II RENOVATIONS
E5 E3
CCTV 150H
1
ALIGN
2'-10"
1
12'-10 5/8"
A8 A552
www.holt.com
PROGRESS PRINT
NOREEN REALE FALCONE LIBRARY
COPY & SCAN STATION 150C
ALIGN
F
11'-4 1/2"
3/14/2018 3:35:02 PM
1
DATE:
8 MARCH 2018
PROJECT:
2017080
C
B
OTHER: DRAWN BY: Author A1
FIRST FLOOR PLAN
A201
A
A
A3 A201
FLOOR PLAN - FIRST FLOOR A1 1/8" = 1'-0"
0'
1
2
3
3/14/2018 3:35:30 PM
1
4
2
5
3
4
2'
4'
8'
A101
16'
6
7
5
8
6
7
9
8
10
9
10
G
G Architecture Planning Interior Design 619 W. State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202 UP STORAGE 150G
p 607 273 7600
www.holt.com
CCTV 150H
28 SF
484 SF
F
WAP
TESTING ROOM 1 150E
PHASE 1
87 SF
TESTING ROOM 2 150D
COPY & SCAN STATION 150C
88 SF
OS
PROGRESS PRINT
D
D NOTE TAKER SCAN STATION 155
4' - 3 9/16"
DSS STAFF ASSISTANT OFFICE 150B
WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.
D
DISABILITY SUPPORT SERVICES 150
D
UP
97 SF
E
DIRECTOR'S OFFICE 150A 111 SF
UP
DSS RECEPTION 157 87 SF
WAP
WAP
CR
WAP
E
REVISION SCHEDULE NAME
BERNAT SPECIAL EVENTS ROOM 160
DATE
UP D
594 SF
D D
F
D
D
MEDIA ROOM 145
D
? ?
81 SF
D
?
WAP
D
F
NOT FOR CONSTRUCTION OR BIDDING
105 SF
TECH LAB 161
ACCESS SERVICES 167
305 SF
221 SF
D
IT SERVICES 162
D
173 SF
WAP
OFFICE 163A
1
WAP
STORAGE 169 WORKROOM 167A
STORAGE 164
34 SF
640 SF
D
D
140 SF
OFFICE 165
D
109 SF
THLBQD3360
THLBQD3360
F
WAP
WAP
PHASE II RENOVATIONS
D
C
WAP
D
WAP
B
WAP
LE MOYNE COLLEGE SYRACUSE, NEW YORK 13202
109 SF
NOREEN REALE FALCONE LIBRARY
WAP
D
WAP
DATE:
8 MARCH 2018
PROJECT:
2017080
C
B
OTHER: DRAWN BY: Author
FIRST FLOOR FURNITURE PLAN
A
1
(FOR INFORMATION ONLY)
FLOOR PLAN - FIRST FLOOR 1/8" = 1'-0"
1
16 Plans: Revit
0'
2
3
4
5
6
7
8
9
2'
4'
8'
10
16'
A801
A
Photography: Revette Photography
17
MOFFETT CENTER Cortland University - Cortland, NY Phase II renovation | In construction HOLT Architects Role: Designer - Contributed in development of interior elevations and details | Completed construction documents
5
2 1/4"
1 1/2" ± VIF
1/4"
PRESSURE-TREATED WOOD BLOCKING
1/2"
1 1/2" ± VIF 2 1/8" ± VIF
1" MIN DOOR D7A DETAIL H4 6" = 1'-0" FILL END OF SEAMS WITH
PRESSURE-TREATED SHIM SILL FOR POSITIVE DRAINAGE
EXISTING FRAME
WEATHER BARRIER, EXTEND OVER SILL AND UNDER SKYLIGHT FRAME
1 7/8" ± VIF
CONTINUOUS SEALANT, ENTIRE PERIMETER
MATCH EXISTING
1/2" ± VIF
LOW VOLTAGE
3/4" ± VIF
INTERIOR (PUSH-SIDE)
EXTERIOR 2 3/4" x 5" x 1/4" LLH x
WOD STEEL ANGLE, PAINT TO MATCH DOOR OPERATOR FINISH
EQ
MATCH EXISTING
2 7/8" ± VIF
D6
RS-3
EQ
12" 1/2" ± VIF
TYPICAL, VON.
FRAME
A603
LOW VOLTAGE WIRING
WOOD DOOR
4 3/8" ± VIF
A603 F9
MATCH SASH THICKNESS QUARTER ROUND WIRING VIEW D9 AT HISTORIC DOOR D7A 3" = 1'-0"
STEEL TUBE, REFER TO PATHWAY FOR WIRING STRUCTURAL DRAWINGS
INTERIOR (PUSH-SIDE)
DOOR FRAME
F2
F-REVEAL TRIM
STEEL BEAM, REFER TO STRUCTURAL DRAWINGS
1/8" ± VIF 1/4" ± VIF
OMIT STOP AT STRIKE
F2 A603
2" ± VIF
WOOD DOOR FRAME - HEAD DETAIL 3" = 1'-0"
WOOD DOOR
DOOR OPERATOR. REFER TO DOOR SCHEDULE FOR LOCATIONS
D2 A603
F2
A
A603
WOOD DOOR
INTERIOR (P
ALL DIMENSIONS TO MATCH EXISTING PROFILE
EXTERIOR
LIGHT FIXTURES TO BE REPLACED, REFER TO ELECTRICAL DRAWINGS
VERIFY AXLE EXTENSION IN-FIELD ±30mm
1/2" ± VIF
1 1/8" ± VIF
F-REVEAL TRIM
INTERIOR (PUSH-SIDE)
F7
WOOD DOOR FRAME TRANSOM DETAIL F54A 6" = 1'-0"
A
EXTERIOR
F9
WOOD DOOR FRAME DETAIL - HEAD AND TRANSOM 3" = 1'-0"
WOOD STOP
1
2
3
4
5
EXISTING WALL CONSTRUCTION
6
3/4" DIAMETER QUARTER ROUND WITH SPLAYED BACK TO ACCOMMODATE WIRING
7
VES H4 3" A60=
D2
D2
A603
A60
LOW VOLTAGE WIRING
18 Details: Revit E
HISTORIC D 3" = 1'-0"
3 1/4" ± VIF
G5
CLERESTORY DETAL 3" = 1'-0"
D11
GLAZING, REFER TO DOOR SCHEDULE
1/8" ± VIF
A603
A3
1/2" X 1" WOOD STOP
F5 A603
LOW VOLTAGE WIRING
F
SASH TO MATCH EXISTING
WOOD BRICK MOLDING TO MATCH EXISTING
EXTERIOR QUARTER ROUND WIRING DETAIL G5 6" = 1'-0" WOOD DOOR FRAME - JAMB DETAIL 4A 3" = 1'-0" HEAD SIMILAR
D2
AUTOMATIC DOOR OPENING UNIT
B
QUARTER ROUND
3/4" PLYWOOD EXISTING WOOD DOOR
2 7/8" ± VIF
1/4" ±
VERIFY AXLE EXTENSION IN-FIELD F2 ±30mm A603
SKYLIGHT DETAIL D9 3" = 1'-0"
ROUTE FRAME BEHIND STOP TO CREATE
EWS-3
CONTINUOUS SEALANT, ENTIRE PERIMETER
EXISTING MATCH EXISTING AUTOMATIC DOOR OPENING UNIT TO BE REMOVED
MATCH 1275' - 1 1/2"EXISTING,
WOOD BRICK MOLDING TO MATCH EXISTING CONTINUOUS SEALANT, INTERIOR (PUSH-SIDE) ENTIRE PERIMETER
1 3/8" ± VIF
BASE PLIES
DOOR OPERATOR, REFER TO DOOR SCHEDULE FOR LOCATIONS
DOOR D4A DETAIL 6" = 1'-0"
1 7/8" ± VIF
T.O HSS O.1STEEL 1275'T. -WOOD 1/2" BRICK MOLDING TO
LOW VOLTAGE WIRING
MODIFIED MEMBRANE
WOOD DOOR C FRAME - JAMB DETAIL 3" = 1'-0"
G
HEAD / JAMB DETAIL
WOOD DOOR
1/4" ± 1/2" ± 6 1/2" ± VIF
SAW2
EXISTING LIMESTONE SURROUND
3/4" QUARTER ROUND EXISTING WALL CONSTRUCTION
3/4" X 1 3/4" WOOD STOP
PRE-MANUFACTURED ROOFING CANT
H6
A603
3/4" ± VIF
WOOD STOP
DOOR D7A DETAIL 6" = 1'-0" SEALANT
STEEL BEAM, RE STRUCTURAL DR
5/8" GYPSUM BOARD
6 1/2" ± VIF
CORNER BEAD TRIM
1X WOOD CASING TO MATCH EXISTING VESTIBULE DOOR FRAMES
ROUTE FRAME FOR ELECTRIC STRIKE AND DOOR CONTACT WIRING 3/4" DIAMETER QUARTER MODIFIED MEMBRANE ROUND WITH SPLAYED BACK FLASHING PLY TO ACCOMMODATE WIRING PATHWAY, TYPICAL. OMIT AT BASE FLASHING PLY DOOR OPERATOR 1" ± VIF
WOOD DOOR
H4
1 1/2" ± VIF 2 1/8" ± VIF G5
7/8" ± VIF
INTERIOR 3" = 1'-0"
EXISTING WALL CONSTRUCTION
12" MIN
HIGH-DENSITY RIGID INSULATION
GLAZING, REFER TO DOOR SCHEDULE
1 1/2" ± VIF
8.00° ± VIF
WOOD BRICK MOLDING TO H2 MATCH EXISTING, TYPICAL, UON.
RS-4
SILL PAN FLASHING BY WINDOW MANUFACTURER
ALIGN
H
D CASING TO CH EXISTING
EXTERIOR
DOOR STICKING / GLAZING STOP TO MATCH EXISTING
GLASS TYPE-4
3/4" DIAMETER QUARTER ROUND WITH SPLAYED BACK TO ACCOMMODATE WIRING PATHWAY, TYPICAL
PLA NOTE: MATCH ALL DIMENSIONS AN BOLL EXISTING DOORS AND F11 WIND DOOR PANEL AND PROFILE CLOSED-CELL SPRAY VESTIBULE DOOR FRAME DETAIL - HEAD AND TRANSOM 1 1/2 EXISTING F9 TO MATCHAPPLIED INSULATION 3" = 1'-0" JAMB SIMILAR EXTERIOR
MATCH EXISTING
WOOD DOOR FRAME DETAIL - HEAD AND TRANSOM 3" = 1'-0"
1/4" 4" PRE-FINISHED ALUMINUM FASCIA WITH MIN 1" DRIP EDGE
8
CONTINUOUS SE
SPONGE TAPE
1X WOOD CASING TO MATCH EXISTING
7 DOOR TO INTERIORWOOD (PUSH-SIDE)
WOOD DOOR TO MATCH EXISTING
INTERIOR (PUSH-SIDE)
WOOD DOOR FRAME TRANSOM DETAIL 6" = 1'-0"
SHIM AND SLOPE SILL FOR POSITIVE DRAINAGE, TYP
6
WOOD DOOR
LOW VOLTAGE WIRING
STRUCTURAL GLAZED TILE
5
1"
2 5/8" ± VIF
7/8" ± VIF
J-TRIM STEEL COLUMN BEYOND, REFER TO STRUCTURAL DRAWINGS
4
3/4" DIAMETER QUARTER ROUND
WOOD STOP TO MATCH EXISTING
D2
D2 A603
2 1/4"
EXISTING WALL CONSTRUCTION
A603
2 1/4"
8.00° ± VIF
F5
WOOD DOOR, REFER TO DOOR SCHEDULE
D
DOOR OPERATOR. REFER TO DOOR SCHEDULE FOR LOCATIONS
F7
I
PRESSURE-TRE WOOD BLOCKIN
WOOD DOOR D2
ALL DIMENSIONS TO MATCH EXISTING PROFILE
EXTERIOR
E
ROUND WITH COMMODATE WAY, TYPICAL
2' - 10"
2" ± VIF
CONTINUOUS SEALANT
1/2" ± VIF
WOOD DOOR FRAME - HEAD DETAIL 3" = 1'-0"
1 1/8" ± VIF
3
ZEE CLOSURE W SEALANT TOP A
URETHANE TUB VERTICAL SEAM CLOSURE
BEARING PLATE
WOOD BLOCKING
1/2" ± VIF 2" ± VIF
F2
2
VERIFY AXLE EXTENSION IN-FIELD ±30mm
1 3/4" ± VIF
INTERIOR (PUSH-SIDE)
1
1/4" ±
1/7/2019 5:17:16 PM
G5 A603
1/8" ± VIF 1/4" ± VIF
1/2" ± VIF
WOOD DOOR
F
ALUMINUM-FRAMED STOREFRONT ASSEMBLY
1/2" ± VIF
4 3/8" ± VIF
A603
METAL ROOFING CLIP METAL ROOFING PANEL
STEEL BEAM AND PLATE, REFER TO STRUCTURAL DRAWINGS
BACKER ROD AND SEALANT
F5 A603
TIE-IN TRIM BY ROOFING MANUFACTURER
2 5/8" ± VIF
1/2" ± VIF
D2
PRE-FINISHED ALUMINUM SOFFIT
1/8" ± VIF
F2 A603
F5 A603 ACOUSTIC PANEL CEILING, REFER TO REFLECTED CEILING PLANS
3 1/4" ± VIF
1/2" ± VIF 2" ± VIF
1/4" ±
1/4" ±
2 7/8" ± VIF 1 3/4" ± VIF
2 7/8" ± VIF
G
1/2" ± VIF
METAL CLEAT
EWS-2
GLAZING, REFER TO DOOR SCHEDULE
QUARTER ROUND WIRING DETAIL 6" = 1'-0"
4" PRE-FINISHED ALUMINUM G5 FASCIA WITH MIN 1" DRIP EDGE
FINISHED GRADE
EXISTING WOOD STOP
1/2" X 1" WOOD STOP
MATCH SASH THICKNESS AT HISTORIC DOOR D7A
5 1/2" RIGID WOOD BRICK MOLDING TO INSULATION, TYP 3/4" PLYWOOD SHEATHING, TYP MATCH EXISTING CONTINUOUS SEALANT, WEATHER BARRIER ENTIRE PERIMETER
1 3/8" ± VIF
WOOD BRICK MOLDING TO MATCH EXISTING
WOOD BRICK MOLDING TO MATCH EXISTING
VAPOR BARRIER
MATCH EXISTING
CONTINUOUS SEALANT, ENTIRE PERIMETER
SASH TO MATCH EXISTING
4"
FILL ENTIRE CAVITY
2 1/2" METAL FRAMING @ 24" O.C.
PRESSURE-TREATED WOOD BLOCKING
1/4" ± 1/2" ± 6 1/2" ± VIF
L6X4X5/16" STEE STRUCTURAL DR
PRE-FINISHED ALUMINUM FASCIA
EXISTING WALL CONSTRUCTION CLOSED-CELL SPRAY INSULATION,
STEEL ANGLES, REFERWIRING TO STRUCTURAL DRAWINGS
1" ± VIF
J-TRIM
4" PRE-FINISHED ALUMINUM FASCIA WITH MIN 1" DRIP EDGE, FLASH INTO SKYLIGHT ASSEMBLY
3/4" QUARTER
ROUND METAL CLEAT
T
SILL SEALER
PAINT EXPOSED PLYWOOD TO M
METAL CLEAT
3/8" BENT STEEL PLATE
H INTERIOR VESTIBULE DOOR FRAMES HEAD / JAMB DETAIL 3" = 1'-0"
GLASS TYPE-5
3/4" PLYWOOD
4" PRE-FINISHED ALUMINUM FASCIA WITH MIN 1" DRIP EDGE
H2
10
ISOLATION MATERIAL PER SKYLIGHT MANUFACTURER'S WOOD TRIM TO MATCH EXISTING, SALVAGE RECOMMENDATION EXISTING, REPAIR, AND REINSTALL IF POSSIBLE
6 1/2" ± VIF
DOOR D4A DETAIL H6 6" = 1'-0"
URETHANE TUBE SEALANT AND PAINT TO COLOR MATCH
EFER TO CHEDULE
9
11
ALUMINUM-FRAMED SKYLIGHT ASSEMBLY
RS-4
CL
GLAZING, REFER TO DOOR SCHEDULE
10
NOTE: MATCH ALL DIMENSIONS AND PROFILES OF TYP 7 EXISTING DOORS AND WINDOWS, 8
6
DOOR PANEL AND PROFILE TO MATCH EXISTING
9
42"
4
DOOR STICKING / GLAZING STOP TO MATCH EXISTING
I
8
30"
3
7
WOOD DOOR TO MATCH EXISTING
3/4" ± VIF
O MATCH EXISTING
2
6
1/2"
ASING TO EXISTING
1
5
WOOD DOOR TO MATCH EXISTING
2 1/4"
NG WALL RUCTION
QUARTER ROUND
4
3/4" ± VIF
3
1/7/2019 5:17:12 PM
2
This project is a renovation of the Moffett Center, which was previously the main gymnasium of Cortland Unviersity. But with a new sports complex in place, Cortland will use the Moffett Center to house several academic departments, from mathematics to Africana studies. HOLT Architects completed both phases of the renovation. I assisted in design development and construction documentation for the second phase.
8
H6 A603
9 EXISTING LIMESTONE
G5 REFER TO STRUCTURAL DRAWINGS FOR A603 LIMESTONE REPAIRS
10
STRUCTURAL ELEMENTS. REFER TO RCP FOR HEIGHTS OF GYPSUM SOFFITS AND CEILINGS. ALL GYPSUM BOARD CEILINGS AND SOFFITS ARE COLOR P2 UNLESS OTHERWISE NOTED ON FINISH PLANS. RESTORE ALL CEILINGS AND PLASTER COATINGS TO MATCH EXISTING AT ALL LOCATIONS OF HAZ-MAT INSPECTION HOLES, TYPICAL. LAY-IN ACOUSTIC CEILING HEIGHTS, TYPICAL UNLESS OTHERWISE NOTED: 8' - 6" AFF - CORRIDORS 9' - 0" AFF - FACULTY SUITES 10' - 0" AFF - CLASSROOMS
6 7
2"
8 9 G1
8' - 1"
EQ
A561
A602
9' - 8"
EQ EQ
2' - 0"
2"
AWC1
2"
EQ
CEILING MATERIALS 9' - 0"
4' - 0"
2' - 9"
1117 9' - 0"
EQ
2' - 9"
EQ
P1
REVEAL, TYP
P1
9' - 0"
1119-D
1119-G 9' - 0"
OS
9' - 0"
F
SD
OS
1121-B
1119-F
SD
1123-C
1123-B
A9
F
SD
SD
F
SD
OS
F
F
SD
SD
OS F
9' - 0" 1116
SD
SD
SD
OS
SD
SD
F
EQ
1126 10' - 0"
F
OS
SD
OS
1120-C
SD
SD
1194-D
E1
ALIGN GRIDS, TYP
A561
1125-D
OTHER
1100-A
RETURN AIR/ EXHAUST GRILLE
OS
10' - 0"
SD
F
F
1122
F
10' - 0"
OS
EQ
C1
10' - 0"
SD
1130 10' - 0"
F
H1
10' - 0"
EQ
OS
A8 A554
SD
SMOKE DETECTOR
EXHAUST GRILLE
F
FIRE ALARM STROBE
LINEAR DIFFUSER
PROJECTION SCREEN
EXIT SIGN OCCUPANCY SENSOR
DATA/VIDEO PROJECTOR. CENTER MOUNT ON PROJECTION SCREEN
ACCESS PANEL
CHILLED BEAM
1125-B
1125-A
F
SD
A561
SUPPLY AIR GRILLE
OS
SD
SPEAKER
G8
CEILING HEIGHT
1'-0"
A561 1124-B
4' - 0"
A561
8' - 6"
OS
9' - 0"
9' - 0" SD
G8
4' - 0" 3' - 0"
H8 A561
Sim
SIM
C1 A561
7' - 6"
9' - 0"
10' - 0" 4
C
9 FULL PANELS
13 EQUAL PANELS
G5 A153
3 FULL PANELS
EQ
SIM
C1
A561
1125
A561
SIM
A1
9' - 0"
SIM
A561
SPRINKLER HEAD
OS
SD
8' - 1"
SD
2' - 0"
E
PENDANT LIGHT FIXTURE
OS
SD
9' - 0"
8' - 6"
4
D
SEMI-RECESSED LIGHT FIXTURE WALL WASHER LIGHT FIXTURE
LINEAR RECESSED LIGHT FIXTURE
F
9' - 0"
1128 10' - 0"
F
SD
OS
RECESSED LIGHT FIXTURE
LARGE DIAMETER RECESSED LIGHT FIXTURES
9' - 0"
1125-C
F
SD OS
SD
9' - 6"
9' - 6"
4
1123-G
9' - 0"
1120-D
1 H8
F
RECESSED COVE LIGHT FIXTURE
LINEAR SURFACEMOUNTED LIGHT FIXTURE
LAY-IN/ RECESSED TROFFER LIGHT FIXTURES
9' - 0"
1194-C
LINEAR PENDANT LIGHT FIXTURE
OS
SD
F
1120-A
2' - 0"
14 FULL PANELS
OS
SD
9' - 0"
2' - 0"
A561
1123-F
OS
1120 8' - 6"
18 FULL PANELS
9' - 0"
3 FULL PANELS
F OS
F
LIGHT FIXTURES
8' - 1"
9' - 0"
1120-B
1118
2' - 6" 4' - 0"
E
9' - 0"
4' - 0"
A561
NOTE: SEE CEILING ELEVATION TAGS FOR CEILING TYPE
SD
F
SD
9' - 0"
H3
F SD
F
1123-D 9' - 0" 1123-E 1123 OS
1100-H
3' - 3" 1197-B 7 FULL PANELS
EXPOSED STRUCTURE AND DECK ABOVE (NO PAINT)
EXP
9' - 0"
9' - 0"
SKYLITE, TYP.
A561 1
P1 EXISTING LIGHT FIXTURE TO REMAIN
48' - 6"
5
SD
6
F
SD
4' - 6"
9
F
P1
4' - 6"
4' - 6"
4' - 6"
10
F SD
4' - 0"
4' - 0" 3' - 0" 4' - 0"
4
1131 10' - 0"
F
I
OS SD
EQ
1
A8
1124-A G8
A554
SD
A561
EQ 10' - 0"
2
9' - 0"
9' - 0"
1101-A
1101-B
SD
OS
SD
F
4 5
SIM
C1 A561
e2
e3
e4 1127
e5
5
e6
6
e7
H
7
e8
8
e9
9
8 9 10
I
A201
A2
A2
15
215
A2
3 15
4
A2
15
5
2009072
6
10
11
SUNY NO.:
2009030
www.holt.com
A153 H
2 1/2"
4
1194-F
5D
ELEC 1194-F
5D
29' - 4"
3
4A
4A
A253
4D FR
4A ADJ 4 1120-B
3A
H10
7
2' - 0"
4A
4D
E1
4A C1
E5
31' - 5"
C1
3A
GENERAL CLASSROOM 4 1128
6' - 0"
5' - 0" 4C
23' - 2"
5' - 0"
ALIGN
H3
7 A2
16' - 0 1/2"
H7 7 A2
4C
13
A254
H11
COPY/WORK/MAIL 1125-B
1A
4C
H9
6
ALIGN
6
SIM G1
7
8
A258
A258
A258
1100.6
A252
C1
9
E1 5D
E7
23' - 2"
A7
A4
3B
3B
2
STAIR 6 1199-H
A256
CORR 1100-A
STOR 1124-A
4C
STORAGE 1101-A
5C
1A
4C
F10 A451
COPY / WORK / 4C MAIL 1101-B
1101-A
A2
6 15' - 11 3/4"
1A
5D
OPP
3
7/8"
1129
ALIGN
1102
4
A254
5
D1 1A
1101
A2
SOUTH
7 8
A254
H e4
e5
5
e6
6
e7
7
e8
8
e9
9
10
I
11
FIRST FLOOR PLAN - NORTH A1 1/8" = 1'-0"
12 13
1
2
G
F6
3
4
5 F6
D11A D22
STAIR 5 1199-C
6
7
8
9
10 16 17 18
STAIR 4 1199-D
19 F2
F6
C4
D11A
D11
F2
C4 20
STAIR 1 1199-E OFFICE 109B
TOILET 100O
UP F4
D11
F
CL. 109E
C4
C4 F2
CL. 109D
C4
C4
F4
GENERAL CLASSROOM 107
C1
D7
. D6
D2
C4
OFFICE 108
F4
VEST. 100N
D11
TOILET 105E
F1
D11 D6
F1
UP
C4
D7
F4
. D6
C4 D11
F1
.
D17
D6
D8
HEALTH DEPT. OFFICE 105C
STORAGE D D16
OFFICE 104 D16
F4
D#
eA G
D11
F2
D11
. D6
D2
MAIL 105H
D2
C4
TOILET 105I
STORAGE 100D
D30
CONFERENCE ROOM 103
D SALVAGE AND STORE EXISTING CHANDELIER FOR REINSTALLATION
D27 D9
GYMNASIUM 160
C4
.
D6
D6
F1
.
F1
C4
F2
CLOSET 102B
C4
C4 A
CORRIDOR 1100-A
C
OFFICE 129C
F4
D11
TOILET 102A OFFICE 101
M B K L J D27 D25 D9
STORAGE 100E
F# F1 F2 F3
D19 F3
F4
D5
LOBBY 1100
C
F5 F6 F7 F8
D8
D27 D18
D8 C6
D6
.
CL
.
D6
B
C#
D8
F5
C1 C2 C3 C4
D8
D
C5 D9
KEYED DEMOLITION NOTES
CUT OPENING IN EXISTING ROOF ABOVE FOR SCHEDULED SKYLIGHT. REFER ALSO TO STRUCTURAL DRAWINGS. REMOVE, SALVAGE, AND STORE EXISTING DOOR FOR REINSTALLATION. TEMPORARILY SALVAGE DOOR HARDWARE TO USE FOR MATCHING SCHEDULED HARDWARE. REMOVE EXISTING AUTOMATIC DOOR OPERATOR ASSEMBLY, INCLUDING METAL FRAMING. REFER ALSO TO ELECTRICAL DRAWINGS. D4 NOT USED. D5 REMOVE WALL ASSEMBLY IN ITS ENTIRETY (TYPICAL ALL WALLS SHOWN AS DASHED ON PLAN) D6 CUT OPENING IN WALL ASSEMBLY AS REQUIRED TO ACCOMMODATE SCHEDULED WORK. PROVIDE LINTEL AS REQUIRED. D7 REMOVE DOOR AND FRAME (TYPICAL ALL DOORS SHOWN AS DASHED ON PLAN). D8 REMOVE DOOR. EXISTING FRAME TO REMAIN. TEMPORARILY SALVAGE DOOR HARDWARE TO USE FOR MATCHING SCHEDULED HARDWARE. FOR EXTERIOR DOORS, REFER ALSO DETAIL H6/AD100. D9 EXISTING WINDOW TO REMAIN. D10 REMOVE WALL TILE, GROUT, AND ANY SUBSTRATE DOWN TO EXISTING STRUCTURE. PROVIDE NEW SUBSTRATE AS REQUIRED FOR SCHEDULED WORK. D11 REMOVE EXISTING GLAZED TILE WAINSCOTING, TRIM AND BASE ON INTERIOR PARTITIONS ONLY (NOT EXTERIOR WALLS). D11A EXISTING GLAZED TILE WAINSCOTING, TRIM AND BASE TO REMAIN. REPLACE ALL DAMAGED (CRACKED, CHIPPED, MISSING) TILES TO MATCH EXISTING. D12 REMOVE, SALVAGE, AND STORE EXISTING LIMESTONE SILL FOR REINSTALLATION. D13 REMOVE, SALAVAGE AND REFINISH EXISTING RADIATOR UNIT FOR REINSTALLATION. REFER ALSO TO MECHANICAL AND PLUMBING DRAWINGS. D14 NOT USED. D15 REMOVE EXISTING LOUVER ASSEMBLY. REFER ALSO TO MECHANICAL DRAWINGS. D16 REMOVE ROLL-UP DOOR ASSEMBLY. D17 REMOVE OVERHEAD EMERGENCY GATE AND TRACK ASSEMBLY. D18 REMOVE EXISTING FOLDING PARTITION ASSEMBLY. D19 REMOVE EXISTING BLEACHER ASSEMBLY. D20 REMOVE RAILING / GUARDRAIL. D21 REMOVE EXISTING WALL-MOUNTED HANDRAIL ASSEMBLY. D22 REPLACE EXISTING WOOD HANDRAIL TO MATCH EXISTING. D23 REMOVE EXISTING STAIR ASSEMBLY. D24 CUT OPENING FOR SKYLIGHT UNIT. REFER ALSO TO STRUCTURAL DRAWINGS. D25 REMOVE ALL CEILING AND WALL-MOUNTED ATHLETIC EQUIPMENT SYSTEMS. D26 REMOVE EXISTING SMOKE HATCH ASSEMBLY. D27 REMOVE EXISTING BUILT-IN DISPLAY CASE UNIT. D28 REMOVE EXISTING BUILT-UP SILL AND RADIATOR ENCLOSURE. D29 REMOVE EXISTING LADDER ASSEMBLY. D30 REMOVE PORTIONS OF WALL AS REQUIRED FOR WORK IN SHAFT.
ROOM 105B
F1
D7
F
D3
C1
D6
EXISTING PARTITION
D2
WAITING ROOM 105 C4
STORAGE C
D7
EXISTING DOOR
SCOPE LIMIT LINE
ROOM 105A
D7
CORRIDOR 1100C
ALTERNATE WORK SCOPE AS INDICATED
MATCHLINE
D1
D6
C4
E
CLOSET 131B
F4 F1
D11
C6 C7
CLOSET 129A
CLOSET 131A
OFFICE 131
C1 C4
F
E
KEYED FLOOR DEMOLITION NOTES REMOVE CARPET/VINYL FLOORING AND RESILIENT WALL BASE. REMOVE TILE FLOORING AND GROUT DOWN TO EXISTING CONCRETE. REMOVE EXISTING WOOD FLOOR, MASTIC, SUBSTRATE, SLEEPERS AND BASE DOWN TO CONCRETE SLAB. EXISTING WOOD FLOOR TO REMAIN. ATTACH SECURELY TO SLAB AND PREP TO RECEIVE 1/4" UNDERLAYMENT EXISTING TERRAZZO FLOORING TO REMAIN. REMOVE SLATE STAIR AND LANDING TREADS. REMOVE CONCRETE CURB. REMOVE RAISED CONCRETE FLOOR SLAB AREA DOWN TO LEVEL OF ADJACENT FLOOR SLAB.
KEYED CEILING DEMOLITION NOTES REMOVE ACOUSTICAL PANEL CEILING SYSTEM. REMOVE GYPSUM BOARD CEILING SYSTEM. REMOVE GYPSUM SOFFITS AND ALL ASSOCIATED FRAMING. REMOVE EXISTING PLASTER / ACOUSTICAL PLASTER CEILING SYSTEM, INCLUDING SOFFIT SYSTEMS AND INSULATION. REMOVE AND REINSTALL EXISTING CEILING ONLY AS REQUIRED TO ACCOMMODATE ABOVE CEILING MECHANICAL, ELECTRICAL, PLUAMING AND FIRE PROTECTION WORK. REFER ALSO TO MEP/FP DRAWINGS. EXISTING CEILING TO REMAIN. REMOVED EXISTING WOOD CEILING SYSTEM, INLCUDING FRAMING.
11/19/2018
PROJECT:
2009072
SUNY NO.:
2009030
FIRST FLOOR DEMOLITION PLAN - NORTH
NORTH
N
FIRST FLOOR DEMOLITION PLAN - NORTH 1/8" = 1'-0"
1
2
AD103
SOUTH
3
4
5
6
7
8
9
10
11
C
B
DRAWN BY: EMS
NORTH SOUTH
DATE:
D
OTHER:
KEY PLAN
D11
E
A1
G
PARTITIONS, DOORS AND ITEMS TO BE REMOVED
AREA NOT IN CONTRACT (NIC)
OFFICE 105D
F6
GENERAL CLASSROOM 106
A103
12
CONTRACT LIMIT LINE
F4
DN
F4
H
A
DEMOLITION LEGEND
C4
STORAGE 105G
OFFICE 109A
.
MEN 0
.
DN
I
ArchitectureB Planning Interior Design
619 West State Street 11/19/2018 Ithaca, New York 14850 REMOVALS OF EXISTING CONSTRUCTION. CONTRACTOR SHALL CUT AND PATCH, OR 2009072 PROJECT: REMOVE AND REINSTALL, EXISTING CONSTRUCTION AS REQUIRED FOR INSTALLATION OF E. Jefferson Street SUNY NO.: 132 2009030 ALL SCHEDULED WORK. Syracuse, New York 13202 THE SCOPE OF ALL DEMOLITION WORK INCLUDES THE PATCHING AND PREPARATION OF THE OTHER: REMAINING SURFACES TO MATCH THE EXISTING ADJACENT SURFACE MATERIAL AND FINISH p 607 273 7600 www.holt.com OR THE PREPARATION OF THE SURFACE TO RECEIVE THE SCHEDULED WORK. DRAWN BY: CK, CRB, AFD, RAB ANY PORTION OF THE PROJECT TO REMAIN WHICH IS DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY SHALL BE REPAIRED OR REPLACED TO MATCH THE EXISTING CONDITION. THE OWNER HAS FIRST RIGHT TO ALL SALVAGE ITEMS. ITEMS NOT CLAIMED BY THE OWNER NORTH SHALL BECOME THE CONTRACTOR’S RESPONSIBILITY TO DISPOSE OF PROPERLY. SAWCUT EXISTING SLABS ON GRADE AS REQUIRED TO ACCOMMODATE SCHEDULED WORK OF ALL TRADES. PATCH AND REPAIR SLABS TO MATCH EXISTING AND PREPAIR TO RECEIVE SCHEDULED FINISH. INFILL TO MATCH EXISTING ADJACENT CONSTRUCTION AND DOWEL INTO EXISTING 4’-0” OC UNLESS OTHERWISE NOTED. SOUTH TO RECEIVE SCHEDULED WORK BY EXISTING CONCRETE SLABS SHALL BE PREPARED N GRINDING, SCRAPING, FILLING, AND PATCHING. AT UNEVEN AREAS AND DEPRESSIONS PROVIDE PATCHING AND/OR LEVELING AS REQUIRED TO CREATE A FLAT AND LEVEL BASE CONDITION THAT IS SUITABLE FOR SCHEDULED CONSTRUCTION AND FINISHES. WARNING: It is a violation of New RECYCLE ALL WOOD, GLASS, METAL, AND GYPSUM BOARD. ALL MASONRY TO BE USED AS York State Law for any person, CLEAN FILL OFF SITE. unless acting under the direction of REMOVE ALL SURFACE MOUNTED ACCESSORIES INCLUDING BUT NOT LIMITED TO: a licensed Architect, to alter this SPEAKERS, SURFACE MOUNTED CONDUIT, GRILLES, PEGBOARDS, TACK BOARDS, MARKER document in any way. If a document AND WHITE BOARDS, LOCKERS, MIRRORS, CASEWORK, CLOCKS, ARTWORK, SIGNAGE, bearing the seal of an Architect is CHALKBOARDS, AND TOILETROOM ACCESSORIES. altered, the altering Architect shall affix to such document his seal and REMOVE ALL WOOD WINDOW CASINGS, WALL BASE, CHAIR RAILS, MOLDING, ECT. TYPICAL. REMOVE ALL SURFACE MOUNTED AND BUILT IN COUNTERTOPS, CASEWORK, AND SHELVING, the notation "altered by" followed by his signature, the date of such TYPICAL THROUGHOUT, UNLESS OTHERWISE NOTED. alteration, and a specific description REMOVE ALL WINDOW SYSTEMS, INCLUDING FRAME, TYPICAL UNLESS OTHERWISE NOTED of the alteration. REMOVE ALL WALL COVERING, TYPICAL. REMOVE ALL FIRE EXTINGUISHER / HOSE CABINET. SALVAGE AND RETUREN EXITNGUISHER REVISION SCHEDULE TO OWNER, TYPICAL UNLESS OTHERWISE NOTED REMOVE, SALAVAGE AND REFURBISH ALL EXISTING RADIATOR UNITS FOR REINSTALLATION NAME DATE UNLESS OTHERWISE INDICATED ON MECHANICAL DRAWINGS. REFER ALSO TO MECHANICAL AND PLUMBING DRAWINGS. ADD-01 12/14/18 REMOVE ALL PLUMBING FIXTURES, TOILET PARTITIONS, AND ACCESSORIES, TYPICAL, UNLESS OTHERWISE NOTED. REFER ALSO TO PLUMBING DRAWINGS.
11
14 15
D11A D22
C
FIRST FLOOR PLAN - NORTH
9 e3
D
KEY PLAN
6
NORTH
1127
3B
SIM H9 H11
SIM H7
1101-B
F8
F
THIS DEMOLITION DRAWING INDICATES MAJOR ARCHITECTURAL ITEMS FOR REMOVAL, PATCH, AND REPAIR. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF WORK AND SHALL COORDINATE AND EXECUTE FULL SCOPE OF REMOVALS AS REQUIRED TO EXECUTE SCHEDULED WORK. ITEMS SCHEDULED FOR REMOVAL MAY CONTAIN ASBESTOS, LEAD, OR OTHER HAZARDOUS MATERIALS. REFER TO HAZARDOUS MATERIAL DRAWINGS AND/OR SURVEY FOR SPECIAL DEMOLITION REQUIREMENTS. PROTECT/ MAINTAIN ALL EXISTING FIRE PROTECTION AND FIRE RESISTANCE RATED CONSTRUCTION. WHERE DEMOLITION OR SCHEDULED WORK DISTURBS FIRE PROTECTION, THE CONTRACTOR SHALL MAKE REPAIRS NECESSRY TO MAINTAIN REQUIRED RATING. CONTRACTOR SHALL, AT ALL TIMES, PRESERVE THE STRUCTURAL INTEGRITY OF THE EXISTING CONSTRUCTION AND MAINTAIN WEATHER-TIGHTNESS OF THE EXISTING ENVELOPE. THE CONTRACTOR SHALL PROVIDE TEMPORARY STRUCTURAL BRACING AS REQUIRED DURING DEMOLITION AND CONSTRUCTION. DATE: REFER TO DRAWING OF OTHER TRADES FOR CONSTRUCTION REQUIRING SELECTIVE
1100.3
1100.8
6
A7 3B
1
VESTIBULE 1100
1100.4
1B
12
GENERAL DEMOLITION NOTES
1100.2
ALIGN 1124-A
G1
2 1/2"
A10
GENERAL CLASSROOM 3A 1131
E
A258
11
F3
F6
13' - 6"
A6
FEC
5' - 0"
FR
9' - 9"
10
A254
F8 1100.5
3' - 7"
FORUM 1124
4' - 0"
1131
A1 A256
1100.1
F1
6
F1
3B
FR 5' - 0"
e2
5/8" GYPSUM BOARD INSTALLED TO CONCEALED SIDE OF DOOR TO COVER GLASS DOOR LITE WITHIN STUD CAVITY. GYPSUM BOARD TO BE LABEL-FREE. MODIFY UNDERCUT OF EXISTING DOOR TO ACCOMMODATE RAISED FLOOR. PROVIDE MINIMUM 1/2" UNDERCUT. EXTEND FLOOR LEVELING AND FINISH INTO DOOR OPENING. PATCH AND PAINT WALLS AT WINDOW REPLACEMENT AREAS.
RENOVATIONS TO
FR
E1
ALIGN
e1
E
1125-B
STORAGE 1125-A F10 A451
6
14 15
1A 1125-A
A201
A1
1125
5D
VENDING 1124-B
1A
A254
MATH DEPT OFFICE 1125
13
A2
H1
ALIGN
F
KEYED CONSTRUCTION NOTES WORK LIMITED TO EXTERIOR WALL MODIFICATIONS, FIRE PROTECTION, AND ABOVE-CEILING WORK RELATED TO THE FIRST FLOOR, WITH ASSOCIATED ABATEMENT. PREPARE AS FUTURE SURGE SPACE. NO FLOOR OR CEILING FINISH. PATCH AND PRIME WALLS. INFILL OPENING TO MATCH AND ALIGN WITH EXISTING ADJACENT WALL CONSTRUCTION AND FINISH. 1/2" X 8' - 0" TALL PLYWOOD SHEATHING (FIRE RATED) TO ACCOMMODATE EQUIPMENT INSTALLATION ALL WALLS. BOTTOM OF PLYWOOD AT TOP OF WALL BASE (4" AFF). PROVIDE STUD WIDTH AND NUMBER AND THICKNESS OF GYPSUM BOARD SHEETS TO EQUAL EXISTING WALL THICKNESS. PROVIDE FIRE AND SMOKE RATINGS TO MATCH EXISTING AND AS REQUIRED BY CODE CONFORMANCE DRAWINGS. REPAIR PLASTER WALL AND PREPARE FOR SCHEDULED FINISH. INFILL ALL MASONRY OPENINGS, INCLUDING ABANDONDED BEAM POCKETS AND PREPARE WALL FOR INSTALLATION OF SCHEDULED EQUIPMENT. REFER ALSO TO MECHANICAL DRAWINGS. LEVEL FLOOR TO ALIGN WITH ADJACENT FINISHED FLOOR. PROVIDE SEALER AT ALL LOCATIONS WHERE LEVELER IS LEFT EXPOSED. PROVIDE SKIM-COATING UNLESS OTHERSWISE NOTED. ( # ) = APPROXIMATE FLOORING LEVELING DEPTH IF MORE THAN A SKIM-COATING IS REQUIRED. TROWELABLE UNDERLAYMENT SLOPED TO FLOOR DRAIN. RESTORE LAWN / LANDSCAPING TO MATCH EXSTING. REPAIR WATER-DAMAGED ROOF PLANKS WITH WOOD CONSOLIDANT EPOXY. RESTORE GYPSUM BOARD TO MATCH EXISTING, INCLUDING FINISH WHERE REMOVED FOR ACCESS TO CHASE. REPLACE WALL BASE TO MATCH EXISTING AS REQUIRED. REINSTALL ALL WALL-MOUNTED EQUIPMENT AND FIXTURES TEMPORARILY REMOVED TO ACCOMMODATE THE WORK. INSTALL 30" X 30" RATED ACCESS DOOR UNDER MARKER RAIL.
1A
4' - 0"
1130
5
5C
9' - 2"
1125-C
5C
A451
9 10 11 12
1/8"
1A
4C
1122
STAIR 7 1199-G
8
A2
7
14' - 11 1/2"
4C
5C
ALIGN
A256
B
DEPT CHAIR 1125-C
1A
3
5B
ALIGN
SIM F1
CORR 1100-G
A1
6 7
4C
TESTING 1125-D
3
A252
F6
3B
4ALIGN
D
5
A
FAC 4 1123-F
A4
3B
DATE 12/27/18 01/03/19 01/09/18
FR
FLOOR RECEPTACLE
1100.7
5' - 0"
3
FEC
2 CL
3 4
9' - 10 3/4"
1A
4C
4A
A254
9' - 9"
ALIGN
24' - 0 5/8"
1
A1
1125-D
3B
UP
6 5' - 11" 4C
C11
A1 A9
25' - 3"
D11 A553
A
1A
4C 1A
5D
5' - 0"
A256
# 1 2
1123-F
FR
C
A301
A555
3B
30' - 5"
A
1A
1A
1123-G
ADJ 1 1123-G
1194-D
4A 1A
A9
FR
F4
G1
5' - 0"
5C
A11
A7
1126
1128
MATH COMPUTER LAB AND METHODS CLASSROOM 3 1130
H1
A253
TUTORING 1120-C
STUDENT COLLABORATIVE WK RM 1122
FR
3B
A
A256
1A
C9
FEC
FAC 3 1123-E
E3
E6
1194-C
MECH 1194-D
1A
A1
FR
M B K L J
A253
TUTORING 1120-D 4A
1120-D
1120-C
FCO
G
REVISION SCHEDULE NAME ADD-03 ADD-04 ADD-05
6
SIM
D
C11
1A
1A
3B
C5
ACTIVE CLASSROOM 5 1126
4C 6' - 0"
4A
E1 FAC COM 1123 A253
E8 1123
5D
3
ELEC 1194-C
1A
16' - 5"
GENERAL CLASSROOM 1 2124
A253
A5
30' - 1"
A256
C5
13' - 0"
12
C
. 3
4A
CR
PP
FD
FLOOR DRAIN
RESTORE LAWN/ LANDSCAPING
H11
3' - 6"
3.
3 5/8"
4A
10' - 3"
4C
1' - 7 5/8"
3 5/8"
5C
E10
1123-E
ALIGN
ELEV 1198
4C
ADJ 3 1120-A 1120-A
A252
F10
5D A6
1A
CORR 1120 1120-B
7
CARD READER, REFER TO ELECTRICAL
A
1A
AUTOMATIC DOOR OPERATOR PUSH PLATE
8
5D
5D
FEC
FLOOR CLEAN OUT
FAC 2 1123-D
1123-D
ALIGN
5D
ADD-05 01/09/18
9' - 0 3/8"
ELEC
A
9' - 10 3/4" 1A
A253
1199-E
5D
SIM
CONSTRUCTION LEGEND ELECTIC PANEL FIRE EXTINGUISH CABINET/BRACKET
8
FAC COM 1123-A E11
4C
5D
10' - 6"
4A
SM CONF RM 2 4A 1118 F10 6' - 0" FR
WOMEN 1116
A
G
E5 A602
CORRIDOR 1100-H
UP 8
1118
6' - 0"
CUSTODIAL 1197-B
1A MIRE11
A11
6' - 0"
A
STAIR 1 1199-E
ADD-05 01/09/18
A253
A
State University of New York Cortland 40 Graham Avenue, Cortland, New York 13045
8
6
1A
State University of New York Cortland 40 Graham Avenue, Cortland, New York 13045
F5 1121
4C
1116
1121-F
FAC COMM 1121-G
A253
6
1A
FAC 1 1123-C
4C
1A
1123-C
DN
Moffett Center - Phase II
1121-E
STOR 1123-B 1123-B
4C 1A
12' - 8"
4' - 1 1/8"
1A
1121-A
FAC 5 1121-F
RENOVATIONS TO
4A 5D
F1
F1
1121-D
FAC COM 1121
ADJ 2 1121-A
4C
1A
FAC 6 1121-E
4C
A252
A252 1' - 3"
1A
1A
4C
10' - 10"
1/8" 10' - 6 1/2"
1A
4A
4A
H1
3
3
6' - 0"
1121-B
STOR 1A 1121-B
6
7
FAC 7 1121-D
1121-C
1A
1A
17' - 3" FAC 13 1119-F 4C
1A
6' - 4"
STOR 1119-G
8' - 5" C1 A402
FAC 8 1121-C
1128.1
A
A
132 E. Jefferson Street Syracuse, New York 13202 p 607N273 7600
WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.
10
7/8"
1A
A001
14' - 8 3/4"
A4
14' - 0"
14' - 7"
3
1119-F
4C
1A 4C 4C
TYP
D6
FAC 12 1119-E
F8 A452
2 1/2"
11' - 1" A
12
RCP, Plan, & Demolition Plan: Revit
B
RCP - NORTH
619 West State Street Ithaca, New York 14850
12
TYP
E1 A651
20' - 3"
5D
ADD-05 01/09/18
7
A202
TYP
A
11' - 7"
FEC
3
1119-E 1119-G
7' - 3 1/2"
1119
A252
A11
eA
E
9
21' - 7 1/4"
1A
1197-B
15
C1 A651
11' - 10"
A
ALIGN
E11
1A H5
H6
SIM
4C
7
1A
7 1A
1119-D
H1 A253
8
A253
1A
FAC 11 1119-D
1119-C
FAC COM E5 SIM A602 1119 8
FAC COM 1119-A
1117
15
11' - 7" A
4' - 6"
FAC 10 1119-C 1119-B
4A
5D
G1 A402
1A
6
FAC 9 1119-B
1A
MEN 1117
1199-D
A
9' - 11" A
9' - 4 3/4" 7/8"
4D
F
A301
A
5' - 2 1/2"
4C
6
STAIR 4 1199-D
A
A302 14' - 4"
A
A
DN
STAIR 5 1199-C
15
8
A AA
G
D1
SIM
11' - 7"
D1
6' - 3 3/4"
TYP
D6
15
7
15
C
OTHER: Architecture DRAWN BY: CK, AFD Planning FIRST FLOOR Interior Design
Moffett Center - Phase II
A
15
10' - 5 3/4" 7/8"
A
A001
A
11/19/2018
PROJECT:
F3 A452 A
D
I
DATE:
E1
1 SIM F3 A452
I
6
SOUTH SIM TO 1126
7
REFLECTED CEILING PLAN - FIRST FLOOR NORTH 1/8" = 1'-0"
A3
NORTH
12
GENERAL CONSTRUCTION NOTES
CONTRACTOR SHALL PROVIDE FIRE RETARDANT WOOD BLOCKING AT ALL FLOOR, WALL, AND CEILING MOUNTED EQUIPMENT, MILLWORK, AND ACCESSORIES PROVIDED UNDER THIS CONTRACT AND EQUIPMENT TO BE PROVIDED BY THE OWNER. CONTRACTOR SHALL PROVIDE BRACING WHERE REQUIRED TO SUPPORT OR STABILIZE ALL NON-STRUCTURAL FRAMING. PROVIDE ACCESS PANELS IN WALLS AND CEILINGS AS REQUIRED TO OBTAIN CONVENIENT MAINTENANCE ACCESS TO ALL VALVES, DAMPERS, CONCEALED JUNCTION BOXES, AND OTHER EQUIPMENT REQUIRING ADJUSTMENT, SERVICE, OR MAINTENANCE. PROVIDE PROPOSED LOCATION AND SIZE OF ALL ACCESS PANELS FOR REVIEW AND APPROVAL BY ARCHITECT PRIOR TO INSTALLATION. PROVIDE FIRE RATED ACCESSORIES AT ALL FIRE RATED PARTITIONS. REFER TO CODE CONFORMANCE DRAWING FOR FIRE EXTINGUISHER CABINET LOCATIONS. PATCH EXISTING PLASTER TO REMAIN WHERE DAMAGED DUE TO REMOVALS AND CONSTRUCTION. NORTH PROVIDE WOOD BLOCKING AS REQUIRED FOR LEVEL INSTALLATION OF SUBFLOOR AT LOCATION WHERE WALLS WERE REMOVED, TYPICAL. CORRIDORS (TYPICAL): SKIM-COAT AND LEVEL ENTIRE FLOOR SLAB. PROVIDE 1/4" UNDERLAYMENT OVER EXISTING WOOD FLOORS. WHERE CERAMIC TILE FLOOR REMOVAL OCCURS, BUILD UP FLOOR TO ALIGN WITH SOUTH ADJACENT FLOOR. SUBLOOR SHOULD ALIGN WITH ADJACENT SUBLFOOR AND BE CONTINUOUS TO PROVIDE A LEVEL AND SMOOTH SURFACE TO RECEIVE FINISHES.
KEY PLAN
3
8' - 6"
10' - 0"
10' - 0"
e1
11
4' - 7 5/8"
EXISTING CEILING TO BE PAINTED
A561
A
1/7/2019 5:17:28 PM
8
G10 A552
1124
4' - 6"
H1
B
7
D3 A553
10' - 0"
5' - 6"
3
8' - 6"
2
1' - 7 5/8"
1/7/2019 5:16:36 PM
10' - 0"
1
DATE
SOUND ABSORBING CEILING UNIT CEILING TYPE: SAW2
SD
SD
9' - 0" 1121-A
OS
A561
OS
NAME
ACOUSTICAL WOOD CEILING CEILING TYPE: AWC1
2' X 6' ACOUSTICAL PANEL CEILING TYPE: APC2
OS
G
REVISION SCHEDULE
WOOD VENEER PANEL
2' X 2' ACOUSTICAL PANEL CEILING TYPE: APC1
OS
SD
1199-E OS
8' - 1"
G8 A153
SD
1121-F
SD OS
OS
SD
8' - 1"
9' - 0"
1121-E
9' - 0"
SD
SD
1121
1119-A
A561
1121-D
SD OS
SIM
C1
P1
9' - 0"
1121-C
GYPSUM BOARD CEILINGS AND SOFFITS
9' - 0"
9' - 0"
SD
OS
1119 SD
F
9' - 0"
1119-E
SD OS
9' - 0"
SIM
C1
SD OS
A561
2' - 5" 4' - 9"
F
9' - 0"
1119-C
SD OS
H3
4' - 0"
F OS
3 FULL PANELS
2' - 7 5/8"
9' - 0"
1119-B
4' - 0"
STAIR 5
WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.
EQ
RENOVATIONS TO
A1 A561
H
ACOUSTIC WOOD CEILING AT FACULTY COMMONS ENTRANCE, TYP G8 1/4" = 1'-0"
COORDINATE SKYLIGHT LOCATIONS WITH DUCTWORK, STRUCTURE, AND OTHER ABOVE CEILING AND ROOF ITEMS
SIM
A5 A561
EQ
www.holt.com
Moffett Center - Phase II
G
4
AWC1
ALIGN
ACOUSTIC WOOD CEILING AT FACULTY DEPARTMENT ENTRANCE, TYP G5 1/4" = 1'-0"
3
RECESSED LIGHT FIXTURE
p 607 273 7600
REMOVE AND REINSTALL CEILNG TO ACCOMMODATED ABOVE CEILING WORK. REPLACE ALL DAMAGED / DIRTY CEILING TILES TO MATCH EXISTING. CONTRACTOR SHALL ASSUME 25% WILL REQUIRE REPLACEMENT. REPAIR EXISTING PLASTER / GYPSUM BOARD CEILNG TO MATCH EXISTING AS REQUIRED TO ACCOMMODATE MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION WORK. SCOPE LIMITED TO EXTERIOR WALL MODIFICATIONS, FIRE PROTECTION, AND ABOVE-CEILING WORK RELATED TO THE FIRST FLOOR, WITH ASSOCIATED ABATEMENT. CENTER LIGHTING IN SOFFIT.
2
2"
619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202
KEYED REFLECTED CEILING NOTES
# 1
H
Architecture Planning Interior Design
State University of New York Cortland 40 Graham Avenue, Cortland, New York 13045
1/7/20
ALIGN WITH GRID ABOVE RECESSED LIGHT FIXTURE
3 FULL PANELS
H5
19
A
TRANSFORMATION GRANT PROJECT Schuyler Hospital - Montour Falls, NY Addition and alteration | Construction documents completed November 2018 HOLT Architects Role: Designer - Completed construction documentation
1/8/2019 4:59:01 PM
The Transformation Grant Project added a new inpatient unit to the existing hospital, as well as a renovation to its outpatient unit. I assisted in the production of construction documents and renderings.
1
2
3
4
5
6
7
8
9
10
11
12
REFLECTED CEILING PLAN NOTES: 1. AT ALL LAY-IN ACOUSTIC CEILINGS ARE 8'-0" ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED. 2. AT GROUND FLOOR ALL GYPSUM SOFFITS AND CEILINGS ARE 7'-11" ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED.
I
I
3. AT FIRST FLOOR ALL GYPSUM SOFFITS AND CEILINGS ARE 8'-5" ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED. 4. ALL GYPSUM SOFFITS AT CASEWORK ARE 7'-2" ABOVE FINISHED FLOOR, UNLESS OTHERWISE NOTED. 5. MOUNT ALL SPRINKLER HEADS, ELECTRICAL DEVICES, LIGHT FIXTURES, ETC. CENTERED IN 2'X2' ACOUSTIC CEILING PANELS, UNLESS OTHERWISE NOTED. 6. CENTER ACOUSTIC CEILING PANELS WITHIN FIELD AS INDICATED ON REFLECTED CEILING PLANS, PROVIDING NUMBER OF PANELS SHOWN, UNLESS OTHERWISE NOTED. 7. ACOUSTICAL PANEL CEILING TYPE: ACP 1, UNLESS OTHERWISE NOTED.
Architecture Planning Interior Design 619 West State Street Ithaca, New York 14850 132 E. Jefferson Street Syracuse, New York 13202
8. ALL GYPSUM SOFFITS TO BE PAINTED P1, UNLESS OTHERWISE NOTED
p 607 273 7600
ADDENDUM 2 12/6/18
H
www.holt.com
ADDENDUM 2 12/6/18
H
R4
R4
1719T 1717
9' - 6" ACP-2
F
C123
1718T
9' - 0" ACP-3
9' - 6"
R4
7' - 2" C124
F A561 8' - 6"
R4
R2
1721
GYPSUM BOARD CEILINGS AND SOFFITS
F
R3
8' - 6" ACP-2
1742 H10
9' - 6" ACP-2
A561
8' - 6" ACP-2
2' - 0" R4 1711
FULL TILE H10 A561
8' - 6" ACP-3
SD
1726 1729
F
SD
9' - 0" ACP-1 7' - 2"
1421
F
SD
C120 F
9' - 0" H10
SD
ø 7'
SD
RETURN AIR/ EXHAUST GRILLE SUPPLY AIR GRILLE
SD
SMOKE DETECTOR
LINEAR DIFFUSER
F
FIRE ALARM STROBE
9' - 6"
SD
A561
EXIT SIGN 1764T 1760
1509
1761
1762
F
M
M
M
9' - 0"
ACCESS PANEL SPEAKER
7' - 2"
PULL SIDE
1'-0" CEILING HEIGHT/ MATERIAL (APC#)
H7
EQ
ROLLER SHADES, SEE FINISH PLANS
DATA/VIDEO PROJECTOR. CENTER MOUNT ON PROJECTION SCREEN
A561 EQ
DOME SAFETY MIRROR CUBICLE CURTAIN
OCCUPANCY SENSOR
OS
SD
1763
10"
R1
SPRINKLER HEAD
- 0"
7' - 2"
1508
C
PENDANT LIGHT FIXTURE
WALL WASHER LIGHT FIXTURE
OTHER ALIGN 8' - 6"
1' - 6"
ALIGN SD
RECESSED LIGHT FIXTURE
SURFACE MOUNTED LIGHT FIXTURES
1725
E
RECESSED COVE LIGHT FIXTURE
LAY-IN/ RECESSED PARABOLIC LIGHT FIXTURES
1725T
F
R2
8' - 6" ACP-3
LINEAR RECESSED LIGHT FIXTURE (W) - WALL WASH
SURFACE MOUNTED TRACK LIGHT FIXTURE
LAY-IN/ RECESSED TROFFER LIGHT FIXTURES
R4
8' - 6"
1728T 8' - 6"
ALIGN
EQ
F
8' - 6"
1728
FULL TILE
W
LAY-IN/RECESSED DIRECT/INDIRECT LIGHT FIXTURES
ADDENDUM 2 12/6/18
4"
R4
C121
7' - 2"
LINEAR SURFACE MOUNTED LIGHT FIXTURE 1724
R4 4"
SD
1703 8' - 6"
LINEAR PENDANT LIGHT FIXTURE
1724T
A1 A404
1727
R4
FULL F TILE
1710T
1701 8' - 6" ACP-3
LIGHT FIXTURES
F
C126
9' - 6"
F
SD
TYPICAL INPATIENT ROOM
1723
9' - 6" ACP-2
H7 A561
C127
4"
R3
9' - 6" ACP-2 1710
D
R4
SD
1748
R2
9' - 6" ACP-2
F
METAL PANEL CEILING
NOTE: SEE CEILING ELEVATION TAGS FOR CEILING TYPE
D1 A403
1723T
R4
1740 SD
2' - 0"
WOOD PANEL CEILING
NO CEILING (OPEN TO STRUCTURE)
R3
C125
8' - 6" ACP-3
1741
8' - 6" ACP-2
EQ
ADDENDUM 2 12/6/18
E
F
SD
1747
1746
2' X 2' ACOUSTICAL PANEL CEILING TYPE: APC1, APC2, APC3 AS NOTED
1722
R4
EQ
1712
CEILING MATERIALS
1722T
1744
C122
SD
9' - 6" ACP-2
DATE 11/29/18 12/6/18
1721T
1745
1743
1712T
G
REVISION SCHEDULE NAME ADDENDUM 1 ADDENDUM 2
A4 A404
SD
8' - 6" ACP-2
1713T R4
R4
R4
F
SD
9' - 6" ACP-2
H7
EQ
SD
8' - 6" ACP-3
MODIFY EXISTING CEILING IN ORDER TO ACCOMMODATE THE WORK BOTTOM FACE OF SOFFIT AND ALL EXPOSED SIDES TO BE PAINTED P2 (BLUE) BOTTOM FACE OF SOFFIT AND ALL EXPOSED SIDES TO BE PAINTED P4 (GREEN) PROVIDE METAL FILLER PANEL TO MATCH LIGHT HOUSING
ADDENDUM 2 12/6/18
1720
8' - 5" ACP-2
8' - 6" ACP-3
FULL TILE
1713
F
R1 R2 R3 R4
F
1720T 1717A
4"
1714T
SD
4" FULL TILE
9' - 6" ACP-3
8' - 6" ACP-3
8' - 5" ACP-2 2' - 0"
WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.
REFLECTED CEILING PLAN KEYED NOTES:
KEY PLAN
B
1704
1
SCHUYLER HOSPITAL 220 Steuben Street, Montour Falls, New York 14865
1717T
9' - 6" ACP-2
ADDENDUM 2 12/6/18
1719
ADDITION AND ALTERATION FOR
SD
1715T
1714
G
2' - 0" TYP
1718
4" FULL TILE
TRANSFORMATION GRANT PROJECT
1715
DATE:
NOV 2, 2018
PROJECT:
2017082
D
C
B
OTHER: DRAWN BY: Author
8' - 0"
SECTOR
A
A1
1
0'
2
3
2
4
3
5
4
6
5
7
6
8
7
9
8
9
4'
8'
16'
FIRST FLOOR REFLECTED CEILING PLAN A SECTOR 1
3
SECTOR
FIRST FLOOR REFLECTED CEILING PLAN - SECTOR 1 1/8" = 1'-0"
1
2
A151
32'
10
10
11
12
11
12
GENERAL FINISH NOTES 1 2
ALL WALLS TO BE PAINTED P1 UNLESS OTHERWISE NOTED ALL GYPSUM BOARD CEILINGS TO BE PAINTED P7 UNLESS OTHERWISE NOTED ON REFLECTED CEILING PLAN. ALL DOORS / FRAMES AND PAINTED WINDOW TRIM / FRAMES SHALL BE PAINTED P6 UNLESS OTHERWISE NOTED. PAINT ALL PREVIOUSLY PAINTED SURFACES IN CONTRACT LIMIT LINE. ALL WALL BASE TO BE B1 UNLESS OTHERWISE NOTED. SEE INTERIOR ELEVATIONS FOR ADDITIONAL WALL AND BASE FINISHES, TYPICAL. SEE REFLECTED CEILING PLAN FOR ADDITIONAL FINISH INFORMATION, TYPICAL. SEE INTERIOR ELEVATIONS FOR WALL TILE LAYOUT AND LOCATION, TYPICAL. ALL FLOORING MATERIAL AND TRANSITIONS SHALL BE CENTERED UNDER THE DOOR IN THE CLOSED POSITION UNLESS OTHERWISE NOTED. AT TRANSITIONS BETWEEN CARPET AND VCT, PROVIDE RESILIENT TRANSITION STRIP. NO VCT TO BE CUT LESS THAN 6", REFER TO FINISH PLAN FOR PATTERN. EXTEND ALL FINISHES UNDER CABINETS, BENCHES, SHELVING, COUNTERTOPS AND LAVATORIES. MISCELLANEOUS ELECTRICAL PANEL COVERS, GRILLES, ETC. TO BE PAINTED TO MATCH ADJACENT WALL SURFACES. ALL METAL UNDER-COUNTER SUPPORT BRACKETS TO BE PAINTED TO MATCH ADJACENT WALL FINISH. ALL GYPSUM BOARD AT TOILET ROOMS TO BE MOISTURE RESISTANT GYSPUM BOARD UNLESS OTHERWISE NOTED. REFER TO INTERIOR ELEVATIONS FOR LOCATION OF CABINET LOCKS ADHESIVES AND FINISHES TO BE LOW VOC. OUTSIDE CORNERS TO RECEIVE CORNER GUARDS (U.O.N.). PROVIDE (1) ROBE HOOK MOUNTED AT 5'-6" AFF AND (1) MOUNTED AT 4'-0" AFF AT EACH TOILET ROOM DOOR. CENTER HOOK ON INSIDE OF DOOR. RIGID WALL PROTECTION (WP1) AT 4'-0" HEIGHT (TOP @ 4'-6" ABOVE BASE) U.O.N.
3
I
4 5 6 7 8 9 10 11 12 13 14
H
15
RS1/RS2
P8
CG1 1-D WP1
EXAM 1711 P1 SV1 CV
CC1
D
1-B WP2
P8
F1
CG1
STAFF ROOM 1728 P1 V1 B1
LOCKERS 1729 P1 V1 B1 SAW1
WC PL1 CT PL1 E E3 C PL1
P8
5' - 8"
10' - 6"
SAW1
1-C WP1
AMBULANCE STORAGE 1421 P1 V1 B1
EVS 1701 SV1 CV
WC CT SS1 E E2 C
1-B WP1
F12
OFFICE 1509 P1 V1 B1
RS1
P8
CG1
MDF FEATURE PANEL
WP1
PS1
GRAPHIC PANEL
P2
ACCENT WALL PAINT COLOR
INPATIENT SINGLE
CO FB
FLOOR FINISHES SCOPE OF WORK AREA
CG1
V2
P1
OFFICE 1761 P1 C1 B1
OFFICE 1762 P1 C1 B1
FLOOR CLEANOUT COORDINATE WITH PLUMBING DRAWINGS
E
FLOOR BOX
WC
TALL OR BASE CABINET FINISH
WD1
CT
PL1
E
SS1
C
PL2
* REFER TO ELEVATIONS
V3
KEYED FINISH NOTES
A1
F1
OFFICE 1763 P1 C1 B1
F2 F4 F5 F6 F7 F8 F9 F10 F11
V2
C
F12
REFER TO TYPICAL INPATIENT TOILET ROOM FOR FINISH INFORMATION CENTER POINT OF FLOORING PATTERN EXISTING FLOORING TO REMAIN, PATCH AS REQUIRED SAW3 DIVIDER, TYPICAL SS1 TRANSACTION TOP SS2 TRANSACTION TOP ACCENT WALL OPPOSITE DOOR, TYPICAL REFER TO ROOM 1961T FOR FINISH INFORMATION PF1 IN HOLLOW METAL FRAME, TYPICAL ROLLER SHADES RS1/RS2 AT CLERESTORY WINDOW ABOVE, SEE FINISH PLAN PAINT WALLS TO MATCH EXISTING ADJACENT
KEY PLAN CORRIDOR 1704 P1 V1 B1
B
F
WALL PROTECTION (REFER TO WALL PROTECTION LEGEND)
COUNTERTOP EDGE
CP1 RB1
NOTE: REFER TO FINISH SCHEDULE FOR MATERIALS.
PUBLIC TOILET 1764T P1 FT TB
GLAZING FILM
RESILIENT WALL BASE, MATCH EXISTING (SHOWN GRAPHICALLY ONLY WHEN IN PATCHING APPLICATIONS)
COUNTERTOP FINISH
BASE TREATMENT IFC1
CG1
DATE 11/29/18
CORNER GUARD 4'-0"H U.O.N. (TOP @ 4'-6" AFF). TYPICAL AT ALL OUTSIDE CORNERS. COORDINATE WITH MILLWORK
WALL CABINET FINISH
3101
WALL TREATMENT FLOOR TREATMENT
WC CT PL3 E E1 C
STAFF TOILET 1728T P1 T1 TB1
G
REVISION SCHEDULE
MILLWORK FINISH KEY:
ROOM NUMBER
INPATIENT SINGLE
CG2
RB1
WALL COVERING
MP1
WC CT SS1 E E3 C V2
MARKERBOARD TACKABLE/ ACOUSTIC PANEL
TP1
INPATIENT SINGLE
GF1
ROLLER SHADES
MB1
WC1
CG1
STORAGE 1726 P1 V1 B1
OFFICE 1760 P1 C1 B1
F12
VINYL COMPOSTION TILE, V4
PULL SIDE
G1 A403
F1
SHELL SPACE 1508
VINYL COMPOSTION TILE, V3
ROOM FINISH KEY:
1-A WP1
CG1
VINYL TILE, LVT1
VINYL COMPOSTION TILE, V2
NOTE: 1. ALL FLOORING TO BE V1, U.O.N.
INPATIENT SINGLE
CG1 1-C WP1
SHEET VINYL, SV1
VINYL COMPOSTION TILE, V1
WC PL1 CT SS1 E E3 C
IFC1
1-E WP1
CG1
CARPET TILE, C1
TYPICAL INPATIENT ROOM
F7
P8 SAW1
WC CT PL4 E E4 C PL2
IT 1703 P1 V1 B1
CG1
SAW1 SOILED 1748 SV1 CV
F7
F7
F2
CG1
CG1 F11
12' - 6"
9' - 10"
CG1
MB1
CG1
OBSERV DOUBLE 1710 P1 SV1 CV
12' - 6"
CG2
H
NAME ADDENDUM 1
V3
14' - 1"
PORCELAIN FLOOR TILE, PT1
INPATIENT SINGLE
CG1
CLEAN 1747 CG1 P1 V1 B1
P8
P8
14' - 0"
CG1
WC PL1 CT PL3 E E1 C PL1 DOC. 1746 P1 V1 B1
SAW1
CC1
F11
F2
4' - 0" CG2
V3
1-B WP2
E
MED 1744 P1 V3 B1
CLEAN 1742 P1 V1 B1
WC PL1 CT SS1 E E3 C CG1
1-B WP2
F11
CG1
WC PL1 CT SS1 E E3 C PL1
NURSE STATION 1745 P1 V3 B1
P8
CC1
CG1
CG1
OBSERV. DOUBLE 1712 P1 SV1 CV
NOURISH 1743 P1 V1 B1
WC PL1 CT PL4 E E4 C PL2
P8
CC1
CG1
SAW1
F1 CG1
CG2
WC PL1 CT SS1 E E3 C PL1
WC CT SS1 E E3 C
MB1
P8 1-B WP2
RS1/RS2
F
CG1 CG1
CG1
SAW1
P8 CG1
INPATIENT SINGLE
CG1 F1 1-E WP1
CG1
INPATIENT SINGLE
FINISH LEGEND
P8
F1
WC PL1 CT E C
www.holt.com
WARNING: It is a violation of New York State Law for any person, unless acting under the direction of a licensed Architect, to alter this document in any way. If a document bearing the seal of an Architect is altered, the altering Architect shall affix to such document his seal and the notation "altered by" followed by his signature, the date of such alteration, and a specific description of the alteration.
CG1
TYPICAL IN CORRIDORS UON
CG2
CG1
INPATIENT SINGLE
G
20
132 E. Jefferson Street Syracuse, New York 13202 p 607 273 7600
V2
1
SCHUYLER HOSPITAL 220 Steuben Street, Montour Falls, New York 14865
INPATIENT BARIATRIC
INPATIENT SINGLE (ISOLATION)
INPATIENT SINGLE
16 17 18 19
INPATIENT SINGLE
P8
CG1
619 West State Street Ithaca, New York 14850
ADDITION AND ALTERATION FOR
CG1 CG1
I Architecture Planning Interior Design
TRANSFORMATION GRANT PROJECT
1/8/2019 4:53:53 PM
SECTOR
SECTOR
DATE:
NOV 2, 2018
PROJECT:
2017082
D
C
B
OTHER: DRAWN BY: Author
FIRST FLOOR FINISH PLAN SECTOR 1
3
A
2
A1
1
20 RCP & Finish Plan: Revit
FIRST FLOOR FINISH PLAN - SECTOR 1 1/8" = 1'-0"
2
A181 3
4
5
6
7
8
9
10
11
12
A
PROFESSIONAL RENDERINGS
University of Rochester iZone, Rush Rhees Library
INPATIENT ROOM at Schuyler Hospital
INPATIENT ADDITION at Schuyler Hospital
Renderings: Revit, Photoshop
21
22
S. Agnese in Agone
University work 24 34 42 48 56 60 61
National Veteran’s Resource Complex Syracuse, NY
[ R e a d ] cycl in g Park Participatory Recycling on Manhattan’s West Side
I D E A L a b & Commu n it y Ce n t er Brooklyn, NY
C h u r c h of t h e Res u rrect ion Rome, Italy
M e t h o d Med itat ion Thesis Project
I n t o t h e F ol d Syracuse, NY
O t h e r w ork Internships, Personal, & Sketches
23
MICRO CITY National V e t e r a n ’s Resource Complex In Collaboration with Yiwei Wu Syracuse, NY Spring 2016 | Prof. Larry Davis
24
The NVRC will be one of the most important new buildings on Syracuse University’s campus. Not only is it meant to be a welcoming and useful place for veteran’s and their families, but it is also the first building in the new campus Framework Plan, and thus will set the example for university buildings to come after it.
In response to this, we designed the parti of our NVRC to mimic the campus framework, which consists of bars of built, urban-esque areas, with connecting pathways throughout the campus. Not only does this create a modular design to be mimicked around the campus, but also creates urban-esque spaces within the project, that allow spacial separation, and yet allow visual connections throughout the project.
Sketch by Yiwei Wu
Rendering: Revit, Photoshop
25
26 Diagrams: Photoshop
SECTION A
SECTION B
SECTION C
SECTION D
Site Plan: AutoCAD, Illustrator SITE PLAN 1’ 0” = 1/40”
27
ALYSIS
SC
RO USE
AVE
L SHA MAR
ER WAV
B
C
VE LY A
D
E
F
G
H
I
J
K
L
M
N
19' - 0" 23' - 0"19' - 7 1/2" 19' - 5 1/4" 22' - 0 1/4"
A
L ST
7
6
5
4
3 2b
29' - 8"
2
1
PROJECT BRIEF
CONCEPT
SITE ANALYSIS
PRECEDENT
18” x 36” Beam 9” x 18” Beam 6” x 12” Beam 4” x 8” Beam 12” x 12” Column
SUN & AIR
6” x 6” Column 16' - 6"
30' - 0"
30' - 0"
30' - 0"
30' - 0"
38' - 0"
42' - 6"
35' - 6"
30' - 0"
19' - 0"
30' - 0"
30' - 5"
Bearing Wall
Summer Sun 70°
Winter Sun 23°
Summer (Louvre Closed)
CONCEPT
PRECEDENT
Winter (Louvre Open)
SUN & AIR Summer (Louvre Closed) Fresh Air
Winter (Louvre Open) Supply Air Return Air Hot Water Pipe Chilled Water Pipe Energy Recovery Ventilation System Blower
Summer Sun 70°
Winter Sun 23°
Summer (Louvre Closed)
Summer (Louvre Closed) Fresh Air
Winter (Louvre Open)
Winter (Louvre Open) Supply Air Return Air Hot Water Pipe Chilled Water Pipe Energy Recovery Ventilation System Blower
28 Diagrams: Revit, AutoCAD, Illustrator
2b
30
2b
15
2b
0
2b
-1
Axons: Revit, Illustrator
Plans: AutoCAD, Illustrator
29
7
6
5
4
3
2
1
Roof 62' - 0" Level 4 55' - 0"
Level 3 40' - 0"
Level 2 25' - 0"
Level 1 10' - 0"
Level 0 0' - 0" T.O.FOUNDATION -5' - 0"
SECTION B 1’ 0” = 1/8” 0’
D
E
30
F
G
H
2’
4’
8’
I
16’
1
2
3
4
5
6
7
Roof 62' - 0" Level 4 55' - 0"
Level 3 40' - 0"
Level 2 25' - 0"
Level 1 10' - 0"
Level 0 0' - 0" T.O.FOUNDATION -5' - 0"
SECTION D 1’ 0” = 1/8” 0’
J
K
L
M
2’
4’
8’
16’
N
Sections & Elevations: Revit, AutoCAD, Illustrator
31
32
Renderings: Revit, Photoshop
Model: Laser-cut chipboard & acrylic
33
[READ]CYCLING PARK: P a r t i c i pa t o ry R e cyc l i n g M a n h a t ta n ’ s W e s t S i d e In Collaboration with Celeste Pomputius New York, NY Fall 2014 | Prof. Lori Brown
34
on
[READ]cycling Park is a proposed Material Recovery Facility for the bureau of Manhattan, where no MRFs currently reside. To interacted with the vibrant community in the area, we added a library to the program, as well as other interactive attractions, with hopes of bringing the community closer to the waste process.
Rendering: Rhino, V-Ray, Photoshop
35
Amsterdam
ay adw Bro
Columbus
Central Park West
Amsterdam
Bro
Columbus
Central Park West
Columbus
Central Park West
68th
2009
West End Street
69th
from the 2010 Census
West End Street
Residences
West Side Highway
105K or Higher
West Side Highway
Minority Population of NYC’s West Side
67th
85K to 105K
66th
Lincoln Square Population
65th
55,239
65K to 85K
64th
Median Household Income
45K to 65K
63rd
105K or Higher
62nd
61st
85K to 105K
60th
59th
65K to 85K
25K to 45K
58th
57th
56th
45K to 65K
<$25,000
55th
54th
25K to 45K
53rd
52nd
51st
<$25,000
49th
100% of block
69th
68th
ay
Parks
adw
Greenscapes of NYC’s West Side
67th
66th
65th
50% of block
1. Riverside Park South 2. De Witt Clinton Park 3. Trump Total Greenspace Square Footage w/i .25mi
730,663 SF 44,268 SF 245,456 SF 1,020,387 SF
64th
63rd
62nd
61st
60th
59th
58th
0% of block
57th
56th
55th
54th
53rd
52nd
51st
49th
97.1 - 100%
67th
66th
Public High Schools 60.1 - 80%
40.1 - 60%
20.1 - 40%
5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15.
P.S. 191 Amsterdam Independence High School High School for Environmental Studies Beacon School Fiorello H Laguardia High School Urban Assembly Media High School Manhattan Theater Lab High School Manhattan/ Hunter Science High School High School for Law, Advocacy, + Community Justice High School for Arts, Imaginations, and Inquiry High School of the Arts + Technology
Performing Arts High Schools
16. Kaufman Music Center 17. The School of American Ballet 18. The Julliard School (pre-college)
Private High Schools
0.5 - 20%
19. Abraham Joshua Heschel High School 20. Professional Children’s School Total High School Aged Population
21. 22. 23. 24. 25. 26.
Higher Education
Lander College for Women John Jay College of Justice New York Institute of Technology The American Musical + Dramatic Academy The Julliard School Fordham University Total College Aged Population
65th
497 388 1300 1263 2688 369 241 456 454 434 603
200 450 290
64th
63rd
62nd
61st
60th
59th
58th
57th
860 220
56th
10,713
55th
54th
1150 13,217 900 1138 850 8345 25,600
53rd
52nd
51st
49th
36 Diagrams: Photoshop, Illustrator - by C. Pomputius
ay
68th
adw
unknown unknown unknown 70
Amsterdam
The River School Preschool of America New York Kids Club Lincoln Square Neighborhood Center
69th
Bro
1. 2. 3. 4.
Pre-K and Daycares
West End Street
80.1 - 97%
2009
Educational Institutions
West Side Highway
Median Household Income of NYC’s West Side
The Site Within the City Central Park West
Columbus
Amsterdam
ay adw Bro
West End Street
West Side Highway
Lincoln Center
Hellâ&#x20AC;&#x2122;s Kitchen
um
ss
in
m
Gla
Alu
ard
bo
T PE s #1
rd
Ca
$
$
$
$
l
eta
M
PE HD 2s #
er
p Pa
$
61st St.
Riverside Park [Existing] Bammens Bottle Return
Library
60th St. Material Recovery Facility Splash Plaza Bike Path + Park
Unloading
MRF Admin.
59th St. West End Ave.
West Side Hwy
Site Plan: AutoCAD, Illustrator
37
G YCL IN
REC
[READ]CYCLING PARK :
ss Gla
inum Alum
rd
T PE 1s #
al Met
PE HD 2s #
r pe Pa
er
p Pa
LIBRARY MRF
oa db Car
rd
oa
rdb
Ca
PARTICIPATORY RE $
T PE 1s #
$
PE HD 2s #
um
min
Alu l
ta Me
ss
Gla
$
$
$
$
$
$
$
$
$
Raw Material for Export
Sound Wall
$ in in
h :T iet Th Q u i et: Qu
ay 1 D ay 1D
Waste Studio Armand Damari and Celeste Pomputius Waste Studio Lori Brown Pomputius | 10.14.14 Armand Damari and Celeste Lori Brown | 10.14.14
$
$$ ck ck
i Th d : hi Lo u d: T Lo u
Library
Bottle Return
th on h 1 M o nt 1M
Collect Waste Studio
Armand Damari and Celeste Pomputius Waste Studio
S
Lori Brown Pomputius | 10.14.14 Armand Damari and Celeste Lori Brown | 10.14.14
$
38 Diagrams & Section: Rhino, Illustrator - by C. Pomputius
$
ECYCLING ON MANHATTANâ&#x20AC;&#x2122;S WEST SIDE Saturated with educational institutions, populated by a diverse citizenry, and located nearby a generous public greenspace, the Lincoln Center neighborhood seems an unlikely setting for Manhattanâ&#x20AC;&#x2122;s Material Recovery Facility (MRF). With particular attention to recreation and particpation, the pairing of a library and parkscape with the MRF aims to rectify the usually unwelcome characteristics of such industrial operations. $
Sort
Smog Wall
h :T iet h Q u i et: T Qu
in in
$
$
$ ay 1 D ay 1D
$
Waste Studio Armand Damari and Celeste Pomputius Waste Studio Lori Brown | 10.14.14
Armand Damari and Celeste Pomputius Lori Brown | 10.14.14
$
$ i Th d: i Lo u d: Th Lo u
ck ck
$
Bale
th on 1 M o nth 1M
Waste Studio Armand Damari and Celeste Pomputius Waste Studio
Play
Bike
Lori Brown | 10.14.14
Armand Damari and Celeste Pomputius Lori Brown | 10.14.14
$$
Sectional Rendering: Rhino, V-Ray, Photoshop
39
40 Rendering: Rhino, V-Ray, Photoshop
Model: Cardboard, chipboard, wood
41
IDEA LAB & COMMUNITY CENTER Brooklyn, NY Spring 2014 | Prof. Bess Krietemeyer
42
Located on the Smith & 9th St. subway station in Brooklyn, this IDEA lab is designed to promote solutions for the pollution problem that has plagued this industrial part of Brooklyn for years. To include this mundane site in Brooklynâ&#x20AC;&#x2122;s rising status, I have combined the lab with a community center, so it will be easy for those producing the ideas to share them with the community, and for the community to be part of the change. With large amounts of foot traffic from the center and the subway station, the site has the potential to bring life to industrial Brooklyn, and this proposal hopes to help the site reach its full potential.
Rendering & Diagrams: Rhino, V-Ray, Photoshop, Illustrator
43
SYSTEMS
PHOTOVOLTAIC SOLAR PANELS
EVACUTED TUBING
ELECTROLUMINESCENT FOIL
METHOD
WALL
MODULE
CURVE
WINDOW
ENTRY
SOUND
WIND
Evacuated Tubes
This Strip Module employs a combination of evacuated tubing, photovoltaic panels, and electroluminescent neon foil to create a skin system that is both flexible in design and in use. The strips can be adjusted to respond to its place on the site and the individual challenges that it may hold. This could include harvesting energy to providing an entry. Flexible Photovoltaic Panel
Electroluminescent Neon Foil
LONGITUDINAL SECTIO
STRUCTURE
44 Diagrams & Elevations: Rhino, Illustrator
SOUND
LIGHT
WIND
WATER
SITE MAP |
WEST ELEVATION | 1/16” = 1’ 0” |
SOUTH ELEVATION | 1/16” = 1’ 0” |
ON | 1/4” = 1’ 0” |
Section & Site Plan: Rhino, V-Ray, Photoshop, Illustrator
45
46
Renderings: Rhino, V-Ray, Photoshop
47
CHURCH OF THE RESURRECTION Rome, Italy Fall 2015 | Prof. Luca Ponsi
48
As the name suggests, this Catholic church is designed as a Church of the Resurrection reflection on the death and resurrection of Jesus, via circulation and sequence through geometrically similar volumes. 1. Jesus is put in the tomb However, due to the importance of the site, the church also - Religious serves to activate the contemplation adjacent public piazza, by providing contemplation spaces deep within the site, and public spaces - Baptistry along the perimeter. 2. Remains for one day - Personal contemplation - Individual chapels 3. Rises from the dead on the third day - Congregational celebration - Main prayer space Spaces are made up of mathematically similar volumes that are sized according to which part of the program they belong, and are organized by the rhythem of Santâ&#x20AC;&#x2122;Ivo, as well as other site forces.
49
1. Jesus is put in the tomb - Religious contemplation - Baptistry 2. Remains for one day - Personal contemplation - Individual chapels 3. Rises from the dead on the third day - Congregational celebration - Main prayer space Spaces are made up of mathematically similar volumes that are sized according to which part of the program they belong, and are organized by the rhythem of Santâ&#x20AC;&#x2122;Ivo, as well as other site forces.
50 Models: cardboard, chipboard, wood
Diagrams: Graphite & marker on vellum
51
52 Sanctuary Model: Foam core, pulp board, wood
Site Model: Blue foam, pulp board, gesso, wood
53
54 Plan / Section Combination: Graphite on vellum
Axon: Graphite on vellum
55
METHOD MEDITATION AN EXPERIMENTAL DEMONSTRATION OF SYSTEMIZATION IN ARCHITECTURE
Thesis Project Fall 2016 - Spring 2017 | Prof. Joseph Godlewski
56 Pavilion Axons: Rhino, Illustrator
The place of psychology in architecture has always been a contentious topic. Though the physical environment has an effect on how occupants feel and behave, neither architects nor psychologists have been able to produce environments that can consistently create a desired effect. To address this situation, many architects, such as Christopher Alexander, have utilized methods similar to those of psychologists, consisting of patterns, graphs, and statistics. Though many great buildings have been designed using this systemization, others designed using the same systems have failed. This lack of consistency has been attributed to a lack of empirical evidence, current developmental methods, and even the personal biases of the architects themselves. Meanwhile, other artists and architects have used systemization to push the boundaries of their own design. In these cases, the effect the rules of the system have on the result is clear. And though the results are often far from the “perfect” design Alexander is searching for, the intent of the artist also remains clear. In this thesis, I have continued to test the legitimacy of systemization in architectural design by using a rigorous survey of potential users. My system is informed by previous experiments, yet also employs the critiques of these systems to inform the rules. It’s theorized the byproduct of this unlikely system should be the “perfect” space for calmness and relaxation. The system itself is designed based on the techniques and methods of Alexander. These are incorporated mainly in a series of components I have composed based on his fifteen fundamental principles of harmonious architecture. However, participants from outside the realm of architecture have provided the rules. They did so by choosing which of the designed components are best for calmness and relaxation via a series of surveys. I interpreted these survey results, and have designed a series of relaxation pavilions based on what the participants chose. I hypothesize these pavilions will not provide relaxation for all who enter them, nor “perfect” relaxation for anyone. However, these pavilions provide a forum to discuss order and systemization as a method to find “truth” in design. As a whole, the experiments reflect on the disciplinary expertise of architects and the role of user input in the design process.
Fifteen Fundamental Principles Five Variables Strong Centers
Local Symmetries
Contrast
Gradients
Roughness
12
12
12
12
12
Determine the more desireable componets Survey 6
6
6
6
6
Gain better undrestanding of each component Scale
Color
degree / amount
Reasons for desireablility
Survey
Combine components two or three variables at a time Construct physical models Survey
Determine most Desireable components 3
3
3
3
3
Combine components All five variables
Construct physical models
Healing Space Pavilions 3-5
Components: Graphite
57
User Pavilions
Designer Pavilions
Axon | 1’ = 1/8” Axon | 1’ = 1/8”
Section| 1’ = 1/8”
Section| 1’ = 1/8”
Axon | 1’ = 1/4”
58
Axon | 1’ = 1/4”
Axon | 1’ = 1/8”
Section| 1’ = 1/8”
Axon | 1’ = 1/4”
Section| 1’ = 1/8”
Axon | 1’ = 1/8”
59
INTO THE FOLD:
A FREEDOM BY DESIGN PROJECT Designed in collaboration with Jon Anthony and Tiffany Pau Proposal drawings in collaboration with Jake Copich, Jon Anthony, and Tiffany Pau Construction Drawings in collaboration with Jon Anthony, Tiffany Pau, Stephen Muir, and Russell Sheer Syracuse, NY Summer 2013 - Spring 2014 (End of Involvement) Into the Fold is an accessibility ramp for the Westminster Church in Syracuse. It was commissioned to provide accessibility for the members of its aging parish that are unable to climb the stairs that stood in front of all entrances to the sanctuary. To solve this, as well as the threat of falling icicles, we designed a ramp and awning. Also, to further stimulate the surrounding community, we incorporated space for outside worship and activities. Like all other Freedom by Design projects, Into the Fold was designed, pitched, drawn, budgeted, and built by members of the chapter.
Freedom By Design Syracuse AIAS Wrap
In order to alleviate these social problems, the design team propose a ramp for Westminster that wraps ARMAND DAMARI SKETCHES around the site, or "Wramp" for IN ORDER OF DEVELOPMENT 12. 20.13 short. The design intention was to create a safe space for the community by integrating seating and an outdoor barbeque space as well as to solve the technical issue of accessibility. The ramp, which extends for 24ft and rises 2 ft, is enclosed on the side by a wrapping structure that protects users from falling icicles, diverting gravitational force using its multiplanar shape. SKETCH BY TIFFANY PAU
W estminster Church 1601 Park St Syracuse New York
60 Diagrams: Illustrator - Renderings: Photoshop
Into the Fold
SPECTRUM HEALTH Spectrum Health - Grand Rapids, MI Summer 2016 During my summer at Spectrum Health, I had the opportunity to be part of a Facilities department that oversees the eight million square feet owned and used by the healthcare giant, which is still expanding at an incredible rate. Under the architects in the facilities dept., I assisted with drawing and planning for many of the personnel moves and renovations across the entire organization, and also went around the West Michigan region surveying many of the buildings of the newly acquired practices, so that the department would have record of the plans and site. It was also my responsibility to add all these changes and additions to ProLease for the department. In addition, I also was asked to help the organizationâ&#x20AC;&#x2122;s push for more evidence-based design across its facilities, to make the most of the space already available. In response, the other two design interns and I visited many of the facilities and gathered data and asked the staff, practitioners, and patients questions about each space, and how it could be improved. We focused mainly on the overall layout of the exam rooms and work areas. After this process, we presented our findings of effectiveness and efficiency of each layout to the leadership of Spectrum Health. ISSUE DATE ISSUED FOR REVIEW
LEGEND
Current State Office
Office
Mechanical
Storage
Toilet
KEY PLAN
Office
Office Conference Conference
Office
Office
Storage
Office
Learning Center Office
Office
Office
Women's Mechanical / Electrical
ARCHITECT Reception
Reception
SEAL
INTERIOR DESIGN
Corridor
MECHANICAL
Office
ELECTRICAL
Corridor
Toilet
7 Toilet
PROJECT MANAGER
Office
Comm. Closet
Aetna Office
Conference Room
Toilet
Office
Workroom Storage Office Classroom
Classroom Coffee
Corridor
Office Office
Office
Office Office
Corridor
Conference Office
Office
Office
Nursing Infomatics Relocate to Cook - 9 Staff
PROJECT NAME & LOGO
Radiology Relocate to Blodgett 2S - 4 Staff
BLH Minidocs
Office Office
Office
Office
SPECTRUM HEALTH FACILITY PLANNING, DESIGN & CONSTRUCTION 648 MONROE, SUITE 410 MAIL CODE 116 GRAND RAPIDS, MICHIGAN, 49503
Office Office
Finance Relocate to Brassworks/545 MI - 15 Staff
Office Office
THESE DRAWINGS ARE FOR REFERENCE ONLY ANY AND ALL DIMENSIONAL DATA AND ROOM LAYOUTS MUST BE VERIFIED IN THE FIELD.
PAS/Finance Counselor Relocate to Blodgett 2S - 6 Staff
DRAWING NAME ISSUE DATE ISSUED FOR REVIEW
Future State - Relocated staff from 5th Floor (Nursing Infomatics stays) Care Management (16)
PH (2)
Continuing Care (2)
Psych (2)
Lab (3)
Quality (2)
Open
Nursing & Risk (2)
Rev Cycle (5)
NORTH
Office 6C-33
Mechanical
Storage
PROJECT NUMBER
DRAWING NUMBER
BLH Minidocs
Floor 6
LEGEND
A6.1
No Scale
Office 6C-36
Total = 34
Toilet Office 6C-32
KEY PLAN
6C-41 Office Conference
6C-23A
6C-23B Conference
Office
6C-26 Learning Center
Office
Storage
Office
6C-28
Office
Office
Office 6C-29
Women's Mechanical / Electrical
SEAL
ARCHITECT Reception
Reception
6C-22B
Corridor
INTERIOR DESIGN MECHANICAL
6C-13 Office Toilet Workroom
Office 6C-10
Corridor
Toilet
7
Aetna Office 6C-03
Conference Room
ELECTRICAL Comm. Closet
6C-14 Office
PROJECT MANAGER
Toilet Storage
Classroom
Classroom Coffee
Corridor
6C-15
Office
Office
6C-08B Office
Office
Office 6C-08A
Office 6C-02A
Corridor
Conference
Office
Office
6C-50 Office
6C-44
Office Office
SPECTRUM HEALTH FACILITY PLANNING, DESIGN & CONSTRUCTION 648 MONROE, SUITE 410 MAIL CODE 116 GRAND RAPIDS, MICHIGAN, 49503 PROJECT NAME & LOGO
Office Office
Office
Office 6C-49
Office 6C-47
BLH Minidocs
Office
THESE DRAWINGS ARE FOR REFERENCE ONLY ANY AND ALL DIMENSIONAL DATA AND ROOM LAYOUTS MUST BE VERIFIED IN THE FIELD.
DRAWING NAME
Plans: ProLease, AutoCAD, BlueBeam, Illustrator PROJECT NUMBER
BLH Minidocs
DRAWING NUMBER
61
PERSONAL WORK & SKETCHES 2016 Chongqing South Bank Residential-skyscraper Green Eco Space International Design Competition In collaboration with Yiwei Wu, Fanyi Pan, and Zhaoqi Chen
62 Plan & Section: AutoCAD, Illustrator
Architectural Survey, Italy - Fall 2015
Villa Giulia
Tempietto
Ca Dâ&#x20AC;&#x2122;Oro
63
Armand F Damari a f d a m a r i @ s y r. e d u