1 minute read

EXCELLENCE IN CONSTRUCTION OF COMMERCIAL BUILDINGS $10M-$15M

Sj Higgins Pty Ltd

Project: St George’s Church Redevelopment / St Michael’s Grammar School Performing Arts Centre, St Kilda

Website: www.sjhiggins.com.au

Designer: Kneeler Design Architects

Photographer: Scott Burrows Photography — Scott Burrows

SJ Higgins delivered the redevelopment of St George’s Uniting Church, a heritage brick Presbyterian Church of 1877-1880 by the esteemed architect Albert Purchas, including a Lewis & Co organ of 1881. The project repurposed the building for St Michael’s Grammar School to provide dedicated facilities for music, drama and performing arts, and general use. It included a complete reworking of the interior to include a centre stage surrounded by seating to the north and south, a backstage extension to the east, and a tiered seating mezzanine to the west. Beneath the tiered mezzanine, a box office/welcome foyer and plant/storage area was also created. Along with the adjusted internal layout, we delivered significant upgrades to services and acoustic treatment to enhance the atmospheric quality of performances.

Sponsored by

This article is from: