ARCHITECTURE PORTFOLIO
ARPINE
SARDARIAN
SUMMERY Creative thinker, detail oriented, self motivated, and energetic young Architectural Designer with 3+ years of experience in Designing Architectural buildings, ranging from a small scale installation to large scale developments. I believe in the power of Architecture, research, and design to create a better shaped built environment through the creation of beautiful, functional architecture. My professional skills have given me the opportunity to work on the various types of Architectural projects, and have been recommended by my coworkers to other Architecture offices located in different States, such as North Carolina, and Texas.
EDUCATION University of California, Berkeley Bachelor of Arts in Architecture Isfahan University Associate of Arts in Architecture AWARDS AND ACHIEVEMENTS
Presented a studio project in Berkeley Circus, as one of the best projects in the studio Participated as a design team member for a project in Huston, Texas, because of my Revit skills Volenteered with Habitat for Humanities
CERTIFICATES
OSHA 10: Construction Outreach Training Course V4 Fleet Safety: VNA-PS4 Fire Extinguisher Safety: CNA-PS4 Hearing Conservation (CEU), PS4
PROFESSIONAL EXPERIENCE FLEWELLING AND MOODY Designer
Key Projects:
04/16 to 03/18
Glendale Community College, Glendale, CA Pathways LA, Los Angeles, CA Pasadena High School, Pasadena, CA Sea Bridge Elementary School, Oxnard, CA Norma Coombs Elementary School, Pasadena, CA Brekke Elementary School, Oxnard, CA Alhambra School District, Alhambra, CA Isbell Middle School, Santa Paula, CA
CLARK, RICHARDSON AND BISKUP: CRB Junior Architectural Designer
Key Projects:
04/15 to 04/16
Boeing, El Segundo, CA Boeing, Long Beach, CA Lonza, Huton, TX Baxter Bioscience, Los Angeles, CA Acorda, Raleigh, NC Amgen, Thousand Oaks, CA
UBERION ARCHITECTURE + DESIGN Project Designer
Key Projects:
10/14 to 04/15
Coachella Valley Home, Coachella CA Bel Air Home, Bel Air, CA Angelo View, Los Angeles, CA
SKIDMORE, OWINGS AND MERRILL: SOM Internship
Key Projects:
6/14 to 8/14
SFVA Medical Center, San Francisco, CA Cofco, China
ARPINE SARDARIAN
Glendale Community College, Learning Center Renovation Glendale, California
JOB EXPERIENCE
FLEWELLING AND MOODY 815 COLORADO BLVD. SUITE 200 LOS ANGELES, CALIFORNIA 04/2016TO 03/2018
SEA BRIDGE ELEMENTARY SCHOOL Goals • Architecture is designed to reflect the Seabridge residential and commercial buildings in style and materials • Allows for access to the public walkways along marina • All learning spaces to utilize 21st century learning design criteria
New Campus Facilities • K-5 Elementary School Campus for a 630-Student Capacity • 21 Classrooms & 4 Kindergarten Classrooms • Multipurpose Building to Accommodate Assemblies, Food Services, and an Elementary Size Basketball Court Library/Resource Center
I PARTICIPATED IN THE DEVELOPMENT OF THIS PROJECT, STARTING FROM RESPOND TO “REQUEST FOR QUALIFICATIONS” TO CREATING CONSTRUCTION DRAWINGS FOR SUBMITTING TO DSA, AS AN ARCHITECTURAL DESIGNER. SEABRIDGE - TYPICAL CLASSROOM INTERIOR RENDERING
SEA BRIDGE ELEMENTARY SCHOOL, CLASSROOM BUILDING PRESENTATION FOR DESIGN PROPOSAL RENDERINGS WERE CREATED BY REVIT AND PHOTOSHOP
EASTERN ELEVATION
Legend 1
Parking & Drop-Off Area
2 3
Bus Drop-Off Seabridge Elementary School Play Field Future Oxnard City Park
6 1 2 1
4
3
5
4 5 6 7
7
Seabridge Site Plan JOB EXPERIENCE; FLEWELLING AND MOODY, ARCHITECTURAL DESIGNER, LOS ANGELES CALIFORNIA; 04/16-03/18
Wooley Road Westport Marina
SAMPLE PRESENTATION PAGES FOR SEABRIDGE PROJECT
1 2
Project Budget Hard Costs/GMP Value Soft Costs “All-In” Budget
3
$20,831,163
Legend
$7,737,269
4
$28,568,432
6
DSA Submittal
February 20, 2018
Start Construction
November, 2018
End Construction
April, 2020
9
10 Breakout Room
5 12
8
Project Schedule
7
1 2 3 4 5 6 7 8 9
17
10
Budget & Schedule
Building A - Administration/Library Building
Lobby Parent Workroom Principal’s Office WorkArea Nurse’s Office Conference Room Lounge Makers Lab Library
SAMPLE SITE PLAN
JOB EXPERIENCE; FLEWELLING AND MOODY, ARCHITECTURAL DESIGNER, LOS ANGELES CALIFORNIA; 04/16-03/18
SAMPLE ELEVATIONS
SAMPLE DETAILS PAGE
JOB EXPERIENCE; FLEWELLING AND MOODY, ARCHITECTURAL DESIGNER, LOS ANGELES CALIFORNIA; 04/16-03/18
SOME ADDITIONAL IMAGES OF PROJECTS THAT I WAS A MEMBER OF THE ARCHITECTURAL TEAM.
SEABRIDGE ELEMENTARY SCHOOL
SANTA PAULA ELEMENTARY SCHOOL
SANTA PAULA ELEMENTARY SCHOOL
Pasadena High School, Kitchen Modernization Pasadena, CA
GLENDALE COMMUNITY COLLEGE - LEARNING CENTER
GLENDALE COMMUNITY CENTER - COMPUTER LAB
JOB EXPERIENCE; FLEWELLING AND MOODY, ARCHITECTURAL DESIGNER, LOS ANGELES CALIFORNIA; 04/16-03/18
6
WILLIAM S. HART HIGH SCHOOL Newhall CA
William S. Hart Union High School District
ADDITIONAL DATA
Flewelling & Moody has recently completed remodeling of Learning Center and Technology Classroom in Glendale Community College and we welcome the opportunity of extending our services to other education facilities in Glendale. Our regional office is 4 miles from the Glendale Unified School District office, and both our offices are located within Los Angeles County. We take great pride that much of our work is also local to us, that many local school districts come back to us. In addition to ourselves being local, Budlong & Associates Engineering, an engineering company that we have often used, is headquartered in Glendale. our Structure Engineers from Grossman & Speer, also are located in Glendale. Shorter travel distance to Glendale Unified School District and schools located in Glendale, will save us time and budget for traveling.
Cypress College, Cypress, CA
SAMPLE “REQUEST FOR QUALFICATIONS” PAGES
Flewelling and Moody is often asked to participate with our district clients in presentations and reporting regarding any assignment. We’ve been involved in a number of assessments and evaluations of projects and procedures as an interegal part of our services to our clients. The letter of refrences speak to very specific and unique services or actions that the firm has undertaken for the client.
SCOPE OF WORK Infrastructure Phase 1
CLIENT
William S. Hart Union High School District Phone: (661) 753-5740 Ext. 274 Email: motavka@hartdistrict.org
FIRM PERSON:
Matthew Buchanan, AIA
ORIGINAL CONSTRUCTION BUDGET $3,000,000
In order to facilitate future construction projects throughout the Hart campus, Flewelling & Moody was retained to rectify infrastructure deficiencies which included: 1. Cross-connections between domestic water, irrigation water, and fire water lines. 2. Insufficient fire flow available on campus due to a single fire water supply and pipe size 3. Inadequate offsite water system infrastructure to support the proposed fire line upgrades for Building “H”. 4. Insufficient sizing of the gas line system within the campus to support Building “H”. 5. Inadequate power and communication infrastructure within the campus to support Building “H”.
FLEWELLING AND MOODY Flewelling & Moody is a California Corporation, California Registration #0343778 and has been in business for 88 years and has always operated under the same name. The officers of the corporation are Scott Gaudineer and Matthew Buchanan.
Flewelling & Moody has been an acknowledged leader in K-12 educational facilities and planning since 1928. Each day an average of over 500,000 California students attend schools designed by Flewelling & Moody. Many of these 3500+ schools stand out for their creative, practical and technological approach to educational facility design.
NELLIE COFFMAN MIDDLE SCHOOL MODERNIZATION PALM SPRINGS UNIFIED SCHOOL DISTRICT CATHEDRAL CITY, CA Completion Date Cost Scope Of Services
2014 $5,382,240 Modernization Multi-Purpose Building & Classroom Buildings
To date Flewelling & Moody has completed approximately 50 high schools, 175 middle schools, 500 elementary schools, and multiple addition projects. We have also modernized some 150 schools over the last 25 years. We are dedicated to achieving and maintaining high project standards – we are therefore selective about the districts that we choose to work with; we establish relationships in which the district can benefit from our services over many years. Several of our clients have worked with the firm for 20, 30, even 50+ years, testimony to the quality of client service we provide. BASIC SERVICES ADDITIONAL SERVICES Schematic Design Programming Design Development. Program Management Construction Documentation Facilities Assessment Construction Administration Pre-Bid Qualification Structural Engineering Interior Design Mechanical Engineering Master-Planning Electrical Engineering Bond Assistance Landscape Architecture Public Relations LOCATIONS SENIOR MEMBERS OF THE FIRM Flewelling & Moody - Headquarters Scott Gaudineer 35 years 815 Colorado Blvd. Suite 200 Matthew Buchanan 26 years Los Angeles, CA 90041 Mike Stahlheber 37 years Phone: (323) 543-8300 Steve Colombero 24 years Fax: (323) 543-8198 Sam Sahand 14 years fm-pasadena@flewelling-moody.com Flewelling & Moody - Lancaster Regional Office 1035 W. Lancaster Blvd. Lancaster, CA 93534 Phone: (661) 949-0771 Juan Cabrillo Elementary School, Hawthorne, CA
DESCRIPTION OF FIRM
HART HIGH SCHOOL MODERNIZATION WILLIAM S. HART UNION HIGH SCHOOL DISTRICT SANTA CLARITA, CA Completion Date Cost Scope Of Services
2011 $14,558,886 Modernization campus (phase 1)
SANTA FE HIGH SCHOOL NEW SCIENCE BUILDING S WHITTIER UNION HIGH SCHOOL DISTRICT, SANTA FE SPRINGS, CA Completion Date Cost Scope Of Services
2012 $2,871,244 Modernization Sience Building S
SIMILAR PROJECT EXAMPLES
SAMPLE “REQUEST FOR QUALFICATIONS” PAGES
JOB EXPERIENCE; FLEWELLING AND MOODY, ARCHITECTURAL DESIGNER, LOS ANGELES CALIFORNIA; 04/16-03/18
JOB EXPERIENCE
CLARK RICHARDSON & BISKUP 1515 W. 190TH STREET GARDENA, CA 04/2015 TO 04/2016
LONZA The existing Houston Lonza Viral and Cell Therapeutics facility were located in approximately 30,000sqft of leased space with the facility operations distributed across two different buildings. Lonza Houston, Inc. negotiated an (EPCM) Engineering, Procurement, Construction and Management contract for the detailed designand construction management services to expand and relocate to a new 170,505sqft building located on a greenfield site in Pearland, TX. CRB contracted to initiate design and associated preconstruction efforts that include review and modification of the previous Basis of Design (BOD) to provide a revised concept package that reflected a design that best met the needs of Lonza as it embarked on this expansion.
3D VIEW OF PROPOSED TYPICAL LAB
BECAUSE OF MY REVIT SKILLS, I WAS SELECTED TO WORK ON THIS PROJECT, LOCATED IN HUSTON, TEXAS, FROM MY LOS ANGELES OFFICE. I PARTICIPATED IN CREATING A REVIT MODEL FOR THIS PROJECT, AS A JUNIOR ARCHITECTURAL DESIGNER.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
GENERAL NOTES
16
2 A-4010
A
# HUDDLE ROOM
OFFICE
OFFICE OFFICE
OFFICE OFFICE
SHEET NOTES
OFFICE OFFICE OFFICE
B C
TEL TEL HUDDLE ROOM B
HUDDLE ROOM A
OPEN TO BELOW
OPEN TO BELOW
OPEN TO BELOW
TRAINING ROOM
ELEV
E HUDDLE ROOM A
BOARD ROOM
HUDDLE HUDDLE ROOM B RROM C
IDF JAN ROOM
OPEN TO BELOW
OPEN TO BELOW
OPEN TO BELOW
ELEC ROOM
D
OPEN TO BELOW
OPEN TO BELOWOPEN TO BELO W OPEN TO BELOW
OPEN TO BELOW
STAIRS
OPEN TO BELO W
OPEN TO BELOW
TEL TEL
WOMENS
MENS
CLIENT
SERVICE CENTER
F
CONSULTING ARCHITECT/ENGINEER HUDDLE ROOM A
HUDDLE ROOM B
OFFICE AREA
1 A-4010
CLARK, RICHARDSON & BISKUP CONSULTING ENGINEERS, INC.
OPEN TO BELOW
CRB ARCHITECTS-ENGINEERS P.C.
MECHANICAL MEZZANINE
6565 N MACARTHUR BOULEVARD SUITE 1050 IRVING, TX 75039 PHONE: 469-801-8700 FAX: 469-801-8701
TEL TEL
ENGINEERING LICENSE FOR THE STATE OF TEXAS: F-000709 ARCHITECTURE LICENSE FOR THE STATE OF TEXAS: BR169
G
PROJECT TITLE
Lonza Houston Relocation Pearland 1 RE V A B
OFFICE
OFFICE OFFICE
OFFICE
OFFICE OFFICE
OFFICE
OFFICE
OFFICE
BY CRB CRB
DATE DESCRIPTION 02-29-2016 ISSUED FOR REVIEW 03-08-2016 ISSUED FOR SCHEMATIC DESIGN
OFFICE UTILITY ROOM STAIRS
H
SECOND FLOOR PLAN - OVERALL - REVIT PROJECT ARCHITECTURAL - SECOND FLOOR PLAN - OVERALL 8'
1/16" = 1'-0"
16'
3D VIEW OF PROPOSED LOBBY AREA
LICENSEE
32'
ROBERT J. PHILLIPS 18798 TX 1
5
A B C D
AREA 1.1 AREA
10
13
AREA 2.1
AREA 2.2
AREA 2.3
AREA 2.4
AREA
AREA
OVERALL
16
CLIENT CONFIDENTIALITY STATEMENT PROJ. NO. 151833 SCALE: 1/16" = 1'-0" DATE: 01/22/16
AREA 3.1 AREA
DESIGNED BY: PSS CHECKED BY: RJP APPROVED BY: RJP
DRAWING TITLE
ARCHITECTURAL -
F:\CRB\LONZA PROJECT - Copy.rvt
0
G ENGINEERS, INC. 8:44:45 PM 4/22/2018
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
GENERAL NOTES
16
2 A-4010
CATERING STAGING/ WASTE AREA
A CELL THERAPY FACS NON-VIRAL CELL CULTURE LAB
PD SUPPLY CLOSET
QC OPEN LAB
NON-VIRAL TISSUE CULTURE
PD OPEN LAB
VESTIBULE
VESTIBULE
GAS CYLINDER STORAGE
PD LAB PCR SUITE TECH AUTOCLAVESPACE
MICROBIOLOGY
QPCR POST RUN
QPCR PRE-RUN
LARGE CONFERENCE
SHIPPING ENCLOSED DOCK
LONG-TERM STORAGE UTILITIES/ IT
IDF/ SERVER STORAGE
SUPPLY CHAIN STAGING/ DOCK
SUPPLY CHAIN OFFICE
ELECTRICAL CORRIDOR ROOM
WALK-IN COLD ROOM
WALK-IN COLD ROOM
PAL OUT RAW PAL IN MATL SAMPLE
CORRIDOR
D
STORAGE
SECURITY OFFICE
CL
FIRST AID/ PRIVACY
PAL OUT
WOMENS
AUDIT AREA
RECEPTION
SHEET NOTES
FOOD STAGING AREA
FLUORESCENT SCOPE PD LAB PCR SUITE
CHEMICAL BUFFER AREA
QC LAB MICRO ROOM
C
#
VIRAL TISSUE CULTURE REFRESHMENT CENTER
QC SUPPLY CLOSET
VIRAL/ CELL CULTURE ROOM
B
UPSTREAM/ DOWNSTREAM FULL-UNIT OPS
FACILITIES ENGINEERING OFFICES
DOCUMENT STORAGE
OFFICE SPACE
CONTROL ROOM
RR FACILITIES ENGINEERING
MENS
OFFICE SPACE ELEV EQ ROOM
RR
ELEC
SUPPLY CHAIN STORAGE
PAL IN FUTURE ROOM
RR
1
REJECT CAGE
A-5021
CONFERENCE ROOM
JAN
AIR LOCK
CORRIDOR
E
HUDDLE ROOM A
HUDDLE HUDDLE TEL ROOM B ROOM C
TEL
BOARD ROOM
PAL D WOMENS
MENS
DECON DISPOSAL
PAL IN CPAL IN B VISITOR GOWNING
SERVICE CENTER
GOWNING
PAL IN D
MAL IN C MAL IN D
FILL SUITE GRADE B
PAL OUT C
PAL OUT D
PAL OUT D
MAL OUT
COLUMN (UN)PACKING
EQUIPMENT STORAGE
MANUFACTURING MATERIAL STAGING
PAL IN C BUFFER PREP GRADE C
MAL OUT C
PAL IN D
MAL IN D
OFFICE
OFFICE AREA
OFFICE
A-4010
TEL TEL
OFFICE
PAL IN CPAL IN B PAL IN D
CL CL
G OFFICE
CLEAN
LOCKER ROOM
MAL IN DMAL IN C
PAL IN CPAL IN B
OFFICE PAL IN D
CONFERENCE ROOM
OFFICE OFFICE OFFICE
H
1
OFFICE
OFFICE
OFFICE
FIRE PUMP ROOM OFFICE DOMESTIC WATER ROOM
AUTOCLAVE
COMPONENT ASSEMBLY GRADE C
PAL D PAL D
CLIENT
PAL D
MODULE MANUFACTURING AREA LOCKER ROOM
HUDDLE ROOM B
1
INSPECTION/ LABELING GRADE D
FILTER INTEGRITY
CLEAN ROOM CLEAN SUPPLY
F HUDDLE ROOM A
TABLETING ROOM GRADE D
MAL IN DMAL IN C
PAL OUT C VT/CT PAL OUT GRADE B D MAL OUT C
PAL OUT C
PAL OUT C
PAL IN BPAL IN C
PAL OUT VT/CT D GRADE B
PAL IN C
PAL IN D
PAL IN D
MAL OUT C
MAL IN C MAL IN D
MAL IN D
PAL OUT C
PAL IN BPAL IN C
VT/CT PAL OUT GRADE B D
PAL OUT D
MAL OUT C
MAL OUT C
VT/CT GRADE B
PAL IN D MAL IN CMAL IN D
PAL IN CPAL IN B
PAL IN D
MAL IN DMAL IN C
PAL OUT D
1000L BATCH VIRAL GRADE C
CONSULTING ARCHITECT/ENGINEER
FUTURE VT/CT GRADE B
MAL OUT D
FUTURE 1000L BATCH VIRAL GRADE C
FUTURE LARGER SUITE OPTION
PAL IN CPAL IN B
PAL IN D
CRB ARCHITECTS-ENGINEERS P.C. 6565 N MACARTHUR BOULEVARD SUITE 1050 IRVING, TX 75039 PHONE: 469-801-8700 FAX: 469-801-8701
PAL OUT D MAL OUT C
MAL IN DMAL IN C
ENGINEERING LICENSE FOR THE STATE OF TEXAS: F-000709 ARCHITECTURE LICENSE FOR THE STATE OF TEXAS: BR169
PROJECT TITLE
PAL OUT C VT/CT PAL OUT GRADE B D
CLARK, RICHARDSON & BISKUP CONSULTING ENGINEERS, INC.
PAL OUT C
2000L BATCH VIRAL GRADE B
FUTURE VT/CT GRADE B
Lonza Houston Relocation Pearland 1
FUTURE VT/CT GRADE B
FUTURE VT/CT GRADE B
RE V A B
MAL OUT C
ARCHITECTURAL - FIRST FLOOR PLAN - OVERALL 0
8'
1/16" = 1'-0"
16'
BY CRB CRB
DATE DESCRIPTION 02-29-2016 ISSUED FOR REVIEW 03-08-2016 ISSUED FOR SCHEMATIC DESIGN
GOWNING
LICENSEE
32'
D
F
13
16
AREA 2.2
AREA 2.3
AREA 2.4
AREA 4.1
AREA 5.1
AREA 5.2
AREA 6.1
AREA 4.2
AREA 5.3
AREA 5.4
AREA 6.2
AREA 1.1
H
N
DESIGNED BY: PSS CHECKED BY: RJP APPROVED BY: RJP
DRAWING TITLE
AREA 3.1
OVERALL
KEYPLAN
CLIENT CONFIDENTIALITY STATEMENT PROJ. NO. 151833 SCALE: 1/16" = 1'-0" DATE: 01/22/16
AREA 2.1
A B C
10
NOT FOR CONSTRUCTION
THIS DOCUMENT IS RELEASED FOR THE PURPOSE OF ESTABLISHING A BASIS OF DESIGN. IT IS NOT TO BE USED FOR CONSTRUCTION, REGULATORY APPROVAL, BIDDING OR PERMITTING PURPOSES.
ARCHITECTURAL FIRST FLOOR PLAN OVERALL DRAWING NUMBER
PL1- A-1100
SECOND FLOOR PLAN - OVERALL - REVIT PROJECT
JOB EXPERIENCE; CLARK RICHARDSON, and BISKUP; GARDENA, CALIFORNIA; 04/2015 TO 04/2016
COPYRIGHT © CLARK, RICHARDSON & BISKUP CONSULTING ENGINEERS, INC. 8:43:52 PM 4/22/2018
5
F:\CRB\LONZA PROJECT - Copy.rvt
ROBERT J. PHILLIPS 18798 TX 1
I HAVE BEEN PART OF THE ARCHITECTURAL TEAM, DESIGNING BUILDINGS FOR AEROSPACE AND PHARMACEUTICAL COMPANIES, SUCH AS BOEING, AMGEN, BAXALTA, AND BAXTER BIOSCIENCE. HOWEVER, I CAN NOT PROVIDE ANY DRAWINGS OR DATA, FOR CONFIDENTIAL PURPOSES. ADDITIONAL INFORMATION MIGHT BE PROVIDED PER REQUEST, AFTER GETTING PERMISSION FROM THOSE COMPANIES.
SAMPLE DIAGRAM - CREATED FOR ACORDA PROJECT IN NORTH CAROLINA
JOB EXPERIENCE; CLARK RICHARDSON, and BISKUP; GARDENA, CALIFORNIA; 04/2015 TO 04/2016
JOB EXPERIENCE
SKIDMORE, OWINGS AND MERRILL LLP ONE FRONT STREET SAN FRANCISCO SUMMER 2014
I PARTICIPATED IN CREATING CREATING DRAWINGS, DIAGRAMS AND PRESENTATION FOR THIS PROJECT AS AN INTERN MEMBER.
SFVAMC DESIGN DEVELOPMENT 2 BUILDINGS 1, 6, & 8: SEISMICALLY RETROFIT EXISTING HISTORIC BUILDINGS, RENNOVATE, AND FILL WITH A MIXTURE OF CLINICAL, MEDICAL EDUCATION & ADMIN. PROGRAMS BUILDING 40: NEW 100,000SF LAB BUILDING COLLECTING ALL STATION’S WET LABS UNDER ONE ROOF
SOUTHERN ELEVATION
SOUTH ELEVATION
EASTERN ELEVATION
SITE AERIAL
BUILDING 40
BUILDING 6 BUILDING 1 GAR. ADDTNS.
BUILDING 8
NOTHERN ELEVATION
WESTERN ELEVATION
JOB EXPERIENCE; SKIDMORE, OWINGS AND MERRILL, LLP, INTERNSHIP; SAN FRANCISCO, CALIFORNIA; SUMMER 2014
BUILDING 40 – CONCEPT MEP LAB OFFICES PUBLIC CIRCULATION & CONFERENCE ROOMS
BUILDING 40
TYPICAL FLOOR PI OFFICES
PI OFFICES
ATRIUM
WRITE-UPS
LABS
LABS
WRITE-UPS
JOB EXPERIENCE; SKIDMORE, OWINGS AND MERRILL, LLP, INTERNSHIP; SAN FRANCISCO, CALIFORNIA; SUMMER 2014
JOB EXPERIENCE; SKIDMORE, OWINGS AND MERRILL, LLP, INTERNSHIP; SAN FRANCISCO, CALIFORNIA; SUMMER 2014
PHYSICAL MODELS AND DIGRAMS ON THESE 2 PAGES ARE CREATED BY MYSELF. “ENTHALPY ENERGY RECOVERY WALL
PRIMARY “FRESH” OUTSIDE AIR TO FLOOR BY FLOOR AIR HANDLERS RETURN AIR BYPASS
RETURN AIR FROM FLOORS (TYP)
RETURN AIR PLENUM
AIR OUT OF TOP OF FACADE
DOUBLE FACADE (SEE DETAIL) AIR IN AT BOTTOM OF FACADE
JOB EXPERIENCE; SKIDMORE, OWINGS AND MERRILL, LLP, INTERNSHIP; SAN FRANCISCO, CALIFORNIA; SUMMER 2014
JOB EXPERIENCE
UBERION ARCHITECTURE + DESIGN 23501 PARK SORRENTO STREET # 201 CALABASAS, CALIFORNIA FALL 2014
THIS PROJECT IS A SINGLE FAMILY RESIDENTAL HOUSE LOCATED ON 10101 ANGELO VIEW DRIVE, IN LOS ANGELES CALIFORNIA. IT IS ABOUT 84000 SWUARE FEET. I PARTICIPATED IN SCHEMATIC DESIGN AND CONSTRUCTION DOCUMENT PHASES OF THIS PROJECT, IN UBERION ARCHITECTURE FIRM.
H
G
F
E
D
C
B
A
8
U 7
LE A
6
NEW
1010 LOS
ANG 77 BE LOS TEL:
5 H
G
F
E
D
C
B
A
2
EAST ELEVATION 1" = 10'-0"
8
4
3535 E. COAST HWY #145 CORONA DEL MAR, CA 92625 B-953964 949-375-8618
UBERION
1 2
DESIGN
7
3
LESLlE LlPPlCH ARCHlTECT ARCHlTECTURE PLANNING DESIGN
6
PLAN
NEW HOUSE DESIGN 10101 ANGELO VIEW DR LOS ANGELES, CA 90210
2
ANGELO VIEW ASSOCIATES, LLC 77 BEVERLY PARK LOS ANGELES, CA. 90210 TEL: (424) 293-2400
5
2
EAST ELEVATION 1" = 10'-0"
1
1
10101 ANGELO VIEW DR. LOS ANGELES, CA 90210
SHEE
1" = 10'-0"
4
H
1 2
3
EXT ELE
NORTH ELEVATION
SCALE
1" = DATE
11.1
DRAWIN
PLA
DRAWIN
A4.
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A H
F
G
E
D
B
C
A
1
A4.01
8
8
3535 E. COAST HWY #145 CORONA DEL MAR, CA 92625 B-953964 949-375-8618
H
DESIGN
J
i
F
E
G
D
B
A
7
1
3535 E. COAST HWY #145 CORONA DEL MAR, CA 92625 B-953964 949-375-8618
C
UBERION
LESLlE LlPPlCH 2
K
ARCHlTECT
3
L
down
ARCHlTECTURE PLANNING DESIGN
6
5
7
10101 ANGELO VIEW DR LOS ANGELES, CA 90210
01
A4.
M
DESIGN
NEW HOUSE DESIGN
2
4
UBERION
P
6
N
ANGELO VIEW ASSOCIATES, LLC 77 BEVERLY PARK LOS ANGELES, CA. 90210 TEL: (424) 293-2400
8
LESLlE LlPPlCH
10101 ANGELO VIEW DR. LOS ANGELES, CA 90210
Q
7
5
ARCHlTECT R
9
ARCHlTECTURE PLANNING DESIGN
P
S
4
10
6
T
1 2
8
NEW HOUSE DESIGN
U
7
10101 ANGELO VIEW DR LOS ANGELES, CA 90210
4
ANGELO VIEW ASSOCIATES, LLC 77 BEVERLY PARK LOS ANGELES, CA. 90210 TEL: (424) 293-2400
V
5
6
X'
3
11.10.2014
X
3
W
PLAN CHECK
Z
2
Y
2
AA
1
5
BB
SHEET TITLE
2
10101 ANGELO VIEW DR. LOS ANGELES, CA 90210
SITE PLAN
SOUTH ELEVATION 1" = 10'-0"
4
SCALE
1
1
SITE PLAN
DATE
A
11.10.2014 DRAWING STATUS
PLAN CHECK SUBMITTAL
1/16" = 1'-0"
DRAWING NUMBER
A1.00
H
G
F
E
D
JOB EXPERIENCE; UBERION ARCHITECTURE + DESIGN; JUNIOR ARCHITECT; CALABASAS, CALIFORNIA; FALL 2014 TO PRESENT 1 2
1/16" = 1'-0"
2 00 4.
C
B
A
F
G
E
D
7
B
C
AA
8
X'
A
H
3'-0"
GLASS GUARD @ 42"
(TYP.)
H
3'-6"
28
8
27 26 25
32
24
13
16
12'-0"
15
17'-0"
19 18 17 16 15 14
14 13 12
12
3535 E. COAST HWY #145 CORONA DEL MAR, CA 92625 B-953964 949-375-8618
11
12'-0"
17
GLASS GUARDRAIL @ 42" METAL HANDRAIL @ 36"
21 R @ 7 3/16"
8'-212"
21 20 19 18
14 R @ 7 1/32 " 13 T @ 12 "
23 22
METAL HANDRAIL @ 36"
(TYP.)
28
10 9 8 7
11
6
10 9
8'-912"
8 7 6 5 4
15 R @ 7 1/32 " 14 T @ 12 "
5 4 3 2 1
3 2
UBERION
1
7
14'-87 8"
6'-37 8"
DESIG
13'-818"
STAIR 5 SECTION
STAIR 8 SECTION
1/4" = 1'-0"
1/4" = 1'-0"
Z
AA
X'
7
8
LlPPlCH
ARCHlTECT ARCHlTECTURE PLANNING DESIGN
EDGE OF BUILDING
6
1" TEMP. GLASS GUARDRAIL
R
5
6" @ 2" 1 T @ '-0" 5
T.W. 877'- 6"
LESLlE
H
G
1 1/2" DIA. METAL HANDRAIL
1 2 3
6
6'-6"
4 5
-
6
1
8
7
6
5
4
3
2
15
14
13
12
11
10
9
16
17
18
19
20
5
4
3
2
1
6
7
8
9
21
22
23
24
25
HAND RAIL @ 36"
26
27
4
I
STAIR 5 @ FIRST FLOOR PLAN Z
15
16
17
18
19
Y
20
21
NEW HOUSE DESIG 10101 ANGELO VIEW DR LOS ANGELES, CA 90210
ANGELO VIEW ASSOCIATES, L 77 BEVERLY PARK LOS ANGELES, CA. 90210 TEL: (424) 293-2400
1/4" = 1'-0"
X
1
(TYP.)
3'-0"
14
STAIR 8 @BASEMENT 1 PLAN
2
1/4" = 1'-0"
5
13
10101 ANGELO VIEW DR. LOS ANGELES, CA 90210
H
12
18" DEEP WATER BASIN WATER @ 841.5"
GUARD RAIL @ 42" EDGE OF BUILDING
G
11
12" CONC. POOL COPING
-
28
10
(TYP.)
36 35 34
28
32
METAL HANDRAIL @ 36"
25
30
27
21
26 25 24 18
23 17
22
14
GLASS GUARDRAIL @ 42" METAL HANDRAIL @ 36"
14
13 12
21
11
13
20
METAL HANDRAIL @ 36"
19 18 17 16
10
12
15 8 7
10
3'-6"
4 3 2
(TYP.)
6
13 12 11
5
10 4
3'-0"
5
3 2 1
(TYP.)
6'-0"
6
4'-0"
7
8R@6" 7 T @ 12 "
8
11 R @ 6 1/2" 10 T @ 12"
9
14
(TYP.)
11
3'-0"
9
5'-0"
16
14'-0"
15
10 R @ 6" 9 T @ 12"
16
18'-0"
18
19
28 R @ 6 8"
10'-0"
20
17
15
8'-0"
28
22
20 R @ 6 " 19 T @ 12 "
12'-0"
29
23
21 R @ 7 3/16" 20 T @ 12"
19
4
31
24
5'-0"
25 24 23 22 21 20
16 R @ 6" 15 T @ 12"
26
26
42" GLASS GUARDRAIL
33
27
10 R @ 6" 9 T @ 12"
3'-0"
32 31 30 29 28
8 7 6 5 4 3
1
2 1
1 2
STAIR 7 SECTION
EXTERIOR GLAZING
I
1 1/2" DIA. METAL HANDRAIL
-
5'-0"
H
1
1/4" = 1'-0"
1/4" = 1'-0"
G
3
STAIR 9 SECTION
STAIR 4 SECTION
1/4" = 1'-0"
18" DEEP WATER BASIN WATER @ 841.5"
28 27
12" CONC. POOL COPING
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
-
9
10
36
35
34
33
32
31
30
28
29
26
27
24
25
23
22
21
20'-812"
11
12
13
14
15
16
17
18
19
PLAN CHECK
20
11.10.20
7'-2"
10
1" TEMP. GLASS GUARDRAIL 1 1/2" DIA. METAL HANDRAIL
3
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
2 6'-7"
-
11
10
STAIR 9 @ BASEMENT 1 PLAN
1/4" = 1'-0"
1/4" = 1'-0"
1 1 1/2" DIA. METAL HANDRAIL
9
8
7
6
5
4
3
2
1 1/2" DIA. METAL HANDRAIL
1
4'-0"
1'-0"
12
STAIR 4 @ SECOND FLOOR PLAN
SHEET TITLE
STAIR 4, 5, 7, 8, 9 ENLARGED PLANS AND SECTIONS
1'-0"
up
5'-0"
-
10
9
8
7
6
5
4
3
2
1
11
12
13
14
15
16
17
18
-
LANDING 11
1
5
STAIR 7 @ BASEMENT 1 PLAN 3 G
9
8
5'-312"
7
6
5
4
7'-0"
3
2
-
1 19
-
20
SCALE
1/4" = 1'-0" DATE
8'-012"
11.10.2014 DRAWING STATUS
1/4" = 1'-0"
H
10
3'-0"
F
STAIR 4 @ FIRST FLOOR PLAN
1
1/4" = 1'-0"
E
D
C
STAIR 9 @ BASEMENT 2 PLAN 1/4" = 1'-0"
B
A
PLAN CHECK SUBMITTAL DRAWING NUMBER
A6.02.0
H
F
G
E
D
B
C
A
5
G
8
2'-1"
℄
7'-0"
1'-0"
9'-0"
1'-0" 1'-10" 8"
4'-6"
℄
4'-6"
2'-9"
1'-0"
12'-0"
12'-0"
13'-6"
12'-0"
CHASE STAIRWAY
3535 CORON B-953
HELICOPTER PAD
UBE
ELEVATOR LOBBY
7
ASSISTANT'S OFFICE
STAIRWAY
AR
15'-6"
15'-6"
14'-0"
15'-6"
LESL ARCHlTEC
ELEVATOR LOBBY
GARAGE
6
NEW HO
12'-0"
12'-0"
10101 ANG LOS ANGE
PARKING
STAIRWAY
18'-0"
18'-0"
ANGELO V 77 BEVERLY LOS ANGEL TEL: (424
GAME ROOM
GAME ROOM
18'-0"
12'-0"
℄ 1'-0"
℄
1'-0"
1'-0"
6 A7.00
ELEVATOR PIT : ENLARGED PLAN
7
1/4" = 1'-0"
SECTION 2
SECTION 1
6
1/4" = 1'-0"
1 2
1/4" = 1'-0"
3
7
G 7
7
A7.00
A7.00
H
PLAN CHEC
MECHANICAL ROOM 830'-0" FF
7'-2"
1'-0"
1'-0"
842'-0" FF
6 A7.00
STAIRWAY
875.5' FF
860'-0" FF
℄
℄
830'-0" FF
6 A7.00
1'-0"
1'-0" STAIRWAY
1'-0"
STAIRWAY
℄
8"
GAME ROOM
848'-0" FF
1'-5"
℄
PARKING
4'-3"
℄
7'-0"
2'-1" 1'-5"
A7.00
8"
8"
6
4'-3"
℄ 860'-0" FF
1'-0"
1'-0"
5
9'-0"
3'-1"
1'-0" 1'-5"
4'-3"
9'-0"
1'-0"
℄
9'-0"
℄ 860'-0" FF
8" 1'-0"
1'-0"
℄
5
1'-0"
8"
6 A7.00
875.5' FF
℄
3'-1"
1'-0"
℄
ELEVATOR LOBBY
7'-0"
3'-1" 1'-5" 4'-3"
℄ 875.5' FF
2'-1"
8"
5
CHASE
G
H
1'-0"
860'-0" FF
1'-0"
1'-312"
1'-10" 8"
874'-0" FF
5
9'-0"
ASSISTANT'S OFFICE
LAWNSCAPE
2
1'-0"
2'-312"
2'-1"
3'-8"
G
H
11'-0"
2'-1"
7'-0"
G
H
10'-0"
2'-1"
4'-3"
7 A7.00
A7.00
7'-0"
℄
ACCESS LADDER
5
ELEVATOR PIT
HOISTWAY PISTON
1'-3"
3"
4
7'-0"
7'-0"
℄
CONC. WALL PER. STRUCT.
ELEVATOR LIFT
ELEVATOR LOBBY
MECHANICAL ROOM
8'-0"
9'-0" 1'-0"
RECESSED SUMP PIT, 12"x12"
1'-0"
5
STAIRWAY
12'-0"
H 7 A7.00
4'-0"
G
18'-0"
5
8'-0"
ELEVATOR LIFT
STAIRWAY
848'-0" FF
835'-0" FL
SHEET TITLE
ELEVAT ENLARG AND SE SCALE
1/4" = 1'-0
1
DATE
4
SECOND FLOOR : ENLARGED PLAN 1/4" = 1'-0"
3
FIRST FLOOR : ENLARGED PLAN 1/4" = 1'-0"
2
BASEMENT 1 : ENLARGED PLAN 1/4" = 1'-0"
1
BASEMENT 2 : ENLARGED PLAN 1/4" = 1'-0"
11.10.2014 DRAWING STATUS
PLAN CHE
DRAWING NUMBER
A7.00
H
G
F
E
D
C
B
JOB EXPERIENCE; UBERION ARCHITECTURE + DESIGN; JUNIOR ARCHITECT; CALABASAS, CALIFORNIA; FALL 2014 TO PRESENT
A
GREEN GATE
ARCH 100C FINAL PROJECT INSTRUCTOR: MR. HARRISON FRAKER UNIVERSITY OF CALIFORNIA BERKELEY FALL 2013
GRAND CENTRAL PERFORMANCE
OBJECTIVE: TO DESIGN A MULTIFUNCTIONAL BUILDING FOR STUDENTS AND FACULTY, WHERE THEY CAN DO ACTIVITIES SUCH AS SHOPPING, GATHERING, AND DANCING. SITE: UNIVERSITY OF CALIFORNIA BERKELEY CONCEPT: DESIGNING A LIGHT STEEL STRUCTURE AND ATTATCH LIGHT VEGETATIONS TO CREATE A PARK LIKE ENVIRONMENT, WHERE STUDENTS CAN WALK AND ENJOY THE BEAUTYUL VIEW OF BAY AREA.
STRATEGY: CREATING A GRID ON THE LOWER AND UPPER PLAZA OF THE BERKELEY UNIVERSITY, AND CREATING
MODUALS BASED ON THAT, IN A WAY THAT THE GRID CONNECTS THE SPROUL HALL BUILDING AND SATHER GATE AND MARTIN LUTHER KING BUILDING AND CEZER CHAVEZ BUILDING AND MY OWN DESIGNED STUDENT PROGRAM CENTER. MAIN COMPONENTS OF THE PROJEC ARE PROPORTION OF THIS MODUAL. FOR EXAMPLE, THE GATE IS CONSIST OF 5 OF THE MODUALS AND THE DOOR AND SINDOW HEIGHTS ARE ONE MODUAL. THE COLUMNS ARE 2.5 MODUALS FAR AWAY FROM EACH OTHER. DESCRIPTIONS: ORIGINALLY, SATHER GATE SERVED AS THE MAIN ENTERANCE OF THE UNIVERSITY OF THE BERKELEY UNIVERSITY. HOWEVER, AFTER BUILDING NEW BUILDINGS ON THE SOUTHER EDGE OF THE UNIVERSITY, IT LOST ITS ORIGINAL FUNCTION. DESIGNING A NEW GREEN GATE AS THE ENTRANCE OF THE UNIVERSITY, NOT ONLY CONNECTED THE SATHER GATE WITH THE NEW BUILDINGS, BUT ALSO PROVIDED A NEW CIRCULATION FOR THE NEW BUILDINGS AND MY PROJECT.
EXTERIOR VIEW FROM BANCROFT TECHNIC: COMPUTER RENDERING SOFTWARES: RHINO, VRAY, PHOTOSHOP AND ILLUSTRATOR
GREEN GATE; ARCH 100C FINAL PROJECT; INSTRUCTOR: MR. HARRISON FRAKER; UNIVERSITY OF CALIFORNIA BERKELEY; FALL 2013
AXON VIEW, SHOWING THE SATHER GATE AND THE SEROUNDING BUILDINGS TECHNIC: COMPUTER RENDERING SOFTWARES: RHINO, VRAY, PHOTOSHOP AND ILLUSTRATOR
SITE PLAN HIGHLIGHTING THE SMALLER COURTYARDS CREATED BY THE GREEN STRUCTURE
GRAND CENTRAL PERFORMANCE
ARCH 10B FINAL PROJECT INSTRUCTOR: MR. GRIFIFTH PASADENA CITY COLLEGE FALL 2010
GRAND CENTRAL PERFORMANCE GRAND CENTRAL PERFORMANCE
INTERIOR VIEW OF THE PERFORMANCE
INTERIOR VIEW OF THE PERFORMANCE TECHNIC: COMPUTER RENDERING SOFTWARES: RHINO AND MAXWELL
OBJECTIVE: TO DESIGN A PERFORMANCE IN THE GRAND CENTRAL MARKET LOCATED IN DOWN TOWN LOS OBJECTIVE: TO DESIGN A PERFORMANCE IN THE GRAND CENTRAL ANGELES. SITE:GRAND GRANDCENTRAL CENTRALMARKET MARKETLOCATED LOCATED ON ON 317 317 SOUTH SOUTH BROADWAY BROADWAY AVENUE AVENUE DOWN DOWN TOWN TOWN LOS SITE: LOS ANGELES, ANGELES, CALIFORNIA CALIFORNIA
CONCEPT:TOUSING THEACHARACHTERISTICS OFBY THE EXISTED AND A MUSICAL INSTRUMENT CALLEDAND CONCEPT: DESIGN PERFORMANCE AREA USING THE BUILDING CHARACHTERISTICS OF THE EXISTED BUILDING
A“RECORDER”. MUSICAL INSTRUMENT CALLED “RECORDER”. STRATEGY:ANALYSING ANALYSINGTHE THECHARACTERISICS CHARACTERISICS OF OF THE THE EXISTED EXISTINGBUILDING BUILDINGAND ANDTHE THEINSTRUMENT INSTRUMENTAND ANDDESIGNING DESIGNING STRATEGY: THEPROJECT PROJECTBASE BASEON ONTHEM THEMIN IN33STEPS. STEPS. THE STEP1:1:DESIGNING DESIGNINGMAIN MAINELEMENTS ELEMENTSOF OFTHE THE PERFORMANCE PERFORMANCE BY BY USING USING THE THE TECHNICS TECHNICS OF OF DECONSTRUCTING STEP DECONSTRUCTING THE THE MAINELEMENTS ELEMENTSOF OFTHE THERECORDER RECORDER“HOLES” “HOLES” MAIN STEP2:2:DEFINING DEFININGTHE THELOCATION LOCATIONOF OFTHE THE PERFORMANCE PERFORMANCE BY BY USING USING THE THE SOUND SOUND SCAPE SCAPE OF OF THE STEP THE EXISTING EXISTED BUILDING. BUILDING. STEP 3: ANALYSING THE CHARACTERISTIC OF THE RECORDER AND DESIGNING THE SECTION OF THE PROJECT STEPON3:THAT ANALYSING THE CHARACTERISTICS OF THE RECORDER AND DESIGNING THE SECTION OF THE PROJECT ABSE CHARECTER. BASED ON THOES CHARECTERS.
STEP 1: DESIGNING THE ELEMENTS OF THE PROJECT STEP 1: DESIGNING THE ELEMENTS OF THE PROJECT 1: DRAWING THE AXON VIEW OF 2: TO TAKE A SECTION 1: DRAWING THE AXON VIEW OF 2: TOHAS TAKE A SECTION THE RECORDER THAT ONE HOLE THE RECORDER
THAT HAS ONE HOLE
3: TO MAKE THE EXTERIOR 3: TO MAKE THE EXTERIOR SURFACE FLAT
SURFACE FLAT
4: TO DIVIDE THE SURFACE INTO 4:EQUAL TO DIVIDE THE SURFACE INTO PARTS EQUAL PARTS
GRAND CENTRAL PERFORMANCE; ARCH 10B FINAL PROJECT; INSTRUCTOR: MR. GRIFIFTH; PASADENA CITY COLLEGE; FALL 2010
AXON VIEW WITHOUT ROOF AXON VIEW WITHOUT ROOF
8: TO LOFT THE CURVES 8: TO TOLOFT GET THE THE CURVES SURFACE TO GET THE SURFACE
5: TO RECONSTRUCT THE 5: SURFACE TO RECONSTRUCT THE THE BY CHANGING SURFACE BY CHANGING THE LOCATION OF THE DIVIDING LOCATION POINTS OF THE DIVIDING POINTS
6: TO SCALE THE HOLE 6: TO SCALE THE HOLE
7: TO RECONSTRUCT 7: TO RECONSTRUCT THE HOLE
THE HOLE
GRAND CENTRAL PERFORMANCE; ARCH 10B FINAL PROJECT; INSTRUCTOR: MR. GRIFIFTH; PASADENA CITY COLLEGE; FALL 2010
A
A
FIRST FLOOR PLAN
A
A
STEP 2: DEFINING THE LOCATION OF THE PERFORMANCE 1: GOING T O T H E G R A N D C E N T R A L M A R K E T A N D M E A S U R ING T H E S O U N D IN T H E E X IS T E D B U ILD IN G . THEN, D R E W ING T H E SOUND SCAPE FOR THREE DIFFERENT TIMES OF DAY.
MORNING
AFTERNOON
EVENING
2: COMBINATION OF SOUND SCAPES
3: CHOOSING THE LOCATION OF PERFORMANCE AND THE CIRCULATION
INTERIOR RENDERING
4:
SEPERATING THE CHOSEN AREA
5: CHANGING THE SCALE
8: ROTATING AND TRIMING THE CURVES TO GET THE LOCATION OF THE PERFORMANCE AND CIRCULATION
AXON VIEW
STEP 3: DESIGNING THE SECTION 1: ANALYSING THE RELATIONSHIP BETWEEN THE MARKET AND THE RECORDER
b
a
b
a
a
b
a a
PRE
2
THE SECTION LATIONSHIP BETWEEN THE MARKET AND THE RECORDER
a
b
a a
b
a
a
b a
THE SKYLIGHTS HAVE AN IMPORTANT RLE IN CREATING THE RYTHM OF THE MARKET.
a
a
b
a
a
b
a
a
2: AN
b
a
a
b
a
P
a THE RYTHM OF THE RECORDER IS CREAED BY OPENING AND CLOSING THE HOLES.
a
SECTION
SHOWING THE SECTION THE RECORDER 2: ANALYSING THE CHARECTERISTICS OF DIAGRAM
PRESSURE: THE PRESURE OF THE AIR IN THE ECORDER DEPENDS ON THE OPENING AND CLOSING THE HOLES
THE HOLES OF THE RECORDER CHANGE THEIR HEIGHTS IN A SPECIFIC ORDER.
2: ANALYSING THE CHARECTERISTICS OF THE RECORDER
PRESSURE: THE PRESURE OF THE AIR IN THE ECORDER DEPENDS ON THE OPENING AND CLOSING THE HOLES
THE HOLES OF THE RECORDER CHANGE THEIR HEIGHTS IN A
CLOSE OPEN
GRAND CENTRAL PERFORMANCE; ARCH 10B FINAL PROJECT; INSTRUCTOR: MR. GRIFIFTH; PASADENA CITY COLLEGE; FALL 2010 CLOSE
EXTERIOR SKIN OF THE MARKET
SKYLIGHTS CIRCULATION AND WAITING AREA
PERFOFMANCE
STAIRS
COLUMNS
WALLS
FLOORS
AXON
SECTION RENDERING
GRAND CENTRAL PERFORMANCE; ARCH 10B FINAL PROJECT; INSTRUCTOR: MR. GRIFIFTH; PASADENA CITY COLLEGE; FALL 2010
INTERIOR RENDERING OF THE MARKET TECHNIC: COMPUTER RENDERING SOFTWARES: RHINO AND MAXWELL
TESLA SHOWROOM AND OFFICES
ARCH 100D FINAL PROJECT INSTRUCTOR: MR. ALAN TSE UNIVERSITY OF CALIFORNIA BERKELEY SPRING 2014
TESLA SHOWROOM AND OFFICES; ARCH 100D FINAL PROJECT; INSTRUCTOR: MR. ALAN TSE; UNIVERSITY OF CALIFORNIA BERKELEY; SPRING 2014
TYPICAL FLOOR PLAN
TESLA SHOWROOM AND OFFICES; ARCH 100D FINAL PROJECT; INSTRUCTOR: MR. ALAN TSE; UNIVERSITY OF CALIFORNIA BERKELEY; SPRING 2014