SYSTRA

Page 1

_1


Contents 1.

Company Profile (SYSTRA)

2.

Stakeholders Management

3.

Transport Planning

4.

Infrastructure

5.

Architecture

6.

Ridership

7.

Staffing (Project Director)

_2


1. Company Profile SYSTRA is the world’s first specialized rail consultant with more than 6,500 staff worldwide. SYSTRA has a truly global and local delivery capability, participating in 50% of the world’s metro and high speed rail projects. Having designed and supervised the original Dubai Metro, the region’s first metro, SYSTRA brings a legacy of local success and an international track record. Of the World Metro and High Speed Rail Projects.

50%

6,500 Staff World’s first

1st Dubai Metro First Metro in the Region

_3


2. Stakeholders Management

Stakeholder management is the process of engaging with these people, and maintaining good relationships with them. You'll likely be working with people in many different roles, with varying levels of influence over your project.

_4


3. Transport Planning

Transport planning is defined as planning required in the operation, provision and management of facilities and services for the modes of transport to achieve safer, faster, comfortable, convenient, economical and environment-friendly movement of people and goods:

Existing and proposed context review

Identify and size supporting transport requirements

Urban integration: access and circulation plans

_5


3. Transport Planning

Transport planning is defined as planning required in the operation, provision and management of facilities and services for the modes of transport to achieve safer, faster, comfortable, convenient, economical and environment-friendly movement of people and goods:

_6


4. Infrastructure MAINLY VIADUCTS AS FOLLOWS: 1A

RC

Box Girder

OBR

PC

U-Shape

_7


4. Architecture

URBAN STUDY To improve operation performance. To determine line physical insertion options and related facilities integration (SCP)

PEDESTRIAN & PASSENGER FLOW STUDIES

CLIENT

To produce the ridership forecast for the optimum sizing and layout of the stations.

_8


5. Ridership RIDER NUMBERS Statistics Lines

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

1

1

2

2

2

2

2

2

2

2

Kilometer's

74.6

Trips (Red Line)

104,961

115,670

Trips (Green Line)

93,795

94,189

Trips (Total)

198,756

209,759

60,024,794

71,914,000

88,886,539

8,982,256

37,576,000

48,872,719

69,007,050

109,490,000

137,759,258

Passengers (Red Line)

6,892,544

38,887,718

Passengers (Green Line) Passengers (Total)

6,892,544

38,887,718

104,000,000

121,000,000

121,600,000

128,054,000

132,400,000

65,942,000

69,708,000

69,700,000

72,021,000

72,000,000

186,942,000

190,708,000

191,300,000

200,075,000

204,000,000

[35]

[36]

[36]

[36]

[36]

[36]

[2]

[2]

[2]

[2]

[2]

[2]

[37]

[37]

[37]

_9


6. Staffing: Project Director

Paul Mike Project Director

23 Years of overall experience Worked as project director for Hanoi project, Paris metro, Bordeaux Tram and Makkah metro

Education

Languages

Master Degree in Civil Engineering

Languages

Worked as project director for Hanoi project, Paris metro, Bordeaux Tram and Makkah metro

Fluent in English, French and Spanish

_10


Get In Touch

SYSTRA DUBAI BRANCH

SYSTRA DUBAI BRANCH Al Masraf Tower - Office 805 Baniyas Road, Deira Dubai. United Arab Emirates

Call Us +971557296163

Email Systrae@gmail.com

Middle-East Operating in the Middle East for more than 40 years, SYSTRA has established itself as a benchmark in public transport engineering, involved in the region’s major projects.

_11


Thank You

F O R Y O U R AT T E N T I O N

_12


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.