Arturo D. Lopez 88 Cohannet St. Apt 3 Taunton, Mass 02780 Prestijio@gmail.com 978-241-2233
Contents 4
Cover Letter
5
Resume
Professional 06
Historic Renovation
08
Retail
10
Mixed Use
12
Water Treatment Facility
14
Single Family Residence
Skills 18
Academic Excerpt
24
Sketching, Models & Hand Renderings
26
Revit & Photoshop Rendering
28
Ceiling Installation
Arturo Lopez 88 Cohanett St, 3rd floor Taunton Ma 02780 Prestijio@gmail.com (978) 241-2233
Kristine, After spending some time looking at the website of Durkee, Brown, Viveiros & Werenfels Architects I am convinced that there is no place better for me to grow. I am fascinated by the diversity of projects that the firm engages in, the competency of the staff, the work environment that is portrayed, and the quality of design that is produced by the firm. I think I can contribute to the excellence that is your firm. I have a bachelor’s degree in interior design, and I am entering the thesis stage of my graduate degree in architecture, at The Boston Architectural College. I am currently employed by a small architecture firm specializing in corporate commercial and residential architecture.
At my current employment I am responsible for all revit modeling and production of construction documents. I have been working in revit for 6 years, both in the production of construction documents and the production of presentation drawings. At my current office I manage all revit related aspects including; the writing of revit standards, creation of libraries, the management of work-sharing and the production of presentation drawings. I am able to produce high quality models and construction documents efficiently and effectively. My professional experience includes production of construction documents and construction of a variety of project types. I am experienced as a licensed general contractor, and providing plan review services as a consultant for municipalities in California. Currently, I am involved in the production of design documents for a school, cold storage facility, and, a church, but, most of my recent experience has been in commercial fit outs and residential applications. Thank you very much for your time and attention. I look forward to speaking with someone from your firm about this matter soon; you may contact me at the above email or at (978) 241-2233. Sincerely,
Arturo Lopez
4
ARTURO LOPEZ 88 COHANETT ST, TAUNTON MASS, 02780 978Ͳ241Ͳ2233 • PRESTIJIO@GMAIL.COM EDUCATION The Boston Architectural College September, 2009 – Present Candidate for Masters of Architecture – Expected Graduation Spring 2015 Westwood College of Technology August, 2002 – May 2006 Bachelors of Science in Interior Design COMPETENCIES Advanced knowledge in Revit 2013, AutoCAD 2010, Adobe Creative Suite Cs6 and Rhino 5. Able to prepare photo realistic renderings, color pencil rendering, sketches, and physical models. Able to prepare construction documents for retail, commercial, restaurant, and residential projects Able to manage a project from conception to completion. PROFESSIONAL EXPERIENCE Janez Design Framingham, Mass Aug 2012 – Present BIM Manager/Drafter Responsible for the qualitative outcome of construction documents. Develop construction details for envelope and components of masonry, metal, and wood framed buildings. Prepare conceptual & realistic presentation drawings using Revit and adobe software for clients. Review and respond to submittals during construction administration. Provide direction and assistance to staff on accurate and efficient methods to build Revit models. Developed office Revit standards, family library, construction detail library, and component library. Effectively manage Revit workͲsharing between team members, and successfully coordinate project files. Conduct field measurements and document existing conditions. El Mariachi Mexican Restaurant Taunton, Mass June 2010 – Aug 2012 Server/Bartender Provide excellent customer service, a fun dining experience, and, promote food and alcohol sales. Prestijio Builders Rowland Heights, CA May 2006 – Nov 2009 Designer/Licensed Contractor Design and develop construction documents for one and two family dwellings. Coordinate municipal procedures for design review boards, construction permits, and construction meetings. Assist clients in determining practical extent of construction based on cost, time frame, and other constraints. Coordinate consultants during drawing phase and subcontractors during construction phase. Provide solutions to problems that arise while engaged in the process of design or construction. Melad & Associates Consulting Engineers Huntington Beach, CA Feb 2003 – May 2006 Building Inspector Provide architectural plan review of residential and commercial projects as a consultant for municipalities. Observe and approve progression of construction in residential and commercial construction. Assist and educate the public on the risk of engaging in a construction project while inexperienced. References: Steve Greenberg (Remax Oak Realty) ͲAshland (508) 641Ͳ1222 Pedro Munoz (PRM Engineering) – (978) 387Ͳ8373
5
HIstoric Residence
EXIST. (NEW) ROOF TO REMAIN, ALL NEW PENETRATIONS TO BE FLASHED TO MAINTAIN EXIST. WARRANTY. PROVIDE NEW HALF ROUND WHITE ALUM GUTTERS AT ALL EAVES, TYP. SEE DETAIL 3/A801
ATTIC 213' - 7 1/2" EXISTING STONE HEADER AND SILL, TYP. SEE NOTES FROM NORTH ELEVATION
W1
W1
LEAD STEP FLASHING LET INTO BRICK, TYP.
W1
W1
PROVIDE NEW WHITE ALUM DOWNSPOUTS WITH MASONRY ANCHORS SET INTO BRICK IN SEALANT. PROVIDE ANCHORS @ 4'-0" O.C. MAX OR AS RECOMMENDED BY MFR
W1
SECOND FLOOR 204' - 11 1/2"
W1
W1
W1 E211
EXISTING BRICK TO BE PAINTED, TYP. REFER TO SPECS FOR COLOR SCHEDULE, PREPARATION AND APPLICATION REQ.
W1
E111
FIRST FLOOR 195' - 5 1/2"
RIM AT N BASES, AME RIME & PAINT
GRANITE STEPS TO REMAIN
SEE WEST ELEVATION FOR NOTES ON FRONT PORCH.
EXPOSED FOUNDATION TO REMAIN UNFINISHED
Facade Elevation
HALL 312
BATH
HALL
121
125
BEDROOM #3 128
6' - 9"
ATTIC 213' - 7 1/2"
SECOND FLOOR 204' - 11 1/2"
KITCHEN FOYER 111
114
DINING
POWDER
113
116
FIRST FLOOR 195' - 5 1/2"
BASEMENT 001
EXISTING BASEMENT 187' - 9 1/4"
Building Section 6
EXIST. ROOF TO REMAIN BELOW
Project Abstract: The scope of this project was to restore the historical character of the house and convert it from a three family residence to a two family residence. My role in this project was to document the existing conditions and draft construction documents. This project had a heavy concetration on envelope detailing, the existing masonry walls were deteriorating, because the historic nature of the residence.
.
36" MIN HEIGHT GUARDRAIL
8 NEW ROOF SHINGLES BELOW
BEDROOM #3 128
2
EXTERIOR DECK
128B
317
.
UP
LIN. CAB 36"H 11
7' - 3" CLEAR
128A
BATH
A402
127A
127
5 A401
DN
DN 1R 3
7
6 A401
BATH
BEDROOM #2
2
126
A501
227
UP LOCATION OF EXISTING STUD WALL TO REMAIN
2
BEDROOM #2
CLOSET
224
227
226
126B
LIN.
2
CLOSET
2
125
6"
125B 2' - 6 1/2"
224B 2' - 4"
1' - 10"
126A
HALL
225 LIN CAB
224A 2
4' - 0"
226 WP AT F.O. STUD
W/D
1' - 10" 1' - 9" 3 221B
HALL
221A
DN
125A
DN
124
ALIGN
4" DRYER VENT
123
2
225
122A
122B
1 4' - 0" 4' - 9"
4' - 3"
C
C
LOCATION OF EXISTING STUD WALL TO REMAIN
LOCATION OF EXISTING STUD WALL TO REMAIN
1 ALIGN
MASTER BEDROOM
HEAD
LINE OF STRUCTURE ABOVE.
122
TILED BENCH
ALIGN
BEDROOM #1 221
PROVIDE FIRESTOPPING BTWN. FLOORS
5 123
EXTERIOR SHEATHING PANELS, NEW
BATH
NEW SHINGLES
3 A401
121
121
EXIST. SHEATHING TO REMAIN EXIST. STUD CAVITY, FILL WITH NEW UNFACED FIBERGLASS BATT INSULATION
PLAN
.
1
.
A501
.
1/2" PLYWOOD, 8D NAILS, 12" O.C. 2 PER.
EXIST. ROOF TO REMAIN BELOW
6 MIL VAPOR RETARDER 1" RIGID INSULATION, CONTINUOUS ONE LAYER GYPSUM WALL BOARD
Second Floor Plan
TYVEK, AS NEEDED
BASE
LINE OF FLOOR. FILL IN EXIST. OPENING
PROVIDE FIRESTOPPING BTWN. FLOORS
NEW DECKING & RAILING SYSTEM 4 1 A802 A401
Wall Type 2' - 0"
ISLAND 3
DW
A501
3
A402
DN EXISTING BULKHEAD
128
7' - 6 1/4"
BEDROOM #3
SIDE PORCH TO BE RECONSTRUCTED PER SHEET 5/A802
PORCH
KITCHEN
115
114
1 A401
EXISTING FLOOR TO FLOOR HEIGHT
NEW ROOF ASSEMBLY PER 5/A802
1
4
3 A801
ROOF FLASHING
REF.
2
EXIST. STEP
E114
6 118
213B
116
N EXIST. NING
16
18
A402
A501
116
213C POWDER 214
17
DINING
FP
113
KITCHEN
6
DW
213A
A402
5' - 10"
Sim
A201
PLUMBING CHASE
2
POWDER
19
213 5 A802
DN
114B
113B
2 A401
4 3
SEE SHEET A201 FOR DESCRIPTION OF NEW GUTTERS, TYP.
KITCHEN 114
8' - 9"
NEW DECK RAIL, PROFILE TO BE SELECTED BY HOMEOWNER
C.O.
30' - 1 1/4"
* NEW 5" EXPOSURE CEDAR SHINGLES * CEDAR BREATHER UNDERLAYMENT * AIR BARRIER * VERIFY CONDITION OF EXISTING SHEATHING WITH OWNER REPLACEPORCH 115 AS REQUIRED * EXISTING 2x4 STUD WALL * NEW 2x4 STUDS AS NEDEED TO ACCOMODATE SPACING @ 16" O.C. * FILL EXISTING WALL CAVITY w/ FIBERGLASS INSULATION. (R15) * 1" CONTINOUS RIGID INSULATION * 6 MIL VAPOR BARRIER * 1/2" LAYER OF GYPSUM BOARD
EXISTING FLOOR TO FLOOR HEIGHT
NEW COLUMNS TO BE SELECTED BY OWNER
3
2' - 6"
REF. TYPICAL EXT. WALL @ REAR ADDITION
4' - 0"
5' - 6"
C.O. 4 1/2"
2' - 6"
2' - 11"
C.O.
CLEAR
213D
113A
EXIST.
EXIST.
C.O.
C.O.
HORIZONTAL CHIMNEY FOR NEW GAS FIREPLACE
ALIGN
2 15
CASED OPENING
EQ
EQ 8
2
A402
7
2
A402
A402
LIVING
LIVING
212
112
FOYER LOCATION OF EXISTING BEARING WALL TO REMAIN
LOCATION OF EXISTING BEARING WALL TO REMAIN
111
211
E211
C.O.
UP
4' - 0"
3
10 1/2"
C.O.
10 1/2"
DECKING TO BE REPLACED PER SHEET 5/A802
4' - 0"
UP
FOYER
E111
SEE STRUCTURAL FOR NEW FOOTING DETAILS.
EXISTING ENTRY PORCH
1 A501
EXISTING PORCH TO BE REPAINTED. SEE EXTERIOR ELEVATIONS. SIDE RAILING TO BE REMOVED. DN
FIBERGLASS BATT W/ KRAFT-FACE UP (R30) INSULATION TIGHT TO SUBFLOOR. INSTALL W/ SPRING CLIPS, TYPICAL ENTIRE CEILING OF BASEMENT
DN
EXISTING STONE STEPS TO REMAIN EXISTING FOUNDATION TO REMAIN
2
Wall section
First Floor Plan
7
A201
FP
EXISTING RAILING
CENTER WALL ON LINE OF EXISTING POSTS
Retail Project Abstract - The scope of this project was to convert an existing Star Market into a large retail Store. My involvement in this project went from documentation of existing conditions and continued into construction administration. I was primarily responsible for the qualitative outcome of construction documents and review of construction submitals during CA. The greater focus of this project was on the restoration of existing cmu walls and brick veneer, in several locations the veneer was pulling apart from the cmu. We provided an extensive set of details and sections to repair the structure but, in the end the challenges proved to be to great and the entire brick and masonry facade was reconstructed from scratch.
F
F
6"
6"
9"
7".
TOP OF BLOCKING EL = 156.61' TOP OF EXIST. STL EL = 146.61'
TOP OF EXIST. STL EL = 146.61'
6 A602
EXIST.W16x31 STL BEAM (SEE STRUCTURAL DRAWINGS)
DASHED LINE INDICATES FACE OF BRICK BEYOND SIGN PANEL
10"
1' - 0"
5 A602 TOP OF BLOCKING EL = 147.19'
EXIST. W16x31 STL BEAM
TYP. EXT. WALL CONST. @ RECESS. ACCENT STUCCO PANELS STUCCO SIGN PANEL BEYOND
* * * * * * * * * *
STUCCO FINISH 1/2" CEMENT BOARD AIR/MOISTURE BARRIER 1/2" GYP SHEATHING 1 1/2" GALV. MTL FURRING @ 16" O.C. EXIST. (OR NEW) 8" CMU BLOCK 2 1/2" GALV Z- FURRING @ 24" O.C. 2 1/2" RIGID XPS INSULATION 6 MIL POLY VAPOR RETARDER 5/8" GWB, PTD
STUCCO SIGN PANELS BEYOND
PRE-FINISHED ALUMINUM CANOPY
7 A602
20' - 9"
21' - 7"
20' - 9" +/- V.I.F.
1' - 0"
8 A602 1' - 0" PRE-FINISHED ALUMINUM CANOPY
STRUCTURAL KICKER TO CEILING. SEE STRUCTURAL DRAWINGS
STRUCTURAL KICKER TO CEILING. SEE STRUCTURAL DRAWINGS TYP. EXT. WALL CONST. @ BRICK PIERS * 4" BRICK VENEER W/ VENEER ANCHORS @ 24" O.C VERT & HORIZ. * AIR SPACE M.E. * SPRAY APPLIED WATER PROOF AIR BARRIER * EXIST. 8" CMU * 2 1/2" GALV Z- FURRING @ 24" O.C. * 2 1/2" RIGID XPS INSULATION * 6 MIL POLY VAPOR RETARDER * 5/8" GWB, PTD
10' - 0"
ALUM STOREFRONT 10' - 0"
21' - 4"
1' - 0 7/16"
TOP OF EXIST. STL EL = V.I.F.
1' - 0 7/16"
W16 X 57 STEEL BEAM (SEE STRUCTURAL DRAWINGS)
BRICK VENEER BEYOND
THRU. WALL FLASHING W/ WEEPS @ 24" O.C. EXIST. CONC SLAB
EXIST. CONC SLAB
TOP OF EXIST. SLAB EL = 125.86'
TOP OF EXIST. SLAB EL = 125.86'
EXIST. CONC FDN
EXIST. CONC FDN
Typical Wall Section
8
EDGE OF PARAPET SUPPORT BEHIND PARAPET
ROOF SURFACE BEHIND PARAPET TOP OF WOOD BLOCKING
3
3.4
3.6
4
4.1
4.5
1' - 0"
2.8
5
6
TOP OF PRE FINISHED ALUM FLASHING NEW 4" BRICK VENEER, TYP. CEMENT BOARD STUCCO FINISH #2, TYP.
9"
2
1
7
CEMENT BOARD STUCCO FINISH #1, TYP
.
.
C E
F
B
11' - 4 5/8"
F
27' - 0"
26' - 0"
EQUAL EQ
EQ
.
26' - 3"
EQUAL .
D E101A
E102
A E104
C.J. C.J.
CENTER CANOPY HANGER RODS ON PIERS & MULLIONS, TYP.
C.J. 2
1
3
4
A602
A602
A602
A601
A
E103
C.J. PRE FINISHED ALUM SILL FLASHING AT STOREFRONT
C.J.
PRE FINISHED ALUM BREAK METAL TO MATCH STORE FRONT FRAMING
3
1
A601
A601
Facade Elevation
1
2
3
2.6
4
3.4
5
4.5
6
7
161'-0" EXIST. V.I.F. 29' -7" EXIST. V.I.F.
6" V.I.F.
5' - 8"
35' - 9" EXIST. V.I.F.
25'-9" EXIST. V.I.F.
6"
114
STOR 3
4
114
HATCHED AREA INDICATES EXISTING MEZZANINE ABOVE
BREAK ROOM CORRIDOR
113
1
109 UP
1
1
WOMEN 110
STAIR
5' - 8"
M.O.
CORRIDOR 117
CENTER ON EXIST BOTTOM STEP NOSING
LOADING
116 1
DN
2
5' - 8"
MEZZANINE ABOVE E106
2547 SF ALIGN FACE OF WALL WITH MEZZANINE SOFFIT ABOVE
DN 2 2
CENTER WALLS ON EXISTING MEZZANINE SUPPORT COLUMNS. FACE OF WALL TO BE PROUD OF EXISTING MEZZANINE FLOOR, TYP.
4' - 0"
25' - 4"
1
6 A301
SKATE FITTING
4
2
106
EDGE OF FLOORING TRANSITION
10' - 0" HI DISPLAY WALLS WITH SLATWALL ON ALL FACES. CONFIRM LOCATION IN PLAN WITH TENANT
30' - 0" EXIST. V.I.F.
119
1' - 3"
4' - 11 1/4"
APPROXIMATE LOCATION OF FUTURE JANITOR'S SINK
DASHED LINE INDICATES THE EXTENT OF SLAT WALL INSTALLATION. REVIEW WITH TENANT REPRESENTATIVE FOR INSTALLATION OF BLOCKING AND SLAT WALL
9' - 0"
107
85'-0" EXIST. V.I.F.
19' - 6"
COMLAX
3' - 6"
37' - 4 7/16" EXIST. V.I.F.
4
C
B.2
118
2
117A
2' - 6"
2
PATCH TOP OF EXISTING CONC FOUNDATION w/ CONC
E109
STORAGE NEW GALV. METAL STEPS & PLATFORM
E110
B.1
CORRIDOR
116
ALIGN
PROVIDE 3 NEW INSULATED OVERHEAD DOOR W/ DOCK SEALS & CONT. BUMPER NEW CONC. SLAB INFILL TO MATCH EXIST. AT DEMOLISHED SLAB AREAS. SEE DEMOLITION PLAN
2
113A E108
115 115
113B
1C
B
POSITION NEW STAIRWALLS SUCH THAT THE INSIDE FACE OF GYP.BD PASSED BY EXIST. MTL STAIR STRINGERS (SEE DTL ?/?) 4' - 8"
1 A301
4A
E111
1C 111
APPROXIMATE LOCATION OF FUTURE TOILET WETWALL 10' - 0"
4' - 0"
34' - 0" EXIST. V.I.F.
4' - 0"
6" V.I.F.
112 1A 112
111
1C 110
3' - 4"
32' - 2 1/4" EXIST. V.I.F. E107
JAN
1B
MEN
4B 3
21' - 4"
20'-0" EXIST. V.I.F.
A
36' - 8 3/4" EXIST. V.I.F.
4C
4
UP E105
5
SALES FLOOR
2
STORAGE
30'-0" EXIST. V.I.F.
105
119
INFILL EXISTING LOADING DOCK DOOR WITH NEW CMU
25' - 10" EXIST. V.I.F. 5
69'-0" EXIST. V.I.F.
MECH 120
120
E
EXTEND PARTITION TO UNDERSIDE OF ROOF DECK A301 DASHED LINE INDICATES THE EXTENT OF SLAT WALL INSTALLATION. REVIEW WITH TENANT REPRESENTATIVE FOR INSTALLATION OF BLOCKING AND SLAT WALL
2.8
2
3.6
4.1
TENANT CASEWORK (N. I. C.) 10' - 9"
20' - 6"
6' - 8" EXIST.
5
2' - 0"
104 2
2
OFFICE
SHOP
104
103
4
NEW CONC SLAB INFILL TO MATCH EXISTING
121 2
2
3'-6" H x 4'-0" W GWB PASS OPENING w/WOOD TRANSACTION TOP EQ
103
F
8' - 0"
C.J
5
102
4' - 0"
6"
8' - 0"
5
VESTIBULE 101
F
4 E102
E103
B
D
E
24' - 0"
3' - 4" M.O.
24' - 0"
3' - 4" M.O.
8' - 0"
C.J
12' .- 0"
6' - 4"
22' .- 0" 1' - 6"
E104 A
C 5' - 0"
M.O.
MECH 121
4
EQ
A
6"
5' - 0" 17' - 0"
6"
123
E101B
E101A C.J
TENANT #3
122
6' - 10"
11' - 0" 6' - 0"
G
CHECKOUT
2
F
TENANT #2
20' - 6" EXIST. V.I.F.
V.I.F.
6"
4 35'-4" EXIST. V.I.F.
154' - 0" EXIST. V.I.F.
D
1' - 6"
M.O.
6' - 4" M.O.
8' - 0"
3' - 4"
8' - 0" 25' - 0"
3' - 4"
17' - 10" 21' - 2"
3' - 4" 8' - 0"
M.O.
17' - 10" 21' - 2"
8' -. 0"
M.O.
195'-0" EXIST. V.I.F.
Floor Plan 9
Mixed use Project Abstract - The Scope of this project was to convert an existing paper store into a mixed use occupancy. The new occupancy consited of a new jewlery store and daycare center. My role for this project was to produce construction documents, provide construction administration support, & produce presentation documents for the town. A challenging aspect of this project was the reconstruction of the entrace stairway, it had to comply with modern ADA standards and the town did no allow for an overhead structure. The solution to the entrance challenge was to install an electric wheel chair lift, unfortunately, it had to be exposed to the elements.
10
AREA OF WORK AT ABBOTT STREET ENTRANCE EXISTING STOREFRONT GLAZING AND FRAME TO BE REPLACED. EXTENT OF REPLACEMENT SHOWN AS SHADED
ROOF PLAN 25' - 0"
EXISTING BRICK FACADE TO BE PAINTED WHITE (EXISTING COLOR)
EXISTING WINDOWS TO REMAIN
ALEX AND ANI 13' - 5"
EXISTING PLANTER SHOWN NEW BUILT-IN PLANTERS ON EACH SIDE OF STAIR
NEW CAST IN-PLACE EXTERIOR STAIR WITH SLATE TREAD. STAINLESS STEEL RAILING WITH GLASS PANELS
NEW LIMITED USE, LIMITED ACCESS CHAIR LIFT ALUMINUM FRAME AND GLASS PANEL.
Elevation
EQUAL
REET TT S T ABBO
EQUAL
SIDEWALK
ROOF PLAN 25' - 0"
14 CRS.
NEW SIDEWALK PLANTERS
SIDEWALK ENTRY
EXISTING BRICK FACADE TO BE PAINTED WHITE (EXISTING COLOR) UP
NEW 6' X 6' STOREFRONT GLAZING WITH CLEAR ANODIZED FRAME. HEAD AND SILL TO ALIGN WITH WINDOWS ON ABBOTT STREET FACADE
DN
6' - 0"
27 COURSES OF BRICK
3' - 2" +/-
NE RTY LI PROPE
EXISTING RAISED PLANTER
NEW SIGNAGE UNDER SEPARATE APPLICATION
ALEX AND ANI 13' - 5"
LIMITED USE/ LIMITED ACCESS CHAIR LIFT
DN TOP LANDING AT BUILDING ENTRY
EXISTING SIGNAGE
ADJACENT TENANT
LANDING AT KIDVILLE GRADE LEVEL BELOW
1 1/2"
2" Ø POST 5 X 5 BASE PLATE @ FLOOR 1 1/2" WOOD HANDRAIL
PRIME AND PAINT EXISTING CONC. WHITE
ALEX & ANI TENANT SPACE
3 A800
KIDVILLE LVL 1' - 6"
Facade Elevation
Enlarged Plan
24' - 0" 7' - 4" THRESHOLD AT SIDEWALK
8' - 7" T.O. PLANTER EXISTING EXTERIOR PLASTER TO REMIAN
A301 A1
5 A800
7' - 0" T.O. SIDEWALK
Sim 1 A101
2
27" x 72" CASE
DN
6
3 NEW P.LAM. SILLS AT ALL WINDOWS TYP. SEE DETAIL X/XXX.
10' - 6" T.O. NEW CONC. LANDING
A800
27" x 72" CASE
EXISTING STOREFRONT TO REMAIN
27" x 72" CASE
EXISTING STOREFRONT TO REMAIN
CASH WRAP
100 12' - 0" T.O. SUBFLOOR
101
SE 72" CA
24" D NESTING TABLES
1
VING SHEL
A301
1
A800
Sim
RETAIL 100
A800
104
101A
106
2
OFFICE STAIR #1
103
DN
J.C. 105
EXISTING CONCRETE COLUMNS TO REMAIN
4
107 107
108A
1 A800
WOMEN
MEN
E
FLOATING SHELVES
10' - 6" T.O. SUBFLOOR
UP
STORAGE
4 A800
2
3
8"
SE 72" CA
102
DISPLAY WALL 103
24" D NESTING TABLES
27" x
BREAK ROOM
UP 3R
4' - 9" M.O.
5 A800
E
4' - 7" M.O.
27" x
10' - 2" CLEAR
RETAIL 102
4" SHAFT LINER
106 101B
108
4"
E
2 A101
108B EXISTING EXTERIOR DOOR FROM LOWER LEVEL SHOWN
Floor Plan 11
Water Treatment Facility Sim 7 A501
1' - 0"
7 A501
TYP. ROOF CONST. * BALLAST. M.E * BALLASTED EPDM MEMBRANE * 3" RIGID INSUL * LIGHT WGT CONC. FILL, SLOPED TO DRAIN * 12" PRECAST. CONC.PLANK (SEE STRUCT. DWGS) * 3" CLOSED CELL SPRAYFOAM INSULATION. * INTUMINESCENT COATING
3' - 4"
REINF. CMU HEADER (SEE STRUCT. DWGS) Sim 1 A801
TYP. EXT. WALL CONST * 8" REINF. SPLITFACED CMU (SEE STRUCT. DWGS) * DRYBLOCK COATING INSIDE FACE OF CMU * 3 5/8" MTL STUDS @ 16" O.C * FULL CAVITY CLOSED CELL SPRAY FOAM INSUL. * 5/8" GYP. BD, PTD.
ACOUSTIC CEILING TILE 6" TO FACE OF STUD
8"
4' - 0"
GWB, PTD W1
NEW ALUM. AWNING WINDOW T.M.E P-LAM SILL W/ WOOD EDGE TYP. SLAB -ON-GRADE CONST. * FLOOR FINISH (SEE FINISH SCH * 4" CONC. SLAB (SEE STRUCT D * VAPOR BARRIER * 2" SAND BED * 6" COMP. GRAVEL BASE
NEW PRECAST CONC. SILL T.M.E 2' - 8"
Sim
BOT OF PLANK - 8" EL = 10' 253.16
STEEL ANGLE
3' - 4"
10' - 8" TO MATCH EXISTING
6 A501
TOP OF PLANK - 8" EL = 11' 254.16
TOP OF SLAB M.E 0" EL = 242.56 BIT. DAMP PROOFING 10" CONC. FDN WALL (SEE STRUCT. DWGS) 6 A501
2" XPS RIGID INSUL. CONT. CONC. FTG W 2X4 KEYWAY (SEE STRUCT. DWGS)
Typical Wall Sections EXISTING BUILDING BEYOND
EXISTING ROOF PLANK
NEW ROOF PLANK TOP OF PLANK - 8" EL = 11' 254.16
CONTROL JOINT
4 A301
Sim
BOT OF PLANK - 8" EL = 10' 253.16 BOND BEAM AT OPENINGS ALUMINUM CASEMENT WINDOWS TO MATCH EXISTING
PATCH CMU AT LET-IN LINTEL TO MATCH EXIST
W1
W1
W1
PRECAST SILL SPLIT FACE CMU T.M.E
TOP OF SLAB M.E 0" EL = 242.56
EXISTING BLDG
NEW ADDITION
Facade Elevation 12
A.9
Project Abstract - The scope of this project was to provide a new office additon to an existing water treatment facility. During the life of this project several challenges presented themselves. First, we the architect, were the consultant for the project, an engineering firm was hired to provide the larger scope and we worked for them. This presented challenges because we were looked at to provide information that was out or our scope, regularly, and had no answer. Another major challenge was, the occupancy group, This building is an H occupancy, and prohibits the addtion of office space attached to its buildings.
EXISTING BUILDING
NEW ADDITION 3 6' - 0"
5' - 8"
REMOVE WINDOW & INFILL OPENING W/ CMU T.M.E.
A501
8"
4' - 0"
4 A101
104
CORRIDOR
W1
102
21' - 4" 6' - 8"
OFFICE 2' - 10".
103
1 A501
2 A100
W1
8' - 0".
101B
2
M.O.
CARPET 2' - 8"
QUARRY TILE
6' - 0"
WH
PROVIDE 5 TIER MELAMINE SHELVING W/ ADJUSTABLE STANDARDS & BRACKETS
M.O.
104
2' - 8"
4' - 6"
A.10
4' - 0"
STORAGE
3' - 0"
REMOVE EXIST DOOR & FRAME. PATCH JAMB TO PROVIDE FINISHED APPEARANCE
A501 5' - 4"
VESTIBULE 101
W1
101A
W1
W1
1 A801 EXT. ALUM. GLAZED DOOR WITH SIDELITE
4 A501
8' X 8' CONCRETE LANDNG PAD
5' - 4" M.O.
4' - 0"
2' - 8"
4' - 0"
M.O.
CANOPY ABOVE
2' - 8"
4' - 0"
M.O.
2' - 8"
4' - 0"
M.O.
29' - 4"
5 A501
Enlarged Floor Plan @ New Addtion
E
64' TRAVEL DISTANCE UP
UP
E
54' TRAVEL DISTANCE
A.9 UP
E
LAT FILES
A.10 71' TRAVEL DISTANCE WH
1 A101
OFFICE 103
E
Water Treatment Facility 13
Single Family Residence The scope of this project was to design a new single family residence. My involvement consisted or producing construction documents and providing the client with drawings they could easily understand. The greatest challenge of this projcect was to make sure that we were exceptionally clear in representing our design intent, the client struggled with picturing our ideas, and it was my responsibility to produce documents that they could understand. The images represent two design options of several that were provided to the client for approval.
Design Options
14
Second Floor Plan
First Floor Plan 15
Skills The Following pages were part of academic studies at The Boston Architectural College. All drawings and diagrams were produced using Revit, Photoshop, and, Indesign.
Planning, Programming & Diagraming The project is about creating the framework that will encourage waterfront development at The Neoponset River in Quincy.
Aerial Master Plan 16
Master Plan 17
a
major moves
Red Line a
a
b
Wayfinding
Section 18
View a
View b These images reflect the ideas that create awareness of the waters edge and new development. The drawings illustrate how the landscape directs views and access to the water. It also shows the redline T stop in a new centralized location with direct views and access to the Water.
19
b a
a
Transition Park
Transition park - Is a reflection on what the Neoponset River represented on while travel to and from Boston and Quincy, a transition. Here it serves the same purpose, it lets the person know they have arrived to the waters edge.
a
b
Section b 20
View a
Section a
21
a a
b
b
Section a
c c
Section c
d
The Waters Edge Connection to Boston - Hardening the waters edge is the single most defining factor of the proposal. It captures the idea of Bostons edge condition to the south and provides connections into boston through the waterfront access roads and across the river. The waters edge now defines the character of Quincy and creates a solid connection to Boston.
e
22
e
d
Section b
Section d
Section e 23
Sketching, Models, & Hand Renderings
a
a c
24 4
Section a
c
b
b
Section b
Section c 25 5
Rendering
26
27
Ceiling Installation
Installation Location
Concept Sketches 28
Force Fitted framework
Progress Installation
Final Installation 29
30
31