Aryan Salvi: Curriculum Vitae and Architectural Portfolio.

Page 1

You will find it in the Circle

ARYAN SALVI


CURRICULUM VITAE Aryan Salvi


June 11, 2000

Software:

Workshop:

Advance- AutoCAD SketchUp MS office Wondershare Filmora Adobe Indesign Adobe Photoshop

_Timber Construction Workshop by Jimmy Lim _Bamboo Workshop, Auroville _Biomimicry by Ar. Vaibhavi Agarwal

Beginner- Rhinoceros Blender Vray

Experience:

Achievement:

_Architecture on Road

_Tarangan Roof Design Competition

aryansalvi1106@gmail.com +91 7020546244

(Initiative by University of Antwerp, Belgium)

_Logo Design for Blissful Parenting _ANDC Wall Painting Initiative _Settlement study Konkan, Maharashtra (Headed one of the Cluster groups)

_Documented a Demolishing Wada in Pune (lead by Ar. Mayukh Gosawi)

(Group, First Prize in Intra College Competition)

_Brick 12 on 12, 2019

(Selected as Best Design for semester 2)

_Interschool Fashion Show (Special Mention)

_Brick 12 on 12, 2021

(Selected as Best Design for semester 6)

Manual Skills:

Activities:

_Drafting, _Wire Sculpting _Model Making _Sketching

_Initiated Fashion shows at College _Vocal Training (Indian Classical Music) _Harmonium Training (Indian Classical Music)

Education:

Travels:

_SMEF’s Brick School of Architecture, Pune _Indira National School, Pune- 12th _City International School, Pune- 10th

Bhuj, Auroville, Kerala, Konkan, Delhi, Aurangabad, Jaipur, Udaipur, Agra, Mathura, Fatehpur Sikri, Mumbai


CHHAKDA

SEMESTER 2 Long Exploration

Presented in Brick 12 on 12 as the best design of the semester

SANRAKSHAN SEMESTER 5 Short Exploration

CONTENTS


NOTES 1 ALL DIMENSIONS ARE IN MM 2 DO NOT SCALE THIS DRAWING 3 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL AND STRUCTURAL DRAWINGS 4 THE CONTRACTOR SHOULD CHECK AND VERIFY ALL DRAWINGS AND DIMENSIONS ON SITE BEFORE STARTING WORKS 5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE OF THE ARCHITECT IMMEDIATELY IN WRITING 6 FOR DRAINAGE, PLUMBING ELECTRICAL AND LANDSCAPE DETAILS PLEASE REFER CONSULTANTS' DRAWINGS

125 C1,C2,C3

2

4

5

9

16650

11

10

C9,C15,C19,C23

14230

C5,C25

11810

C3,C28

C8,C14,C18

9560

8

11215

8390

7

C11,C22

7215

6

C2,C27

C10,C21

5560

C1,C26

4695

3

C7,C13,C17

2545

C4,C24

125

0

1 0,0

C6,C12,C16,C20

7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOUT CONSULTING THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBILITY OF THE CONTRACTOR

12

NORTH

A

No.

Width

Depth

C1

IN DETAIL

IN DETAIL

C2 C3

B C2

450 1420

C4,C5

C C4

4170 C7,C8 4695 C6,C9

5560 C10,C11

7075 C12,C15

7215 C13,C14

VAVA VOOM SEMESTER 6 Long Exploration

Presented in Brick 12 on 12 as the best design of the semester

9555 C17,C18 9695 C16,C19

11210 C21,C22

11805 C20,C23

450

D E

I K

250

C11

450

250

C12

450

250

C13

450

250

C14

450

250

C15

450

C16

450

C17

450

C20

C7

C6

C21

C8

C9

C22 C23 C24

C10

C25

C11

C26 C27

C12

C15

H

J

IN DETAIL

450

C19

F G

250 250

IN DETAIL

C10

250 250 250

C18

C13

C28

450

250

IN DETAIL

IN DETAIL

450

250

450

250

IN DETAIL

IN DETAIL

450

250

450

250

IN DETAIL

IN DETAIL

450

250

IN DETAIL

IN DETAIL

C14

WORKING DRAWING C16

C19

C18

C17

C20

C23

SEMESTER 5 C21

L C24

14225 C24,C25

C5

250 IN DETAIL

450

C8 C9

2545

IN DETAIL 250

IN DETAIL

C7

C3

250

IN DETAIL

C4 C5 C6

C1

450

C22

C25

COLUMN DETAIL

M ARCHITECT

C26

C27

ARYAN SALVI

C28

2ND YEAR YELLOW BATCH BATCH

SMEF's BRICK SCHOOL of ARCHITECTURE 16645 C26,C27,C28

N

PLOT: NUMBER

AREA: NAME

PROJECT:

PUNE HATH'S ADMINISTRATION BLOCK DRG. TITLE:

CENTER LINE PLAN SCALE: 1:50

KEY IN: ARYAN SALVI WD SEM. 5

DATE: xx/xx/xx

PLOTTED ON: xx/xx/xx

DRAWN BY:

CHECKED BY:

APPROVED BY:

ARYAN SALVI ISSUED FOR:

CONSTRUCTION

PROJECT NO. :

01

DRG. NO.:

EXTRA WORK

Architectural Models and Fashion

A-101

REV.

A


CHHAKDA

[Selected for Brick 12 on 12 as best design for semester 2]

We all experienced lifestyle of Gandhi nu Gam, Ludiya in bhuj, Gujarat. Understanding people was a task given by the faculty and resonating this in architecture was aim in form of cultural centre for tourists. Attracting tourists in place where outsiders are not welcomed, but, once accepted soon becomes the family that will always keep you comfortable and safe.



Centralised Planning

Location

Babul Tree

4 2 3 1 Progression of the development of plans: Orgnisation of the plan is developed Radially


Dormitory Community Hall

Library Exhibition Shops

Cafeteria

Administration ATM

N


South Side E

Ground Floor Plan

Roof P

West Side Elevation

North Side Elevation

The plan is inspired by the arrangemnt of the pieces of a section of garlic. The exercise that our faculty took, aimed us to understan An attempt was made to make plans from the nature and that bhuj follows. The language that people speak resonates with the Vehicles that brings people in the site is respected in the context of the design. Something as simple as CHHAKDA,


Elevation

EastW Side Elevation

Central Exhibition Space

Outdoor Seating for Library

Shops and Veterinary clinic

Outdoor Community Space

Library for the visitors

Children’s Play Area

Dormitory for Him and Her

Star Gazing and Fire Place

Plan

nd nature and the organisation it follows. architecture that this complex provides. , can change everything.


SANRAKSHAN

You all are still students of architecture and what better time than now to design something for yourself as students. BRICK School of architecture is looking for a student centre to be designed by the students, for the students. A chance to show your creativity and style without worrying about the cost. Just a creative and out of the box design for the space for you and your friends. How many times will you get this kind of opportunity to show your creativity and style?



Elevator

Rooms

Dining Space

Stage

Seating

Studio

Cafeteria

Isometric View

of the structure that is going to present people with a platform that is going to frame the dying mountains of Undri. Mountains killed by the greed of humans to make themselves a shelter. Guests living here are the face of change, so, a stage to show them the reality of growing cities was important.


View of the Dining Space

View from the terrace of Multi-purpose hall Ground Floor Plan (includes Cafeteria, Dance studio, Multipurpose hall, toilets, Seating Spaces)

View on the passage around Rooms

View of the Cafeteria

Floor Plan at 16m level (Rooms, Dinning Space, Recreational Spaces, Storage spaces, Axis to terrace)

View from the kitchen Counter looking outside


East Side Elevation

Section AA

+

The Height of Bhurj Khalifa is acheived by the most stable shape that is triangle. The plan of Guest Facility and Student Centre is derived from the triangle shape. This shape governs the elevation that attracts the attention of the viewer walking on the street. This induced curiosity is going to ask the question, why? Construction of Bhurj Khlaifa


16 m

A’

South Side Elevation

Samuel Beckett Bridge is a beautiful example of counter weight to hold the entire road forming a bridge. This concept is used to make bridges on top of a column. This bridges creates a platform for the light weight rooms . Construction of Samuel Beckett Bridge

Key Plan


VAVA VOOM

[Selected for Brick 12 on 12 as best design for semester 6] A prominent Indian automobile company, which has its manufacturing plant in Pune wants to assign an architect to design its headquarters for the entire western region. The company through this headquarter wants to portray their philosophy and vision. In parallel with their products, they want to emulate their technological advancements, values and visit into the architecture of this building. The company values its people, history, cultural and socioeconomic impacts in the region.



External columns

Exoskeleton

ZTH Zuric Slab

Skyline of Pune and proposed VAVA Voom

Balconies and Roofs

WTC

One Block

Dividing the two

introduction of the plane

Shifting the plane between WTC

Final Form


The creator was crazy, they said An idea so ambitious he laid, No one could understand the expression The expression difficult to explain. Passion for vehicles he needed to incorporate, For people like him so desperate. A design made to sculpt, Sculpt the curiosity, Sculpt the Infinity. Infinity in a building of veins for cars Humans reciting in it holding visions of Mars. It'll change the way I think, I'll change the way you think. Possible this will be one day Like flying cars and people all gay. A building like an idol, Not the one to pray but one to display. Experience of display certainly not the doom name of the structure will be VAVA VOOM


Cafeteria

Recreational

Office 1

Office 2

Office 3

Service floor

Recteational 2

Upper level

Site Plan (Includes Reception, Formal/ Informal Spaces, Workshop zones, Exhibition)

Top Level Management Plan (10) (Includes Office spaces, Conference rooms, Reception)


Cafeteria / Kitchen (1)

Office Variation 1 (3,7)

Top Level Mangement (10,11)

Office Variation 2 (4,6)

Office Variation 3 (5)

Reception / Waiting Area Isometric View of the Reception (0)


North Side Elevation

Sectio

The Elevation tells a lot about how the designer persues ofiice building. The section allows the cars which is the highlight of the fuction to explor


on AA’

East Side Elevation

re the campus not just horizontally but vertically. The Facade of each direction caters the enviromental necessities.

Key Plan


WORKING DRAWING The structure was from Semester 5 Design exploration Pune Hath. The drawings highlight the construction techniques and steps for the contractor as well as the labours to undertand the construction measurements precisely.


1

C1,C2,C3 0,0

A

125

B

2545

C4,C5

C7,C8 4170

4695

C6,C9

C10,C11 5560

7075

C12,C15

E

G 2 3

C6

F

C12

4 5 6

C1

C10

7 8

C2

C7

9

C4

C8

10 11 12

C3

C C5

D

C9

C11 C15

C9,C15,C19,C23

16650

C5,C25

14230

C3,C28

11810

C8,C14,C18

11215

C11,C22

9560

C2,C27

8390

C10,C21

7215

C7,C13,C17

5560

C1,C26

4695

C4,C24

2545

C6,C12,C16,C20

125

0


1 ALL DIMENSIONS ARE IN MM 2 DO NOT SCALE THIS DRAWING 3 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL AND STRUCTURAL DRAWINGS 4 THE CONTRACTOR SHOULD CHECK AND VERIFY ALL DRAWINGS AND DIMENSIONS ON SITE BEFORE STARTING WORKS 5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE OF THE ARCHITECT IMMEDIATELY IN WRITING 6 FOR DRAINAGE, PLUMBING ELECTRICAL AND LANDSCAPE DETAILS PLEASE REFER CONSULTANTS' DRAWINGS 7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOUT CONSULTING THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBILITY OF THE CONTRACTOR

A

A-201

NORTH

DOOR SCHEDULE

CHANGING

STORE

FEMALE TOILETS

No.

Width

Height

Lintel

1.

2000

3120

3750

Quantity

Material/Remarks

1

Wooden Arched Double Leaf Door

2

2000

2300

3750

2

Double leaf

3.

1000

2100

3750

2

Single Leaf Door

4.

800

2100

3750

7

Single Leaf Toilet Door

MALE TOILETS WINDOW SCHEDULE

CAFE SEATING

WAITING AREA

No.

Width

Height

1.

990

3120

3750

21

3750

4

2.

1250

3120

3.

2000

3600

Cill

Quantity

Material/Remarks Wooden Arched Double Leaf Door Wooden Arched Double Leaf Door

3750 2

Fixed glass

4.

2000

3035

3750 1

Fixed Arched Glass

5.

600

800

3750 9

Louvered Toilet Windows

No.

Width

Height

45*

45*

LANDING A-201

A

1

2

3

4

5

6

OPENING SCHEDULE

8

7

9

DOUBLE HEIGHT

Cill

Quantity

Material/Remarks

10 11 12 13

A-201

A

1

2

3

CAFE ENTRANCE FINISHES SCHEDULE

14 15 16 17

No.

18 19

26 25 24 23 22 21 20

FLOOR

No.

WALL

No.

1.

CONCRETE

1.

STONE CLADDING

1.

2.

MARBLE

2.

3.

WOOD

4.

TILES

CEILING PLASTER

PLASTER

LANDING 45*

SANITIZATION AREA

RECEPTION

CAFE SEATING

Section AA 1

D

BACK OFFICE

A-201

C

dd/mm/yy

B

dd/mm/yy

Decscribe modifications

A

dd/mm/yy

Decscribe modifications

REV

DATE

SECTION AA' SCALE 1:50

COMMENTS

ARCHITECT

ARYAN SALVI

2ND YEAR YELLOW BATCH BATCH

SMEF's BRICK SCHOOL of ARCHITECTURE PLOT: NUMBER

AREA: NAME

PROJECT:

PUNE HATH'S ADMINISTRATION BLOCK DRG. TITLE:

GROUND FLOOR PLAN

A

NOTES SCALE:

1:50

KEY IN: ARYAN SALVI WD SEM. 5

DATE: xx/xx/xx PLOTTED ON: xx/xx/xx 1 ALL DIMENSIONS ARE IN MM DRAWN BY: CHECKED BY: APPROVED BY: 2 DO NOT SCALE THIS DRAWING

A-201

Ground Floor Plan

ARYAN SALVI

3 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL AND STRUCTURAL DRAWINGS

CONSTRUCTION

4 THE CONTRACTOR SHOULD CHECK AND VERIFY ALL DRAWINGS ISSUED FOR: AND DIMENSIONS ON SITE BEFORE STARTING WORKS 5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE OF THE ARCHITECT IMMEDIATELY IN WRITING

01

6 FOR DRAINAGE, PROJECT NO. :PLUMBING ELECTRICAL AND LANDSCAPE DETAILS PLEASE REFER CONSULTANTS' DRAWINGS

A-102

7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOUT CONSULTING REV. DRG. NO.: THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBILITY OF THE CONTRACTOR

A

A-201

A

NORTH

DOOR SCHEDULE

MANAGER'S OFFICE

No.

Width

Height

Lintel

1.

2000

3120

3750

Quantity

Material/Remarks

1

Wooden Arched Double Leaf Door

2

2000

2300

3750

2

Double leaf

3.

1000

2100

3750

2

Single Leaf Door

4.

800

2100

3750

7

Single Leaf Toilet Door

LOCKER ROOM WINDOW SCHEDULE No.

Width

Height

1.

990

3120

3750

2

3750

21

2.

1250

3120

3.

2000

3600

Cill

Quantity

Material/Remarks Wooden Arched Double Leaf Door Wooden Arched Double Leaf Door

3750 2

Fixed glass

4.

2000

3035

3750 1

Fixed Arched Glass

5.

600

800

3750 9

Louvered Toilet Windows

No.

Width

Height

Section BB’

LANDING A-201

A

27 28 29 30 31 32 33 DOUBLE HEIGHT

34 35 10 11

2

OPENING SCHEDULE Cill

Quantity

SECTION BB'

A-202

SCALE 1:50

Material/Remarks

12 13

DINNING AREA

PANTRY

A-201

LANDING

A

14 15 16 17 18 26 25 24 23 22 21 20

19

FINISHES SCHEDULE No.

FLOOR

No.

WALL

No.

1.

CONCRETE

1.

STONE CLADDING

1.

2.

MARBLE

2.

3.

WOOD

4.

TILES

CEILING PLASTER

PLASTER

LANDING

D

CONFERENCE ROOM

C

dd/mm/yy

B

dd/mm/yy

A

dd/mm/yy

REV

DATE

Decscribe modifications Decscribe modifications COMMENTS

ARCHITECT

ARYAN SALVI 2ND YEAR YELLOW BATCH

SMEF's BRICK SCHOOL of ARCHITECTURE PLOT: NUMBER

AREA: NAME

PROJECT:

PUNE HATH'S ADMINISTRATION BLOCK DRG. TITLE:

FIRST FLOOR PLAN

A

A-201

SCALE: 1:50

KEY IN: ARYAN SALVI WD SEM. 5

DATE: xx/xx/xx

PLOTTED ON: xx/xx/xx

DRAWN BY:

CHECKED BY:

APPROVED BY:

ARYAN SALVI

First Floor Plan

ISSUED FOR:

CONSTRUCTION

PROJECT NO. :

01

DRG. NO.:

A-103

Elevation 1

1

REV.

A

A-301

ELEVATION 1 SCALE 1:50


AND DIMENSIONS ON SITE BEFORE STARTING WORKS 5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE OF THE ARCHITECT IMMEDIATELY IN WRITING 6 FOR DRAINAGE, PLUMBING ELECTRICAL AND LANDSCAPE DETAILS PLEASE REFER CONSULTANTS' DRAWINGS 7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOUT CONSULTING THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBILITY OF THE CONTRACTOR

NOTES NOTES

1 ALL DIMENSION

2 DO NOT SCALE

1 ALL DIMENSIONS ARE IN MM

3 THIS DRAWING ARCHITECTURA

2 DO NOT SCALE THIS DRAWING 3 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL AND STRUCTURAL DRAWINGS

NORTH

4 THE CONTRAC AND DIMENSIO

4 THE CONTRACTOR SHOULD CHECK AND VERIFY ALL DRAWINGS AND DIMENSIONS ON SITE BEFORE STARTING WORKS

DOOR SCHEDULE No.

Width

Height

Lintel

Quantity

1.

2000

3120

3750

1

Wooden Arched Double Leaf Door

2000

2300

3750

2

Double leaf

3.

1000

2100

3750

2

Single Leaf Door

4.

800

2100

3750

7

Single Leaf Toilet Door

NORTH

No.

Width

Height

1.

990

3120

3750

2

Wooden Arched Double Leaf Door

2.

1250

3120

3750

21

Wooden Arched Double Leaf Door

3.

2000

3600

Material/Remarks

3750 2

7 MODIFICATION THE ARCHITEC OF THE CONTR

7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOUT CONSULTING THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBILITY OF THE CONTRACTOR

WINDOW SCHEDULE Quantity

6 FOR DRAINAGE PLEASE REFER

6 FOR DRAINAGE, PLUMBING ELECTRICAL AND LANDSCAPE DETAILS PLEASE REFER CONSULTANTS' DRAWINGS

Material/Remarks

2

Cill

5 ANY DISCREPA ARCHITECT IMM

5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE OF THE ARCHITECT IMMEDIATELY IN WRITING

Fixed glass

4.

2000

3035

3750 1

Fixed Arched Glass

5.

600

800

3750 9

Louvered Toilet Windows

No.

Width

Height

OPENING SCHEDULE

STORAGE

Cill

Quantity

Material/Remarks

FINISHES SCHEDULE No.

FLOOR

No.

WALL

No.

1.

CONCRETE

1.

STONE CLADDING

1.

2.

MARBLE

2.

3.

WOOD

4.

TILES

CEILING PLASTER

PLASTER

NOTES

A

A-201

1 ALL DIMENSIONS ARE IN MM

TOILET DETAIL PLAN

2 DO NOT SCALE THIS DRAWING 3 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL AND STRUCTURAL DRAWINGS

SCALE 1:25

4 THE CONTRACTOR SHOULD CHECK AND VERIFY ALL DRAWINGS AND DIMENSIONS ON SITE BEFORE STARTING WORKS 5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE OF THE ARCHITECT IMMEDIATELY IN WRITING

A’

6 FOR DRAINAGE, PLUMBING ELECTRICAL AND LANDSCAPE DETAILS PLEASE REFER CONSULTANTS' DRAWINGS

SECTION BB'

A

7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOUT CONSULTING THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBILITY D OF THE CONTRACTOR

A

A-201

A-402

dd/mm/yy dd/mm/yy

Decscribe modifications

A

dd/mm/yy

Decscribe modifications

REV

DATE

Plan

SCALE 1:25

C B

A

A-201

A-403

Toilet Detail

ARCHITECT

A-401

B

A-402

NOTES 1 ALL DIMENSIONS ARE IN MM

SCALE 1:25

2 DO NOT SCALE THIS DRAWING

3 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS

4 THE CONTRACTOR SHOULD CHECK AND VERIFY ALL D AND DIMENSIONS ON SITE BEFORE STARTING WORKS

5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE O ARCHITECT IMMEDIATELY IN WRITING

A

ARYAN SALVI

NORTH

SECTION CC'

Section 1

SCALE 1:25

COMMENTS

A

A

TOILET DETAIL PLAN

A-401

6 FOR DRAINAGE, PLUMBING ELECTRICAL AND LANDSC PLEASE REFER CONSULTANTS' DRAWINGS

B

7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOUT THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBIL OF THE CONTRACTOR

A-402

3RD YEAR YELLOW BATCH BATCH

SMEF's BRICK SCHOOL of ARCHITECTURE DOOR SCHEDULE

EMULSION PAINT

No.

Width

Height

Lintel

1.

2000

3120

3750

1

2

2000

2300

3750

2

Quantity

PLOT: NUMBER

AREA: NAME

Material/Remarks

PROJECT:

Wooden Arched Double Leaf Door

PUNE HATH'S ADMINISTRATION BLOCK

Double leaf

3.

1000

2100

3750

2

Single Leaf Door

4.

800

2100

3750

7

Single Toilet Door DRG. Leaf TITLE:

NORTH

SECTION AA'

DOOR SCHEDULE

A

A-201

SCALE: 1:50

SCALE 1:100No.

Width

1.

200MM AAC BLOCK WALL HAND WASH BASIN

PLOTTED ON: xx/xx/xx

DRAWN BY: WINDOW SCHEDULE

KEY PLAN 990

Height

Cill

Quantity

3120

3750

2

2.

1250

3120

3750

21

3.

2000

3600

No.

KEY IN: cad file name

DATE: xx/xx/xx

MIRROR

CHECKED BY:

APPROVED BY:

ARYAN SALVI

Material/Remarks

Wooden Arched Double Leaf Door

CONSTRUCTION

ISSUED FOR: Fixed glass

01

2000

3035

3750 1

Fixed ArchedNO. Glass PROJECT :

600

800

3750 9

Louvered Toilet Windows

D

201

DRG. NO.:

A-404

HEALTH FAUCET

A

Double leaf

1000

2100

3750

2

1

Single Leaf Door

Wooden Arched D

4.

800

2100

3750

7

Single Leaf Toilet

WINDOW SCHEDULE

D

Quantity

C

A-404

THIRD YEAR YELLOW BATCH

C

Material/Remarks

D

ARYAN SALVI

A-404

A-403

OPENING SCHEDULE Cill

Material/Remarks

2

3.

A-404 ARCHITECT

Height

Quantity

3750 3750

D

REV.

A-403

Width

Lintel

3120 2300

STORAGE

4.

No.

Height

2000 2000

Wooden Arched Double Leaf Door

3750 2

5.

WATER CLOSET

Width

1. 2

SMEF's BRICK SCHOOL of ARCHITECTURE A-403

BRICK BAT COBA WATERPROOFING

PLOT: NUMBER C

A-403

No.

Width

Height

Cill

Quantity

1.

990

3120

3750

2

2.

1250

3120

3750

21

3.

2000

3600

4.

2000

3035

3750 1

5.

600

800

3750 9

Fixed glass

Fixed Arched Glas

Louvered Toilet W

ARCHITECT

C

AREA: NAME

Material/Remarks

Wooden Arched D

Wooden Arched D

3750 2

PROJECT:

PUNE HATH'S ADMINISTRATION BLOCK

OPENING SCHEDULE SMEF's No.

FINISHES SCHEDULE No.

No.

WALL

No.

1.

CONCRETE

1.

STONE CLADDING

1.

2.

MARBLE

2.

3.

WOOD

4.

TILES

KEY PLAN

A

SCALE 1:25

A-401

SCALE: 1:25

B

ISSUED FOR:

PUNE HA

PLOTTED ON: xx/xx/xx CHECKED BY:

APPROVED BY:

KEY PLAN

A-403 3 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL AND STRUCTURAL DRAWINGS

dd/mm/yy

B

dd/mm/yy

A

dd/mm/yy

REV

DATE

NUMBER

401

2

A-301

SCALE 1:25

ELEVATION 1

0

SCALE 1:50

A-401

DRG. TITLE: FINISHES SCHEDULE No.

No.

WALL

CONCRETE

1.

STONE CLADDING

2.

MARBLE

2.

3.

WOOD

SCALE: 1:25

4.

TILES

DATE: xx/xx/xx DRAWN BY:

NOTES

B

NAME

1 ALL DIMENSIONS ARE IN MM

A-402

2 DO NOT SCALE THIS DRAWING

5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE OF THE

6 modifications FOR DRAINAGE, PLUMBING ELECTRICAL AND LANDSCAPE DETAILS Decscribe

6 FOR DRAINAGE, PLUMBING ELECTRICAL AN PLEASE REFER CONSULTANTS' DRAWINGS DRG. NO.:

N

Decscribe modifications ARCHITECT IMMEDIATELY IN WRITING

40

PLEASE REFER CONSULTANTS' DRAWINGS

COMMENTS

7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOUT CONSULTING THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBILITY OF THE CONTRACTOR

PLOT: NUMBER

7 MODIFICATIONS/DEVIATIONS MADE ON SITE THE ARCHITECT WILL BE AT THE TOTAL RES OF THE CONTRACTOR

4

A-301

D

A-301

A-301

3RD YEAR YELLOW BATCH BATCH

4.1

1.1

AREA: NAME

C

dd/mm/yy

B

dd/mm/yy

A

dd/mm/yy

REV

PROJECT:

NORTH

A-202

DATE

Decscribe modifications Decscribe modifications COMMENTS

ARCHITECT

PUNE HATH'S ADMINISTRATION BLOCK

ARYAN SALVI

A-202

DRG. TITLE:

SECTION BB'No. SCALE: 1:50 DATE: xx/xx/xx DRAWN BY:

ARYAN

SCALE 1:100

Width

1.

2000

2

2000

Height 3120

Lintel 3750

Quantity 1

A-301

A-301

Material/Remarks

2300

3750

Wooden Arched Double Leaf Door

2

Double leaf

PLOTTED ON: xx/xx/xx

3750 2 APPROVED BY: Single Leaf Door

4.

3750

2100

CONSTRUCTION

PROJECT NO. :

01

7

3.

Height

Cill

Quantity

A

A-301

2

Material/Remarks

1.

990

3120

3750

2

Wooden Arched Double Leaf Door

1250

3120

3750

21

Wooden Arched Double Leaf Door

2000

3600

3750 2

A-301

2100

2

Single

SCALE: 1:50

KEY PLAN SCALE 1:100

3035

3750 1

Fixed Arched Glass

800

3750 9

Louvered Toilet Windows

2.1 A-301

KEY IN: cad file na

CHECKED BY:

Height 3120

Cill

Quantity

Quantity 2

2000

APPR

Materi

Woode

Woode

3600

3750 2

4. 2000 3035 PROJECT NO. : 01 5. 600 800

3750 1

Fixed

TRUE ELEVATION 1

3750 9

Louve

DRG. NO.:

Fixed

302

OPENING SCHEDU No.

Material/Remarks

Width

Height

Cill

Quantity

Materi

FINISHES SCHEDU

FINISHES SCHEDULE No.

Cill

3750

SCALE 1:50

OPENING SCHEDULE Height

3750

WINDOW SCHEDU PLOTTED ON: xx/x

DRAWN BY:

No. Width ARYAN SALVI 1. 990

3.

2000 600

Width

Materi

Woode

Double

2. 1250 3120 3750 21 ISSUED FOR: CONSTRUCTION

Fixed glass

4. 5.

No.

Quantity

1 2

DATE: xx/xx/xx

2. 3.

Lintel

3120 3750 AREA: NAME 2300 3750

ELEVATION 2

3.1

REV. WINDOW SCHEDULE Width

1000

Height

DRG. TITLE:

A-301

No.

Width

PUNE HATH'S 4. 800 2100 ADMINISTRATIO 3750 7 Single

Single Leaf Toilet Door

2.1

202

2ND YEAR YELLOW BATCH DOOR SCHEDU

SMEF's BRICK SCHOOL of ARCHITE

No.

1. 2000 PLOT: NUMBER 2 2000 PROJECT:

KEY IN: Aryan Salvi WD SEM 5

3. 1000 CHECKED BY: 2100 800

3

1

DOOR SCHEDULE

ISSUED FOR:

DRG. NO.:

C

3 THIS DRAWING IS TO BE READ INFOR: CONJUNC ISSUED ARCHITECTURAL AND STRUCTURAL DRAWI

5 ANY DISCREPANCY TO BE BROUGHT TO TH PROJECT NO. : ARCHITECT IMMEDIATELY IN WRITING

SMEF's BRICK SCHOOL of ARCHITECTURE

KEY PLAN

1.

PLASTER

4 THE CONTRACTOR SHOULD CHECK AND VE AND DIMENSIONS ON SITE BEFORE STARTIN

ARYAN SALVI

B

No. TOILE

FLOOR

1.

4 THE CONTRACTOR SHOULD CHECK AND VERIFY ALL DRAWINGS AND DIMENSIONS ON SITE BEFORE STARTING WORKS

ARCHITECT

B

A

REV.

Elevation 2

SECTION DD'

A

CONSTRUCTION

A-402

DRG. NO.:

NOTES 1 ALL DIMENSIONS ARE IN MM 2 DO NOT SCALE THIS DRAWING

Material/Remarks

PROJECT:

KEY IN: cad file name

PROJECT NO. :

C

Quantity

PLOT: NUMBER

NAME

SECTION A

D

Cill

TOILET DETAIL

PLASTER

PLASTER

DRAWN BY:

A-401

Height

CEILING

DATE: xx/xx/xx

A

Width

DRG. TITLE:

FLOOR

FLOOR

No.

WALL

No.

1.

CONCRETE

1.

STONE CLADDING

1.

2.

MARBLE

2.

3.

WOOD

4.

TILES

CEILING

No.

FLOOR

No.

PLASTER

1.

CONCRETE

1.

2.

MARBLE

2.

3.

WOOD

4.

TILES

PLASTER

3

A-301

Elevation 3 ELEVATION 3

SCALE 1:50

WALL

STONE CLADD PLASTER


EXTRA WORKS Self Identity is a journey. A person should be more than the title given by education, gender or the society. Extra works desribes this identity of oneself that is supressed my intricasies of the complex society. it is me who gave birth to my confident self. It is the friends and family that gave it nourishment and direction of growth, for them I will be eternally greatful.





THANK YOU


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.