You will find it in the Circle
ARYAN SALVI
CURRICULUM VITAE Aryan Salvi
June 11, 2000
Software:
Workshop:
Advance- AutoCAD SketchUp MS office Wondershare Filmora Adobe Indesign Adobe Photoshop
_Timber Construction Workshop by Jimmy Lim _Bamboo Workshop, Auroville _Biomimicry by Ar. Vaibhavi Agarwal
Beginner- Rhinoceros Blender Vray
Experience:
Achievement:
_Architecture on Road
_Tarangan Roof Design Competition
aryansalvi1106@gmail.com +91 7020546244
(Initiative by University of Antwerp, Belgium)
_Logo Design for Blissful Parenting _ANDC Wall Painting Initiative _Settlement study Konkan, Maharashtra (Headed one of the Cluster groups)
_Documented a Demolishing Wada in Pune (lead by Ar. Mayukh Gosawi)
(Group, First Prize in Intra College Competition)
_Brick 12 on 12, 2019
(Selected as Best Design for semester 2)
_Interschool Fashion Show (Special Mention)
_Brick 12 on 12, 2021
(Selected as Best Design for semester 6)
Manual Skills:
Activities:
_Drafting, _Wire Sculpting _Model Making _Sketching
_Initiated Fashion shows at College _Vocal Training (Indian Classical Music) _Harmonium Training (Indian Classical Music)
Education:
Travels:
_SMEF’s Brick School of Architecture, Pune _Indira National School, Pune- 12th _City International School, Pune- 10th
Bhuj, Auroville, Kerala, Konkan, Delhi, Aurangabad, Jaipur, Udaipur, Agra, Mathura, Fatehpur Sikri, Mumbai
CHHAKDA
SEMESTER 2 Long Exploration
Presented in Brick 12 on 12 as the best design of the semester
SANRAKSHAN SEMESTER 5 Short Exploration
CONTENTS
NOTES 1 ALL DIMENSIONS ARE IN MM 2 DO NOT SCALE THIS DRAWING 3 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL AND STRUCTURAL DRAWINGS 4 THE CONTRACTOR SHOULD CHECK AND VERIFY ALL DRAWINGS AND DIMENSIONS ON SITE BEFORE STARTING WORKS 5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE OF THE ARCHITECT IMMEDIATELY IN WRITING 6 FOR DRAINAGE, PLUMBING ELECTRICAL AND LANDSCAPE DETAILS PLEASE REFER CONSULTANTS' DRAWINGS
125 C1,C2,C3
2
4
5
9
16650
11
10
C9,C15,C19,C23
14230
C5,C25
11810
C3,C28
C8,C14,C18
9560
8
11215
8390
7
C11,C22
7215
6
C2,C27
C10,C21
5560
C1,C26
4695
3
C7,C13,C17
2545
C4,C24
125
0
1 0,0
C6,C12,C16,C20
7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOUT CONSULTING THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBILITY OF THE CONTRACTOR
12
NORTH
A
No.
Width
Depth
C1
IN DETAIL
IN DETAIL
C2 C3
B C2
450 1420
C4,C5
C C4
4170 C7,C8 4695 C6,C9
5560 C10,C11
7075 C12,C15
7215 C13,C14
VAVA VOOM SEMESTER 6 Long Exploration
Presented in Brick 12 on 12 as the best design of the semester
9555 C17,C18 9695 C16,C19
11210 C21,C22
11805 C20,C23
450
D E
I K
250
C11
450
250
C12
450
250
C13
450
250
C14
450
250
C15
450
C16
450
C17
450
C20
C7
C6
C21
C8
C9
C22 C23 C24
C10
C25
C11
C26 C27
C12
C15
H
J
IN DETAIL
450
C19
F G
250 250
IN DETAIL
C10
250 250 250
C18
C13
C28
450
250
IN DETAIL
IN DETAIL
450
250
450
250
IN DETAIL
IN DETAIL
450
250
450
250
IN DETAIL
IN DETAIL
450
250
IN DETAIL
IN DETAIL
C14
WORKING DRAWING C16
C19
C18
C17
C20
C23
SEMESTER 5 C21
L C24
14225 C24,C25
C5
250 IN DETAIL
450
C8 C9
2545
IN DETAIL 250
IN DETAIL
C7
C3
250
IN DETAIL
C4 C5 C6
C1
450
C22
C25
COLUMN DETAIL
M ARCHITECT
C26
C27
ARYAN SALVI
C28
2ND YEAR YELLOW BATCH BATCH
SMEF's BRICK SCHOOL of ARCHITECTURE 16645 C26,C27,C28
N
PLOT: NUMBER
AREA: NAME
PROJECT:
PUNE HATH'S ADMINISTRATION BLOCK DRG. TITLE:
CENTER LINE PLAN SCALE: 1:50
KEY IN: ARYAN SALVI WD SEM. 5
DATE: xx/xx/xx
PLOTTED ON: xx/xx/xx
DRAWN BY:
CHECKED BY:
APPROVED BY:
ARYAN SALVI ISSUED FOR:
CONSTRUCTION
PROJECT NO. :
01
DRG. NO.:
EXTRA WORK
Architectural Models and Fashion
A-101
REV.
A
CHHAKDA
[Selected for Brick 12 on 12 as best design for semester 2]
We all experienced lifestyle of Gandhi nu Gam, Ludiya in bhuj, Gujarat. Understanding people was a task given by the faculty and resonating this in architecture was aim in form of cultural centre for tourists. Attracting tourists in place where outsiders are not welcomed, but, once accepted soon becomes the family that will always keep you comfortable and safe.
Centralised Planning
Location
Babul Tree
4 2 3 1 Progression of the development of plans: Orgnisation of the plan is developed Radially
Dormitory Community Hall
Library Exhibition Shops
Cafeteria
Administration ATM
N
South Side E
Ground Floor Plan
Roof P
West Side Elevation
North Side Elevation
The plan is inspired by the arrangemnt of the pieces of a section of garlic. The exercise that our faculty took, aimed us to understan An attempt was made to make plans from the nature and that bhuj follows. The language that people speak resonates with the Vehicles that brings people in the site is respected in the context of the design. Something as simple as CHHAKDA,
Elevation
EastW Side Elevation
Central Exhibition Space
Outdoor Seating for Library
Shops and Veterinary clinic
Outdoor Community Space
Library for the visitors
Children’s Play Area
Dormitory for Him and Her
Star Gazing and Fire Place
Plan
nd nature and the organisation it follows. architecture that this complex provides. , can change everything.
SANRAKSHAN
You all are still students of architecture and what better time than now to design something for yourself as students. BRICK School of architecture is looking for a student centre to be designed by the students, for the students. A chance to show your creativity and style without worrying about the cost. Just a creative and out of the box design for the space for you and your friends. How many times will you get this kind of opportunity to show your creativity and style?
Elevator
Rooms
Dining Space
Stage
Seating
Studio
Cafeteria
Isometric View
of the structure that is going to present people with a platform that is going to frame the dying mountains of Undri. Mountains killed by the greed of humans to make themselves a shelter. Guests living here are the face of change, so, a stage to show them the reality of growing cities was important.
View of the Dining Space
View from the terrace of Multi-purpose hall Ground Floor Plan (includes Cafeteria, Dance studio, Multipurpose hall, toilets, Seating Spaces)
View on the passage around Rooms
View of the Cafeteria
Floor Plan at 16m level (Rooms, Dinning Space, Recreational Spaces, Storage spaces, Axis to terrace)
View from the kitchen Counter looking outside
East Side Elevation
Section AA
+
The Height of Bhurj Khalifa is acheived by the most stable shape that is triangle. The plan of Guest Facility and Student Centre is derived from the triangle shape. This shape governs the elevation that attracts the attention of the viewer walking on the street. This induced curiosity is going to ask the question, why? Construction of Bhurj Khlaifa
16 m
A’
South Side Elevation
Samuel Beckett Bridge is a beautiful example of counter weight to hold the entire road forming a bridge. This concept is used to make bridges on top of a column. This bridges creates a platform for the light weight rooms . Construction of Samuel Beckett Bridge
Key Plan
VAVA VOOM
[Selected for Brick 12 on 12 as best design for semester 6] A prominent Indian automobile company, which has its manufacturing plant in Pune wants to assign an architect to design its headquarters for the entire western region. The company through this headquarter wants to portray their philosophy and vision. In parallel with their products, they want to emulate their technological advancements, values and visit into the architecture of this building. The company values its people, history, cultural and socioeconomic impacts in the region.
External columns
Exoskeleton
ZTH Zuric Slab
Skyline of Pune and proposed VAVA Voom
Balconies and Roofs
WTC
One Block
Dividing the two
introduction of the plane
Shifting the plane between WTC
Final Form
The creator was crazy, they said An idea so ambitious he laid, No one could understand the expression The expression difficult to explain. Passion for vehicles he needed to incorporate, For people like him so desperate. A design made to sculpt, Sculpt the curiosity, Sculpt the Infinity. Infinity in a building of veins for cars Humans reciting in it holding visions of Mars. It'll change the way I think, I'll change the way you think. Possible this will be one day Like flying cars and people all gay. A building like an idol, Not the one to pray but one to display. Experience of display certainly not the doom name of the structure will be VAVA VOOM
Cafeteria
Recreational
Office 1
Office 2
Office 3
Service floor
Recteational 2
Upper level
Site Plan (Includes Reception, Formal/ Informal Spaces, Workshop zones, Exhibition)
Top Level Management Plan (10) (Includes Office spaces, Conference rooms, Reception)
Cafeteria / Kitchen (1)
Office Variation 1 (3,7)
Top Level Mangement (10,11)
Office Variation 2 (4,6)
Office Variation 3 (5)
Reception / Waiting Area Isometric View of the Reception (0)
North Side Elevation
Sectio
The Elevation tells a lot about how the designer persues ofiice building. The section allows the cars which is the highlight of the fuction to explor
on AA’
East Side Elevation
re the campus not just horizontally but vertically. The Facade of each direction caters the enviromental necessities.
Key Plan
WORKING DRAWING The structure was from Semester 5 Design exploration Pune Hath. The drawings highlight the construction techniques and steps for the contractor as well as the labours to undertand the construction measurements precisely.
1
C1,C2,C3 0,0
A
125
B
2545
C4,C5
C7,C8 4170
4695
C6,C9
C10,C11 5560
7075
C12,C15
E
G 2 3
C6
F
C12
4 5 6
C1
C10
7 8
C2
C7
9
C4
C8
10 11 12
C3
C C5
D
C9
C11 C15
C9,C15,C19,C23
16650
C5,C25
14230
C3,C28
11810
C8,C14,C18
11215
C11,C22
9560
C2,C27
8390
C10,C21
7215
C7,C13,C17
5560
C1,C26
4695
C4,C24
2545
C6,C12,C16,C20
125
0
1 ALL DIMENSIONS ARE IN MM 2 DO NOT SCALE THIS DRAWING 3 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL AND STRUCTURAL DRAWINGS 4 THE CONTRACTOR SHOULD CHECK AND VERIFY ALL DRAWINGS AND DIMENSIONS ON SITE BEFORE STARTING WORKS 5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE OF THE ARCHITECT IMMEDIATELY IN WRITING 6 FOR DRAINAGE, PLUMBING ELECTRICAL AND LANDSCAPE DETAILS PLEASE REFER CONSULTANTS' DRAWINGS 7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOUT CONSULTING THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBILITY OF THE CONTRACTOR
A
A-201
NORTH
DOOR SCHEDULE
CHANGING
STORE
FEMALE TOILETS
No.
Width
Height
Lintel
1.
2000
3120
3750
Quantity
Material/Remarks
1
Wooden Arched Double Leaf Door
2
2000
2300
3750
2
Double leaf
3.
1000
2100
3750
2
Single Leaf Door
4.
800
2100
3750
7
Single Leaf Toilet Door
MALE TOILETS WINDOW SCHEDULE
CAFE SEATING
WAITING AREA
No.
Width
Height
1.
990
3120
3750
21
3750
4
2.
1250
3120
3.
2000
3600
Cill
Quantity
Material/Remarks Wooden Arched Double Leaf Door Wooden Arched Double Leaf Door
3750 2
Fixed glass
4.
2000
3035
3750 1
Fixed Arched Glass
5.
600
800
3750 9
Louvered Toilet Windows
No.
Width
Height
45*
45*
LANDING A-201
A
1
2
3
4
5
6
OPENING SCHEDULE
8
7
9
DOUBLE HEIGHT
Cill
Quantity
Material/Remarks
10 11 12 13
A-201
A
1
2
3
CAFE ENTRANCE FINISHES SCHEDULE
14 15 16 17
No.
18 19
26 25 24 23 22 21 20
FLOOR
No.
WALL
No.
1.
CONCRETE
1.
STONE CLADDING
1.
2.
MARBLE
2.
3.
WOOD
4.
TILES
CEILING PLASTER
PLASTER
LANDING 45*
SANITIZATION AREA
RECEPTION
CAFE SEATING
Section AA 1
D
BACK OFFICE
A-201
C
dd/mm/yy
B
dd/mm/yy
Decscribe modifications
A
dd/mm/yy
Decscribe modifications
REV
DATE
SECTION AA' SCALE 1:50
COMMENTS
ARCHITECT
ARYAN SALVI
2ND YEAR YELLOW BATCH BATCH
SMEF's BRICK SCHOOL of ARCHITECTURE PLOT: NUMBER
AREA: NAME
PROJECT:
PUNE HATH'S ADMINISTRATION BLOCK DRG. TITLE:
GROUND FLOOR PLAN
A
NOTES SCALE:
1:50
KEY IN: ARYAN SALVI WD SEM. 5
DATE: xx/xx/xx PLOTTED ON: xx/xx/xx 1 ALL DIMENSIONS ARE IN MM DRAWN BY: CHECKED BY: APPROVED BY: 2 DO NOT SCALE THIS DRAWING
A-201
Ground Floor Plan
ARYAN SALVI
3 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL AND STRUCTURAL DRAWINGS
CONSTRUCTION
4 THE CONTRACTOR SHOULD CHECK AND VERIFY ALL DRAWINGS ISSUED FOR: AND DIMENSIONS ON SITE BEFORE STARTING WORKS 5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE OF THE ARCHITECT IMMEDIATELY IN WRITING
01
6 FOR DRAINAGE, PROJECT NO. :PLUMBING ELECTRICAL AND LANDSCAPE DETAILS PLEASE REFER CONSULTANTS' DRAWINGS
A-102
7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOUT CONSULTING REV. DRG. NO.: THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBILITY OF THE CONTRACTOR
A
A-201
A
NORTH
DOOR SCHEDULE
MANAGER'S OFFICE
No.
Width
Height
Lintel
1.
2000
3120
3750
Quantity
Material/Remarks
1
Wooden Arched Double Leaf Door
2
2000
2300
3750
2
Double leaf
3.
1000
2100
3750
2
Single Leaf Door
4.
800
2100
3750
7
Single Leaf Toilet Door
LOCKER ROOM WINDOW SCHEDULE No.
Width
Height
1.
990
3120
3750
2
3750
21
2.
1250
3120
3.
2000
3600
Cill
Quantity
Material/Remarks Wooden Arched Double Leaf Door Wooden Arched Double Leaf Door
3750 2
Fixed glass
4.
2000
3035
3750 1
Fixed Arched Glass
5.
600
800
3750 9
Louvered Toilet Windows
No.
Width
Height
Section BB’
LANDING A-201
A
27 28 29 30 31 32 33 DOUBLE HEIGHT
34 35 10 11
2
OPENING SCHEDULE Cill
Quantity
SECTION BB'
A-202
SCALE 1:50
Material/Remarks
12 13
DINNING AREA
PANTRY
A-201
LANDING
A
14 15 16 17 18 26 25 24 23 22 21 20
19
FINISHES SCHEDULE No.
FLOOR
No.
WALL
No.
1.
CONCRETE
1.
STONE CLADDING
1.
2.
MARBLE
2.
3.
WOOD
4.
TILES
CEILING PLASTER
PLASTER
LANDING
D
CONFERENCE ROOM
C
dd/mm/yy
B
dd/mm/yy
A
dd/mm/yy
REV
DATE
Decscribe modifications Decscribe modifications COMMENTS
ARCHITECT
ARYAN SALVI 2ND YEAR YELLOW BATCH
SMEF's BRICK SCHOOL of ARCHITECTURE PLOT: NUMBER
AREA: NAME
PROJECT:
PUNE HATH'S ADMINISTRATION BLOCK DRG. TITLE:
FIRST FLOOR PLAN
A
A-201
SCALE: 1:50
KEY IN: ARYAN SALVI WD SEM. 5
DATE: xx/xx/xx
PLOTTED ON: xx/xx/xx
DRAWN BY:
CHECKED BY:
APPROVED BY:
ARYAN SALVI
First Floor Plan
ISSUED FOR:
CONSTRUCTION
PROJECT NO. :
01
DRG. NO.:
A-103
Elevation 1
1
REV.
A
A-301
ELEVATION 1 SCALE 1:50
AND DIMENSIONS ON SITE BEFORE STARTING WORKS 5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE OF THE ARCHITECT IMMEDIATELY IN WRITING 6 FOR DRAINAGE, PLUMBING ELECTRICAL AND LANDSCAPE DETAILS PLEASE REFER CONSULTANTS' DRAWINGS 7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOUT CONSULTING THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBILITY OF THE CONTRACTOR
NOTES NOTES
1 ALL DIMENSION
2 DO NOT SCALE
1 ALL DIMENSIONS ARE IN MM
3 THIS DRAWING ARCHITECTURA
2 DO NOT SCALE THIS DRAWING 3 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL AND STRUCTURAL DRAWINGS
NORTH
4 THE CONTRAC AND DIMENSIO
4 THE CONTRACTOR SHOULD CHECK AND VERIFY ALL DRAWINGS AND DIMENSIONS ON SITE BEFORE STARTING WORKS
DOOR SCHEDULE No.
Width
Height
Lintel
Quantity
1.
2000
3120
3750
1
Wooden Arched Double Leaf Door
2000
2300
3750
2
Double leaf
3.
1000
2100
3750
2
Single Leaf Door
4.
800
2100
3750
7
Single Leaf Toilet Door
NORTH
No.
Width
Height
1.
990
3120
3750
2
Wooden Arched Double Leaf Door
2.
1250
3120
3750
21
Wooden Arched Double Leaf Door
3.
2000
3600
Material/Remarks
3750 2
7 MODIFICATION THE ARCHITEC OF THE CONTR
7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOUT CONSULTING THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBILITY OF THE CONTRACTOR
WINDOW SCHEDULE Quantity
6 FOR DRAINAGE PLEASE REFER
6 FOR DRAINAGE, PLUMBING ELECTRICAL AND LANDSCAPE DETAILS PLEASE REFER CONSULTANTS' DRAWINGS
Material/Remarks
2
Cill
5 ANY DISCREPA ARCHITECT IMM
5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE OF THE ARCHITECT IMMEDIATELY IN WRITING
Fixed glass
4.
2000
3035
3750 1
Fixed Arched Glass
5.
600
800
3750 9
Louvered Toilet Windows
No.
Width
Height
OPENING SCHEDULE
STORAGE
Cill
Quantity
Material/Remarks
FINISHES SCHEDULE No.
FLOOR
No.
WALL
No.
1.
CONCRETE
1.
STONE CLADDING
1.
2.
MARBLE
2.
3.
WOOD
4.
TILES
CEILING PLASTER
PLASTER
NOTES
A
A-201
1 ALL DIMENSIONS ARE IN MM
TOILET DETAIL PLAN
2 DO NOT SCALE THIS DRAWING 3 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL AND STRUCTURAL DRAWINGS
SCALE 1:25
4 THE CONTRACTOR SHOULD CHECK AND VERIFY ALL DRAWINGS AND DIMENSIONS ON SITE BEFORE STARTING WORKS 5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE OF THE ARCHITECT IMMEDIATELY IN WRITING
A’
6 FOR DRAINAGE, PLUMBING ELECTRICAL AND LANDSCAPE DETAILS PLEASE REFER CONSULTANTS' DRAWINGS
SECTION BB'
A
7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOUT CONSULTING THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBILITY D OF THE CONTRACTOR
A
A-201
A-402
dd/mm/yy dd/mm/yy
Decscribe modifications
A
dd/mm/yy
Decscribe modifications
REV
DATE
Plan
SCALE 1:25
C B
A
A-201
A-403
Toilet Detail
ARCHITECT
A-401
B
A-402
NOTES 1 ALL DIMENSIONS ARE IN MM
SCALE 1:25
2 DO NOT SCALE THIS DRAWING
3 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS
4 THE CONTRACTOR SHOULD CHECK AND VERIFY ALL D AND DIMENSIONS ON SITE BEFORE STARTING WORKS
5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE O ARCHITECT IMMEDIATELY IN WRITING
A
ARYAN SALVI
NORTH
SECTION CC'
Section 1
SCALE 1:25
COMMENTS
A
A
TOILET DETAIL PLAN
A-401
6 FOR DRAINAGE, PLUMBING ELECTRICAL AND LANDSC PLEASE REFER CONSULTANTS' DRAWINGS
B
7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOUT THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBIL OF THE CONTRACTOR
A-402
3RD YEAR YELLOW BATCH BATCH
SMEF's BRICK SCHOOL of ARCHITECTURE DOOR SCHEDULE
EMULSION PAINT
No.
Width
Height
Lintel
1.
2000
3120
3750
1
2
2000
2300
3750
2
Quantity
PLOT: NUMBER
AREA: NAME
Material/Remarks
PROJECT:
Wooden Arched Double Leaf Door
PUNE HATH'S ADMINISTRATION BLOCK
Double leaf
3.
1000
2100
3750
2
Single Leaf Door
4.
800
2100
3750
7
Single Toilet Door DRG. Leaf TITLE:
NORTH
SECTION AA'
DOOR SCHEDULE
A
A-201
SCALE: 1:50
SCALE 1:100No.
Width
1.
200MM AAC BLOCK WALL HAND WASH BASIN
PLOTTED ON: xx/xx/xx
DRAWN BY: WINDOW SCHEDULE
KEY PLAN 990
Height
Cill
Quantity
3120
3750
2
2.
1250
3120
3750
21
3.
2000
3600
No.
KEY IN: cad file name
DATE: xx/xx/xx
MIRROR
CHECKED BY:
APPROVED BY:
ARYAN SALVI
Material/Remarks
Wooden Arched Double Leaf Door
CONSTRUCTION
ISSUED FOR: Fixed glass
01
2000
3035
3750 1
Fixed ArchedNO. Glass PROJECT :
600
800
3750 9
Louvered Toilet Windows
D
201
DRG. NO.:
A-404
HEALTH FAUCET
A
Double leaf
1000
2100
3750
2
1
Single Leaf Door
Wooden Arched D
4.
800
2100
3750
7
Single Leaf Toilet
WINDOW SCHEDULE
D
Quantity
C
A-404
THIRD YEAR YELLOW BATCH
C
Material/Remarks
D
ARYAN SALVI
A-404
A-403
OPENING SCHEDULE Cill
Material/Remarks
2
3.
A-404 ARCHITECT
Height
Quantity
3750 3750
D
REV.
A-403
Width
Lintel
3120 2300
STORAGE
4.
No.
Height
2000 2000
Wooden Arched Double Leaf Door
3750 2
5.
WATER CLOSET
Width
1. 2
SMEF's BRICK SCHOOL of ARCHITECTURE A-403
BRICK BAT COBA WATERPROOFING
PLOT: NUMBER C
A-403
No.
Width
Height
Cill
Quantity
1.
990
3120
3750
2
2.
1250
3120
3750
21
3.
2000
3600
4.
2000
3035
3750 1
5.
600
800
3750 9
Fixed glass
Fixed Arched Glas
Louvered Toilet W
ARCHITECT
C
AREA: NAME
Material/Remarks
Wooden Arched D
Wooden Arched D
3750 2
PROJECT:
PUNE HATH'S ADMINISTRATION BLOCK
OPENING SCHEDULE SMEF's No.
FINISHES SCHEDULE No.
No.
WALL
No.
1.
CONCRETE
1.
STONE CLADDING
1.
2.
MARBLE
2.
3.
WOOD
4.
TILES
KEY PLAN
A
SCALE 1:25
A-401
SCALE: 1:25
B
ISSUED FOR:
PUNE HA
PLOTTED ON: xx/xx/xx CHECKED BY:
APPROVED BY:
KEY PLAN
A-403 3 THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL AND STRUCTURAL DRAWINGS
’
dd/mm/yy
B
dd/mm/yy
A
dd/mm/yy
REV
DATE
NUMBER
401
2
A-301
SCALE 1:25
ELEVATION 1
0
SCALE 1:50
A-401
DRG. TITLE: FINISHES SCHEDULE No.
No.
WALL
CONCRETE
1.
STONE CLADDING
2.
MARBLE
2.
3.
WOOD
SCALE: 1:25
4.
TILES
DATE: xx/xx/xx DRAWN BY:
NOTES
B
NAME
1 ALL DIMENSIONS ARE IN MM
A-402
2 DO NOT SCALE THIS DRAWING
5 ANY DISCREPANCY TO BE BROUGHT TO THE NOTICE OF THE
6 modifications FOR DRAINAGE, PLUMBING ELECTRICAL AND LANDSCAPE DETAILS Decscribe
6 FOR DRAINAGE, PLUMBING ELECTRICAL AN PLEASE REFER CONSULTANTS' DRAWINGS DRG. NO.:
N
Decscribe modifications ARCHITECT IMMEDIATELY IN WRITING
40
PLEASE REFER CONSULTANTS' DRAWINGS
COMMENTS
7 MODIFICATIONS/DEVIATIONS MADE ON SITE WITHOUT CONSULTING THE ARCHITECT WILL BE AT THE TOTAL RESPONSIBILITY OF THE CONTRACTOR
PLOT: NUMBER
7 MODIFICATIONS/DEVIATIONS MADE ON SITE THE ARCHITECT WILL BE AT THE TOTAL RES OF THE CONTRACTOR
4
A-301
D
A-301
A-301
3RD YEAR YELLOW BATCH BATCH
4.1
1.1
AREA: NAME
C
dd/mm/yy
B
dd/mm/yy
A
dd/mm/yy
REV
PROJECT:
NORTH
A-202
DATE
Decscribe modifications Decscribe modifications COMMENTS
ARCHITECT
PUNE HATH'S ADMINISTRATION BLOCK
ARYAN SALVI
A-202
DRG. TITLE:
SECTION BB'No. SCALE: 1:50 DATE: xx/xx/xx DRAWN BY:
ARYAN
SCALE 1:100
Width
1.
2000
2
2000
Height 3120
Lintel 3750
Quantity 1
A-301
A-301
Material/Remarks
2300
3750
Wooden Arched Double Leaf Door
2
Double leaf
PLOTTED ON: xx/xx/xx
3750 2 APPROVED BY: Single Leaf Door
4.
3750
2100
CONSTRUCTION
PROJECT NO. :
01
7
3.
Height
Cill
Quantity
A
A-301
2
Material/Remarks
1.
990
3120
3750
2
Wooden Arched Double Leaf Door
1250
3120
3750
21
Wooden Arched Double Leaf Door
2000
3600
3750 2
A-301
2100
2
Single
SCALE: 1:50
KEY PLAN SCALE 1:100
3035
3750 1
Fixed Arched Glass
800
3750 9
Louvered Toilet Windows
2.1 A-301
KEY IN: cad file na
CHECKED BY:
Height 3120
Cill
Quantity
Quantity 2
2000
APPR
Materi
Woode
Woode
3600
3750 2
4. 2000 3035 PROJECT NO. : 01 5. 600 800
3750 1
Fixed
TRUE ELEVATION 1
3750 9
Louve
DRG. NO.:
Fixed
302
OPENING SCHEDU No.
Material/Remarks
Width
Height
Cill
Quantity
Materi
FINISHES SCHEDU
FINISHES SCHEDULE No.
Cill
3750
SCALE 1:50
OPENING SCHEDULE Height
3750
WINDOW SCHEDU PLOTTED ON: xx/x
DRAWN BY:
No. Width ARYAN SALVI 1. 990
3.
2000 600
Width
Materi
Woode
Double
2. 1250 3120 3750 21 ISSUED FOR: CONSTRUCTION
Fixed glass
4. 5.
No.
Quantity
1 2
DATE: xx/xx/xx
2. 3.
Lintel
3120 3750 AREA: NAME 2300 3750
ELEVATION 2
3.1
REV. WINDOW SCHEDULE Width
1000
Height
DRG. TITLE:
A-301
No.
Width
PUNE HATH'S 4. 800 2100 ADMINISTRATIO 3750 7 Single
Single Leaf Toilet Door
2.1
202
2ND YEAR YELLOW BATCH DOOR SCHEDU
SMEF's BRICK SCHOOL of ARCHITE
No.
1. 2000 PLOT: NUMBER 2 2000 PROJECT:
KEY IN: Aryan Salvi WD SEM 5
3. 1000 CHECKED BY: 2100 800
3
1
DOOR SCHEDULE
ISSUED FOR:
DRG. NO.:
C
3 THIS DRAWING IS TO BE READ INFOR: CONJUNC ISSUED ARCHITECTURAL AND STRUCTURAL DRAWI
5 ANY DISCREPANCY TO BE BROUGHT TO TH PROJECT NO. : ARCHITECT IMMEDIATELY IN WRITING
SMEF's BRICK SCHOOL of ARCHITECTURE
KEY PLAN
1.
PLASTER
4 THE CONTRACTOR SHOULD CHECK AND VE AND DIMENSIONS ON SITE BEFORE STARTIN
ARYAN SALVI
B
No. TOILE
FLOOR
1.
4 THE CONTRACTOR SHOULD CHECK AND VERIFY ALL DRAWINGS AND DIMENSIONS ON SITE BEFORE STARTING WORKS
ARCHITECT
B
A
REV.
Elevation 2
SECTION DD'
A
CONSTRUCTION
A-402
DRG. NO.:
NOTES 1 ALL DIMENSIONS ARE IN MM 2 DO NOT SCALE THIS DRAWING
Material/Remarks
PROJECT:
KEY IN: cad file name
PROJECT NO. :
C
Quantity
PLOT: NUMBER
NAME
SECTION A
D
Cill
TOILET DETAIL
PLASTER
PLASTER
DRAWN BY:
A-401
Height
CEILING
DATE: xx/xx/xx
A
Width
DRG. TITLE:
FLOOR
FLOOR
No.
WALL
No.
1.
CONCRETE
1.
STONE CLADDING
1.
2.
MARBLE
2.
3.
WOOD
4.
TILES
CEILING
No.
FLOOR
No.
PLASTER
1.
CONCRETE
1.
2.
MARBLE
2.
3.
WOOD
4.
TILES
PLASTER
3
A-301
Elevation 3 ELEVATION 3
SCALE 1:50
WALL
STONE CLADD PLASTER
EXTRA WORKS Self Identity is a journey. A person should be more than the title given by education, gender or the society. Extra works desribes this identity of oneself that is supressed my intricasies of the complex society. it is me who gave birth to my confident self. It is the friends and family that gave it nourishment and direction of growth, for them I will be eternally greatful.
THANK YOU