UPB NEWS LETTER
ENGINEERING I PRODUCTION I DELIVERY I ASSEMBLY I SERVICE
2019
GENERAL CONTRUCTION FAÇADES ENGINEERING CONSTRUCTIONS CONSTRUCTION INNOVATIVE PRODUCTS GLASS
STEEL
CONCRETE
ENERGY
MACHINERY
INDUSTRY 4.0
+27%
E
PERI
YE
*
* C O MPA R E D TO 2 0 17
GENERAL INFORMATION
S OF
8 2 X
E
UPB group is an industrial group, the basis of its business being the construction of complex buildings, including designing, engineering, manufacturing and assembly of building structures. UPB group incorporates glass, steel and concrete structure manufacturing plants, a cogeneration module manufacturing, a mechanical engineering plant and a digital solution company.
AR
NCE
UPB GROUP
COMPANIES AND REPRESENTATIVE OFFICES UPB companies UPB representative offices UPB export markets
ACHIEVEMENTS
MARKET STRUCTURE
66%
Export markets
34%
Latvia market
MAIN EXPORT MARKETS SWEDEN
NORWAY
DENMARK
UK
GERMANY
AZERBAIJAN
THE BEST REPUTATION T H E C O N ST R U CT I O N A N D R E A L E STAT E F I E L D
OTHER EXPORT MARKETS SWITZERLAND SLOVAKIA NETHERLANDS BELARUS
BULGARIA
ICELAND
RUSSIA
CHINA
AUSTRIA VIETNAM
SLOVENIA
SOUTH KOREA
SPAIN
LITHUANIA
FINLAND
ESTONIA
CROATIA
HUNGARY
TURKEY
IRELAND
USA
ITALY
UPB PRODUCTS
GLASS
ALUMINIUM & WOOD ALUMINIUM GLAZED STRUCTURES UNITISED FAÇADES FAÇADES WINDOWS DOORS GLASS ROOFS BESPOKE GLASS SOLUTIONS
ENERGY
HEAVY AND COMPLEX STEEL STRUCTURES PRE-ENGINEERED STEEL BUILDINGS BUILDING COMPONENTS EXPLOSION RESISTANT CONTAINERS AND TANKS
STEEL
CONCRETE
MACHINERY
PRECAST BUILDING CONSTRUCTIONS OF ALL KINDS HOLLOW CORE SLABS WALL PANELS BEAMS AND COLUMNS STAIR SPANS FOUNDATION ELEMENTS READY-MIX CONCRETE AGGREGATES
INDUSTRY 4.0
TURNKEY ENERGY PROJECTS COGENERATION MODULES FOR NATURAL GAS BIOGAS SYNTHETIC GAS OIL GAS TRIGENERATION SOLUTIONS
PROCESS AUTOMATION EQUIPMENT AND SPECIAL MACHINES SOLUTIONS FOR GAS AND OIL INDUSTRY CONVEYOR SYSTEMS E-CABINET DEVELOPMENT AND PRODUCTION
BIM ERP SYSTEMS TEKLA PLUGINS FOR GLAZED STRUCTURES STEEL STRUCTURES PREFAB CONCRETE STRUCTURES SMART FACTORY SOLUTIONS
UPB MAIN SERVICES
DESIGN & BUILD
ENGINEERING
DIGITAL SOLUTIONS
GENERAL CONSTRUCTION
ASSEMBLY
SERVICE
N O V E L T Y
CERTIFICATES AND SYSTEMS
WELL - CERTIFICATION STANDARD FOR ADVANCING HUMAN HEALTH AND WELLBEING IN BUILDINGS, SWEDEN 3 UPB PROJECTS IN CERTIFICATION PROGRESS
ISO 9001, ISO 14001 - ENVIRONMENTAL AND QUALITY MANAGEMENT SYSTEMS
EPD - ENVIRONMENTAL PRODUCT DECLARATION
OHSAS 18001 - OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEMS
NORSOK - QUALITY STANDARDS BY THE NORWEGIAN PETROLEUM INDUSTRY
BREEAM - SUSTAINABLE BUILDING CERTIFICATION SCHEME, INTERNATIONAL
BASTA - PRODUCT REGISTRATION AND ASSESSMENT SYSTEM FOR CONSTRUCTION PRODUCTS, SWEDEN
MILJOBYGGNAD - SUSTAINABLE BUILDING CERTIFICATION SCHEME, SWEDEN
SUNDA HUS - PRODUCT REGISTRATION AND ASSESSMENT SYSTEM FOR CONSTRUCTION PRODUCTS, SWEDEN
LEED - SUSTAINABLE BUILDING CERTIFICATION SCHEME, INTERNATIONAL
FUTURE BUILT - GREEN CONSTRUCTION SYSTEM IN NORWAY
ACHILLES - SUPPLIER EVALUATION AND ASSESSMENT SYSTEM, UNITED KINGDOM
PRODUCT XCHANGE - PRODUCT REGISTRATION AND ASSESSMENT SYSTEM FOR CONSTRUCTION PRODUCTS, NORWAY
STARTBANK - SUPPLIER EVALUATION AND ASSESSMENT SYSTEM, NORWAY
BYGGVARU BEDÖMNINGEN - PRODUCT REGISTRATION AND ASSESSMENT SYSTEM FOR CONSTRUCTION PRODUCTS, SWEDEN
CT S
RA
IN THE
U
I
LD
IN G C ONT
•
2018
JECTS
58%
RO
AINABL
RTFOLIO PO
OF
BU
ST
D GREEN
P
E
AN
•
S
SUSTAINABLE CONSTRUCTION UPB has high competence in the field of sustainable and energy efficient construction. We represent one of the largest construction companies in the Baltic states, and we care about the impact we leave both on the environment and the parties involved in the process. certification in progress
ST. ERIK EYE HOSPITAL, MEDICAL INSTITUTION SOLNA, SWEDEN
DESIGN & BUILD Designing and construction in a single contract.
NEW
ENGINEERING COMPANY ACQUIRED
RT
IFIED
BY
CE
ONE CON INDUSTRIAL BUILDINGS TR R E D U C E D AC TO R | O N E C O N MILITARY BUILDINGS T LIEPAJA OLYMPIC CENTRE, TENNIS HALL PROJEC T E X E C U R A C T | S IN G L E W LIEPAJA, LATVIA COMMERCIAL BUILDINGS O R K F LOW TION TI ME AND MULTI-APARTMENT BUILDINGS COSTS PUBLIC BUILDINGS
LIEPAJA OLYMPIC CENTRE , TRACK-AND-FIELD ARENA LIEPAJA, LATVIA
GENERAL CONSTRUCTION
AZERBAIJAN AIRLINES BOEING 747-8 HANGAR BAKU, AZERBAIJAN
100m
width of steel constructions
8047m2 total area
ADVANCED security solutions
IKEA, SHOPPING MALL STOPINU DISTRICT, LATVIA
ENGINEERING
PROJECT WITH SPECIAL PREFAB CONCRETE PRODUCT -
BRICK SANDWICH WALL
Integrated engineering for steel, concrete and glass structures.
UMAMI APARTMENT BUILDING, SWEDEN
INDUSTRY 4.0
STORA FROSUNDA 2, SWEDEN MULTIFUNCTIONAL BUILDING
130+ PROFESSIONAL ENGINEERS
SHARED MODEL FOR ENGINEERING
UPB ENGINEER GROUP IN RIGA, LATVIA UPB ENGINEER GROUP IN LIEPAJA, LATVIA UPB ENGINEER GROUP IN BELARUS
UNIQUEENTS* LY ELECTM SSEMB IO N | A
210 *E N G IN
E E R IN
ODU G | PR
15 600 m2 area of unitised faรงade elements produced by UPB
25 FLOORS
LARGE COMPLEX PROJECTS CAMPUS ALBANO, SWEDEN STUDENT CAMPUS
600
faรงade elements
14 000 m3
concrete structures
FAร ADE F THE SIZE O N A H T E R O M 8 HOCKEY FIELDS
2000 t
steel structures GARDA VESTA OFFICE BUILDING, SWEDEN
3C
PROJECTS*
SORKEDALSVEIEN 8 OFFICE AND APARTMENT BUILDING
*UPB engineered, manufactured and assembled combined glass, steel and concrete solutions
+
GLASS
STEEL
Very Good
CONCRETE
BLENDA OFFICE BUILDING
Combined engineering Shorter assembly time Single estimate Precise execution deadline Efficient use of construction machinery Smooth coordination of work
631 t
steel structures
11 285 m2
glass aluminium structures
18 782 m2
precast structures
REGIONENS HUS, SWEDEN OFFICE BUILDING
sertifik훮cija proces훮
SKY CITY OFFICE ONE OFFICE BUILDING
sertifik훮cija proces훮
SOLUTIONS IN ONE BUILDING
structural glazing unitised façade
MEDICON VILLAGE, OFFICE BUILDING
fire-resistant façade
Thin fiber - reinforced concrete products for unique façade shape and color
double skin façade
LAMINA STRUCTURE Ultra high performance concrete (UHPC) products for stairs, balconies etc.
BESPOKE ELEMENTS
HISTORICAL BRICK FAÇADE ELEMENTS
STRUCTURAL
GLAZING UNITISED FAÇADE
reveal profiles for more aesthetical interior replaces insulated glass unit from inside and outside
stick-built façade
integrated blinds copper lamelas
CARLSBERG, OFFICE BUILDING
UMAMI, MULTIFUNCTIONAL BUILDING
5 FAÇADE
hybrid unitised façade
LAMINA FACE
GAMLESTADS TORG, OFFICE BUILDING
FAÇADE SOLUTIONS
BRICK SANDWICH WALL
GLASS PRODUCTS ALUMINIUM AND WOODALUMINIUM GLASS STRUCTURES BESPOKE FAÇADE SOLUTIONS
+50% FOR GLASS
PRODUCTION CAPACITY ALUMINIUM PRODUCTS *
FAÇADES FOR MEDICAL INSTITUTIONS
INVESTMENT +3500m2 IN PRODUCTION EQUIPMENT
antibacterial glass x-ray resistant glass sunlight resistant glass ST. ERIK EYE HOSPITAL MEDICAL INSTITUTION
AREA FOR ALUMINIUM GLASS PRODUCTION
PRODUCTS
INDUSTRY 4.0
FOR MORE AESTHETICAL FAÇADES
FOR E 8 LINES
T PRODUC T N E M LE
ION
NEW
PRODUCTION AREA FOR WOOD-ALUMINIUM PRODUCTS
FAÇADE ELEMENT FOR PROJECT FARGSKRAPPAN OFFICE BUILDING
IN PRO PR JE OG C T RE SS
2000 t
ns structio n o c l e e st
32m+
STEEL PRODUCTS STEEL CONSTRUCTION STRUCTURES EXPLOSION-RESISTANT CONTAINERS
* C OM PA RE D TO Y E A R 20 1 7
PRESSURE-RESISTANT CISTERNS
high steel constructions
AZERBAIJAN AIRLINES BOEING 747-8 HANGAR
HIGHEST BUILDING IN UPB HISTORY-
28 FLOORS
21%
*
INCREASED PRODUCTION OF STRUCTURAL STEEL
ODUCTS R P L E E T S E IV EXCLUS URAL DESIGN PROJECTS FOR STRUCT
SOUTHBANK PLACE APARTMENT BUILDING
STOCKHOLM NEW OFFICE BUILDING
COMPLEX STEEL SOLUTIONS
11
*
+17%
READY-MIX CONCRETE FACTORIES IN LATVIA
INCREASED PREFAB CONCRETE PRODUCTION AREA
+34%
* INCREASED
CONCRETE
TURNOVER
TE Y-MIX CONCREWAY D A E R E S IN NOR S E IN S U B NEW EQUIPMENT SWEDEN D N A CONCRETE wire folding and straightening O F R E A D Y- M I X C O N C R E T E
W
S E R V
I
PREFAB CONCRETE STRUCTURES
mesh welding
E
N
C
PRODUCTS
RESEARCH CENTRE Development and testing of new concrete products
READY-MIX CONCRETE
3-LAYER PREFAB CONCRETE ELEMENT TERAZZO
AGGREGATES
N O V E LT
CONCRETE LABORATORY INDUSTRY 4.0
MOBILE FACTORY FOR PIGMENTED CONCRETE PRODUCTS
EXTRA THIN
pigmented concrete outer layer
Y PIGMENTED CONCRETE
50%
GRAPHIC CONCRETE
reduced thickness of outer layer
reduced total weight of element
15%
EXPOSED TEXTURE
50-4000kW
3 MW
P O W E R R A N G E
BIOMAS BOILER HOUSE
150 kW
42%
ENERGY
MARKET STRUCTURE
25% VISORC WASTE RECYCLING PLANT
10% 23%
PRODUCTS
COGENERATION MODULES TRIGENERATION MODULES
* C OM PA RE D TO Y E A R 20 1 7
SERVICE
250+ COGENERATION MODULES LARGEST FACTORY IN BALTICS
SERVICE
ENERGY TURNKEY SOLUTIONS
other markets
operation, service and maintenance of power plants 24/7 CHP module maintenance remote monitoring and control
600 kW
200+ SERVICE
OBJECTS COGENERATION MODULE FOR HOSPITAL IN BASEL
WINSEN WASTE WATER TREATMENT PLANT
HIGH ENVIRONMENTAL REQUIREMENTS
MODULE PRODUCES LESS HARMFUL EMMISSIONS THAN ONE MOTORCAR
NEW EXPORT MARKETS
SPAIN TURKEY
EXPANDED
PRODUCTION AREA MACHINERY
PRODUCTS GRABS AND BUCKETS
+24%*
S O LU T I
TURNOVER INCREASE
CRAMLINGTON BIOMASS BIOMAS COGENERATION PLANT
R ONS FO
RIAL T S U D N I SSES E C O R P
TECHNOLOGICALLY COMPLEX PROJECTS FROM A TO Z
PROCESS AUTOMATION EQUIPMENT SOLUTIONS FOR OIL AND GAS INDUSTRY CONVEYOR SYSTEMS ELEVATORS AND LIFTS DESIGNING AND MANUFACTURING OF ELECTRIC CABINETS
PRODUCTION FOR FAÇADE ELEMENTS
PRODUCTION EQUIPMENT
LAKHTA CENTER OFFICE BUILDING
WIND TUNNEL
LAWN MOWER
TILBURY GREEN POWER BIOMASS COGENERATION PLANT
AND ENGINEERING TOOOLS
TEKLA PLUGINS
INDUSTRY 4.0
ALTO 4.0 has developed a set of tools that covers the workflow on modelling in TEKLA Structures.
* C OM PA RE D TO Y E A R 20 1 7
EER E R E N G IN A N D OT H
IN G T O O
PREFAB CONCRETE STEEL CONSTRUCTIONS
30%
INCREASE
BIM INTEGRATED ERP SYSTEMS
NEW COMPANY ESTABLISHED
SMART FACTORY SOLUTIONS
DIGITAL SOLUTION DEVELOPMENT
ENGINEERING TOOLS
20+
GLAZED
PRODUCTS
TEKLA PLUGINS
PLUGINSLS
IN PRODUCTION CAPACITY by implementing
BIM INTEGRATED ERP ALTO 4.0 ERP is a full cycle business process management system designed for the construction industry through a combination of digital capabilities and in depth industry knowledge Prefab production Steel production Supply chain management Logistics management Assembly planning
automatisation solutions
FULL IN-HOUSE DEVELOPMENT TEAM
SMART FACTORY SOLUTIONS
AUTOMATISATION DIGITALISATION
UPB EMPLOYEES UPB ENGINEERS RECEIVE PRIZES
as the best engineers of the year 2018
WE WORK SAFELY OR DO NOT WORK AT ALL
WE
CHALLENGE
OURSELVES DAILY
gada balva
UPB e has one of th s biggest team in the Riga Marathon
SUPPORTING TALENTS
scholarships student trips experience exchange out-of-school activities
98
CHILDREN WERE BORN IN 2018
UPB ENVIRONMENTAL RESPONSIBILITY
WE ARE PROUD WIN NE R
WIN NE R
R AW MAT E R IA L S
GLASS PRISET 2018 - THE MOST BEAUTIFUL GLASS BUILDING IN SWEDEN
health & safety award
T R A N SP O RTAT IO N
SKANSKA HEALTH AND SECURITY AWARD 2018 WINNER
UMESTAN BUSINESS PARK OFFICE BUILDING
EPIC OFFICE BUILDING
2 nd PLA CE
1 st PLA CE
• Analysis of the life cycle of products (EPD) • Recycling • FSC timber • Reuse of packaging • Recycled steel
• Trucks (EU class 5 and higher) • Modernised, environment-friendly ferries
T R A N SP O RT & E Q UIP ME N T • Transport on average under 7 years old • New, more environmentally friendly machinery
R E SO URCE S
ANNUAL CONSTRUCTION AWARD OF LATVIA 2017 - 1st PLACE IN NOMINATION BUILDING ABROAD
MOST SUSTAINABLE BUILDING AND PROJECT 2018 - 2nd PLACE IN THE CATEGORY PUBLIC BUILDING
ALTO 4.0 BLOCKCHAIN SOLUTION WINNER IN THE NORDIC IT COMPETITION
ADAZI FREE WALDORF SCHOOL SPORT HALL
WIN NE R
WIN NE R
BLENDA OFFICE BUILDING
OFFICE BUILDING EPIC IN MALMO, SWEDEN AWARDED AS THE BEST SMALL PROJECT DESIGNED IN CIS COUNTRIES
• Electricity from renewable energy sources • CHP provides heating and electricity for the production units • Automatic thermoregulation system in offices and factories • Natural resource data management and analysis
WAY O F WO R KIN G • Energy efficient solutions during the engineering stage • Process digitalisation and automation • Systematic maintenance of equipment and vehicle fleet
+
CONTINUED EFFORTS TO REDUCE THE USE OF RESOURCES AND IMPLEMENT ENVIRONMENT-FRIENDLY SOLUTIONS
ENERGY
CONCRETE
MACHINERY
UPB GROUP MAIN REFERENCE PROJECTS GLASS
STEEL
CONCRETE
ENERGY
MACHINERY
ENGINEERING I PRODUCTION I DELIVERY I ASSEMBLY I SERVICE
PROJEKTĒŠANA I RAŽOŠANA I LOĢISTIKA I BŪVNIECĪBA I SERVISS
2018
ĢENERĀLĀ BŪVNIECĪBA FASĀDES UN PROJEKTĒŠANA KARKASA KONSTRUKCIJAS BŪVNIECĪBA INOVATĪVI PRODUKTI GLASS
STEEL
CONCRETE
ENERGY
MACHINERY
MAIN REFERENCES www.upb.eu.com
REGIONENS HUS OFFICE BUILDING, Gothenburg, Sweden GLASS
STEEL
CONCRETE
ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
certification in progress
MAIN REFERENCES www.upb.eu.com
MEDICON VILLAGE OFFICE BUILDING, Lund, Sweden GLASS ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
GENERA
L C O N ST
R U C TO R
AZERBAIJAN AIRLINES BOEING 747-8 HANGAR, Baku, Azerbaijan STEEL ENGINEERING | GENERAL CONSTRUCTION | PRODUCTION | DELIVERY | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
ST. ERIK EYE HOSPITAL MEDICAL INSTITUTION, Solna, Sweden GLASS
STEEL
CONCRETE
ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
certification in progress
MAIN REFERENCES www.upb.eu.com
SKY CITY OFFICE ONE OFFICE BUILDING, Arlanda, Sweden GLASS
STEEL
CONCRETE
ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
GAMLESTADS TORG OFFICE BUILDING, Gothenburg, Sweden GLASS
MACHINERY
ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
certification in progress
MAIN REFERENCES www.upb.eu.com
HAMMARBY TERRASSEN OFFICE BUILDING, Stockholm, Sweden STEEL
CONCRETE
ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
certification in progress
MAIN REFERENCES www.upb.eu.com
VALAND 6 OFFICE BUILDING, Kungsbacka, Sweden GLASS
STEEL
ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
GARDA VESTA OFFICE BUILDING, Gothenburg, Sweden GLASS ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
certification in progress
MAIN REFERENCES www.upb.eu.com
CARLSBERG OFFICE BUILDING, Copenhagen, Denmark GLASS ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
GENERA
L C O N ST
R U C TO R
IKEA, SHOPPING MALL Stopinu district, Latvia GENERAL CONSTRUCTION | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
GENERA
L C O N ST
R U C TO R
LIEPAJA OLYMPIC CENTRE TENNIS HALL, Liepaja, Latvia ARCHITECTURE | GENERAL CONSTRUCTION | ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
MAIN REFERENCES
R U C TO R
LIEPAJA OLYMPIC CENTRE TRACK-AND-FIELD ARENA, Liepaja, Latvia ARCHITECTURE | GENERAL CONSTRUCTION | ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
Ce
L C O N ST
rtified
by
www.upb.eu.com
GENERA
MAIN REFERENCES www.upb.eu.com
GENERA
L C O N ST
R U C TO R
JENSEN METAL METALWORKING FACTORY, Liepaja, Latvija GENERAL CONSTRUCTION | ENGINEERING | PRODUCTION | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
6300MÂ kWW BIOMAS BOILER HOUSE Vangazi, Latvia ENERGY ENERGY SOLUTIONS | ENGINEERING
MAIN REFERENCES www.upb.eu.com
GENERA
L C O N ST
R U C TO R
UZAVAS ALUS BEER BREWERY, Uzava, Latvia GENERAL CONSTRUCTION | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
UMAMI APARTMENT BUILDING, Stockholm, Sweden STEEL
CONCRETE
ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
STOCKHOLM NEW OFFICE BUILDING, Stockholm, Sweden STEEL
CONCRETE
ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
CAMPUS ALBANO STUDENT CAMPUS, Stockholm, Sweden GLASS
STEEL
CONCRETE
ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
EPIC OFFICE BUILDING, Malmรถ, Sweden STEEL
CONCRETE
ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
WELLINGEBY APARTMENT BUILDING, Vällingby, Sweden STEEL
CONCRETE
ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
FARGSKRAPPAN PUBLIC BUILDING, Sollentuna, Sweden GLASS
STEEL
CONCRETE
ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
SOLNA UNITED OFFICE BUILDING, Solna, Sweden STEEL
CONCRETE
ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
150Â kW VISORC COGENERATION MODULE, Mikkeli, Finland ENERGY ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
158Â kW WINSEN WASTE WATER TREATMENT PLANT, Winsen, Germany ENERGY ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
600Â kW COGENERATION MODULE FOR HOSPITAL Basel, Switzerland ENERGY ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
MODULE PRODUCES
LESS HARMFUL EMMISSIONS THAN A MOTORCAR
MAIN REFERENCES www.upb.eu.com
CRAMLINGTON BIOMASS BIOMASS COGENERATION PLANT, Cramlington, UK MACHINERY ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
HØNEFOSS STONE CRUSHING AND SORTING PLANT, Norway MACHINERY ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
TILBURY GREEN POWER BIOMASS COGENERATION PLANT, London, UK MACHINERY ENGINEERING | PRODUCTION | DELIVERY | ASSEMBLY
MAIN REFERENCES www.upb.eu.com
EQUIPMENT FOR PRODUCTION Latvia MACHINERY ENGINEERING | PRODUCTION
w w w. u p b . e u . c o m ENGINEERING I PRODUCTION I DELIVERY I ASSEMBLY I SERVICE
2019
GENERAL CONTRUCTION ĢENERĀLĀ BŪVNIECĪBA FAÇADES ENGINEERING CONSTRUCTIONS CONSTRUCTION INNOVATIVE PRODUCTS Distribution, copying, editing, preservation, archiving and complete or partial publishing without the written permission of UPB AS is prohibited.
STIKLS
METĀLS
BETONS
ENERĢĒTIKA
MAŠĪNBŪVE
INDUSTRIJA 4.0