DESIGN & BUILD DIGITAL GENERAL CONSTRUCTIONSOLUTIONS
NEWS LETTER ENERGY
MACHINERY STEEL
INNOVATIVE PRODUCTS GENERAL CONSTRUCTION DIGITAL SOLUTIONS DE SI GN & BUILD
LARGE AND COMPLEX PROJECTS
GLASS
STEEL
CONCRETE
GLASS STEEL CONCRETE
DIGITAL SOLUTIONS
TRY FOR THE CONSTRUCTION INDUS
URES COMBINED
3 TYPES OF STRUCT
GLASS
GLASS
STEEL
CITYGATE, OFFICE BUILDING, GOTHENBURG, SWEDEN, GENERAL CONSTRUCTION: SKANSKA
FACADE & FRAME INDUSTRY 4.0 2020 COMPLEX CONCRETE STRUCTURES SOLUTIONS GLASS INDUSTRY 4.0
STEEL
CONCRETE
CONCRETE
DUCTION DESIGN I PRO
ENERGY
MACHINERY
HIGH-RISE SOLUTIONS N IO I CONSTRUCT
INDUSTRY4.0
UPB GROUP UPB group is an industrial group, the basis of its business being the construction of complex buildings, including designing, engineering, manufacturing and assembly of building structures. UPB group incorporates glass, steel and concrete structure manufacturing plants, a cogeneration module manufacturing, a mechanical engineering plant and a digital solution company. GENERAL INFORMATION
9
IN COUNTRIES ENTERPRISES
COMPANIES AND REPRESENTATIVE OFFICES
ACHIEVEMENTS
UPB companies UPB representative offices UPB export markets
2019 2019
MARKET STRUCTURE
60%
Export markets
40%
UPB CONSOLIDATED 5-YEAR NET TURNOVER
Latvian market
MAIN EXPORT MARKETS
SWEDEN
NORWAY
DENMARK
UK
GERMANY
200
AZERBAIJAN
815
MILLION EURO
OTHER EXPORT MARKETS SLOVAKIA
RUSSIA
BULGARIA
AUSTRIA
ICELAND
BELARUS
SLOVENIA
FINLAND
USA
CANADA
CHINA
CROATIA
HUNGARY
TURKEY
IRELAND
ESTONIA
ITALY
UKRAINA
LITHUANIA SOUTH KOREA
SPAIN
100 Mill.euro
SWITZERLAND VIETNAM
NETHERLANDS
0
2015 2016 2017 2018 2019
UPB PRODUCTS
GLASS
ALUMINIUM & WOOD ALUMINIUM GLAZED STRUCTURES UNITISED FAÇADES FAÇADES WINDOWS DOORS GLASS ROOFS BESPOKE GLASS SOLUTIONS
ENERGY
METAL BUILDING STRUCTURES NON-STANDARD HANGARS CONSTRUCTION COMPONENTS
STEEL
CONCRETE
EXPLOSION-RESISTANT CONTAINERS AND TANKS
ALL TYPES OF REINFORCED CONCRETE STRUCTURES HOLLOW PLATES WALL PANELS BEAMS, COLUMNS AND STAIR FLIGHTS BUILDING FOUNDATION ELEMENTS IN-TRANSIT CONCRETE INERT MATERIALS CONCRETE RESEARCH
MACHINERY
INDUSTRY 4.0
TURNKEY ENERGY PROJECTS COGENERATION MODULES FOR NATURAL GAS BIOGAS SYNTHETIC GAS OIL GAS TRIGENERATION SOLUTIONS
PROCESS AUTOMATION EQUIPMENT AND SPECIAL MACHINES SOLUTIONS FOR GAS AND OIL INDUSTRY CONVEYOR SYSTEMS E-CABINET DEVELOPMENT AND PRODUCTION
BIM ERP SYSTEMS TEKLA PLUGINS FOR GLAZED STRUCTURES STEEL STRUCTURES PREFAB CONCRETE STRUCTURES SMART FACTORY SOLUTIONS
UPB MAIN SERVICES
DESIGN & BUILD
ENGINEERING
DIGITAL SOLUTIONS
GENERAL CONSTRUCTION
ASSEMBLY
SERVICE
SUSTAINABLE CONSTRUCTION
LD
CTS
RA
IN THE
77%
S
•
U
ING CONT
2019
JECTS
OF
AINABLE
RTFOLIO PO
I
ST
GREEN
RO
BU
SORKEDALSVEIEN 8, OFFICE AND APARTMENT BUILDING, OSLO, NORWAY
ND
P
A
•
UPB has high competence in the field of sustainable and energy efficient construction. We represent one of the largest construction companies in the Baltic states, and we care about the impact we leave both on the environment and the parties involved in the process.
UPB ENVIRONMENTAL RESPONSIBILITY ENERGY EFFICIENCY and CO2 REDUCTION
RECYCLING AND REUSE OF MATERIALS
• Environmental declarations of products • Energy-efficient solutions during the engineering stage • Electrical power from renewable energy sources • Cogeneration station that provides heating and electricity for the production unit • Biofuel additive for transport vehicles • Implementation of the energy efficiency programme in accordance with the results of the energy audit (EN 16247)
• Sorting and recycling of waste • Reuse of packaging • Products from recycled raw materials – use of recycled steel in production • More environmentally friendly solutions for the production of reinforced concrete elements – new waste-free production facility – coming soon! RESPONSIBLE OPERATION PRINCIPLES IN FULL ECONOMIC CYCLE • Process digitalisation and automation • Systematic maintenance of equipment and vehicle fleet • Use of modernised, environment-friendly ferries for transport • Trucks: Euro V and higher
EFFICIENT USE OF RESOURCES AND REDUCTION OF ENVIRONMENTAL FOOTPRINT • Product lifecycle analysis using One Click LCA software - New! • Material optimisation already in the engineering stage • New, more environmentally friendly equipment at production plants
+
EFFORTS TO REDUCE THE CONSUMPTION OF RESOURCES AND IMPLEMENT ENVIRONMENTALLY FRIENDLY SOLUTIONS
Design and construction under a single contract
SĀGA, RECREATION AND SHOPPING CENTRE, RIGA, LATVIA, DEVELOPER VPH
BENEFITS
DESIGN & BUILD
• ONE CONTRACTOR • ONE CONTRACT • UNIFIED WORKFLOW • SHORTER PROJECT TURNAROUND TIME • LOWER COST
57 000m2
GENERAL CON STRU CT IO N
total area
ROOF STRUCTURES
LS • SANDWICH PANE PANELS • POLYCARBONATE S ARBONATE WINDOW LYC PO GE RID OF • RO AND SUN L RO NT CO TE IMA • AUTOMATED CL SHADES
DEEP SOIL MIXING piles
1530t 6415m3 2415m3 9580m2 steel structures
ready-mix concrete
reinforced concrete
floor panels
YOUR IDEA
OUR UNIQUE 3 CONSTRUCTION EXPERTISE STEEL | CONCRETE | GLAZED STRUCTURES
EARLY STAGE
TING CONSUL
EARLY-STAGE CONSULTING FOR FRAME AND BUILDING ENVELOPE
PR
GRC
PR
O D U CT
O D U CT
NEW
NEW
BENEFITS
• EXPERIENCE-BASED EXPERT CONSULTING IN THE EARLY PHASE OF THE PROJECT • PRECISE SYSTEM DRAWINGS OF THE STRUCTURAL FRAME AND FACADE • BUDGET CONTROL
• CUSTOM MOCK-UP OF THE FINAL PRODUCT
ENGINEERING Integrated engineering of steel, concrete and glass structures
X ST E E L COMPLE NS S O LU T I O
180+
THE LARGEST PROJECT IN THE HISTORY OF UPB
66 900m2
E
FFICEU S O G N I R LAR S NGINEE IA | BE L AT V I A
UA | LITH
N
STORA FROSUNDA, MULTIFUNCTIONAL BUILDING, SOLNA, SWEDEN
UPB
ENGINEERING CAPACITY
PRINCETON, OFFICE BUILDING STOCKHOLM, SWEDEN
PARTICIPATION
Developer: HB Reavis
COMPLEX 3D ASSEMBLIES AND COMPONENTS
BLOOM CLERKENWELL, COMMERCIAL BUILDING, LONDON, UK
THE HIGHEST BUILDING DESIGNED BY UPB TO DATE
144 METERS 39 STOREYS CITYGATE, OFFICE BUILDING, GOTHENBURG, SWEDEN
4 MONTHS 6 MONTHS 5 MONTHS MANUFACTURING ASSEMBLING ENGINEERING OF ELEMENTS
FARGSKRAPAN, PUBLIC BUILDING, SOLLENTUNA, SWEDEN
3C
GLAZED STRUCTURES
PROJECTS GLASS
STEEL
CONCRETE
UPB engineered, manufactured and assembled combined glass, steel and concrete solutions
CONCRETE STRUCTURES
BENEFITS
+
STEEL STRUCTURES
REDUCED TOTAL CONSTRUCTION TIME SEAMLESS DESIGN IN 3D EARLY-STAGE CONSULTING FOR IMPLEMENTATION OF THE CUSTOMER’S IDEA KEEPING A SINGLE PROJECT BUDGET OPTIMAL USE OF CONSTRUCTION SITE EQUIPMENT
FACADE SOLUTIONS
+50%
HIGHLY PROCESSED WALL ELEMENTS
OF INCREASTEION C U D PRO REINFORCED CONCRETE THERMAL INSULATION BRICK FINISH
S FACADE H IS IN F GRC
Arkitekt: www.kanozi.se
ALLS INISH W F K IC R B
CURVED WALLS
L
A
GRC BRICK
M
STORA FROSUNDA, MULTIFUNCTIONAL BUILDING, SOLNA, SWEDEN
NATRIUM, UNIVERSITY BUILDING, GOTHENBURG, SWEDEN
KARLBERG, OFFICE BUILDING STOCKHOLM, SWEDEN
I
N
GRC
A
TERRAZZO
F A C E
TERAZZO
GRAPHIC CONCRETE
EXPOSED TEXTURE
PIGMENTED CONCRETE
Thin fiber - reinforced concrete products for unique facade shape and color
GAMLESTADS TORG, OFFICE BUILDING, GOTHENBURG, SWEDEN
FACADE SOLUTIONS HIGHLY PROCESSED WALL ELEMENTS INSULATED GLASS UNITS IN VARIOUS SHAPES AND SIZES 3D ALUMINIUM CARTRIDGE FINISH
STRUCTURAL GLAZING UNITISED FACADE
VALLE VIEW, OFFICE BUILDING, OSLO, NORWAY
integrated shutters
special profiles for appealing interior aesthetics replacement of insulated glass units both from the inside and outside of the building
SPECIAL ELEMENT FACADES
copper plates
CARLSBERG HEAD OFFICE, COPENHAGEN, DENMARK
Illustration: NCC/Lund+Slaatto Arkitekter
PROBABLY THE BEST FACADE IN THE WORLD
GLASS PRODUCTS ALUMINIUM AND WOODALUMINIUM GLASS STRUCTURES BESPOKE FACADE SOLUTIONS
SAFETY CERTIFICATE
50%
INCREASE IN ORDERS
F U L LY AU TO M AT ED PRO DU CT I O N
NEW MARKET
NEW
5 3mx r et es
in insulated glass unit production line
ions dimens
PRODUCTION AREA ING IN INVEST LOGY TECHNO
+1000m2
m fro 0 3. 9m 5. to
STEEL
3 PR D ST OJ EE EC L L T IN KS
STORA FROSUNDA, MULTIFUNCTIONAL BUILDING, SOLNA, SWEDEN
Weight from 243 to 682kg
28 STOREYS
ø from 32 to 46cm
STEEL CONSTRUCTION STRUCTURES EXPLOSION-RESISTANT CONTAINERS PRESSURE-RESISTANT CISTERNS
COMPLEX COLUMN SOLUTIONS PRODUCTION EQUIPMENT FOR REINFORCED CONCRETE PLANT
PRODUCTS
21%
STEEL INDUSTRIAL PRODUCTS
E OF INCREASTION PRODUC VOLUME
USE OF RECYCLED STEEL
2000 t
es structur l e e t s f o
THE HIGHEST BUILDING IN THE HISTORY OF UPB STOCKHOLM NEW OFFICE BUILDING
10
Mill. INVESTING IN NEW
LAMINA STRUCTURE
EURO PRODUCTION FACILITIES
VERY HIGH PERFORMANCE CONCRETE
CONCRETE
READY-MIX CONCRETE AGGREGATES CONCRETE LABORATORY
+15%
OF READY-MIX CONCRETE PLANTS
ACCREDITED CONCRETE TESTING LABORATORY IN DAUGAVPILS, LATVIA
FILIGREE SLABS
with installed engineering networks
RETE BUSINESS READY-MIX CONC NORWAY N AND IN
SE NEW RV ICE
PREFAB CONCRETE STRUCTURES
INCREASE OF TURNOVER SELF-CONSOLIDATING CONCRETE
PRODUCTS
UHPC
SWEDE
FOR STRUCTURAL ELEMENTS • BALCONIES • STAIRS
MOBILE CONCRETE LABORATORY
S FOR DETERMIWIRELESS SENSOR PROPERTIES NING CONCRETE
pacity Thermal ca
ENERGY
3 m 0 0 0 18 E VOLUM RRIER A C T A HE
PRODUCTS ENERGY TURNKEY SOLUTIONS COGENERATION MODULES TRIGENERATION MODULES SERVICE
design of heat storage system for Latvenergo TEC-2, Latvia
SERVICE
operation, service and maintenance of power plants 24/7
THE LARGEST HEAT ACCUMULATION TANK IN THE BALTIC STATES
550 MWh
3 MW BIOMASS BOILER HOUSE VANGAZI, LATVIA
50 kW
TIVE
INNOVAAIN PROJECT M HEATING
UŽAVAS ALUS, COGENERATION PLANT UZAVA, LATVIA
600 kW
CHP module maintenance remote monitoring and control
HEATING MAIN PROJECT BALOZI, LATVIA
COGENERATION MODULE FOR A HOSPITAL BASEL, SWITZERLAND
FULL-CYCLE PRODUCTION engineering | production | assembly
MACHINERY
+600m
assembly area
+26%
VOLUME GROWTH
2
PRODUCTS GRABS AND BUCKETS PROCESS AUTOMATION EQUIPMENT SOLUTIONS FOR OIL AND GAS INDUSTRY
for the finished products
TECHNICAL LIFT STOPINI CULTURE CENTRE
+21%
CONVEYOR SYSTEMS ELEVATORS AND LIFTS PARTICIPATION IN INTERNATIONAL FAIRS
INDUSTRIAL LINES UKRAINE
INCREASE OF PRODUCTION IN FINLAND
CUSTOM NS FOR SOLUTIO IAL INDUSTR OBJECTS
LIFTING SYSTEM LIDAN, UNITED KINGDOM
20+ PROGRAMMERS
Extensive production facility digitalisation programme applica e qu
ti
v
el
PRODUCTS
Construction file sharing system
BIM INTEGRATED ERP SYSTEMS SMART FACTORY SOLUTIONS
altoerp.com
TEKLA PLUGINS ENGINEERING TOOLS
A full-cycle enterprise process management system designed for the construction industry.
ope
LT
O
de
4 .0
un i
s on
INDUSTRY 4.0
d by A
SPECIALISATION IN HIGH-RISE BUILDINGS FRAME + FACADE ENGINEERING | PRODUCTION | ASSEMBLY
SIMULTANEOUS ASSEMBLY OF THE STRUCTURAL FRAME AND FACADE
STOCHOLM NEW, OFFICE BUILDING, STOCKHOLM, SWEDEN
COMPACT CONSTRUCTION SITE PREFABRICATED SOLUTION FOR UP TO 40 FLOORS ELEMENTS ARE MANUFACTURED AT THE PRODUCTION PLANT, IN A CONTROLLED ENVIRONMENT EARLY-STAGE CONSULTING TO CHOOSE THE MOST EFFICIENT SOLUTIONS
STOREYS
3C
REGIONENS HUS, OFFICE BUILDING, GOTHENBURG, SWEDEN
STOREYS
GARDA VESTA, OFFICE BUILDING, GOTHENBURG, SWEDEN
28 33 STOREYS
STOREYS
3C
2016 STRUCTURAL FRAME SOLUTION
HIGH-RISE OBJECTS
CITYGATE, OFFICE BUILDING, GOTHENBURG, SWEDEN
DRAKEN, HOTEL, GOTHENBURG, SWEDEN
STRUCTURAL FRAME SOLUTION
STOCKHOLM NEW, OFFICE BUILDING, STOCKHOLM, SWEDEN
FACADE SOLUTION
GARDA VESTA, OFFICE BUILDING, GOTHENBURG, SWEDEN
16 25
Arkite kt: Wh ite Ark itekter
MUNKSJÖSTADEN, OFFICE BUILDING, JÖNKÖPING, SWEDEN
12 37
STOREYS
2019
GAMLESTADS TORG, OFFICE BUILDING, GOTHENBURG, SWEDEN
1ST PLA CE
OF BUIL TH DIN EY G EAR
WE ARE PROUD TRINGSRATTEN, COURTHOUSE LUND, SWEDEN
GAMLESTADS TORG, OFFICE BUILDING, GOTHENBURG, SWEDEN
ANNUAL CONSTRUCTION AWARD OF LATVIA – NEW BUILDING – PUBLIC BUILDING BUILDING OF THE YEAR
ONE OF THE TOP 20 “BUILDINGS OF THE YEAR IN SWEDEN 2019”
DESIGN & BUILD
LIEPAJA OLYMPIC CENTRE TRACK-AND-FIELD ARENA, LIEPAJA, LATVIA
ESS, EUROPEAN RESEARCH INSTITUTE, LUND, SWEDEN
WINNER OF SKANSKA ENVIRONMENT AND SAFETY AWARD 2018
MOST ENERGY EFFICIENT PUBLIC BUILDING IN LATVIA 2019
UPB EMPLOYEES UPB ENGINEERS RECEIVE PRIZES
rkshop Safety wo SKA A K with S N
gada balva
the best engineer of the year 2019
WE WORK SAFELY
OR DO NOT WORK AT ALL WE CHALLENGE OURSELVES DAILY
UPB e has one of th s biggest team in the Riga Marathon
WE SUPPORTS
STUDENTS
scholarships student trips experience exchange out-of-school activities
112
CHILDREN WERE BORN IN 2019
STUDENTHUSET CAMPUS VALLA , PUBLIC BUILDING, JÖNKÖPING, SWEDEN
URE T C U R ST N E D O O ED T W A S R U G VARIO IONS INTE NCRETE SOLUT EL AND CO IN STETRUCTIONS CONS
WALLS FLOORS BALCONIES BEAMS COLUMNS TRUSSES
CERTIFICATES AND SYSTEMS ISO 9001, ISO 14001 - ENVIRONMENTAL AND QUALITY MANAGEMENT SYSTEMS
n! soo ing 1 Com 4500
ISO
WELL - CERTIFICATION STANDARD FOR ADVANCING HUMAN HEALTH AND WELLBEING IN BUILDINGS, SWEDEN
OHSAS 18001 - OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEMS
NORSOK - QUALITY STANDARDS BY THE NORWEGIAN PETROLEUM INDUSTRY
ACHILLES - SUPPLIER EVALUATION AND ASSESSMENT SYSTEM, UNITED KINGDOM
EPD - ENVIRONMENTAL PRODUCT DECLARATION
CONSTRUCTIONLINE SUPPLIER ASSESSMENT AND CONTROL SYSTEM, THE UNITED KINGDOM NEW
ONE CLICK LCA – PRODUCT LIFECYCLE CALCULATION PROGRAMME (INCLUDING CO2)
SSIP – SAFETY SCHEMES IN PROCUREMENT, THE UNITED KINGDOM
BYGGVARU BEDÖMNINGEN - PRODUCT REGISTRATION AND ASSESSMENT SYSTEM FOR CONSTRUCTION PRODUCTS, SWEDEN
NEW
STARTBANK - SUPPLIER EVALUATION AND ASSESSMENT SYSTEM, NORWAY NULL CO2 – SUSTAINABLE BUILDING CERTIFICATION SYSTEM, SWEDEN
BASTA - PRODUCT REGISTRATION AND ASSESSMENT SYSTEM FOR CONSTRUCTION PRODUCTS, SWEDEN
NEW
BREEAM - SUSTAINABLE BUILDING CERTIFICATION SCHEME, INTERNATIONAL
SUNDA HUS - PRODUCT REGISTRATION AND ASSESSMENT SYSTEM FOR CONSTRUCTION PRODUCTS, SWEDEN CONSTRUCTION MATERIAL REGISTRATION AND ASSESSMENT SYSTEM, NORWAY
MILJOBYGGNAD - SUSTAINABLE BUILDING CERTIFICATION SCHEME, SWEDEN
NEW
PRODUCT XCHANGE - PRODUCT REGISTRATION AND ASSESSMENT SYSTEM FOR CONSTRUCTION PRODUCTS, NORWAY
LEED - SUSTAINABLE BUILDING CERTIFICATION SCHEME, INTERNATIONAL NORDIC SWAN – NORDIC ECO LABEL/ SUSTAINABLE BUILDING CERTIFICATION SYSTEM
NEW
FUTURE BUILT - GREEN CONSTRUCTION SYSTEM IN NORWAY
NEW
2020
w w w. u p b . e u . c o m Distribution, copying, editing, preservation, archiving and complete or partial publishing without the written permission of UPB AS is prohibited.
GLASS
STEEL
CONCRETE
ENERGY
MACHINERY
INDUSTRY 4.0