Asa Build Portfolio

Page 1

ASA BUILD Portfolio 2018-2020



ASA BUILD

about us ASA BUILD āsā : (f.) wish; desire; hope; longing. We are a contractor that has been established since 2007 and has worked on more than 50 residential construction projects in Jabodetabek. In carrying out projects we are able to collaborate with architects or independently, because we have a team that is experienced in the construction field.

01


ASA BUILD

our specialization

design & build

renovation

furniture

Provides new residential construction services on a vacant lot.

Provides total and partial building renovation services.

Provides manufacturing and installation services for built in furniture such as kitchen sets, wardrobes, etc.

contact us infoasabuild@gmail.com 08877771727 Jakarta 02


ASA BUILD

our projects 5 Tankus House Tanah Kusir, Jakarta Selatan

9 LA House Lenteng Agung, Jakarta Selatan

13 DS House Duren Sawit, Jakarta Timur

17 Aries House Taman Aries, Jakarta Barat

19 R House Rempoa, Tangerang Selatan

22 Furniture Jakarta

03


ASA BUILD

new constructions projects 5 Tankus House Tanah Kusir, Jakarta Selatan

9 LA House Lenteng Agung, Jakarta Selatan

12 DS House Duren Sawit, Jakarta Timur

04


ASA BUILD Tankus House

01 Project Description. Tankus House is a residential construction project located in Tanah Kusir which was completed in eight months. The initial process of this residential planning starts with the design by Mr. Hendra as the architect. This residence has a land area of 120 m2 and a building area of 300 m2, consisting of three floors with four bedrooms and four bathrooms.

Tankus House Overview

Client

Location

Area

New house construction, 2020

Pak Aris

Tanah Kusir, Jakarta Selatan

120 m2

05


ASA BUILD Tankus House

Construction Process The Tankus House construction process took approximately eight months

Before and after picture of Tankus House after 1,5 months 0-8 Months Progress 1 Site preparation, foundation and concrete casting, structural reinforcement, brick masonry work

06

Progress 2 Ceramic installation on the house interior

Progress 3 Finishing process


Finishing Process Finishing process of Tankus House starts in six months, and consists of installing tiles, frames, stair railings, window and door frame, painting and exterior finish.

2 1

1 2 3 4

Textured cement finishing on the exterior walls Tiles installation on the stairs Doors and windows frame made of aluminium Stair railing using steel bar

3

4

07


Completed in 2020 1

2

2 3 4 5

1

08

3

4

Balcony railings made of steel and perforated steels Canopy made of steel with structural support cables Textured concrete finish Laundry drying area Aluminium window frame

5


ASA BUILD LA House

02 Project Description LA House is a residential construction project in Lenteng Agung with an area of 140 m2. The process of building this residence takes approximately eight months. This residence consists of two floors, carport for two cars, with four bedrooms, and 3,5 bathrooms. The interesting aspect about this house is the use of wooden texture cladding and clay ventilation bricks.

LA House Overview

Client

Location

Area

New house construction, 2020

Pak Danny

Lenteng Agung, South Jakarta

140 m2

09


ASA BUILD LA House

Construction Process The LA House construction process took approximately eight months

Before and after picture of LA House after two months Progress 1 Site preparation, foundation and concrete casting, structural reinforcement

10

Progress 2 Brick masonry work

Progress 3 Cement plaster application

Progress 4 Tile roof installation


1

2

Completed in 2020 1 2 3 4

The use of wood pattern tile on the facade The facade lighting using philips outdoor spotlight Aluminium window frame Using clay ventilation bricks as the facade variation

3

4

11


Completed in 2020 1 2

1

12

3 4 5

2

3

4

5

Stairs using wooden parquet and hollow iron railing Shadowline ceiling made of gypsum Aluminium window frame Clay ventilation bricks Vinly flooring


ASA BUILD DSHouse

03 Project Description. DS House is a residential construction project in Duren Sawit covering an area of 200 m2. The construction process was completed in ten months. This residence consists of two floors with five bedrooms, four bathrooms, and carport for two cars.

DS House Overview

Client

Location

Area

New house construction, 2018

Pak Donny

Duren Sawit, Jakarta Timur

200 m2

13


ASA BUILD DSHouse

Construction Process The DS House construction process took approximately ten months

Before and after picture of DS House after four months Progress 1 Site preparation, foundation and concrete casting, structural reinforcement

14

Progress 2 Brick masonry work,

Progress 3 Roof truss installation

Progress 3 Exterior wall coating and cladding process


1

Completed in 2019 1 2 3

The use of stone wall cladding on the exterior facade Floating staircase with vertical railings Wooden fence with metal frame

2

3

15


renovation projects 16 Aries House Taman Aries, Jakarta Barat

20 R House Rempoa, Tangerang Selatan

16


ASA BUILD Aries House

01 Project Description. Aries House is a residential renovation project in Taman Aries, West Jakarta. The renovation consists of adding floors to existing building, new roof construction and painting the facades. It was completed in four months.

Aries House Overview

Client

Location

Renovation project, 2020

Ibu Winny

Taman Aries, Jakarta Barat

17


Completed in 2020 1 2

1 2

18

Slanted roof as the statement of this house Vertical wall cladding creating a pattern on the facade


ASA BUILD R House

03 Project Description. Landscape and facade remodelling project in Rempoa, South Tangerang. This project was completed in three months. In addition to working on the facades (includes painting) and garden construction, roof tiles were installed on the walls around the house.

R House Overview

Client

Location

Landscape and facade renovation, 2020

Pak James

Rempoa, Tangerang Selatan

19


Construction Process 1

5

2

3

1 Progress 1

4

Landscape renovation, finishing and painting

2 Progress 2

Canopy construction made of concrete and installing double-skin facade made of hollow iron

20


ASA BUILD R House

Completed in 2020 1

2

Facade remodelling (double skin construction using hollow metal, adding concrete canopy) The installation of rooof tiles around the walls using wooden structures.

1

2

21


ASA BUILD

furniture Built in furniture. We provide services for the manufacture and installation of various types of furniture such as kitchen sets, cabinets, storage, dining tables and chairs, etc. Made by using a variety of materials, such as multiplex (taco finishing), hpl, teak, mahogany, etc.

22


Kitchen Set 1

2

Cabinet made from plywood laminated with Taco Sheet, kitchen countertop and backsplash covered with homogeneous tile, cooker hood Modena, sink Toto, stove Rinnai. Cabinet made from plywood laminated with Taco Sheet, marble kitchen countertop, backsplash covered with homogeneous tile, lazy susan (rotating tray) inside the cabinet, cooker hood Teka, sink Toto, stove Rinnai.

1

2

23


Storage 1

2 3

1

24

2

3

Sink vanity (sink Toto, vanity using plywood with tacosheet finishing) Bed storage (plywood finishing hpl) Wardrobe (plywood finishing hpl)



ASA BUILD infoasabuild@gmail.com 08877771727 Jakarta


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.