Asher Paxton Work Sample
1
1
Hand Models 4-7 Photoshop 8-13 Illustrator 14-23 Sketching 24-27 Rendering 28-37 Rendering / CAD 38-45
2
4-7
8-13
14-23
TERRACE 3.2m x 3.6m
POOL 2.5 x 6.6m
BANQUET 6m x 6.3m
TERRACE 3m x 7m BAR 1.6m X 3.2m
KITCHEN & FOOD PREP 3.6m X 4m MEDIA ROOM 3m x 6.4
LIVING ROOM 8m x 7m
CORRIDOR 1.2m x 5.8m
LIFT 2.1m X 2.2m
MAID
p
PWDR
KITCHEN
CLOSET DINING 3m x 6m
re
no.
28-37
38-45
N
24-27
0
100 0
500 0
NO
10000
Millimeters
1
MAIN LEVEL PLAN SCALE: 1 : 100
M
P
3
3 3
HAND MODELING This section is a representation of modeling and hand crafting skills that I have. The model above was created to fit within a larger site model and was made entirely out of basswood. 1mm basswood sheets were laser cut for topography and each building mass was hand chiseled to its current form. The model to the right was created for an HOA design review in a Las Vegas neighborhood. It was constructed from an existing revit model. The site was laser cut out of cork and the building masses and forms from basswood. A box was constructed to fit the model in a carry on sized box so someone could fly with it. The gifts below are examples of the handmade tokens that were given to fellow interns upon leaving at the end of their term. They had special significance to each person’s backgrounds and personalities.
4
Tai Po Site Model
Site Model Created from Revit modeling Olson Kundig Internship Tai Po: Solo construction - tips from Scott Valoria Las Vegas: Solo construction - working with Josh Aylett Intern gift: Worked with other interns on all projects. The Blue Tape cutter was designed and built by Jonnie Nelson.
Las Vegas Residence
Site Model created for HOA design review
5
Intern Gifts
Recipie Box / Drawing Paper Holders
6
Intern Gifts
Blue Tape Cutter
7
PHOTOSHOP This section is a culmination of photoshop work that I have done in my last year of internships. All of these graphics were completed for separate marketing purposes to tell a story about how the building was renovated, constructed, or thought of. Each Site plan works with multiple layers to focus the viewer on the subject at hand, be it the context of the building, the location on a site or the part of the structure that was renovated.
Mr. Steam Marketing Render
Graphical description of renovation
Olson Kundig Internship Mr Steam: Marketing drawing completed with Mackenzie Cotters and Evan Harlan WSU: Marketing drawing completed with Mackenzie Cotters and Evan Harlan
CCY Internship Aspen Residence: Marketing Drawings completed with Nicole Kinsler and Simon Elliot
8
Mr Steam Site Plan
Site Plan marketing drawing
9
Mr Steam Vicinity Map Brooklyn New York
10
WSU Museum of Art Site Plan Creation
11
Aspen, CO Residence Third floor winter floorplan
12
Aspen, CO Residence
Second floor winter floorplan
13
ILLUSTRATOR A culmination of marketing and illustrator drawings that I did in my last year on Co-Op. Many of these drawings are an export from a 3D modeling program like Rhino, Revit or Sketchup and the linework is edited, colored and finished in Illustrator. The weather diagram was created to show wind, sun, and temperature ratings in Coco Point, Barbuda. The floorplans were created from a Revit to Illustrator export. The mountain illustration and icons were created for a presentation I did during my internship at Olson Kundig.
WSU Museum of Art
Reference image / Photoshop of new sky
Olson Kundig Internship WSU : Supervised by Mackenzie Cotters and Evan Harlan Mr Steam: Supervised by Mackenzie Cotters & Evan Harlan Presentation: Solo Design and work
CCY Internship Squaw Valley: Supervised by Nicole Kinsler Music Box: Supervised by Evan Barrett Montana Resort: Supervised by Jenny Narrod
14
WSU Museum of Art
Structural Exploded Axon Drawing
15
1 2 3 4 5 6 7 8
8
5
6
4
7
4
Second Floor Plan
3
4
Reception Waiting Area Workspace Offices Show Room Conference Room Kitchen Collaborative Space
2
1
Scale: 1/16” = 1’-0”
Mr Steam Floorplan
Marketing Drawing - Floorplan for publishing
16
Squaw Valley Proposal - Design Intent Diagram Drawing description of three key design intents for marketing
17
Wind and Sun Diagram Development proposal
18
Music Box Facade Diagram
Facade detail diagram done in Rhino and Illustrator
19
Montana Resort Unit Floorplans Floorplan edits from Revit to illustrator
20
Montana Resort Unit Floorplans Floorplan edits from Revit to illustrator
21
Presentation Landscape Graphic Intern Presentation Illustrator Art
22
Presentation Icons
Intern presentation descriptor icons
23
SKETCHING A compilation of sketches from various levels of the design process. A couple of random sketches from presentations that I was watching, A few from the design process on a water’s edge design, some sketches of a prototype house for a development and other random sketches here and there.
Presentation Sketches
WSU Experimental Gallery sketch Sketching Credits: All sketches done by me Barbuda Development sketches done in conjunction with Justin Ping, Matt Quall, Rich Carr and others at CCY Architects.
24
Sketchbook sketches at Olson Kundig
Just thinking about things and drawing them on paper...
25
California Resort Sketch Water’s edge sketch
26
Development Site Plan sketches Prismacolor, Pen, and Marker
27
RENDERING An array of renderings mainly from Lumion and a few from VRAY and Enscape. All lumion renders were exports from sketchup or Revit. Upon each learning experience in Lumion I learned something new. About how to populate the scene with trees, import realistic people, use appropriate skies or create an aesthetically pleasing ambiance in a scene. These renderings range in style and project type, and were done at two of the firms I have worked at in the last two years.
Telluride, CO Residence Lumion Rendering
CCY Internship Telluride: Supervised by Simon Elliot California Resort: Supervised by Matt Quall Montana Resort: Supervised by Jenny Narrod Squaw Valley: Supervised by Todd Kennedy
JJCA Internship Belmont: Supervised by Halie Chandler Ensworth: Supervised by Steven Reutter
28
Telluride, CO Residence Lumion Rendering
29
California Resort Rendering Lumion export from Revit
30
California Resort Rendering Lumion export from Revit
31
Behavioral Healthcare Center Rendering Lumion Rendering from Revit Export
32
Behavioral Healthcare Center Rendering Lumion Rendering from Revit Export
33
Ensworth Academy Renovation Rendering Lumion export from Sketchup and Revit
34
Ensworth Academy Renovation Rendering Lumion export from Sketchup and Revit
35
Montana Resort Winter Render Photoshop, Lumion and Illustrator
36
California Resort Rendering Lumion, Photoshop and Revit
37
Tai Po, Hong Kong
HKRI - Tai Po Town - House D North
project:
TERRACE 3.2m x 3.6m
POOL 2.5 x 6.6m
BANQUET 6m x 6.3m
TERRACE 3m x 7m BAR 1.6m X 3.2m
KITCHEN & FOOD PREP 3.6m X 4m MEDIA ROOM 3m x 6.4
LIVING ROOM 8m x 7m
CORRIDOR 1.2m x 5.8m
LIFT 2.1m X 2.2m
principal architect KK
MAID
project manager RJ
PWDR
KITCHEN
drawn by SV, SC
Author checked by Checker
CLOSET
job no. 17073
DINING 3m x 6m
date 09/19/2018
revisions:
no.
N
0
100 0
500 0
Millimeters
1
date
by
NOT FOR CONSTRUCTION
10000
CONCEPT DESIGN
MAIN LEVEL PLAN
09/19/2018
SCALE: 1 : 100
MAIN LEVEL PLAN
P2.10
REVIT / CAD All of these projects were produced in Revit. I have over 3 years of experience in Revit - through School, offices and my own personal work. Each of these drawings are unique in their own way, from the presentation floorplan above, the material elevations to the right, to the Photoshopped Site plan on the next spread. Any of these CD’s are available at a larger scale upon request. The drawings on the last couple of pages were created for charette books that helped clients visualize their spaces material pallet, site context and future space.
Tai Po Development
Revit Design Floorplans
Olson Kundig Internship Tai Po: Supervised by Scott Valoria / Bob Jakubik Dallas Retail: Supervised by Chris Gerrick 555 NYC Condos: Supervised by Clay Anderson Charette Books: Supervised by Jerry Garcia
CCY Internship Telluride : Supervised by Simon Elliot
38
Telluride, CO Residence Revit Material Elevations
39
03-19-2019
Telluride, CO Site Plan
Revit / Photoshop / Illustrator
40
ROOF LEVEL 6
ROOF LEVEL 6
LEVEL 4
LEVEL 4
110200 mm
110200 mm
LEVEL 3
LEVEL 3
106800 mm
106800 mm
Tai Po, Hong Kong
LEVEL 5
113600 mm
HKRI - Tai Po Town - Towers 5-10
117200 mm mm 117000
LEVEL 5
113600 mm
project:
Tai Po, Hong Kong
project:
1 A4.00
HKRI - Tai Po Town - Towers 5-10
117200 mm mm 117000
ROOF
117200 mm
3600 mm
LEVEL 6
LEVEL 2
LEVEL 2
103400 mm
103400 mm
117000 mm
LEVEL 5
3400 mm
113600 mm
MAIN LEVEL
MAIN LEVEL
100000 mm
100000 mm
T7 - REENTRANT NORTH 2
5
T7 - REENTRANT NORTH 1
4
SCALE: 1 : 100
SCALE: 1 : 100
LEVEL 4
3400 mm
110200 mm
LEVEL 3
3400 mm
106800 mm ROOF LEVEL 6
ROOF LEVEL 6
117200 mm mm 117000
LEVEL 2
ROOF LEVEL 6
117200 mm mm 117000
117200 mm mm 117000
principal architect KK
LEVEL 5
LEVEL 5
LEVEL 5
principal architect KK
project manager RJ
113600 mm
113600 mm
113600 mm
project manager RJ
drawn by SV
100000 mm
drawn by SV
Author
Author
checked by XX
checked by Checker
job no. 17073 date 08/29/2018
T8 - GARDEN ELEVATION
T7 - GARDEN ELEVATION
LEVEL 4
LEVEL 4
LEVEL 4
110200 mm
110200 mm
110200 mm
job no. 17073 date 08/29/2018
revisions:
no.
revisions:
date
LEVEL 3
LEVEL 3
LEVEL 3
106800 mm
106800 mm
106800 mm
LEVEL 2
LEVEL 2
LEVEL 2
103400 mm
103400 mm
103400 mm
MAIN LEVEL
MAIN LEVEL
MAIN LEVEL
100000 mm
100000 mm
100000 mm
by
no.
NOT FOR CONSTRUCTION
date
DESIGN DEVELOPMENT
08/29/2018
08/29/2018
T7-T8 - EXTERIOR ELEVATIONS GARDEN
3
T7 - REENTRANT EAST
2
SCALE: 1 : 100
T7 - REENTRANT SOUTH
T7 - EXTERIOR ELEVATIONS REENTRANT
T7 - REENTRANT WEST
1
SCALE: 1 : 100
SCALE: 1 : 100
A3.00
2
7.A
project:
8.A
8.1
8.2
8.E
7-8
8-11
A3.00
A3.00
1
1
8.A
8.A
Tai Po, Hong Kong
8-11
HKRI - Tai Po Town - Towers 5-10
8.E
A3.00
B
8.2
8.E
8.2
8-11
8.1
7.A
8.A
7.A
8.A
project:
7-8
7-8
1
A1
7.5 A3.00
1 A4.00
B
7.3
7.2
A3.02
A1
7.1
by
NOT FOR CONSTRUCTION
DESIGN DEVELOPMENT
Tai Po, Hong Kong
MAIN LEVEL
HKRI - Tai Po Town - Towers 5-10
3400 mm
103400 mm
1
2
A3.03
A3.02
A3.03
2
5
7-8
A3.03
2
8.E
A3.03
1
8.B
8.B A3.03
7-8
A3.03
3
8-9
4
5
8-9
3
A3.03
8-9
4
5
7.C
8-11 8.B
A3.03
7-8
A3.03 A3.03
8.C
8.F
7.B
8.B
7.B 1
A3.03
A3.03
4
7.C
A3.03
8.B 8-11
3
D
1
8.F
A3.03
8.F
5 A3.02
6-7
1200
2 A3.03
7.B
6.4
D
A3.02
7.C
8.C
8.C
8.C
A
A
C
project manager RJ
C
principal architect KK
principal architect KK project manager RJ drawn by SV
drawn by SV
Author
Author
checked by Checker
checked by Checker
7.D
job no. 17073
7.D
8.D
date 08/29/2018
8.D
7.D
job no. 17073
8.D
date 08/29/2018
revisions:
revisions:
7.4
6.4
8.1
8.2
8.2 8.F
8.F
8.1 1
6.4 2 A3.01
no.
date
8.1
8-9
6.4
_T6-T9 - OVERALL PLAN - 01 MAIN LEVEL
no.
2
_T8 - 02 Upper Level Plan
1
SCALE: 1 : 100
_T8 - 01 Main Level Plan
DESIGN DEVELOPMENT 08/29/2018
N 0
7.1
7-8
1 A4.00
7.2
7.3
7.5
1
7-8
1125 mm
A3.00
1
A3.02
3
1
7.A
7.A 8.A
A3.02
3
A3.02
C
A
1
project:
7.A
C
A
2
A3.03 4
A3.03
7.B
5 1
A3.02
6-7
A3.03
A3.03
A3.03
A3.02
7.B
4 A3.02
4
7.B
5 1
A3.02
6-7
3
1200
2
7.C
8.B
A3.03
7-8
A3.03
A3.02
A3.03
5
D
2
T8 - MAIN & UPPER PLANS
A2.12
A3.02
2
A3.02
10000
project:
7.5 A3.00
500 0
Tai Po, Hong Kong
7.3
100 0
Millimeters
HKRI - Tai Po Town - Towers 5-10
1 A4.00
7.2
by
date
NOT FOR CONSTRUCTION
SCALE: 1 : 100
08/29/2018
A2.01
7.1
A3.01
8.F
DESIGN DEVELOPMENT
OVERALL PLAN MAIN LEVEL
SCALE: 1 : 100
8.2
by
NOT FOR CONSTRUCTION
1
8-9
8.D 8-9 1 A3.01
Tai Po, Hong Kong
7.2
HKRI - Tai Po Town - Towers 5-10
6-7
A3.03
3
A3.03
5
D
4
7.C
8.C
7.C 8.C
A1
B
A1
B
principal architect KK
principal architect KK
project manager RJ
project manager RJ drawn by SV
drawn by SV
--
Author
checked by Checker
checked by Checker
job no. 17073
job no. 17073
date 08/29/2018
date 08/29/2018
7.D
7.D 8.D
1125 mm
7.D
6-7
8.1
6-7
2
7.2
_T7 - 02 Upper Level Plan SCALE: 1 : 100
7.4
7.2
7.4
6.4
8.1
6.4
no.
1
revisions:
revisions:
_T7 - 01 Main Level Plan SCALE: 1 : 100
date
no.
by
NOT FOR CONSTRUCTION
DESIGN DEVELOPMENT
DESIGN DEVELOPMENT
08/29/2018
08/29/2018
2 N 0
100 0
Millimeters
500 0
10000
by
date
NOT FOR CONSTRUCTION
ROOF CONSTRUCTION DETAIL SCALE: 1 : 10
1
DECK CONSTRUCTION DETAIL SCALE: 1 : 10
T7 - MAIN & UPPER PLANS
DETAIL SECTIONS
A2.10
A4.10
Tai Po Construction Documents Floorplan, Elevation and Detail work
41
41
EXTERIOR WINDOW SCHEDULE DIMENSIONS (ROUGH OPENING) WIDTH HEIGHT
MARK ORIENTATION
1 2 3 4 5 6 7
NORTH SOUTH SOUTH SOUTH SOUTH SOUTH SOUTH
20' - 7" 3' - 8" 3' - 5" 3' - 8" 3' - 8" 3' - 5" 3' - 8"
13' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0"
AREA
FRAME FINISH
268 SF 33 SF 31 SF 33 SF 33 SF 31 SF 33 SF 461 SF
GLASS TYPE
STEEL/ALUMINUM STEEL/ALUMINUM STEEL/ALUMINUM STEEL/ALUMINUM STEEL/ALUMINUM STEEL/ALUMINUM STEEL/ALUMINUM
INSULATED - LOW E INSULATED - LOW E INSULATED - LOW E INSULATED - LOW E INSULATED - LOW E INSULATED - LOW E INSULATED - LOW E
FRAME TYPE
FINISH
PANEL
STEEL - ALUMINUM STEEL - ALUMINUM STEEL - ALUMINUM
GLASS GLASS GLASS
FRAME
PAINTED PAINTED PAINTED
project:
1 3/4" 2" 2"
3'-8"
3'-5"
3'-8"
3'-8"
3'-5"
3'-8"
2
3
4
5
6
7
DALLAS, TEXAS 75226
DIMENSIONS HEIGHT THICKNESS
WIDTH
2626 MAIN STREET
WINDOW SCHEDULE - PIVOT DOORS MARK
MAIN LEVEL PLAN 100.1 5' - 8 41/128" 9' - 6 3/4" 100.2 11' - 7" 20' - 5" 100.3 13' - 0" 15' - 7" Grand total: 3
(E) HEADER
9'-0"
113' - 0"
MAIN LEVEL PLAN
100' - 0"
4
SOUTH - EMPLOYEE ENTRANCE SCALE: 1/4" = 1'-0"
principal architect KM, TK project manager CG, MC drawn by CG
20'-5"
15'-6"
(E) HEADER
113' - 0"
113' - 0"
13'-0"
11'-7"
1
100.1
Sim
MAIN LEVEL PLAN
MAIN LEVEL PLAN
100' - 0"
100' - 0"
1 A8.00
9'-9"
8'-3"
13'-0"
revisions:
1'-6"
13'-0"
Sim
date 10/9/2018
3'-3"
3'-3"
3'-3"
(E) HEADER
113' - 0"
100.2
9'-9"
job no. 18061
7 EQ PANELS
(E) HEADER
100.3 1 A8.00
checked by QC
20'-7"
8 EQ PANELS
6 EQ PANELS
1
10/17/2018
no. MAIN LEVEL PLAN
100' - 0"
SD PRICING
date
by
NOT FOR CONSTRUCTION SCHEMATIC DESIGN
3
EAST - STOREFRONT - PIVOT DOOR
2
SCALE: 1/4" = 1'-0"
NORTH - STOREFRONT - PIVOT DOOR
1
SCALE: 1/4" = 1'-0"
10/9/2018
NORTH - STOREFRONT SCALE: 1/4" = 1'-0"
1
WINDOW SCHEDULE
A0.20
2
A
3
ROOF LEVEL 119'- 0"
WIRE ROPE SHEAVE TRANSOM WINDOW IN OPEN POSITION WIRE ROPE SHEAVE
project:
COUNTERBALANCE IN LOWEST POSITION
CONTROL DRIVE WHEEL AND GEARBOX TURNS REQUIRED TO FULLY OPEN: APPROX. 30-40 OPENING SEQUENCE DURATION: APPROX. 30-40 SECS.
DALLAS, TEXAS 75226
(E) BRICK WALL ABOVE
PIVOT WINDOW IN OPEN POSITION
MAIN OPERABLE PIVOT WALL
2626 MAIN STREET
3 A8.01 OPERABLE TRANSOM COUNTERBALANCE WEIGHT ON WALL MOUNTED GUIDE TRACK
LINK ARM MAIN PANEL MOTION SEQUENCE MAIN PIVOT WALL PICKUP BRACKET AND PIVOT
1'-6"
1'-6"
BENCH
BENCH
1'-6"
PIVOT DOOR - INTERIOR ELEVATION
2
SCALE: 1/2" = 1'-0"
20'-0"
5'-9 3/4"
2 A8.00
A
RETAIL
1
100
B
job no. 18061 date 10/14/18
To operate the window wall, an approved user will unlock the gearbox with a key and then begin turning the handwheel. The upper transom will start to move first, enabling the user to vent the window without opening the main panel. After the transom has opened to a predetermined angle the main panel will begin to open. Continued rotation of the handwheel will open both transom and main panel to their fully open positions. If the operator releases the handwheel at any point during the opening or closing sequence, the window wall and drive mechanism will immediately stop and hold its position regardless of anticipated maximum wind conditions. An alternate mechanism design could create an operation sequence where the upper transom fully opens before the main window wall panel begins to move.
revisions:
1
PIVOT DOOR - PLAN SCALE: 1/2" = 1'-0"
The fabrication and installation of the window wall will be performed per the General Conditions of the Contract and per applicable sections of the project specifications. The fabricator will assume delegated responsibility for all aspects of the window wall's final design and engineering for all included system components, as well as for operation, safety, structure, and finish. The fabricator will coordinate with the manufacturer of the storefront window system to verify that adequate support is provided by the operable window frames for the storefront system throughout all aspects of the operable window wall's movements. A report prepared by a licensed structural engineer will be submitted to demonstrate that all aspects of the window wall and its drive mechanism have been designed to accommodate the loads and service that they will experience for its operational lifetime. The fabricator will coordinate with the Architect to communicate structural impact of the door on the supporting building and to confirm compliance with the Architect's Design Intent. A written operation and maintenance manual and one-year minimum warranty will be submitted after project completion. Structural performance and engineering for the storefront system applied to the operable wall will be the delegated responsibility of the storefront system manufacturer and subcontractor.
10/17/2018 SD PRICING
no.
date
by
NOT FOR CONSTRUCTION SCHEMATIC DESIGN 10/9/2018
1 PIVOT WINDOW DRAWINGS
A8.00
project:
1
drawn by CG checked by QC
All components will be fabricated in steel and finished with a paint coating or other finish as specified. No electrical power is required. The fabricator will fully assemble and test the window wall to ascertain proper functioning and operation prior to delivery to the jobsite using adequate additional weight to simulate the storefront window system during testing.
A8.01
B
KM, TK
project manager CG, MC
A revolving handwheel of approximately 24 inches diameter is used to operate a wall mounted drive station gearbox. The drive station mechanism will be designed to sequentially operate the upper transom window and main door. It will fully open both panels with 30 to 40 revolutions of the handwheel. The drive station is located adjacent to the window wall opening so that the operator has continuous line of sight observation of the window wall though out its range of motion and to monitor for potential safety conflicts and obstructions. One person should be able to comfortably operate the window wall through the full range of opening and closing. 100.3
A8.01
principal architect
The main window wall panel will move with a path best described as a lift and pivot, ending in a horizontal position when fully open, extending outward from the face of the building like a canopy. The maximum projection of the panel from the face of the building is to be determined. The transom will pivot around a horizontal axis located midway down from its top edge. The main panel requires a counterbalance weight that is guided on a wall mounted track. It will weigh approximately one half the weight of the main door panel and its main purpose is to offset the door's weight, making it possible to manually open the door. A system of cables and pulleys connects the counterbalance weight to the main door. An aluminum storefront window system provided and installed by others will be fastened to the exterior faces of the main window wall panel and upper transom vent.
A
2
SCALE: 1/2" = 1'-0"
This operable window wall consists of four parts including 1. A steel frame lower main window wall panel 2. A steel frame upper transom vent 3. A counterbalance system for the main window wall panel 4. A manually operated drive mechanism
3
100.1
PIVOT DOOR - SECTION
Montgomery Dallas Operable Window Wall Operational Narrative
100.2
2
MAIN LEVEL PLAN 100'- 0"
1'-6"
2
2626 MAIN STREET
3
1'-0"
DALLAS, TEXAS 75226
1ST FLOOR
3 principal architect
KM, TK
project manager CG, MC drawn by CG
(E) BRICK OVERHEAD CLERESTORY WINDOW WALL
checked by QC job no. 18061
LINK ARM
3 4"
STL. JAMB
date 10/14/18
LINK ARM
A
COUNTERBALANCE HOUSING
revisions:
STL. COL. PER STRUCT. STRUCT. WINDOW FRAME ROLLER PIVOT BRACKET ARCH. CLOSURE, TBD.
1 no.
ROLLER TRACK
10/17/2018 SD PRICING date
by
NOT FOR CONSTRUCTION
(E) MASONRY, CHANNEL CUT FOR STRUCT. COL.
SCHEMATIC DESIGN 10/9/2018
INPUT DRIVE GEARBOX
1 3
PIVOT DOOR - CLERESTORY HEAD SCALE: 1-1/2" = 1'-0"
2
PIVOT DOOR - PLAN FRONT SCALE: 1-1/2" = 1'-0"
1
PIVOT DOOR - PLAN CORNER SCALE: 1-1/2" = 1'-0"
PIVOT WINDOW DETAILS
A8.01
Dallas, TX Retail
Shop Drawings of Pivot Door
42
OWNER:
OWNER:
RELATED COMPANIES
RELATED COMPANIES
COLUMBUS CIRCLE, 19TH FLOOR NEW YORK, NY 10023 TEL.: 212.801.1000
COLUMBUS CIRCLE, 19TH FLOOR NEW YORK, NY 10023 TEL.: 212.801.1000
EXECUTIVE ARCHITECT:
2BR B
2BR C
SLCEArchitects
1359 BROADWAY NEW YORK, NY 10018 TEL.: 212.979.8400
2258 SF 3BR D
54 SF
DESIGN ARCHITECT:
LIVING / DINING BEDROOM 1
LIVING / DINING
MASTER BATH
KITCHEN
AV
KITCHEN
BATH 1 KITCHEN
POWDER
POWDER POWDER
FOYER
MASTER BATH
POWDER
FOYER
FOYER
MASTER BATH
MASTER BATH
BEDROOM 2 COATS
LAUNDRY / MUD ROOM
MASTER BEDROOM
BEDROOM 1
14'-0"
WSP USA Buildings Inc. One Penn Plaza, 2nd Floor New York, NY 10019 (212) 465-5000 www.wsp.com
MASTER BEDROOM
LIVING + DINING
MASTER BEDROOM
LIVING + DINING
GEOTECHNICAL ENGINEER:
14 PENN PLAZA - 225 WEST 34TH STREET NEW YORK, NY 10122 TEL.: 917.339.9300
BATH 1
BATH 1
BEDROOM 2
BEDROOM 1
15'-0"
VIDARIS, INC
W/D
10 SF
10 SF
BUILDING ENVELOPE CONSULTANT:
VIDARIS, INC
177 SF
5'-1"
UNIT C
7'-0" 3'-6"
11TH AVENUE
KITCHEN 371 SF
UNIT D
FOYER 75 SF
MASTER BATH
UNIT E
151 SF
4'-0"
190 SF
5 REGENT STREET LIVINGSTON, NJ 07039 TEL.: 973-994-9220
DINING
13'-3"
LIVING
ELEVATOR CONSULTANT:
36 SF
15'-11"
26'-4"
5 REGENT STREET LIVINGSTON, NJ 07039 TEL.: 973-994-9220
CL 1
CL 1
MASTER BEDROOM
360 PARK AVENUE SOUTH NEW YORK, NY 10010 TEL.: 212.689.5389
POWDER
3'-6"
ELEVATOR CONSULTANT:
796 SF 1BR E
FCU BEDROOM 1
360 PARK AVENUE SOUTH NEW YORK, NY 10010 TEL.: 212.689.5389
818 SF 1BR F
14 PENN PLAZA - 225 WEST 34TH STREET NEW YORK, NY 10122 TEL.: 917.339.9300
5'-1"
CL 2
MASTER BEDROOM
AV 9 SF
BUILDING ENVELOPE CONSULTANT:
MASTER BEDROOM
BEDROOM 1
SLCE COORDINATE COLUMN LOCATION WITH GLAZING
MEP ENGINEER:
71 SF 7'-4"
CL 2
BATH 2
CL 1
4'-1 1/2"
KITCHEN
FOYER
W/D
BATH 1
1972 SF 2BR D
KITCHEN
6'-4"
IS THERE A COLUMN AT THIS LOCATION?
BATH
15'-0"
GEOTECHNICAL ENGINEER:
POWDER BATH 2
WSP USA Buildings Inc. One Penn Plaza, 2nd Floor New York, NY 10019 (212) 465-5000 www.wsp.com
177 SF
WSP USA Buildings Inc. One Penn Plaza, 2nd Floor New York, NY 10019 (212) 465-5000 www.wsp.com
CL 1
CL 1 CL 1
KITCHEN
STRUCTURAL ENGINEER:
BEDROOM 2
MEP ENGINEER:
MASTER BATH COATS
LINEN
COATS
LAUNDRY / MUD ROOM
COATS
W/D
LIVING / DINING
POWDER
FOYER
COATS FOYER
W/D
159 SOUTH JACKSON STREET, SUITE 600 SEATTLE, WA 98104 TEL.: 206.381.6527
1'-6"
WSP USA Buildings Inc. One Penn Plaza, 2nd Floor New York, NY 10019 (212) 465-5000 www.wsp.com
KTICHEN
CONTEXT PLANS IN PROGRESS DO NOT REVIEW
W/D FOYER
FOYER
POWDER
460 WEST 34th STREET, NEW YORK, NY 10001 TEL (212) 967-5100 | FAX (212) 967-5588
Olson Kundig
4'-6"
1'-7 1/2"
FCU
LINEN
MASTER BATH
CL
MASTER BATH
STRUCTURAL ENGINEER:
KITCHEN
CL 1
BATH 1
PANTRY
INTERIOR DESIGN ARCHITECT:
147 SF
3'-0"
KITCHEN CL 1
13'-5"
FCU
DESIGN ARCHITECT:
MASTER BATHROOM
INTERIOR DESIGN ARCHITECT:
Olson Kundig 159 SOUTH JACKSON STREET, SUITE 600 SEATTLE, WA 98104 TEL.: 206.381.6527
BATH 1
KITCHEN
MASTER BEDROOM
LIVING + DINING
LIVING + DINING
LIVING / DINING
CL 2
BATH 1
13'-0"
FCU
ROBERT A.M. STERN ARCHITECTS, LLP 14'-10"
13'-8"
5'-4"
LIVING / DINING
LIVING / DINING
249 SF
460 WEST 34th STREET, NEW YORK, NY 10001 TEL (212) 967-5100 | FAX (212) 967-5588
MASTER BEDROOM
BEDROOM 1
8'-5 1/2"
BEDROOM 1
MASTER BEDROOM
7'-1"
MASTER BEDROOM
ROBERT A.M. STERN ARCHITECTS, LLP BEDROOM 1
1359 BROADWAY NEW YORK, NY 10018 TEL.: 212.979.8400
CL
5'-7"
2BR A
1553 SF
4'-10"
3BR A
674 SF
8'-3"
1025 SF
10'-7"
2BR B
2511 SF
9'-11"
2BR C
EXECUTIVE ARCHITECT:
SLCEArchitects
RELOCATED COLUMN 1384 SF
15'-11"
WEST 23RD STREET 1701 SF
COATS
MASTER BATH
16 SF
CL 2
2005 SF
BEDROOM 1
2BR E
DEPARTMENT OF BUILDINGS APPLICATION NUMBER:
DEPARTMENT OF BUILDINGS APPLICATION NUMBER:
XXX XXX XXX
W LAUNDRY / MUD ROOM D
BATH 1
BEDROOM 2
XXX XXX XXX
KITCHEN
LIVING / DINING
N FOYER
BATH 2
LEVEL 6-9 - UNIT D - PLAN
2
0
1'
2' 3'
4'
8'
12'
SCALE: 1/4" = 1'-0"
COATS POWDER KITCHEN
W/D
FCU
COATS
COATS
LIVING / DINING
BEDROOM 1
MASTER BEDROOM
FOYER
1165 SF 1BR F
CL 2
COLUMNS 13 & 125 RELOCATED
POWDER
1
BATH 1
BATHROOM
17-11-07
No: Date:
MASTER BATH
FOYER
BEDROOM
SD BACKGROUND
1
17-11-07
No: Date:
Revision:
SCALE:
CL 1
SD BACKGROUND
Revision:
SCALE:
COATS W/D CL 1
FCU LINEN
1BR G
2772 SF
FCU
POWDER SPARE ROOM
W
LAUNDRY / MUD ROOM
D
N
KEY PLAN:
3BR H
BATHROOM
LIVING / DINING / BEDROOM
KITCHEN
CL-1
N
KEY PLAN:
WEST 23rd STREET
WEST 23rd STREET
11th AVENUE
1055 SF
SLCE CONFIRM DOUBLE COLUMN LIVING / DINING
11th AVENUE
FOYER
KITCHEN
WEST 22nd STREET
31' - 0"AFF
WEST 22nd STREET
PROJECT:
WEST 22ND STREET
PROJECT:
555 W. 22nd Street
555 W. 22nd Street
New York, NY 0
2'
4'
6'
8'
16'
New York, NY
24'
TITLE:
1
TITLE:
LEVEL 3 PLAN SCALE: 1/8" = 1'-0"
SEAL & SIGNATURE:
SEAL & SIGNATURE:
SCALE: DATE:
SCALE:
July 27, 2018
DATE:
PROJECT No:
2016-44
PROJECT No:
2016-44
FILE No:
\DWGS\CD
FILE No:
\DWGS\CD
DRAWN BY:
CADD FILE No:
CHECKED BY: DWG No:
ID2.73
CADD FILE No:
OF
OWNER:
RELOCATED COLUMN 2837 SF
SLCE CONFIRM COLUMN SIZE AT LEVEL 9
3BR A
RELATED COMPANIES
EXECUTIVE ARCHITECT:
SLCEArchitects 1359 BROADWAY NEW YORK, NY 10018 TEL.: 212.979.8400
DESIGN ARCHITECT:
DESIGN ARCHITECT:
ROBERT A.M. STERN ARCHITECTS, LLP 460 WEST 34th STREET, NEW YORK, NY 10001 TEL (212) 967-5100 | FAX (212) 967-5588
MASTER BEDROOM
CL 2
BATH 2
CL 1
POWDER
WSP USA Buildings Inc. One Penn Plaza, 2nd Floor New York, NY 10019 (212) 465-5000 www.wsp.com
CONTEXT PLANS IN PROGRESS DO NOT REVIEW
W D
STRUCTURAL ENGINEER:
12'-4 1/2"
KITCHEN
LAUNDRY / MUD ROOM
AV
FOYER
Olson Kundig 159 SOUTH JACKSON STREET, SUITE 600 SEATTLE, WA 98104 TEL.: 206.381.6527
12'-2"
STRUCTURAL ENGINEER:
AV
FCU
PANTRY
MASTER BATH
DEN / BEDROOM 3
INTERIOR DESIGN ARCHITECT:
Olson Kundig 159 SOUTH JACKSON STREET, SUITE 600 SEATTLE, WA 98104 TEL.: 206.381.6527
10'-9"
BATH 1 LIVING / DINING
460 WEST 34th STREET, NEW YORK, NY 10001 TEL (212) 967-5100 | FAX (212) 967-5588
INTERIOR DESIGN ARCHITECT: LIVING / DINING
WSP USA Buildings Inc. One Penn Plaza, 2nd Floor New York, NY 10019 (212) 465-5000 www.wsp.com
MEP ENGINEER:
5'-8"
POWDER
MEP ENGINEER: 8'-5"
BEDROOM 2
ROBERT A.M. STERN ARCHITECTS, LLP
10'-9"
BEDROOM 1
KITCHEN
OF
COLUMBUS CIRCLE, 19TH FLOOR NEW YORK, NY 10023 TEL.: 212.801.1000
EXECUTIVE ARCHITECT:
SLCEArchitects 1359 BROADWAY NEW YORK, NY 10018 TEL.: 212.979.8400
2511 SF
4BR B
ID2.47
OWNER:
RELATED COMPANIES COLUMBUS CIRCLE, 19TH FLOOR NEW YORK, NY 10023 TEL.: 212.801.1000
WEST 23RD STREET
July 17, 2018
DRAWN BY:
CHECKED BY: DWG No:
MASTER BATH WSP USA Buildings Inc. One Penn Plaza, 2nd Floor New York, NY 10019 (212) 465-5000 www.wsp.com
FOYER BATH 3 CL-4
LINEN
COATS
LAUNDRY / MUD ROOM
GEOTECHNICAL ENGINEER:
CL 1
POWDER
BATH 2
CL
FOYER
BATH 1
22'-2"
16'-7"
11'-1"
CL 1
LINEN CLOSET
1'-6"
LINEN CLOSET
3'-11"
5 REGENT STREET LIVINGSTON, NJ 07039 TEL.: 973-994-9220
4'-9 1/2"
4'-6"
4'-5" 8'-2"
11TH AVENUE
MASTER BEDROOM
ELEVATOR CONSULTANT:
12'-2"
5 REGENT STREET LIVINGSTON, NJ 07039 TEL.: 973-994-9220
1'-6"
4'-0"
7'-2"
DOES COLUMN EXIST? NOT SHOWN IN STRUCT DWGS
CL 2
VIDARIS, INC 360 PARK AVENUE SOUTH NEW YORK, NY 10010 TEL.: 212.689.5389
21'-11"
ELEVATOR CONSULTANT:
BATH 1
BUILDING ENVELOPE CONSULTANT:
22'-2" 11'-1"
VIDARIS, INC 360 PARK AVENUE SOUTH NEW YORK, NY 10010 TEL.: 212.689.5389
12'-3"
MASTER BEDROOM
BEDROOM 1
14 PENN PLAZA - 225 WEST 34TH STREET NEW YORK, NY 10122 TEL.: 917.339.9300
12'-2"
BUILDING ENVELOPE CONSULTANT:
BEDROOM 2 COATS
13'-0"
LIVING / DINING
3'-10 1/2"
14 PENN PLAZA - 225 WEST 34TH STREET NEW YORK, NY 10122 TEL.: 917.339.9300
11'-5"
W/D
BEDROOM 1
1593 SF 2BR C
WSP USA Buildings Inc. One Penn Plaza, 2nd Floor New York, NY 10019 (212) 465-5000 www.wsp.com
3'-10 1/2"
GEOTECHNICAL ENGINEER:
W/D KITCHEN
4'-0"
MASTER BATH
12'-7"
11'-0"
3'-6"
11'-0"
11'-0"
12'-1"
CL 1
12'-1"
MASTER BATH
23'-10"
3'-0"
7'-4 1/2"
7'-0"
MASTER BEDROOM
DEPARTMENT OF BUILDINGS APPLICATION NUMBER:
4'-0"
SO CM WD
MASTER BATH
MASTER BATH
COATS W/D
SD BACKGROUND
Revision:
SCALE:
FCU
2664 SF
W/D
1
17-11-07
SD BACKGROUND
Revision:
SCALE:
3'-0"
CL 1 COATS
BATH 1
No: Date:
LOT 1
FOYER
FOYER
2BR E KITCHEN
17-11-07
No: Date:
5' - 2"
1
POWDER
CL 2
4'-9 1/2" PANTRY
MASTER BEDROOM
COLUMNS 13 & 125 RELOCATED
LIVING / DINING
12'-10"
BEDROOM 1
CL-1
D
BATH 1
MASTER BEDROOM
12'-10 1/2"
SO CM WD
3'-0"
AV
W
CL 1
1736 SF
FAN COIL
4'-0"
6'-4"
DRYER
5'-7 1/2" POWDER ROOM
FOYER
LIVING / DINING KITCHEN
MUD ROOM/ COATS
FREZ
5'-11"
W/D
4'-7 1/2"
REFR FREZ
FAN COIL
6'-3"
POWDER
LAUNDRY / MUD ROOM
SLCE CONFIRM THAT COLUMN IS THIS LARGE AT LEVEL 9
XXX XXX XXX
WASHER
9'-5"
W/D
REFR
4'-8" BEDROOM 1
6'-2"
3'-0"
MECHANICAL
FREZ
COATS
REFR
LINEN
BATH 1
6'-4"
BATH 2
3'-2"
BEDROOM 2
DEPARTMENT OF BUILDINGS APPLICATION NUMBER:
XXX XXX XXX
2100 SF 3BR D
N
KEY PLAN:
3BR H
N
KEY PLAN:
BEDROOM 1 PANTRY
KITCHEN
WEST 23rd STREET
WEST 23rd STREET 10'-11"
POWDER
LIVING / DINING
11th AVENUE
11th AVENUE
COLUMN RELOCATED
WEST 22nd STREET
WEST 22nd STREET
PROJECT:
WEST 22ND STREET
PROJECT:
555 W. 22nd Street New York, NY 0
2'
4'
6'
8'
16'
N
3
LEVEL 06-09 - UNIT H PLAN - ALT SCALE: 1/4" = 1'-0"
2
LEVEL 06-09 - UNIT H - PLAN
1
SCALE: 1/4" = 1'-0"
LEVEL 3 - 5 - UNIT H - PLAN (3BR)
0
1'
2'
3'
4'
8'
12'
TITLE:
1
555 W. 22nd Street New York, NY
SCALE: 1/4" = 1'-0"
24'
TITLE:
LEVEL 09 - OVERALL PLAN SCALE: 1/8" = 1'-0"
SEAL & SIGNATURE:
SEAL & SIGNATURE:
SCALE: DATE:
SCALE:
July 27, 2018
DATE:
PROJECT No:
2016-44
PROJECT No:
2016-44
FILE No:
\DWGS\CD
FILE No:
\DWGS\CD
DRAWN BY:
CADD FILE No:
CHECKED BY: DWG No:
ID2.76
CADD FILE No:
OF
OWNER:
1637 SF
1377 SF
3BR A
3BR B
2BR C
RELATED COMPANIES
EXECUTIVE ARCHITECT:
SLCEArchitects
1359 BROADWAY NEW YORK, NY 10018 TEL.: 212.979.8400
1359 BROADWAY NEW YORK, NY 10018 TEL.: 212.979.8400
DESIGN ARCHITECT:
DESIGN ARCHITECT: 7'-3"
ROBERT A.M. STERN ARCHITECTS, LLP
3'-0"
COATS
MASTER BATH
CL 2
CL 1
LIVING / DINING
w
FCU
D
UNIT A
RELOCATED COLUMN
BEDROOM 1
BEDROOM
LIVING / DINING
MASTER BEDROOM
MASTER BEDROOM
5'-2" 4'-0"
3'-3"
10'-11"
WSP USA Buildings Inc. One Penn Plaza, 2nd Floor New York, NY 10019 (212) 465-5000 www.wsp.com
1'-6"
8'-8 1/2"
DW
14'-6"
6'-7"
11'-6"
BEDROOM 1
40 SF
GEOTECHNICAL ENGINEER:
10'-1"
BATH 1 9'-8"
40" MIN CLR
36'-2" 12'-11 1/2"
WSP USA Buildings Inc. One Penn Plaza, 2nd Floor New York, NY 10019 (212) 465-5000 www.wsp.com
5'-0" 6'-6"
15'-7"
REFR FREZ
5'-0"
11'-3 1/2"
203 SF 4'-4"
10'-8 1/2"
6'-1"
14'-6"
KITCHEN
124 SF
164 SF
14 PENN PLAZA - 225 WEST 34TH STREET NEW YORK, NY 10122 TEL.: 917.339.9300
6'-7"
BUILDING ENVELOPE CONSULTANT:
MASTER BATH
BUILDING ENVELOPE CONSULTANT:
VIDARIS, INC
BEDROOM
VIDARIS, INC
360 PARK AVENUE SOUTH NEW YORK, NY 10010 TEL.: 212.689.5389
POWDER
360 PARK AVENUE SOUTH NEW YORK, NY 10010 TEL.: 212.689.5389
COORDINATE WITH NEW SLCE BACKGROUNDS
ELEVATOR CONSULTANT:
118' - 5"AFF
BATH 1
UNIT H
98 SF
MEP ENGINEER:
14 PENN PLAZA - 225 WEST 34TH STREET NEW YORK, NY 10122 TEL.: 917.339.9300
FOYER
LAUNDRY / MUD ROOM AV
BATH 3
STRUCTURAL ENGINEER:
COATS
DEN / BEDROOM 3
BEDROOM 1
Olson Kundig
5'-3"
BATH
6'-4"
12'-4" 4'-6"
FCU IN CEILING FOYER
MW
DINING
224 SF
3'-2"
BATH 1
5'-0"
WINE
BATH
4'-2"
COATS
8 SF
LIVING
GEOTECHNICAL ENGINEER: PANTRY
6'-9"
6'-5"
13'-10"
10'-5" 1'-2"
11 SF
159 SOUTH JACKSON STREET, SUITE 600 SEATTLE, WA 98104 TEL.: 206.381.6527
MEP ENGINEER:
WSP USA Buildings Inc. One Penn Plaza, 2nd Floor New York, NY 10019 (212) 465-5000 www.wsp.com
KITCHEN
FOYER
KITCHEN
INTERIOR DESIGN ARCHITECT:
UNIT E
POWDER
COATS
CL 1
UNIT A
UNIT H
W/D
WSP USA Buildings Inc. One Penn Plaza, 2nd Floor New York, NY 10019 (212) 465-5000 www.wsp.com
KITCHEN FOYER
FOYER
POWDER
RELOCATED COLUMN
LIVING / DINING
460 WEST 34th STREET, NEW YORK, NY 10001 TEL (212) 967-5100 | FAX (212) 967-5588
32 SF 5'-10"
COATS 8 SF
91 SF
4'-3"
BATH
MASTER BATHROOM
266 SF
BATH
COATS
SLCE COORDINATE COLUMN LOCATION WITH GLAZING BATH 2
72 SF
CL 2
CONTEXT PLANS IN PROGRESS DO NOT REVIEW
FOYER BEDROOM 2
CL 1 KITCHEN
MASTER BEDROOM
STRUCTURAL ENGINEER:
KITCHEN
2931 SF
THESE EXTERIOR WALLS ARE IN RAMSA BACKGROUNDS. DO THEY PENETRATE INTO THE ROOM THIS FAR?
2'-8"
KITCHEN
LIVING / DINING
CL 2
POWDER
12'-5"
Olson Kundig 159 SOUTH JACKSON STREET, SUITE 600 SEATTLE, WA 98104 TEL.: 206.381.6527
BEDROOM
BEDROOM
MASTER BATH
4BR A
CL 1
INTERIOR DESIGN ARCHITECT: LIVING + DINING
MASTER BEDROOM
14'-1"
5'-10"
11'-6" 11'-3"
460 WEST 34th STREET, NEW YORK, NY 10001 TEL (212) 967-5100 | FAX (212) 967-5588
7'-7"
2'-4"
ROBERT A.M. STERN ARCHITECTS, LLP LIVING + DINING
OF
COLUMBUS CIRCLE, 19TH FLOOR NEW YORK, NY 10023 TEL.: 212.801.1000
UNIT D
EXECUTIVE ARCHITECT:
1440 SF
ID2.44
OWNER:
RELATED COMPANIES COLUMBUS CIRCLE, 19TH FLOOR NEW YORK, NY 10023 TEL.: 212.801.1000
SLCEArchitects
WEST 23RD STREET
July 17, 2018
DRAWN BY:
CHECKED BY: DWG No:
1215 SF
1450 SF
2BR E
2BR D
ELEVATOR CONSULTANT:
11TH AVENUE
5 REGENT STREET LIVINGSTON, NJ 07039 TEL.: 973-994-9220
UNIT B + C
1
LEVEL 6-9 - UNIT E - PLAN SCALE: 1/4" = 1'-0"
N 0
1'
2' 3'
4'
8'
12'
5 REGENT STREET LIVINGSTON, NJ 07039 TEL.: 973-994-9220
FCU
118' 118' - 11"AFF - 11"AFF
118' - 11"AFF
KITCHEN
POWDER
LIVING / DINING
1482 SF FOYER
2BR B
W/D
COATS
MASTER BEDROOM
DEPARTMENT OF BUILDINGS APPLICATION NUMBER:
DEPARTMENT OF BUILDINGS APPLICATION NUMBER:
XXX XXX XXX
MASTER BATH CL
XXX XXX XXX
BEDROOM 1 KITCHEN COATS
POWDER
BATH 1
FCU
2353 SF
RELOCATED COLUMN RAMSA TO COORDINATE WINDOW
LIVING / DINING
3BR C AV
W/D
CL 2
BEDROOM 2 CL 1
RELOCATED COLUMN
BATH 2
1
17-11-07
No: Date:
SD BACKGROUND
1
MASTER BATH
17-11-07
No: Date:
Revision:
SCALE:
MASTER BEDROOM
SD BACKGROUND
Revision:
SCALE:
RELOCATED COLUMN
RAMSA TO COORDINATE ENLARGED WINDOW
N
KEY PLAN:
N
KEY PLAN:
RELOCATED COLUMN
11th AVENUE
WEST 23rd STREET
11th AVENUE
WEST 23rd STREET
WEST 22nd STREET
WEST 22nd STREET
PROJECT:
WEST 22ND STREET
PROJECT:
555 W. 22nd Street
555 W. 22nd Street
New York, NY 0
2'
4'
6'
8'
16'
New York, NY
24'
TITLE:
1
TITLE:
LEVEL 11 PLAN SCALE: 1/8" = 1'-0"
SEAL & SIGNATURE:
SEAL & SIGNATURE:
SCALE: DATE:
SCALE:
July 27, 2018
DATE:
PROJECT No:
2016-44
PROJECT No:
2016-44
FILE No:
\DWGS\CD
FILE No:
\DWGS\CD
DRAWN BY:
CADD FILE No:
July 17, 2018
DRAWN BY:
CHECKED BY: DWG No:
CHECKED BY:
ID2.78 OF
DWG No:
CADD FILE No:
ID2.48 OF
555 Condos, NYC
Revit Sets / Red Lines / Design Changes
43
Art Los Angeles Contemporary February 14-17th, 2019
CITY SITE PLAN
Art Los Angeles Contemporary
0m
.75mi
1.5mi
3mi
February 14-17 2019
2
PROPERTY SITE PLAN
Art Los Angeles Contemporary
0m
75’
150’
AERIAL SHOT 3
300’
Art Los Angeles Contemporary
February 14-17 2019
February 14-17 2019
5
HANGER INTERIOR
8
INSTILLATIONS AND USES
Art Los Angeles Contemporary
Art Los Angeles Contemporary
February 14-17 2019
February 14-17 2019
10
11
Charette Book - Art Los Angeles Site Plans and Image Boards
44
STRANGMAN RESIDENCE Valle de Guadalupe
CITY SITE PLAN
STRANGMAN RESIDENCE
0m
750m
1500m
3000m
August 2nd, 2018
4
298
.00
299
.00
300
.00 297
.00
298
.00
299
.00
6.0
0m
30
0.0
0
30
0.0
0 300.00
0
7.0
1
29
0m
3.0
29
8.0
0
E
300
.00m
20
299.00
F .00
D
VIEW E
30
C
0.0 0
A
B
30
0.
00
G
VIEW F PROPERTY SITE PLAN // SCALE - 1:1000
STRANGMAN RESIDENCE
VIEW G
STRANGMAN RESIDENCE Scale // 1:400
STRANGMAN RESIDENCE
August 2nd, 2018
8
August 2nd, 2018
11
NOTABLE BEAUTIFUL DETAILS
NOTABLE BEAUTIFUL DETAILS
STRANGMAN RESIDENCE
STRANGMAN RESIDENCE
August 2nd, 2018
17
August 2nd, 2018
18
Charette Book - Guadalupe Residence Site Plans and Image Boards
45
Work Title
brief description of work displayed
47