ARCHITECTURE PORTFOLIO
P R O F E S S I O N A L W O R K S 2 012 - 2 018
QUAZI MOHD ASHIQUE-UZ-ZAMAN 8537 Karrman Ave, Burnaby, BC V3N 2M3, Canada email: iamashique@gmail.com; cell:+1 778 867 5503
ARCHITECTURE PORTFOLIO
P R O F E S S I O N A L W O R K S 2 012 - 2 018
QUAZI MOHD ASHIQUE-UZ-ZAMAN 8537 Karrman Ave, Burnaby, BC V3N 2M3, Canada email: iamashique@gmail.com; cell:+1 778 867 5503
KEY EVENTS & PLACES 2019 VANCOUVER, CANADA
2008 WASHINGTON DC, USA
2017 SHENZHEN, EUROPE
- Moved to Vancouver as Canadian Permanent Resident
- Selected to attended Student Leadership exchange program conference
- Visited Renzo Piano, MVRDV and UNStudio office as part of WATG Fortis program
2016 TIANJIN - First built hotel project, Four Seasons
2017 SEATTLE, USA
2010 BANGLADESH
- Temopary transfer from WATG Singapore to WATG Seattle for training
- Graduated with B. Arch. with Vice Chancellor’s gold medal (2010)
2011 SINGAPORE - Masters from NUS (2011) - Started working at WATG (2012)
2018 MUMBAI, INDIA
2009 AHMEDABAD, INDIA
- Latest luxury hotel project under construction - First project overseen as Project Designer
- Internship under Pritzker winning architect B.V. Doshi
CURRICULUM VITAE
Quazi Mohd Ashique-Uz-Zaman CAREER SUMMARY
CONTACT INFORMATION
EDUCATION
I have a passion for building technology and sustainable design and have been an active participant in the Sustainablity Think Tank in the Singapore WATG office which strives to stay up-to-date on the latest in sustainable design principles, materials and trends. I am always in pursuit of acquiring knowledge about BIM application and advanced capabilities in software such as Revit and Dynamo give me the ability to execute each project with efficiency and detail.
•
Address: 8537 Karrman Ave, Burnaby, BC V3N 2M3, Canada
•
2011-2012: Master of Arts in Urban Design National University of Singapore CGPA 3.95/5
•
Email address: iamashique@gmail.com
•
•
Cell: +1 778 867 5503
I am also actively building my knowledge and skill set in Rhino and Grasshopper, a key design tool for our urban and mixed-use projects. I travelled to Seattle and Chicago multiple times to help WATG Urban, a studio focused on urban high-rise design and took part in trainings and business meetings to upgrade my skills.
•
Skype ID: ashique_zaman
2005-2010: Bachelor of Architecture BRAC University, Bangladesh CGPA: 3.85 out of 4 *Highest distinction & Vice Chancellor’s Gold Medal
•
Linkedin: https://www.linkedin.com/in/ashiquezaman-93076454/
•
•
Nationality: Bangladeshi Passport Number: BH0990074
2008: Selected as one of the candidate to participate at the Student Leader 2008 Exchange Program in USA. The program was fully funded and facilitated by the State Government, USA.
•
Permanent Residency (PR) Status: Confirmation of Canadian PR received
•
2004: Higher Secondary School Certificate Notredame College, Bangladesh Result: GPA 5.00/5.00
•
2002: Secondary School Certificate St. Joseph High School & College, Bangladesh Result: GPA 4.50
•
IELTS Overall Band: 8.5 (Listening 8.5, Reading 9.0, Writing 8.0, Speaking 8.5)
Recently I was selected to be a part of WATG’s 2016 Fortis Program which recognizes up-and-coming leaders in the office and engages them in a Fortis project that will continue to push the office in terms of innovation and creativity from a design and business perspective.
ACADEMIC ACHIEVEMENTS •
Conferred Bachelor of Architecture, B. Arch degree (Highest distinction) from BRAC University 2011.
•
Five times recipient of ‘Vice Chancellor’s Award for Academic Achievement’, for the semester of Summer 2010, Fall 2008, Spring 2008, Fall 2007 and Summer 2007 (BRAC University)
•
‘Dean’s Award for Academic Achievement’, for the semester of Spring 2009 (BRAC University)
•
‘Special Recognition for Discipline & Devotion’, Residential Semester at TARC, Summer 2005 (BRAC University)
•
Received BRAC University Performance & Need Based Scholarship, partial tuition waiver every semester, upon admission at BRAC University during Summer 2005
CURRICULUM VITAE
Quazi Mohd Ashique-Uz-Zaman WORK EXPERIENCE •
Project Designer at WATG and Wimberly Interiors, Singapore July 2018 - present
•
Intermediate Designer at WATG and Wimberly Interiors, Singapore July 2015 - June 2018
•
Junior Designer at WATG and Wimberly Interiors, Singapore May 2012 - June 2015
• •
Associate Architect at Volumezero Ltd., Bangladesh May 2010 - July 2011 Intern Architect at Vastushilpa Consultants, Ahmedabad, India May 2009 - September 2009
TRAININGS • 2014: Participated in the Parametric Design Training organized by SIA (Singapore Institute of Architects) • 2013: Attended ‘Integrating BIM Into a Sustainable Design Process’ Workshop organized by BCA • 2013: Attended ‘Maximizing your BIM workflow with collaboration and data management’ Workshop organized by BCA
AWARDS •
• 2013: Acknowledgement for Outstanding performance in BIM by WATG, Singapore. • 2013: Winner of the Singapore BIM Competition 2013 Organized by Building and Construction Authority, Singapore • 2011: ‘Second Prize’ Winner for the “Cool Ideas for better HDB Living” design competition organized by Housing & Development Board, Singapore.
KEY RESPONSIBILITIES - Brainstorm and conceptualize design ideas with area, cost and site constraint. Conduct environmental and feasibility studies of the design - Prepare and supervise presentation, drawings and details for client and consultants. Take part in site visits to ensure implementation of design intent - Proficiency in hospitality design principles and parameters. Also understand local building codes and regulations clearly. - See through projects from concept stage to design development. - Lead small to medium team to design and document drawings and presentations - Present design ideas to the client directly & attend coordination meetings with other consultants - Conduct in-house parametric/computational software training for the office
SOFTWARES • • • • • • • • • • • •
Revit Dynamo Rhino Grasshopper Autocad Sketchup Enscape Lumion Illustrator Indesign Photoshop MS Office
PROJECT EXPERIENCE - Upscale Hotel Design in Mumbai, India, 2018 (Under Construction) - China Merchant Competition, China, 2018 - ARIA Façade Design, Jakarta, Indonesia, 2017 (Under Construction) - Thom Island Resort Master Plan, Vietnam, 2017 - Port Sultan Qaboos Master Plan, Oman, 2017 - Ayana Lifestyle Hotel, Indonesia, 2017 - Saadiyat Island Beach Resort Abu Dhabi, UAE, 2016 - JW Marriott Da Nang, Vietnam, 2016 (Under Construction) - Crowne Plaza Business Bay UAE, 2016 - Kiroro Resort, Japan, 2016 - Solaire Integrated Resort Incheon, Korea, 2015 - Ecopark Waterfront Villas Vietnam, 2015 - Vinhomes Harbour City, Vietnam, 2015 - King Abdullah Gardens, Jordan, 2015 - Swissotel Hotel and Residences Riyadh, Saudi Arabia, 2014 - Weihai Marriott Resort, China, 2014 - Pyay Towers Mixed-Use Yangon, Myanmar, 2014 - Xianhai Boutique Resort Mianyang, China, 2014 - Ba River Wellness Resort China, 2014 - Guangzhou Residential Development China, 2013 - Crimson Boracay Resort Philippines, 2013 - Four Seasons Hotel Tianjin, China, 2012 (Built) - Anantara Resort and Residences Tangalle, Sri Lanka, 2012 (Built) - Sofitel Golf Resort Zhongshan China, 2012
TAJ AT THE TREES Mumbai, India
PROJECT INFORMATION The proposed hotel is one of the significant components of a larger mixed Use development called “The Trees”, located in Vikhroli, Mumbai. Master plan and Urban Design guidelines for “The Trees”, has been made by SASAKI. The proposed hotel would fit into the larger context of the Trees and the envisaged master plan. The proposed hotel is to be of 23,000 sm built up area, 150 key hotel with all the associated front of house amenities and associated services, parking, back of house areas and other facilities. The hotel design must be in accordance with the brand standards and other relevant specifications as provided by the operator
ROLES & RESPONSIBILITIES
SLAB EDGE LINE - 2200 FROM GRIDLINE -L
FACADE EDGE LINE
I started this project from its inception. Although I was as an intermediate designer when this project started, after couple of month was promoted to Project Designer. I spent some time in Seattle to work with a highly qualified team and attend meetings with the client over conference call. I have also been attending meetings in India to present design progress to the client as well as to take part in coordination meetings with other consultants. I have been given the responsibility to ensure a high standard of design and detail as the project lead. I have prepared hand sketches, digital models using Rhino, Revit and walkthroughs for the client’s understanding of the design. I also have worked towards having a clear understanding of the local building code and made sure the design complies with it.
DOUBLE GLAZED UNIT PANEL PER FACADE CONSULTANTS DETAILS & SPECIFICATION ALUMINUM CAPPING PER FACADE CONSULTANTS DETAILS & SPECIFICATIONS
FIBRE CEMENT CLADDING COLO & FINISH TO ARCHITECTS APPROVAL
SELECTED FLOORING PER INTERIOR DESIGNERS DETAILS & SPECIFICATIONS
FIBRE CEMENT CLADDING COLO & FINISH TO ARCHITECTS APPROVAL
CONCEALED ALUMINUM CURTAIN WALL MULLION PER FACADE CONSULTANTS DETAILS & SPECIFICATIONS
960
750
SPANDREL BACK PANEL PER FACADE CONSULTANT DETAILS & SPECIFICATIONS
CLADDING SUPPORT AND CEILING CARCASS TO BUILDERS DETAILS & SPECIFICATIONS
CEILING IN APPROVED FINISHES TO ID APPROVAL
ALUMINUM CAPPING PER FACADE CONSULTANTS DETAILS & SPECIFICATIONS
I was involved in this project from Initial Concept stage to Design Development stage. During this time I have used Sketchup, Revit, Rhino, Grasshopper and Enscape for this project.
1 DETAIL-05 1 : 10
3 DETAIL-09 1 : 10 1500 1150
350
75mm X 200mm ALUMINIUM FIN / LOUVRES TO FACADE CONSULTANTS DETAILS & SPECIFICATIONS
500
FIBRE CEMENT CLADDING COLOR & FINISH TO ARCHITECTS APPROVAL
GALVANIZED STEEL BRACKET TO ENGINEERS DETAILS & SPECS.
Status: Under Construction.
FIBRE CEMENT CLADDING COLOR & FINISH TO ARCHITECTS APPROVAL
SELECTED FLOORING PER INTERIOR DESIGNERS DETAILS & SPECIFICATIONS
1500
LEVEL 3.5 18.30m
STEEL BRACKET TO ENGINE DETAILS & SPECS.
9/2018 10:03:37 PM
STEEL BRACKET TO ENGINEERS DETAILS & SPECS.
CLADDING SUPPORT AND CEILING CARCASS TO BUILDERS DETAILS & SPECIFICATIONS
200
2018
original size of this drawing is A1 (594mm x 841mm)
TIMELINE
CLADDING SUPPORT AND FRAMING / CARCASS TO BUILDERS DETAILS & SPECIFICATIONS
9° 48.4
Copyright © 2017 2015 WATG. All rights reserved.
ALUMINUM FRAME BACKING TO SPECILAIST DETAILS & SPECIFICATIONS
FIBRE CEMENT CLADDING COLOR & FINISH TO ARCHITECTS APPROVAL
2 DETAIL-04 1 : 10
FIBRE CEMENT CLADDING COLOR & FINISH TO ARCHITECTS APPROVAL
1400 1500
100
CEILING IN APPROVED FINISHES TO ID APPROVAL
DOUBLE GLAZED UNIT PANEL PER FACADE CONSULTANTS DETAILS & SPECIFICATION
4 DETAIL-08 1 : 10
TAJ AT THE TREES Mumbai, India
NOTE: *TRANSFER FLOOR BETWEEN LEVEL 4 AND 3 *MEP LEVEL BETWEEN LEVEL 11 AND LEVEL 12
LEVEL 12 - ROOF - BAR & MEP SPACE
strategy planning architecture landscape interiors
watg.com
LEVEL 4-11 - GUESTROOMS client | consultant
LEVEL 3 - RESTAURANTS KITCHEN & POOL
stamp | approval
NOT FOR CONSTRUCTION
This document and its contents are the copyright of the designer. Any party receiving this document does so in confidence and agrees that information contained herein shall not be published in whole or in part or disclosed to others without the express prior written consent of WATG. Do not Scale. All dimensions to be checked on site. All information on these drawings are for aesthetic content only. notice
LEVEL 2 - SPA & FITNESS & BOH
key plan
6 5 4 3 2 1
50% DD ARCHITECTURE | 09 NOV 2018
no.
m)
Copyright © 2017 2015 WATG. All rights reserved.
GROUND FLOOR - FUNCTION DROP-OFF & BALLROOM
date
50% DD ARCHITECTURE POST 100% SD ARCHITECTURE REVISED 100% SD ARCH POST 100% SD ARCHITECTURE 100% SD ARCHITECTURE 50% SD ARCHITECTURE
issue
strategy planning architecture landscape interiors
watg.com
RETAIL FACADE
issues | revisions client | consultant
1. STORY
stamp | approval
NOT FOR CONSTRUCTION
This document and its contents are the copyright of the designer. Any party receiving this document does so in confidence and agrees that information contained herein shall not be published in whole or in part or disclosed to others without the express prior written consent of WATG. Do not Scale. All dimensions to be checked on site. All information on these drawings are for aesthetic content only. notice
project logo
2. LOGIC
HOTEL - EXPLODED AXONOMETRIC sheet title project no. 173113
date
07/03/18
checked by: LP
project code. TAJTR
drawn by: AZ
org code:
WATG
AR-DWG-012
Discipline code
Document type
Sheet number
SCHEMATIC DESIGN ARCHITECTURE | 3 JULY 2018
LEVEL 1 - HOTEL DROP OFF & MEETING ROOMS
09 NOV 2018 26 OCT 2018 2 OCT 2018 10 SEPT 2018 29 AUG 2018 3 JUL 2018
key plan
3. SCREEN 1
no.
3 JULY 2018 50% SCHEMATIC DESIGN ARCHITECTURE
date
issue
issues | revisions
OPTION 2B - PERFORATED ALUMINIUM SCREEN PATTERNS project logo
Mumbai Godrej Upscale Hot
CHINA MERCHANT COMPETITION Shenzhen, China
设计概念 CONCEPT
PROJECT INFORMATION The site is located at the Shenzhen Airport start-up zone and the surrounding has been built with water-land resorts. To the east are Shajing and Fuyong areas, which are mainly the old industrial estates and villages in the city. To the west is the future Airport Peninsula district and Islands. The base is mainly reclamation area and its current state is mainly an unbuilt land. The hotel is part of a small site that is approximately 3 hectares .This site consists of residential, shopping mall, plaza, hotel etc. Hotel building gross floor area is 50,000sm having 360 keys.
结构设计概念
STRUCTURE CONCEPT
传统的酒店塔楼
EXPERIENCE & IDENTITY
体验与识别性
人性化设计
S M A R T B U I L D I N G T E C H N O LO G Y
智能建筑科技
PEOPLE ORIENTED DESIGN
T.A
T.B
T.C
T.E
T.D
T.F
T.G
T.I
T.H
T.J
T.L
T.K
CO N V E N T I O N A L H OT E L TO W E R
43200 4800
600 4200
4800
4800
4800
4800
4800
4200 600
4800
T.1
5400
T.2
7200
T.4
P2
4800
P5
P3
P6
P4
4800
39600
T.5
P1
4800
S1
S2
S3
T.6
7200
T.7
5400
T.8
钢结构非正式型六角屋顶
连接核心组合的横向负荷抵抗梁
LATERAL LOAD RESISTING BEAMS WHICH TIE MINI CORES TOGETHER
服务核心
SERVICE CORE
框架核心组合
FRAMED STRUCTURAL MINI-CORES
南 组 团 总 平 面图
10 8
8 11
塔楼主要结构构件
MAIN STRUC TURAL ELEMENTS FOR TOWER 1. 南组团入口
6
South Group Entrance
2. 酒店塔楼
Hotel Tower
3. 酒店落客处 Hotel Drop-off
7
4. 宴会厅落客处
1
5. 服务式公寓第一塔楼
Service Apartment Tower 1
6. 服务式公寓第二塔楼
9
Service Apartment Tower 2
7. 商业零售中心
3
Retail Mall
Street retail
8
9. 商业节点
Commercial Node
10. 绿地开放空间
Green Open Space
11. 人行桥
Pedestrian Bridge
2018
基底主杆结构
BASE STEM STRUCTURE
STEEL EXOSKELETON CARRYING PERIMETER FLOOR LOADS
8. 底商
TIMELINE
负荷分配
DISTRIBUTED STRUCTURAL FORCES
钢制外露框架结构,承载外侧楼板荷载
Ballroom Drop-off
Status: Competition participation.
CENTRAL R.C CORE
STEEL IRREGULAR HEXAGRID ROOF
SOUTH GROUP MASTER PLAN
This was a short term competition project and I was part of it from start to end. During the process I mainly used Rhino, Grasshopper, Illustrator and Indesign for this project.
中心钢筋混凝土核心筒
T.3
P
I was brought into this project for my expertise in Urban Design and enthusiasm for high-rise building design. I was part of a 6 person team. I used my Rhino and Grasshopper skills to design and model the complex components of this project. I also used parametric environmental analyzing software to determine the proper orientation of building and facade modulation to comply with sustainability requirement as well. Beside design, I did conceptual diagrams to explain the structure and mechanical principles of this design proposal. I made sure the design complies with the local building code as well.
U
ROLES & RESPONSIBILITIES
钢制外露框架结构
EXOSKELETAL BUILDING ENVELOPE
4
5
2
核心和框架综合系统、双面结构系统 PAR T - CORE | PAR T - FRAME DUAL STRUC TURAL SYSTEM
CHINA MERCHANT COMPETITION Shenzhen, China
滾滾長 江 東
立面材料策略
DESIGN APPROACH
FA C A D E M AT E R I A L S S T R AT E G Y 1. 双层低辐射玻璃
A- 钢结构竖框
1. DOUBLE GLAZED LOW-E REFLECTIVE GLASS
A - STEEL SECTION
B- 预埋件 1
2. 钢结构结合 铝扣板饰面
2
C- REINFORCED CONCRETE SLAB
2.STEEL STRUCTURE WITH ALUMINUM CLADDING 2
优化建筑功能位置
OPT I MI Z E S I T I N G OF PR O GR AM
优化裙房形态 O P TI M I Z E P O DI U M S HA P E
减小建筑体量 RE DUC E MA SS SC A LE
B - CAST-IN CHANNEL
C- 钢筋混凝土楼板 D - 调整
D- ADJUSTMENTS
E - 角钢固定件 E- ANGLE
3. 玻璃纤维增强水 泥面板及不同的窗洞 口设计
典型立面局部剖面
S TA N D A R D FA C A D E S E C T I O N
典型立面幕墙节点示意图
T YPICAL JOINT DIAGRAM
3.GFRC PANELS WITH VARIABLE OPENINGS
促进城市设计,优化周边环境 URBA N CON T EX T I N T ER AC TI O N
打造独特的屋顶体验 C R E ATE U NI Q U E SKYLI NE E X P E R I E NC E
钢制外露框架
E XO SK E LE TO N
幕墙与垂直的竖梃
CURTAIN WALL WITH VERTICAL FINS
蜿蜒的玻璃纤维增强水泥面板 UNDULATING GFRC PANELS
玻璃纤维增强水泥面板 , 立面打 造出窗洞口 GFRC PATTERNS WITH OPENINGS
ARIA FACADE DESIGN Jakarta, Indonesia
BUILDING MASSING CONCEPT
PROJECT INFORMATION
CONTEXT
SITE PARAMETER
MAXIMISING SITE VOLUME
SHIFTING THE MASSING
The site is located in a fast developing area in Jakarta. It is adjacent to Fatmawati road and is surrounded by residential and mixed use developments around. Being very close to the future metro station, the site provides an opportunity to give identity to the area.
The setback allowed for the site ranges from 11 to 15 meters. Addressing the setback makes some corners of the site to be narrow, hence challenging to deal with.
The towers are placed strategically in order to avoid overlooking, allow ventilation and most importantly to maximise the site volume in terms of density. The towers are at a maximum of 33 storey tall and sitting between them is a pavilion like reception building.
The rectangular tower footprint is broken up into parts and shifted to adjust to the site. It also adds more surface to allow views for the units.
VERTICAL BREAK
HORIZONTAL LAYERING 10/11/2017 2:23:39 PM
Vertical breaks are introduced to the towers The are broken horizontally create the original size of to this drawing is A1 towers (594mm x 841mm) Copyright © 2017 WATG. to All rights reserved. allow ventilation for the deeper part of the units a distinct base, body and top. It is additionally and also to break the large facade. It helps emsliced horizontally to create refuge area which phasize the sense of verticality. also acts as community garden space. By having the refuge areas at different levels on each of the tower, they start having their own identity.
SKY-GARDEN MODULE
ARTICULATING THE FACADE
A modular facade system is designed and tested out in singularity which can create an iconic expression to the towers. It acts as floating garden for the residents in the sky effect while providing shade to the units. Although they live at a higher unit, with this module introduced, they never feel far from nature.
The garden in the sky boxes, when multiplied creates an iconic mask for the tower which expresses the notion of nature, sustainability and a better living condition for the units. It also in a way gives back nature to the city and helps create a natural and softer cityscape of Jakarta.
ROLES & RESPONSIBILITIES
T2.A
T2.B
T2.C
T2.D
T2.E
T2.F
T2.G
T2.H
6300
ROOF 140.30 m
I was brought into this project to work on the facade design. I had a senior project designer overseeing this project but was given the responsibility to lead this project with a small team by myself. I, along with other designers worked closely in a collaborative way and came up with several design options, amongst which the client chose the one that appeared to be like floating boxes in the sky. Later I took the design and detailed it for planning approval while selecting appropriate materials. I worked closely with the local architects to make the building compliant of local codes while going trough some design iterations. I also developed the reception building, addressing client’s wish to make it welcoming and ‘resort-like’.
4500
LEVEL 39 134.00 m
3500
LEVEL 38 129.50 m
3500
LEVEL 37 126.00 m
3500
LEVEL 36 122.50 m
3500
LEVEL 35 119.00 m
3500
LEVEL 34 115.50 m
3500
LEVEL 33 112.00 m
3500
LEVEL 32 108.50 m
3500
LEVEL 31 105.00 m
3500
LEVEL 30 101.50 m
3500
LEVEL 29 98.00 m
3500
LEVEL 28 94.50 m
3500
LEVEL 27 91.00 m
3500
LEVEL 26 87.50 m
3500
LEVEL 25 84.00 m
3500
LEVEL 24 80.50 m
3500
3500
3500
LEVEL 23 77.00 m
3500
3500
3500
3500
I started this project from Concept stage and saw it through Schematic Design.
3500
3500
3500
3500
3500
3500
3500
3500
3500
Stage: The design proposal is now pending building permit.
3500
3500
3500
TIMELINE 1:250
01.25
3500
3500
3500
2017 6.25 12.5
METERS
1
SOUTH ELEVATION 1 : 250
LEVEL 22 73.50 m
140300
Located in the central part of Jakarta, Indonesia, this project consisted of 4 residential towers, a reception lobby and a show flat unit. The client went to different designers for this project before and when it came to WATG it already had the plans approved by the planning committee. WATG was responsible to work on the facade without changing the plans significantly. The client asked WATG to express the facade in a simple but appealing gesture and then look at the other components (reception building and show flat unit) in more detail.
LEVEL 21 70.00 m LEVEL 20 66.50 m LEVEL 19 63.00 m LEVEL 18 59.50 m LEVEL 17 56.00 m LEVEL 16 52.50 m LEVEL 15 49.00 m LEVEL 14 45.50 m LEVEL 13 42.00 m LEVEL 12 38.50 m LEVEL 11 35.00 m LEVEL 10 31.50 m LEVEL 9 28.00 m LEVEL 8 24.50 m LEVEL 7 21.00 m LEVEL 6 17.50 m LEVEL 5 14.00 m LEVEL 4 10.50 m LEVEL 3 7.00 m LEVEL 2 3.50 m LEVEL 1 0.00 m
T1.H
T1.G 9025
T1.F
T1.E
T1.D 42600 4600
T1.C
T1.B
ARIA FACADE DESIGN 4775
3700
3700
T1.A
7775
T1.H
T1.G
9025
T1.F
9025
4775
1
1
Jakarta, Indonesia
T1.D 42600 4600
3700
T1.C 3700
7775
1
1
POOL
A1-303
A1-303
A1-401
3800
T1.I
T1.2
1900
queen size bed 200x160cm
A1-401
T1.E
T1.3
queen size bed 200x160cm
3800
POOL
1
1
A1-304
A1-302 UP
DN
1 A1-402
T1.5
TR
NK
32250
UP
T1.6
1
T1.7
A1-302 NK
TR
T1.8
3750
DN
1950 1850 1950
3750
T1.4
3800
T1.9
1650
T1.10
4050
T1.11
T1.12
1
1
A1-301
1
A1-
LEVEL 1 FLOOR PLAN - TOWNHOUSE
2
1 : 200
LEVEL 2 FLOOR PLAN - TOWNHOUSE 1 : 200
+16.0m
9025
4775
T1.E
T1.D 42600 4600
3700
T1.C
T1.B
3700
T1.A
7775
T1.H
9025
T1.E
1
25˚
6m
+4.5m
4.5m | 10
king size bed 200x180cm
3800
T1.3 king size bed 200x180cm
OPTION 1
SECTION
32250
1950 1850 1950
TR
NK
T1.6
1
T1.7
A1-302 TR
T1.8
NK
0
1
king size bed 200x180cm
T1.9 3800
T1.11
king size bed 200x180cm
queen size bed 200x160cm
4050
queen size bed 200x160cm
king size bed 200x180cm
single bed 1000x2000mm
queen size bed 200x160cm
1650
T1.10
single bed 1000x2000mm
queen size bed 200x160cm
RECEPTION BUILDING - EL king size bed 200x180cm
queen size bed 200x160cm
king size bed 200x180cm
king size bed 200x180cm
PROJECT NO. 173068
single bed 1000x2000mm
e of this drawing is A1 (594mm x 841mm)
3750 A1-402
T1.5
3750
1
queen size bed 200x160cm
Copyright © 2017 WATG. All rights reserved.
NK
single bed 1000x2000mm
:30:26 PM
+0.0m
king size bed 200x180cm
A1-304
TR
+9.5m
T1.2
1900
single bed 1000x2000mm
queen size bed 200x160cm
1
1
1.5m
5m
3800
single bed 1000x2000mm
1
7775
king size bed 200x180cm
queen size bed 200x160cm
king size bed 200x180cm
king size bed 200x180cm
TR
A1-302
T1.C
+14.3m
+11.0m
A1-303
T1.4 king size bed 200x180cm
NK
T1.D 1.7m
42600 4600 3.3m 3700
3700
A1-401
T1.I
queen size bed 200x160cm
4775
25˚
A1-303
queen size bed 200x160cm
T1.F
9025
1
1 A1-401
T1.G
king size bed 200x180cm
T1.F
queen size bed 200x160cm
T1.G
queen size bed 200x160cm
T1.H
T1.12
*Patterns on the feature wall is only to express the idea. Details to be addressed further.
1
LEVEL 7 FLOOR PLAN
A1-301 PROJECT NO. 173068
LEVEL 13 FLOOR PLAN
RECEPTION BUILDING - PERSPECTIVE
1
A1-
JW MARRIOTT DANANG RESORT Da Nang, Vietnam
PROJECT INFORMATION JW Marriott Danang project includes 801 key five-star hotel with other facilities. It includes restaurants, swimming pools, a fitness center, a spa, a steam room, conference and parking facilities. WATG architecture, interiors and landscape team was involved in this integrated service project. Spread across a huge site, the program area of the project was more than 90,000 sm, making it very dense and compact. When WATG got this project, the structure of the hotel towers were already fixed. The client asked for a design that represents Vietnamese culture and also have some iconic forms that represent the sea which the site is adjacent to.
ROLES & RESPONSIBILITIES I have been a part of the design team working on this large scale luxury resort in the coast of Da Nang in Vietnam from the veru beginning. Due to the project status upon start, there were a number of constraints that we were required to work within which was challenging at first but forced us to develop creative and innovative design solutions. I was given responsibility of the hotel towers to conceptualize and design the façade elements. I produced sketches, physical and digital models and details to convey my ideas to the client. I studied materials for the façade and also talked to different suppliers to make the design cost effective. I also went to the construction site to co-ordinate design and specification during construction.
10000
50016
SITE PROPERTY LINE
SPECIALTY RESTAURANT
watg.com
singapore | 65 6227 2618
1 1 A4.03 Y
B
Z
C
D
CC
E
F
POOL BAR FUNCTION LAWN
LEVEL 3
client | consultant
16.00 m
LEVEL 2M
5000
13.00 m
ARRIVAL LOBBY
LOBBY LOUNGE
PANTRY
LEVEL 2
8.00 m
4
KID'S PLAY AREA
GARDEN VILLAS
LOBBY LOUNGE - PARTIAL BUILDING SECTION 1 : 200
stamp | approval
QUIET SPA/POOL
3000
LEVEL 3
NOT FOR CONSTRUCTION FUNCTION FACILITIES & BOH
13.00 m
OPEN TO CONCEIRGE LIBRARY
LEVEL 2
RETAIL CIRCULATION
(594mm x 841mm)
HOTEL ENTRY DRIVE
20000
RETAIL DROP-OFF MAIN ENTRY
RETAIL DROP-OFF SECONDARY ENTRY
FUNCTION ENTRY DRIVE TRUONG SA
1 : 200
1
1
3000
LEVEL 3
16.00 m
LEVEL 2M
5000
13.00 m
GROUP CHECK-IN
key plan
WORK AREA
2500
LEVEL 2
8.00 m
LEVEL 1 MEZZANINE
5.50 m
4
06 FEBRUARY 2015 28 NOVEMBER 2014 17 OCTOBER 2014 12 SEPTEMBER 2014
4500
CHINESE RESTAURANT
LEVEL 1
100% DESIGN DEVELOPMENT PART 1
1.00 m
GROUP CHECK-IN - PARTIAL BUILDING SECTION 75% DESIGN DEVELOPMENT 3 1 : 200
2 1
PART 1
100% SCHEMATIC DESIGN
2 1 A4.17
50% SCHEMATIC DESIGN
date
issue
issues | revisions
DA NANG, VIETNAM
GROUP CHECK-IN - PARTIAL BUILDING SECTION 1 : 200
project name | project logo
OVERALL SITE PLAN sheet title
16.00 m
LEVEL 2M 13.00 m
LEVEL 2
8.00 m
LEVEL 1 MEZZANINE
CHINESE RESTAURANT
5100
JW MARRIOTT DA NANG RESORT
PRE-FUNCTION
1900
GROUP CHECK-IN
3800 200 3000
LEVEL 3
no.
CHINESE KITCHEN
1000
2
OCEAN HOTEL TOWER
6/2/2015 7:30:30 PM
DRIVEWAY TO RETAIL BASEMENT PARKING
MAIN HOTEL TOWER
SITE PROPERTY LINE
Copyright © 2014 WATG. All rights reserved.
HOTEL PODIUM
DRIVEWAY TO BASEMENT PARKING
1.00 m
1 A4.17
GROUP & FUNCTION DROP-OFF
ALL-DAY DINING RESTAUNRANT
SSETBACK
ARRIVAL LOBBY
Copyright © 2014 WATG. All rights reserved.
HOTEL DROP-OFF
GROUND FLOOR CONNECTION TO CASINO
LEVEL 1
LOBBY LOUNGE - PARTIAL BUILDING SECTION
100% DESIGN DEVELOPMENT - PART 1 | 06 FEBRUARY 2015
LOBBY LOUNGE
the original size of this drawing is A1 (594mm x 841mm)
EXISTING CROWNE PLAZA
EXISTING EMERGENCY VEHICLE ACCESS
EXISTING CASINO
DRIVEWAY TO BASEMENT STAFF PARKING
SPA & FITNESS
3
8.00 m
LEVEL 1 MEZZANINE
5.50 m
SERVICE CORRIDOR
notice
GROUP CHECK-IN
16.00 m
LEVEL 2M
5000
CHINESE RESTAURANT PAVILIONS
This document and its contents are the copyright of the designer. Any party receiving this document does so in LOBBY LOUNGE confidence and agrees that information contained herein shall not be published in whole or in part or disclosed to others without the express prior written consent of WATG. Do not Scale. All dimensions to be checked on site. All information on these drawings are for aesthetic content only.
2500
KID'S CLUB
4500
SPA GARDENS
Stage: Under construction.
2016
strategy planning architecture landscape interiors
FUNCTION PAVILION
POOL
FAMILY POOL
BEACH CLUB
I was involved in this projects from Final Concept to Design Development Phase.
TIMELINE
PART 1
SHORELINE PROPERTY LINE
3000
PART 2
BEACH
SHORELINE SETBACK
SETBACK
SITE PROPERTY LINE
5.50 m
LEVEL 1
1.00 m
1:200 0 1
METERS 5
10
JW MARRIOTT DANANG RESORT Da Nang, Vietnam
8
1100
100
DRAIN 300
watg.com
LEVEL 16 - PENTHOUSE VILLA
825
225
200
225
25
client | consultant
68.10 m
POOL
700
500
strategy planning architecture landscape interiors
singapore | 65 6227 2618
250
SLOPE
VARIES INTERIOR
stamp | approval
ALUMINUM CLADDING (CLADDING SUPPORT BY OTHERS)
This document and its contents are the copyright of the ALIGN SURFACES designer. Any party receiving this document does so in
confidence and agrees that information contained herein shall not be published in whole or in part or disclosed to others without the express prior written consent of WATG. Do not Scale. All dimensions to be checked on site. All information on these drawings are for aesthetic content only.
A-DT08_RAILING n POOL TEMPERED LAMINATE GLASS (20mm) key plan
EXTERIOR FLOOR FINISH BY INTERIOR 2 1
no.
SLOPE
SLOPE
22 MAY 2015 100% DESIGN DEVELOPMENT PART 2 31 MARCH 100% SCHEMATIC DESIGN 2015 PART 2
date
LEVEL 6
32.60 m
SLOPE
issues | revisions
JW MARRIOTT DA NANG RESORT
100
DA NANG, VIETNAM
ALIGN SURFACES
20mm DRIP MOULD
project name | project logo
ALUMINUM CLADDING (CLADDING SUPPORT BY OTHERS)
EXTERIOR
CEILING BY INTERIORS POOL BAR - DETAILS sheet title
2
EXPLODED AXONOMETRIC
checked by: RG
143027
project no.
A-DT05_TYP BALCONY drawn by:
1 : 20
REF2 A3.62
AZ
date
05/22/15
5 A9.03
component
A
sheet no.
TEMPERED LAMINATE GLASS (20mm)
869.83
EXTERIOR FLOOR FINISH BY INTERIOR
Copyright © 2011 WATG. All rights reserved.
FLOOR FINISH BY INTERIORS
SLOPE
SLOPE
LEVEL 4
600
25.60 m
20mm DRIP MOULD
1000
ALUMINUM CLADDING (CLADDING SUPPORT BY OTHERS) EXTERIOR
1000
MEP
the original size of this drawing is A1 (594mm x 841mm)
1
2/6/2015 4:43:01 PM
the original size of this drawing is A1 (594mm x 841mm)
SLOPE
issue
250
Copyright © 2014 WATG. All rights reserved.
100% DESIGN DEVELOPMENT - PART 2 | 22 MAY 2015
4
INTERIOR
22/5/2015 2:46:15 PM
6.0 Roofing 6.1 Metal Ro 6.2 Concrete 6.3 Green Ro
REF2 A3.70
FLOOR FINISH BY INTERIORS
869.83
LEVEL 3M TRANSFER
23.00 m
1
A-DT11_TYP TRANSFER FLOOR 1 : 20
REF2 A3.65
3.0 Glass 3.1 Low-E G 3.2 Laminate 3.3 Glass Cu 3.4 Glass Cu 3.5 Glass Cu 3.6 Glass Ba
5.0 Curtain W (Refer to Cur
notice
1 : 20
2.0 Aluminum 2.1 Lightweig 2.2 Decorativ 2.3 Aluminum 2.4 Timber-li 2.5 Aluminum
4.0 Plaster 4.1 Plaster a 4.2 Plaster a
EXTERIOR
NOT FOR CONSTRUCTION
3
1.0 Stone 1.1 Granite 1.2 Granite 1.3 Granite -
TEMPERED LAMINATE GLASS (20mm)
SLIDING WINDOW
FLOOR FINISH BY INTERIORS
KEYNOT
9
EXTERIOR FLOOR FINISH BY INTERIOR
SOLAIRE INTEGRATED RESORT Incheon, South Korea
PROJECT INFORMATION Located very close to Incheon airport, the site was divided into two parts. Muuido is the site along the bay and Silmido is a neighbouring island connected with a bridge. The 1000 key hotel, a casino, a theme park and an art school were part of a huge program that was supposed to be located on a serene 17 hectare site facing the sea. The challenge was to have a single gesture which unifies different components which resonates the graceful nature and talks about Korean culture. The final product was also expected to be the result of a combined collaborative effort of both WATG and the local architect. This was a competition by invitation.
ROLES & RESPONSIBILITIES Considering the scale of the project and the time constraint, designers were given their own component to work with while talking with each other so that it becomes a holistic design. I was given the hotel block to work on which I designed using Rhino and Grasshopper. I tried to ‘sculpt’ the hotel into 2 wings in a way that it appears to be looking at the ocean and also looks unique from different angles. I later documented the Rhino sculpting process to share it with the rest of the office. I also spearheaded to take the level of in-house post production rendering to a higher level using this project as a test bed. I experimented and implemented my vray and photoshop skills to produce quick renderings for this project which has since then been a norm in the office. The competition project was for a month and I was involved from the beginning till the end. Status: Competition won by WATG but the project went on hold
TIMELINE 2015
SOLAIRE INTEGRATED RESORT Incheon, South Korea
Rhino It Yourself
Solaire Hotel Tower PRE-REQUISITE: BASIC RHINO USER INTERFACE ORIENTATION & MOST IMPORTANTLY A CURIOUS MIND...
STEP 1 EXTRUDE THE CURVE TO CREATE THE BASIC FORM
START WITH A TOWER FOOTPRINT CURVE
commands: ExtrudeCrv, (Solid=Yes)
a. draw the curves on the side view of the form
b. extrude and overlap them with the tower form
STEP 2 EXTRUDE CUTTING CURVES & SUBTRACT FROM THE FORM commands:BooleanDifference
Rhino It Yourself
Solaire Hotel Tower STEP 3 FILLET EDGES AS NECESSARY commands:FilletEdges
GO TO NEXT PAGE...
U N I V4E R S I T Y STEP SELECT THE FORM & USE CONTOUR COMMAND WITH REQUIRED FLOOR TO FLOOR HEIGHT TO GENERATE FLOOR CURVES commands: Contour (Distance between Contours= 3600 in this case)
a. Offset curves outwards
a. Extrude curves STEP 5
OFFSET THE CURVES AND EXTRUDE THEM TO EXPRESS FLOOR THICKNESSES OR BALCONIES commands: Offset, ExtrudeCrv
OPTIONAL: OUTER SHELL
THE OUTER SHELL IS MODELED REPEATING THE SAME COMMANDS SHOWN BEFORE
UNIVERSITY
CRIMSON RESORT & SPA Boracay Island, Phillipines
PROJECT INFORMATION The project site is located on the northern tip of Boracay, it measures 2.9 hectares and it is accessible by a private road; it is oriented toward the west, has a beautiful white sand beach and its ocean views are framed by a small island called Naked Rock to the north and a rock peninsula on the south. It is a sloping site which offers a good opportunity to stagger buildings and create an array of vistas from the majorities of the guest rooms and public spaces. It also has a small private island called Naked Rock. The current architectural program follows the original development brief proposed by the client with some adjustments to the key type distribution, overall there will be 190 keys, a spa, a ballroom, 3 restaurants and two bars.
ROLES & RESPONSIBILITIES I came into this project at schematic design stage. I was given the responsibility to design the villa types and a beach restaurant. The project already had a unique architectural expression with the use of simple form and local patterns. The buildings I was designing also had to speak the same language. I did sketches, models in Revit and tried to document the details in a very efficient way. I also helped other team members of the team with their components as well. I was still learning Revit at that time but tried to be a very quick learner and speak out to express design ideas and enthusiasm about details. I was involved from Schematic Design to Design Development phase. Stage: Under construction.
TIMELINE 2013
CRIMSON RESORT & SPA Boracay Island, Phillipines
TYPE A VILLA 16 TYPE A VILLA 15
TYPE A VILLA 17
TYPE A VILLA 14
TYPE A VILLA 18
TYPE A VILLA 13
TYPE A VILLA 19
TYPE C VILLA 22
strategy p
TYPE A VILLA 12
singapore key plan
TYPE C VILLA 23
VILLA D 1 5D A1.01 PRESIDENTIAL VILLA
TYPE C VILLA 20
2 5C A1.01
VILLA 6
TYPE C VILLA 21
VILLA C
VD.5
VD.6
VD.10 VD.7
VD.9
TYPE B2 VILLA 8
W1.1
1 5A A1.01
VILLA 7
1 5D A4.02
*ACCESSIBLE VILLA
TYPE B2 VILLA 9
VILLA A
TYPE B VILLA 4
VILLA 5
TYPE B
7 VILLA 3 5D A4.01
TYPE B VILLA 2
NOT F
TYPE B VILLA 1
VD.8
3.30 m
ROOF LEVEL
100
TYPE B2 VILLA 10
TYPE D PRESIDENTIAL VILLA
VILLA B
3200
LEVEL 1
KID'S POOL
0.00 m
500 500
KID'S AREA
LANDSCAPE LEVEL WELCOME PAVILION
PRESIDENTIAL VILLA - ELEVATION A Copyright © 2011 WATG. All rights reserved.
notice
3 5B A1.01 4 VILLA B2 5B A1.01
1 : 100
GUESTWING F
3.20 m
TYPE B2 VILLA 11
1
This docum designer. confidence not be pub without th Do not Sca informatio
TOP OF GREEN ROOF
*ACCESSIBLE VILLA
-0.50 m
8
POOL LEVEL
MAIN POOL
POOL BAR
4
-1.00 m
no.
SEAFOOD RESTAURANT
watg.com
singapore | 65 6227 2618 key plan
VD.7
VD.7 VD.6
1
VD.E
W1.1
VD.5
4150
5D A3 .01
VD.4
4400
8
VD.D
VILLA ROOF PLAN
1:200
5 5D A4.02
1 : 200
G4 D2
TOP OF GREEN ROOF 3.30 m
ROOF LEVEL 3.20 m
1600
VD.G
VILLA 2
LOUNGE
BATHROOM
3200
1600
VD.F
VD.G
JACUZZI
3500
-0.15 m
LOUNGE
VD.H
NOT FOR CONSTRUCTION
VD.D
3500
5D A3.01
VD.J
7
VD.D
notice
UP BATHROOM
5D A3.01
LOUNGE
POOL LEVEL
-1.00 m
VD.C
PRESIDENTIAL VILLA - ELEVATION B
4150
VILLA 3
2
VD.K
5D A3.01
4150
BEDROOM
VD.K
-0.05 m
2
2
5D A3.01
BATHROOM
VD.B
A3.0
6
3
5D A3.01
5D A3 .01
1
4
4400
4 5D
VD.B
5D
POOL
A3.0
1 : 100
5D A3.01 1 4400
6
3
5D A3 .01
0.00 m
-0.50 m
+3.20 m
4400
4400
-0.35 m
VD.C
LEVEL 1
LANDSCAPE LEVEL
3500
VILLA 1
VD.J
This document and its contents are the copyright of the designer. Any party receiving this document does so in confidence and agrees that information contained herein shall not be published in whole or in part or disclosed to others without the express prior written consent of WATG. Do not Scale. All dimensions to be checked on site. All information on these drawings are for aesthetic content only.
12.00° 2000
4150
4150
12.00°
VD.H
500 500
3500
BEDROOM
7
0 1
W1.1
5D A3.01
4000
VD.F
W1.1
1
VD.C
DINING PAVILION
VD.4
4400
8
5D A3.01
4000
VD.6
3500
VD.5
4150
5D A3 .01
VD.B
100
3500
1
VD.E
7/3/2013 6:13:31 PM
VD.A
the original size of this drawing is A1 (594mm x 841mm)
BEACH
strategy planning architecture landscape interiors
BEDROOM
JACUZZI
DINING PAVILION
5
4000
VD.8 +2.85 m
VD.9
VD.10
5D
3500
A3.0
no.
1
+0.10 m
VD.10
3500
VD.1
4000
4000
VD.2
VD.3 3500
VD.1
3
/3/2013 5:41:44 PM
he original size of this drawing is A1 (594mm x 841mm)
5D A3.01
1
PRESIDENTIAL VILLA - ROOF PLAN 1 : 100
3
4000
VD.2
VD.3
5D A3.01
2
date
issue
issues | revisions
PRESIDENTIAL VILLA - FLOOR PLAN 1 : 100
1:100 0 0.5
METERS 2.5
5
R1
FDC Hotels Corporation
TOP OF GREEN ROOF
DINING PAVILION
3.30 m
W1.1
sheet title
123066
checked by: Checker drawn by:
Author
LEVEL 1
0.00 m
LANDSCAPE LEVEL
-0.50 m
POOL LEVEL
-1.00 m
5D A2.01
TOP OF GREEN ROOF 3.30 m
DINING PAVILION
ROOF LEVEL 3.20 m
W3
project logo
PRESIDENTIAL VILLAS PLANS
R1
3.20 m
G4
client logo
project no.
ROOF LEVEL
100
1
3200
A3.0
W1.3
4300
5D
3500
500 500
VD.9
03 JULY 100% DESIGN DEVELOPMENT 2013 06 JUNE 90% DESIGN DEVELOPMENT 2013 02 MAY 2013 50% DESIGN DEVELOPMENT 14 MAR 2013 100% SCHEMATIC DESIGN
3200
5
4000
VD.8
00% DESIGN DEVELOPMENT | 03 JULY 2013
Copyright © 2011 WATG. All rights reserved.
2 1
100
4 3
4300
VD.A DINING PAVILION
500 500
VD.A
LEVEL 1
0.00 m
LANDSCAPE LEVEL
-0.50 m
POOL LEVEL
-1.00 m
03 JU 2013 14 M
dat
issues | re
METERS 5
10
100% DESIGN DEVELOPMENT | 03 JULY 2013
VD.4
FDC
client logo
project log
VILLA
sheet title
project no
checked b
drawn by:
FOUR SEASONS HOTEL Tianjin, China
PROJECT INFORMATION Four Seasons Tianjin is housed in one of two new towers, both of which are supported by a podium for leisure amenities. The 52,000sm complex contains 90 residential units, 5,000sm of retail space and 259 hotel guest rooms in the 210m tall Four Seasons Tianjin tower. WATG was responsible for the architecture and interior design of the hotel.
ROLES & RESPONSIBILITIES This was my first project after joining WATG. I joined the design team after the concept stage. I was given the responsibility to design the facade modulation and details while consulting witht the team. The office didn’t roll in Revit at that time so this project was seen through till Design Development in Autocad. I experimented with Autocad parametric block feature with regards to the facade design as it was quite repetitive which helped the team be more efficient. HI tried to do quick design iterations to come up with different options and finalize the facade design. I also grew great enthusiasm to learn about hotel back of house design. I was involved from Schematic Design Phase and saw the project through Design Development. Stage: Constructed.
TIMELINE 2012
FOUR SEASONS HOTEL Tianjin, China
YES
MISC. PROJECTS Apart from the projects shown earlier, Iwas also involved in a number of other projects around the world. Some were part of business development proposals, some went to schemtic design phase and went on hold. Regardless of scale, location and complexity I tried to approach every project with passion for good design using latest technologies. I have always tried to be understanding of client’s need, site constraint and the environment. Beside working on projects, from time to time, I also shared tips and techniques for other designers to learn from by organizing brown bag sharing sessions. Rhino It Yourself
Thom Island Iconic Lantern PRE-REQUISITE: BASIC RHINO USER INTERFACE ORIENTATION & MOST IMPORTANTLY A CURIOUS MIND...
Kiroro Resort Gondola Station, Japan (2016) STEP 1 DRAW A CIRCLE, DEFINE THE CENTER
STEP 2 COPY INSTANCES IN Z-DIRECTION & SCALE THEM
STEP 3 SELECT THE CIRCLES & LOFT THEM TO CREATE SURFACE
commands: circle, line
commands: copy, scale
commands: loft
front
what it does
STEP 4 GO TO ANY ORTHOGONAL VIEW (FRONT, LEFT, RIGHT,ETC), DRAW CURVED LINES AND PROJECT THEM ON THE SURFACE
STEP 4 PIPE THE PROJECTED LINES WITH DESIRED DIAMETER/ RADIUS commands: pipe
commands: curve, project
STEP 5 MIRROR THE GROUP OF PIPES ALONG AN AXIS & THEN ARRAY IT RADIALLY AROUND THE ORIGINAL CENTER POINT
YOU HAVE YOUR LANTERN!
commands: Mirror, ArrayPolar
UNIVERSITY
Thom Island Lantern Pavilion Modeling (2017)
Ayana Lifestyle Resort, Bali (2017)
King Abdullah Gardens, Jordan (2016)
MISC. PROJECTS KEYNOTES / LEGENDS MATERIAL LEGEND Material Tag 2.8
5.11
5.5
6.4 11.1 11.2
6.4
Material Description EXPOSED STEEL DARK FINISH 1 THATCH ROOF BAMBOO TENSILE MEMBRANE
NOTE: BUILDING FINISH FLOOR LEVEL AT LEVEL 1 TO BE 50mm ABOVE THE LANDSCAPE PLATFORM LEVEL.
6.4
2.8
strategy planning architecture landscape interiors
2.8 watg.com
singapore | 65 6227 2618
LEVEL ROOF 2 30.55 m
LEVEL ROOF 2 30.55 m
2.8 6.4
client | consultant
11050
8200 11050
8200
11.2 11.2
11.1 6.4
stamp | approval
LOWER ROOF 22.35 m
2850
2.8
LOWER ROOF 22.35 m
11.1
NOT FOR CONSTRUCTION
This document and its contents are the copyright of the designer. Any party receiving this document does so in confidence and agrees that information contained herein shall not be published in whole or in part or disclosed to others without the express prior written consent of WATG. Do not Scale. All dimensions to be checked on site. All information on these drawings are for aesthetic content only.
2850
11.1
2.8
LEVEL 1 19.50 m
LEVEL 1 19.50 m
WL +18.90m
WL +18.90m
BUILDING LEVELS
1
BUILDING ELEVATION 1
2
1 : 100
All Building Levels and Spot Elevations reflected on this package, will be confirmed in the Landscape Architecture 100% SD Package.
BUILDING ELEVATION 2
notice
1 : 100
2
5.A
5.A
the original size of this drawing is A1 (594mm x 841mm)
4/10/2016 7:52:44 PM
8200 11050
11050
Copyright © 2016 WATG. All rights reserved.
Vinhomes Harbour City, Vietnam (2015)
LEVEL ROOF 2 30.55 m
8200
LEVEL ROOF 2 30.55 m
Thom Island Lantern Pavilion, Vietnam (2017)
AR - 100% SCHEMATIC DESIGN (REVISION) | 04 OCT 2016
1
2850
LOWER ROOF 22.35 m
2850
LOWER ROOF 22.35 m
LEVEL 1 19.50 m
LEVEL 1 19.50 m
WL +18.90 m
WL +18.90
3
4
key plan
4 3 2 1
no.
04 OCT 2016 AR - 100% SCHEMATIC DESIGN (REVISION) 23 SEPT AR - 100% SCHEMATIC DESIGN 2016 27 MAY 2016 90% SCHEMATIC DESIGN 29 APRIL 30% SCHEMATIC DESIGN 2016
date
issue
issues | revisions
THOM ISLAND PHASE ONE HON THOM ISLAND, VIETNAM
project name | project logo
LANTERN PAVILION ELEVATIONS AND SECTIONS sheet title
3
BUILDING SECTION A 1 : 100
4
BUILDING SECTION B 1 : 100
checked by: HC
1:100 0 0.5
METERS 2.5
drawn by:
project no.
AZ/IGA
5
component
date
153117
04/28/2016
5 A-301 sheet no.
Crowne Plaza Business Bay, Dubai (2016)
Ecopark Villas, Vietnam (2016)
ARCHITECTURE PORTFOLIO
P R O F E S S I O N A L W O R K S 2 012 - 2 018 QUAZI MOHD ASHIQUE-UZ-ZAMAN 8537 Karrman Ave, Burnaby, BC V3N 2M3, Canada email: iamashique@gmail.com; cell:+1 778 867 5503