8'-0"
53'-1 1/4"
8'-0"
5
6
5
7 7 7
13
8
3
. P
2
Cooler
. P
2
2
14
10'-0"
9 10
11
7'-10"
Food Prep 1
All Plumbing fixtures (sinks, washers, dishwashers, etc.) must be within 10'-0" of a plumbing trench.
4
8" Cast Iron waste into city sewer
3
5" 4'-3" 5"
Electric
9'-2"
north
Existing Conditions
OccupancyFloor plan
Equipment Schedule
Back Dining Room
Table Qty. Seat qty. SF/Person
538.16
696.19 603.99
4 seasons room
2 top
3
4 top
3
12
4 top
5
20
12.38 SF
4 top
1
4
4.44 SF
1
3
6 29.00 SF
BTU
81,000
4.8
108,000 90,000 149,000
5.8
16 15
65,000
QTY 1 1 1 1 2 1 3 1 1 1 1 1 1 1
MM.DD.YY
Main Dining Room
Table Top
AMPS 8.6 9.1 7.2 10.3
ISSUE
Kitchen
Area
3 4 5 6 7 8 9 10 11 12 13 14
TYPE LOCATION MAKE MODEL True Drawered Prep Table Kitchen TPP-67D-4 T-49 Reach in Refrigerator Kitchen True -10 degree freezer Kitchen True T-23F Kitchen Sandwich,Salad unit TSSU-72-18 True Kitchen Gas Griddle Vulcan MSA36 VACB36 Kitchen Counter Gas Broiler Vulcan 35C+ Tube Fired Gas Fryer Kitchen Pitco Kitchen Southbend P32A-171 Infrared Broiler Kitchen Perlick Glass Froster FR24 Kitchen Perlick TS3010 Standrad Ice Chest Kitchen Hobart HL600 60 QT. Mixer Kitchen Dishwasher E CMA Broaster 1800 Kitchen Broast Co. Walk-in cooler Exterior 10'x14'
245.170
OCCUPANCY TABLE CHART Location
NO. 1 2
100 SF/Person=538.16SF=10SF=5.38
PROJECT NO.
Kitchen
Proposed 98
Suzann Nordstrom
Restaurant 15 SF/Person 1344.55 SF+15=89.64
DRAWN BY
Occupancy Count
CLIENT
scale: 1/8"-1'-0"
Lounge seating Counter seating
45.83
Bar Counter
13 Tables/ 1 Counters
45
MM.DD.YY
14'-7"
12
Client Name 12345 Main Street Boulder, CO 00000 Tel: 000.000.0000
WH
RE-ISSUE
Food Prep
PROJECT
6'-8"
4" Cast iron waste stack
.. P
Trash and Grease
COORDINATION Occupancy by more than 96 persons is dangerous and unlawful
Structural Mechanical Electrical
Plumbing Data Other ________
I
PROGRESS DRAWING This drawing is not intended to be used for contract pricing or fabrication purposes. All content is subject to change
2
Cooler
Food Prep
Trash and Grease
Food Prep
WH
Floor plan scale: 1/8"-1'-0"
CLIENT
MM.DD.YY
RE-ISSUE
Existing stair wells and egress Existing plumbing Existing lobby location and the existing hotel brand The cultural norms Begin selecting only hospitality rated furniture and materials. Provide notes on the plan regarding the following Properties/performance criteria, ergonomics, environmental attributes and life cycle costs Possible installation methods and maintenance requirements Acoustical design ideas Note clearance standards and accessibility standards. Please be sure to use your text
PROJECT
Note on your plan the restrictions discussed in class and how you are creatively working around them (working with complex design problems)
MM.DD.YY
Apply universal design principles
ISSUE
245.170
Apply anthropometric data
PROJECT NO.
Suzann Nordstrom
DRAWN BY
Prove that you will appropriately apply theories of human behavior in the built environment
Client Name 12345 Main Street Boulder, CO 00000 Tel: 000.000.0000
north
COORDINATION Structural Mechanical Electrical
Plumbing Data Other ________
PROGRESS DRAWING This drawing is not intended to be used for contract pricing or fabrication purposes. All content is subject to change
I 3
2
north Floor plan
Fluorescent Fixture
CLIENT
s
Smoke Detector Pendant Fixture
MM.DD.YY
Track Lighting
RE-ISSUE
Recessed Ceiling Vapor MM.DD.YY
Lighting for clean-up includes fluorescent cans.
Sconce Fixture E
Emergency Light Direct exit
2
Exit through corridor Exit
9
All exit signs shall comply with city ordinances and meet OSHA requirements COORDINATION Structural Mechanical Electrical
Plumbing Data Other ________
PROJECT
1. Emergency lighting and exit signs shall be circuited to the existing base building emergency panel. 2. Provide separate neutral wires for emergency lighting and exit sign circuits. 3. Refer to architectural reflected ceiling plan for exact fixture locations for general lighting. Exit sign and emergency lighting shall be based on the engineering plans. Submit existing and emergency lighting layout to city per specifications and adjust locations if so directed. 4. Coordinate the exact mounting of all exit signs with architect and interior designer prior to ordering. Coordinate with door swing, obstructions, etc. to avoid conflicts.
ISSUE
Stand-by power system implemented.
11. All wall outlets to be mounted at 12" AFF unless noted. 12. All electrical components shall conform to the applicable requirements and standards, shall be UI listed and shall comply with requirements of the National Electrical Code. 13. All switches, outlets, cable TV jacks and telephone wall jacks to be white unless noted otherwise. 14. The contractor shall submit to the owner for review the following: Drawings, product specifications and wiring connection diagrams together with installation instructions, operating and maintenance manuals, field check-out, start-up and testing procedures for all equipment furnished. 15. No pull-chain fixtures as per code. 16. Provide minimum two small appliance circuits in kitchen.
245.170
Natural lighting is utilized during the day. Daylighting systems are installed.
Recessed Ceiling Fixture 1. All work shall comply with code. 2. Provide complete electrical system, including new electrical service, meter panels, wiring, conduit, outlets and wall boxes. 3. All wiring to be copper, min. 14 guage 4. Provide disconnect switch and wiring for all mechanical equipment. 5. Provide smoke and carbon monoxide detector units as per city code and as indicated on drawings. Hardwire all detector units. 6. Wall switches and outlets shall be 250 volts, 15 AMP or 20 AMP as required. All kitchen GFI outlets to be 20 AMP. 7. All outlets in toilet rooms, outdoor locations, mechanical room and within 6' of the kitchen sink must be GFI. Toilet rooms shall be on a separate circuit. 8. Connect all appliances and equipment as per city code. 9. All light swithches to be mounted at 48" AFF unless noted. 10. All thermostats to be mounted at 60" AFF and humidistats at 58" AFF unless noted otherwise.
PROJECT NO.
Suppression: devices used to extinguish flames including sprinklers, standpipes, fire hose cabinets and extinguishers.
Wall Washer
Emergency Lighting Notes
Suzann Nordstrom
Model 2100 Fire and smoke implemented for fire separation and smoke containment. vertically deploying fire and smoke rated curtain From smoke guard implemented in opening to the lobby. This solution works well for atrium separation and openings in walls.
Electrical Notes
DRAWN BY
Notes
Client Name 12345 Main Street Boulder, CO 00000 Tel: 000.000.0000
RCP Symbols
scale: 1/8"-1'-0"
I
PROGRESS DRAWING This drawing is not intended to be used for contract pricing or fabrication purposes. All content is subject to change
4