ASH L E Y ROD R I G UEZ
S E L E C T E D WORK SAMPLES 2017-19
I'M REALLY INTO... B R A N D E D ENVIRONMENTS I N T E D E S G D
R I O R I G N
R A P H I E S I G
C N
B U S I N E S S D E V E L O P M E N T P R O J E C T M A N A G E M E N T P U B L I C S P E A K I N G U D
X E
/ S
I
U G
I N
A R C H I T E C T U R E I
M
P
R
O
V
sierra tucson
renderings interior/exterior
behavioral
health hospital tucson arizona
reality front entrance
Full interiors package and design for a high-end inpatient hospital in the mountains of tucson, az. southwest revival style with behavioral health standards and codes met in a stylish, patient focused environment.
reality entry lobby
A L P A CONSTRUCTION
Behavioral health codes are some of the toughest to navigate, especially when trying to create a higher-end space. This project achieved both.
renderings interior/exterior
bedford
p a r k event center multi-sport
complex/ community
center A L P A CONSTRUCTION
south elevation facade design
floorplans sports court design rfp coordination and development of brand standards for rfp response including resume templates, diagrams, and infographics.
Working with community leaders and sport facility consultants was crucial in this project becoming a reality. Construction begins summer 2019.
studio apartment atlanta ga
INDEPENDENT
INTERIOR DESIGN A N D ILLUSTRATION
independent p r o j e c t
illustration chicago two-flats
I was given the freedom to re-design my studio apartment in atlanta, ga and chose to create a ww1 dazzle ship-inspired mural with sleek furniture and pops of color.
Creativity is a lifestyle for me, and I take every opportunity I can to flex those muscles! I illustrate and paint in my spare time, and love exploring new trends in interior design.
liebman science center
rendering exterior perspective
m c h e n r y c o u n t y c o l l e g e m c h e n r y i l l i n o i s
demonica kemper architects
rendering typical lab
Interior coordination assistance and design for the liebman science center at mchenry county college including a planetarium with glass face. coordinated CD set and worked closely with senior interior deisgner.
reality exterior perspective
Fritted and screen printed glass panels make up the planetarium's backlit window. The building utilizes brigk, zinc panels, and butt glazed openings.
mood board
v i v cycle
context connectivity study
RiNo District: Local art
Murals-IG Icons
Exposed Brick/Steel
Rehabbed Buildings
Pop-Up Shopping
i n d o o r cycling s t u d i o
VivCycle:
Reclaimed Material Pallette (Brick+Wood)
Pop-Up Shops Featuring Local Goods/Health Foods
Pop-Up Cycling Classes
VivCycle Step and Repeat/Mural for Social Media Presence
denver colorado
Calming/Natural Ambiance to Bring Outdoors In
conceptual floor plan
INDEPENDENT P R O J E C T cycle studio
ldry.
5
open stretch area
3
4
flex/ retail space
women’s
men’s
1
Developed concept, branding, and layout for a spin studio in Denver's RiNo arts district. Researched the area and derived clear connections between the brand and site. currently under construction.
1
lockers
1. 2. 3. 4. 5.
conceptual entry elevation
p pop-upy sho ma 6
2
shoe cubbies retail display community board communal sink/beauty bar stall bars/resistance bands
Working one-onone with a young client to bring her vision to reality to potential investors secured a lease and funding for @vivcycle, coming summer 2019.
rendering looking south
maggie daley p a r k pavillion concess i o n s pavillion
chicago A L P A CONSTRUCTION
rendering looking north east
winning competition entry to propose a concessions and event center in an empty space of maggie daley park. Design blends the landscape and building, satisfying both the city and friends of the park.
many late nights, revit crashes, and hours of rendering and researching over 5 days produced a coherent and well thought out scheme for maggie daley park.
rendering looking north from above
maggie daley p a r k pavillion oncessions pavillion
chicago A L P A CONSTRUCTION
design includes a rooftop brewpub, green roof, event space, children's activity area, and much needed public restrooms.
one of the main concerns for the review board was seamlessly integrating the building with the park. this view expressed how the building did just that.
renderings nstagram feed interior/exterior
BRANDING A N D SOCIAL M E D I A STRATEGY
construction project rfp response DELIVERY METHOD
STATUS
Target Cost IPD GC Proposal Cost Plus Fee GMP + LEAN
DATE APPROVED
COLLABORATORS
CURRENT CONDITIONS
PROJECT EXPERIENCE
BACKGROUND
BELMONT BEHAVIORAL HEALTH
• Owner/Designer seeking GC partner for Target Value Design and Construction Process • Target Construction Investment is $36.7 Million • Integrated partnership & schedule. Assumed 6 Months of Preconstruction & 18 Months of Construction.
Todd Sarason- Project Manager Paul Gabriel - Superintendent William Green - Project Engineer
Brian Shunk - Director of Construction Maxwell Nichols - BIM Director Kurt Scheuermann - Project Executive
Proposal
New Construction of a 128 Bed, 105,000 SF Behavioral Health Facility in Fargo, ND. The ground up new facility includes a Gymnasium, Cafeteria, Administration and Support spaces.
INNOVATION
BIM & VDC SOLUTIONS COLLABORATIVE MODEL INTEGRATION
$130 Million, 250,000 SF of phased New Construction, including 252 beds.
Main Construction Entrance. See Bid Instructions
Construc
tion Area Trailers Play
"B" North Half
Detention
Detention
1 Cab
Note: The Underground Storm Detention in the Southeast and Partial Southwest (Shown in Green) are the first Items to be Installed
Continuous Coordination, Pre-Construction and refinement
Note: The Hospital will be built from South to North with the South half structure built first and the North half structure built second
$35 Million, 89,900 SF of New Construction, including 128 Acute Beds. 13 Month schedule.
CLOSEOUT/TURNOVER
May Jun Jul
CIVIL
CIVIL
STRUCTURAL ENVELOPE
BELMONT HOSPITAL ($318.50/SF)
INTERIORS
HARBOR OAKS ($267.33/SF)
Oct
Nov Dec
Jan Feb
Mar
A L P A CONSTRUCTION
WINTER CONDITIONS: NOV 1 - MAR 31
2021 Apr
May Jun
Jul
$31,580,680
$75,000
$149,050
$315,807
$35,898,428
$341.89
Jan
Feb
Mar
Apr May Jun Jul Aug
Sep Oct Nov
MEP TRIM
INTERIOR FRAMING EXTERIOR ENCLOSURE
INTERIOR FINISHES MEP ROUGH
CONCRETE SLABS /FIREPROOFING
BUILDING PAD / FOUNDATIONS
CORE WALL SHEAR ELEMENTS SCHEDULE - HEADS IN BEDS NOVEMBER 26, 2021
2019
2-4-8 MONTH PLAN
May Jun Jul • Target Value Design Workshop(s) • Execute RFP for Design Assist trade partners • Early work packages investigation and prep (Site Clearing, Utilities, Rough Grade, etc.) • Work in close contact with each design discipline team to deliver design at or under Target Cost • Issue Design Development & early Bid Packages
Oct Nov Dec
DRYWALL
TOTAL COST/SF
4 MONTHS
Sep
STRUCTURAL STEEL
MEP
TOTAL OPINION OF COST
$1,579,034
Aug
EXISTING BUILDING DEMOLITION
PRAIRIE ST.JOHN ($296.00/SF)
PERMITS (1%) ESCALATION
$789,517
Sep
$107.70/SF
$8.17/SF
$106.17/SF
$65.98/SF
$54.42/SF
$79.21/SF
$53.32/SF
$48.85/SF
$ 63.31/SF
$35.01/SF
$ 32.59/SF
$36.59/SF
$25.91/SF
$ 22.46/SF
STRUCTURAL
$0
GENERAL FEE (2.5%) REQUIREMENTS
Define the project and conditions of satisfaction Establish the Project Goals within Target Based Value Design Discuss and validate expected cost Create detailed “Master Schedule” Outreach to local trade partners Open communication with local AHJ and Utility providers Develop and agree on Target Cost
TIME AND MONEY SAVINGS
2020 Aug
PRECONSTRUCTION
$25/SF
MEP $11.3 M
2 MONTHS
=
PROPOSED PROJECT SCHEDULE - 18 MONTHS
2019
PRECONSTRUCTION GENERAL CONDITIONS
• • • • • • •
MODULARIZATION
STEEL MOMENT FRAME SCHEDULE - HEADS IN BEDS AUGUST 31, 2021
$50/SF
SUBCONTRACTED HARD COSTS
$1,409,340
+
Leverage BIM Models to expedite prefabrication off site of long lead items, large quantities of assemblies while also minimizing costs and maximizing time savings.
$75/SF
Sales
ENVELOPE
$31,580,680
$100/SF
$33.31.88/SF
INTERIORS
CIVIL $2.7 M
chicago
CONSTRUCTION
Early integration of Construction & Design teams
PRE-FABRICATION
MEP
INTERIORS $6.9 M
PRE-DESIGN DESIGN
CURRENT OPINION OF COSTS
SUBCONTRACTED COSTS
LEAN CONSTRUCTION PRINCIPALS Always analyzing, adjusting and refineing processes throughout entire project duration.
Multiple Permitting & Bid Packages
EXCEED EXPECTATIONS & CREATE LASTING RELATIONSHIPS • Assist the Joint Venture between UHS and Prairie St.John Hospital to help fill the increasing necessity for Behavioral Health services in North Dakota • Achieve on-schedule and within budget project by listening, learning and integrating project specific best practice.
STRUCTURAL $3.7M
CONSTRUCTION
Drive
HARBOR OAKS BEHAVIORAL HEALTH
PROJECT GOALS
ENVELOPE $5.6 M
A L P A
PROJECT DELIVERY WORKFLOW DIAGRAM
"O" South
4-D BIM CONSTRUCTION SEQUENCING
Find errors before they happen on site through Adding a layer of time (scheduling) to the 3D Model Clash Detection. All project partners model building sequences and logictics collaboritivly creating the most effecient and planning can help save the project time effective solutions. and money.
M/M Hoist
Alpa Construction Hospital Phasing Plan May 31, January 15,2018 2018 May 31, 2018
Storm
Storm
South Half
Storm
Hospital Patient & Staff Entrance. See Bid Instructions
Detention
"G"
INNOVATIVE, DEDICATED, PROVEN EXPERT TEAM
3-D BIM COORDINATION
On Site, in the field, at the Office & in the Cloud. Constantly updating geometry & data shared by all project partners.
Gym
Healing Garden
PROJECT TEAM
• National presence with local experience • Local trade partner relationships with Behavioral Health experience • Expertise in Lean Construction, Integrated Project Delivery, Prefabrication and BIM/VDC processes • 7 years of experience working with Stengel-Hill Architects on multiple Behavioral Health Facilities across the nation. • Project specific team developed to provide UHS the most experienced and knowledgeable ALPA Team.
PROJECT DESCRIPTION
TBD
8 MONTHS
2020 Aug
Sep
Oct
Nov Dec
Jan Feb
Mar
2021 Apr
May Jun
Jul
Aug
SHEAR WALLS STAIR AND ELEVATOR TOWERS
PRECONSTRUCTION
• Consistent reporting of Target Cost = Transparent Updates and Dialogue • Meet Target Value Goals - Never Exceed • Establish GMP • Issue Subcontracts & procure Long Lead Items • Complete deferred Design Submittals • Plan Reviews and Permit • On-Site Mobilization
EXISTING BUILDING DEMOLITION
Sep
Oct Nov Dec
Jan
Feb
Mar
Apr May Jun Jul Aug
Sep Oct Nov
INTERIOR FINISHES
EXTERIOR ENCLOSURE
STRUCTURAL STEEL
INTERIOR FRAMING
MEP TRIM
MEP ROUGH DRYWALL BUILDING PAD / FOUNDATIONS
CONCRETE SLABS /FIREPROOFING
template and logo production ALPA Construction is a full-service construction management and design services firm with projects nationwide. ALPA’s expertise and strengths lies in the planning, execution, and development of complex, multi-faceted projects. ALPA prides itself on working closely with our clients,consultants, and local authorities. Our all-inclusive approach provides consistent, detail-oriented services whilst maintaining open lines of communication with our clients throughout all phases of planning,design, pre-construction and construction.
Resumés
MAXWELL NICHOLS
About
Education/Experience
Maxwell brings 15 years of professional BIM experience to the ALPA team. Maxwell has worked with project teams and AEC organizations to develop organizational and project specific BIM processes for all major AEC disciplines and various specialty consultants. Maxwell has taken part in the BIM coordination and execution processes on more than 20 IPD, Design/Build and/or Design Assist projects. These projects include leading the BIM portion of several IPD projects with construction costs over 100 million USD.
KEY FACTS
ALPA CONSTRUCTION IS COMMITTED TO IMPROVING THE LIVES OF MILLIONS AFFECTED BY MENTAL HEALTH DISORDERS NATIONWIDE.
BIM DIRECTOR
B.ARCH Boston Architectural College Professional Bachlor of Architecture Autodesk Certified Implementor (ACI), Educator (ACE) and Professional (ACP) for Multiple AEC Disciplines
NEW FACILITIES IN 2018
816
26
PATIENT BEDS CREATED
(Architecture, Structural, MEP & Construction Disciplines) includes both Navisworks and Revit Software
SPACES TRANSFORMING
BEHAVIORAL HEALTH EXPERTISE 38 behavioral health projects completed in 2018 Project teams have 18 years of behavioral health experience
LEAN/LAST PLANNER
PROVEN TRACK RECORD
BIM COORDINATION
SELF-PERFORM CAPABILITIES
Fully integrated with LEAN construction processes
All projects delivered on or before contractural completion date in 2018
Integrated BIM/Virtual Design & Constrution (VDC) department
Demoltion/Carpentry
Milestone pull sessions
Masonry
PROJECT SECTORS
ALPA CONSTRUCTION
HEALTHCARE AVIATION
LIVES
LEED AP, eSPECS Integrator
Flooring/Paint
Leaders in prefabrication
NATIONWIDE PROJECT EXPERIENCE
PUBLIC/MUNICIPAL MASTER PLANNING ATHLETICS
CHINATOWN LIBRARY Chicago, IL Project completed at other firm
18,000 squatre foot Chicago Public Library Design/Building partnership which won multiple AIA awards. Architectural and MEP-FP coordination helped allow the building to be delivered 2 months early and 1.5 million dollars under budget.
Created system of RFP response and company profile templates in InDesign and created infographics, logos, and brand standards. Managed all social media accounts and increased engagement by 300%.
HOSPITALITY
ALPA IS NATIONWIDE. OUR PROJECTS CAN BE FOUND IN
Experience CHILDREN’S HOSPITAL Milwaukee, WI
CAMPUS RESIDENCE HALL Chicago, IL
Project completed at other firm
Project completed at other firm
Campus expansion project featuring 425,000 square feet patient bedtower including 181 patient beds, acute care spaces and an attached Parking Structure. Fast Tracked Design/Build Project with integrated BIM workflows.
Developed, managed and helped execute BIM Model Management and Coordination Strategy for 320,000 SF Design-Build Student Housing and Cafeteria building. Executed project 6 months ahead of schedule and more the 10 million under budget with an integrated design and construction team.
28
STATES ACROSS THE CAAOUNTRY
RESTAURANTS
Currently have active projects in
14 states
RETAIL
...AND COUNTING!
WWW.ALPACONSTRUCTION.COM
WWW.ALPACONSTRUCTION.COM
Execution
Managing social media and marketing allows me to utilize my creative and graphic skillset everyday. I'm always looking for the next idea for our outreach.
LIKE WHAT YOU SEE? C O N T A C T ASHLEYNRODRIGUEZ@OUTLOOK.COM 4 0 4 . 9 5 6 . 8 6 6 9
@ S T U F F A S H L E Y D I D