Work Samples 2017-2019

Page 1

ASH L E Y ROD R I G UEZ

S E L E C T E D WORK SAMPLES 2017-19


I'M REALLY INTO... B R A N D E D ENVIRONMENTS I N T E D E S G D

R I O R I G N

R A P H I E S I G

C N

B U S I N E S S D E V E L O P M E N T P R O J E C T M A N A G E M E N T P U B L I C S P E A K I N G U D

X E

/ S

I

U G

I N

A R C H I T E C T U R E I

M

P

R

O

V


sierra tucson

renderings interior/exterior

behavioral

health hospital tucson arizona

reality front entrance

Full interiors package and design for a high-end inpatient hospital in the mountains of tucson, az. southwest revival style with behavioral health standards and codes met in a stylish, patient focused environment.

reality entry lobby

A L P A CONSTRUCTION

Behavioral health codes are some of the toughest to navigate, especially when trying to create a higher-end space. This project achieved both.


renderings interior/exterior

bedford

p a r k event center multi-sport

complex/ community

center A L P A CONSTRUCTION

south elevation facade design

floorplans sports court design rfp coordination and development of brand standards for rfp response including resume templates, diagrams, and infographics.

Working with community leaders and sport facility consultants was crucial in this project becoming a reality. Construction begins summer 2019.


studio apartment atlanta ga

INDEPENDENT

INTERIOR DESIGN A N D ILLUSTRATION

independent p r o j e c t

illustration chicago two-flats

I was given the freedom to re-design my studio apartment in atlanta, ga and chose to create a ww1 dazzle ship-inspired mural with sleek furniture and pops of color.

Creativity is a lifestyle for me, and I take every opportunity I can to flex those muscles! I illustrate and paint in my spare time, and love exploring new trends in interior design.


liebman science center

rendering exterior perspective

m c h e n r y c o u n t y c o l l e g e m c h e n r y i l l i n o i s

demonica kemper architects

rendering typical lab

Interior coordination assistance and design for the liebman science center at mchenry county college including a planetarium with glass face. coordinated CD set and worked closely with senior interior deisgner.

reality exterior perspective

Fritted and screen printed glass panels make up the planetarium's backlit window. The building utilizes brigk, zinc panels, and butt glazed openings.


mood board

v i v cycle

context connectivity study

RiNo District: Local art

Murals-IG Icons

Exposed Brick/Steel

Rehabbed Buildings

Pop-Up Shopping

i n d o o r cycling s t u d i o

VivCycle:

Reclaimed Material Pallette (Brick+Wood)

Pop-Up Shops Featuring Local Goods/Health Foods

Pop-Up Cycling Classes

VivCycle Step and Repeat/Mural for Social Media Presence

denver colorado

Calming/Natural Ambiance to Bring Outdoors In

conceptual floor plan

INDEPENDENT P R O J E C T cycle studio

ldry.

5

open stretch area

3

4

flex/ retail space

women’s

men’s

1

Developed concept, branding, and layout for a spin studio in Denver's RiNo arts district. Researched the area and derived clear connections between the brand and site. currently under construction.

1

lockers

1. 2. 3. 4. 5.

conceptual entry elevation

p pop-upy sho ma 6

2

shoe cubbies retail display community board communal sink/beauty bar stall bars/resistance bands

Working one-onone with a young client to bring her vision to reality to potential investors secured a lease and funding for @vivcycle, coming summer 2019.


rendering looking south

maggie daley p a r k pavillion concess i o n s pavillion

chicago A L P A CONSTRUCTION

rendering looking north east

winning competition entry to propose a concessions and event center in an empty space of maggie daley park. Design blends the landscape and building, satisfying both the city and friends of the park.

many late nights, revit crashes, and hours of rendering and researching over 5 days produced a coherent and well thought out scheme for maggie daley park.


rendering looking north from above

maggie daley p a r k pavillion oncessions pavillion

chicago A L P A CONSTRUCTION

design includes a rooftop brewpub, green roof, event space, children's activity area, and much needed public restrooms.

one of the main concerns for the review board was seamlessly integrating the building with the park. this view expressed how the building did just that.


renderings nstagram feed interior/exterior

BRANDING A N D SOCIAL M E D I A STRATEGY

construction project rfp response DELIVERY METHOD

STATUS

Target Cost IPD GC Proposal Cost Plus Fee GMP + LEAN

DATE APPROVED

COLLABORATORS

CURRENT CONDITIONS

PROJECT EXPERIENCE

BACKGROUND

BELMONT BEHAVIORAL HEALTH

• Owner/Designer seeking GC partner for Target Value Design and Construction Process • Target Construction Investment is $36.7 Million • Integrated partnership & schedule. Assumed 6 Months of Preconstruction & 18 Months of Construction.

Todd Sarason- Project Manager Paul Gabriel - Superintendent William Green - Project Engineer

Brian Shunk - Director of Construction Maxwell Nichols - BIM Director Kurt Scheuermann - Project Executive

Proposal

New Construction of a 128 Bed, 105,000 SF Behavioral Health Facility in Fargo, ND. The ground up new facility includes a Gymnasium, Cafeteria, Administration and Support spaces.

INNOVATION

BIM & VDC SOLUTIONS COLLABORATIVE MODEL INTEGRATION

$130 Million, 250,000 SF of phased New Construction, including 252 beds.

Main Construction Entrance. See Bid Instructions

Construc

tion Area Trailers Play

"B" North Half

Detention

Detention

1 Cab

Note: The Underground Storm Detention in the Southeast and Partial Southwest (Shown in Green) are the first Items to be Installed

Continuous Coordination, Pre-Construction and refinement

Note: The Hospital will be built from South to North with the South half structure built first and the North half structure built second

$35 Million, 89,900 SF of New Construction, including 128 Acute Beds. 13 Month schedule.

CLOSEOUT/TURNOVER

May Jun Jul

CIVIL

CIVIL

STRUCTURAL ENVELOPE

BELMONT HOSPITAL ($318.50/SF)

INTERIORS

HARBOR OAKS ($267.33/SF)

Oct

Nov Dec

Jan Feb

Mar

A L P A CONSTRUCTION

WINTER CONDITIONS: NOV 1 - MAR 31

2021 Apr

May Jun

Jul

$31,580,680

$75,000

$149,050

$315,807

$35,898,428

$341.89

Jan

Feb

Mar

Apr May Jun Jul Aug

Sep Oct Nov

MEP TRIM

INTERIOR FRAMING EXTERIOR ENCLOSURE

INTERIOR FINISHES MEP ROUGH

CONCRETE SLABS /FIREPROOFING

BUILDING PAD / FOUNDATIONS

CORE WALL SHEAR ELEMENTS SCHEDULE - HEADS IN BEDS NOVEMBER 26, 2021

2019

2-4-8 MONTH PLAN

May Jun Jul • Target Value Design Workshop(s) • Execute RFP for Design Assist trade partners • Early work packages investigation and prep (Site Clearing, Utilities, Rough Grade, etc.) • Work in close contact with each design discipline team to deliver design at or under Target Cost • Issue Design Development & early Bid Packages

Oct Nov Dec

DRYWALL

TOTAL COST/SF

4 MONTHS

Sep

STRUCTURAL STEEL

MEP

TOTAL OPINION OF COST

$1,579,034

Aug

EXISTING BUILDING DEMOLITION

PRAIRIE ST.JOHN ($296.00/SF)

PERMITS (1%) ESCALATION

$789,517

Sep

$107.70/SF

$8.17/SF

$106.17/SF

$65.98/SF

$54.42/SF

$79.21/SF

$53.32/SF

$48.85/SF

$ 63.31/SF

$35.01/SF

$ 32.59/SF

$36.59/SF

$25.91/SF

$ 22.46/SF

STRUCTURAL

$0

GENERAL FEE (2.5%) REQUIREMENTS

Define the project and conditions of satisfaction Establish the Project Goals within Target Based Value Design Discuss and validate expected cost Create detailed “Master Schedule” Outreach to local trade partners Open communication with local AHJ and Utility providers Develop and agree on Target Cost

TIME AND MONEY SAVINGS

2020 Aug

PRECONSTRUCTION

$25/SF

MEP $11.3 M

2 MONTHS

=

PROPOSED PROJECT SCHEDULE - 18 MONTHS

2019

PRECONSTRUCTION GENERAL CONDITIONS

• • • • • • •

MODULARIZATION

STEEL MOMENT FRAME SCHEDULE - HEADS IN BEDS AUGUST 31, 2021

$50/SF

SUBCONTRACTED HARD COSTS

$1,409,340

+

Leverage BIM Models to expedite prefabrication off site of long lead items, large quantities of assemblies while also minimizing costs and maximizing time savings.

$75/SF

Sales

ENVELOPE

$31,580,680

$100/SF

$33.31.88/SF

INTERIORS

CIVIL $2.7 M

chicago

CONSTRUCTION

Early integration of Construction & Design teams

PRE-FABRICATION

MEP

INTERIORS $6.9 M

PRE-DESIGN DESIGN

CURRENT OPINION OF COSTS

SUBCONTRACTED COSTS

LEAN CONSTRUCTION PRINCIPALS Always analyzing, adjusting and refineing processes throughout entire project duration.

Multiple Permitting & Bid Packages

EXCEED EXPECTATIONS & CREATE LASTING RELATIONSHIPS • Assist the Joint Venture between UHS and Prairie St.John Hospital to help fill the increasing necessity for Behavioral Health services in North Dakota • Achieve on-schedule and within budget project by listening, learning and integrating project specific best practice.

STRUCTURAL $3.7M

CONSTRUCTION

Drive

HARBOR OAKS BEHAVIORAL HEALTH

PROJECT GOALS

ENVELOPE $5.6 M

A L P A

PROJECT DELIVERY WORKFLOW DIAGRAM

"O" South

4-D BIM CONSTRUCTION SEQUENCING

Find errors before they happen on site through Adding a layer of time (scheduling) to the 3D Model Clash Detection. All project partners model building sequences and logictics collaboritivly creating the most effecient and planning can help save the project time effective solutions. and money.

M/M Hoist

Alpa Construction Hospital Phasing Plan May 31, January 15,2018 2018 May 31, 2018

Storm

Storm

South Half

Storm

Hospital Patient & Staff Entrance. See Bid Instructions

Detention

"G"

INNOVATIVE, DEDICATED, PROVEN EXPERT TEAM

3-D BIM COORDINATION

On Site, in the field, at the Office & in the Cloud. Constantly updating geometry & data shared by all project partners.

Gym

Healing Garden

PROJECT TEAM

• National presence with local experience • Local trade partner relationships with Behavioral Health experience • Expertise in Lean Construction, Integrated Project Delivery, Prefabrication and BIM/VDC processes • 7 years of experience working with Stengel-Hill Architects on multiple Behavioral Health Facilities across the nation. • Project specific team developed to provide UHS the most experienced and knowledgeable ALPA Team.

PROJECT DESCRIPTION

TBD

8 MONTHS

2020 Aug

Sep

Oct

Nov Dec

Jan Feb

Mar

2021 Apr

May Jun

Jul

Aug

SHEAR WALLS STAIR AND ELEVATOR TOWERS

PRECONSTRUCTION

• Consistent reporting of Target Cost = Transparent Updates and Dialogue • Meet Target Value Goals - Never Exceed • Establish GMP • Issue Subcontracts & procure Long Lead Items • Complete deferred Design Submittals • Plan Reviews and Permit • On-Site Mobilization

EXISTING BUILDING DEMOLITION

Sep

Oct Nov Dec

Jan

Feb

Mar

Apr May Jun Jul Aug

Sep Oct Nov

INTERIOR FINISHES

EXTERIOR ENCLOSURE

STRUCTURAL STEEL

INTERIOR FRAMING

MEP TRIM

MEP ROUGH DRYWALL BUILDING PAD / FOUNDATIONS

CONCRETE SLABS /FIREPROOFING

template and logo production ALPA Construction is a full-service construction management and design services firm with projects nationwide. ALPA’s expertise and strengths lies in the planning, execution, and development of complex, multi-faceted projects. ALPA prides itself on working closely with our clients,consultants, and local authorities. Our all-inclusive approach provides consistent, detail-oriented services whilst maintaining open lines of communication with our clients throughout all phases of planning,design, pre-construction and construction.

Resumés

MAXWELL NICHOLS

About

Education/Experience

Maxwell brings 15 years of professional BIM experience to the ALPA team. Maxwell has worked with project teams and AEC organizations to develop organizational and project specific BIM processes for all major AEC disciplines and various specialty consultants. Maxwell has taken part in the BIM coordination and execution processes on more than 20 IPD, Design/Build and/or Design Assist projects. These projects include leading the BIM portion of several IPD projects with construction costs over 100 million USD.

KEY FACTS

ALPA CONSTRUCTION IS COMMITTED TO IMPROVING THE LIVES OF MILLIONS AFFECTED BY MENTAL HEALTH DISORDERS NATIONWIDE.

BIM DIRECTOR

B.ARCH Boston Architectural College Professional Bachlor of Architecture Autodesk Certified Implementor (ACI), Educator (ACE) and Professional (ACP) for Multiple AEC Disciplines

NEW FACILITIES IN 2018

816

26

PATIENT BEDS CREATED

(Architecture, Structural, MEP & Construction Disciplines) includes both Navisworks and Revit Software

SPACES TRANSFORMING

BEHAVIORAL HEALTH EXPERTISE 38 behavioral health projects completed in 2018 Project teams have 18 years of behavioral health experience

LEAN/LAST PLANNER

PROVEN TRACK RECORD

BIM COORDINATION

SELF-PERFORM CAPABILITIES

Fully integrated with LEAN construction processes

All projects delivered on or before contractural completion date in 2018

Integrated BIM/Virtual Design & Constrution (VDC) department

Demoltion/Carpentry

Milestone pull sessions

Masonry

PROJECT SECTORS

ALPA CONSTRUCTION

HEALTHCARE AVIATION

LIVES

LEED AP, eSPECS Integrator

Flooring/Paint

Leaders in prefabrication

NATIONWIDE PROJECT EXPERIENCE

PUBLIC/MUNICIPAL MASTER PLANNING ATHLETICS

CHINATOWN LIBRARY Chicago, IL Project completed at other firm

18,000 squatre foot Chicago Public Library Design/Building partnership which won multiple AIA awards. Architectural and MEP-FP coordination helped allow the building to be delivered 2 months early and 1.5 million dollars under budget.

Created system of RFP response and company profile templates in InDesign and created infographics, logos, and brand standards. Managed all social media accounts and increased engagement by 300%.

HOSPITALITY

ALPA IS NATIONWIDE. OUR PROJECTS CAN BE FOUND IN

Experience CHILDREN’S HOSPITAL Milwaukee, WI

CAMPUS RESIDENCE HALL Chicago, IL

Project completed at other firm

Project completed at other firm

Campus expansion project featuring 425,000 square feet patient bedtower including 181 patient beds, acute care spaces and an attached Parking Structure. Fast Tracked Design/Build Project with integrated BIM workflows.

Developed, managed and helped execute BIM Model Management and Coordination Strategy for 320,000 SF Design-Build Student Housing and Cafeteria building. Executed project 6 months ahead of schedule and more the 10 million under budget with an integrated design and construction team.

28

STATES ACROSS THE CAAOUNTRY

RESTAURANTS

Currently have active projects in

14 states

RETAIL

...AND COUNTING!

WWW.ALPACONSTRUCTION.COM

WWW.ALPACONSTRUCTION.COM

Execution

Managing social media and marketing allows me to utilize my creative and graphic skillset everyday. I'm always looking for the next idea for our outreach.


LIKE WHAT YOU SEE? C O N T A C T ASHLEYNRODRIGUEZ@OUTLOOK.COM 4 0 4 . 9 5 6 . 8 6 6 9

@ S T U F F A S H L E Y D I D


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.