ARCHITECTURE
PORTFOLIO Ashrafuli52@gmail.com
MD ASHRAFUL ISLAM
02.03.1993 Dhaka, Bangladesh
Wari Dhaka Bangladesh-1204 1624050779 Ashrafuli52@gmail.com EDUCATION
Bachelor of Architecture North South University 2012-2017
Higher Secondary School Certificate Dhaka City College Science 2009-2011
Secondary School Certificate Ideal School and College Science 2007-1009
EXPERIENCE
Archden Consaltants Junior Architect 2018-2019
COMPUTER SKILLS
Autodesk Auto CAD Autodesk Revit Adobe Photoshop Adobe Illustator Adobe InDesign Sketch UP, V-Ray,Lumion Microsoft Word, Excel, Powerpoint
AUTOBIOGRAPHY Md Ashraful Islam
It was my Intense desire to be an Architect Isince my Childhood. After Completing my highschool, in 2011 I got chance to beadmitted at the Architecture discipline North South University, One of the Most Competitive and Reputed Privet Universities in Bangladesh. In the early Years I Focused on both functional and Aesthetical Aspects. My Design thinking had influenced by the indisputable position of Architecture in the Social and Cultural Context. Along with the clarity of function and Various Aesthetic canons, My Architecture become more meaningful with the Integration of climate, context, Functionality, Structure, Economic and most importantly conscientiousness to the Environment. I got the opportunity to Involve in the Icontextual practice in my early years of study. Working in the practical ground with a number of senior Architects was a major twist in my works. Comprising my experiences both from my academic works and practice, I feel that Architecture is strain between Limited condition and architects has that Artistic Interpretation. Architecture and planning in Bangladesh or most of the developing countries is dilemma between Economics and Environment Aspects.
ARCHITECTURAL PORTFOLIO
MD ASHRAFUL ISLAM SELECTED WORKS
SELECTED COMPETITION PROJECTS Sedhio Cultural Centre IDCOL Head Office Green Building SELECTED ACADEMIC PROJECTS Vertical Car Parking Urban Development Along Purbachol Expressway Bextext Garments Worker Settlement SELECTED PRACTICE PROJECTS 12th Storied Apartment Building at Gulshan 8th Storied Apartment Building at Baridhara Water Development Board Housing at Sylhet - Shahi-Eidga Housing. - Sobhanighat Housing. - Zakigonj Housing. - Zaintapur Housing. - Nairpool Housing. Sairu Hill Reasort. Fencing Association Office.
SELECTED COMPETITION PROJECTS SEDHIO CULTURAL CENTRE Affillation Withe The Project Project Architect Design and Function Documentation and Presentation 3D Model Making Site Area 7200sft Program Requared: 44,000sft Project Abstuct: Senegal is a country situated in west coast of Africa, full of rich tradition and culture such as music, dance, art and storey telling. This project aims to provide a facility that will give the community a place to share their culture, tradition, by means of storey telling and showcasing their vibrant tradition and culture. This also gives an opportunity to share their culture not just among themselves but with other communities of different ethnicity.
Concept: For us it’s not only important to design an architecture, but also to design it in a way that influence the both the environment and the community in a positive way. To do so, we used two major considerations. Firstly, we designed the building in such a way that all functions get adequate natural light and ventilation to reduce dependency on mechanical sources during the day. Along with this rain water harvesting was integrated with the design. Secondly, references were taken from the local community, about their locally available materials, and building techniques etc. So, by using local materials and technique it is possible for the community to be involved both physically and mentally with the designer and the building. It presents them a sense of ownership. And finally, to tie these two considerations together, we developed a layout that is fixable to the needs and demand of the people and the community.
Site plan
SEDHIOU CULTURAL CENTRE
Main Axis of Movement
Arrangement of Program Along The Axis of Movement Toilets
Performance /Education
Toilets
Library
Design Consideration: Sustainability Layout option for Cultural Education
Natural Light
Natural Ventilation
Rain Water Harvesting
Local Material
Layout Option 1
Education Performence Library Admin Exhibition Services Layout option for Performance
Store
A Performance /Education
A Exhibition
Flexible open space Office
Plan @ 5’ 0
5 10
20
40 ft
Design Consideration: Community Engagement Layout Option 2 Community Involvement
Local Work Force
Layout Option 1
Local Building Methods
Connecting Communities through
Layout Option 3
Layout Option 2
South East Elevation Natural Ventilation
Story Telling
Library
Exhibition
Performance
Layout Option 4 Layout Option 3
Rain Water Harvesting
Layout Option 5
Performance / Education space
Sectional Perspective
Performance / Education space
Office
Exhibition Space
TeamID: AINOLIESH123
IDCOL Head Office Green Building Agargaon Affillation Withe The Project Project Architect Design and Function Documentation and Presentation 3D Model Making Site Area 7200sft Program Requared: 44,000sft Project Abstruct: This project was an open competition the site is situated in shere-e-bangla nagar agargaon Dhaka. Site is surrundin all side except the south side along with the 60feet road. This building will be used for the IDCOL head office near future. The program of the project was design by IDCOL according to there needs. Threr main concern of the building should be a Certified green building as they are working with the green eneargy for the society.
Concept: The Building project for IDCOL is move to ecological sustainable development, which require new principles, technology, tools and changes to the process of planning and design. Green building or sustainable design is a response to the new Age of Information and Ecology. While building design will includes and utilize ecological principles, a sustainable dilemma can be solved if the building provide improved environmental performance in their operations. Ecological design principles have come about due to the effects of human activity on the planets ecological cycles. The design will add further dimensions of the state of the ecological system. Hence the approach of ‘Form follows environment’ is a simplified description of the design may be considered. Yet there is a substantive matter may concern the building both to provide a meaningful expression of the ecological principles on which the design will be based and providing high operational environmental performance.
IDCOL,
Agargaon, Sher-E-Bangla Nagar, Dhaka. Open Architectural Design Competition, For the design of “Commercial (ofce) Green Building” for IDCOL.
DESIGN DEVELOPMENT
The Site is elongated on the East West side, exposing the site to the western and the easter sun. The site is also surrounded in all side except the South Site
Based on the building regulation an optimum mass is developed, which is elongated to the east west side.
To cut heat from the intense western sun the vertical cirulation of the building is place on the west which acts as a thermal mass sheilding the main mass. This opens up the best sides of the mass for be manupulated.
Then from the main mass was recessed in a stagared manner to create intimate green terrace for each ofce oor. This creates an oppurtunity for the users to engage each other outside of work environment, enreaching work environment, and reducing work related stresses. this als helps to funnel in the south eastern wind in the the building.
An screening is used to shade the glasses on the easten side to further reduce the building’s heat gain for the sun. This also shades the terrace creating a area.
2
4
3
A'
1
A
B'
B
B
C
D
A
E
Ground Floor Plan Scale 1:200
F
Sustainable Siting—this approach optimizes land use and development to reduce adverse impacts and minimize the building’s ecological footprint. Energy Efficiency—this technique focuses on the establishment of performance targets that account for intended use, occupancy and other energy operations for new construction and Section AA renovation projects. Scale 1:200 Water efficiency— this technique emphasizes the value of decreasing demands for fresh water and reducing the generation of waste water through optimized landscaping, integrated rainwater catchment , gray water recycling, and wastewater treatment systems. Building Materials—by using sustainable construction materials and resources, green building materials have aided the reduction of extraction, p r o c e s s i n g , transportation, solid waste, and consumption. H e a l t h y I n d o o r E n v i r o n m e n t a l Quality—these processes have enhanced the sustainable communities through ventilation and thermal comfort, moisture control, daylighting, environmental tobacco smoke control, and protecting indoor air q u a l i t y d u r i n g construction.
terrace
4
3
2
1
4
1
A'
3
2
A'
1
A
3
2
A'
4
3
2
1 A
A'
4
4
A'
A
4
A
3
3
B
B
3
2
1 A
B
B
2
2
B B
B
2
B
B
B
B
2
C
C
1
C
C
Lorem ipsum
1
1
BASEMENT 3 Scale 1:200
BASEMENT 1&2 D Scale 1:200
D
D1. parking
3
2
A'
E
E
E
F
F
A
A
1.parking
1
4
1
3
2
A
A'
A
4
1
2
3
A
A'
B
B
1st Floor Plan Scale 1:200
D
1.cafe 2. Lobby 3. Services 4. Washroom
F
4
3
2
1
A'
E
F
A
A
B
D 1
E
F
A
4
3
2
1 A
B
B
2nd Floor Plan Scale 1:200 1. Multipurpose 2. Lobby 3. Services 4. Washroom
4
4
B
RENTAL SPACES
B
B
C
B
B'
B
B'
1
A'
4 A
B
B
B
B
B
B
B
1
1
C
C
C
C
C
D
D
1
D
E
1
3
2
A'
5th Floor Plan Scale 1:200 E
F
A
D
D
4th Floor Plan Scale 1:200 .GYM and indoor game
F
A
4
1
3
2
A
A'
7th Floor Plan Scale 1:200
6th Floor Plan Scale 1:200 E
1.Rental space
1 A
2
3
A'
E
3ipsum
F
A
4
1.Ofce space
1
3
2
A
A'
E
3
F
A
4
8th Floor Plan Scale 1:200
1. ofce space
4
1 A
2
3
A'
1. Ofce space
F
A
4 A
2
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
1
C
C
C
C
C
1
D
D
D
D
D
1
9th Floor Plan Scale 1:200 E
2
A
F
10 Floor Plan Scale 1:200
1.common space for IDCOL 2. Washroom
1.Department5,6,7 2.2Head of department F 3. Washroom
11 Floor Plan Scale 1:200
E
A
E
A
F
1. Deputy CEO 2. Company Secretary 3.Auditors
12 Floor Plan Scale 1:200 E
3 A
F
Roof Plan Scale 1:200
1. CEO 2. Chairman 3. Washroom
E
A
F
SELECTED ACADEMIC PROJECTS VERTICAL CAR PARKING AT GULISTHAN DHAKA
B.Arch Studio Project
3rd Year Project Abstuct: The site is situated in Gulisthan Motijheel Dhaka Near Banghanadho National Stadium. Site is Surrunded by several tall office building as gulisthan motijheel area is the business hub of Bangladesh. The Soule object of the project was to provide Vichel parking facilities for the Office Building. Site Area: 30,500Sst Functional Requarment: 20,800Sft
Concept: In this Studio Project Students should come-up with an
Idea that could be the solution of urban problem of dhaka city. The primary idea was to take the maximum benefits of modern technology to solve the problem we face now a days. Traffic jam is one of the biggest problem we face today so i try to found out the reason behind of this problem. i found out that 25% traffic jam is happening for car parking on the roads at gulisthan during office time, as the lacking of enough car parking spaces. Thats the reason to come up with an idea that solve the problem at gulisthan area during office time.
Site Surrounding
Master Plan
Ground Floor Plan
Section AA’
URBAN DEVELOPMENT ALONG PURBACHOL EXPRESSWAY
B.Arch Studio Project
4th Year Project Abstuct: Urban design occurs across all parts of a city, from the inner city to the suburbs and outer metropolitan fringe. Urban design is relevant to developments, whatever their nature and size. City-wide transport and infrastructure networks, urban infill projects, regional towns, new suburban developments, shopping malls, streets, office blocks, university campuses and hospitals are all the result of urban design. High quality urban design becomes even more important as we increase the density of our cities and cater for a growing and changing population. It requires excellent planning, design and management of our built environment and the supporting social and economic infrastructure.
Concept: Urban design is concerned with the arrangement, appearance and function of our suburbs,
towns and cities. It is both a process and an outcome of creating localities in which people live, engage with each other, and the physical place around them. Urban design involves many different disciplines including planning, development, architecture, landscape architecture, engineering, law and finance. Urban design operates from the macro scale of the urban structure (planning, zoning, transport and infrastructure networks) to the micro scale of street furniture and lighting. When fully integrated into policy and planning systems, urban design can inform land use planning, infrastructure, built form and even the socio-demographic mix of a place.
Smart City Urban Place Making Princepal (Source Internet)
Toward TONGI via PUBAIL
Towards DHAKA CITY via 300ft width highway
Towards DHAKA-SYLHET Highway
Towards NARAYANGANJ via RUPGANJ
GULSHAN STREET ELEVATION
TYPICAL FLOOR PLAN
PROPOSED RAJUK ZONING
Primary road (250ft) Secondary road (150ft) Tertiary road (100ft) Internal road (75ft) Peripheral road (160ft)
COMMERCIAL OFFICE BUILDING
RESIDENTIAL BULDING
RESIDENTIAL BULDING
URBAN UTILITIES OPEN SPACE WATER BODY
COMMERCIAL MIXED USE INSTITUTION
PROPOSED ZONING PLAN MAIN ROAD EXPRESS HIGHWAY EXPRESS HIGHWAY MAIN ROAD
MASTER PLAN SCALE:1/64’’=1’-0’’ TRANSPORTATION NETWORK
STREET ELEVATION
PROPOSED LANDSCAPE
SECTION AA
SCALE: 1/64”=1’-0”
SCALE: 1/32”=1’-0”
SE
ECTION BB
MASSING TYPOLOGY ANALYSIS
DESIGN PHASE 1 PLOT TYPE A PLOT TYPE B
PLOT TYPE B
PLOT TYPE C1
COMMERCIAL OFFICE BUILDING
COMMERCIAL OFFICE BUILDING
COMMERCIAL OFFICE BUILDING
SCHOOL
EACH SQUARE REPRESENTS TEN KATHA PLOT
PLOT TYPE C2
PLOT TYPE C3
LAN D DIVISION TYPOLOGY
COMMERCIAL MIXED USE INSTITUTION URBAN UTILITIES GREEN RESIDENCE
SCALE: 1/32”=1’-0”
SECTION CC
SCALE: 1/32”=1’-0”
SECTION DD
SECTION EE
SCALE: 1/32”=1’-0”
PLOT TYPE C4
PLOT TYPE C5
BEXTEXT GARMENTS WORKER SETTLEMENT B.Arch Studio Project 5th Year Thesis Project Abstruct: The project is a proposed RMG housing community for the workers in the Bextex ltd which will make an improvement in the living standards of the workers. The project is to address the different problems and biases that are related to the community dependent on RMG Workers. Site Area: 1200Acre Program Requarment: 130 Acre
Concept: The project aims to allow the RMG workers to access to basic amenities such as community housing, school, healthcares and social gathering spaces creating platforme to advance the community leading to a better future during their stay while keeping intact the rural scenario of our country. Design philosophy focuses on maximizating of social qualites, and sensitivity to the context, lifestyle trends.Together to increas the quality of living and bring about a welcoming community for its residence
The project aims to allow the RMG Workers to have access to basic amenities such as community housing, school, healthcare and social gathering spaces creating a platform to advance the community leading to a better future during their stay while keeping intact the rural scenario of our country. The project is a proposed RMG housing community for the workers in the Bextex ltd which will make an improvement in the living standards of the workers. The project is to address the different problems and biases that are related to the community dependent on RMG Workers and my Design philosophy focuses on maximization of social qualities, and sensitivity to context, lifestyles, and trends. Together to increase the quality of living and bring about a welcoming community for its residents, Fulfilment of social obligation by extending support to RMG Workers in achieving desired Living Standard.
Family Size
Earning Per-Month
Now-a-days the industrial revolution is taking place in Bangladesh like the other developing countries. The number of industries is increasing resulting the increased number of migrant people as workers. This large infuse of people demands housing. To meet this demand, the land owners are constructing houses without considering the quality. This study tends to explore the existing housing condition of garment workers in a sub-city Gazipur, Bhabanipur near Dhaka. The aspects that mainly considered in this study were type and material of house, size of room and occupancy, related facilities and services such as water supply, electricity, drainage, solid waste management and so on. It was found that the garment workers usually rent a single room in a group housing whatever the family size is. In a group housing a minimum of 5 and maximum 35 families lived. They shared the kitchen, toilet and bathroom.
Occupation
Family Member 5
Family Member 3
Earning Member 2
Bachelor Grade 1-2
Bachelor Grade 2-3
Master Plan
SELECTED PRACTICE PROJECTS Multi-Storied Apartment Buildding at Gulshan Archden Consultants Affillation Withe The Project Design and Function Documentation and Presentation 3D Modeling and Rendaring Site Area 7200sft Project Abstruct: I got the opportunity to involve in the project located in near gulshan lacke. Site has the maximum benifits of natural and contextual elements. The formal expresation of the building influenced by the natural elemante such as view, wind flow, natural lights along with the functional clarity and verious asthetice canons this project becomes more meaningful.
Concept: The Primary idea was to take the Maximum benefit of Tclimatic character of the broad context and also the Micro Climatic condition Regarding the urban context. Overall planning, Orientation and composition of forms and Fenestration are design to make the building Naturally Ventilated in the summer and passive heating during the winter season. Apparently the design is highly r e s p o n s i b l e t o i t s s iteandsurroundings
Making the House more effective the individual functional Fneeds were acknowledged and efforts was given to create an inviting space that reflects the Context own ethos. The intention of the design firstly was to achieve energy efficiency through maximize the use of day Lighting. The Overall interior comprise two type of space and one is Services areas and another one is Privet areas room.
Water Development Board Housing Project Site No 1 Affillation Withe The Project Project Architect Master plan,Landscap Design Individual Building Design Design and Function Documentation and Presentation 3D Modeling Site Supervission Site Area 14.50 Bigha Project Abstruct: Clint of the project is shylet Water Development Board, and location of the site is near shylet shahe eid ga Moidan. The project aim to be design a community housing for the water development workes with the communial facilities. The idea is to generate social housing along with the communial facilites to make a community more strong. The aim of the project is to Promotes social housing for the people of Water development board at shylet. Architecture and planing of this project is very contextual way to promote the natural asthetics along with the various functional canons with the integration of climate, context, economics, most impotantly conscientiousness to the environment
Concept: Design generate from the zoning of calculation regarding where the maximum light can be
brighten Tup the rooms during day time to optimize the use of artificial light and ventilation is also a very important part of the design orientation of the massing to naturally ventilated of the rooms. Circulation space has been optimize to a minimum and the efficiency of the utility also include the use of space under the ground area. The primary obstacle of this project was a questionable economic viability. The orientation of the building is north south elongated to use the maximum urban climatic Venifit as well as micro climate also. and most of the exposer of the building is north south facing to reduce the direct hit radiation during day time.
Sairu Hill Resort at Bandarban
Affillation Withe The Project Design and Function Documentation 3D Modeling Project Abstruct: SAIRU Hill Resorts is set against the spectacular greenery covered hill range of Bandarban in the Chittagong Hill Tracts. Sairu has conveniently located only 18 km away from Bandarban Town on the hill slopes at the Y – junction of the road from Bandarban to Chimbuk.
My responsibility of this project is to generate the idea of the design and basic drawing to develop the final design. I was working on this project under the full time senior architect. The idea was to make an out door semi-outdoor and indoor facility restaurant to maximize the outer view of the natural hill top and to hide the s e r v i c e s a r e w e d esignundergroundkitc h e n a n d workers rest spaces so that we can open up the 360 degree view for the Guests.
Sairu Hill Resort Tent Plan
Sairu Hill Resort Bachelor Tent Plan
Sairu Hill Resort Tent Section
Mirpur Indoor-Stadium Fencing Association Office Affillation With The Project Free-lancing Project Design and Function Documentation Site Supervision Project Cost Estimate 3d Modeling and Rendaring Client Meating Site Area 1150sft Project Abstruct: Indoor -Stadium Fencing Association office Design as a free-lancing project with in a limited budget for there Players and Stufe Use only. The project has one conferance room for the use of meeting and one office room for coach and president, and survice space. The idea was to expres the fencing association own ethos, so that players and stufe can get a visual expression of Fencing.
Concept: For Making the office more effective the individual functional needs
were acknowledged and efforts was given to create an inviting space that reflects the fencing association own ethos. The intention of the design firstly was to achieve energy efficiency through maximize the use of day Lighting. The Overall interior comprise two type of space and one is conference and another one is chairman room.
Proposed Plan
Md Ashraful Islam Selected Workes 2018-2019 Asharfuli52@gmail.com