Alex Stewart Design Portfolio 2015
Critics David Lewis Andrew Bernheimer David Leven Jean Gardner Brian McGrath Astrid Lipka Peter Wheelwright Yolande Daniels Paul Goldberger Jing Liu Bryan Young Emily Abruzzo Luben Dimcheff Erica Goetz Derek Porter Ed Keller Reid Freeman Bernardo Secchi & Paola Vigano
Contents 01 The Growery Production for the Post-Industrial City 02 Blurred Lines Lower East Side Light Laboratory 03 Over Under Velodrome Pavilion in Queens 04 Flipped City NYCHA Housing in the Lower East Side 05 HELIOcity LevenBetts 06 Models, etc. Young Projects, LevenBetts 07 San Francisco PUC Headquarters TomEliotFisch 08 White House Retrofit Installation for the Reach Higher Workshop
The Growery Production for the Post-Industrial City Parsons Option Studio In collaboration with Kristen Garibaldi Instructor : Jing Liu Fall 2014 Brooklyn, NY, USA
Worldwide economies are migrating to the digital realm, bringing with them a change in the model of urban infrastructure. Meanwhile, efforts to invest in and invent for a new paradigm to utilize these advances is underway. In the wake remains the physical vestiges of a obsolete, industrial era; large-scale facilities ripe for a new type of production. The Brooklyn Navy Yard, occupying prime East River real estate, sits at the forefront of this revitalization effort. Equipped with a concentration of industrial space, the organization is intent on rebranding itself from a naval construction and repair yard to a tech and light-manufacturing hub. No building serves a greater role in this metamorphosis than No. 77, a vehemoth of cast-concrete construction, totaling nearly 1 million square feet in leasable space. The Growery is a catalization of these opportunites. It rethinks the productiondistribution loop, and ushers in new forms of urban farming for products uniquely new in their handling; algae for the production of biofuel, and cannabis as America’s future cash crop. By exploiting the inherent capabilities of the building’s structural properties, and introducing a new form of demolition to selectively excavate portions of the existing framework, the two forms of growing are able to exist in harmony across the expansive floor plates. Through calibrated circulation loops, the produce is able to be grown, harvested, and transported by land, by sea, and by air.
Existing Condition A monotonous field of stacked slabs and columns, hidden behind thin, clipped panels (resulting in rumors of the buildings past life as a secret ammunitions depot)
Minimal Exterior Manipulation The structural stability of Building 77 required a specific surgical touch for demolition, in order to accommodate the programmatic requirements for algeum biofuel production
Introduction of Vierendeel Truss placed above existing structural grid
1. Vierendeel Truss
placed on and around existing concrete cores
Brooklyn Generator
Vertical Boring Drill drill is lowered between the column interstitial space, removing slab but leaving structure
kG-aS Stud
2. Tunnel Boring Drill
placed on and around existing concrete cores
Brooklyn Generator
Coring a series of hollowed cavities remain following the operation
kG-aS Studi
3. Coring
Brooklyn Generator
Craning Tanks large grow and harvest tanks are lowered from above to various heights within the cavities
kG-aS Studi
4. Lower Tanks Into Place
Brooklyn Generator
Extraction & Processing cannabis processes are stretched across the remaining slab
kG-aS Studio
Calibrated Interior Renovation3. Coring
precise demolition for biofuel tanks
A series of manuveurs enable systematic carving of the interior space, providing the necessary square footage to house grow tanks and the adjoining circulatory piping, cannabis grow, harvest, dry and packaging facilities, and pathways through which drones--the air apparatus by which products are distributed--can pass on their way to and from the building
Brooklyn Generator
The Growery : Production for the Post-Industrial City
kG-aS Stud
A
B
C
D
E
F
G
H
I
J
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Typical Cannabis Floor Plan Growth and Harvest rooms occupy the remaining floorplate left vacant after the tank shafts are excavated
Pinkhouses The grow rooms utilize an advanced technique for incubation employing red and blue LEDs. As plants capture only those two colors from the light spectrum, a controlled environment with a pinkish hue increases size and maturation period, yielding a more robust and economically competitive product The Growery : Production for the Post-Industrial City
A
B
C
D
E
F
G
H
I
J
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Twelfth Floor, Tank Operations Visible from the exterior as the first level with existing fenestration, the 12th floor operates as the biofuel nerve center, where algae is tested and cultivated via access to the upper most tanks
Live CCTV Feed Images of the interior space at the northeast “pill� shaft with crossing circulation; drones operating within the tubes; and a tank transfer floor The Growery : Production for the Post-Industrial City
Algae - Biofuel Horizontal circulation from grow tanks to cultivation, from storage to ground and water distribution
Visitors Coreographed movement from elevated entry, up escalator system to roofscape
Cannabis Vertical production from grow and drying rooms, to packaging, shipping, and drone delivery
Workers Central, existing core provides vertical movement from new, open private entrance
Circulation Four separate loops of entry and exit for human and product output operate within the walls of No. 77, each with unique speeds and distribution modes
Escalator Detail As the most prominent circulatory apparatus, the series of public escalators that carry visitors through the building acts as a conveyor belt of sorts, displaying the growing and manufacturing procedures using sectional panning, similar to a single-shot film scene. The Growery : Production for the Post-Industrial City
Blurred Lines Lower East Side Light Laboratory Parsons Allied Studio In collaboration with Yuliya Savelyeva Instructors : David Leven, Derek Porter Fall 2013 Manhattan, NY, USA
Situated within the metropolis of New York, amidst the high density grid of streets, parks, and subway lines, the Lower East Side Light Laboratory is a respite from the urban milieu. It provides a passage. A manifestation of the developing need for increased light education and exploration, the LESlab is a physically permanent gallery cataloguing the qualities of natural light through an unrepeatable experience, uniquely altered with each passing minute of each day, as the light changes in depth, weather, and season. We began our design with a question: how can separate gallery and laboratory program be packed together within a tight, urban footprint? Experimentation yielded the concept of a dual-purpose “tube” that snakes through the building to capture light opportunities for ethereal display, simultaneously serving as primary mode of circulation and public exhibit. Each lateral shift of the tube engenders moments of reflection and repose, entry or exit. Each vertical rise provides unique visual displays of light play. Its movement disrupts the rectilinear slabs and their specific programmatic boundaries, carving away pieces of floor for increased sightlines and daylighting. Its heavy material quality of precast concrete serves as a juxtaposition against the light, steel structure and thin, fin envelope, the gradual oscillation of which both occludes and exposes the tube from various exterior vantage points while shading the interior.
Color Temperature
Given + Selected As they often do, our site defined our first constraints, delivering a coordinate field through which we could embed a linear light gallery
Diffusion
Gradient
Color
Effervescence
Intensity
Embedding the Tube The process of stitching the gallery from our imagined floor to floor heights, and across the width and depth of the site engendered the formalizing logic of the project itself; moments that capture, disperse, and display light from different directions through constructed apparatuses.
The Structural System Our scheme evolved out of a desire to keep columns and floor plates as light and thin as possible. The solution was a a set of vierendeel trusses cantilevered from two concrete cores, from which the floor plates hung below. Thermodeck precast panels were chosen to minimize depth of structure and ease of running MEP systems. Blurred Lines : Lower East Side Light Laboratory
Fuzzy Node The second tubular light condition employs fiber-optic rods embedded within poured concrete. The effect is a blanket of illuminated points across a dark expanse of solid material. As wind and cloud cover pass across the south facade of the building, the rods themselves reveal the exterior condition through different levels of brightness.
Schematic Drawings Blurred Lines : Lower East Side Light Laboratory
Above: Clevis Joint Hanging floor plates are visibly suspended from truss above
Left: Detail Model 1�=1’ sectional cutaway expressing floor plate composition and curtainwall construction
Expressing the Detail The clevis to Thermodeck relationship became a point of intrigue within the project. As the realities of construction altered initial conceptual agendas, we used the detailing as a way to compromise and enhance the quality of the overall form.
Traversing the Gallery Blurred Lines : Lower East Side Light Laboratory
Cutaway at Entry / Public Space from physical model
View from Office into Library from digital model Blurred Lines : Lower East Side Light Laboratory
Blurred Lines : Lower East Side Light Laboratory
Over Under Velodrome Pavilion in Queens Parsons Comprehensive Studio Instructor : David J. Lewis Spring 2014 Queens, NY, USA
As the only competition bicycle race track in the greater New York metropolitan region, Kissena boasts a pristine surface and an attractive setting, nestled as it is against the woods of Corona Park and the residential streets of central Queens. What it lacks, however, is any amenities. A simple set of bleachers and a shipping container for bike storage constitute the only city investment in upgrades to this sporting institution, where national and international competition has occurred. To better serve the growing New York cycling community, the Over Under Pavilion provides an inhabitable threshold regulating access to the track, but not restricting it. As the new home for various trophies and records as well as cafe, storage, changing, mechanic, and observation space, its form is a derivation of the flows of various movement inside and above the structure, from human circulation via foot and bike, to water and sunlight. It sits low in the landscape in deference to the surrounding roofline of double-story, single family homes, yet announces its purpose through its sloping rooves and wide entrance. The Pavilion is also an exercise in timber construction and environmental form. Its composition relies on a combination of glulam beams and CLT panels with a Rhinezinc panel exoskeleton; its form is optimized for rainwater deflection and solar gain.
Above: Form and Function Models & Interior Rendering of Over Under Entry Opposite: VJAA Rowing Club
Explorative Models As a point of departure for the exploration of wood as primary construction medium, I studied the Minneapolis Rowing Club by Vincent James Architects, a glulam roof structure that creates a hyperbolic paraboloid through the simple and gradual rotation of the spanning king-post trusses.
Over Under : Velodrome Pavilion in Queens
Site Plan The location of the project separates the various modes of transportation by which visitors and competitors can enter both the building and the track. Approach by car provides access to two portals, one dipping below the building and into the central field, and the other passing through the building to the track edge. The long walking path from the street provides pedestrians a more natural entrance, through tree groves and landscaping.
Biking In
Racing Out, North Elevation
Where the south facing facade is a closed shed, the north is an open viewport from which spectators have an elevated vantage of the race track beyond. Cyclists have direct access from the changing and mechanic rooms onto the racing platform, while the office punches through the skin to give direct sightlines onto the banked west turn. Over Under : Velodrome Pavilion in Queens
1. 2.
BASEMENT PLAN
6. 3.
4.
5.
BASEMENT PLAN
9.
7. 8.
GROUND FLOOR PLAN
Plans Lower Floor : 1. Recevption; 2. Exhibit/Flex Space Ground Floor : 3. Cafe; 4. Women’s Changing; 5. Men’s Changing; 6. Mechanical Room; 7. Bike Mechanic; 8. Bike Storage; 9. Warm Up
10.
11.
CLT CAST-IN-PLACE CONCRETE
BASEMENT PLAN GROUND FLOOR PLAN
GROUND SECONDFLOOR FLOORPLAN PLAN
Plan & Sectional Diagram Upper Floor : 10. Office; 11. Viewing Deck Over Under : Velodrome Pavilion in Queens
1.
2.
3.
4.
5.
Kit of Parts 1. Rhein Zinc Shell; 2. Glulam Beams; 3. Concealed Steel Attachment Plates; 4. Cross-Laminated Timber; 5. Cast Concrete Foundation
Under the Hood The Rhein Zinc skin conceals a robust and articulated skeleton whose aggregated geometrical complexity belies a rather simple structural system. Over Under : Velodrome Pavilion in Queens
Tonight, there’s a movie in the great room, so I dragged Jose to it. He loves hanging out with me though, even he pretends not too. Teenagers. No I don’t.
Party for my neighbor Tom’s 75th in the common kitchen. Hooray!
Having a market selling fresh veggies and fruits right in the building saves me time in my busy shcedule, and keeps Jose and me healthy.
Yo.
Hi! I’m Esmerelda. I’m a 37-year old single mother living in a 1-bedroom apartment with my teenage son, Jose.
Time for a quick workout. Super convenient having a gym on my floor. Spin Nothing better than a sunny Saturday in our park. I brought down a batch of my famous tamales!
Evening Esmerelda! The lobby is a nice place to pass through, grab mail, and see a neighbor or two. It’s quite bright with a great view of the gardens outside There’s Bert from 5A over there! And there’s that other guy (he’s really into judo and wears his suit around...weird if you
Flipped City NYCHA Housing in the Lower East Side Parsons Housing Studio In collaboration with Ayesha Ghosh Instructors : Andy Bernheimer, David Leven Spring 2013 Manhattan, NY, USA
Intent on debunking long held stigmas relating to the public housing block, we set forth an agenda to create a more interactive, socially charged “neighborhood� within the apartment building itself, using daylighting and views as a form of social equilizer across the entirety of the structure. Through examination of existing New York public housing, we developed a concern for the lack of shared space between inhabitants, a direct contributor to a lack of communal atmosphere and, arguable, to isolation and criminal activity, we posited. In response, we conceived of an articulated common space running from ground to roof that acts as a hive of activity for the tenants, and a nexus for communication and visibility. We selected a variety of programming to occupy each floor’s common space, providing an opportunity for connection between neighbors as they pass between spaces for cooking or reading, exercise or repose. At ground level, a public grocery mart provides locally sourced food while courts and community gardens are incorporated into the landscaping plan, thereby further connecting the inhabitants to their neighborhood at large. Siting the building to the south provides each tenant with a bright, airy apartment calibrated to the movement of the sun throughout the year, engendering a sense of social inclusion. Each room provides views, natural air movement and sunlight, the latter two passively controlled by an occupiable brise soleil.
Between Two Bridges The Alfred E. Smith NYCHA Housing development lies on the true north bank of the East River, nestled below the Brooklyn Bridge, adjacent to the FDR Drive, and just west of the Manhattan Bridge
1:32 Site Model We were asked to deploy our design within the confines of an existing parking lot next to the highway, bordered by prototypical, Corbusian towers. We chose to evoke but depart from this immediate precedent Flipped City : NYCHA Housing in the Lower East Side
01. footprint
02. raise building
03. add bracing
04. shear walls, floor plates
05. apartment grid
06. insert apartment units
07. attach exterior screen
08. ground floor grocery
09. insert program
10. final form
Ten Steps Breaking the architectural moves into sequential and diagrammatic order Flipped City : NYCHA Housing in the Lower East Side
north elevation
south elevation
South Elevation
north elevation
North Elevation
south elevation
Flipped City : NYCHA Housing in the Lower East Side
03
HELIOcity A Solar Guide to a Northern Locale LEVENBETTS Summer 2014 East Lansing, MI, USA
HELIOcity posits a new way of planning cities and conceiving of architecture in direct integrated relation to the omnipresent movement of the sun and the carefully calibrated deployment of electric light. The dynamic nature of the sun, in this new scenario, productively and sustainably disrupts seemingly immutable urban and architectural organizational structures in order to sustain, collect and delight the inhabitants of a place. Seen through the lens of HELIOcity, East Lansing’s Michigan State University football stadium and the spectacle of the game is the paradigm of the collector, social and solar, that transcends the town/gown divide. Extending to the downtown, the HELIOcity university town is now reconsidered along the pedestrian alley running parallel and to the north of Grand River Avenue. A series of spaces and buildings along this linear collector are designed in deference to the daytime sun and provide for an inviting glow in the evening. This urban proposal was developed for East Lansing 2030, an exhibition at the Eli and Edythe Broad Art Museum in East Lansing Michigan.
HELIOcity : A Solar Guide to a Northern City
PAUL
FLOYD OF ROS E
PAUL
BUN YA N’ S
BUN YA N’ S
AX
E
AX
E
2 66 MI
2 66 MI
DALE 302MI
M 57.6 I
I
17
IT L
E BRO W TL
14 9 MI
IT
E BRO W TL
Y BELL OR
O L OA
CO L
D
KE N
PURDU E CANNON 90.3MI
LAN
KET BUC
110 MI
O L
978MI
3O 08LD BRASS SP IT T MI OON
CO L
V IC T RNOR’S
O TR P HLYAN D OF L 14 9 M I IN
GOVE
N
DO FL IN
HY
LAND GRANT TRO
I L LIBUCK
HY
P
HERO’S TROPHY 297MI
LAND GRANT TRO
183 MI
N
651M I
MI 450
308
O TR P H Y
H
N J UG
MI
L
TOON
5M
EA RT LA
I
17
L 978MI RY BEL TO
P
V IC RNOR’S GOVE
183 MI
HERO’S TROPHY 297MI
Y
651M I
PAU L BU NY AN
H
H TRO P ND
N J UG
328MI
MI 450
I 2 9 6M
328MI
SP IT
Y
M 57.6 I
EA RT LA
5M
DALE 302MI
H TRO P ND
OLD BRASS
FLOYD OF ROS E
PAU L BU NY AN
I L LIBUCK
I 2 9 6M
D
OA
N KET BUC 110 MI
PURDU E CANNON 90.3MI
KE
Macro Investigation Identifying the 12 member universities of the BIG 10 through their rivalry games via the cross-country or cross-state roadways that connect them
U NEBRASKA
U NEBRASKA
U WISCONSIN
U WISCONSIN
PENN STATE U
PENN STATE U
U MICHIGAN
U MICHIGAN
PURDUE U
PURDUE U
OHIO STATE U
OHIO STATE U
U ILLINOIS
U ILLINOIS
U INDIANA
U INDIANA
U IOWA
U IOWA
U MINNESOTA
U MINNESOTA
NORTHWESTERN U
NORTHWESTERN U
Pigskin Personalities At the heart of each of these schools, and indeed each community, lies the football stadium; a source of pride, a source of defeat, but above all a social catalyst
MICHIGAN STATE U
MICHIGAN STATE U
Micro Investigations Researching East Lansing through its urban fabric : connection to Detroit, to its county, its motorways, its flood levels, parks, and parking lots
HELIOcity : A Solar Guide to a Northern City
P
Existing Street
P
a. Lift
b. Lower
c. Automate
Surface Reclamation 1. Parking Strategies We saw parking lots or garages as the means to relcaim the ground datum
Sunspot We identified Spartan Stadium as the principle example of both university and town congregation through means of solar exposure
The New Main Street With these two conditions in mind, we proposed investment into an under-utilized pedestrain street parallel to the over-trafficked state thruway that bisects East Lansing, and developed a list of potential programs that support existing economic infrastructures HELIOcity : A Solar Guide to a Northern City
Program Playbook Potential modes for occupation or operation on existing buildings or ground up construction
Solar Strategies Methods for bringing daylight into structures and using electric light for signage and social attractor
HELIOcity : A Solar Guide to a Northern City
Models, etc. Professional and Academic Young Projects December 2012 - October 2013 LEVENBETTS December 2013 - January 2015 Parsons Design Seminar Spring 2013 The models featured in this section were produced in the offices of Bryan Young and David Leven/Stella Betts, respectively. Projects ranged from competition to in-office study, and were composed of the following: 1. Playa Grande Main House: cnc-routed high density foam, acrylic, plywood, chipboard 2. Camera Obscura-ed: z-corp 3d print, museumboard 3. Universal Music Group Lobby: clear and brushed acrylic 4. TAYSTEE Building: acryclic, paper, chipboard, museumboard 5. Microgreens Housing: poured rockite, foam, acrylic, paper
Models, etc.
1.
3.
2.
1. Playa Grande Main House, Young Projects 2. Universal Music Group Lobby, Young Projects 3. TAYSTEE Building, LevenBetts 4. Microgreens Housing, LevenBetts 5. Camera Obscura-ed, Parsons Design Seminar
4.
5. Models, etc.
San Francisco PUC Headquarters TomEliotFisch/KMD Architects Completed 2010 San Francisco, CA
The new Public Utilities Commission building is a 275,000 SF, 13-story highly sustainable office tower located in the San Francisco Civic Center. The structure establishes a benchmark for sustainability within the urban environment. Green strategies include high-performance building envelope, photovoltaic panels, wind turbines, and grey and blackwater recycling. The building is certified LEED Platinum. TEF developed and implemented the interiors package for the PUC, working collaboratively with KMD using Revit models for sequencing and construction documents. Besides working through the development of the entire CD package, my responsibilities lay in the 13th floor executive suite design, the entry cafe bar, and the Child Development Center.
San Francisco PUC : TomEliotFisch
K
L
N
M
O
Q
P
R
S
T
A
B
C
D
E
F
G
I
H
J
K
L
N
M
O
Q
P
R
E
F
G
H
J
A
CONTRACTOR TO PROVIDE BACKING FOR LCD MONITORS WHERE SHOWN. MONITORS TO BE INSTALLED AT +54" AFF. COMBINED WEIGHT OF MONITORS AND SUPPORT BRACKET TO BE ASSUMED TO BE 150 LBS. TOTAL.
4.
1
1
2
2
3
3
B
C
D
E
FOR PARTITION TYPES SEE SHEETS I10.03, I10.04 & I10.05
A
E.3
A.7
B.3
H.2
F.8
1
FOR INTERIOR WINDOW TYPES SEE SHEET I10.33.
E.3
101
FOR INTERIOR OPENING (DOOR) SCHEDULE SEE SHEETS I10.31 AND I10.32.
B.3
4 I10.08
FOR PARTITION FURRING TYPES, SEE SHEET I10.05
E.9
4
4
5
5
1.3 1.3B
CONFERENCE I-0220
CONFERENCE I-0221
3' - 4"
K
CONFERENCE I-0222
8' - 11 11/16"
STORAGE I-0203 7' - 4 13/16"
5' - 0"
K
STORAGE I-0240
K
K
CONFERENCE I-0223
C
203
205
K
5' - 0"
PRE-K I-0174
2
2
3
3
A.5
FOR INTERIOR OPENING (DOOR) SCHEDULE SEE SHEETS I10.31 AND I10.32.
DN
4
5
5
L
N
M
G
O
H
E.3
R
S
T
A
FEC
1
3 I10.01
11' - 2 5/8"
10' - 9 3/8"
A
A
343
OFFICE I-0340
11' - 1"
A
342
B MAIL RM. I-0262
B
1 I7.01
SHARED COPY I-0343
C
SHARED CONFERENCE I-0326
X5
X1 UP
353a
B
OFFICE I-0345
RECEPTION I-0354
B
11
1 I3.03C FILES I-0338
B
OPEN OFFICE I-0233
5
I9.02A
3
230
B
1
I9.02A
I9.02A
5
231
5 I10.01
X5
17 I10.06
ALIGN
8
FEC
5
6
6
7
7
I9.20
16 I10.06
1 I3.03B
COPIER RM I-0357
4 I3.03C 14 I10.06
B
OFFICE I-0351
9' - 6 5/16"
B
B
OFFICE I-0365
B
8
A
10' - 0"
10' - 0"
19 I10.06
8
9
9
A
A
300
366
5
ALIGN 13' - 2 3/4"
19 I10.06
OPEN OFFICE I-0333
336
I9.03A
FEC B
C OFFICE I-0331
19 I10.06
6 I10.01
330
4
B2
B FEC B2
J
331 B I9.03A
OFFICE I-0335
5' - 0 9/16"
B
FEC
10' - 0"
EAST COR. I-0300A
367 PANTRY I-0367
A 365
A
I9.03A
C
OFFICE I-0366
10' - 0"
A
B2
A
ALIGN
ALIGN
356
350 10' - 0"
B
11
4
5
B
352 349
1
6
10
11
4
R
C4
C4 326
ALIGN FEC
WAITING I-0353
357
351
B OFFICE I-0350
OFFICE I-0349
OFFICE I-0336
1 I3.02C 10
FOR INTERIOR OPENING (DOOR) SCHEDULE SEE SHEETS I10.31 AND I10.32.
LCD OFFICE I-0324
2' - 9"
B OFFICE I-0332
6
335
10
10
11
11
12
12
LCD SIM. 1 I3.07B
CONFERENCE I-0330
332
7
8
FOR INTERIOR WINDOW TYPES SEE SHEET I10.33.
355
B
B
B
ALIGN
9
5.8
B
J
7
1
101
B B
B
337
COUNSEL I-0337
9
3
B
1 I3.02E
NCR ROOM I-0231
2
3
353b
ALIGN
B
B
4' - 0"
SUPPLY I-0356
M2 FEC
19 I10.06
2
B
B
J
235
8' - 1"
OPEN OFFICE I-0352
UP
302
L H
STORAGE I-0177
7
B
B
INTAKE I-0355 DN
B
4.5 4.6 338
EMPLOYEE LOUNGE I-0230 10
11
8
FOR PARTITION TYPES SEE SHEETS I10.03, I10.04 & I10.05
1 I3.03A
X1
OFFICE I-0344
5 4
265 A
M1
OFFICE I-0235
1 I10.01
10
7
8 200 A
262 A
7
EAST COR. I-200A
5' - 0"
STAFF RM. I-0265
B
B
1
X1
B
324
19 I10.06
B2 FEC
C
14 I10.06
ALIGN
I9.02A
CONTRACTOR TO PROVIDE BACKING FOR LCD MONITORS WHERE SHOWN. MONITORS TO BE INSTALLED AT +54" AFF. COMBINED WEIGHT OF MONITORS AND SUPPORT BRACKET TO BE ASSUMED TO BE 150 LBS. TOTAL.
1
FOR PARTITION FURRING TYPES, SEE SHEET I10.05
B
345
OFFICE I-0342 B
6
90°
INTERIOR WALL PARALLEL TO ANGLED NORTH CURTAIN WALL
A
344
A
13' - 3" B2
236
4.
H.2
F.8
OFFICE I-0325
B
255
C
A
FEC
B
B
FOR TYPICAL INTERIOR PARTITION INTERSECTION DETAILS AT CONCRETE COLUMNS AND CORE WALLS SEE DETAILS SHEET I10.06, U.O.N.
X1
4
4 A7.14
12' - 0" OFFICE I-0236
6
9
9
FOR INTERIOR PARTITION INTERSECTION DETAILS AT SOUTH STONE FRAME ELEMENT SEE DETAIL 6/I10.06, U.O.N.
3.
325
340
250
WORKSTATIONS, FURNITURE AND EQUIPMENT SHOWN FOR REFERENCE ONLY, U.O.N.
2.
A
I9.03A
16 I10.06
HD FILE I-0255
OFFICE I-0250
1.
FLOOR PLAN LEGEND
OPEN OFFICE I-0322
2
3
13' - 7 3/8"
STAIR NO. 12 NOT INCLUDED IN ADDENDUM E BID
DN
Q
E.9
2
6
10' - 9 13/16" B
6
5.8
STAIR NO. 12
DN
P
J
1
R 17 I10.06 FEC
252b
UP
13' - 4 1/2" OFFICE I-0249
19 I10.06
5 A7.09
1 I3.01C
177
K
F
B.3 4
X2 H
J
E
A.7
201
FEC
STORAGE 171
OPEN TO BELOW 2 A7.09
101
MAP ROOM I-0252
252a
B COPIER I-0238
B
STAIR NO. 9
H PRE-K I-0175
H
ALIGN
5' - 0"
LEVEL 2 ENTRY 182
L
H
30x48
DN
6
4.5 4.6
174 183
30x48
5.8
8
249
182
H 175
7
8
L
5 I3.01C
180
179
181 STAIR NO. 8
FOR INTERIOR WINDOW TYPES SEE SHEET I10.33.
90°
STORAGE I-0179
178
7
10 I3.02C
182A
SHELVING I-0178
I
H
D
1.3 1.3B
NORTH COR. I-200B
242
5
FEC
G
C
UP
238
19 I10.06
F
B
FOR PARTITION FURRING TYPES, SEE SHEET I10.05
225
B
NEW SERVICE I-0242
3 A7.14 STAFF I-0173
CLASS ROOM I-0180
E
B
170
5
FOR PARTITION TYPES SEE SHEETS I10.03, I10.04 & I10.05
1 I3.02D
173
UPPER ATELIER I-0172
CONTRACTOR TO PROVIDE BACKING FOR LCD MONITORS WHERE SHOWN. MONITORS TO BE INSTALLED AT +54" AFF. COMBINED WEIGHT OF MONITORS AND SUPPORT BRACKET TO BE ASSUMED TO BE 150 LBS. TOTAL.
1
X1
5' - 0"
A
C LCD
WEST COR. I-200C
6
171
UNISEX TOILET I-0171
D
A
M
B
207
5' - 2"
A B
4
7 I3.01C
C
1
X1
OFFICE I-0225
223 A
C
C
4
OPEN TO BELOW
B
GENERAL SHEET NOTES 1
X1 224 225A C
STORAGE I-0207 C
223A
222 A
ADA UNISEX TOILET I-0170
UP
A
H.2
OFFICE I-0224
C
STORAGE I-0223A
C LCD
K
K
C K
K
LCD
222A
A
240
6
FOR TYPICAL INTERIOR PARTITION INTERSECTION DETAILS AT CONCRETE COLUMNS AND CORE WALLS SEE DETAILS SHEET I10.06, U.O.N.
FLOOR PLAN LEGEND
1 I3.02B
3 I10.07 K
STORAGE I-0205
5' - 0"
K 221
4' - 0 1/4"
220
B2
STORAGE I-0222A
8' - 5 5/16" LCD
K FEC
3
R
WORKSTATIONS, FURNITURE AND EQUIPMENT SHOWN FOR REFERENCE ONLY, U.O.N. FOR INTERIOR PARTITION INTERSECTION DETAILS AT SOUTH STONE FRAME ELEMENT SEE DETAIL 6/I10.06, U.O.N.
3.
3 I10.07 3 7/16"
LCD 4 I10.01
UP
4.5 4.6
8A I10.01
F.8
3' - 4 1/4"
2
1-HR. RATED WALL 2-HR. RATED WALL
PROPOSED CHILD CARE CENTER TENANT BUILD-OUT
3
A
T
1. 2.
E.9 8A I10.01
8A I10.01
1 I3.02A
4 I10.08
RATED WALL LEGEND
LEGEND
2
J
1
3 I10.01
1 1.3 1.3B
H
EQ
A.7
G
4.
A.5
FLOOR PLAN LEGEND
A.5
F
EQ
D
FOR TYPICAL INTERIOR PARTITION INTERSECTION DETAILS AT CONCRETE COLUMNS AND CORE WALLS SEE DETAILS SHEET I10.06, U.O.N.
12' - 0"
C
WORKSTATIONS, FURNITURE AND EQUIPMENT SHOWN FOR REFERENCE ONLY, U.O.N. FOR INTERIOR PARTITION INTERSECTION DETAILS AT SOUTH STONE FRAME ELEMENT SEE DETAIL 6/I10.06, U.O.N.
3.
EQ
B
1. 2.
EQ
A
S
GENERAL SHEET NOTES
GENERAL SHEET NOTES
J
8 OPEN TO BELOW
8
12
12
13
13
1
E
12
12
13
13
LEVEL 2 FLOOR PLAN 1/8" = 1'-0"
1
L
I
H
J
K
N
FLOOR PLAN - LEVEL 1 INTERMEDIATE CHILD CARE CENTER
359-305 ISSUE DATE July 23, 2010
1/8" = 1'-0"
Q
R
A JOINT VENTURE PARTNERSHIP
A
BY
222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
T
E
OF
APP
O I F CAL
R
N
C OUN T
Y
CERTIFIED BY
O R O E N PA Z
FI E
E N G UER RA
R RO
WWE/PUC APPROVALS
-------------------
SECTION MANAGER
PUBLIC UTILITIES COMMISSION
DATE:
1/2"
1"
0" CONTRACT NO. CS-842
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
14
DRAWING NO.
14
6 5 4 3 2 1 #
I2.02
KMD PROJECT NO.
CITY AND COUNTY OF SAN FRANCISCO SFPUC JOB NO.:
DIVISION MANAGER
DATE:
ASSIST. GEN. MANAGER
DATE:
FLOOR PLAN - LEVEL 2
359-305 ISSUE DATE July 23, 2010
1/8" = 1'-0" COPYRIGHT
C
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/23/10 SITE PERMIT SET - RESPONSE 1 03/18/10 CD PROGRESS DOCUMENTS 02/02/10 CD PROGRESS DOCUMENTS 11/20/09 DESIGN DEVELOPMENT 2 - REVISED (DD2-R2) DATE DESCRIPTION
EN
SE
ARC
D
HI T
201 Post Street 7th Floor San Francisco CA 94108
Douglas Tom C12405 10/11
NO.
A JOINT VENTURE PARTNERSHIP
REN.
A
BY
T
E
OF
APP
O I F CAL
R
AN
KMD | STEVENS
E
I
D
L
I L
201 Post Street 7th Floor San Francisco CA 94108
7/20/2010 10:41:50 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
S
AN
KMD | STEVENS
E
222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
N
C OUN T
D
CERTIFIED BY
O R O E N PA Z
FI E
E N G UER RA
R RO
WWE/PUC APPROVALS
-------------------
Y
TH E CIT Y
DATE:
HI T
A
DATE:
P
ARC
I
DIVISION MANAGER
ASSIST. GEN. MANAGER
O
D
F O
SFPUC JOB NO.:
M
SE
Douglas Tom C12405 10/11
TH E CIT Y
CITY AND COUNTY OF SAN FRANCISCO
EN
F O
R RO
L
C
NO.
REN.
A
A
I
G
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/23/10 SITE PERMIT SET - RESPONSE 1 03/18/10 CD PROGRESS DOCUMENTS 03/02/10 CD PROGRESS DOCUMENTS (ELEVATOR BID) 02/02/10 CD PROGRESS DOCUMENTS 11/20/09 DESIGN DEVELOPMENT 2 - REVISED (DD2-R2) DATE DESCRIPTION
I
I L
TH E CIT Y
FI E
E N G UER RA
SE A
F O
O R O E N PA Z
O SC CI
N
7 6 5 4 3 2 1 #
SA N FR A N OF
R
I2.01 INT
T
O I F CAL
F
14
14
DRAWING NO.
KMD PROJECT NO.
S
E
CONTRACT NO. CS-842
T
D
0"
1"
C
OF
COPYRIGHT
C
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
DATE:
SA N FR A N OF
E
CERTIFIED BY
SECTION MANAGER
PUBLIC UTILITIES COMMISSION
T
T
T
APP
WWE/PUC APPROVALS
-------------------
Y
S
S
BY
C OUN T
D
T
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
C
T
201 Post Street 7th Floor San Francisco CA 94108
SA N FR A N OF
C
A
ELEVATOR BID) DESCRIPTION
AN
KMD | STEVENS
E
L
HI T
SE A
ARC
D
O SC CI
SE
Douglas Tom C12405 10/11
L
EN
REN.
SE A
0"
C
NO.
1
SECTION MANAGER
PUBLIC UTILITIES COMMISSION
B
A.5
C
D
E
F
A.7
E.3
G
H
J
A
CITY AND COUNTY OF SAN FRANCISCO SFPUC JOB NO.:
DIVISION MANAGER
DATE:
ASSIST. GEN. MANAGER
DATE:
1.
WORKSTATIONS, FURNITURE AND EQUIPMENT SHOWN FOR REFERENCE ONLY, U.O.N.
2.
FOR INTERIOR PARTITION INTERSECTION DETAILS AT SOUTH STONE FRAME ELEMENT SEE DETAIL 6/I10.06, U.O.N.
3.
FOR TYPICAL INTERIOR PARTITION INTERSECTION DETAILS AT CONCRETE COLUMNS AND CORE WALLS SEE DETAILS SHEET I10.06, U.O.N.
4.
CONTRACTOR TO PROVIDE BACKING FOR LCD MONITORS WHERE SHOWN. MONITORS TO BE INSTALLED AT +54" AFF. COMBINED WEIGHT OF MONITORS AND SUPPORT BRACKET TO BE ASSUMED TO BE 150 LBS. TOTAL.
C
D
E
F
G
I
H
J
K
L
N
M
O
P
H.2
F.8
B
C
D
E
F
A.5
3
A.7
E.3
G
H
J
FOR INTERIOR OPENING (DOOR) SCHEDULE SEE SHEETS I10.31 AND I10.32.
4
1.
WORKSTATIONS, FURNITURE AND EQUIPMENT SHOWN FOR REFERENCE ONLY, U.O.N.
2.
FOR INTERIOR PARTITION INTERSECTION DETAILS AT SOUTH STONE FRAME ELEMENT SEE DETAIL 6/I10.06, U.O.N.
3.
FOR TYPICAL INTERIOR PARTITION INTERSECTION DETAILS AT CONCRETE COLUMNS AND CORE WALLS SEE DETAILS SHEET I10.06, U.O.N.
4.
CONTRACTOR TO PROVIDE BACKING FOR LCD MONITORS WHERE SHOWN. MONITORS TO BE INSTALLED AT +54" AFF. COMBINED WEIGHT OF MONITORS AND SUPPORT BRACKET TO BE ASSUMED TO BE 150 LBS. TOTAL.
17 I10.06
EQ
4.5 4.6
D
ALIGN 12' - 0"
765
19 I10.06
19 I10.06
7
7
HD FILE I-0855
D
D
4.5 4.6
PLOTTER I-0854
F
8
8
9
9
15 I10.06
ALIGN
C
OFFICE B I-0865
B
8' - 7"
B
7
FILE STORAGE I-0866
10' - 0"
5
B I3.08A
EQ
B
B
9
1 I10.01
9
A
13' - 2 3/4"
5.8
J
6
19 I10.06
B
EQ
SHARED CONFERENCE ROOM I-0730
EQ
OFFICE I-0732
I9.08A
13' - 2 3/4"
B
B2 OFFICE I-0831
I9.03A
6
4
830
FEC B
B2
10
3
866
FEC
LCD
B
865 19 I10.06
OPEN OFFICE I-0833
2
B
731 B
5.8
J
6
831 10
10
11
11
12
12
12
13
13
13
13
14
14
10 B
OFFICE I-0835
1 I3.07B
835
832
7
FEC J 11
SHARED EMPLOYEE LOUNGE I-0830
B OFFICE I-0832
732
OFFICE I-0735
4
B
COPIER I-0853
F1
I9.08A
I1
3
I9.20
D
B
730
6
735
7
B
19 I10.06
838
1
C OFFICE I-0731
I9.03A
B2
FEC
6
6
5
17 I10.06
16 I10.06
FEC
845
FILES I-0846
837 OFFICE I-0837
767 A
B2
B
4
B FEC
B
ALIGN
8
766 FEC
I9.07A
OPEN OFFICE I-0733
ALIGN
5
OFFICE I-0767 10' - 0"
3
736
1 I10.01
UP
OFFICE I-0838
8
B
B OFFICE I-0766
OFFICE I-0765 10' - 0" A
OFFICE I-0736
6
B
B
B FEC
CORR. I-0848
PANTRY I-0847
8 15 I10.06
C
EQ
B
DN
PLOTTERS I-0754
I9.07A
B
1 I10.01
839
R
ALIGN
D
F 8' - 7"
1
B
C4
826
B2 B
B
7
COPIER I-0753
CORR. I-0748 PANTRY I-0747 B
737 OFFICE I-0737
FILE STORAGE I-0852
C1
PHOTO ARCHIVE I-0845
B
2
1 I3.08A
SHARED CONFERENCE I-0826
X5 C4
EQ
19 I10.06
B2
7
D
FEC F
738 OFFICE I-0738
B 11' - 3"
743
STORAGE I-0743
5
5.8
19 I10.06 B2
5
5
LCD X5
UP
12' - 0"
UP
OFFICE I-0844
B
B FEC
OFFICE I-0839
EQ
B 1 I10.01
840
4
16 I10.06
B B DN
3
4
4
X1
825 4
852
OFFICE I-0843
6
I9.20
FEC
ALIGN
739
FOR INTERIOR OPENING (DOOR) SCHEDULE SEE SHEETS I10.31 AND I10.32.
X1
OFFICE I-0825 DN
A
ALIGN
ALIGN
ALIGN
1 I3.07C
FEC
FOR INTERIOR WINDOW TYPES SEE SHEET I10.33.
1
X1
B 5
3
EQ
ALIGN FEC 19 I10.06 B2
OFFICE I-0739
1
101
1.3 1.3B
B
X1
A 844
B
OFFICE I-0840
I9.08A
2
843
3
6
5
INTERIOR WALL PARALLEL TO ANGLED NORTH CURTAIN WALL
I9.08A
A
R
C4
OPEN OFFICE I-0822
1 I3.08B
4
A
1 I10.01
2 I3.07A
C4
4' - 1 5/8"
SHARED CONFERENCE I-0726
X5 X5
UP
726
740
4
4.5 4.6
DN
2
5
SEE I3.06A (SIM.)
LCD
X1 B
725
ALIGN
5
OFFICE I-0725
2
2
3
1.3 1.3B
X1 B I9.07A
B
ALIGN
OPEN OFFICE I-0722
4
OFFICE I-0740
C
FOR PARTITION FURRING TYPES, SEE SHEET I10.05
H.2
F.8
8A I10.01
4'-0"
INTERIOR WALL PARALLEL TO ANGLED NORTH CURTAIN WALL
A 1 I10.01
3
B
1
1
2
FOR PARTITION TYPES SEE SHEETS I10.03, I10.04 & I10.05
A
1
4
1 I3.07A
2
A
T
FLOOR PLAN LEGEND
E.9
B.3
FOR INTERIOR WINDOW TYPES SEE SHEET I10.33.
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO S 06/04/10 CD PROGRESS DOCUMENTS 03/23/10 SITE PERMIT SET - RESPONSE 1 03/18/10 CD PROGRESS DOCUMENTS 02/02/10 CD PROGRESS DOCUMENTS 11/20/09 DESIGN DEVELOPMENT 2 - REVISED (DD2-R2) DATE D
7/20/2010 10:42:26 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
S
2
3
1
359-305 ISSUE DATE July 23, 2010
R
1
2
101
8A I10.01
6 5 4 3 2 1 #
I2.03
1/8" = 1'-0"
Q
FOR PARTITION FURRING TYPES, SEE SHEET I10.05
1
DRAWING NO.
GENERAL SHEET NOTES 1
A
FOR PARTITION TYPES SEE SHEETS I10.03, I10.04 & I10.05
A
B.3
14
CONTRACT NO. CS-842
FLOOR PLAN - LEVEL 3 COPYRIGHT
B
FLOOR PLAN LEGEND
E.9
1.3 1.3B
13
14
1"
KMD PROJECT NO.
7/20/2010 10:42:08 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
T
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
DATE:
GENERAL SHEET NOTES
A
13
LEVEL 3 FLOOR PLAN 1/8" = 1'-0"
LEVEL 1 INT FLOOR PLAN 1/8" = 1'-0"
O SC CI
1
NDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW
J
1 I3.06B
SIM.
B
FEC
2' - 10"
11
8
7
8
8 12
LEVEL 7 FLOOR PLAN 1/8" = 1'-0"
DATE:
F
G
I
H
J
K
L
N
M
0" CONTRACT NO. CS-842
I2.07
O
Q
P
359-305 ISSUE DATE July 23, 2010
R
C
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/23/10 SITE PERMIT SET - RESPONSE 1 03/18/10 CD PROGRESS DOCUMENTS 02/02/10 CD PROGRESS DOCUMENTS 11/20/09 DESIGN DEVELOPMENT 2 - REVISED (DD2-R2) DATE DESCRIPTION
EN
SE
D
ARC
HI T
201 Post Street 7th Floor San Francisco CA 94108
A JOINT VENTURE PARTNERSHIP
REN.
T
E
OF
APP
O I F CAL
R
AN
KMD | STEVENS
E
Douglas Tom C12405 10/11
NO.
A
BY
222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
N
CERTIFIED BY
D
C OUN T
O R O E N PA Z
FI E
E N G UER RA
Y
R RO
WWE/PUC APPROVALS
------------------PUBLIC UTILITIES COMMISSION
SECTION MANAGER
DATE:
DIVISION MANAGER
DATE:
ASSIST. GEN. MANAGER
DATE:
T
A
SFPUC JOB NO.:
C
D
E
F
G
I
H
J
K
L
N
M
B
A.5
C
D
E
F
A.7
E.3
G
H
J
1.
WORKSTATIONS, FURNITURE AND EQUIPMENT SHOWN FOR REFERENCE ONLY, U.O.N.
2.
FOR INTERIOR PARTITION INTERSECTION DETAILS AT SOUTH STONE FRAME ELEMENT SEE DETAIL 6/I10.06, U.O.N.
3.
FOR TYPICAL INTERIOR PARTITION INTERSECTION DETAILS AT CONCRETE COLUMNS AND CORE WALLS SEE DETAILS SHEET I10.06, U.O.N.
4.
CONTRACTOR TO PROVIDE BACKING FOR LCD MONITORS WHERE SHOWN. MONITORS TO BE INSTALLED AT +54" AFF. COMBINED WEIGHT OF MONITORS AND SUPPORT BRACKET TO BE ASSUMED TO BE 150 LBS. TOTAL.
O
Q
P
E.9
FOR PARTITION TYPES SEE SHEETS I10.03, I10.04 & I10.05
A
1
FOR INTERIOR WINDOW TYPES SEE SHEET I10.33.
101
FOR INTERIOR OPENING (DOOR) SCHEDULE SEE SHEETS I10.31 AND I10.32.
I2.08 359-305
ISSUE DATE
S
1
A 2
2
3
3
4
4
B
A.5
C
D
E
A.7
F
E.3
G
H
J
6 5 4 3 2 1 #
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/23/10 SITE PERMIT SET - RESPONSE 1 03/18/10 CD PROGRESS DOCUMENTS 02/02/10 CD PROGRESS DOCUMENTS 11/20/09 DESIGN DEVELOPMENT 2 - REVISED (DD2-R2) DATE DESCRIPTION
7/20/2010 10:44:18 PM
T
1.
WORKSTATIONS, FURNITURE AND EQUIPMENT SHOWN FOR REFERENCE ONLY, U.O.N.
2.
FOR INTERIOR PARTITION INTERSECTION DETAILS AT SOUTH STONE FRAME ELEMENT SEE DETAIL 6/I10.06, U.O.N.
3.
FOR TYPICAL INTERIOR PARTITION INTERSECTION DETAILS AT CONCRETE COLUMNS AND CORE WALLS SEE DETAILS SHEET I10.06, U.O.N.
4.
CONTRACTOR TO PROVIDE BACKING FOR LCD MONITORS WHERE SHOWN. MONITORS TO BE INSTALLED AT +54" AFF. COMBINED WEIGHT OF MONITORS AND SUPPORT BRACKET TO BE ASSUMED TO BE 150 LBS. TOTAL.
FLOOR PLAN LEGEND
E.9
A
FOR PARTITION FURRING TYPES, SEE SHEET I10.05
H.2
F.8
14
14
DRAWING NO.
July 23, 2010
R
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
A
B
C
D
GENERAL SHEET NOTES 1
FLOOR PLAN LEGEND
B.3
CONTRACT NO. CS-842
1/8" = 1'-0"
GENERAL SHEET NOTES
A
1"
FLOOR PLAN - LEVEL 8 COPYRIGHT
B
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
KMD PROJECT NO.
CITY AND COUNTY OF SAN FRANCISCO
7/20/2010 10:43:44 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
S
6 5 4 3 2 1 #
I
DRAWING NO.
1/8" = 1'-0"
L
I
E
1"
FLOOR PLAN - LEVEL 7 COPYRIGHT
D
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
TH E CIT Y
DATE:
F O
DATE:
DIVISION MANAGER
ASSIST. GEN. MANAGER
A
SECTION MANAGER
KMD PROJECT NO.
SFPUC JOB NO.:
I
TH E CIT Y
F O
PUBLIC UTILITIES COMMISSION CITY AND COUNTY OF SAN FRANCISCO
T
L
L
WWE/PUC APPROVALS
-------------------
Y
R RO
S
T
FI E
E N G UER RA
SE A
A
C OUN T
SA N FR A N OF
S
I
D
O R O E N PA Z
T
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
C
T
201 Post Street 7th Floor San Francisco CA 94108 N
SA N FR A N OF
AN
KMD | STEVENS
E
R
O SC CI
HI T
O I F CAL
OF
L
ARC
D
C
E
CERTIFIED BY
SE A
SE
Douglas Tom C12405 10/11
T
APP
LEVEL 8 FLOOR PLAN 1/8" = 1'-0"
1
0" EN
NO.
REN.
A
BY
O SC CI
1
C
OR ARCH. REVIEW
ON
B.3
FOR PARTITION TYPES SEE SHEETS I10.03, I10.04 & I10.05
1
1
2
2
3
3
4
4
5
5
6
6
A
FOR PARTITION FURRING TYPES, SEE SHEET I10.05
H.2
F.8 2 I10.01
1
1
FOR INTERIOR WINDOW TYPES SEE SHEET I10.33.
101
FOR INTERIOR OPENING (DOOR) SCHEDULE SEE SHEETS I10.31 AND I10.32.
1 I3.12A
1.3 1.3B
1 1.3 1.3B
INTERIOR WALL PARALLEL TO ANGLED NORTH CURTAIN WALL
DN
LCD
ALIGN 1139
C
C4
1125
1126
4
FEC
9' - 4"
OFFICE I-1139
LCD
X5
UP
B
1 I3.11B
ALIGN
ALIGN
R
OFFICE I-1240
3 6
I9.20
4
CORR. I-1148
OFFICE I-1137
11' - 3"
ALIGN
B 7
7
8
8
4.5 4.6
B
D
DN
OFFICE I-1237
OFFICE I-1249
19 I10.06
B
B
B
B
B
8' - 7"
OPEN OFFICE I-1233
1250 12' - 0"
A
5
12' - 0"
1265
EQ
EQ
EQ
1266
19 I10.06
2
B OFFICE I-1232
1235
7
SHARED CONFERENCE ROOM I-1130
11
11
12
12
13
13
14
14
B
10
J
1232
SIM. 1 I3.06B
SHARED EMPLOYEE LOUNGE I-1230 B
FEC
B2
7
B 11
11
12
12
13
13
14
14
8
L
DATE:
F
G
H
I
J
K
ASSIST. GEN. MANAGER
N
M
0" CONTRACT NO. CS-842
I2.11
O
359-305 ISSUE DATE July 23, 2010
1/8" = 1'-0"
DATE:
Q
P
R
C
EN
SE
D
ARC
HI T
201 Post Street 7th Floor San Francisco CA 94108
Douglas Tom C12405 10/11
NO.
A JOINT VENTURE PARTNERSHIP
REN.
A
BY
T
E
OF
APP
O I F CAL
R
AN
KMD | STEVENS
E
I
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/23/10 SITE PERMIT SET - RESPONSE 1 03/18/10 CD PROGRESS DOCUMENTS 02/02/10 CD PROGRESS DOCUMENTS 11/20/09 DESIGN DEVELOPMENT 2 - REVISED (DD2-R2) DATE DESCRIPTION
222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
N
C OUN T
D
O R O E N PA Z
CERTIFIED BY
FI E
E N G UER RA
R RO
Y
WWE/PUC APPROVALS
------------------PUBLIC UTILITIES COMMISSION
SECTION MANAGER
DATE:
DIVISION MANAGER
DATE:
T
A
1
1
2
2
B
C
D
E
F
G
I
H
J
K
L
N
M
O
Q
P
R
S
T
A
C
D
E
F
G
I
H
J
K
SFPUC JOB NO.:
L
ASSIST. GEN. MANAGER
N
M
1" CONTRACT NO. CS-842 DRAWING NO.
I2.12
FLOOR PLAN - LEVEL 12
O
359-305 ISSUE DATE July 23, 2010
1/8" = 1'-0"
DATE:
COPYRIGHT
B
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
KMD PROJECT NO.
CITY AND COUNTY OF SAN FRANCISCO
7/20/2010 10:44:55 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
S
6 5 4 3 2 1 #
L
DRAWING NO.
KMD PROJECT NO.
SFPUC JOB NO.:
L
1"
FLOOR PLAN - LEVEL 11 COPYRIGHT
E
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
TH E CIT Y
DATE:
DIVISION MANAGER
F O
SECTION MANAGER
A
PUBLIC UTILITIES COMMISSION CITY AND COUNTY OF SAN FRANCISCO
I
I L
WWE/PUC APPROVALS
-------------------
Y
TH E CIT Y
SE A
F O
R RO
T
CERTIFIED BY
FI E
E N G UER RA
SA N FR A N OF
A
C OUN T
S
T
I
D
O R O E N PA Z
T
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
C
201 Post Street 7th Floor San Francisco CA 94108 N
SA N FR A N OF
AN
KMD | STEVENS
E
R
O SC CI
HI T
O I F CAL
L
ARC
S OF
SE A
D
T
E
O SC CI
SE
C
T
LEVEL 12 FLOOR PLAN 1/8" = 1'-0"
1
0" EN
Douglas Tom C12405 10/11
APP
8
LEVEL 11 FLOOR PLAN 1/8" = 1'-0"
1
C
NO.
REN.
A
BY
Q
P
R
S
6 5 4 3 2 1 #
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/23/10 SITE PERMIT SET - RESPONSE 1 03/18/10 CD PROGRESS DOCUMENTS 02/02/10 CD PROGRESS DOCUMENTS 11/20/09 DESIGN DEVELOPMENT 2 - REVISED (DD2-R2) DATE DESCRIPTION
7/20/2010 10:45:34 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
A
T
B
C
A
D
1
1
2
2
3
3
AL
STORAGE I-1229 10
B
J
FEC
6
ALIGN 1229
J
1231
3
OFFICE I-1235
1 I10.01
5.8
5
1230
B
I9.12A
9
9 I9.12A
B
B2
FEC I9.12A
1236
1 I10.01
10
4
13' - 2 3/4"
B2 OFFICE I-1236
OFFICE I-1231
10 SIM.
1 I3.07B
B A
A
B
1132
1135
1249 19 I10.06
B
6 STORAGE I-1129
LCD
OFFICE I-1266
B
5
15 I10.06
EQ
OFFICE I-1265
B
1129 J B
OFFICE I-1132
1 I10.01
4.5 4.6
EQ
B
FEC
1 I10.01
5.8 1130 ALIGN
OFFICE I-1131 1131 B
8
1 I3.12B
ALIGN
EQ
3
B
6
B
9
C
B2
FEC
19 I10.06
I9.03A
EQ
OPEN OFFICE I-1133
9
13' - 2 3/4"
I9.11A
B2
1136 B
7
8
HD FILE I-1254
D PLOTTER I-1253
EQ
19 I10.06 FEC
B
OFFICE I-1136
7 D COPIER I-1252
D
CORR. I-1248
F
OFFICE I-1250
A
OFFICE I-1135
4
FEC
1242
F
1237
15 I10.06
9' - 4"
EQUIP I-1242
PANTRY I-1247
I9.12A
B
5
16 I10.06
ALIGN
UP
1238
OFFICE I-1238 1
PLOTTER I-1153
C
FEC
B
B 1239
HD FILE I-1154
D
F
3
17 I10.06
ALIGN
16 I10.06 ALIGN
OFFICE I-1239
D COPIER I-1152
F1
PANTRY I-1147
EQ
B
FEC 19 I10.06
UP
I9.11A
R
UP
C
ALIGN
B2
EQ
DN
B
1
1138
1137
X1
LCD
6
I9.12A
FEC
16 I10.06
F
LIBRARY I-1144 B
1225
FEC
19 I10.06
7' - 11 3/16"
OFFICE I-1138
B
6 1240
FEC
2 3 I10.01
DN
C4
5
17 I10.06
I9.11A
2 I3.12A
LIBRARY I-1226
ALIGN
3
C
EQ
X1
C
10' - 0"
C
SHARED CONFERENCE I-1143 EQ
7' - 6"
C
19 I10.06
X1
1 I3.11A
SHARED CONFERENCE I-1126
10' - 0"
A 1143
FEC
SHARED CONFERENCE I-1225
OPEN OFFICE I-1222
4
3 I10.01
X5
OFFICE I-1125
ALIGN
2
OFFICE I-1142
B2
B 1140
A
X1
X1 10' - 7"
I9.11A
1142 OFFICE I-1140
2
5
EQ
B 4
A
5
X1
EQ
OPEN OFFICE I-1122
INTERIOR WALL PARALLEL TO ANGLED CURTAIN WALL
1
1
2
2
3
3
4
4
5
5
D
A.5
E
A.7
B
D 1
I3.01C
E
I-0126 2-East 3 1/4" = 1'-0"
4
4
TA-3
5
5
4
TA-5
10
I-0152 2-East 1/4" = 1'-0"
9
5' - 7"
6
6
7
7
TA-3 TA-1
CERAMIC TILE
WC-2
11
UNISEX TOILET I-0171
8
I-0126 1-North 1/4" = 1'-0"
E.3
E.9 F
F.8
8
14
I3.01C
5 I10.28
1 I10.28
EQ
EQ
EQ
EQ
PROVIDE DOUBLE STUDS IN PARTITION WHEN OPER. PTN INTERSECTS
TA-3
15
6
6
7
7
8
8
171 13
10
1
TA-5
I-0170 3-South 1/4" = 1'-0"
9
I-0170 2-East 1/4" = 1'-0"
8
TA-4
I-0170 1-North 1/4" = 1'-0"
7
I-0220, I-0221 & I-0222 Conference Rms 1/4" = 1'-0"
LEVEL 1 INT FLOOR PLAN 1/4" = 1'-0"
8
4' - 6 3/4"
A.5
A.7
EQ
EQ
EQ
WC-1
EQ
EQ
EQ
WC-1
2
2
9
9
9 I3.01B
3
9
I3.01C
16
EQ
EQ
EQ
9
16
EQ
3
9
EQ
EQ
ACOUSTICAL BARRIER
LAV-1
CERAMIC TILE
10
5
3'-6"
3'-6"
4' - 6 3/4"
CERAMIC TILE
LAV-1
3'-0"
2 I10.08 WOOD CAP
WOOD CAP
WOOD CAP
WOOD CAP CERAMIC TILE
LAV-1
10
4
10
I3.01B
7
WC-1
CERAMIC TILE
4' - 6 3/4"
WC-1
CERAMIC TILE
LAV-1
CERAMIC TILE
LAV-1
4' - 6 3/4"
WOOD CAP
CERAMIC TILE
LAV-1
4' - 6 3/4"
2
4
WC-1
7
10
I-0220, I-0221, I-0222 1-North 1/4" = 1'-0"
10
I3.01C
WC-1
D R
11
11
12
12
13
13
7'-11"
2'-2"
CERAMIC TILE
4"
4'-6 1/2"
4'-11"
WOOD CAP LAV-1
2' - 0"
WOOD CAP
4'-4" 10
3
2' - 0"
8'-0"
2
4'-0"
2
I3.01A
2' - 0"
7'-2"
4
2' - 0"
3'-4"
CUSTOMER SERVICE I-0126
7'-4"
4'-11"
6'-4"
6'-0"
3'-3 1/2"
LAV-1
6'-0"
17
CCC Child Toilets
4
I-016 4-North 1/4" = 1'-0"
3
I-016 3-South 1/4" = 1'-0"
16
I-016 2-East 1/4" = 1'-0"
2
I-016 1-North 1/4" = 1'-0"
1
B 3 I10.08
OPERABLE PARTITION
4' - 6 3/4"
4' - 6 3/4"
G
1.3B
V.I.F. - OPERABLE PARTITION LENGTH
TA-3
D
8
4' - 6 3/4"
E
POC
3
TA-4
170 4' - 6"
D
2
5' - 0"
9
10
LAV-2
CERAMIC TILE
I-0170 4-West 1/4" = 1'-0"
I3.01C
12
WC-2
CERAMIC TILE
TA-4
3' - 5 1/4"
HINGED CLOSURE PANEL
8
11
WC-2 CERAMIC TILE
TA-2
WC-2
153
CHILD CARE CENTER LEVEL 1 1/4" = 1'-0"
ADA UNISEX TOILET I-0170
10' - 10 1/2"
LAV-2 TA-5
2' - 9"
15
2
E
4
TA-6 LAV-2
5' - 7 5/8"
7
CONFERENCE I-0220
LEVEL 1 INT FLOOR PLAN 1/4" = 1'-0"
5
TA-2
TA-3
I3.01B
13
I-0152 1-North 1/4" = 1'-0"
1.3
DF-1
V.I.F. - OVERHEAD SUPPORTING TRACK LENGTH
3' - 4"
4' - 0"
1' - 6"
I-0172 1-South 1/4" = 1'-0"
6
4
1' - 6"
14
LAV-2
8
I-0171 1-North 1/4" = 1'-0"
TA-4 TA-6
TA-2 152
12
UNISEX TOILET I-0153
TA-5
I-0152 3-South 1/4" = 1'-0"
12
E
9
10
WC-2
LAV-2
TA-3
5' - 6"
TA-4
CERAMIC TILE
WC-2
I-0152 4-West 1/4" = 1'-0"
I3.01B
1' - 6"
WC-2
2' - 10"
LAV-2
11
I-0171 3-South 1/4" = 1'-0"
LAV-2
8
11
TA-2 TA-6
TA-2
4' - 0"
TA-2
2' - 9" 4' - 0"
7
4' - 0"
6
7
2' - 9" 1' - 6"
6
CERAMIC TILE
EQ
1.3B
13
10' - 10 1/2"
ADA UNISEX TOILET I-0152
TA-5
TA-2
CERAMIC TILE
I-0171 4-West 1/4" = 1'-0"
14
E
TA-4
4
TA-1 CERAMIC TILE
EQ
WC-2
CERAMIC TILE
I-0171 2-East 1/4" = 1'-0"
26' - 7 5/16"
15
2' - 10"
3' - 4"
CERAMIC TILE
1' - 6"
DF-1
CHILD CARE CENTER LEVEL 1 1/4" = 1'-0"
26' - 7 1/4"
5
4' - 0 1/4"
I-0155 1-South 1/4" = 1'-0"
10' - 4"
6
1' - 6"
I-0153 1-North 1/4" = 1'-0"
1' - 6"
12
1' - 6"
5
I-0153 3-South 1/4" = 1'-0"
7' - 2"
5
13
DF-1
WC-2
EQ
1' - 6"
1' - 10"
4' - 0"
4' - 0"
2' - 10"
1' - 6"
WC-2
INFANTS I-0162
I-0153 4-West 1/4" = 1'-0"
6
6' - 0"
4
14
CERAMIC TILE
TA-4
4' - 0"
4
I-0153 2-East 1/4" = 1'-0"
TA-5
4' - 0"
I-0126 4-West 4 1/4" = 1'-0"
WC-2
EQ
DF-1
TA-1
CERAMIC TILE
3
15
CERAMIC TILE
TA-4
CERAMIC TILE
LAV-2
TA-3
3' - 4"
LAV-2 TA-3 CERAMIC TILE
3
TA-6
6
CERAMIC TILE
CERAMIC TILE
TA-5
3' - 2"
CERAMIC TILE
3' - 4"
TA-4 TA-6
FLOOR TO SLAB ABOVE
I3.01B
11
11
12
12
13
13
CHILD CARE CENTER LEVEL 1 1/4" = 1'-0"
4
I-017 4-North 1/4" = 1'-0"
3
I-017 3-South 1/4" = 1'-0"
16
I-017 2-East 1/4" = 1'-0"
2
I-017 1-North 1/4" = 1'-0"
1
11
11
12
12
13
13
LEVEL 1 INT FLOOR PLAN 1/4" = 1'-0"
C
ACOUSTIC FABRIC PANELS
OPERABLE PARTITION, WITH FULL EXTENSION INTO STORAGE POCKET POCKET DOORS FURNISHED BY OPERABLE PARTITION MFR., DOORS TO BE PRIMED FOR FIELD PAINTING
ALIGN .
11
DATE:
1/4" = 1'-0" COPYRIGHT
July 23, 2010 2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
201 Post Street 7th Floor San Francisco CA 94108
Douglas Tom C12405 10/11
NO.
REN.
2 1 #
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
A
BY
APP
T
E
OF
O I F CAL
CERTIFIED BY 7/20/2010 8:32:32 PM
R
N
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
D
C OUN T
Y
O R O E N PA Z
FI E
E N G UER RA
R RO
------------------PUBLIC UTILITIES COMMISSION CITY AND COUNTY OF SAN FRANCISCO SFPUC JOB NO.:
WWE/PUC APPROVALS
SECTION MANAGER
DATE:
DIVISION MANAGER
DATE:
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
CONTRACT NO. CS-842 DRAWING NO.
14
14
C
I3.01B
DATE:
LEVEL 1 ENLARGED FLOOR PLANS & ELEVATIONS As indicated COPYRIGHT
359-305 ISSUE DATE July 23, 2010
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
13th Floor Executive Suite
EN
SE
D
ARC
HI T
E
201 Post Street 7th Floor San Francisco CA 94108
Douglas Tom C12405 10/11
NO.
KMD PROJECT NO.
ASSIST. GEN. MANAGER
TA-3
GRAB BAR CONTINUOUS REAR AND SIDE MOUNTED WASTE RECEPTACLE
REN.
2 1 #
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
A
BY
APP
T
E
OF
O I F CAL
CERTIFIED BY 7/20/2010 8:33:32 PM
R
N
KMD | STEVENS A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
AN
D
C OUN T
Y
10 I10.41
BRADLEY 5912
BRADLEY 812 BRADLEY 346-10
TA-4
HAND DRYER
TA-5
RECESSED SOAP DISPENSER
BRADLEY 6437
TA-6
MIRROR
BRADLEY 780-2436
O R O E N PA Z
FI E
E N G UER RA
R RO
-------------------
PAINTED GWB
BRADLEY 2902-287300
PUBLIC UTILITIES COMMISSION CITY AND COUNTY OF SAN FRANCISCO SFPUC JOB NO.:
WWE/PUC APPROVALS
SECTION MANAGER
DATE:
DIVISION MANAGER
DATE:
PAINT GRADE WOOD 1 X 6 CHAIR RAIL.
4
1/2"
DATE:
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE LEVEL 1 INT ENLARGED FLOOR PLANS & ELEVATIONS As indicated COPYRIGHT
7 I10.41
I-0220, I-0221, I-0222 3-South 1/4" = 1'-0"
1" CONTRACT NO. CS-842 DRAWING NO.
I3.01C
KMD PROJECT NO.
ASSIST. GEN. MANAGER
EQ 2"
2' - 6" 0' - 6"
RECESSED WALL MOUNTED SEAT COVER, MULTI-ROLL TOILET TISSUE DESPENDER & SANITARY NAPKIN DISPOSAL
EQ
359-305 ISSUE DATE July 23, 2010
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
14
14
C I
AN
TA-1 TA-2
LAV-2 AT ADA MOUNTING HT.
A1I2H00B
EQ
L
KMD | STEVENS
TH E CIT Y
E
I
HI T
MANUF / MODEL NO.
ITEM NO. DESCRIPTION
WC-2 AT ADA MOUNTAING HT.
AM. STANDARD 0124.024
0"
L
ARC
MODEL NO. REMARKS
AM. STANDARD AM. STANDARD 0373.027
LAV-2 LAVATORY
1"
F O
359-305
D
L
I3.01A
ISSUE DATE
SE
MANUF. AM. STANDARD
WC-2 WATER CLOSET LAV-1 LAVATORY
DF-1 DRINKING FOUNTAIN ACORN
1/2"
A
LEVEL 1 ENLARGED FLOOR PLANS & ELEVATIONS
EN
I
C
KMD PROJECT NO.
ASSIST. GEN. MANAGER
BRADLEY 346-10
BRADLEY 780-2436
I
14
A
14
TH E CIT Y
CONTRACT NO. CS-842 DRAWING NO.
I
DATE:
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
F O
F O
I L
TH E CIT Y
L
A
DATE:
DIVISION MANAGER
BRADLEY 812
BRADLEY 6437
DESCRIPTION
WC-1 WATER CLOSET
BRADLEY 5912
BRADLEY 2902-287300
2" EQ
5 4 3 2 1 #
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS 02/02/10 CD PROGRESS DOCUMENTS 11/20/09 DESIGN DEVELOPMENT 2 - REVISED (DD2-R2) DATE DESCRIPTION
NO
RE
A
T
SFPUC JOB NO.:
SECTION MANAGER
WASTE RECEPTACLE HAND DRYER MIRROR
I10.41
ACCESSORY SCHEDULE
S
I
PUBLIC UTILITIES COMMISSION CITY AND COUNTY OF SAN FRANCISCO
GRAB BAR CONTINUOUS REAR AND SIDE MOUNTED
RECESSED SOAP DISPENSER
TA-6
SA N FR A N OF
R RO
RECESSED WALL MOUNTED SEAT COVER, MULTI-ROLL TOILET TISSUE DESPENDER & SANITARY NAPKIN DISPOSAL
TA-4 TA-5
T
FI E
E N G UER RA
TA-2
S
O R O E N PA Z
TA-1
TA-3 LAV-2 AT ADA MOUNTING HT.
T
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
WC-2 AT ADA MOUNTAING HT.
A1I2H00B
C
N
WWE/PUC APPROVALS
SA N FR A N OF
CERTIFIED BY
R
-------------------
T
O I F CAL
Y
S
OF
C OUN T
T
T
E
D
AM. STANDARD 0124.024
0"
C
S T
AN
SA N FR A N OF
T
201 Post Street 7th Floor San Francisco CA 94108
Douglas Tom C12405 10/11
NO.
REN.
A
KMD | STEVENS
SE A
E
O SC CI
HI T
AM. STANDARD 0373.027
L
ARC
AM. STANDARD
NO.
MANUF / MODEL NO.
ITEM NO. DESCRIPTION MODEL NO. REMARKS
AM. STANDARD
SE A
D
MANUF.
LAV-1 LAVATORY LAV-2 LAVATORY
1"
O SC CI
SE
1/2"
L
EN
C
C
DESCRIPTION
WC-1 WATER CLOSET WC-2 WATER CLOSET
DF-1 DRINKING FOUNTAIN ACORN
0"
SE A
I-0126 Customer Service 1/4" = 1'-0"
FIXTURE SCHEDULE
O SC CI
NO.
1
ACCESSORY SCHEDULE
FIXTURE SCHEDULE
3
26 South = 1'-0"
PP
J
ALIGN
I
H
8' - 1 7/8"
G
ALIGN
F
ALIGN
E
5' - 5"
D
WEST COR. I-0300C
C
12' - 0"
B
BY
T
APP
CERTIFI 7/20/2010 8:34:00 PM
T
A
FOR INTERIOR PARTITION INTERSECTION DETAILS AT SOUTH STONE FRAME ELEMENT SEE DETAIL 6/I10.06, U.O.N.
3.
FOR TYPICAL INTERIOR PARTITION INTERSECTION DETAILS AT CONCRETE COLUMNS AND CORE WALLS SEE DETAILS SHEET I10.06, U.O.N.
B
C
D
E
F
G
I
H
J
K
L
N
M
O
P
Q
R
4.
CONTRACTOR TO PROVIDE BACKING FOR LCD MONITORS WHERE SHOWN. MONITORS TO BE INSTALLED AT +54" AFF. COMBINED WEIGHT OF MONITORS AND SUPPORT BRACKET TO BE ASSUMED TO BE 150 LBS. TOTAL.
1
A 2
2
3
3
B
C
D
E
F
G
H
J
FLOOR PLAN LEGEND
A.5
A.7
E.3
E.9
FOR PARTITION TYPES SEE SHEETS I10.03, I10.04 & I10.05
A
S
A.5
A.7
E.3
WORKSTATIONS, FURNITURE AND EQUIPMENT SHOWN FOR REFERENCE ONLY, U.O.N. 1
2.
FOR INTERIOR PARTITION INTERSECTION DETAILS AT SOUTH STONE FRAME ELEMENT SEE DETAIL 6/I10.06, U.O.N.
3.
FOR TYPICAL INTERIOR PARTITION INTERSECTION DETAILS AT CONCRETE COLUMNS AND CORE WALLS SEE DETAILS SHEET I10.06, U.O.N.
H.2
4.
CONTRACTOR TO PROVIDE BACKING FOR LCD MONITORS WHERE SHOWN. MONITORS TO BE INSTALLED AT +54" AFF. COMBINED WEIGHT OF MONITORS AND SUPPORT BRACKET TO BE ASSUMED TO BE 150 LBS. TOTAL.
A
1 I3.04A
1
FOR INTERIOR WINDOW TYPES SEE SHEET I10.33.
101
FOR INTERIOR OPENING (DOOR) SCHEDULE SEE SHEETS I10.31 AND I10.32.
B.3 4
X1
11' - 2 15/16" B
5
5
6
6
427
I9.20
16 I10.06
1 I3.04C
538
7
7
8
8
13' - 11 3/16"
12' - 11 3/8"
A
459
A
460
B
OFFICE I-0465 10' - 0"
19 I10.06
B
BILL PRINTING I-0542
526
465
B
OPEN OFFICE I-0433
FEC
5.8
1
B2
J
10
OFFICE I-0432
B
B OFFICE I-0549 10' - 0"
F
OFFICE I-0550 10' - 0"
ALIGN
5
5
6
6
C
B
B
OFFICE I-0566 10' - 0" A
551 A
7
8
8
B
OFFICE I-0567
J
K
FI E
E N G UER RA
R RO
SFPUC JOB NO.:
N
M
DATE: DATE:
FLOOR PLAN - LEVEL 4
359-305 ISSUE DATE July 23, 2010
1/8" = 1'-0"
Q
P
HI T
I
L A
BY
APP
T
E
OF
O I F CAL
201 Post Street 7th Floor San Francisco CA 94108 R
AN
KMD | STEVENS
E
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
N
CERTIFIED BY
R
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
S
D
C OUN T
Y
TH E CIT Y
DIVISION MANAGER
ASSIST. GEN. MANAGER
O
ARC
D
A
CITY AND COUNTY OF SAN FRANCISCO
L
SE
Douglas Tom C12405 10/11 I
I
A
I
I
H
EN
NO.
REN.
F O
L
L
TH E CIT Y
F O
O R O E N PA Z
SE A
G
SHARED CONFERENCE I-0626
LCD
B
C
D
E
F
5
FEC
10
11
11
E.3
G
H
8' - 7" B
B
OFFICE I-0649 10' - 0"
OFFICE I-0651
OFFICE I-0650 10' - 0" A
H.2
F.8
7
8
OFFICE I-0657
8
9
9
650
B
9 I3.06D A
651
657
665
3
13' - 2 3/4"
I9.06A
A 2
2
19 I10.06
OPEN OFFICE I-0633
I9.06A
B
B
FILE RM I-0665
A
A
649
19 I10.06
FEC
B
B2
4
B
J B
B I9.03A
SHARED EMPLOYEE LOUNGE I-0630
OFFICE I-0632
6
635
5 I10.01
630 OFFICE I-0631
631
B2 OFFICE I-0635
632
J
10
10
11
11
12
12
1 I3.06B
B
FEC
2' - 10"
O R O E N PA Z
FI E
E N G UER RA
R RO
WWE/PUC APPROVALS
-------------------
SECTION MANAGER
PUBLIC UTILITIES COMMISSION
12
12
13
13
DATE:
1
1/2"
0" CONTRACT NO. CS-842
14
14
DRAWING NO.
6 5 4 3 2 1 #
I2.05
KMD PROJECT NO.
CITY AND COUNTY OF SAN FRANCISCO SFPUC JOB NO.:
DIVISION MANAGER
DATE:
ASSIST. GEN. MANAGER
DATE:
FLOOR PLAN - LEVEL 5
359-305 ISSUE DATE July 23, 2010
1/8" = 1'-0"
7/20/2010 10:42:43 PM
COPYRIGHT
LEVEL 6 FLOOR PLAN 1/8" = 1'-0"
1"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
13
13
LEVEL 5 FLOOR PLAN 1/8" = 1'-0"
C
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/23/10 SITE PERMIT SET - RESPONSE 1 03/18/10 CD PROGRESS DOCUMENTS 02/02/10 CD PROGRESS DOCUMENTS 11/20/09 DESIGN DEVELOPMENT 2 - REVISED (DD2-R2) DATE DESCRIPTION
EN
SE
ARC
D
HI T
A
BY
T
E
201 Post Street 7th Floor San Francisco CA 94108
O I F CAL
OF
APP
R
AN
KMD | STEVENS
E
Douglas Tom C12405 10/11
NO.
A JOINT VENTURE PARTNERSHIP
REN.
222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
N
C OUN T
D
CERTIFIED BY
O R O E N PA Z
FI E
E N G UER RA
R RO
WWE/PUC APPROVALS
-------------------
Y
SECTION MANAGER
PUBLIC UTILITIES COMMISSION
A
C
D
E
F
G
I
H
J
K
CITY AND COUNTY OF SAN FRANCISCO SFPUC JOB NO.:
L
N
M
1" CONTRACT NO. CS-842
14
14
DRAWING NO.
6 5 4 3 2 1 #
I2.06
KMD PROJECT NO. DIVISION MANAGER
DATE:
ASSIST. GEN. MANAGER
DATE:
FLOOR PLAN - LEVEL 6
O
Q
P
359-305 ISSUE DATE
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FO 06/04/10 CD PROGRESS DOCUMENTS 03/23/10 SITE PERMIT SET - RESPONSE 1 03/18/10 CD PROGRESS DOCUMENTS 02/02/10 CD PROGRESS DOCUMENTS 11/20/09 DESIGN DEVELOPMENT 2 - REVISED (DD2-R2) DATE DESCRIPTIO
July 23, 2010
1/8" = 1'-0" COPYRIGHT
B
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
DATE:
7/20/2010 10:43:06 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
R
7/20/2010 10:43:25 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
S
T
A
B
C
GENERAL SHEET NOTES
WORKSTATIONS, FURNITURE AND EQUIPMENT 1 SHOWN FOR REFERENCE ONLY, U.O.N.
1.
WORKSTATIONS, FURNITURE AND EQUIPMENT 1 SHOWN FOR REFERENCE ONLY, U.O.N.
FOR INTERIOR PARTITION INTERSECTION DETAILS AT SOUTH STONE FRAME ELEMENT SEE DETAIL 6/I10.06, U.O.N.
2.
FOR INTERIOR PARTITION INTERSECTION DETAILS AT SOUTH STONE FRAME ELEMENT SEE DETAIL 6/I10.06, U.O.N.
FOR TYPICAL INTERIOR PARTITION INTERSECTION DETAILS AT CONCRETE COLUMNS AND CORE WALLS SEE DETAILS SHEET I10.06, U.O.N.
3.
FOR TYPICAL INTERIOR PARTITION INTERSECTION DETAILS AT CONCRETE COLUMNS AND CORE WALLS SEE DETAILS SHEET I10.06, U.O.N.
4.
CONTRACTOR TO PROVIDE BACKING FOR LCD MONITORS WHERE SHOWN. MONITORS TO BE INSTALLED AT +54" AFF. COMBINED WEIGHT OF MONITORS AND SUPPORT BRACKET TO BE ASSUMED TO BE 150 LBS. TOTAL.
4.
CONTRACTOR TO PROVIDE BACKING FOR LCD MONITORS WHERE SHOWN. MONITORS TO BE INSTALLED AT +54" AFF. COMBINED WEIGHT OF MONITORS AND SUPPORT BRACKET TO BE ASSUMED TO BE 150 LBS. TOTAL.
FOR PARTITION TYPES SEE SHEETS I10.03, I10.04 & I10.05
1
2
2
3
3
A
B
C
D
E
F
G
H
J
FOR PARTITION TYPES SEE SHEETS I10.03, I10.04 & I10.05
A
1
FOR INTERIOR WINDOW TYPES SEE SHEET I10.33.
101
FOR INTERIOR OPENING (DOOR) SCHEDULE SEE SHEETS I10.31 AND I10.32.
4
4
5
5
A.7
E.3
E.9
1
2
2
FLOOR PLAN LEGEND
A.5
FOR PARTITION FURRING TYPES, SEE SHEET I10.05
B.3
7
ALIGN
B
C1
B
3.
J
5
6
16 I10.06
2.
E.9
5
6
I9.20
1.
A
A.7
4
HD FILE I-0656
FEC
10
T
FLOOR PLAN LEGEND
A.5
3
4
R
C4
626 17 I10.06
ALIGN
GENERAL SHEET NOTES
A
FOR INTERIOR OPENING (DOOR) SCHEDULE SEE SHEETS I10.31 AND I10.32.
2 I3.06A
C4
UP
SA N FR A N OF
N
B
T
R
B
B
S
O I F CAL
FOR INTERIOR WINDOW TYPES SEE SHEET I10.33.
D
T
OF
F
C
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/23/10 SITE PERMIT SET - RESPONSE 1 03/18/10 CD PROGRESS DOCUMENTS 02/02/10 CD PROGRESS DOCUMENTS 11/20/09 DESIGN DEVELOPMENT 2 - REVISED (DD2-R2) DATE DESCRIPTION
T
E
6 5 4 3 2 1 #
1
101
PLOTTERS I-0655
7
0"
14
2
3
8
CONTRACT NO. CS-842 14
2
X5
DN
ALIGN FEC
SIM.
1 I3.07B
13
I2.04
COPIER I-0654
D
2
6
6 I10.01
SHARED CONFERENCE ROOM I-0530
J
1"
DRAWING NO.
FOR PARTITION TYPES SEE SHEETS I10.03, I10.04 & I10.05
D
OFFICE I-0637
530
J
B
X1
B
11' - 3"
19 I10.06
MAP RM I-0646
UP
PANTRY I-0647
1 I10.01
5.8
12
KMD PROJECT NO.
COPYRIGHT
D
1/2"
B
15 I10.06
9
9
A
1
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
DATE:
FILES I-0645
FEC
G
532
S
E
CERTIFIED BY
SECTION MANAGER
PUBLIC UTILITIES COMMISSION
B B
I9.06A
637
LCD
B
SA N FR A N OF
T
T
APP
WWE/PUC APPROVALS
-------------------
Y
CONTRACTOR TO PROVIDE BACKING FOR LCD MONITORS WHERE SHOWN. MONITORS TO BE INSTALLED AT +54" AFF. COMBINED WEIGHT OF MONITORS AND SUPPORT BRACKET TO BE ASSUMED TO BE 150 LBS. TOTAL.
1
X1
625
5
C
B2
531
6
FEC
T
S
BY
C OUN T
D
4.
1
F1
B
567
OFFICE I-0531 I9.03A
B2
C
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
B4
FILE RM I-0653
C
T
201 Post Street 7th Floor San Francisco CA 94108
SA N FR A N OF
C
A
DESCRIPTION
AN
KMD | STEVENS
E
O SC CI
HI T
FOR TYPICAL INTERIOR PARTITION INTERSECTION DETAILS AT CONCRETE COLUMNS AND CORE WALLS SEE DETAILS SHEET I10.06, U.O.N.
FOR PARTITION FURRING TYPES, SEE SHEET I10.05
6
SHARED CONFERENCE I-0625
B DN
1
B
13' - 2 3/4"
B
5
I9.05A
FEC
L
ARC
D
FOR INTERIOR PARTITION INTERSECTION DETAILS AT SOUTH STONE FRAME ELEMENT SEE DETAIL 6/I10.06, U.O.N.
3.
638
OFFICE I-0638
B
566 19 I10.06
FEC
I9.05A
OPEN OFFICE I-0533
SE A
SE
Douglas Tom C12405 10/11
644
OFFICE I-0639
B
A
565
3
5
A
WORKSTATIONS, FURNITURE AND EQUIPMENT SHOWN FOR REFERENCE ONLY, U.O.N.
2.
X2
X2
I9.06A
4
A 653
OFFICE I-0652
B
B
7
15 I10.06
B
OFFICE I-0565 10' - 0"
B
10' - 0"
550 A
B
19 I10.06
4.5 4.6
C
A
T
1.
X1
C
B
INTERIOR WALL PARALLEL TO ANGLED NORTH CURTAIN WALL
A
652
B
645
8' - 7"
S
H.2
7' - 11 1/4" 1 I3.06C
OFFICE I-0643
B2
FEC
4
HD FILE I-0555
O SC CI
EN
R
A
3
A 643
OFFICE I-0642 B 640
I9.20
LEVEL 4 FLOOR PLAN 1/8" = 1'-0"
0"
C
Q
P
FLOOR PLAN LEGEND
2
A
642
3
11
13
NO.
O
J
E.9
OPEN OFFICE I-0622 I9.06A
4
1 I10.01
R
8
REN.
N
M
H
F.8
2
OFFICE I-0640
FEC
OFFICE I-0532
12
E.3
639
2
19 I10.06
B
8
SFFD/DBI FOR ARCH. REVIEW
L
G
1 I3.06A
1 I3.05A
C4
D
535
11
A.7
G
7
2' - 10"
1
K
F
8A I10.01
6
17 I10.06
ALIGN
FEC
OFFICE I-0551 549
536
OFFICE I-0535
SHARED EMPLOYEE LOUNGE I-0430
B
432
J
E
1
4
4
PLOTTERS I-0554
OFFICE I-0536
10
1 I3.04B
EQ
2
B
1 I10.01
B
431 B I9.04B
FEC
B
B
1 I10.01
6
5 I10.01
B
B2
OFFICE I-0431
9
I9.04B
430
435
7
9
467 13' - 2 3/4"
FEC
19 I10.06
FOR INTERIOR OPENING (DOOR) SCHEDULE SEE SHEETS I10.31 AND I10.32.
D
537 OFFICE I-0537 4' - 8"
466
2
A.5
16 I10.06
D COPIER I-0553
CORR. I-0548
I9.05A
A
A
A
462
I9.04A
FOR INTERIOR WINDOW TYPES SEE SHEET I10.33.
527
M1
FEC 19 I10.06
UP
DN
F
OFFICE I-0467 A
10' - 0"
A
461
3
B
OFFICE I-0466
EQ
B
OFFICE I-0435
SHARED CONFERENCE I-0527
C4
UP
EQ
458 2
I9.04A
B
B OFFICE I-0462
OFFICE I-0461 13' - 11 3/16"
A
A
451 4
ALIGN
B
13' - 11 3/16"
A
450
B
B OFFICE I-0460
3
EQ
B
OFFICE I-0451 A
OFFICE I-0459
2
3
X5
X1
EQ
A
B
B
EQ
10' - 0"
449
ALIGN
B OFFICE I-0458
2 19 I10.06
B4
B2
FILE RM I-0538
12' - 0"
12' - 0"
B A
B
PANTRY I-0547
B
8' - 7"
OFFICE I-0450 10' - 0"
B
4.5 4.6 15 I10.06
B3
SHARED CONFERENCE I-0526
LCD
C OFFICE I-0525
5
B
B
OFFICE I-0449
B
525
N-S/T & S-S/T I-0552
542A
542
x I3.05C
D HD FILE I-0457
WORKROOM I-0456
12' - 0"
B
B
437
6
FEC
1
OFFICE I-0437
STORAGE I-542A
D
PANTRY I-0447
5
1 I10.01
B
4
D I9.04A
I
H
D
X1
OFFICE I-0524
4
4 A
552
OFFICE I-0540 540
FEC
G
C
B.3
1
101
X1
I9.05A
1 I3.05B
3
7
G
F1
1
8A I10.01
524
INTERIOR WALL PARALLEL TO ANGLED NORTH CURTAIN WALL
1
A 3 I10.01
R
C4 426
17 I10.06
B
5.8
OPEN OFFICE I-0522
2
MEETING ROOM I-0427
C4
ALIGN
FEC
454
OFFICE I-0453
SHARED COPY I-0455
ALIGN
2
EQ
BUDGET BOOKS I-0446
7'-2"
EQ
CORR. I-0448
B
CLOSET I-0445B
UP
438
OFFICE I-0438
EQ
DN
10' - 0"
OFFICE I-0445
5' - 2 1/4"
439
B
FEC
445
445B
B
OFFICE I-0439
4.5 4.6
B
OFFICE I-0452 19 I10.06
SHARED CONFERENCE I-0426
LCD
X5
B
ALIGN
B B
C2
X5
X1
425
3
10'-0"
90°
B
19 I10.06
X1 UP
I9.04B
STORAGE I-0454 ALIGN
10' - 11"
X1
C 11' - 4" OFFICE I-0425
3
A 453
B4
F
B
1.3 1.3B
90°
A 452 OFFICE I-0444
11' - 3 3/4"
FEC
440
4
OFFICE I-0424
424
INTERIOR WALL PARALLEL TO ANGLED NORTH CURTAIN WALL 3
A 444
OFFICE I-0443
11' - 11"
FOR PARTITION TYPES SEE SHEETS I10.03, I10.04 & I10.05
1.3 1.3B
ALIGN
A 443
OFFICE I-0442
B2
B
2
A
442
OFFICE I-0440
E
EQ
B OPEN OFFICE I-0422
I9.04A
1
A 3 I10.01
3
H.2
F.8
8A I10.01
1
4
8A I10.01
2
D
FOR PARTITION FURRING TYPES, SEE SHEET I10.05
ALIGN
F.8
8A I10.01
C
1
A
FLOOR PLAN LEGEND
E.9
4' - 11 3/8"
B.3 1
B
GENERAL SHEET NOTES
1.
FOR PARTITION FURRING TYPES, SEE SHEET I10.05
1.3 1.3B
A
T
GENERAL SHEET NOTES 1
ALIGN
WORKSTATIONS, FURNITURE AND EQUIPMENT SHOWN FOR REFERENCE ONLY, U.O.N.
2.
EQ
1.
EQ
S
GENERAL SHEET NOTES
4' - 9 1/16"
R
ALIGN
Q
TH E CIT Y
P
F O
O
J
3'-6"
N
M
H
10'-0"
L
G
12' - 0"
K
F
I
J
E
L
I
H
D
A
G
C
I
F
B
L
E
SE A
D
A
O SC CI
C
3
3
4
4
5
5
6
6
FOR PARTITION FURRING TYPES, SEE SHEET I10.05
B.3
H.2
F.8
1
FOR INTERIOR WINDOW TYPES SEE SHEET I10.33.
101
FOR INTERIOR OPENING (DOOR) SCHEDULE SEE SHEETS I10.31 AND I10.32.
1 1.3 1.3B
1 1.3 1.3B
B
I9.10A
A
1042
OFFICE I-1040
2
A
1043
B
X1
B
B
OFFICE I-1043
OFFICE I-1044
1026 ALIGN
I9.10A
1 I3.10B
B
C4 17 I10.06
ALIGN
FEC
C4
R
1 I3.10A
1045A
FEC
7
7
8
8
2
X1
OFFICE I-1044
3
X5
X5
UP
7
C4
1025
1026 ALIGN
I9.10A
1 I3.10B
B
SHARED CONFERENCE I-1026
LCD
DN
B
B
OFFICE I-1043
3 I10.01
OFFICE I-1025 B
1024 B
B
17 I10.06
ALIGN
FEC
C4
R
1 I3.10A
4
5
FEC
I9.20
16 I10.06
B OFFICE I-1039
B
11' - 3"
4.5 4.6
D
1045A
B
ALIGN
7
7
8
8
B
B
10' - 0"
10' - 0"
1049
B
1050 A
D
D
9
9
B
10' - 0"
EQ
1057 A
B
EQ
1030
SHARED EMPLOYEE LOUNGE I-1030
EQ
1032
B
1 I3.06B
B
B
B
10' - 0"
OFFICE I-1051
OFFICE I-1065
B B
10' - 0"
OFFICE I-1066
B
EQ
1055
3
A
1056
1057
A 2
A
1030 1029
OFFICE I-1031 I9.03A
6
1031
J
11
12
12
SHARED EMPLOYEE LOUNGE I-1030
OFFICE I-1032
13
13
14
14
1032
7
10
10
11
11
12
12
13
13
1 I10.01
STORAGE I-1029
B
B
1035 11
1 I10.01
5
B
OPEN OFFICE I-1033
B2
6
I9.10A
B
B2
FEC
19 I10.06
5.8
4
1066 13' - 2 3/4"
5
19 I10.06
A
1065 A
I9.10A
SIM.
2' - 10"
B
EQ
A
1051 A
15 I10.06
ALIGN
OFFICE I-1057
OFFICE I-1056
OFFICE I-1035
B
J
FEC
FEC
STORAGE I-1029
B
OFFICE I-1032 1035
ALIGN
10
10
J
1031 B
B 10' - 0"
1050 A
B
6
1029
EQ
6
B 10' - 0"
1049
OFFICE I-1031 I9.03A
B
C OFFICE I-1055
7' - 7 3/8"
OFFICE I-1037
5.8
5
B
OPEN OFFICE I-1033
B2
OFFICE I-1035
9
I9.10A
B
B2
FEC
19 I10.06
9
4
1066 13' - 2 3/4"
5
19 I10.06
A
1065 A
I9.10A
5
PLOTTER I-1053
B
OFFICE I-1050
OFFICE I-1049
1037
OFFICE I-1066
B
A 1056 A 2
FEC B
B
10' - 0"
1055
3
A
B ALIGN
B
OFFICE I-1051
1051
A
OFFICE I-1065
B
HD FILE I-1054
COPIER I-1052
PANTRY I-1047
5
15 I10.06
ALIGN
OFFICE I-1057
OFFICE I-1056
4.5 4.6
D
CORR. I-1048
F1
11' - 3"
B
FEC
19 I10.06
UP
I9.10A
EQ
12' - 0"
B
OFFICE I-1037
1
B
C OFFICE I-1055
7' - 7 3/8"
DN
1038 OFFICE I-1038
PLOTTER I-1053
B
OFFICE I-1050
OFFICE I-1049
1037
LIBRARY I-1045
CLOSET I-1045A
1039
B
HD FILE I-1054
COPIER I-1052
D
EQ
B D
CORR. I-1048
PANTRY I-1047
B
ALIGN
I9.10A
FEC
19 I10.06
UP F1
1
12' - 0"
DN
1038 OFFICE I-1038
EQ
LIBRARY I-1045
CLOSET I-1045A
1039
B
EQ
B
3
A 1044
19 I10.06
EQ
B
EQ
B
A
OFFICE I-1042
B2
X1
4
16 I10.06
B OFFICE I-1039
B 1040
I9.20
2
1043
3
5
FEC
OFFICE I-1024
I9.10A
A
1042
OFFICE I-1040
6
6
X5
X5
UP
1025
X1
X1
INTERIOR WALL PARALLEL TO ANGLED NORTH CURTAIN WALL
4
3 I10.01
SHARED CONFERENCE I-1026
LCD
DN
B 7
B
19 I10.06
FEC
1040
OFFICE I-1025 B
1024
3
A 1044
OFFICE I-1042
B2
OPEN OFFICE I-1022
INTERIOR WALL PARALLEL TO ANGLED NORTH CURTAIN WALL A
X1
ALIGN
4
3 10.01
OFFICE I-1024
2
X1
X1
INTERIOR WALL PARALLEL TO ANGLED NORTH CURTAIN WALL
ALIGN
OPEN OFFICE I-1022
INTERIOR WALL PARALLEL TO ANGLED NORTH CURTAIN WALL A
1 I3.06B
7
SIM.
B
J
FEC
2' - 10"
8 8
LEVEL 10 FLOOR PLAN 1/8" = 1'-0"
1
J
R RO
SFPUC JOB NO.:
N
M
DATE: DATE:
FLOOR PLAN - LEVEL 10
359-305 ISSUE DATE July 23, 2010
1/8" = 1'-0"
Q
P
R
E
F
A.7
E.3
J
1.
WORKSTATIONS, FURNITURE AND EQUIPMENT SHOWN FOR REFERENCE ONLY, U.O.N.
2.
FOR INTERIOR PARTITION INTERSECTION DETAILS AT SOUTH STONE FRAME ELEMENT SEE DETAIL 6/I10.06, U.O.N.
3.
FOR TYPICAL INTERIOR PARTITION INTERSECTION DETAILS AT CONCRETE COLUMNS AND CORE WALLS SEE DETAILS SHEET I10.06, U.O.N.
4.
CONTRACTOR TO PROVIDE BACKING FOR LCD MONITORS WHERE SHOWN. MONITORS TO BE INSTALLED AT +54" AFF. COMBINED WEIGHT OF MONITORS AND SUPPORT BRACKET TO BE ASSUMED TO BE 150 LBS. TOTAL.
FLOOR PLAN LEGEND
E.9
A
C
FOR PARTITION TYPES SEE SHEETS I10.03, I10.04 & I10.05
A.7
H.2
F.8 1 I10.01
1 I10.01
1 I10.01
1
FOR INTERIOR WINDOW TYPES SEE SHEET I10.33.
101
FOR INTERIOR OPENING (DOOR) SCHEDULE SEE SHEETS I10.31 AND I10.32.
12' - 0 1/16" A1
B
2
3
3
F2
1.3
F3 3' - 9 1/2" HIGH DENSITY FIXED SHELVING, ANCHORED TO WALL
B
B
C
C
C
C
F3
C
C
LCD
EQ
16 I10.06
11' - 9"
FEC
1
X2
C2
FUR OUT CONC. AT THIS LOCATION
ALIGN
I9.13A
19 I10.06
I9.13A
OPEN OFFICE I-1339
FEC
19 I10.06
4"
B3
14'-9"
4"
14'-9"
1337
4"
4"
B3
14'-9"
3"
1334
14'-11"
3"
1333
6
6
11'-0"
1331
OFFICE I-1334
OFFICE I-1333
B3
3"
7
7
8
8
I L
C
C
C
C
C
C
C
C
C
C
F7
B
B
F6
B
B
B
B
B
F6
C
C
C
F7
C
C
C
C
C
F7
C
C
C
C
C
C
C
C
C
F7
6
24"D x 36"W x 85"H
6
C
24"D x 42"W x 85"H
6
24"D x 48"W x 85"H
F1*
1
1
C
D
2
2
6
18"D x 30"W x 85"H
F7
C
C
C
C
C
C
C
C
C
C
C
C
3
R
C
C
C
C
C
F7
C
C
C
C
C
F7
8 I10.41
F8
4
C
C
C
C
C
C
F7
C
C
C
C
C
C
6
18"D x 42"W x 85"H
6
18"D x 48"W x 85"H
6
24"D x 30"W x 85"H
6
F6*
24"D x 36"W x 85"H
6
F7*
24"D x 42"W x 85"H
6
F8*
24"D x 48"W x 85"H
6
F9*
15"D x 30"W x 85"H
6
F10*
15"D x 36"W x 85"H
6
F11*
15"D x 42"W x 85"H
6
F12*
15"D x 48"W x 85"H
6
3
3
4
4
F7
4' - 5"
2
4' - 3 1/4"
6
18"D x 36"W x 85"H
F3* F4* F5*
-
I3.
F7
Types A, B, C, & D are Mobile Units, accessible from both sides. * Types F1, F2, F3, F4, F5, F6, F7, F8, F9, F10, F11 & F12 are Fixed/Static Shelving Units; Accessible from one side when located adjacent to wall; Accessible from two sides when freestanding.
I3.
B
B.3
C
1
D
HIGH DENSITY FIXED SHELVING
1.3 1.3B
5
5
6
6
7
7
2
HIGH DENSITY FIXED SHELVING ANCHORED TO WALL
HIGH DENSITY FIXED SHELVING
HIGH DENSITY MOBILE SHELVING
HIGH DENSITY MOBILE SHELVING
8
8
9
9
HIGH DENSITY MOBILE SHELVING
9
B3
2
3
AL-123 2-East 1/4" = 1'-0"
10
10
10
11
11
11
11
12
12
12
12
13
13
13
13
14
14
14
14
D
O R O E N PA Z
FI E
E N G UER RA
J
K
B.3
B
A.7
2
WWE/PUC APPROVALS
------------------PUBLIC UTILITIES COMMISSION
SECTION MANAGER
DATE:
DIVISION MANAGER
DATE:
SFPUC JOB NO.:
L
ASSIST. GEN. MANAGER
N
M
O
P
I-012 1/4"
5
1/2"
AL-123 3-South 1/4" = 1'-0"
5
0" CONTRACT NO. CS-842 DRAWING NO.
C
I2.13
FLOOR PLAN - LEVEL 13
Q
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
A
BY
T
E
D
OF
APP
ARC
HI T
R
AN
KMD | STEVENS
E
201 Post Street 7th Floor San Francisco CA 94108
O I F CAL
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
N
C OUN T
D
O R O E N PA Z
CERTIFIED BY
FI E
E N G UER RA
Y
R RO
WWE/PUC APPROVALS
------------------PUBLIC UTILITIES COMMISSION
SECTION MANAGER
DATE:
DIVISION MANAGER
DATE:
T
A
B
C
D
E
F
G
I
H
J
K
L
N
M
O
Q
P
R
S
T
A
C
D
E
F
G
I
H
J
K
SFPUC JOB NO.:
L
ASSIST. GEN. MANAGER
N
M
1" CONTRACT NO. CS-842 DRAWING NO.
I3.LL1
LEVEL LL1 ENLARGED FLOOR PLANS & ELEVATIONS
O
Q
P
3 2 1 #
359-305 ISSUE DATE July 23, 2010
1/4" = 1'-0"
DATE:
COPYRIGHT
B
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
KMD PROJECT NO.
CITY AND COUNTY OF SAN FRANCISCO
7/20/2010 8:59:28 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
S
SE
Douglas Tom C12405 10/11
July 23, 2010
R
EN
NO.
REN.
2 1 #
359-305 ISSUE DATE
1/8" = 1'-0"
DATE:
AL-123 4-West 1/4" = 1'-0"
1"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
KMD PROJECT NO.
CITY AND COUNTY OF SAN FRANCISCO
1.3B 1.3
LEVEL 13 FLOOR PLAN 1/8" = 1'-0"
I
Y
R RO
C
L
C OUN T
D
TH E CIT Y
A I
I
H
AL-123 A-North 1/4" = 1'-0"
10
OFFICE I-1330
B3
T
T
F O
I
B
C
C
SA N FR A N OF
L
C
S
S
G
# SHELVES **
24"D x 30"W x 85"H
B
** Number of possible shelves based on 11.75" minimum vertical spacing
HIGH DENSITY FIXED SHELVING ANCHORED TO WALL
1 I3.13A
3'-11"
1330 OFFICE I-1331
COPYRIGHT
F
B
C
C
T
T
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
CERTIFIED BY
E
B
C
C
C
201 Post Street 7th Floor San Francisco CA 94108 N
SA N FR A N OF
AN
KMD | STEVENS
E
R
L
HI T
O I F CAL
SE A
ARC
D
OF
B
B3
B3
O SC CI
SE
Douglas Tom C12405 10/11
E
DIMENSIONS (Nominal)
A
AL-123 HD File Storage Rm 1/4" = 1'-0"
1
4
EN
T
C
F7
5
9
0"
C
NO.
REN.
A
APP
B
HIGH DENSITY SHELVING LEGEND
ALIGN
1
BY
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/23/10 SITE PERMIT SET - RESPONSE 1 03/18/10 CD PROGRESS DOCUMENTS 02/02/10 CD PROGRESS DOCUMENTS 11/20/09 DESIGN DEVELOPMENT 2 - REVISED (DD2-R2) DATE DESCRIPTION
A
B3 OFFICE I-1335 B3
B3
B3
B3
14'-9"
1335 7 OFFICE I10.06 I-1336
OFFICE I-1337 14'-7"
3
B3
14'-9"
1336 B3
OFFICE I-1338 B3
E.3
6 5 4 3 2 1 #
7/20/2010 10:44:36 PM
T
9'-0"
2 4"
1338 B3
July 23, 2010 2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
S
LCD
1329
I9.13A EQ. (+/- 6'-8")
1340
B4 B5
CONFERENCE I-1329
1 I3.13D
I9.13A
OFFICE I-1340
E
14
359-305 ISSUE DATE
1/8" = 1'-0"
R
15 I10.06
FEC
ALIGN
5'-1"
B3 B3
FLOOR PLAN - LEVEL 10
Q
F8
4' - 0 1/2"
5
C
3' - 9 1/2"
A.7
1360b
EQ. (+/- 6'-8")
A1
DATE:
P
1360a
5
5' - 9 3/4"
X4
DATE:
O
CONFERENCE I-1360
B4
1341
DIVISION MANAGER
ASSIST. GEN. MANAGER
I2.10
C1
C2
OFFICE I-1342
OFFICE I-1341
SFPUC JOB NO.:
N
14
DRAWING NO.
KMD PROJECT NO.
CITY AND COUNTY OF SAN FRANCISCO
M
CONTRACT NO. CS-842
FEC
A1
B3
D
4' - 4 1/2"
C
F3
1355
1345
LIGN
F7
2
7' - 9 1/4" 16 I10.06
17 I10.06
ALIGN X5
1354
C
OFFICE I-1355
1342
R RO
L
1"
R
X5
ALIGN
K
HIGH DENSITY FIXED SHELVING, ANCHORED TO WALL
8 I10.41
F3
4
4
C1 C PANTRY I-1354
UP
I9.13B
OFFICE I-1345
C
J
3 Reception I-1326
X1
1324
I9.13B
C2
I10.26 UP
I
H
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
F2*
1.3B
X1 2
DN A1
FI E
E N G UER RA
DATE:
D 2
5
X1
LCD
O R O E N PA Z
SECTION MANAGER
1353
COPIER I-1353 ALIGN
1
A1
G
TH E CIT Y
C
6 I3.13B DN
A1
4
FEC
1346
OFFICE I-1346 B
1 I3.13C
F
F O
12' - 7 1/2"
1323
OPEN OFFICE I-1322
222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
N
PUBLIC UTILITIES COMMISSION
SECTION LABEL
X1 EQ
5' - 0" OFFICE I-1352
B
B4
D
OFFICE I-1323 A1
1352
2' - 2"
FEC
90°
1351 OFFICE I-1351
12' - 3 9/16"
C1
CONFERENCE I-1324
A1
1321
3
1350 OFFICE I-1350
R
WWE/PUC APPROVALS
-------------------
B.3
90°
A1 A1
1320
I9.13B
A1
19 I10.06
E
B
8 I3.13C
90°
OFFICE I-1321
C1
2
1347
O I F CAL
OF
Y
1
10' - 0 1/2"
CONFERENCE I-1320
C3
OFFICE I-1347
D
1
1
FOR PARTITION FURRING TYPES, SEE SHEET I10.05
4 I10.01
B.3
H
E
C OUN T
COPYRIGHT
B
A
1 I3.13B
G
T
APP
D
2"
D
A JOINT VENTURE PARTNERSHIP
I
A.5
C
201 Post Street 7th Floor San Francisco CA 94108
2"
B
A
BY
AN
KMD | STEVENS
E
CERTIFIED BY
A
T
GENERAL SHEET NOTES
A
HI T
7/20/2010 10:44:18 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
S
ARC
D
TH E CIT Y
DIVISION MANAGER
ASSIST. GEN. MANAGER
O
SE
Douglas Tom C12405 10/11 REN. A
KMD PROJECT NO.
CITY AND COUNTY OF SAN FRANCISCO
L
EN
NO.
F O
FI E
E N G UER RA
C
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/23/10 SITE PERMIT SET - RESPONSE 1 03/18/10 CD PROGRESS DOCUMENTS 02/02/10 CD PROGRESS DOCUMENTS 11/20/09 DESIGN DEVELOPMENT 2 - REVISED (DD2-R2) DATE DESCRIPTION
I
TH E CIT Y
F O
O R O E N PA Z
K
6 5 4 3 2 1 #
I2.10
7' - 9 1/4"
I
H
DRAWING NO.
L
I
I
G
0" CONTRACT NO. CS-842
SE A
F
LEVEL 10 FLOOR PLAN 1/8" = 1'-0"
1"
O SC CI
L
A
222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
N
L
R
COPYRIGHT
E
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
SA N FR A N OF
O I F CAL
DATE:
T
OF
SECTION MANAGER
PUBLIC UTILITIES COMMISSION
T
E
CERTIFIED BY
WWE/PUC APPROVALS
-------------------
Y
S
T
T
APP
C OUN T
D
C
T
A JOINT VENTURE PARTNERSHIP
SA N FR A N OF
C
201 Post Street 7th Floor San Francisco CA 94108
S
A
BY
AN
KMD | STEVENS
E
SE A
HI T
O SC CI
ARC
D
L
SE
Douglas Tom C12405 10/11 REN.
SE A
0" EN
O SC CI
1
C
NO.
R
BY
AP
7/20/2010 8:31:17 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
S
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
A
T
B
C
D
E
ACCESSORY SCHEDULE
1
2
D
E
E.3
E.9 F
F.8
1.3 1.3B
2 1
1
2
2
H
H.2
J
G
4
3
1.3B 3
3
4
4
8
I3.02B
CONFERENCE I-0223
7
NCR ROOM I-0231
OFFICE I-0224
8
I-0223 1-North 1/4" = 1'-0"
2
3
3
3
4
4
I-0223 2-East 1/4" = 1'-0"
CONFERENCE I-0222
3' - 11 1/8"
2
I3.02B
225A
3
R
E
2
1.3B 1.3
13
2' - 1"
I3.02B
6' - 6"
I-0230 1-North 1/4" = 1'-0"
7' - 0"
REFRIGERATORS; SEE SPECS.
2
4 I10.21
20 I10.06
2 I10.21
C
D
1
1.3 1.3B
2
5
I3.02C
8
8
2' - 1"
4' - 6"
7
I-0223 Conference, I-0224 Office & I-0225 Office 1/4" = 1'-0"
F7
A
C
C
3' - 10"
C
C
C
C
C
C
C
A
A
C
C
6
5
HD FILE I-0255
7
F3
5
I3.02D
F3
F1
F3
I10.07
3
E.3
1
E.9 F
1.3 1.3B
2
5
6
6
7
7
8
8
1
I-0230 Lounge, I-0231 NCR Rm 1/4" = 1'-0"
4
F E.9
I-0230 3-South 1/4" = 1'-0"
5
COFFEE MAKER; SEE SPECS.
I-0230 4-West 1/4" = 1'-0"
TA-11
1 I10.21
TA-10
6
6
7
7
8
8
9
9
1
I-0242 New Service, I-0252 Map Room, I-0255 HD File 1/4" = 1'-0"
I-0223 4-West 1/4" = 1'-0"
E.3
2
H
H.2
6
H.2
6
H
E
E.3
1.3B 1.3
PLAS. LAM. WORK COUNTER
PLAS. LAM. WORK COUNTER
LATERAL FILE, N.I.C.
END PANEL W/ PLAS. LAM. FIN.
END PANEL W/ PLAS. LAM. FIN.
PLAS. LAM. WORK COUNTER
SOLID SURFACE WORK COUNTER INTERMEDIATE VERTICAL PLAS. LAM. PANEL
2' - 6"
9
9
A.5
3
2
POCKET DOORS FURNISHED BY OPERABLE PARTITION MFR., DOORS TO BE PRIMED FOR FIELD PAINTING
1.3B 1.3
10
10
11
11
E.3
1
E.9 F
F.8
I-0224 2-East 1/4" = 1'-0"
8
G
2
LOW WALL
I-0224 3-South 1/4" = 1'-0"
9
F E.9
3
STEEL SUPPORT BRACKETS
7
I-0231 2-East 1/4" = 1'-0"
8
I-0231 3-South 1/4" = 1'-0"
9
E.3
3
10
10
11
11
A
A.5
2
LOW WALL
4.5 4.6
A.5
4.5 4.6
COPIER, N.I.C.
A.5
5
A
I3.02C
COPIER I-0238
2 I10.24
PLAS. LAM. END PANEL
LOW DOOR ON DOUBLE ACTING SPRING HINGES
3' - 6"
COPIER, N.I.C.
3' - 6"
2' - 10"
3' - 6"
TO CL
LOW WALL
2 I10.24
2' - 10"
13
12
12
13
13
COPIER, N.I.C. COPIER, N.I.C.
PLAS. LAM. CASEWORK
---
SOLID SURFACE COUNTERTOP
5
11
PLAS. LAM. CASEWORK
COPIER, N.I.C.
SOLID SURFACE COUNTERTOP
12
12
13
13
14
14
EXPOSED CONC. WALL 7 I10.23
20 I10.06
PLAS. LAM. CASEWORK SIGNAGE; SEE SIGNAGE DWGS.
PLAS. LAM. CASEWORK
BY
APP
E
E
201 Post Street 7th Floor San Francisco CA 94108
CERTIFIED BY 7/20/2010 8:34:49 PM
R
N
KMD | STEVENS A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
AN
D
C OUN T
O R O E N PA Z
FI E
E N G UER RA
R RO
Y
------------------PUBLIC UTILITIES COMMISSION CITY AND COUNTY OF SAN FRANCISCO SFPUC JOB NO.:
WWE/PUC APPROVALS
SECTION MANAGER
DATE:
DIVISION MANAGER
DATE:
1/2"
1"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
0" CONTRACT NO. CS-842 DRAWING NO.
14
14
I3.02B
KMD PROJECT NO.
ASSIST. GEN. MANAGER
DATE:
LEVEL 2 ENLARGED FLOOR PLANS & ELEVATIONS
359-305 ISSUE DATE July 23, 2010
1/4" = 1'-0" COPYRIGHT
I-0238 4-West 1/4" = 1'-0"
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
Typical Office Floor San Francisco PUC : TomEliotFisch
C
5 4 3 2 1 #
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS 02/02/10 CD PROGRESS DOCUMENTS 11/20/09 DESIGN DEVELOPMENT 2 - REVISED (DD2-R2) DATE DESCRIPTION
EN
SE
D
ARC
HI T
E
BY
APP
T
E
OF
O I F CAL
CERTIFIED BY 7/20/2010 10:46:18 PM
201 Post Street 7th Floor San Francisco CA 94108
Douglas Tom C12405 10/11
NO.
REN.
A
R
N
KMD | STEVENS A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
AN
D
C OUN T
O R O E N PA Z
FI E
E N G UER RA
R RO
Y
------------------PUBLIC UTILITIES COMMISSION CITY AND COUNTY OF SAN FRANCISCO SFPUC JOB NO.:
WWE/PUC APPROVALS
SECTION MANAGER
DATE:
DIVISION MANAGER
DATE:
1/2"
1"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
CONTRACT NO. CS-842 DRAWING NO.
I3.02C
KMD PROJECT NO.
ASSIST. GEN. MANAGER
DATE:
LEVEL 2 ENLARGED FLOOR PLANS & ELEVATIONS 1/4" = 1'-0" COPYRIGHT
359-305 ISSUE DATE July 23, 2010
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
C
4 3 2 1 #
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS 02/02/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
EN
SE
D
ARC
HI T
E
Douglas Tom C12405 10/11
NO.
REN.
A
HI T
TH E CIT Y
ARC
O I F CAL
I
D
OF
TH E CIT Y
SE
Douglas Tom C12405 10/11
T
F O
EN
REN.
A
14
A
T
July 23, 2010 2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
I-0238 3-South 1/4" = 1'-0"
S
COPYRIGHT
C
NO.
3 2 1 #
13
T
1/4" = 1'-0"
359-305 ISSUE DATE
I-0238 2-East 1/4" = 1'-0"
C
DATE:
14
I3.02A
KMD PROJECT NO.
ASSIST. GEN. MANAGER
14
I
CONTRACT NO. CS-842 DRAWING NO.
L
0"
1"
L
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE LEVEL 2 ENLARGED FLOOR PLANS & ELEVATIONS
12
SA N FR A N OF
DATE:
I-0238 1-North 1/4" = 1'-0"
T
DATE:
DIVISION MANAGER
11
S
SFPUC JOB NO.:
WWE/PUC APPROVALS
SECTION MANAGER
I-0238 Copy 1/4" = 1'-0"
BY
APP
I
10
I
I-0225 4-West 1/4" = 1'-0"
F O
13
A
I-0225 3-South 1/4" = 1'-0"
I
12
T
PUBLIC UTILITIES COMMISSION CITY AND COUNTY OF SAN FRANCISCO
T
O SC CI
SE A
L
F O
I-0225 2-East 1/4" = 1'-0"
C
-------------------
A
Y
S
R RO
T
FI E
E N G UER RA
I
C OUN T
TH E CIT Y
D
O R O E N PA Z
11
SA N FR A N OF
AN
I-0225 1-North 1/4" = 1'-0"
C
T
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
SA N FR A N OF
C
KMD | STEVENS
10
I-0220, I-0221, I-0222 4-West 1/4" = 1'-0" 0"
201 Post Street 7th Floor San Francisco CA 94108
12
13
BULLETIN BOARD SURFACE W/ TRIM APPLIED TO CONC. WALL SOLID SURFACE BACKSPLASH W/ INTEGRAL ELEC OUTLETS
PLAS. LAM. END PANELS
5
E
12
2' - 10"
SIM.
2"
L
4' - 6" TYP
EQ
SE A
EQ
O SC CI
2" EQ
HINGED CLOSURE PANEL @ POCKET DOORS
L
EQ 2"
LCD
10
11
4.64.5
12
SE A
EQ
10
I-0252 1-North 1/4" = 1'-0"
11
14
O SC CI
2" EQ
HINGED CLOSURE PANEL @ POCKET DOORS
(E) 13'-6" W x 25"D x 38"H SHELVING UNIT RELOCATED FROM 1155 MARKET ST.
STEEL SUPPORT BRACKETS
I-0231 4-West 1/4" = 1'-0"
8
PLAS. LAM. COUNTERTOP
PLAS. LAM. COUNTERTOP
FIN. CEILING, S.A.D.
I-0231 1-North 1/4" = 1'-0"
I-0224 4-West 1/4" = 1'-0"
L
A.7
7
1' - 8"
B
OPERABLE PARTITION, WITH FULL EXTENSION INTO STORAGE POCKET
I-0224 1-North 1/4" = 1'-0"
2' - 10"
STEEL SUPPORT BRACKET
INTERMEDIATE VERTICAL PANEL W/PLAS. LAM. FIN.
9
6 6
I-0220, I-0221, I-0222 2-East 1/4" = 1'-0"
13
A
A
C
PLAS. LAM. CASEWORK 5
7
I-0223 3-South 1/4" = 1'-0"
PLAS. LAM. COUNTERTOP
I
4 I10.41
A
C
2
B.3 FINISH CEILING S.A.D.
IED BY
MAP ROOM I-0252
9
10
A
I10.07
9
N
I3.02D
A
C
6 I10.21
SIGNAGE; SEE SIGNAGE DWGS
1
R
F7
SOLID SURFACE COUNTERTOP
I10.07
HI T
4.5 4.6
3
5
EQ
TO CL
6
7
FIN. CEILING, S.A.D.
3 I10.08
3
ARC
6
1
6
2 I10.08
O I F CAL
E
NEW SERVICE I-0242
3
F5
4
EQ
ACOUSTICAL BARRIER
D
I3.02D
13' - 2"
BULLETIN BOARD SURFACE W/ TRIM APPLIED TO WALL
MICROWAVE OVENS; SEE SPECS.
LATERAL FILES, N.I.C.
OF
5
2 I10.07
EQ
STEEL SUPPORT BRACKETS
SE
3
4
H
I10.41
B.3
Douglas Tom C12405 10/11
3
4
I-0230 2-East 1/4" = 1'-0"
3
H.2
10
E
D
2' - 1"
3 I10.25
I10.41
EN
1
2
4
2 EMPLOYEE LOUNGE I-0230
4' - 10"
11 I10.41
4
O.
1
2
11
3' - 8 5/8"
7
LCD
11
12
5
1
T
BRADLEY 250-15
8
4' - 8 7/8"
5
PROVIDE DOUBLE STUDS IN PARTITION WHEN OPER. PTN INTERSECTS
EN.
BRADLEY 6562
SURFACE MOUNTED PAPER TOWEL DISPENSER
2
7
10
5' - 0"
3
OPERABLE PARTITION
SURFACE MOUNTED SOAP DISPENSER
TA-11
4
J
OFFICE I-0225
4
CKET DOORS BY OPER. PTN. MFR.
FIN. CEILING, S.A.D.
TA-10
7
2
5
5
I3.02C
6
9
R
7
10 I10.07
6
9
2' - 6"
25' - 9 1/4"
V.I.F. - OVERHEAD SUPPORTING TRACK LENGTH
V.I.F. - OPERABLE PARTITION LENGTH
I3.02A
25' - 9 5/16"
2
5
6
MFR./MODEL NO.
2' - 6" 2' - 5 5/8"
1.3
HINGED CLOSURE PANEL
J
DESCRIPTION
9' - 5"
3' - 5 1/4"
CONFERENCE I-0221
H.2
6 I10.24
6
ITEM NO.
3' - 9 3/8"
1
2
E
2' - 1"
B.3
D
D
2"
C
T
E
OF
O I F CAL
CERTIFIED BY 7/20/2010 8:37:14 PM
R
N
G
F
I
H
J
K
L
N
M
O
P
Q
R
S
T
A
B
C
D
E
F
G
I
H
J
K
L
N
M
O
P
Q
R
S
A
T
B
C
D
E
F
G
I
H
J
K
L
N
M
O
P
Q
R
S
A
T
B
C
D
E
F
ACCESSORY SCHEDULE DESCRIPTION
MFR./MODEL NO.
SURFACE MOUNTED SOAP DISPENSER
BRADLEY 6562
TA-11
SURFACE MOUNTED PAPER TOWEL DISPENSER
BRADLEY 250-15
C 1
D
E
E.3
4.5 4.6
OPEN 3
B
I3.05C
B
N-S/T & S-S/T I-0552
1
2
TALL STORAGE CABINETS
TALL OPEN SHELVING
542A
F3
SOLID SURFACE COUNTERTOP
CONTRACTOR TO COORDINATE SEQUENCE OF DOOR & EQUIP INSTALLATIONS
4
HD FILE I-0555 COPIER I-0553
5
5
6
6
LOW WALL
I3.05B
5
FULL HEIGHT WALL
BILL PRINTER, NIC 3
HGIH DENSITY MOBILE SHELVING
I3.05B
11
2 6
C
C
C
C
C
C
C
C
I3.05B
I3.05B
10
8
9
5
C
C
C
C
F11
F10
5.8
7
7
3
PLAS. LAM. WORK SURFACE COUNTERTOP W/ WALL BRACKETS & GROMMETS
PLAS. LAM. SHELVING
15"D x 30"W x 85"H
6
15"D x 36"W x 85"H
6
F11*
15"D x 42"W x 85"H
6
F12*
15"D x 48"W x 85"H
6
4 I10.24
2' - 0"
4
PASSAGE WAY
5
5
6
6
7
7
A
A.5
2' - 6"
9
F1
A
A
A
A
A
A
F1
10
10
B
B
B
B
B
B
B
B
B
B
B
11
11
8
8
12
12
8
F4
PLAS. LAM. SHELVING, ANCHORED TO WALL
201 Post Street 7th Floor San Francisco CA 94108
A JOINT VENTURE PARTNERSHIP
A
222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
I
A
BY
T
APP
E
OF
O I F CAL
R
AN
KMD | STEVENS
E
N
CERTIFIED BY
July 23, 2010
D
C OUN T
Y
O R O E N PA Z
FI E
E N G UER RA
R RO
WWE/PUC APPROVALS
-------------------
SECTION MANAGER
PUBLIC UTILITIES COMMISSION
A
CITY AND COUNTY OF SAN FRANCISCO SFPUC JOB NO.:
DIVISION MANAGER
DATE:
ASSIST. GEN. MANAGER
DATE:
1
1
2
2
C
D
F
E
F
G
I
H
F.8
F.8
J
K
2
L
3
N
M
O
14
14
0" CONTRACT NO. CS-842 DRAWING NO.
R
EN
D
SE
ARC
HI T
359-305 ISSUE DATE July 23, 2010
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
201 Post Street 7th Floor San Francisco CA 94108
A JOINT VENTURE PARTNERSHIP
REN.
A
BY
T
E
OF
APP
O I F CAL
R
AN
KMD | STEVENS
E
Douglas Tom C12405 10/11
NO.
3 2 1 #
222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
N
D
C OUN T
CERTIFIED BY
O R O E N PA Z
FI E
E N G UER RA
R RO
WWE/PUC APPROVALS
-------------------
Y
SECTION MANAGER
PUBLIC UTILITIES COMMISSION
T
A
12
C
H
2 1
1
2
2
D
E
H.2
F
G
I
H
J
J
K
CITY AND COUNTY OF SAN FRANCISCO SFPUC JOB NO.:
H.2
L
N
M
J
O
DIVISION MANAGER
DATE:
ASSIST. GEN. MANAGER
DATE:
13
14
14
1" CONTRACT NO. CS-842 DRAWING NO.
C
I3.05C
LEVEL 5 ENLARGED FLOOR PLANS & ELEVATIONS
5 4 3 2 1 #
359-305 ISSUE DATE July 23, 2010
1/4" = 1'-0"
Q
P
6
13
KMD PROJECT NO.
COPYRIGHT
B
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
DATE:
7/20/2010 8:43:34 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
S
C
I3.05B
1/4" = 1'-0"
Q
P
3
F.8
13
1"
LEVEL 5 ENLARGED FLOOR PLANS & ELEVATIONS COPYRIGHT
B
13
KMD PROJECT NO.
7/20/2010 8:43:05 PM
T
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
DATE:
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
S
12
2' - 6"
R
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS 02/02/10 CD PROGRESS DOCUMENTS 11/20/09 DESIGN DEVELOPMENT 2 - REVISED (DD2-R2) DATE DESCRIPTION
SOLID SURFACE COUNTERTOP
ARC
HI T
O I F CAL
E
201 Post Street San Francisco C R
A
B
7 1
1
2
2
C
D
E
N
C
F
G
D
E
E.3
4
I3.07A
R
4
FB
5
3
3 ? ?
3
I-0725 1-North 1/4" = 1'-0"
I-0725 2-East 1/4" = 1'-0"
4
5
I-0725 3-South 1/4" = 1'-0"
3
3
4
4
3
I-0725 4-West 1/4" = 1'-0"
6
I-0730 1-North 1/4" = 1'-0"
I-0730 2-East 1/4" = 1'-0"
4
3
3
4
4
5
5
SHARED CONFERENCE ROOM I-0730
SE A
L
OFFICE I-0732
743 2
5
4.64.5
4
4
J
3
7
HIGH DENSITY FIXED SHELVING
6
I3.07B
7
H.2
1
6 CENTER JOINT ON MONITOR
4
EQ
EQ
EQ
EQ
F4 CORR. I-0748
COPIER I-0753
SOLID SURFACE COUNTERTOP
F3
I10.41
I3.07C
HIGH DENSITY MOBILE SHELVING
ACOUSTIC FABRIC PANELS
I3.07C 15
6
I3.07C
14
11
FULL HEIGHT WALL
3 I3.20
SOLID SURFACE EATING COUNTER
10
PLOTTERS I-0754
I3.07C
SOLID SURFACE COUNTERTOP
12
C
C
C
C
C
C
C
C
13
C
C
6"
I10.41
7
PANTRY I-0747
11
VIF
5
2"
-
3' - 9" 10
5
5
F3
8
I3.07C
9
I-0725 Office 1/4" = 1'-0" 2'-3"
5
3
STORAGE I-0743
4.5 4.6
9 I10.41
5
OPEN TO COPIER RM.
I3.07C
4
3
3' - 8 1/4"
O SC CI
6
5
D
OF
3
PLAS. LAM. CASEWORK
FLAT FILES, NIC
I-0655 1-North 1/4" = 1'-0"
5
E
CERTIFIED BY
T
10 I10.07
OFFICE I-0731
OFFICE I-0725
2
PLAS. LAM. BACK PANEL
HIGH DENSITY FIXED SHELVING UNITS, ANCHORED TO WALL
T
APP
LOW WALL
LATERAL FILES, NIC
4.5 4.6
SE
Douglas Tom C12405 10/11
NO.
REN.
A
BY
7/20/2010 8:44:16 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
S
EN
I
2' - 6"
I-0542 Bill Printing 3-South 1/4" = 1'-0"
L
HI T
I-0626 Shared Conference 1/4" = 1'-0"
A
ARC
REN.
11
I
13
TH E CIT Y
D
L
359-305 ISSUE DATE
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
TH E CIT Y
SE
Douglas Tom C12405 10/11
NO.
3 2 1 #
F O
EN
I
C
I3.04B
11
LEVEL 5 FLOOR PLAN 1/4" = 1'-0"
I
I-0542 Bill Printing 1-North 1/4" = 1'-0"
x
L
12
10
6
OPEN
4
I-0555 HD file 4-West 1/4" = 1'-0"
10
B
537
BILL PRINTER, N.I.C.
PLAS. LAM. CASEWORK
L
14
14
DRAWING NO.
1/4" = 1'-0"
R
11
9
I-0538 File Rm 4-West 1/4" = 1'-0"
9
2
F2
I10.21
1' - 6" 1' - 6"
0" CONTRACT NO. CS-842
LEVEL 4 ENLARGED FLOOR PLANS & ELEVATIONS
Q
I-0555 HD File 2-East 1/4" = 1'-0"
I-0538 File Rm 2-East 1/4" = 1'-0"
8
T
COPIER, NIC
HIGH DENSITY MOBILE SHELVING UNITS
8
S
DATE:
SOLID SURFACE COUNTERTOP
I-0654 Copier 4-West 1/4" = 1'-0"
HIGH DENSITY FIXED SHELVING UNITS, ANCHORED TO WALL
I3.06A
SHARED CONFERENCE I-0626
5 3' - 0"
1"
D
D
J
2
HIGH DENSITY MOBILE SHELVING
T
TH E CIT Y
7
H.2
C
F O
7
I-0625 Shared Conference 1/4" = 1'-0"
1
H
7
SA N FR A N OF
DATE:
PASSAGE WAY
PLAS. LAM. SIDE & BACK PANELS
3' - 7 1/2"
5
6
9
I3.05C
T
4' - 6"
5
6
FB
S
DIVISION MANAGER
ASSIST. GEN. MANAGER
P
NIC
3
R
3
9
T
LATERAL FILES, NIC
6 6
4
5
3
C
O
FULL HEIGHT WALL
SOLID SURFACE COUNTERTOP
OPEN TO CORRIDOR
PASSAGE WAY
15"D x 42"W x 85"H 15"D x 48"W x 85"H
I3.06A
SHARED CONFERENCE I-0625
B
F2
I10.21
2' - 6"
SA N FR A N OF
N
M
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
DATE:
10
T
CITY AND COUNTY OF SAN FRANCISCO
4.64.5
FULL HEIGHT WALL
F11* F12*
4
F1
A
13
KMD PROJECT NO.
SFPUC JOB NO.:
SOLID SURFACE COUNTERTOP
3
6
3
4
4' - 0 1/4"
C
HIGH DENSITY FIXED SHELVING, ANCHORED TO WALL
S
5
D
HIGH DENSITY MOBILE SHELVING
F O
HIGH DENSITY MOBILE SHELVING
I-0554 Plotter 3-South 1/4" = 1'-0"
C
T
SECTION MANAGER
PUBLIC UTILITIES COMMISSION
L
FB
2
FILE RM I-0538
8
9
4.64.5
HD SHELVING ANCHORED TO WALL
C
SA N FR A N OF
K
6
5' - 0 1/4"
4 I10.41
4.5 4.6
PLOTTER, NIC
I-0554 Plotter 2-East 1/4" = 1'-0"
SE A
WWE/PUC APPROVALS
-------------------
COPYRIGHT
J
6
15"D x 36"W x 85"H
4.64.5 HIGH DENSITY FIXED SHELVING, ANCHORED TO WALL
I
HD SHELVING ANCHORED TO WALL
5
5
8
O SC CI
0"
I
15"D x 30"W x 85"H
10
F1
2"
3' - 10 1/4"
9
COPIER RM
I-0554 Plotter 1-North 1/4" = 1'-0"
2' - 6"
H
F9* F10*
3
8
4' - 6" FLAT FILES, NIC
7
12
13
G
6 6
B2 SIGNAGE; SEE SIGNAGE DWGS
8
R RO
2
6 6 6 6 6
24"D x 42"W x 85"H 24"D x 48"W x 85"H
FEC
LOW WALL
SIGNAGE; SEE SIGNAGE DWGS
FI E
G
6
18"D x 36"W x 85"H 18"D x 42"W x 85"H 18"D x 48"W x 85"H 24"D x 30"W x 85"H 24"D x 36"W x 85"H
F7* F8*
4 8
PLAS. LAM. CASEWORK
2' - 0" 1' - 6" 1' - 6"
FLAT FILES, NIC
SOLID SURFACE COUNTERTOP
OPEN TO COPIER RM.
E N G UER RA
F.8
A.7 4.5 4.6
D
5
SOLID SURFACE COUNTERTOP
OPEN TO HD FILE RM.
LOW WALL PLAS. LAM. CASEWORK
I-0553 Copier 4-West 1/4" = 1'-0"
11
12
O R O E N PA Z
F
* Types F1, F2, F3, F4, F5, F6, F7, F8, F9, F10, F11 & F12 are Fixed/Static Shelving Units; Accessible from one side when located adjacent to wall; Accessible from two sides when freestanding.
L
6
4.5 4.6
222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
1
** Number of possible shelves based on 11.75" minimum vertical spacing
BULLETIN BOARD SURFACE W/ TRIM, APPLIED TO WALL
20 I10.06
9
10
11
Y
18"D x 30"W x 85"H
F2* F3* F4* F5* F6*
I-0552 4-West 1/4" = 1'-0"
3
** Number of possible shelves based on 11.75" minimum vertical spacing
9
C OUN T
6 6 2
NOTE: COUNTERTOP CORNER OUTLINE TO FOLLOW WALL CORNER GEOMETRY
SIM.
2' - 0" DOUBLE FACED SHELVING UNITS
I-0552 3-South 1/4" = 1'-0"
2
4
I-0553 Copier 3-South 1/4" = 1'-0"
5
LATERAL FILES, NIC
D
6
24"D x 42"W x 85"H 24"D x 48"W x 85"H
HD FILE RM
I-0553 Copier 1-North 1/4" = 1'-0"
4.5 4.6
OPEN
PASSAGE WAY SOLID SURFACE. COUNTERTOP
PLAS. LAM. SIDE & BACK PANELS
AN
6
24"D x 36"W x 85"H
C D
SOLID SURFACE COUNTERTOP LATERAL FILES, NIC
SIGNAGE, SEE SIGNAGE DWGS.
# SHELVES **
24"D x 30"W x 85"H
B
538
9
A JOINT VENTURE PARTNERSHIP
1 DIMENSIONS (Nominal)
A
Types A, B, C, & D are Mobile Units, accessible from both sides.
* Types F1, F2, F3, F4, F5, F6, F7, F8, F9, F10, F11 & F12 are Fixed/Static Shelving Units; Accessible from one side when located adjacent to wall; Accessible from two sides when freestanding.
FULL HEIGHT WALL OPEN
SOLID SURFACE COUNTERTOP
SOLID SURFACE COUNTERTOP (OVER LATERAL FILES, NIC)
OPEN TO CORRIDOR
SIGNAGE; SEE SIGNAGE DWGS
10
KMD | STEVENS
2' - 0" DOUBLE FACED SHELVING UNITS
I-0552 2-East 1/4" = 1'-0"
HIGH DENSITY FIXED SHELVING, ANCHORED TO WALL
I-0430 4-West 1/4" = 1'-0"
201 Post Street 7th Floor San Francisco CA 94108
HIGH DENSITY SHELVING LEGEND
3 3
F1*
PLAS. LAM. SHELVING, ANCHORED TO WALL & FLOOR
PLAS. LAM. WORK SURFACE COUNTERTOP
1
SE A
3 I10.41
F9* F10*
4 4
PLAS. LAM. WORK SURFACE COUNTERTOP W/ WALL BRACKETS & GROMMETS
Types A, B, C, & D are Mobile Units, accessible from both sides.
LOW WALL PLAS. LAM. CASEWORK
4.64.5
8
8
2
3
C
FULL HEIGHT WALL
6
PLAS. LAM. CASEWORK
2' - 6"
D 5
PLAS. LAM. CASEWORK
TA-11 TA-10
1 I10.21
20 I10.06
D
6 6
I-0542 Thru I-0555 Level 5 Core 1/4" = 1'-0"
1
6 I10.21
SOLID SURFACE COUNTERTOP
BULLETIN BOARD SURFACE W/ TRIM, APPLIED TO WALL
E.3
2 6 6 6
6
24"D x 42"W x 85"H 24"D x 48"W x 85"H
D D
SECTION LABEL
6
24"D x 36"W x 85"H
F7* F8*
E E
O SC CI
2 I10.21 COFFEE MAKER; , SEE SPECS
4 I10.21
20 I10.06
COPIER, NIC
F9
4 C
6
MICROWAVE OVENS; , SEE SPECS
E
SOLID SURFACE COUNTERTOP
BULLETIN BOARD SURFACE W/ TRIM, APPLIED TO WALL
F
B
REFRIGERATORS, SEE SPECS
7
STONE FACADE PANELS. SEE EXTERIOR CURTAIN WALL PACKAGE
D
7
SOLID SURFACE COUNTERTOP
SOLID SURFACE EATING COUNTER
I-0430 5-Alcove North 1/4" = 1'-0"
5
C
6' - 8 13/16"
PLOTTERS I-0554 3 I3.20
I-0430 6-Alcove South 1/4" = 1'-0"
C
C
I3.05B
F
PANTRY I-0547
4
C
E.3 E.3
44
1
6
24"D x 30"W x 85"H
F6*
4 I10.41
2"
3' - 8 15/16"
CORR. I-0548
4.5 4.6
PAINTED GYP BD WALL
18"D x 30"W x 85"H 18"D x 36"W x 85"H 18"D x 42"W x 85"H 18"D x 48"W x 85"H
F5*
BILL PRINTING
I-0548 Corridor 4-West 1/4" = 1'-0"
3
4
SOLID SURFACE COUNTERTOP
FIN. CEILING, S.A.D.
6 6
F1*
LATERAL FILES, NIC
I-0548 Corridor 2-East 1/4" = 1'-0"
F3 3' - 9 15/16"
H.2 4
6
24"D x 42"W x 85"H 24"D x 48"W x 85"H
F2*
B4
BILL PRINTING I-0542
NOTE: THIS ELEVATION IS TYPICAL FOR ALL SHARED EMPLOYEE LOUNGES
6
24"D x 36"W x 85"H
C D
F4* PANTRY
2
13
H.2
# SHELVES **
24"D x 30"W x 85"H
B
OPEN
B
PLAS. LAM. COUNTERTOP, CORNER EDGES TO FOLLOW WALL GEOMETRY
12
I3.05B
F4
J
DIMENSIONS (Nominal)
A
F3*
4
2' - 6"
3
1' - 8"
2
3
1 SECTION LABEL
2' - 10"
2
I-0430 2-East 1/4" = 1'-0"
3
HIGH DENSITY SHELVING LEGEND
4
PLAS. LAM. SIDE & BACK PANELS
A
I-0430 1-North 1/4" = 1'-0"
4.64.5
FULL HEIGHT WALL BEYOND SOLID SURFACE COUNTERTOP
RECESSED F.E.C.
A 552
3
2
5
5
1
2' - 6"
ITEM NO. TA-10
7' - 0"
7
2' - 6"
6
J
6
7
7
8
8
H.2
2'-6"
H 6
J 1
I-0730 Shared Conference, I-0731 Office, I-0732 Office 1/4" = 1'-0"
7
6
6
6
7
7
7
7
8
8
8
8
5 7
H
I-0656 HD Files 2-East 1/4" = 1'-0"
H.2
8
I-0656 HD Files 4-West 1/4" = 1'-0"
5
6
PLOTTERS, NIC
0655 3-South /4" = 1'-0"
CHAIR RAIL
I-0730 3-South 1/4" = 1'-0"
6
PAINTED GWB
I10.41
I-0730 4-West 1/4" = 1'-0"
2
1 I-0726 1-North 1/4" = 1'-0"
7
I-0726 2-East 1/4" = 1'-0"
8
I-0743 Thru I-0755 Level 7 Core 1/4" = 1'-0"
7
J
10
I3.07A
9
8
R
4' - 2"
CENTER JOINT ON MONITOR
4' - 2"
20
ACOUSTIC FABRIC PANELS
3
---
I10.41
FRAMELESS GLASS PANELS
9
-
D
FB
SHARED CONFERENCE I-0726
CERAMIC FRIT ETCH
BULLETIN BOARD SURFACE W/ TRIM, APPLIED TO WALL
I10.06
2' - 6"
11
2' - 8"
PLAS. LAM. CASEWORK
2' - 6"
SOLID SURFACE COUNTERTOP
10
J
H.2
9
9
7
PAINTED GWB
I-0726 3-South 1/4" = 1'-0"
9
I-0665 2-East 1/4" = 1'-0"
11
9
9
6" CHAIR RAIL
I-0665 1-North 1/4" = 1'-0"
SOLID SURFACE COUNTERTOP
SIGNAGE; SEE SIGNAGE DWGS
2'-6"
9
9
I10.41
I-0726 Shared Conference 2 1/4" = 1'-0"
OPEN
I10.41
LCD
10
F9
F10
F11
10
I10.41
I-0726 4-West 1/4" = 1'-0"
PLAS. LAM. BACK PANEL
COPIER, NIC
8
I-0753 1-North 1/4" = 1'-0"
9
10
10
10
10
10
10
11
11
11
11
11
11
12
12
12
12
12
12
OPEN TO HD FILE RM.
13
13
13
13
13
13
COPIER RM.
H
4.5 4.6
I-0753 3-South 1/4" = 1'-0"
5
SOLID SURFACE COUNTER TOP
20 I10.06
BULLETIN BOARD SURFACE W/ TRIM, APPLIED TO WALL PLAS. LAM. CASEWORK SIGNAGE, SEE SIGNAGE DWGS
I-0665 4-West 1/4" = 1'-0"
12
R
FI E
E N G UER RA
SECTION MANAGER
DATE:
DIVISION MANAGER
DATE:
ASSIST. GEN. MANAGER
DATE:
0" CONTRACT NO. CS-842 14
DRAWING NO.
14
I3.07A
7/20/2010 8:47:06 PM
COPYRIGHT
C
5 4 3 2 1 #
359-305 ISSUE DATE July 23, 2010
1/4" = 1'-0"
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS 02/02/10 CD PROGRESS DOCUMENTS 11/20/09 DESIGN DEVELOPMENT 2 - REVISED (DD2-R2) DATE DESCRIPTION
EN
SE
ARC
D
HI T
T
E
201 Post Street 7th Floor San Francisco CA 94108
O I F CAL
OF
APP
R
AN
KMD | STEVENS
E
Douglas Tom C12405 10/11
NO.
A JOINT VENTURE PARTNERSHIP
REN.
A
BY
222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
N
CERTIFIED BY
D
C OUN T
O R O E N PA Z
FI E
E N G UER RA
WWE/PUC APPROVALS
-------------------
Y
R RO
PUBLIC UTILITIES COMMISSION
SECTION MANAGER
DATE:
DIVISION MANAGER
DATE:
ASSIST. GEN. MANAGER
DATE:
SFPUC JOB NO.:
14
DRAWING NO.
14
C
I3.07B
EN
SE
D
ARC
HI T
I-0754 Plotters 3-South 1/4" = 1'-0"
E
201 Post Street 7th Floor San Francisco CA 94108
Douglas Tom C12405 10/11
NO.
3 2 1 #
359-305 ISSUE DATE
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
REN.
A
BY
APP
T
E
OF
O I F CAL
R
N
CERTIFIED BY 7/20/2010 8:48:32 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
A
T
O SC CI
SE A
L
1
B
C
D
E
F
G
H
1
HIGH DENSITY FIXED SHELVING, ANCHORED TO WALL
H
HIGH DENSITY MOBILE SHELVING
13
CONTRACT NO. CS-842
July 23, 2010
1/4" = 1'-0" COPYRIGHT
I-0754 Plotter 2-East 1/4" = 1'-0"
1"
LEVEL 7 ENLARGED FLOOR PLANS & ELEVATIONS
7/20/2010 10:47:37 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
KMD PROJECT NO.
CITY AND COUNTY OF SAN FRANCISCO
I
1"
LEVEL 7 ENLARGED FLOOR PLANS & ELEVATIONS
L
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
KMD PROJECT NO.
SFPUC JOB NO.:
A
PUBLIC UTILITIES COMMISSION CITY AND COUNTY OF SAN FRANCISCO
I
WWE/PUC APPROVALS
-------------------
TH E CIT Y
Y
R RO
I
C OUN T
L
D
O R O E N PA Z
F O
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
N
A
201 Post Street 7th Floor San Francisco CA 94108 R
AN
KMD | STEVENS
E
I
O I F CAL
I
HI T
L
OF
TH E CIT Y
ARC
A E
F O
D
I T
CERTIFIED BY
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
S
SE
Douglas Tom C12405 10/11
APP
T
Q
EN
NO.
REN.
A
BY
S
P
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS 02/02/10 CD PROGRESS DOCUMENTS 11/20/09 DESIGN DEVELOPMENT 2 - REVISED (DD2-R2) DATE DESCRIPTION
T
O
C
5 4 3 2 1 #
359-305 July 23, 2010
C
N
M
14
I3.06D
ISSUE DATE
SA N FR A N OF
L
14
DRAWING NO.
T
K
0" CONTRACT NO. CS-842
C
J
1"
1/4" = 1'-0" COPYRIGHT
I
H
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE LEVEL 6 ENLARGED FLOOR PLANS & ELEVATIONS
T
DATE:
S
DATE:
SA N FR A N OF
DATE:
DIVISION MANAGER
ASSIST. GEN. MANAGER
T
SECTION MANAGER
KMD PROJECT NO.
SFPUC JOB NO.:
C
PUBLIC UTILITIES COMMISSION CITY AND COUNTY OF SAN FRANCISCO
T
F O
WWE/PUC APPROVALS
-------------------
S
TH E CIT Y
Y
R RO
SA N FR A N OF
FI E
E N G UER RA
L
C OUN T
SE A
D
O R O E N PA Z
O SC CI
0"
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
L
13
AN
KMD | STEVENS
SE A
I-0665 3-South 1/4" = 1'-0"
O SC CI
12
PLOTTER, NIC
FLAT FILES,NIC
H.2
J
HIGH DENSITY FIXED SHELVING, ANCHORED TO WALL
2
2
3
3
2
CONFERENCE I-0926
5
FB
I3.09A
3
4
R 3
I-0852 File Storage 4-West 1/4" = 1'-0"
4
4
1
O SC CI
F O
R RO
SE A
L K
DIVISION MANAGER
SFPUC JOB NO.:
DATE:
ASSIST. GEN. MANAGER
4.5 4.6
E.3
N
M
O
5
5
OPEN
4.64.5
4
DIMENSIONS (Nominal)
# SHELVES **
24"D x 30"W x 85"H
6
B
24"D x 36"W x 85"H
6
24"D x 42"W x 85"H
D
C
4
4.5 4.6
LIBRARY
5
5
4.64.5
4
HIGH DENSITY FIXED SHELVING, ANCHORED TO WALL
HIGH DENSITY MOBILE SHELVING
D
E
F
G
I
H
HIGH DENSITY FIXED SHELVING, ANCHORED TO WALL
J
K
L
H.2 H.2 H
N
O
P
H.2
SLANT J
JJ
R
S
A
T
B
C
33 1
D
E
F
C
1
G
I
H
D
E
J
2
2
3
3
2
2
3
3
F8*
24"D x 48"W x 85"H
6
15"D x 30"W x 85"H
6
15"D x 36"W x 85"H 15"D x 42"W x 85"H
6
15"D x 48"W x 85"H
6
P
Q
R
I3.10A
R 2
3
I-1026 1-North 1/4" = 1'-0"
3
4.5 4.6
I-1026 2-East 1/4" = 1'-0"
4
JJ
I-1026 Shared Conference 1 1/4" = 1'-0"
4
H.2 H.2
3 3
FRAMELESS GLASS PANELS
I3.10B
I3.10B
F3
2
6
I3.10B
11
SOLID SURFACE COUNTERTOP
I3.10B
C
C
C
C
C
C
3
LIBRARY
F4* F5*
D 20
BULLETIN BOARD SURFACE W/TRIM, APPLIED TO WALL
I10.06
C
6' - 9 9/16"
8
C
C
F11
F10
C
T
E
APP
D
E
D
OF
ARC
HI T
O I F CAL
E
201 Post Street 7th Floor San Francisco CA 94108 R
N
F
2' - 6"
2' - 6"
1' - 6" 1' - 6"
COPIER, NIC
PLAS. LAM. CASEWORK
SOLID SURFACE COUNTERTOP
F9
H
H.2
6
2
2
3
3
6 6
2
SHARED CONFERENCE I-1126
6 6
FB
5
I3.11A
3
R
6
24"D x 36"W x 85"H
6
24"D x 42"W x 85"H
6
F8*
24"D x 48"W x 85"H
6
F9*
15"D x 30"W x 85"H
6
15"D x 36"W x 85"H
3
6
F11*
15"D x 42"W x 85"H
6
F12*
15"D x 48"W x 85"H
6
4
4
1
I-1126 Shared Conference 1/4" = 1'-0"
Types A, B, C, & D are Mobile Units, accessible from both sides.
SOLID SURFACE COUNTERTOP
PLAS. LAM. CASEWORK
* Types F1, F2, F3, F4, F5, F6, F7, F8, F9, F10, F11 & F12 are Fixed/Static Shelving Units; Accessible from one side when located adjacent to wall; Accessible from two sides when freestanding.
LATERAL FILES, NIC
5
5
6
6
7
7
C ** Number of possible shelves based on 11.75" minimum vertical spacing
C
FABRIC PANELS
C
4
C
I-0953 HD File 2-East 1/4" = 1'-0"
5
I-0953 HD Files 4-West 1/4" = 1'-0"
6
6
I10.41
D
D
2' - 6"
4
BULLETIN BOARD SURFACE W/TRIM, APPLIED TO WALL
20 I10.06
2' - 6"
7
PLAS. LAM. CASEWORK
1' - 6" 1' - 6"
5
7
7
5
I-1026 4-West 1/4" = 1'-0"
7
SOLID SURFACE COUNTERTOP
SOLID SURFACE COUNTERTOP
8
7
5
8
8
8
9
9
6
9
PLAS. LAM. CASEWORK
SIGNAGE; SEE SIGNAGE DWGS.
SOLID SURFACE COUNTERTOP
8
I-1052 Copier 4-West 1/4" = 1'-0"
7
8
9
9
PLOTTER, NIC
FLAT FILES, NIC
COPIER RM
8
I-1053 Plotter 1-North 1/4" = 1'-0"
I-1053 Plotter 2-East 1/4" = 1'-0"
9
I-1053 Plotter 3-South 1/4" = 1'-0"
D
10
10
10
10
11
11
11
11
4.5 4.6 BULLETIN BOARD SURFACE W/TRIM, APPLIED TO WALL
1' - 6" 1' - 6"
OPEN TO HD FILE RM
D
BULLETIN BOARD SURFACE W/TRIM APPLIED TO WALL
2' - 0" 1' - 6" 1' - 6" 1' - 6"
LATERAL FILES, NIC
FLAT FILES, NIC
9
I10.06
OPEN TO HD FILE RM
SOLID SURFACE COUNTERTOP
PLAS. LAM. SIDE & BACK PANELS
I-0954 Copier 3-South 1/4" = 1'-0"
I-1052 Copier 3-South 1/4" = 1'-0"
5 20
SOLID SURFACE COUNTERTOP
OPEN
PASSAGE WAY
PLAS. LAM. BACK PANEL
I-0954 Copier 1-North 1/4" = 1'-0"
5
4.5 4.6
FULL HEIGHT WALL SOLID SURFACE COUNTERTOP
LATERAL FILES, NIC
PLAS. LAM. CASEWORK
6
4.5 4.6
I-1052 Copier 1-North 1/4" = 1'-0"
D
4.64.5
OPEN TO CORRIDOR
PASSAGE WAY
SOLID SURFACE COUNTERTOP SIGNAGE, SEE SIGNAGE DWGS
I-1026 3-South 1/4" = 1'-0"
6
4
FULL HEIGHT WALL
OPEN
COPIER, NIC
6
I-1043 Thru I-1054 Level 10 Core 1/4" = 1'-0"
PAINTED GWB
7
F9
** Number of possible shelves based on 11.75" minimum vertical spacing
PLAS. LAM. BACK PANEL
1
CHAIR RAIL
5
5
10
10
11
11
12
12
4.64.5
HIGH DENSITY FIXED SHELVING, ANCHORED TO WALL HIGH DENSITY MOBILE SHELVING
SOLID SURFACE COUNTERTOP
20 I10.06
HIGH DENSITY FIXED SHELVING, ANCHORED TO WALL
PLAS. LAM. CASEWORK SIGNAGE; SEE SIGNAGE DWGS
OPEN TO COPIER RM
PLOTTER, NIC
14
14
14
14
10
COPYRIGHT
July 23, 2010
HI T
E
201 Post Street 7th Floor San Francisco CA 94108 A
I OF
O I F CAL
CERTIFIED BY 7/20/2010 8:51:59 PM
R
N
KMD | STEVENS A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
AN
D
C OUN T
O R O E N PA Z
FI E
R RO
Y
E N G UER RA
------------------PUBLIC UTILITIES COMMISSION CITY AND COUNTY OF SAN FRANCISCO SFPUC JOB NO.:
WWE/PUC APPROVALS
SECTION MANAGER
DATE:
DIVISION MANAGER
DATE:
1/2"
1"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
0" CONTRACT NO. CS-842 DRAWING NO.
ASSIST. GEN. MANAGER
DATE:
1/4" = 1'-0" COPYRIGHT
C
I3.10A
KMD PROJECT NO.
LEVEL 10 ENLARGED FLOOR PLANS & ELEVATIONS
359-305 ISSUE DATE July 23, 2010
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
EN
SE
D
ARC
HI T
E
201 Post Street 7th Floor San Francisco CA 94108
Douglas Tom C12405 10/11
NO.
3 2 1 #
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
REN.
A
BY
APP
T
E
OF
O I F CAL
CERTIFIED BY
R
N
KMD | STEVENS A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
AN
D
C OUN T
Y
TH E CIT Y
ARC
I
APP
E
F O
D
L
BY
T
TH E CIT Y
SE
Douglas Tom C12405 10/11
REN.
A
F O
ISSUE DATE
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
O R O E N PA Z
FI E
R RO
E N G UER RA
------------------PUBLIC UTILITIES COMMISSION CITY AND COUNTY OF SAN FRANCISCO SFPUC JOB NO.:
7/20/2010 8:52:41 PM
Stair Details The north stair is situated within the protruding wind turbine tower, and acts as both fire stair and floor to floor circulation.
WWE/PUC APPROVALS
SECTION MANAGER
DATE:
DIVISION MANAGER
DATE:
ASSIST. GEN. MANAGER
DATE:
1/2"
13
14
14
1"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
CONTRACT NO. CS-842 DRAWING NO.
C
I3.10B
1/4" = 1'-0" COPYRIGHT
359-305 ISSUE DATE July 23, 2010
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
EN
SE
D
ARC
HI T
E
201 Post Street 7th Floor San Francisco CA 94108
Douglas Tom C12405 10/11
NO.
KMD PROJECT NO.
LEVEL 10 ENLARGED FLOOR PLANS & ELEVATIONS
REN.
2 1 #
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
A
T
1/4" = 1'-0"
EN
NO.
3 2 1 #
S
DATE:
359-305
13
T
ASSIST. GEN. MANAGER
C
I3.09B
KMD PROJECT NO.
I
0" CONTRACT NO. CS-842 DRAWING NO.
L
1"
SA N FR A N OF
O SC CI
SE A
L
F O
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE LEVEL 9 ENLARGED FLOOR PLANS & ELEVATIONS
T
DATE:
S
DATE:
DIVISION MANAGER
I-1054 HD file 4-West 1/4" = 1'-0"
T
SFPUC JOB NO.:
WWE/PUC APPROVALS
SECTION MANAGER
11
C
PUBLIC UTILITIES COMMISSION CITY AND COUNTY OF SAN FRANCISCO
SA N FR A N OF
E N G UER RA
-------------------
T
TH E CIT Y
Y
S
R RO
T
FI E
L
C OUN T
SE A
D
O R O E N PA Z
C
AN
SA N FR A N OF
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
O SC CI
0"
KMD | STEVENS
I-1054 HD File 2-East 1/4" = 1'-0"
I
13
L
12
13
A
12
13
BY
APP
I
12
13
C
12
A
I-0955 Plotter 3-South 1/4" = 1'-0"
I
11
L
I-0955 Plotter 2-East 1/4" = 1'-0"
SE A
10
FLAT FILES, NIC PLAS. LAM. BACK PANEL
O SC CI
COPIER RM
G
J
FULL HEIGHT WALL PASSAGE WAY
SOLID SURFACE COUNTERTOP
SIGNAGE; SEE SIGNAGE DWGS
5
1
6
18"D x 30"W x 85"H 18"D x 36"W x 85"H 18"D x 42"W x 85"H 18"D x 48"W x 85"H 24"D x 30"W x 85"H
F6* F7*
F10*
OPEN C
9
B
4
I-1048 Corridor 4-West 1/4" = 1'-0"
D
10
C I3.10B
5 5
24"D x 42"W x 85"H 24"D x 48"W x 85"H
F1*
PANTRY
I-1048 Corridor 2-East 1/4" = 1'-0"
4 I10.41
3' - 9"
7
B CENTER JOINT ON MONITOR
5
HIGH DENSITY MOBILE SHELVING
5
PLOTTER I-1053
2"
-
2
3 I3.20
SOLID SURFACE EATING COUNTER
9 I10.41
5
6
F2*
PANTRY I-1047
4
6
24"D x 36"W x 85"H
F3* F3
HD FILE I-1054
4
COPIER I-1052
FULL HEIGHT WALL
SLANT J
# SHELVES **
24"D x 30"W x 85"H
B
D
LATERAL FILES, NIC
SOLID SURFACE COUNTERTOP
CORR. I-1048
F1
3
4
DIMENSIONS (Nominal)
A
C SOLID SURFACE COUNTERTOP
PLAS. LAM. SIDE PANELS F4 3
A
T
1
B 2
5
S
HIGH DENSITY SHELVING LEGEND
FB
CERAMIC FRIT ETCH
* Types F1, F2, F3, F4, F5, F6, F7, F8, F9, F10, F11 & F12 are Fixed/Static Shelving Units; Accessible from one side when located adjacent to wall; Accessible from two sides when freestanding.
O
FULL HEIGHT WALL
OPEN
LIBRARY I-1045
SHARED CONFERENCE I-1026
6
F11* F12*
N
M
E.3
1045A
B
6 6
F9*
L
SECTION LABEL
6 6
6 6
K
J
Types A, B, C, & D are Mobile Units, accessible from both sides.
OPEN TO COPIER RM.
C
Q
OPEN
C
C
M
1
6
24"D x 36"W x 85"H 24"D x 42"W x 85"H
F10*
HIGH DENSITY FIXED SHELVING, ANCHORED TO WALL
HIGH DENSITY FIXED SHELVING, ANCHORED TO WALL
C
6
18"D x 30"W x 85"H 18"D x 36"W x 85"H 18"D x 42"W x 85"H 18"D x 48"W x 85"H 24"D x 30"W x 85"H
F6* F7*
A
BY
CERTIFIED BY
B
4
C
C
F5*
FILE
SE
Douglas Tom C12405 10/11
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
7/20/2010 8:50:47 PM
A
6
24"D x 48"W x 85"H
F1* F2* F3* F4* PANTRY
I-0948 Corridor 4-West 1/4" = 1'-0"
3
EN
REN.
July 23, 2010
T
A
C
FULL HEIGHT WALL BEYOND
OPEN
PLAS. LAM. SIDES & BACK PANELS
I-0948 Corridor 2-East 1/4" = 1'-0"
C
NO.
2 1 #
359-305 ISSUE DATE
S
HIGH DENSITY SHELVING LEGEND
LATERAL FILES, NIC
2
14
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
R
SOLID SURFACE COUNTERTOP
4 I10.41
13
14
I3.08C
1
2"
12
13
I
DRAWING NO.
1/4" = 1'-0"
Q
SECTION LABEL
F1
12
CONTRACT NO. CS-842
LEVEL 8 ENLARGED FLOOR PLANS & ELEVATIONS
DATE:
P
RECESSED F.E.C.
C
11
KMD PROJECT NO.
CITY AND COUNTY OF SAN FRANCISCO
L
10
11
T
J
10
1"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
COPYRIGHT
I
1/2"
9
S
FI E
E N G UER RA
DATE:
8
9
T
O R O E N PA Z
SECTION MANAGER
PUBLIC UTILITIES COMMISSION
7
8
C
222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
WWE/PUC APPROVALS
-------------------
Y
7
3' - 9 3/4"
C OUN T
TH E CIT Y
D
SA N FR A N OF
A JOINT VENTURE PARTNERSHIP
5
6
L
0" AN
KMD | STEVENS
5
6
I-0926 SHARED CONFERENCE 1/4" = 1'-0"
A
3
I
I-0852 File Storage 3-South 1/4" = 1'-0"
2
T
E
OF
O I F CAL
CERTIFIED BY 7/20/2010 8:53:10 PM
R
N
H
G
I
H
J
K
L
N
M
O
P
Q
R
S
A
T
B
C
D
E
F
G
I
H
J
K
L
N
M
O
P
Q
R
S
A
T
B
C
D
E
F
G
I
H
J
K
L
N
M
O
P
Q
R
S
A
T
B
C
D
E
F
ACCESSORY SCHEDULE
F
F.8
G
2
3
1
H
1
H.2
H.2
J
6
J
7
FIN. CEILING, S.A.D.
ITEM NO.
DESCRIPTION
MFR./MODEL NO.
TA-10
SURFACE MOUNTED SOAP DISPENSER
BRADLEY 6562
TA-11
SURFACE MOUNTED PAPER TOWEL DISPENSER
BRADLEY 250-15
HIGH DENSITY SHELVING LEGEND 1
2
2
3
3
C
D
E
E.3
4
4.5 4.6
P-1 PAINT
2
2
3
3
4
SECTION LABEL
5
SOLID SURFACE COUNTERTOP
ACCENT PAINT
12' - 4"
FULL HEIGHT WALL BEYOND
ACCENT PAINT
P-1 PAINT
I3.06C
I-0630 1-North 1/4" = 1'-0"
4
I-0630 2-East 1/4" = 1'-0"
8
11
I3.06C
OFFICE I-0632
I3.06D
COPIER I-0654
9
3
I3.06C
-
2
HIGH DENSITY MOBILE SHELVING
FULL HEIGHT WALL
2
10
F3
1/2" PAINTED REVEAL
F3
HD FILE I-0656
4
4 2
7
I3.06B
6
J
4
H.2
STONE FACADE PANELS; SEE EXTERIOR CURTAIN WALL PACKAGE
H
7
5
6
4
SOLID SURFACE COUNTERTOP
4.5 4.6
6
I-0625 3-South 1/4" = 1'-0"
5
7
I-0630 3-South 3 1/4" = 1'-0"
7
I3.06D
5
6
SOLID SURFACE COUNTERTOP
2"
C
C
C
C
C
C
C
C
2
2
3
3
1
I-0630 4-West 6 1/4" = 1'-0"
7
LATERAL FILES, NIC
PLAS. LAM. SIDE & BACK PANELS
I-0648 Corridor 2-East 1/4" = 1'-0"
5
C
C
4.64.5
CUSTOM PATTERN CERAMIC FRIT GLASS; SEE SPECS
C
C
6
H.2
H
SOLID SURFACE COUNTERTOP OVER PLAS. LAM. CASEWORK
24"D x 42"W x 85"H
COPIER, N
6
F8*
24"D x 48"W x 85"H
6
F9*
15"D x 30"W x 85"H
6
F10*
15"D x 36"W x 85"H
6
F11*
15"D x 42"W x 85"H
6
F12*
15"D x 48"W x 85"H
6
2
4.5 4.6
4
4
I-0654 3-South 1/4" = 1'-0"
5
SOLID SURFACE COUNTERTOP
20
LOW WALL
BULLETIN BOARD SURFACE W/TRIM, APPLIED TO WALL
I10.06
2' - 6" 5
5
6
6
OPEN TO HD FILE RM. PLAS. LAM. CASEWORK
** Number of possible shelves based on 11.75" minimum vertical spacing
SIGNAGE; SEE SIGNAGE DWGS
F9
I-0643 Thru I-0656 Level 6 Core 1/4" = 1'-0"
SANDBLASTED GLASS
PANTRY
MAP RM.
6
7
7
C
4
I-0 1/
FILES
I-0648 Corridor, West 3 1/4" = 1'-0"
7
FLAT FILES, NIC
COPIER RM.
I-0655 2-East 1/4" = 1'-0"
H
H.2
OPEN LOW WALL
SIGNAGE; SEE SIGNAGE DWGS
I-0654 1-North 1/4" = 1'-0"
1
* Types F1, F2, F3, F4, F5, F6, F7, F8, F9, F10, F11 & F12 are Fixed/Static Shelving Units; Accessible from one side when located adjacent to wall; Accessible from two sides when freestanding.
C
F10
6 6
Types A, B, C, & D are Mobile Units, accessible from both sides.
C
C F11
6 6
6
24"D x 30"W x 85"H 24"D x 36"W x 85"H
4 PAINTED WALL
PLAS. LAM BACK PANEL
END OF PAINTED GYP WALL
5
6
C H
PLAS. LAM. CASEWORK SOLID SURFACE COUNTERTOP
5
NOTE: THIS ELEVATION IS TYPICAL FOR ALL SHARED EMPLOYEE LOUNGES
BULLETIN BOARD SURFACE W/TRIM, APPLIED TO WALL
2' - 6"
6
18"D x 48"W x 85"H
F5* F6* F7* RECESSED F.E.C.
2
2' - 10" 20 I10.06
TA-11 TA-10
1 I10.21
20 I10.06
6' - 4 3/16"
4' - 6"
5
18"D x 30"W x 85"H 18"D x 36"W x 85"H 18"D x 42"W x 85"H
F4*
7
4
I3.06D
PLOTTERS I-0655
1' - 6"
2' - 6" 1' - 8"
SIGNAGE; SEE SIGNAGE DWGS
BULLETIN BOARD SURFACE W/TRIM, APPLIED TO WALL
I-0625 4-West 1/4" = 1'-0"
6
8
SOLID SURFACE EATING COUNTER
PLAS. LAM. CASEWORK
2' - 10"
I-0630 Shared Employee Lounge, I-0631 Office, I-0632 Office 1/4" = 1'-0"
I3.06D
3 I3.20
PANTRY I-0647 5
6
PAINTED GYP BD
1
3
C
6 I10.21
2 I10.21 COFFEE MAKER, SEE SPECS.
4 I10.21
REFRIGERATORS, SEE SPECS.
3
5
6
SOLID SURFACE COUNTERTOP
MICROWAVE OVENS, SEE SPECS.
1/2" PAINTED REVEAL
4 I10.41
3' - 9" 4
2
6 6
F3* F4
1
SOLID SURFACE COUNTERTOP
3' - 5"
2
I-0625 2-East 1/4" = 1'-0"
4
3
F.8
6
24"D x 42"W x 85"H 24"D x 48"W x 85"H
F2*
OPEN
5
MAP RM I-0646
3' - 10 3/16"
I-0625 1-North 1/4" = 1'-0"
3
6
24"D x 36"W x 85"H
C D
3' - 7 1/2"
14' - 0"
OPEN 7
6
G
# SHELVES **
24"D x 30"W x 85"H
B
F1* 4
FILES I-0645
SHARED EMPLOYEE LOUNGE I-0630
DIMENSIONS (Nominal)
A
COPIER, NIC
STORAGE I-0644 644 OFFICE I-0631
1
1
1
PAINTED GYP. WALL
6
H.2
J
4
6
8
8
8
8
9
9
9
9
8
8
9
9
10
R
I-0626 1-North 1/4" = 1'-0"
7
10
10
7
FRAMELESS BUTT JOINT GLAZING
PAINTED GWB WALL
FRAMELESS GLASS DOOR, SEE DOOR SCHEDULE
I-0631 1-North 1/4" = 1'-0"
5
I-0631 2-East 1/4" = 1'-0"
9
I-0631 3-South 1/4" = 1'-0"
I-0631 4-West 1/4" = 1'-0"
10
10
10
I-0645 Files 1-North 1/4" = 1'-0"
4
4' - 2"
4' - 2"
CENTER JOINT ON MONITOR
11
11
11
11
12
12
12
12
I10.41
I10.41
C
7' - 0"
LCD
PLAS. LAM. SIDE PANEL
PLAS. LAM. BACK PANEL
10
10
FILE RM I-0665
47" x 36" x 55" H, 15-DWR FLAT FILES, TYP
11
11
12
12
13
13
14
14
I-0665 File Rm 1/4" = 1'-0"
9
8 I10.21
SOLID SURFACE COUNTERTOP
SOLID SURFACE COUNTERTOP
I-0645 Files 4-West 1/4" = 1'-0"
4.64.5
PARTIAL HEIGHT WALL
PARTIAL HEIGHT WALL
SOLID SURFACE COUNTERTOP
PLAS. LAM. SHELVING
CHAIR RAIL
11
12
7
4.5 4.6
1' - 3"
ACOUSTIC FABRIC PANELS
VIF
I3.06D
DOOR TO STORAGE I-0644
I-0645 Files 3-South 1/4" = 1'-0"
6
11
2' - 10" 10
LCD
I-0645 Files 2-East 1/4" = 1'-0"
5
C
9 I10.41
CERAMIC FRIT ETCH
PAINTED GWB WALL
EXPOSED CONC. WALL
I-0626 2-East 1/4" = 1'-0"
8
FIN. CEILING, S.A.D.
13
EXPOSED CONC. WALL
DOOR, SEE SCHEDULE
PLAS. LAM. SHELVING ANCHORED TO WALL
PARTIAL HEIGHT WALL
PLAS. LAM, SHELVING
PLAS. LAM. SIDE & BACK PANELS
FLAT FILES, NIC 7
2' - 6"
I-0646 Map Rm 1-North 1/4" = 1'-0"
8
O R O E N PA Z
FI E
E N G UER RA
R RO
T
A
C
D
E
F
G
I
H
J
K
SFPUC JOB NO.:
L
N
M
0" CONTRACT NO. CS-842 14
DIVISION MANAGER
DATE:
ASSIST. GEN. MANAGER
DATE:
LEVEL 6 ENLARGED FLOOR PLANS & ELEVATIONS
O
Q
P
R
359-305 July 23, 2010
6
24"D x 36"W x 85"H
6
C
24"D x 42"W x 85"H
6
SE A
L
D
24"D x 48"W x 85"H
F1*
H
H.2
T
A
1
J
B
C
4
I-0743 3-South 1/4" = 1'-0"
F9*
15"D x 30"W x 85"H
6
F10*
15"D x 36"W x 85"H
6
D
E
O I F CAL
R
N
F
C
O R O E N PA Z
G
I
H
D
E
J
6 6
2
2
3
3
K
2
3
3
F4
OFFICE I-0844
4
I-0826 Shared Conference 1/4" = 1'-0"
I3.08C
PHOTO ARCHIVE I-0845
4
2'-6"
4'-2"
F3
CORR. I-0848
D
D
D
D
4.64.5
4
5
5
6
6
FILES I-0846
D
D
D
D
C
C
C
C
C
C
C
C
D
B
SE
ARC
D
HI T
E
201 Post Street 7th Floor San Francisco CA 94108
Douglas Tom C12405 10/11
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
REN.
A
BY
T
E
O I F CAL
OF
APP
R
N
CERTIFIED BY 7/20/2010 8:46:26 PM
T
DIMENSIONS (Nominal)
# SHELVES **
A
24"D x 30"W x 85"H
6
B
24"D x 36"W x 85"H
6
C
24"D x 42"W x 85"H
6
24"D x 48"W x 85"H
A
B
C
D
E
F
G
1
HIGH DENSITY FIXED SHELVING ANCHORED TO WALL
6
18"D x 30"W x 85"H
6
18"D x 42"W x 85"H
6
18"D x 48"W x 85"H
F5*
F7
PANTRY
I-0848 CORRIDOR 2-EAST 1/4" = 1'-0"
3
FILES
I-0848 CORRIDOR 4-WEST 1/4" = 1'-0"
C
2
6
18"D x 36"W x 85"H
F3* F4*
SOLID SURFACE COUNTERTOP
LATERAL FILES, NIC
2
I-0826 3-South 1/4" = 1'-0"
5
I3.08B
4.5 4.6
2'-6"
2' - 3"
7
6
24"D x 30"W x 85"H
6
24"D x 36"W x 85"H
6
F7*
24"D x 42"W x 85"H
6
F8*
24"D x 48"W x 85"H
6
F9*
15"D x 30"W x 85"H
6
F10*
15"D x 36"W x 85"H
6
F11*
15"D x 42"W x 85"H
6
F12*
15"D x 48"W x 85"H
6
3
3
4
4
5
5
6
6
7
7
1
I-0852 File Storage 1-North 1/4" = 1'-0"
F7
13 3
I3.08B
I3.08B
FULL HEIGHT WALL
2
-
6
I3.08B
11
I3.08B
C
PLOTTER I-0854
I3.08B
7
7
C 7' - 11"
JJ
H.2 H.2
8
FULL HEIGHT WALL
OPEN SOLID SURFACE COUNTERTOP
PASSAGE WAY
SOLID SURFACE COUNTERTOP
SIGNAGE; SEE SIGNAGE DWGS
SOLID SURFACE COUNTERTOP
PLAS. LAM. CASEWORK
F9
PLAS. LAM. BACK PANEL
4
JJ
** Number of possible shelves based on 11.75" minimum vertical spacing
PLAS. LAM. CASEWORK
1' - 6" 1' - 6"
C F10
F
I-0853 COPIER 1-NORTH 1/4" = 1'-0"
5
I-0853 COPIER 3-SOUTH 1/4" = 1'-0"
I-0843 THRU I-0855 LEVEL 8 CORE 1/4" = 1'-0"
1
H.2 H.2 5
2' - 6"
COPIER, NIC C
C F11
J
8
2' - 6"
C
C
8
C 9
7
BULLETIN BOARD SURFACE W/TRIM, APPLIED TO WALL
I10.06
C
C 7
SOLID SURFACE COUNTERTOP
* Types F1, F2, F3, F4, F5, F6, F7, F8, F9, F10, F11 & F12 are Fixed/Static Shelving Units; Accessible from one side when located adjacent to wall; Accessible from two sides when freestanding.
4 I10.41
10
PANTRY I-0847 3 I3.20
D
D
2"
20
HIGH DENSITY MOBILE SHELVING
5
C
F1
LCD
I-0826 4-West 1/4" = 1'-0"
SOLID SURFACE EATING COUNTER
H.2
Types A, B, C, & D are Mobile Units, accessible from both sides.
F11
F11
HD FILE I-0855
4
COPIER I-0853
SOLID SURFACE COUNTERTOP
PAINTED GWB
I10.41
4
8
July 23, 2010
2
FULL HEIGHT WALL BEYOND
OPEN
F7
12
10
6
D
4.64.5
5
D
OPEN
D
D
EN
NO.
3 2 1 #
359-305 ISSUE DATE
HIGH DENSITY SHELVING LEGEND
FILE STORAGE I-0852
D
C
I3.06C
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
S
F2*
D
F12
VIF
I10.41
7
5
R
F6*
D
5
D
Q
F4
I3.08C
F3
F3
I10.41
5
6
STORAGE
P
845
11 5
4
DRAWING NO.
1/4" = 1'-0"
4 I10.41 B2
3' - 9 1/8"
9 I10.41
ACOUSTIC PANELS
** Number of possible shelves based on 11.75" minimum vertical spacing
PANTRY
O
PLAS. LAM. SIDE PANELS CENTER JOINT ON MONITOR
CERAMIC FRIT ETCH
CONTRACT NO. CS-842
LEVEL 6 ENLARGED FLOOR PLANS & ELEVATIONS
2
4
I-0826 2-East 1/4" = 1'-0" (4) FREEZERS, NIC
4
I-0748 Corridor 4-West 1/4" = 1'-0"
7
N
5
1
3
B
3
I-0826 1-North 1/4" = 1'-0"
6"
SOLID SURFACE COUNTERTOP(OVER LATERAL FILES, NIC )
I-0748 Corridor 2-East 1/4" = 1'-0"
DATE:
F1* OFFICE I-0843
4
CHAIR RAIL
6
DATE:
26' - 8 1/2"
3
3
I3.08A
2
1
* Types F1, F2, F3, F4, F5, F6, F7, F8, F9, F10, F11 & F12 are Fixed/Static Shelving Units; Accessible from one side when located adjacent to wall; Accessible from two sides when freestanding.
DIVISION MANAGER
ASSIST. GEN. MANAGER
RECESSED F.E.C.
A 2
852
5
R
Types A, B, C, & D are Mobile Units, accessible from both sides.
FULL HEIGHT WALL BEYOND
OPEN
SFPUC JOB NO.:
M
1"
KMD PROJECT NO.
CITY AND COUNTY OF SAN FRANCISCO
L
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
DATE:
1
B
FB
SHARED CONFERENCE I-0826
3
RECESSED F.E.C.
OPEN
SECTION MANAGER
PUBLIC UTILITIES COMMISSION
E.3
4' - 0 1/16"
15"D x 42"W x 85"H 15"D x 48"W x 85"H
R RO
WWE/PUC APPROVALS
-------------------
2"
F11* F12*
FI E
E N G UER RA
FRAMELESS GLASS PANELS 4 I10.41
"
Y
SECTION LABEL
6
6 6
OF
4.5 4.6
6
6
24"D x 42"W x 85"H 24"D x 48"W x 85"H
E
844
6
24"D x 36"W x 85"H
F7* F8*
T
APP
C OUN T
D
843
6
18"D x 42"W x 85"H 18"D x 48"W x 85"H 24"D x 30"W x 85"H
F6*
I-0743 4-West 1/4" = 1'-0"
5
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
A
2
I-0743 2-East 1/4" = 1'-0"
3
201 Post Street 7th Floor San Francisco CA 94108
1
6
18"D x 36"W x 85"H
F3* F4* F5*
I-0743 1-North 1/4" = 1'-0"
2
A
BY
AN
KMD | STEVENS
E
COPYRIGHT
2
6
18"D x 30"W x 85"H
F2*
1
HI T
4' - 10 5/16"
# SHELVES **
24"D x 30"W x 85"H
B
ARC
D
REN.
CERTIFIED BY
B.3 1
DIMENSIONS (Nominal)
A
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
7/20/2010 8:45:40 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
S
SE
Douglas Tom C12405 10/11
NO.
3 2 1 #
ISSUE DATE
1/4" = 1'-0"
EN
L
I3.06B
HIGH DENSITY SHELVING LEGEND SECTION LABEL
C I
14
DRAWING NO.
TH E CIT Y
CITY AND COUNTY OF SAN FRANCISCO
2' - 6"
1"
KMD PROJECT NO.
COPYRIGHT
B
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
DATE:
A
SECTION MANAGER
PUBLIC UTILITIES COMMISSION
I
N
CERTIFIED BY
WWE/PUC APPROVALS
-------------------
F O
R
TH E CIT Y
A
I O I F CAL
F O
I L
TH E CIT Y
O SC CI
F O
OF
Y
20' - 2 15/16"
4.64.5
E
C OUN T
7/20/2010 8:44:58 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
S
T
APP
L
R
A
BY
D
SE A
C
4.5 4.6
Q
P
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
O SC CI
O
201 Post Street 7th Floor San Francisco CA 94108
2' - 6 1/4"
T
July 23, 2010
AN
KMD | STEVENS
E
2' - 6"
I-0646 Map Rm 4-West 1/4" = 1'-0"
S
C
N
M
359-305 ISSUE DATE
1/4" = 1'-0"
HI T
11
T
LEVEL 6 ENLARGED FLOOR PLANS & ELEVATIONS
ARC
I-0646 Map Rm 3-South 1/4" = 1'-0"
C
DATE:
D
SA N FR A N OF
DATE:
SE
Douglas Tom C12405 10/11
T
DIVISION MANAGER
ASSIST. GEN. MANAGER
EN
NO.
REN.
S
SFPUC JOB NO.:
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS 02/02/10 CD PROGRESS DOCUMENTS 11/20/09 DESIGN DEVELOPMENT 2 - REVISED (DD2-R2) DATE DESCRIPTION
T
CITY AND COUNTY OF SAN FRANCISCO
L
C
5 4 3 2 1 #
C
K
14
I3.06A
SA N FR A N OF
J
14
DRAWING NO.
T
I
0" CONTRACT NO. CS-842
KMD PROJECT NO.
COPYRIGHT
H
1"
S
R RO
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
DATE:
T
FI E
E N G UER RA
SECTION MANAGER
PUBLIC UTILITIES COMMISSION
C
O R O E N PA Z
WWE/PUC APPROVALS
-------------------
Y
10
L
C OUN T
D
SA N FR A N OF
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
I-0646 Map Rm 2-East 1/4" = 1'-0"
SE A
0" AN
KMD | STEVENS
7th Floor CA 94108
9
I
13
13
L
13
O SC CI
13
A
PAINTED GWB
I-0626 4-West 1/4" = 1'-0"
10
I
I10.41
I-0626 3-South 1/4" = 1'-0"
9
8
4.5 4.6
D
5
D
8
8
9
9
FILES, NIC
OPEN
SOLID SURFACE COUNTERTOP
3' - 6"
9
I3.08A
47" x 36" x 55" H, 15-DWR FLAT FILES, TYP NIC
9
11
10
10
11
11
OPEN TO HD FILE RM
SOLID SURFACE COUNTERTOP
SOLID SURFACE COUNTERTOP
PLAS. LAM. SIDE BACK PANELS
866
I-0754 Plotter 1-North 1/4" = 1'-0"
OPEN
PASSAGE WAY
SOLID SURFACE COUNTERTOP
I-0753 4-West 1/4" = 1'-0"
10
SIGNAGE, SEE SIGNAGE DWGS
FLAT FILES, NIC
10
5
5
4.64.5
7
I-0866 File Storage 1/4" = 1'-0"
I-0866 1-North 1/4" = 1'-0"
8
I-0866 3-South 1/4" = 1'-0"
6
11
I-0853 COPIER 4-WEST 1/4" = 1'-0"
11
HIGH DENSITY FIXED SHELVING, ANCHORED TO WALL
HIGH DENSITY MOBILE SHELVING
7
4.5 4.6
12
12
13
13
13
SOLID SURFACE COUNTERTOP
OPEN TO COPIER RM.
12
10
O I F CAL
R
N
O R O E N PA Z
FI E
E N G UER RA
R RO
1"
0"
CONTRACT NO. CS-842 14
14
I3.08A
C
SFPUC JOB NO.:
DIVISION MANAGER
DATE:
ASSIST. GEN. MANAGER
DATE:
LEVEL 8 ENLARGED FLOOR PLANS & ELEVATIONS
D
ARC
HI T
3 2 1 #
359-305 July 23, 2010
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
A
BY
T
E
OF
APP
O I F CAL
201 Post Street 7th Floor San Francisco CA 94108 R
AN
KMD | STEVENS
E
NO.
ISSUE DATE
1/4" = 1'-0"
SE
Douglas Tom C12405 10/11 REN.
KMD PROJECT NO.
CITY AND COUNTY OF SAN FRANCISCO
EN
I
DRAWING NO.
L
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
DATE:
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
N
CERTIFIED BY
COPYRIGHT
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
D
C OUN T
Y
TH E CIT Y
OF
SECTION MANAGER
PUBLIC UTILITIES COMMISSION
F O
E
CERTIFIED BY
WWE/PUC APPROVALS
-------------------
A
T
APP
Y
I
A
BY
C OUN T
TH E CIT Y
A
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
D
7/20/2010 8:49:07 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
S
F O
I L
July 23, 2010
R
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
I
2 1 #
359-305 ISSUE DATE
1/4" = 1'-0"
Q
201 Post Street 7th Floor San Francisco CA 94108
12
13
13
14
14
I-0846 FILES 3-SOUTH 1/4" = 1'-0"
O R O E N PA Z
FI E
E N G UER RA
R RO
WWE/PUC APPROVALS
------------------PUBLIC UTILITIES COMMISSION
SECTION MANAGER
DATE:
DIVISION MANAGER
DATE:
ASSIST. GEN. MANAGER
DATE:
1/2"
1" CONTRACT NO. CS-842
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
DRAWING NO.
SFPUC JOB NO.:
LEVEL 8 ENLARGED FLOOR PLANS & ELEVATIONS
July 23, 2010
COPYRIGHT
O SC CI
SE A
L
J
SE
ARC
D
HI T
E
201 Post Street 7th Floor San Francisco CA 94108
Douglas Tom C12405 10/11
REN.
2 1 #
359-305 ISSUE DATE
1/4" = 1'-0"
EN
NO.
KMD PROJECT NO.
CITY AND COUNTY OF SAN FRANCISCO
7/20/2010 8:49:56 PM
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
A
BY
T
E
OF
APP
O I F CAL
R
N
CERTIFIED BY 7/20/2010 8:50:20 PM
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
T
A
1
H.2
C
I3.08B
T
LEVEL 7 ENLARGED FLOOR PLANS & ELEVATIONS
AN
KMD | STEVENS
E
13
S
DATE:
HI T
PLAS. LAM. BACK & SIDE PANELS
T
DATE:
P
ARC
12
LATERAL FILES, NIC
PLAS. LAM. SIDE & BACK PANELS
I-0846 FILES 1-NORTH 1/4" = 1'-0"
C
DIVISION MANAGER
ASSIST. GEN. MANAGER
O
D
SA N FR A N OF
N
SE
Douglas Tom C12405 10/11
12
T
SFPUC JOB NO.:
EN
I-0855 HD FILE 4-WEST 1/4" = 1'-0"
C
TH E CIT Y
C
NO.
REN.
11
T
F O
14
I-0855 HD FILE 2-EAST 1/4" = 1'-0"
S
CITY AND COUNTY OF SAN FRANCISCO
M
14
I3.07C
SA N FR A N OF
R RO
L
DRAWING NO.
T
K
0" CONTRACT NO. CS-842
C
J
1"
KMD PROJECT NO.
COPYRIGHT
I
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
DATE:
T
FI E
E N G UER RA
SECTION MANAGER
PUBLIC UTILITIES COMMISSION
S
O R O E N PA Z
WWE/PUC APPROVALS
-------------------
Y
L
C OUN T
SE A
D
SA N FR A N OF
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
O SC CI
0" AN
KMD | STEVENS
SOLID SURFACE COUNTERTOP
LATERAL FILES, NIC
10' - 0"
13
I-0755 4-West 1/4" = 1'-0"
15
L
I-0755 2-East 1/4" = 1'-0"
SE A
14
O SC CI
PLOTTERS, NIC
10
11
I-0854 PLOTTER 3-SOUTH 1/4" = 1'-0"
HIGH DENSITY FIXED SHELVING, ANCHORED TO WALL
5' - 5"
12
9
4.64.5
HIGH DENSITY MOBILE SHELVING
OPEN TO COPIER RM.
I-0854 PLOTTER 2-EAST 1/4" = 1'-0"
8
5
11
PLOTTER, NIC
I-0854 PLOTTER 1-NORTH 1/4" = 1'-0"
5
10 COPIER RM.
FLAT FILES, NIC
6
4.5 4.6
PLAS. LAM. CASEWORK
2' - 0" 1' - 6" 1' - 6" 1' - 6"
FULL HEIGHT WALL
OPEN TO CORRIDOR
8
FLAT FILES, NIC
10
D
I10.06
7
FILE STORAGE I-0866
9
9
LATERAL FILES, NIC
I
SOLID SURFACE COUNTERTOP
L
PASSAGE WAY
BULLETIN BOARD SURFACE W/ TRIM, APPLIED TO WALL
A
PLAS. LAM. SIDE & BACK PANELS SOLID SURFACE COUNTERTOP
LATERAL FILES, NIC
20
SOLID SURFACE COUNTERTOP
I
OPEN TO CORRIDOR
PASSAGE WAY SOLID SURFACE COUNTERTOP
FILES, NIC
FULL HEIGHT WALL
5' - 5"
FULL HEIGHT WALL
B
C
D
E
F
C
1
G
H
D
E
3 A
3 2
2
3
3
951
OFFICE I-0943
B
C1
OFFICE I-0951
8' - 0 3/4"
B
4
F3
F2 3' - 9 9/16"
B HD FILE I-0953
B FILE I-0945
C 945
2
I-0926 1-North 1/4" = 1'-0"
FRAMELESS GLASS PANELS
J
H.2
C
C 4
4
5
5
CORR. I-0948
LIBRARY I-0946
3
C 5
I3.09B
4
C
9
CERAMIC FRIT ETCH
3' - 9"
FILES I-0952
B
I-0926 2-East 1/4" = 1'-0"
3
I10.41
4.5 4.6
CENTER JOINT ON MONITOR
COPIER I-0954
SOLID SURFACE COUNTERTOP
F1
3
I3.09B
6
I3.09B
2
FULL HEIGHT WALL
-
C
HIGH DENSITY MOBILE SHELVING
C
7
C 2'-0"
+/- 4'-2"
ACOUSTIC FABRIC PANELS
VIF
I10.41
8
PANTRY I-0947
11
C 3 I3.20
10 I10.41 CHAIR RAIL
6
6
7
7
SOLID SURFACE EATING COUNTER
PAINTED GWB
I3.09B
9
PLOTTER I-0955
SOLID SURFACE COUNTERTOP
I3.09B
C
10
C
11
5
F11
F10
7 I10.41
4
I-0926 3-South 1/4" = 1'-0"
5
I-0926 4-West 1/4" = 1'-0" I-0943 Thru I-0955 Level 9 Core 1/4" = 1'-0"
1
8
8
9
9
D
4.64.5
10
10
FULL HEIGHT WALL
OPEN TO CORRIDOR
11
11
12
12
13
13
OPEN
PASSAGE WAY
SOLID SURFACE COUNTERTOP
SOLID SURFACE COUNTERTOP
SOLID SURFACE COUNTERTOP
PLAS. LAM. SIDE & BACK PANELS
LATERAL FILES, NIC
PLAS. LAM. BACK PANEL
8
DATE:
ASSIST. GEN. MANAGER
L
H.2
N
O
LEVEL 9 ENLARGED FLOOR PLANS & ELEVATIONS
14
J
Q
S
1
C
D
E
F
C
1
G
I
H
D
E
J
K
L
4.5 4.6
E.3
N
M
O
5
5
P
Q
R
4.64.5
S
1 DIMENSIONS (Nominal)
# SHELVES **
A
24"D x 30"W x 85"H
6
B
24"D x 36"W x 85"H
6
C
2
2
3
3
OPEN
FULL HEIGHT WALL
OPEN
F3* F4*
F3
J
H.2
4
3
3
I3.11B
SOLID SURFACE COUNTERTOP
9
4'-2"
5
HIGH DENSITY MOBILE SHELVING 11
I3.11B
I3.11B
C
C
C
C
3
D
D BULLETIN BOARD SURFACE W/TRIM APPLIED TO WALL
I10.06
10
C SOLID SURFACE COUNTERTOP
3' - 9"
PLOTTER I-1153
I3.11B
C
C
F11
D
F
1
F.8
E
F
G
I
H
7' - 8 1/4"
2' - 6"
2' - 6"
PLAS. LAM. CASEWORK
1' - 6" 1' - 6"
E.9 F
COPIER, NIC
SOLID SURFACE COUNTERTOP
SOLID SURFACE COUNTERTOP
SIGNAGE; SEE SIGNAGE DWGS
PLAS. LAM. CASEWORK
SOLID SURFACE COUNTERTOP
L
M
N
O
P
Q
R
S
T
F.8
2
G
HI T
E
I
A
1
3
B
T
E
201 Post Street 7th Floor San Francisco CA 94108
O I F CAL
OF
APP
D
R
E
N
F
G
D
E
H
E.3
B
F8*
24"D x 48"W x 85"H
6
F9*
15"D x 30"W x 85"H
6
15"D x 36"W x 85"H
2
3
3
2
EQ
1'-9"
15"D x 42"W x 85"H
6
15"D x 48"W x 85"H
6
I3.12A
2
2
3
3
EQUIP I-1242
EQ
F4
ACOUSTIC FABRIC PANEL
R
3
6
4.5 4.6
CHAIR RAIL PAINTED GWB
F
3
I-1225 1-North 1/4" = 1'-0"
3
3 4
5
5
4
I-1225 2-East 1/4" = 1'-0"
PANTRY I-1247
1
COPIER I-1252
I3.12B
FULL HEIGHT WALL
2
HD FILE I-1254
-
HIGH DENSITY MOBILE SHELVING
6
G
LEVEL 12 FLOOR PLAN 1/4" = 1'-0"
F.8
3
F
4
4
5
5
11
7
SOLID SURFACE COUNTERTOP
PLOTTER I-1253
I3.12B
SOLID SURFACE EATING COUNTER
2
I3.12B
F3
2"
C
C
C
C
4 I10.41
10
C
C
C
C
C
C
3' - 9" 8
9
5
F11
F10
F9
I-1242 Thru I-1254 Level 12 Core 1/4" = 1'-0"
COPIER, NIC
J
2'-6"
6"
H.2
I3.12B
CORR. I-1248 3 I3.20
** Number of possible shelves based on 11.75" minimum vertical spacing
H
I3.12B
12
1225
C
SOLID SURFACE COUNTERTOP
1242
7 I10.41
4
F3
4
4
5
SHARED CONFERENCE I-1225
6
F11* F12*
B
B 2
6 6 6 6
6 6
1
LATERAL FILES, NIC
C
C
1
9
6
24"D x 36"W x 85"H 24"D x 42"W x 85"H
* Types F1, F2, F3, F4, F5, F6, F7, F8, F9, F10, F11 & F12 are Fixed/Static Shelving Units; Accessible from one side when located adjacent to wall; Accessible from two sides when freestanding.
PASSAGE WAY F9
K
I10.41
Types A, B, C, & D are Mobile Units, accessible from both sides. FULL HEIGHT WALL
OPEN
C
F10
J
G
C
C
8
9
CHAIR RAIL
C
6
18"D x 30"W x 85"H 18"D x 36"W x 85"H 18"D x 42"W x 85"H 18"D x 48"W x 85"H 24"D x 30"W x 85"H
F6* F7*
F10*
20
F
5
ACOUSTIC FABRIC PANELS
F5*
LIBRARY
I-1148 Corridor 4-West 1/4" = 1'-0"
4 I10.41
7
3 I3.20 SOLID SURFACE EATING COUNTER 5
4'-2"
2"
-
5
PANTRY I-1147
CENTER JOINT ON MONITOR
I10.41
9"
HD FILE I-1154
I3.11B
FULL HEIGHT WALL
2
4
6
FRAMELESS GLASS PANELS CERAMIC FRIT ETCH
4
COPIER I-1152
3' - 9 1/8"
CORR. I-1148
4.5 4.6
PANTRY
I-1148 Corridor 2-East 1/4" = 1'-0"
B
6
24"D x 48"W x 85"H
F1* F2*
LATERAL FILES, NIC
I-1126 2-East 1/4" = 1'-0"
24"D x 42"W x 85"H
D
SOLID SURFACE COUNTERTOP
PLAS. LAM. SIDE PANELS F3
A
T
HIGH DENSITY SHELVING LEGEND SECTION LABEL
2 3
ARC
D
REN.
A
BY
CERTIFIED BY
B
F4
I-1126 1-North 1/4" = 1'-0"
SE
Douglas Tom C12405 10/11
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
7/20/2010 8:51:31 PM
A
T
3
EN
L
July 23, 2010 2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
R
LIBRARY I-1144
2
C
NO.
3 2 1 #
359-305 ISSUE DATE
1/4" = 1'-0"
DATE:
P
A
DIVISION MANAGER
SFPUC JOB NO.:
M
14
I3.09A
KMD PROJECT NO.
CITY AND COUNTY OF SAN FRANCISCO
L
DRAWING NO.
3' - 10 1/4"
SE A
K
CONTRACT NO. CS-842
6"
F O
O SC CI
J
1"
T
R RO
COPYRIGHT
I
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
S
FI E
E N G UER RA
DATE:
T
O R O E N PA Z
SECTION MANAGER
PUBLIC UTILITIES COMMISSION
C
222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
WWE/PUC APPROVALS
-------------------
Y
2'-6"
C OUN T
TH E CIT Y
D
SA N FR A N OF
A JOINT VENTURE PARTNERSHIP
FLAT FILES, NIC
I-0955 Plotter 1-North 1/4" = 1'-0"
9
I
0" AN
KMD | STEVENS
I-0954 Copier 4-West 1/4" = 1'-0"
PLAS LAM. BACK PANEL
PAINTED GWB 6
6
4
7
1
I10.41
4
I-1126 3-South 1/4" = 1'-0"
5
I-1143 Thru I-1154 Level 11 Core 1/4" = 1'-0"
I-1152 Copier 1-North 1/4" = 1'-0"
5
I-1152 Copier 3-South 1/4" = 1'-0"
6
6
7
7
6
6
7
7
7
7
5
D
4.64.5
4.5 4.6
5
8
9
SOLID SURFACE COUNTERTOP
OPEN TO HD FILE RM
OPEN
PASSAGE WAY
COPIER RM
FLAT FILES, NIC
10
I-1153 Plotter 1-North 1/4" = 1'-0"
8
I-1153 Plotter 2-East 1/4" = 1'-0"
4.5 4.6
5
5
11
12
12
13
13
14
14
D
8
9
4.5 4.6
8
8
9
9
FULL HEIGHT WALL
SOLID SURFACE COUNTERTOP
10
10
11
11
12
12
13
13
14
14
LEVEL 12 FLOOR PLAN 1/4" = 1'-0"
7
I-1226 1-North 1/4" = 1'-0"
7
8
I-1226 2-East 1/4" = 1'-0"
10
10
11
11
12
12
13
13
14
14
I-1253 Plotter 1-North 1/4" = 1'-0"
I-1253 Plotter 2-East 1/4" = 1'-0"
8
J
3
H.2
I-1154 HD File 4-West 1/4" = 1'-0"
FI E
R RO
E N G UER RA
WWE/PUC APPROVALS
------------------PUBLIC UTILITIES COMMISSION CITY AND COUNTY OF SAN FRANCISCO SFPUC JOB NO.:
SECTION MANAGER
DATE:
DIVISION MANAGER
DATE:
1/2"
DATE:
1/4" = 1'-0" COPYRIGHT
10
I-1226 4-West 1/4" = 1'-0" 0"
CONTRACT NO. CS-842 DRAWING NO.
C
I3.11B 359-305
ISSUE DATE July 23, 2010
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
EN
SE
D
ARC
HI T
E
201 Post Street 7th Floor San Francisco CA 94108
Douglas Tom C12405 10/11
NO.
KMD PROJECT NO.
ASSIST. GEN. MANAGER
I-1226 3-South 1/4" = 1'-0"
1"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE LEVEL 11 ENLARGED FLOOR PLANS & ELEVATIONS
REN.
2 1 #
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
A
BY
APP
T
E
OF
O I F CAL
CERTIFIED BY 7/20/2010 8:54:32 PM
Entry and Cafe San Francisco PUC : TomEliotFisch
R
N
KMD | STEVENS A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
AN
D
C OUN T
O R O E N PA Z
FI E
R RO
Y
E N G UER RA
------------------PUBLIC UTILITIES COMMISSION CITY AND COUNTY OF SAN FRANCISCO SFPUC JOB NO.:
WWE/PUC APPROVALS
SECTION MANAGER
DATE:
DIVISION MANAGER
DATE:
ASSIST. GEN. MANAGER
DATE:
1/2"
1"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE
CONTRACT NO. CS-842 DRAWING NO.
1/4" = 1'-0" COPYRIGHT
C
I3.12A
KMD PROJECT NO.
LEVEL 12 ENLARGED FLOOR PLANS & ELEVATIONS
359-305 ISSUE DATE July 23, 2010
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
EN
SE
D
ARC
HI T
E
I
Y
L
C OUN T
201 Post Street 7th Floor San Francisco CA 94108
Douglas Tom C12405 10/11
NO.
3 2 1 #
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
REN.
A
D
O R O E N PA Z
I
AN
A
BY
APP
I
A JOINT VENTURE PARTNERSHIP 222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
TH E CIT Y
A
I
CERTIFIED BY 7/20/2010 8:53:52 PM
KMD | STEVENS
F O
201 Post Street 7th Floor San Francisco CA 94108 N
L
E
R
A
HI T
O I F CAL
TH E CIT Y
ARC
I
APP
OF
F O
D
L
BY
E
T
July 23, 2010
T
S
ISSUE DATE
2010 BY KAPLAN MCLAUGHLIN DIAZ. ALL RIGHTS RESERVED
SE
Douglas Tom C12405 10/11
REN.
A
T
COPYRIGHT
07/23/10 FINAL CD DOCUMENTS – ADDENDUM S-3: TO SFFD/DBI FOR ARCH. REVIEW 06/04/10 CD PROGRESS DOCUMENTS 03/18/10 CD PROGRESS DOCUMENTS DATE DESCRIPTION
C
1/4" = 1'-0"
EN
NO.
3 2 1 #
SA N FR A N OF
DATE:
359-305
T
ASSIST. GEN. MANAGER
C
I3.11A
KMD PROJECT NO.
I
0" CONTRACT NO. CS-842 DRAWING NO.
S
TH E CIT Y
1"
T
O SC CI
SE A
L
F O
1/2"
NEW SFPUC ADMINISTRATION OFFICE BUILDING AT 525 GOLDEN GATE AVENUE LEVEL 11 ENLARGED FLOOR PLANS & ELEVATIONS
C
DATE:
T
DATE:
DIVISION MANAGER
S
SFPUC JOB NO.:
WWE/PUC APPROVALS
SECTION MANAGER
SA N FR A N OF
PUBLIC UTILITIES COMMISSION CITY AND COUNTY OF SAN FRANCISCO
T
E N G UER RA
-------------------
L
Y
C
R RO
SA N FR A N OF
FI E
SE A
C O UN T
O SC CI
D
O R O E N PA Z
L
11
SE A
I-1154 HD File 2-East 1/4" = 1'-0"
9
0" AN
I-1253 P 1/4" = 1'
FLAT FILES, NIC
4.64.5
O SC CI
10
A JOINT VENTURE PARTNERSHIP
9
SIGNAGE; SEE SIGNAGE DWGS
COPIER RM
FLAT FILES, NIC
2
T
E
OF
O I F CAL
CERTIFIED BY 7/20/2010 8:55:13 PM
BULLETIN BOARD SURFACE W/TRIM APPLIED TO WALL
PLAS. LAM. CASEWORK
SOLID SURFACE COUNTERTOP
LATERAL FILES, NIC
I-1153 Plotter 3-South 1/4" = 1'-0"
20 I10.06
2' - 0" 1' - 6" 1' - 6" 1' - 6"
OPEN TO HD FILE RM
OPEN
PASSAGE WAY
4
9
5
SOLID SURFACE COUNTERTOP
3
OPEN TO COPIER RM
222 VALLEJO STREET SAN FRANCISCO, CALIFORNIA 94111 PHONE: 415.398.5191 FAX: 415.399.4807
I-1252 Co 1/4" = 1'-
I-1225 4-West 1/4" = 1'-0"
J
HIGH DENSITY FIXED SHELVING, ANCHORED TO WALL
HIGH DENSITY MOBILE SHELVING 11
H.2
PLOTTER, NIC
FLAT FILES, NIC
10
HIGH DENSITY FIXED SHELVING, ANCHORED TO WALL
8
9
SIGNAGE; SEE SIGNAGE DWGS
LATERAL FILES, NIC
7
6
R
PLAS. LAM. CASEWORK
SOLID SURFACE COUNTERTOP
SOLID SURFACE COUNTERTOP
PLAS. LAM. SIDE & BACK PANELS
I-1152 Copier 4-West 1/4" = 1'-0"
8
9
3
BULLETIN BOARD SURFACE W/TRIM APPLIED TO WALL
2' - 0" 1' - 6" 1' - 6" 1' - 6"
FULL HEIGHT WALL
OPEN TO CORRIDOR
6
I-1225 3-South 1/4" = 1'-0"
7
I3.12A
20 I10.06
2' - 10"
8
9
5
LIBRARY I-1226
D 10
SOLID SURFACE COUNTERTOP
KMD | STEVENS
4
I-1126 4-West 1/4" = 1'-0"
R
N
White House Retrofit Installation for the Reach Higher Program Parsons School of Design Fall 2014 Washington, DC, USA
When the White House calls with a request to develop and install a redesign of the East Room of 1900 Pennsylvania Avenue for Michelle Obama’s Reach Higher initiative, in two weeks, you answer. Such was the challenge handed down to a select group of Parsons colleagues and me in the middle of our fall semester: create an innovative retofit for Mrs. Obama, her staff, high school participants in the program, and 20 of America’s top fashion designers. The event sought to encourage young people to pursue careers in fashion, and in her inspiring remarks Mrs. Obama stressed the critical role of fashion in the national economy, stating: “Fashion is about so much more than just a pretty pair of pumps or the perfect hemline. For so many people across the country, it is a calling, it is a career, and it’s a way they feed their families.” Using donated books and found materials, we developed sets of table centerpieces, mannequin scarves and headpieces, a hanging backdrop for the prestigious speakers (Anna Wintour, Diane Von Furstenberg, FLOTUS), napkin holders, and a podium, all to infuse the rather tame room with a bit of “elegance and modernity”, per the First Lady’s request.
White House Retrofit : Installation for the Reach Higher Program
White House Retrofit : Installation for the Reach Higher Program
Alex Stewart
jalexstewart@gmail.com 410.353.5913
Education Parsons, School of Constructed Environments New York, NY Master of Architecture, expected May 2015
UniversitĂ IUAV
Venice, Italy Atlantis Program: Urbanisms of Inclusion, Summer 2013
Hobart College
Geneva, NY Bachelor of Arts, May 2007
Awards & Publications CFA Eleanor Allwork Scholarship, 2014 Jonathan Speirs Scholarship, 2013 Atlantis Travel Grant, 2013 Architecture Foundation of Cincinnati - Design.Make.Display exhibit selection, 2013 The Growery in Vertical Urban Factory by Nina Rappaport, 2015 White House Retrofit in Refinery 29, New York Magazine, Architectural Digest, 2014 Flipped City in Urban Omnibus, Archinect, 2013
Experience LEVENBETTS
New York, NY Junior Designer, December 2013 – present Projects: East Flatbush Library, East Lansing: 2030, models for Microgreens Housing, TAYSTEE Building References: David Leven dl@levenbetts.com, Stella Betts sb@levenbetts.com
stpmj
New York, NY Collaborator, Summer 2014 Project: Wynwood Table Reference: Sueng Teak Lee st@stpmj.com
Young Projects
Brooklyn, NY Junior Architect, January 2013 – October 2013 Projects: Universal Music Group Lobby, Architecture League Prize Exhibit, Hamptons Residence Reference: Bryan Young bryan@young-projects.com
Tom Eliot Fisch
San Francisco, CA Junior Designer, October 2007 – March 2012 Projects: Byers Eye Institute, Hoover Pavilion, San Francisco PUC Headquarters Reference: Doug Tom doug@tefarch.com, Alyosha Verzhbinski alyosha@tefarch.com
Software Revit, Rhinoceros, AutoCAD, Vectorworks, SketchUp, Adobe Suite, Vray, GIS LEED Accredited