PORTFOLIO ADITYA SURENDHRA
Education
Syracuse University Bachelor of Architecture Dean’s List Syracuse Architecture Merit-Based Scholarship London Study Abroad (Fall 2018) Florence Study Abroad (Spring 2018) 3D Print, Laser Room and Wood Shop Technician
Syracuse, NY
Indian School Muscat/Al-Ghubra
Muscat, Oman Sports Captain, Basketball and Table Tennis Athlete Designed School Website 9.8/10 GPA
Work Experience
VIP Structures
Syracuse, NY Developing firm’s Revit Standards, creating templates and dynamo scripts Historic Preservation project, 19th century Smith building in Downtown Syracuse Using point clouds to measure building and create detailed BIM model Site visits to document existing condition, study structure, historic materials and finishes Organize weekly meeting with client to discuss progress and steps to take with SHPO
Cybul Cybul Wilhelm Architects
Edgewater, NJ Cold Storage Warehouses and Food Processing Centers, created construction drawings Epicured meal prep company’s commercial kitchen and cafe projects Worked with BIM manager to realize future projects, create families and improve workflow Site visits to take measurements and document existing conditions to be modeled Total of 9 commercial projects of varying scales, use and design intent
October 2019Present
Summer 2019 May-August
Summer 2017
FBA Consulting
Summer 2016
Chennai, India Focused on a Clubhouse design as part of a residential smart-city Master Plan Produced design iterations that cut costs Initial 3D renderings for firms use Made presentations to interns and architects promoting the project
2019-Present Solar Decathlon: Net-Zero Building Collaboration with Christopher Community; 16-unit housing complex for autistic individuals Partnering with engineers at SUNY-ESF and industry partners in Syracuse to realize our goal Spearheading the architecture team, BIM model and ADA compliance to meet unique needs Marsception: Colony on Mars Produced renderings, diagrammed the research of Ph.D. engineers
Skills
2011-2015
C R Narayana Rao Architects & Engineers
Chennai, India Worked on the design of residential buildings and Amazon Delhi headquarters project Produced interior renders to communicate with clients Made recommendations on furniture and decor which were implemented Designed custom wallpapers and seating for leisure spaces
Competitions
May 2020
Revit, Dynamo, AutoCAD, ReCap Pro, Photoshop, Illustrator, InDesign, Rhinoceros 3D, Grasshopper, V-Ray, SimScale, ArcGIS Pro, Lumion 3D Printing, Woodwork, Laser Cutter, CNC Mill, Vacuum Form, Drafting, Sketching, Painting
2018
1
-
CYBUL CYBUL WILHELM INTERNSHIP
2
-
VIP STRUCTURES INTERNSHIP
3
-
CULVER CITY RECREATION CENTER
4
-
CENTRAL SAINT MARTINS APPROPRIATION
5
-
PALAZZI ROSSI FLORENTINE VILLA
6
-
OAKWOOD CEMETERY CHAPEL
7
-
JOHN STREET PARK MICRO UNIT TOWER
8
-
HOUSE IN YAMASAKI ANALYSIS
9
-
CR NARAYANA RAO INTERNSHIP
10
-
SKETCHES HAND+DIGITAL
11
-
COMPETITIONS
CYBUL CYBUL WILHELM INTERNSHIP Edgewater, NJ » Cold storage warehouses and food processing centers » Epicured meal prep company’s commercial kitchen and cafe projects » Developed details for IMP wall joints, deck fittings, bollards and curbs and freezer doors
11
10
4 A-300
9
3 A-300
54' - 0"
8
54' - 0"
54' - 0"
54' - 0"
IMPORTANT NOTE: G.C. TO COORDINATE WITH BUILDING OWNER THIRD PARTY THERMAL IMAGING OF NEW REFRIGERATED
CORRIDOR WH100
REPORT AFTER START OF REFRIGERATED ONCE PULLED DOWN TO TEMPERATURE
WH103
4.57870 4.8 SF5 |
0 °F
5.5
1
WH103A
7 A-501
WH103B
7' - 11 3/4" 4' - 4 7/8" 11' - 5 3/8"
18' - 4 5/8"
1'-6"
11'-9"
AUTOMATIC TRANSFER SWITCH JOC KEY PUMP CONTR OL LER
1'-11 3/8"
H&C
EVAP.
FH
6'-0"
15'-4 3/8"
WOMEN'S LOCKERS
1'-11"
H&C
3 A-502
X -B R AC IN G
6" SQ LEADER
3'-6" EVAP. EVAP.
H&C
12'-1 1/8"
3'-4 1/8" EVAP.
6 1/4"
SHIP RECEIVE OFFICE
-2' - 10"
102
GENERAL OFFICE
125
A5
WH103C
3"
FROST F REE H O S E B IB
100 DOUBLE STORY LOBBY
G.5
H.4
101 FLOOR DRAIN IN RECESSED MATT AREA
OFFICE 103
1
FH
118 VESTIBULE
CS
109
X -B RA C IN G
21'-8"
1'-11 1/2"
6'-0"
A5 2
0' - 0"
BW
OFF. SUP. CLOSET
OFFICE
108
FH
B
A-305
ADDITION OF BOLLARDS ALONG THE PROJECT EXTERIOR IN MULTIPLE LOCATIONS, TYP.
104
5
A-302
DN
A5
SP
1
NIT
-0' - 3 1/4"WH101H
50' - 0"
DASH LINE REPRESENTS THERMAL CUT IN SLAB SEE DETAIL 5/A505
FH
A-300 CO2
4 A-607
C
2 6 A-502
11 A-608
Sim
106
CONFERENCE ROOM
105
1 A-106
-1' - 5 3/4"
6" SQ 1 LEADER
A-300
OFFICE
-0' - 9"
4'-6"
X -B R AC IN G
6" SQ LEADER
1
STRUCTURAL BRACING
CS -2' - 10"
127
EMPLOYEE COAT CLOSET
WH100
117 MEN'S TOILET -2' - 10"
CORRIDOR
4' - 0" WIDE AND 4" THICK RIGID INSULATION BAND AROUND PERIMETER AS SHOWN
WOMEN'S 1 2HC TOILET
FLAT
RAMP
110
A-305
4' - 0" WIDE AND 4" THICK RIGID INSULATION BAND AROUND PERIMETER AS SHOWN
50' - 0"
PRIVATE TOILET
1 A-608
HC HO SE S T A T IO N F ROM CL G A BO V E
11'-9 5/8"
FH
4
CS
A-200
116
RAMP
111
A-304
115 JANITOR4 SUPPLY
CS
113
4
A5
9
FLAT
CS
LAB
2
119 HOWIE'S 1 TOOLS ROOM
RAMP
WOMEN'S TOILET
3
5 A-506
10 A-500
A
0' - 0"
A-302
4
STORAGE COOLER
SP
114 CORRIDOR
21'-1 1/2"
5
112
5 A-502
X -B RA C IN G
X -B RA C IN G
X -B RA C IN G
SP
SMALL PARTS
120
+/- 29' - 0"
A5
5052 SF | 28-33 °F
H&C
EVAP.
LUNCH ROOM
CS
DR1000 RECESSED BOOT SOLE WASHER IN RECESSED PIT
EVAP.
FH
X -B RA C IN G
EVAP.
EVAP.
WH103
WH100A 6'-4 7/8"
WH101F
EVAP.
D.5
HOSE BIBB PC
PC
WH100B
7870 SF | A50 °F
SP
BOOTH REMOVED
1'-0 3/4"
DASH LINE REPRESENTS THERMAL CUT IN SLAB SEE DETAIL 5/A505
29' - 3 1/4"
HC HO SE S T A T IO N F ROM CL G A BO V E
1'-1 7/8"
8
A-305
124
1
15800 SF | 33-40 °F
9 A-500
CORRIDOR
HOOKS
FREEZER
1
WH101E BW
PROCESSING AREA
EVAP.
5 A-500
34' - 0"
CS
SAFETY AREA
SP
UC
A-305
-2' - 0"
EVAP.
WH101
FH
M8
A5
EVAP.
A5
1
A5
UP
30' - 9"
EVAP.
EMPLOYEES HAND WASH
123
29'-0 3/8"
EVAP.
14 GA 3 COMP. SINK WITH DUAL DASH DRAIN. VERIFY SELECTION WITH OWNER- TYP.
EVAP.
D.1 44
57'-9 1/8" 1'-1 H&C1/4"
2 A-301 1
A4
EVAP.
AIR HANDLING UNIT
7'-1 3/8"
X -B RA C IN G
10'-11 3/4"
1'-9 1/8" 5'-10 1/2"
2 A-502
ADDED BOLLARDS FOR CORNER PROTECTION
CS
X -B R AC IN G
6 7/8"
1'-1"
3
DN
6 A-607
EVAP.
H&C
BW WH101C WH101B 4'-7 1/8" 2 5/8"
UC
H&C
4' - 0" WIDE AND 4" THICK RIGID INSULATION BAND AROUND PERIMETER AS SHOWN
6 A-500
EVAP.
1'-11 3/4"
13'-4"
13'-4"
EVAP.
3'-4 1/8"
EVAP.
1375 SF | 40 °F
X -B R AC IN G
4'-1"
LINE FOR CEILING ABOVE
A5
10'-6 1/4"
1 A-502
MEN'S JANITOR CLOSET LOCKERS MEN'S TOILET 121 128 122
-4' - 0"
8X8 PREFAB BOOTH PORTA-KING
SP 1'-10 1/8"
WH111
50' - 0"
F R O S T F RE E H O S E B IB
A-301
14 A-501
S2
7'-5 7/8"
6' - 9 1/2"
A-303
WH107F
STAIR 2
178'-2 5/8"
AMBIENT NO CEILING
K
WH105B
A
CS
EVAP.
8'-0" VINYL COATED CHAIN LINK FENCE AROUND CHEMICAL STORAGE SIZE TBD
X -B R AC IN G
EVAP.
CORRIDOR
H&C
CONCRETE APRON SEE SITE CIVIL
WH107E
9709 SF | 28-33 °F
METAL PANEL CONTRACTOR TO COMPLETE ALL CORNERS OF FREEZER FOR PROPER THERMAL BREAK FOAM & SEAL AS REQUIRED
10 A-501
1672 SF | 33-40 °F
B
BZ
9'-0"
4' - 9 1/8"
D
WH105A 14'-10 7/8"
H&C
UC
50' - 0"
EVAP.
0' - 0"
A5
REFRIGERATED LOADING DOCK 1
2
4 A-502
1'-8 1/4"
WH102A 4613 SF | 44 °F
A6
A5
WH102 18'-5"
BW
5268 SF |
1
6 A-501
WH101G
6193 SF | 34-36 °F
WH101B
WH101
DN
EVAP.
H&C
1'-11"
4 A-500
BW WH101A COOLER 2'-0"
BW
53'-4 7/8"
EVAP.
21'-8" WH105D
6
13 A-501
SP
TRIM AS REQUIRED FOR 4" TO 6" CONNECTION
WH105
4'-5 3/4"
1'-10 3/8"
EYE WASH STATION EVAP. SP
J
Z
DE-FROST
EVAP.
WH107C
WH107
SP
3'-3 3/4"
EVAP.
5'-7" H&C
WH103
COORDINATE FAST ACTING DOOR CONTROL
WH106C
9'-5"
WH109
8 A-500
BOX LOCATION FOR DOOR & PROPOSED HOSE REFRIGERATED STATION IN FIELD WITH X-BRACING LOADING AMBIENT WH103D STORAGE 1 DOCK A-407 WH102
-3' - 8 1/2"
TION - 3 = 1'-0"
WH110A UC
14'-4 3/4"
WH102D
7'-9 3/4"
6' - 9 1/4"
5'-11 7/8"
H&C
7' - 1 1/8"
FH
REFRIGERATED TRASH AREA
FH
23' - 2 1/8"
WH102C
SF | -20 °F
A6
FH
A6
-4' - 0"
1
A-304
FH
LABEL STORAGE 1'-2 7/8" WH109
8'-6 1/8" 5'-11 7/8" WH104B
BZ
SP
1 A-406
12 A-501 A5
A-300
9 A-501
4 7/8"
5'-7 1/4"
WH103B
A-300
H H.4
15'-1 1/8"
WH104
A-300
A6
12'-0"
BZ
DASH LINE REPRESENTS THERMAL CUT IN SLAB SEE DETAIL 5/A505
C
WH106B
2
WH110
12'-0"
UC
EX
BZ
AMB. VEST.
A6
12'-2 1/8"
WH102B
WH103A
6
EOD
11'-2 7/8"
3
G.5
EOD
7 A-500 1026
1'-2 7/8" A5 UC WH108
EVAP.
EOD
9'-11 3/8"
898 SF | 50 °F
2 A-500
A6
BLAST FREEZER
12'-4"
6" SQ LEADER
A5
A-408
G
12'-4"
3'-0 1/8"
18' - 5 1/4"
3
X -B RA C IN G
8' - 2 5/8"
3' - 7 1/8"
11' - 0 3/4"
POWER FOR TRASH & HYDRAULICS
3 A-500
3
HB
WH103C
1 A-301
35'-5"
4
7'-10" POWER FOR CARD BOARD COMPACTOR
A-300
EVAP.
X -B RA C IN G
CARD BD. DUMPSTER
D.4
6'-0"
FH
UC
A-301
D.5
A6
14'-4"
3' - 6 3/8" 26'-9"
TRASH COMPACTOR UNIT
2"
25' - 3 5/8"
C.5
5 A-501
12'-8 3/4" SEE ELECTRICAL DWGS FOR PROPOSED INTERLOCK BETWEEN DOORS FOR PROPER DOOR OPERATION. WHILE ONE DOOR IS DOWN OTHER ONE IS UP FOR PROPER AIR LOCK
WH110B
12' - 2 1/2"
WH106A
50' - 0"
7'-11"
18' - 3 3/8"
WH107D
2
WH108
14'-4 5/8"
13'-0"
10' - 0 7/8"2' - 0 1/4"
WH107B
WH114
FH
HK PAD
A5
EYE WASH STATION
WH114
A6
A-303
EDIBLE LUBRICANTS
A-304 WH104A
5'-11 7/8" 8'-0 1/8" 5'-3 3/8"
DN
223
8 A-501
4 A-501
GC TO INSTALL (5) KASON 1845 PRESSURE RELIEF VENTS IN METAL PANEL WALLS-PROVIDE POWER AS REQUIRED IN UNITS. SEE MECH. DWGS FOR ADD. INFO.
D
1
61' - 0"
CONCRETE APRON SEE SITE CIVIL
D
9 A-301 2 A-501
7 A-402
STAIR 3
5534 SF | -10 °F 0' - 0"
A-303
AMBIENT MAINTENANCE ROOM
WH106 28'-6 1/4"
29' - 11 1/4"
1
29' - 5 7/8"
11 A-501
WH107A
WH107G
FREEZER UC
X -B R AC IN G
11'-4 3/4"
UP
-4' - 0"
5'-6"
17'-1 1/4"
X -B R AC IN G
A6
6' - 9"
21'-8"
WH107H
6" SQ LEADER
4'-1 3/4"
MDP
A4
8'-0"
GAS
27'-4 3/8"
3
4
WH113
20'-9 7/8"
6" SQ LEADER
22' - 1"
3 A-501
G
WH113B
11'-5"
23'-0 3/4"
A4
ELECTRIC RM
WH113A
X -B R AC IN G
C
A-304
6" SQ LEADER
6" T O 6-WAY PU MP T EST H EADER
16' - 9" 11' - 11"
5
ON - 2 1'-0"
8_ccw_mk.rvt
WATER TANK 24'-0" DIA 32'-0" HT
6" SQ LEADER
B
E
PUMP ROOM WH112
A-303
E
3
2 A-300 30' - 10"
D
17'-4 1/2"
FIRE PUMP CONTROLLER
-4' - 0"
MDP TRANS.
4
F
29' - 10"
CO
12'-6"
17' - 5 3/8"
1 A-607
1 A-501
PROJECT WH110 NORTH
12
50986 SF | AMBIENT °F
17'-5 1/4"
5' - 21'1/2" - 1 1/4"
6" SQ LEADER
A-500
11 11.4 11.5 4' - 0" WIDE AND 4" THICK RIGID INSULATION BAND AROUND PERIMETER AS SHOWN
WH112
8
10
12'-6"
23' - 6 1/4"
A
A.5
9.8
co
ED
14'-4 5/8"
1' - 8 1/2"
9
12'-6"
29' - 10 3/4"
WH102B
8
9'-4 1/4"
24' - 11 1/2"
7
1
EVAP.
23' - 6 1/2"
WH102A
6.5
EX 11.9
A-200
A-300
29' - 11 3/8"
WH101A
5.8 6
EX
10' - 0"
4
EX
9'-0"
6193 SF | 34-36 °F 3
29' - 0"
WH102
29' - 0"
1.1
TRUE NORTH
DRY N STORAGE WAREHOUSE
COOLERSTRUCTURE. FREEZER PROVIDE REPORT FOR DUAL STAGE IMAGING - ONE REPORT PRIOR TO START UP OF REFRIGERATION AND ONE
INSULATED METAL PANEL 35'- 0" A.F.F. 1.2 2 2.2
TH AR RE O IN SP LI TH TH CO TH O DI FI SI TO RE PR TH
N
30' - 3"
29' - 0"
5
50' - 0"
ADDITION OF BOLLARDS ALONG THE PROJECT EXTERIOR IN MULTIPLE
1
COOLER VESTIBULE STAIR 1 S1 WH116
LUNCH AREA 107
D 3
6
1
PROPOSED CORPORATE ENTRY
PROPOSED CORPORATE ENTRY
COOLER AREA COOLER AREA
PROCESSING AREA
OFFICE
OFFICE
STAIR WELL B
PROCESSING AREA
STAIR WELL A
STAIR 2
DRY DOCK
DRY DOCK
EQUIPMENT MAINTENANCE
TRASH AREA
TRASH AREA LOADING DOCK 1 LOADING
DOCK 1
MAINTENANCE & PUMP ROOMS
RAMP
MAINTENANCE ROOM UTILITY EQUIPMENT AREA
TRASH AREA ELECTRIC ROOM
UTILITY EQUIPMENT AREA
TRASH AREA
LOADING DOCK 2
FREEZER
DE-FROST
ISOMETRIC SCHEME 1
BLAST FREEZER
FREEZER
LOADING DOCK 2 BLAST FREEZER
SCALE:
TRIC SCHEME 1 BLAST FREEZER TRASH STAIR AREA
WELL A
FREEZER BLAST
FREEZER
FREEZER
TRASH AREA EQUIPMENT MAINTENANCE
TRASH AREA
CORRIDOR FOR EQUIPMENT MAINTENANCE STAIR 2
TRASH AREA LOADING DOCK 1
LOADING
DRY DOCK
DRY DOCK
S
PROCESSING AREA
COOLER AREA
EMPLOYEE WELFARE AND ENTRY AREA
PROCESSING AREA
ISOMETRIC SCHEME 2
STAIR 1
CORPORATE AREA
A6
SEE
INSTALL ARCHITECTURAL EXPOSED CONCRETE IN OFFICE SECTION OF EXPOSED FOUNDATIONS
1
GRADE -4' - 0"
WALL SECTION @ A5 COL. 12 & D SCALE: 1/2" = 1'-0"
1' - 6" 1' - 6"
GRADE LEVEL. SEE CIVIL DWGS
1' - 6"
B
STRUCTURAL DWGS FOR -4' - 0" ADDIT. INFO.
1' - 6"
1' - 0"
<T C A B ON -S S U EL L EC TA T NT TO L O U G PD O AT 2 E>
GROUND FLOOR 0' - 0"
INSTALL ARCHITECTURAL EXPOSED CONCRETE IN OFFICE SECTION OF EXPOSED FOUNDATIONS CONCRETE STRUCTURE.
-4' - 0"
INSTALL 1"METAL DIA.ARCHITECTURAL EPOXY COVE EXPOSED CONCRETE IN COLUMN. SEE OFFICE SECTION OF BASE STRUCTURAL EXPOSED FOUNDATIONSDWGS
ADDIT. INFO. 6"FOR CONCRETE CURB
26 GAGE BENT METAL METAL COLUMN. SEE TRIM AS REQUIRED STRUCTURAL DWGS FOR ADDIT. INFO.
26 GAGE BENT METAL TRIM AS REQUIRED
2
WALL SECTION @
SCALE: 1/2" = 1'-0"
8"
TYPICAL, SEE FINISH SCHEDULE FOR FLOOR AND BASE
2'-0"
1'-0"
2'-0"
2'-0"
7/12/2019 11:39:33 AM
4'-0"
1'-0"
GRADE -4' - 0"
2'-0"
2'-0"
8"
2'-0"
Martin J. Cybul Oliver R. Wilhelm
<T C A B ON <T C -S S U A B ON EL L -S S U EC TA EL L T NT EC TA TO L O T NT U G TO L PD O O U G AT 1 PD O E 1
2'-0"
N.Y. 21140
9" STAIR 1
CEILING LINE
2'-0"
S1
SPECIFICATIONS. COLOR ZINC GRAY
5" INSULATED METAL PANEL
B1
B1 1
VAPOR BARRIER
VAPOR BARRIER 5 CUT PANEL, FOAM A-504 LUNCH AREA & TRIM AT FIELD 1'-5 3/4" FOR PROPER 107 GROUND FLOOR THERMAL BREAK 0' - 0" BOTTOM OF PANEL 6" CUT PANEL, FOAM BELOW SLAB @ COL. 8" LINE 10 & 11 & TRIM AT FIELD 4" FOR 7" PROPER 16 GAGE ANGLE CONCRETE FLOOR STRUCTURE. SEE STRUCTURAL GROUND FLOOR THERMAL BREAK DWGS FOR ADDIT. INFO. OFFICES GF 0' 0" CEILING TRIM -2' - 10" (AS PER 4 MANUFACTURER 16 GAGE ANGLE A-504 'S SPECS) CEILING TRIM (AS PER MANUFACTURER S E E S T RU R A L D W G S F O R A L L S L A B & P IL E C A P C O N D I T I O N S T Y P . 'SCTUSPECS)
LUNCH AREA
GROUND FLOOR 0' - 0"
NEW 1.5" POLYISO RIGID INSULATION W/ 3.5" STUDS 14 GAGE @16" O.C. + VAPOR BARRIER MEMBRANE & 5/8" GYP. BD. TAPE, SPACKLE. INSTALL WALL FINISH
8" BLK
4'-0" 9"
107
GROUND FLOOR 0' - 0"
4"
CEILING SUPPORT STRUCTURE ABOVE AS PER WH100 MANUFACTURERS SUPPORT 28-33CEILING °F 3" HORIZONTAL METAL PANEL INSTALLATION BY METL SPAN OR FROM STRUCTURE SPECIFICATIONS ARCHITECT'S APPROVED ABOVE AS PER EQUAL; SUPPORT OFF OF FULL HEIGHT BATT MANUFACTURERS STUDSINSULATION AS PERIN GAP BETWEEN WALL PANEL INSTALLATION MANUFACTURER'S AND CONCRETE BLOCK INSTALLATION SPECIFICATIONS WALL
2 A-504
105
4 A-504
A6
A6
GRADE -4' - 0" INSTALL ARCHITECTURAL EXPOSED CONCRETE IN OFFICE SECTION OF EXPOSED COL. 12 FOUNDATIONS &K
2'-0" 2'-0"
0' - 2". 0' - 2".
1' - 0".
2'-0" 2'-0" 2'-0" 4'-0"
4'-0"
GROUND FLOOR
N.Y. 15125 7"
FROM STORAGE COOLER
1'-5 3/4"
CONFERENCE ROOM
26 GA CAP TRIM 0' - 0" FIELD NEW 1.5"CUT POLYISOPANEL, RIGID INSULATION W/ 3.5" STUDS 14 FOAM &O.C. TRIM GAGE @16" + VAPOR BARRIER MEMBRANE & 5/8" 26GYP.GA TRIM BD. CAP TAPE, SPACKLE. INSTALL WALL FINISH 1" DIA. EPOXY COVE TYPICAL, SEE FINISH FIELD CUT PANEL, SCHEDULE FOR FLOOR AND BASE BASE FOAM & TRIM 6" GRADE CONCRETE CURB
FH
STRUCTURE ABOVE, SEE PLANS FOR ADDITIONAL INFORMATION
0"
<T C A B ON -S S U EL L EC TA T NT TO L O U G PD O AT 1 E>
0' - 6"
GRADE LEVEL. SEE CIVIL DWGS
GRADE
CUT PANEL, FOAM & TRIM AT FIELD FOR PROPER THERMAL BREAK
A6
105
120
B
CEILING TRIM (AS PER MANUFACTURER 'S SPECS)
CONFERENCE ROOM
STRUCTURAL DWGS FOR ADDIT. INFO.
16 GAGE ANGLE
A6
0' - 6"
LUNCH ROOM CONCRETE STRUCTURE. SEE
<T C A B ON -S S U EL L EC TA T NT TO L O U G PD O AT 3 E>
VAPOR BARRIER
1' - 0"
10
0' - 0"
.18_ccw_mk.rvt
ETAL PANEL .F.F.
0' -
1' - 0" 1' - 0"
GERATED CONDENSATE PIPE NG DOCK SEE REFRIGERATION DWGS FOR H101 ADDITIONAL INFO D METAL PANEL RATED 0" A.F.F. DOCK 01
CEILING SUPPORT FROM STRUCTURE ABOVE AS PER MANUFACTURERS INSTALLATION SPECIFICATIONS
1' - 0"
18' - 0" CONDENSATE PIPE BOT. EVAP. SEE REFRIGERATION DWGS FOR ADDITIONAL INFO
0' - 7"
ALTERNATIVE FOR KAWNEERA5 LUNCH ROOM THERMAL WINDOW AA6500 120 6"FOR 0'OWNER'S - 7" 1' - 0" CONSIDERATION GROUND FLOOR
NEW 6" METAL STUD WALL CONSTRUCTION. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION, INSTALL 5/8" GYPSUM BOARD TAPE AND SPACKLE. PREPARE WALL FOR ALTRO WALL FINISH. INSTALL BATT INSULATION 2 A-504 IN STUD WALL AS SHOWN. 1'-2"
INSTALL METL VISION WINDOW SYSTEM - PROVIDE PRICE ALTERNATIVE FOR KAWNEER INSTALL METL VISION WINDOW AA6500 THERMAL WINDOW FOR OWNER'S SYSTEM - PROVIDE PRICE CONSIDERATION
0' - 6"
10'-0"
INSTALL 5/8" GYPSUM BOARD SPACKLE. J. AND Cybul N.Y. 15125 MartinTAPE N.J.PREPARE C-7447 WALL FOR ALTRO WALL FINISH. R. Wilhelm N.Y. 21140 Oliver INSTALL N.J. 16021 BATT INSULATION IN STUD WALL AS SHOWN.
B1
<T C A B ON <T C -S S U A B ON EL L -S S U EC TA EL L T NT EC TA TO L O T NT U G TO L PD O O U G AT 2 PD O E 2
NEW 6" METAL STUD WALL CONSTRUCTION. SEE STRUCTURAL DRAWINGS FOR
(201)ADDITIONAL 224-0274INFORMATION,
220
IMP WALL 1064 River Rd. ATTACHMENT TO Edgewater, NJ 07020 ROOF STRUCTURE. SEE IMPSTRUCTURAL WALL (201) 224-4100 1064 River Rd. DWGS ATTACHMENT TO Edgewater, NJ 070 1 COAT PRIME AND 224-0274 (201) ROOF STRUCTURE. 2 COATS FINISH A4 OFFICES SF PAINT SEEofSTRUCTURAL C:\RVT.local\20\1912-House Spice.20_CCW_APS.rvt 14' - 7" J.224-4100 Cybul N.Y. 15125 Martin (201) DWGS A5 N.Y. 21140 Oliver R. Wilhelm ACOUSTIC DLE & GRID (201) 224-0274 A4 HANG FROM CELING
CEILING LINE 3" HORIZONTAL METAL PANEL BY METL SPAN OR ARCHITECT'S APPROVED EQUAL; SUPPORT OFF OF STUDS AS PER MANUFACTURER'S INSTALLATION SPECIFICATIONS. COLOR ZINC GRAY
CORRIDOR
<T C A B ON <T C -S S U A B ON EL L -S S U EC TA EL L T NT EC TA TO L O T NT U G TO L PD O O U G AT 3 PD O E 3
Edgewater, NJ 07020
4'-0 1/4"
CONSTRUCTION. SEE COLUMN DETAIL @10/A STRUCTURAL DRAWINGS FOR (201) 224-4100 ADDITIONAL INFORMATION, SCALE: 1" = 1'-0" INSTALL 5/8" GYPSUM BOARD TAPE AND SPACKLE. PREPARE FOR ALTRO WALL FINISH. COLUMN DETAIL WALL @10/A INSTALL BATT INSULATION IN A5 SHOWN. SCALE: 1" = 1'-0"STUD WALL AS10
3" HORIZONTAL METAL OFFICE PANEL BY METL SPAN OR ARCHITECT'S APPROVED AREA EQUAL. SUPPORT OFF OF
STUDS AS PER MANUFACTURER'S INSTALLATION SPECIFICATIONS; COLOR ZINC GRAY NEW 6" METAL STUD WALL CONSTRUCTION. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION, INSTALL 5/8" GYPSUM BOARD TAPE AND SPACKLE. PREPARE WALL FOR ALTRO WALL FINISH. INSTALL BATT INSULATION IN STUD WALL AS SHOWN.
ACOUSTIC DLE & GRID CELING HANG FROM STRUCTURE ABOVE, SEE PLANS FOR ADDITIONAL INFORMATION
3" HORIZONTAL METAL PANEL BY METL SPAN OR ARCHITECT'S APPROVED EQUAL. SUPPORT OFF OF STUDS AS PER MANUFACTURER'S INSTALLATION SPECIFICATIONS; COLOR ZINC GRAY 8'-10"
WH103 1064 RiverNEW Rd. 6" METAL STUD WALL
10'-0"
5
ADDITIONAL INFORMATION
15'-11 1/2"
FREEZER IMP WALL ATTACHMENT TO ROOF STRUCTURE. SEE STRUCTURAL DWGS
18' - 0"
BOT. EVAP.
EVAP.
WH103
C:\RVT.local\18\1711-A-Schuster Meats-Central.18_ccw_mk.rvt
EVAP.
INFORMATION ACOUSTIC DLE & GRID CELING HANG FROM STRUCTURE ABOVE, SEE PLANS FOR ADDITIONAL INFORMATION
5
BOT. CLG
ACOUSTIC DLE & GRID OFFICE HANG FROM METALCELING STUD WALL BY STRUCTURE ABOVE, AREA SEE PLANS FOR OTHERS
A.I.A.
A4
21' - 0"
A6
FREEZER
OFFICES SF 14' - 7"
ACOUSTIC DLE & GRID CELING HANG FROM STRUCTURE ABOVE, SEE PLANS FOR ADDITIONAL INFORMATION
A
B1
BUILDING FOR CEILINGLIGHT PANEL END SUPPORT FIXTURE; SEE INSTALL DETAIL AS MECHANICAL AND PER 2/ A-507 SITE CIVIL DRAWINGS FOR ADDITIONAL INFORMATION
220 BUILDING LIGHT FIXTURE; SEE MECHANICAL AND SITE CIVIL DRAWINGS FOR ADDITIONAL INFORMATION
no.:
8" CONCRETE BLOCK. SEE STRUCTURAL DWGS FOR ADDITIONAL INFORMATION. DOB BARCODE: BLOCK FILL & PAINT INTERNAL BLOCK SURFACE - COLOR TO BE SELECTED BY THE OWNER & ARCHITECT
EXIST. FINISH SLAB
CORRIDOR
TYPICAL NOTE: METAL14 STUD CONTINUED TO A-703 INSTALL STUDS BETWEEN FLANGE. FOR HORIZONTAL PANEL ATTACHMENT COORDINATE IN FIELD
A
BUILDING EXTERIOR LIGHT FIXTURE; SEE MECHANICAL
AND COLUMN. SITE CIVIL DRAWINGS METAL SEE FOR ADDITIONAL INFORMATION DWGS FOR STRUCTURAL TYPICAL SEE FINISH ADDIT. INFO. SCHEDULE FOR FLOOR
METAL COLUMN. OFFICES SF SEE CUT PANEL, FOAM & TRIM 14' - 7" STRUCTURAL DWGS FOR IN FIELD TYPICAL NOTE: METAL CONTINUED TO ADDIT.STUD INFO. INSTALL STUDS BETWEEN METAL STUD FLANGE. FOR WALL BY HORIZONTALFOAM PANEL CUT PANEL, & TRIM OTHERS ATTACHMENT IN FIELD COORDINATE IN FIELD
3" HORIZONTAL METAL PANEL BY ACOUSTIC DLE & GRID METL SPAN OR ARCHITECT'S CELING APPROVED EQUAL.HANG SUPPORTFROM OFF OFSTRUCTURE STUDS AS PER ABOVE, MANUFACTURER'S INSTALLATION SEE PLANS SPECIFICATIONS; COLORFOR ZINC GRAY ADDITIONAL
COLUMN BEYOND BOX P3 OUT AND FINISH; SEE FINISH SCHEDULE
OFFICES SFA-703 14' - 7"
AND BASE
A6
CURB C4 SCALE: 1 1/2" = 1'-0"
C4
8'-0"
0' - 6"
2'-7"
ATTACH TRIM TO METAL PANEL
BUILDING EXTERIOR LIGHT FIXTURE; SEE MECHANICAL AND SITE CIVIL DRAWINGS FOR ADDITIONAL INFORMATION TYPICAL SEE FINISH SCHEDULE FOR FLOOR AND BASE 9
by:
project no.:
FIRE STOP TOP OF BLOCK FOR 1drawing HOUR RATING
SCHEDULE GROUND FLOOR 0' - 0"
14 A-703
0"
214
ACOUSTIC DLE & GRID CELING HANG FROM STRUCTURE ABOVE, SEE PLANS FOR ADDITIONAL INFORMATION
FULL HEIGHT BATT INSULATION
ATTACH TRIM TO METAL PANEL
3" EDGE OF ROOF DECK
AND FINISH; SEE FINISH
9 A-703
4" VERTICAL METAL PANEL date: BY METL SPANrelease OR ARCHITECT'S AND OWNER'S APPROVED EQUAL, COLOR - REGAL GRAY. SUPPORT OFF OF CMU WALL AS PER drawing date: MANUFACTURER'S INSTALLATION SPECIFICATIONS. REST BOTTOM OF PANEL ON ROOF DECK drawn by:
ROOFING CONTRACTOR TO ENSURE WATERTIGHT approved SEAL TO PANEL
CHEMICAL ANCHOR FIELD CUT, FOAM TRIM WALL TO CEILING PANEL FOR BOLT. SEE PROPER THERMAL BREAK COLUMN BEYONDDWGS BOX STRUCTURAL P3 OUT
2'-0"
STORAGE
3" HORIZONTAL METAL PANEL BY METL SPAN OR ARCHITECT'S APPROVED EQUAL. SUPPORT OFF OF STUDS AS PER MANUFACTURER'S INSTALLATION OFFICES SF SPECIFICATIONS; COLOR ZINC 14' - 7" GRAY
EXISTING ROOF
A
0' - 6"
4'-0"
P3
C1 OFFICES SF 14' - 7" PARTS
OFFICES B.O.D 29' - 7 1/2"
2'-0"
B6
NEW SOLARBAN 60 1" INSULATED WINDOW TO FIT INTO OWNER PREFERRED WINDOW FRAME SYSTEM.
15'-11 1/2"
NEW SOLARBAN 60 1" INSULATED WINDOW TO FIT INTO OWNER PREFERRED WINDOW FRAME SYSTEM.
EXISTING ROOF ATTACH TRIM TO METAL PANEL
32' - 0"FOR ADDITIONAL PLANS INFORMATION BOTTOM OF IMP CEILING
2'-0"
15'-0 1/2"
0' - 6"
copyright 2017- CYBUL CYBUL WILHELM ARCHITECTS
SLOPE TOP OF PANEL WITH ACOUSTIC GRID CONTINUOUS DLE ANGLE& AND STEEL FRAMING TOP OF CELING HANGSTEP FROM PANEL AS REQUIRED . VERIFY STRUCTURE ABOVE, SEE IN FIELD
BEAM BEHIND
NEW SOLARBAN 60 1" INSULATED WINDOW TO FIT INTO OWNER PREFERRED WINDOW FRAME SYSTEM.
4'-0"
10 2'-7"
C1
0' - 6"
4'-0"
0' - 2".
3'-5"
214
FIELD, FOAM AND CUT PANEL TO ALLOW FOR ROOF MOVEMENT
1
B6
P3
A4
34' - 3 1/2"
5" INSULATED METAL PANEL
1
2'-0"
0' - 6"
3'-5"
10
STORAGE
9
SIGN CONTRACTOR TO INSTALL INDIVIDUAL ACRYLIC FACE LETTERS WITH LIGHT UP FEATURE. INSTALL SIGNAGE THROUGH HORIZONTAL METAL PANEL & COORDINATE WITH STUD WALL BACK UP. CAULK FOR WATER TIGHT SEAL- GC TO COORDINATE ELEC POWER AS REQUIRED. PROVIDE SHOP DRAWING FOR REVIEW & APPROVAL PRIOR TO FABRICATION.
4'-0"
ABOVE,HEREIN, SEE PLANS THIS DRAWING AND THE DESIGN DESCRIBED INCLUDING THE SPECIFICATIONS, ARE THE EXCLUSIVE PROPERTY OF CYBUL CYBUL WILHELM FOR ADDITIONAL ARCHITECTS A.I.A. WE RESERVE THE RIGHT TO HAVE THIS WORK INFORMATION REPRODUCED, FABRICATED, CONSTRUCTED OR MANUFACTURED. THIS DRAWING IS PLACED ON LOAN SOLELY FOR YOUR INSPECTION. ACTUAL FABRICATION, CONSTRUCTION OR MANUFACTURING, IS SPECIFICALLY PROHIBITED UNLESS AND/OR UNTIL ALL GOVERNMENTAL PERMITS, LICENSES, AS WELL AS INSURANCE REQUIREMENTS, HAVE BEEN PROPERLY FILED BY THE COMPANY OR INDIVIDUAL (CONTRACTOR) WHO HAS BEEN RETAINED TO PERFORM THE WORK DESCRIBED HEREIN, AND THIS DRAWING HAS BEEN ACKNOWLEDGED "FOR CONSTRUCTION". THE CONTRACTOR ASSUMES ALL RESPONSIBILITIES FOR VERIFYING THAT THE DIMENSIONS, AND/OR CONDITIONS AT THE JOB SITE ARE AS REPRESENTED ON THIS DRAWING AND ACCOMPANYING SPECIFICATIONS. IF THERE IS ANY DISCREPANCY BETWEEN WHAT IS DESCRIBED IN THESE DOCUMENTS AND THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL INFORM THE ARCHITECT PRIOR TO SIGNING THE CONTRACT. IT IS THE EXCLUSIVE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY AND COMPLY WITH ALL BUILDING AND/OR MUNICIPAL AND STATE RULES AND REGULATIONS. FAILURE OF THE CONTRACTOR TO EXERCISE THE AFOREMENTIONED PROCEDURES WILL RESULT INB6 THE CONTRACTOR CORRECTING AND/OR MODIFYING THE AREAS OR ITEMS IN CONFLICT AT HIS OWN EXPENSE. NO EXCEPTIONS!!
WINDOW FRAME SYSTEM.
CURB C3 @ FREEZER BASE C3B SCALE: 1 1/2" = 1'-0"
33' - 2 3/4"
BOTTOM OF DECK
WINDOW TO FIT
3 A-504
LOCATION OF SECTION
OFFICES B.O.D 29' - 7 1/2"
1" EPOXY COVE BASE
7"
copyright 2017- CYBUL CYBUL WILHELM ARCHITECTS
CUT PANEL TO ALLOW FOR ROOF FIELD, FOAM AND BAR JOIST MOVEMENT2'-0" 14 GAUGE STEEL FACE CUT PANEL TO 35' - 6 1/4" ALLOW FOR ROOF DIMENSION TO BOTTOM OF BASE 1" EPOXY COVE DECK VARIES BASED ON EXISTING ROOF MOVEMENT
TOP OF PARAPET
OFFICES B.O.D 29' - 7 1/2"
B6
WA
FOAM ABOVE AND BELOW METAL DECK
32' - 10 1/4"
A6
TYP. COLUMN DETAIL 9 GRID NEW SOLARBAN ALONG 60 1" ACOUSTIC DLE & INSULATED GRID CELING HANG
TOP OF PANEL
2'-0"
1' - 6"
CAP OVER
TROWEL CONCRETE SMOOTH FINISH FIELD, FOAM AND
1' -3".
CHEMICAL ANCHOR BOLT. SEEA6 1 STRUCTURAL DWGS
GROUND FLOOR 4 SCALE: 1" = 1'-0" 0' - 0" CURB ATTACHMENT TO SLAB TYP. COLUMN DETAIL ALONG 9 GRID SEE STRUC. DWGS 4 SCALE: 1" = 1'-0" PARTS
10 MIL STEGGO WRAP VAPOR BARRIER
BOT. CLG
A
TROWEL CONCRETE SMOOTH FINISH 33' - 2 3/4"
INTO NOTE: OWNER PREFERRED FROM STRUCTURE GENERAL CONDITIONS
SUPPORT 4" INSUL. METAL PANEL CEILING FROM STRUCTURE ABOVE. INSTALL AS PER MANUFACTURER'S INSTALLATION SUPPORT 4" INSUL. METAL PANEL SPECIFICATIONS CEILING FROM STRUCTURE ABOVE. INSTALL AS PER MANUFACTURER'S INSTALLATION SPECIFICATIONS 21' - 0"
TOP OF PANEL
14 GAUGE STEEL FACE
CUT PANEL, FOAM &OFFICES B.O.D 29' - 7 1/2" TRIM IN FIELD
0' - 3"
DRAWINGS FOR ADDIT. INFO.
CONTRACTOR TO A SIGN INSTALL INDIVIDUAL ACRYLIC
TOP OF PARAPET
CUT PANEL, FOAM & 26 GAGE BENT METAL IN FIELD TRIM ASTRIM REQUIRED
SUPPORT 4" INSUL. METAL PANEL MANUFACTURER'S INSTALLATION 3" SAND BED FOR PROPOSED CEILING FROM STRUCTURE SPECIFICATIONS INSTALL AS PER GLYCOL ORABOVE. ELECTRIC HEATING MANUFACTURER'S INSTALLATION LOOP. SEE MECHANICAL SPECIFICATIONS
BOTTOM OF DECK
FACE LETTERS WITH LIGHT UP TOP OF PARAPET FEATURE. INSTALL SIGNAGE THROUGH HORIZONTAL METAL 32' - 10 1/4" PANEL & COORDINATE WITH STUD WALL BACK UP. 33' - 3" CAULK FOR WATER TIGHT SEAL- GC TO COORDINATE ELEC POWER AS REQUIRED. PROVIDE SHOP DRAWING FOR REVIEW & APPROVAL PRIOR TO 1 FABRICATION.
10"
ROOF INSULATION TO BEAM BEHIND FACE OF METAL PANEL
1 A-504
1 A-504
1'-2"
0' - 6"
6" CONCRETE CURBACOUSTIC DLE & A-504 GRID CELING HANG METAL COLUMN. SEE FROM STRUCTURE STRUCTURAL DWGS ABOVE, SEE PLANS FOR ADDIT. INFO. FOR ADDITIONAL METAL COLUMN. SEEINFORMATION 135 MIL FLEECE BACK KEE STRUCTURAL DWGS HP PVC ROOF BY FOR ADDIT. CARLISLE INFO.OR APPROVED EQUAL. SEE ROOF PLAN 26 GAGE BENTFOR METAL ADDITIONAL INFORMATION TRIM AS REQUIRED
2 LAYERS OF 3 INCH 40 PSI OWENS CORNING RIGID SUPPORT 4" INSUL. METAL PANEL INSULATION WITH CEILING FROM STRUCTURE OVERLAPPING JOINTS ABOVE. INSTALL AS PER
C3B 7" 3"X3" BENT C1 24 GAUGE METAL TRIM. CAULK AS REQUIRED C1
TOP OF PANEL
1
FIELD CUT & FOAM AT BASE OF WALL
RIVET
11
3"X3" BENT 24 GAUGE B.O.D AS METAL OFFICES TRIM. CAULK 29' - 7 1/2" TYPICAL NOTE: INSTALL REQUIRED
9
OFFICES B.O.D 29' - 7 1/2"
15'-0 1/2"
1' - 3"
C3B
RIVET
K
8'-10"
EXISTING BUILDING ROOF
9
12
4'-0 1/4"
EXISTING BUILDING ROOF
3" X 3" 14 GA. BENT METAL TRIM BASE WITH EPOXY COVE
CAULK TO MATCH TRIM
2'-0"
FILL STUDS WITH BATT INSULATION.
CONSTRUCTION BYSMOOTH UNEMBOSSED HORIZONTAL ARCHITECTURAL FLAT INSTALL METAL PANEL WALL BY METL SPAN- INSTALL AS PER MANUFACTURER'S 2"x3"x12' METAL TRIM OTHERS OFFICES B.O.D INSTALLATION SPECIFICATIONS. OWNER'S COLOR CHOICE ZINC GRAY. TYP 29' - 7 1/2" 1" DIA. EPOXY COVE 2"x3"x12' METAL TRIM BASE TYP D.1 1" DIA. EPOXY COVE 6" CONCRETE CURB BASE 1' - 6"
CAULK TOP OF TRIM
CAULK TO MATCH TRIM
1
16'-0"
1 PARAPET LOWERED TO NEW ELEVATION. SEE BUILDING ELEVATIONS AND WALL SECTIONS FOR ADDITIONAL INFO
2'-0"
10
6" METAL STUDS @ 16" O.C. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION. BUILD STUD WALL TO UNDERSIDE OF STRUCTURE FOR 3" EXTERIOR HORIZONTAL METAL PANEL SUPPORT.
ATTACH METAL PANEL AS PER MANUFACTURER'S INSTALLATION METAL STUD WALL SPECIFICATIONS TO METAL STUDS. INSTALL 1 LAYER 5/8" GYPSUM BOARD TO CONSTRUCTION BYMETAL STUD, TAPE AND SPACKLE. PREPARE WALL FOR PROPOSED WALL FINISH. INSTALL GYPSUM BOARD FINISH 6" ABOVE FINISHED CEILING HEIGHT. METAL STUDOTHERS WALL
SPECIFICATIONS, ARE THE EXCLUSIVE PROPERTY OF CYBUL ARCHITECTS A.I.A. WE RESERVE THE RIGHT TO HAVE THIS REPRODUCED, FABRICATED, CONSTRUCTED OR MANUFACTU DRAWING IS PLACEDAND ON LOAN SOLELY DESCRIBED FOR YOUR INSPECTIO DRAWING THE DESIGN HEREIN, 1 THIS FABRICATION, CONSTRUCTION MANUFACTURING, SPE SPECIFICATIONS, ARE THE OR EXCLUSIVE PROPERTYISOF CY PROHIBITED UNLESS AND/OR UNTIL ALL GOVERNMENTAL P ARCHITECTS A.I.A. WE RESERVE THE RIGHT TO HAVE drawing name: AS WELL AS INSURANCE REQUIREMENTS, HAVE BEEN PROPER REPRODUCED, FABRICATED, CONSTRUCTED OR MANUF COMPANY OR INDIVIDUAL (CONTRACTOR) BEEN R DRAWING IS PLACED ON LOAN SOLELYWHO FOR HAS YOUR INSP PERFORM THE WORK DESCRIBED HEREIN, AND THIS DRAWIN FABRICATION, CONSTRUCTION OR MANUFACTURING, IS ACKNOWLEDGED "FOR CONSTRUCTION". PROHIBITED UNLESS AND/OR UNTILTHE ALLCONTRACTOR GOVERNMEN RESPONSIBILITIES FOR VERIFYING THAT THE DIMENSIONS, AS WELL AS INSURANCE REQUIREMENTS, HAVE BEEN PR CONDITIONS JOB SITE ARE AS REPRESENTED ON TH COMPANYAT ORTHE INDIVIDUAL (CONTRACTOR) WHO HAS BE ACCOMPANYING SPECIFICATIONS. IF THERE IS AND ANY THIS DISCRE PERFORM THE WORK DESCRIBED HEREIN, DR WHAT IS DESCRIBED IN THESE DOCUMENTS AND THE ACTUA ACKNOWLEDGED "FOR CONSTRUCTION". THE CONTRA CONDITIONS, THE CONTRACTOR SHALL INFORM THE ARCHIT RESPONSIBILITIES FOR VERIFYING THAT THE DIMENSI SIGNING THE CONTRACT. IT ISSITE THEARE EXCLUSIVE RESPONSIBI CONDITIONS AT THE JOB AS REPRESENTED O 39' - 0"CONTRACTOR TO VERIFY AND COMPLY WITH ALL BUILDING ACCOMPANYING SPECIFICATIONS. IF THERE IS ANY D ANDWHAT STATEIS RULES AND REGULATIONS. FAILURE OF THE CON TOP OF PANEL DESCRIBED IN THESE DOCUMENTS AND THE A EXERCISE THE AFOREMENTIONED PROCEDURES WILL RESUL CONDITIONS, THE CONTRACTOR SHALL INFORM THE A CONTRACTOR CORRECTING AND/OR MODIFYING THE AREAS 39' - 4 3/4" SIGNING THE CONTRACT. IT IS THE EXCLUSIVE RESPO CONFLICT AT HIS OWN EXPENSE. NO EXCEPTIONS!! CONTRACTOR TO VERIFY AND COMPLY WITH ALL BUILD TOP OF PARAPET AND STATE RULES AND REGULATIONS. FAILURE OF TH copyright 2017- CYBUL CYBUL WILHELM ARCHITECTS scale: EXERCISE THE AFOREMENTIONED PROCEDURES WILL R CONTRACTOR CORRECTING AND/OR MODIFYING THE A CAPCONFLICT OVER AT HIS OWN EXPENSE. NO EXCEPTIONS!!
GENERAL CONDITIONS
1
8'-0"
A6
CAP OVER
9 9
16'-0"
HP PVC ROOF BY CARLISLE OR APPROVED EQUAL. SEE ROOF PLAN FOR ADDITIONAL INFORMATION
GRADE -4' - 0"
3
WALL SECTION @ COL. 11 & K SCALE: 1/2" = 1'-0"
4
WALL SECTION @ COL. 11 & J SCALE: 1/2" = 1'-0"
5
VIP STRUCTURES INTERNSHIP ROOF 07E 67' - 7"
Syracuse, NY
FLOOR 06E 54' - 11"
» Historic preservation project of Smith Restaurant Supply, originally a 1850s warehouse building in Downtown Syracuse located along the Erie Canal
ROOF 04W 43' - 5"
FLOOR 05E 43' - 5"
» 39 Affordable housing appartments proposed, currently in schematic design stage
FLOOR 04E 31' - 11" FLOOR 03W 27' - 2"
» Detailed BIM model created based off FARO point cloud
FLOOR 03E 20' - 5"
12' - 7 3/16"
FLOOR 02W 13' - 2"
FLOOR 01W 0' - 0"
9' - 6"
FLOOR 02E 8' - 11"
FLOOR 01E -2' - 6"
BSMT 00E -9' - 8"
1
A-200
SOUTH ELEVATION 1/8" = 1'-0"
ELEVATION LEGEND:
LK
A-200
LEGEND & KEYNOTES NO SCALE
GENERAL ELEVATION NOTES:
ELEVATION KEYNOTES:
VIP STRUCTURES INTERNSHIP Syracuse, NY » Point 1 xceperrum iliquo min peritiuscius sit, vendipsanim harunt et quiae dolupta tinimax imenis volenda esectum vellabo. Les maximil intinum quia » Point 2 xceperrum iliquo min peritiuscius sit, vendipsanim harunt et quiae dolupta tinimax imenis volenda esectum vellabo. Les maximil intinum quia » Point 3 veliae aperionem iliquid enistis venis el illiquam ipsum illiquid moles is aliquosa dolorepudi coribus cipit, volorem aceat archillores ellenis ex
CULVER CITY RECREATION CENTER Culver City, CA In collaboration with Sarah Quinn
Second Floor Plan: Public Gallery
E1
E2 20'-0"
E3 20'-0"
E4 20'-0"
E5 20'-0"
E6 20'-0"
E8
E7 10'-0"
10'-0"
10'-0"
EA
10'-0"
EB
20'-0"
EC
20'-0"
ED
10'-0"
DA
20'-0"
DB
10'-0"
DC
DD
20'-0"
EE
20'-0"
D4
20'-0"
EF
20'-0"
D3
20'-0"
EG
20'-0"
D2
10'-0"
EH EI
D1
on
Diagonal Section 3/16” = 1’-0”
Long Section 3/16” = 1’-0”
CENTRAL SAINT MARTINS APPROPRIATION London, United Kingdom » Rooftops on commercial buildings contain interstitial space amid HVAC systems » The idea was to use this space in a dense city like London and draw elements from the Warholian Factory to appropriate the roof and create a space for young creative professionals to live and work » Materials used for the transformation were inspired by industrialized and mass produced “off the rack” elements such as corrugated metal, plywood sheets, and standard lumber cuts
PALAZZI ROSSI FLORENTINE VILLA Florence, Italy
Palazzo Medici
Palazzo Strozzi
Palazzo Pitti
In collaboration with Carolina Holy » Syracuse University’s study abroad program is located in the historical Villa Rossa » Originally designed to exist in outskirts of Florence, current city limits make its archetype encourage seclusion of the students from the surrounding context » Our redesign proposes to multiply the typology of the villa and juxtapose it with that of the Florentine Palazzo to create a multitude of welcoming spaces for the public and encourage student interaction with the surrounding city
Palazzo Davanzati
Palazzo Rucellai
OAKWOOD CEMETERY CHAPEL Syracuse, NY » Cemeteries in America are viewed in an entirely different light from other parts of the world, as a place for recreation and not just mourning
View Deck
Helical Ramp
» A multi-religion chappel is proposed on a natural hill on the site, with spaces for columbariums and a progression leading up the terrain to a majestic interior space
Restrooms
Seating Level
Enterance/Office
» Parametric facade generated in grasshopper acts as structure while also supporting the glazing, which lets light in from all directions
Glazing Geodesic Truss
Space Truss
Structure
Service Yard Flower Stand Chapel
Glazing
Structure Storage
Niches
Columbarium
Columns
Transverse Section 1/8” = 1’0”
JOHN STREET PARK MICRO UNIT TOWER Brooklyn, NY » Being one of the last vacant plots along the Brooklyn waterfront, the project calls for an upscale micro-unit residential tower overlooking the East River » Additional revenue is a must for the site, thus the inclusion of offices and a restaurant on the bottom floors facilitates this requirement
r4
ce
ra
Pie
Pie r5
Pier 6
Sp
Be
ort
ac
h
sF
Beach
ield
Volleyb a
ll
» Facade generated using grasshopper parametrically tightens in patters hence creating greater privacy towards the residential spaces
r Te ay
nw
r3
e
Pi
ee Gr
r2
Pie
ll
Ro
all
etb
ask
k+B
in er R
spect
nite Pro
The Gra
Bro
okly
nB
ridg
lyn
k oo Br
eP
ark
e
idg
Br
Pier 1
Playgro
und
BROOKLYN HEIGHTS
ttan
nha
Ma
DUMBO
ge
Brid
Site
Jan
e’s
Ma
Car ous
in S
el
DOWNTOWN BROOKLYN
East River Vinegar Hill
FORT GREEN
t. P
ark
Over-Bed Storage
Main Program Blocks Tinted Low-E
The Micro-Unit aggregates into the following components to make the best use of the available space:
Pullout Closet Kitchenette + Storage
1) Kitchenette: The largest program in the unit, the space aims at making the Brick comfortable to cook in with ample backup space and appliances. The setup also accommodates a washer and dryer so laundry is taken care of as well. 2) Bed: Raising the bed allows for under bed storage well as a space to slide the loveseat into. The inbuilt closet adjacent to the bed also extends to above-bed storage for both short and seasonal storage. 3) Living/Working Space: While having guests over, it is possible to easily transform the space to accommodate a small group. This is made possible with the help of dynamic custom furniture which can be reconfigured to suit several needs. 4)Bathroom: Features ample shower space and inbuilt storage with no cramping.
1'10"
T.V. Foldable Desk 6'0"
2'6" 5'0"
5'4"
Barcelona Chair
1/64’ = 1’0”
Tuck-Away Loveseat
Under Bed Pull-Out Storage
1/64” = 1’0”
2'0" 2'4"
2'2"
HOUSE IN YAMASAKI ANALYSIS
HIDDEN GUTTER
Yamasaki, Japan In collaboration with Kiersten Davis
DURABLE EPOXY PAINT
» A through building systems analysis was conducted for this house in Japan
BREATHABLE RUBBER MAT POLYPROPYLENE GEOTEXTILE SYNTHETIC FIBER 200g/m2
» A detailed model generated using Revit was created
EXTRUDED POLYSTYRENE THERMAL INSULATION, 10CM PVC WATERPROOFING, 1.5mm
» Focus on enclosure system layers, foundations, plumbing/drainage, finishing, lighting, HVAC and structure
POLYPROPYLENE GEOTEXTILE SYNTHETIC FIBER 200g/m2 LIGHTWEIGHT CONCRETE SCREED FOR SLOPES ALUMINIUM BENCH INCORPORATED INTO RAILING
DRAINAGE GRAVEL PLYWOOD SLAB
SOIL
GWB CEILING
STEEL CABLES STEEL CABLES CORRUGATED PET FINISH EXTERIOR
PLYWOOD PANEL
DRAINAGE GRAVEL
ROCKWOOL INSULATION
EXTRUDED POLYCARBONATE HOLLOW INTERIOR PANEL EGG-CRATE PROTECTION LAYER CONCRETE RETAINING WALL
WATER PROOFING MEMBRANE
STEEL CABLES BITUMINOUS DAMP-PROOFING
WOODEN BEAM
WOODEN BATTEN
EXTRUDED POLYSTYRENE RIGID INSULATION PLYWOOD PANEL WHITE SYNTHETIC PAINT PLYWOOD BASE
FIBER-REINFORCED CEMENT BOARD PANELS
WOODEN MEMBERS
GYPSUM BOARD WOODEN STUD
STRIP FOOTING PORUS CONCRETE DRAINAGE PIPE
CR NARAYANA RAO INTERNSHIP Chennai, India Project Manager G. Jyothiram » Amazon Delhi headquarters- Interior reception area and leisure spaces renders. Custom furniture, wallpapers, and lighting design » Wedding Hall- Exterior facade and enclosure design and renders
SKETCHES HAND+DIGITAL » Florence travel sketches and diagrams of Italian vernacular » London Palimpsest drawings of St. Pauls, Tate Modern and Regent Street juxtapositions
In Collaboration with Andres Feng + Alex Pissarides
INTIMATE POCKETS (NOOKS)
Design Goals
COMPETITIONS Syracuse, NY
INDOOR OUTDOOR CONNECTION
COMPRESSION AND EXPANSION
BREAKING THE LINEARITY
MODULAR DESIGN
ORIENTATION FOR NATURAL DAYLIGHT
COMMON SPACES CONNECTING THE PRIVATE SPACES
NET ZERO
» U.S. Department of Energy Solar Decathlon
Volume proposal
Module first floor layout Volume proposal
» Marsception
Climate response design
Climate response design
Climate response design
Climate response design
Second - Thrid Floor plan
Climate response design
Second - Thrid Floor plan
Circulation: Private - Buffer - Public Second - Thrid Floor plan
Circulation: Private - Buffer - Public
Second - Thrid Floor plan
Circulation: Private - Buffer - Public
Second - Thrid Floor plan
Site view with proposal Circulation: Private - Buffer - Public Circulation: Private - Buffer - Public
First Floor plan
First Floor plan
In Collaboration with Benson Joseph Water System
System Core Food Production
Systems A’ Programs Horizontal Circulation Anchor to System Interaction Spaces
12hr Growth Cycle
Living
Solid
Drink Cook
Kitchen
Water Ice
Potable Water
On-site
Sub- basement
Core
Purification # 1
Farming
Oxygen Generate
Atmosphere
Condensation
Sub- basement
Ceiling
Sub- basement
24hr Growth Cycle
Working
System’s Primary Artery
B’ Programs
Electrical Energy Solar Panels
Storage
Sub- basement
Wind Turbines
Sub- basement
On-site
Habitat
Maintain Functions
Electrical Energy
12hr Growth Cycle
54.6 mil kil.
Core/farm
Ceiling
Purification # 2
Botanist Lab
Void
VZMA3449.
Bath Sanitation
Bath
All spaces
Charging Vehicles Exploration lab
Solar Panels
Food Production ( Hydroponics)
Wind Turbine
Center of Welfare Second Genesis New Eden Oasis
Electrical Energy
Artificial Light
Water System:
Farming Water
Curtain wall
Curtain wall
Farming Farming
Arboretum
Plant- Based Food
Cooking
Sub- basement
Kitchen
Arboretum
Martian Soil Mineral Nutrient Earth Deliver
Sub- basement
On-site
Future Green Zone Future Farming Future Park
Air System Nitrogen Gas Mars Atmosphere co2
Argon Gas Basement
Habitable Atmosphere
HVAC
In-site
Water System
Dendrites
On-site
Waste Gas
Mars Atmosphere
Core/ceiling
On-site
Oxygen Gas Basement
Farming Light
HVAC System All spaces
Shelf
Receptors
Air System
Lab. Equipment
Botanist Lab
Axon
Martian Concrete
Corning Glass
Thermoph: 4D Printing
A new construction material called Martian concrete, composed of simulated Martian soil and molten sulfur.
The space shuttle has triple paned, Optical-quality windows.
Starting with a flat thermoplastic 3D-printing item, it can self-fold to a pre-determinded shape we program in the 3D-printers by thermal treatment.
Dr. Lin Wan, Dr. Roman Wendner and Dr. Gianluca Cusatis,
Tao Y, Yao L, Gu J,
There are two belts of glaciers at Mars central latitudes, 30°~50° in both the southern and northern hemispheres covered by a thick layer of dust. The volume of iced water corresponds to 1.5× 10 ^(5 ) km ^3 with an uncertainty of 25% calculated using radar observations combined with ice flow modeling by a group of researchers at the Niels Bohr Institute.
Water Pool Observation Deck
Vertical Circulation System Primary Artery
Courtyard Garden
Glass a
24hr Growth Cycle
Pleasure
Glass b
Arboretum
Cell Body Effectors
12hr Growth Cycle
Solar Energy
Strolling Zone B 24hr Growth Cycle
Wind
Cooking Area
Myelin Sheath
Function Glvl
Eating Area Medical Facilities
Strolling Zone A
2.58g/cm3
Earth Mars
Bath and Sanitation
Gym
2.7g/cm3
Glacier Water
Crust Mantle
Site: Jesero Crater: 18.85 N 77.519 E
Test Lab Infirmary
Sleeping Area
Interaction Spaces Conference Room Exploration Lab D Zone Garage Storage Elevator Mech. Ladder
The origin of the tool maker is clouded by our limitation to understand the mystical pass and the uncertainty of the future. However, we have been gifted with an ability to conceptualize, promulgate and deploy ideas for situating humanity within the complex, harmonic and sophisticated symphony of the universe. The evidence which support humanities concern for understanding and meaning are the pillars that dot the landscape on our current world. They are governing bodies, religious institutions and the industries which support the growth of our civilization. Despite the many flaws which exist within our methodologies, humanity’s System Control ultimate goal is to increase the quality of life of the individual human being. Station Computer Consequently, the premise of marsception is deeply rooted within a framework that support the physical and psychological wellbeing of productive and Main Control Board Desk progressive society. We are advocating for pillars built on creating renewable energy and resource. The production of food consumption centered on a plant base diet as a mean of reducing waist and preventing fatal disease. In addition, creating spaces that aim to offer tranquility, peace and a Mechanical Systems mode of contemplation such as the ambitions of an Arboretum in Electrical Water the dessert. Food Air
Food Storage 0’
12’
Pillars of Mars
Syracuse Architecture 2020
ADITYA SURENDHRA
apsurend@syr.edu