Mechanical and Structural drawings

Page 1

SECTION'A-A'

KEYPLAN(1:250)

ANGLESUPPORTFIN

DETAILAT'A'(1:5)

DETAILAT'B'(1:5)

DETAILAT'C'(1:5)

JOINTOF4JOINTS

DETAILAT'D'(1:5)

MODULATIONAXIS

SQUARETUBE50x50MM3 MMTHICKNESS(WELDEDTO VERTICALTUBES)

STAINLESSSTEEL SCREW ANDCAP2ANGLEARM SPIDER

170mmspider

1IntegratedAngle Arm Cushion

DETAILOFMODULATIONAXIS

ISOMETRICVIEW

DR.D.Y.PATILCOLLEGEOFARCHITECTURE,AKURDI

DATESIGN STAMP

NAME:ATHARVA.MEHTA.

SUBJECT:ABTS-2

CLASS:FOURTHYEARB'

ROLLNO:

ACADEMICYEAR:2020-21 TERM:II

SILICONEBOARD RECTANGULARTUBE152x50MM 3MMTHICKNESS
CONCRETEBEAM SILICONSEALENT withφ20anchorbars) (Withchemicalanchorbolts) 10MMTHKEMBEDDEDPARTS CONNECTING BOLTS 80X50X5 ANGLESTEEL ROUTEL LAMINATEDTEMPEREDFINGLASS 10mm+1.52PVB+10mm SILICONSEALENT
INSULATINGTEMPREDGLASS 10mm+12A+10mm SILICONSEALENT ROUTEL ANGLESTEEL 80X50X5 FINSPIDER CONNECTING BOLTS 10MMTHKEMBEDDEDPARTS (With4chemicalanchorbolts) SILICONSEALENT withφ20anchorbars) INSULATINGTEMPEREDGLASS 10mm+12A+10mm FINSPIDER CLADDING CONCRETEBOTTOM BEAM
ARMSWITHSLOTS INSULATINGTEMPEREDGLASS 10mm+12A+10mm SPIDERCONN.BOLT CONNECTION BOLTS 40DIA 90 FINSPIDERDETAIL (NOTTOSCALE) ALTERNATEWEB (NOTTOSCALE)
GLASSFINSPLINT SILICONSEALENT SILICONSEALENT (withφ20anchorbars) ROUTEL FINSPIDER
INTEGRATEDFOR RIB
50 100 100 200 32 19 A WEBFORGLASS FIXING INSULATING TEMPREDGLASS D C OPENING SPIDERCONN.BOLT B 0.70 1.75 0.70 1.75 1.75 1.75 ELEVATIONSCALE1:10 11.40 OUT OPENING IN PLANSCALE1:10 1.75 1.75 1.75 1.75
0.70 SILICONSEALENT SILICONSEALENT (withφ20anchorbars) ROUTEL INSULATINGTEMPREDGLASS 10mm+12A+10mm FINSPIDER 4.00 1.00 1.00 1.00 1.00 2.00 0.70 4.00
CURTAINWALL
3
EXIT W.C.1.200.90 W.C. 0.90 W.C.1.200.90 W.C. 0.90W.C.1.200.90 DUCT EXIT W.C.1.200.90W.C.1.200.90 W.C.1.200.90 W.C.1.200.90 W.C.1.200.90 DUCT CONTROL ROOM WING1 WING2 WING3 WING1 WING2 WING3 2.70M.WIDE PASSAGE GANGWAY GANGWAY CSO ABOVWACA L

DATESIGN

DR.D.Y.PATILCOLLEGEOFARCHITECTURE,AKURDI

NAME:ATHARVA.MEHTA.

SUBJECT:ABTS-2

CLASS:FOURTHYEARB'

ACADEMICYEAR:2020-21 TERM:II

EXIT EXIT 0.90W.C.0.901.20W.C. 0.901.20W.C. 0.901.20W.C.TCUD EXIT EXIT W.C.1.200.90 W.C.1.200.90 W.C.1.20 W.C.1.200.90 W.C.1.200.90D U C ROOMCONTROL WINGWINGWING WINGWING 2 WING 3 2.70 M.PASSAGEWIDE WALKTOSTAIRCASE STAGEABOVEWAY 4.4MX6.0 12000MMSTAGE7500 COUNTERTICKET ROOMCRY ROOMCRY LOBBYENTRANCE FOYERENTRANCE TOILETSGENTS TOILETSLADIES TOILETSGENTS TOILETSLADIES COUNTERFOOD GANGWAY GANGWAY R O E U M N E TOILET TOILET TOILET TOILET UP 4WHEELER PARKING 4WHEELER PARKING 2WHEELER PARKING ENTRY EXIT FOUNTAIN 4-WHEELERPARKINGLAWN 24 M WIDE ROAD 79.70 45.90 33.12 35.06 122.80 89.17 5M. DRIVEWAY 5M. DRIVEWAY 5M. DRIVEWAY 5M. DRIVEWAY 5M.DRIVEWAY 5M.DRIVEWAY
SITEPLAN(1:250)
STAMP AUDITORIUM
ROLLNO: LAWN 3M. DRIVEWAY

AUDITORIUM

DATESIGN STAMP

DR.D.Y.PATILCOLLEGEOFARCHITECTURE,AKURDI

NAME:ATHARVA.MEHTA.

SUBJECT:ABTS-2

CLASS:FOURTHYEAR'B

ACADEMICYEAR:2020-21 TERM:II

ROLLNO:
EXIT EXIT W.C.1.20X0.90W.C.1.20X0.90 1.20W.C.0.90X 1.20W.C.0.90X 1.20W.C.0.90X
EXIT EXIT 0.90X1.20W.C.0.90X1.20W.C. 0.90X1.20W.C. 0.90X1.20W.C. 0.90X1.20W.C. TCUD CONTROLROOM WING 1 WING 2 WING 3 WING1WING2WING3 2.70 M. WIDEPASSAGE STAIRCASETOWALK WAYABOVESTAGE 6.0X4.4M STAGE 7500X12000MM TICKETCOUNTER CRYROOM CRYROOM ENTRANCELOBBY ENTRANCEFOYER GENTSTOILETS LADIESTOILETS GENTSTOILETS LADIESTOILETS FOODCOUNTER GANGWAY P R O S C E N I U M L I N E TOILET TOILET TOILET TOILET UP UP A A' UP UP UP UP UP UP UP UP UP UP +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +0.0M UP +1.20M +1.80M +1.40M +0.0M +0.0M +0.0M +0.0M +0.50M +1.40M +1.40M +0.50M +0.50M +1.20M +1.20M ORCHESTRA PIT -0.40M
GROUNDFLOORPLAN(1:100)
DUCT

BALCONYFLOORPLAN(1:100)

DUCT

TCUD

DR.D.Y.PATILCOLLEGEOFARCHITECTURE,AKURDI

DATESIGN STAMP AUDITORIUM

NAME:ATHARVA.MEHTA.

SUBJECT:ABTS-2

CLASS:FOURTHYEAR'B

ACADEMICYEAR:2020-21 TERM:II

ROLLNO: ABCDEF EXIT W.C.1.20X0.90 W.C.1.20X0.90 W.C.1.20X0.90 W.C.1.20X0.90 W.C.1.20X0.90
EXIT 0.90X1.20W.C.0.90X1.20W.C. 0.90X1.20W.C. 0.90X1.20W.C. 0.90X1.20W.C.
RESTROOM GENTSTOILETS LADIESTOILETS GENTSTOILETS LADIESTOILETS FOODCOUNTER P R O S C E N I U M L I N E CATWALK CATWALK CAT WALK CAT WALK FABRICATED JAIL STAGEBELOW UP DN UP DN UP DN DN DN SMOKING BALCONY WAITINGAREA
A A'

DATESIGN

DR.D.Y.PATILCOLLEGEOFARCHITECTURE,AKURDI

NAME:ATHARVA.MEHTA.

SUBJECT:ABTS-2

CLASS:FOURTHYEARB'

ACADEMICYEAR:2020-21 TERM:II

STAMP

CURTAINCURTAINCURTAINCURTAINCURTAINCURTAIN CATWALK CATWALK FABRICATEDJAIL CATWALK CATWALK PLENUMPACE FALSE CEILING STAGE CONTROL ROOM ENTRANCELOBBYENTRANCEFOYER
AUDITORIUM
ROLLNO: FRONTELEVATION(1:100) GL GL +1.80M +5.80M +9.80M +12.30M +14.40M +16.90M +1.80M +5.80M +9.80M +14.40M +16.90M
BACKGROUND SCREENS WALKWAY WALKWAY WAITINGAREA STAIRCASE STAIRCASE STAGE
SECTION-AA'(1:100)

DATESIGN STAMP

DR.D.Y.PATILCOLLEGEOFARCHITECTURE,AKURDI

NAME:ATHARVA.MEHTA.

SUBJECT:ABTS-2

CLASS:FOURTHYEAR'B

ACADEMICYEAR:2020-21 TERM:II ROLLNO:

+14.40M +16.90M
AUDITORIUM
A A' DUCT +9.80M +12.30M +12.30M +11.80M +11.80M +5.80M +5.80M +14.80M +14.80M
TCUD ROOFPLAN(1:100)

AUDITORIUM

DATESIGN STAMP

DR.D.Y.PATILCOLLEGEOFARCHITECTURE,AKURDI

NAME:ATHARVA.MEHTA.

SUBJECT:ABTS-2

CLASS:FOURTHYEAR'B

ROLLNO:

ACADEMICYEAR:2020-21 TERM:II

EXIT EXIT W.C.1.20X0.90W.C.1.20X0.90 1.20W.C.0.90X 1.20W.C.0.90X 1.20W.C.0.90X DUCT EXIT EXIT 0.90X1.20W.C.0.90X1.20W.C. 0.90X1.20W.C. 0.90X1.20W.C. 0.90X1.20W.C.
CONTROLROOM STAIRCASETOWALK WAYABOVESTAGE 6.0X4.4M STAGE 7500X12000MM TICKETCOUNTER CRYROOM CRYROOM ENTRANCELOBBY ENTRANCEFOYER GENTSTOILETS LADIESTOILETS GENTSTOILETS LADIESTOILETS FOODCOUNTER TOILET TOILET TOILET TOILET UP UP A A' UP UP UP UP UP UP UP UP UP UP +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +0.0M UP +1.80M +0.0M +0.0M +0.0M +0.0M +1.40M +1.40M +0.50M +0.50M +1.20M +1.20M
ELECTRICALLAYOUTPLAN(1:100)
TCUD

DR.D.Y.PATILCOLLEGEOFARCHITECTURE,AKURDI

DATESIGN STAMP AUDITORIUM

SUBJECT:ABTS-2

CLASS:FOURTHYEAR'B

ACADEMICYEAR:2020-21 TERM:II

HVACLAYOUTPLAN(1:100)
NAME:ATHARVA.MEHTA.
ROLLNO: EXIT EXIT W.C.1.20X0.90W.C.1.20X0.90 1.20W.C.0.90X 1.20W.C.0.90X 1.20W.C.0.90X
EXIT EXIT 0.90X1.20W.C.0.90X1.20W.C. 0.90X1.20W.C. 0.90X1.20W.C. 0.90X1.20W.C.
CONTROLROOM STAIRCASETOWALK WAYABOVESTAGE 6.0X4.4M STAGE 7500X12000MM TICKETCOUNTER CRYROOM CRYROOM ENTRANCELOBBY ENTRANCEFOYER GENTSTOILETS LADIESTOILETS GENTSTOILETS LADIESTOILETS FOODCOUNTER TOILET TOILET TOILET TOILET UP UP A A' UP UP UP UP UP UP UP UP UP UP +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +0.0M UP +1.80M +0.0M +0.0M +0.0M +0.0M +1.40M +1.40M +0.50M +0.50M +1.20M +1.20M
DUCT
TCUD

AUDITORIUM

DATESIGN STAMP

DR.D.Y.PATILCOLLEGEOFARCHITECTURE,AKURDI

NAME:ATHARVA.MEHTA.

SUBJECT:ABTS-2

CLASS:FOURTHYEAR'B

ROLLNO:

ACADEMICYEAR:2020-21 TERM:II

EXIT EXIT W.C.1.20X0.90W.C.1.20X0.90 1.20W.C.0.90X 1.20W.C.0.90X 1.20W.C.0.90X DUCT EXIT EXIT 0.90X1.20W.C.0.90X1.20W.C. 0.90X1.20W.C. 0.90X1.20W.C. 0.90X1.20W.C.
CONTROLROOM STAIRCASETOWALK WAYABOVESTAGE 6.0X4.4M STAGE 7500X12000MM TICKETCOUNTER CRYROOM CRYROOM ENTRANCELOBBY ENTRANCEFOYER GENTSTOILETS LADIESTOILETS GENTSTOILETS LADIESTOILETS FOODCOUNTER TOILET TOILET TOILET TOILET UP UP A A' UP UP UP UP UP UP UP UP UP UP +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +1.80M +0.0M UP +1.80M +0.0M +0.0M +0.0M +0.0M +1.40M +1.40M +0.50M +0.50M +1.20M +1.20M
SPRINKLERLAYOUTPLAN(1:100)
TCUD

DRAINAGELAYOUT(1:250)

DATESIGN STAMP

DR.D.Y.PATILCOLLEGEOFARCHITECTURE,AKURDI

NAME:ATHARVA.MEHTA.

SUBJECT:ABTS-2

CLASS:FOURTHYEARB'

ACADEMICYEAR:2020-21

EXIT EXIT 0.90W.C.0.901.20W.C. 0.901.20W.C. 0.901.20W.C.TCUD EXIT EXIT W.C.1.200.90 W.C.1.200.90 W.C.1.20 W.C.1.200.90 W.C.1.200.90D U C ROOMCONTROL WINGWINGWING WINGWING 2 WING 3 2.70 M.PASSAGEWIDE WALKTOSTAIRCASE STAGEABOVEWAY 4.4MX6.0 12000MMSTAGE7500 COUNTERTICKET ROOMCRY ROOMCRY LOBBYENTRANCE FOYERENTRANCE TOILETSGENTS TOILETSLADIES TOILETSGENTS TOILETSLADIES COUNTERFOOD GANGWAY GANGWAY R O E U M N E TOILET TOILET TOILET TOILET UP 4WHEELER PARKING 4WHEELER PARKING 2WHEELER PARKING ENTRY EXIT FOUNTAIN 4-WHEELERPARKINGLAWN 24 M WIDE ROAD 79.70 45.90 33.12 35.06 122.80 89.17 5M. DRIVEWAY 5M. DRIVEWAY 5M. DRIVEWAY 5M. DRIVEWAY 5M.DRIVEWAY 5M.DRIVEWAY
AUDITORIUM
TERM:II ROLLNO: LAWN 3M. DRIVEWAY UNDERGROUND WATERTANK SUMP TANK SEWAGE TREATMENT PLANT TRANSFORMERGENERATOR ROOM

WATERSUPPLYANDSEWAGELAYOUT(1:250)

DATESIGN

DR.D.Y.PATILCOLLEGEOFARCHITECTURE,AKURDI

NAME:ATHARVA.MEHTA.

SUBJECT:ABTS-2

CLASS:FOURTHYEARB'

ACADEMICYEAR:2020-21

EXIT EXIT 0.90W.C.0.901.20W.C. 0.901.20W.C. 0.901.20W.C.TCUD EXIT EXIT W.C.1.200.90 W.C.1.200.90 W.C.1.20 W.C.1.200.90 W.C.1.200.90D U C ROOMCONTROL WINGWINGWING WINGWING 2 WING 3 2.70 M.PASSAGEWIDE WALKTOSTAIRCASE STAGEABOVEWAY 4.4MX6.0 12000MMSTAGE7500 COUNTERTICKET ROOMCRY ROOMCRY LOBBYENTRANCE FOYERENTRANCE TOILETSGENTS TOILETSLADIES TOILETSGENTS TOILETSLADIES COUNTERFOOD GANGWAY GANGWAY R O E U M N E TOILET TOILET TOILET TOILET UP 4WHEELER PARKING 4WHEELER PARKING 2WHEELER PARKING ENTRY EXIT FOUNTAIN 4-WHEELERPARKINGLAWN 24 M WIDE ROAD 79.70 45.90 33.12 35.06 122.80 89.17 5M. DRIVEWAY 5M. DRIVEWAY 5M. DRIVEWAY 5M. DRIVEWAY 5M.DRIVEWAY 5M.DRIVEWAY
STAMP AUDITORIUM
TERM:II ROLLNO: LAWN 3M. DRIVEWAY UNDERGROUND WATERTANK SUMP TANK SEWAGE TREATMENT PLANT TRANSFORMERGENERATOR ROOM 8.00 MAIN SUPPLY LINES

SEATINGDETAILS

ManualFold-Down Min480mm,Max550mm(withorwithoutarms) Minof2seats,Maxof12seatsperfold-downset Fullyupholsteredchair REINFORCEMENT Ø18MM 0.9000.900

REINFORCEMENT Ø14MM HANDRAIL 40TOCENTRE STAGE 100MM HANDRAIL

THEMAXIMUMCOMFORTABLE

AMOUNTTHEHEADCANBE TURNEDFROMTHESEAT CENTERLINEIS30° 100MM STEPSINLONGITUDINAL GANGWAY TRANSVERSEGANGWAY RAKELINE R.C.C. RAKER BEAM MAIN TREAD900MMGANGWAYWIDTH1500MMTREAD900MMTREAD900MM

SIGHTLINESATTRANSVERSEGANGWAY

BALCONYDETAIL...(1:50)

6.3623

VERTICALSIGHTLINESFOR 70MMFILM

LIGHTS SPEAKERS

ACVENTDETAIL

SUSPENSIONROD SUPPORTINGBAR APERTUREFORLUMINAIRE GYPSUMBOARD

DESIGNAPPROACHESTOROWCURVATURE... LIGHTFIXTUREINCEILING

OBSERVATION EYEPOINT CURTAIN PROJECTOR OPTICAL CENTRE PROJECTION SUITE BORDER PANEL MAXIMUMTILT 16mm18 35mm15 SCREEN AND FRAME SPEAKER h CJUNCTION SIGHTLINESFROMREARTOTOPOFPICTURE 35 maximum EYELINE 1.43h VERTICALSIGHTLINES16MM&35MMFILM... PERLFIX DETAILSECTIONOFCEILING

ANGLECLEAT[50*50]

25MMMILDSTEELSTRAP HANGERAT200C/C

15*45MILDSTEELCHANNEL AT1200C/C

80*26PRESSEDSTEELCEALING SECTIONAT400C/C

CEILINGDETAILS

DATESIGN STAMP

DR.D.Y.PATILCOLLEGEOFARCHITECTURE,AKURDI

SUBJECT:ABTS-2

CLASS:FOURTHYEAR'B

ROLLNO:

ACADEMICYEAR:2020-21 TERM:II

CENTRELINEOFSEAT 30 A=0.826M. B=0.686M. E=0.267M. D=0.435M. C=0.622M. MAIN
1.ChairType: 2.SeatCenters: 3.ChairsPerBank: 4.Upholstery: DISTRIBUTION BAR Ø8MM MAIN EXIT 1.500
PROJECTIONAXIS ConstantRadius SCREEN 45MAX FixedRadius REINFORCEMENT Ø18MM
THEANGLEOFTHERAKELINEISCONSTANT... 4MAXIMUMTILT
SUSPENSIONROD SUPPORTINGBAR APERTUREFORLUMINAIRE GYPSUMBOARD ACVENT
AIRGAP FRAME
SLOTTEDBOLTFIXINGTO PROVIDELEVELLING ADJUSTMENT
6.3623 1.12
1 2LAYEROF400MMWIDE*12MM THICKPLASTEREDTO CEILINGSECTION CEILINGFINISH
LIGHTS SPEAKERSPOTLIGHT
PROJECTION CENTERLINE
AUDITORIUM
NAME:ATHARVA.MEHTA.

WALLDETAILS

HEADTRACK

20MMAIRGAP

MASONRYWALL460MMTHK

CAVITYMIN100MM

GLASSWOOLINSULATION

20MMGYPSUMBOARD

48MM'C'METALSTUDS

FLOORTRACK

ACOUSTICCAVITYWALL

MLVMASSLOADEDVINYL

RCCCOLUMN ALUMINIUMBOXSECTION (VERTICALWALLSTUD) (STAPLEDTOSOUNDDEADNINGBOARD)

GYPSUMWALLBOARD

ACOUSTICALFOAMMAT AIRVOID BRICKWALL

WOODERNBATTEN 40X80MM

20MMTHK FIBERBOARD

AIRGAP

ACOUSTICALWALL

WALL PLASTER

RCCLINTEL

ALUMINIUMGLASSRETAINERS WITHNEOPRENEGLAZINGGASKETS

GLASS

AIRVOID

ACOUSTICALWINDOW

DETAILSECTIONOFSIDEPANELS

COMMONTYPESOFABSORBENT

MATERIALS:

1.HAIRFELT

2.ACOUSTICPLASTER

3.ACOUSTICTILES

4.STRAWBOARD

5.PULPBOARD

6.COMPRESSEDFIBERBOARD

7.COMPRESSEDWOODENPARTICLEBOARD

8.PERFORATEDPLYWOOD

9.WOODWOOLBOARD

10.QUILTSANDMATS

DATESIGN STAMP

DR.D.Y.PATILCOLLEGEOFARCHITECTURE,AKURDI

NAME:ATHARVA.MEHTA.

SUBJECT:ABTS-2

CLASS:FOURTHYEAR'B

ACADEMICYEAR:2020-21 TERM:II ROLLNO:

AUDITORIUM
FOUNTAINDETAIL

LEGCOLUMN (111MMx176MM)

THICKNESS (2.5MM-4.5MM)

SCREWSFOR FIXING

CONCRETE

BASE

PCDURABLEPANEL 2.0MM

LEGCOLUMN (111MMx176MM) THICKNESS (2.5MM-4.5MM)

CROSSBEAM (53MMx58MM) THICKNESS1.5MM

EDGEBEAM (71MMx109MM) THICKNESS2.5MM

THICKNESSOFPC DURABLEPANEL 2.0MM

CONNECTORCOVER OFFRONTBEAM

BEAMCOVERFRONTBEAM (67MMx73MM)

THICKNESS2.0MM

STREETTREEAERATION-INSTALLED

AT4CORNERSOFTREE

SMOOTHRIVERBOTTOMSTONE

COMPACTEDGRAVELBASE

BIO-RETENTIONPLANTINGMIX

COMPACTEDORUNDISTURBED

SUBGRADE

CONCRETESAND

6'PERFORATEDPIPE

CRUSHEDSTONERESERVOIR

MAINBEAM (65MMx130MM)

THICKNESS1.0MM-2.5MM

PARKING DETAILS

GUTTER (71MMx105MM)

UPPERANDLOWER PANELSUPPORT

DRAINPIPE4.0MMDIA THICKNESS2.0MM

LEGCOLUMN (111MMx176MM) THICKNESS (2.5MM-4.5MM)

5000

BASE

DATESIGN STAMP

DR.D.Y.PATILCOLLEGEOFARCHITECTURE,AKURDI

NAME:ATHARVA.MEHTA.

SUBJECT:ABTS-2

CLASS:FOURTHYEAR'B

ROLLNO:

ACADEMICYEAR:2020-21 TERM:II

5000 7000 1926
3000 30 300 150 100
TOPRAIL SIDERAIL SIDERAIL MALEBARREL BRACKETBASE SURFACEMOUNTTAB FLATHEAD SCREW TOPRAIL FEMALE BARREL 60 500 150 900 150 900 60 300 480.23 575.48 136.02
AUDITORIUM
60 STAIRMOUNTING BRACKET SIDERAIL RAMP (1:10RATIO) DRAINAGE BEAM (300X300) 150 PAVERS ABFIELDSTONE UNIT COMPACTED GRANULARFILL 4000 3000 6000 RAMP DETAILS
STAIRCASE DETAILS

TwoWayRamp(Slope1:10)

TwoWayRamp(Slope1:10)

BASEMENTPARKING(DrainageLayout)

TwoWayRamp(Slope1:10)

DATESIGN STAMP

DR.D.Y.PATILCOLLEGEOFARCHITECTURE,AKURDI

NAME:ATHARVMEHTA

SUBJECT:ABTS-1

CLASS:FOURTHYEAR'B' ACADEMICYEAR:2020-21TERM:I ROLLNO:

SUMPHOUSE (6.866.15M) LIFTSHAFT (1.52.5M) LIFTSHAFT (1.52.5M) FIREDUCT (1.52.6M) FIREDUCT (1.52.6M) LIFTSHAFT (1.5X2.5M) LIFTSHAFT (1.52.5M) FIREDUCT (1.52.6M) FIREDUCT (1.5X2.6M) SERVICELIFT (1.8X2.1M) TOILET(5.23.8M) 3M)3M)3M) DUCT (1.08.0M) (1.08.0M) DUCT (1.08.0M)
SUMPHOUSE (6.86X6.15M) LIFTSHAFT (1.5X2.5M) LIFTSHAFT (1.52.5M) FIREDUCT (1.52.6M) FIREDUCT (1.5X2.6M) LIFTSHAFT (1.52.5M) LIFTSHAFT (1.52.5M) FIREDUCT (1.52.6M) FIREDUCT (1.52.6M) SERVICELIFT (1.82.1M) TOILET(5.23.8M) 3M)3M)3M)3M) DUCT (1.08.0M) DUCT (1.0X8.0M) (1.08.0M)
SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE SLOPE
RAMP FOR LOWER BASEMENTLVL Y Y' X X' Y Y' X X' UPPERBASEMENT(Scale1:200) LOWERBASEMENT(Scale1:200) CHANNELDETAIL Sal CHANNELDETAILatlanding Sal 150THKRCC SLABRAMP 600X300 RCCBEAM
GUTTER150X500
600X4800 DAMPPROOF MEMBRANE 150THKRCC SLABRAMP DAMPPROOF MEMBRANE STEELGRATING 600X4800 STORMWATERDRAIN GUTTER150X500 SUMPPITDETAIL Sal
STORMWATERDRAIN
STEELGRATING

TwoWayRamp(Slope1:10)

TwoWayRamp(Slope1:10)

TwoWayRamp(Slope1:10)

DATESIGN STAMP

DR.D.Y.PATILCOLLEGEOFARCHITECTURE,AKURDI

NAME:ATHARVMEHTA

SUBJECT:ABTS-1

CLASS:FOURTHYEAR'B' ACADEMICYEAR:2020-21TERM:I

SUMPHOUSE (6.866.15M) LIFTSHAFT (1.52.5M) LIFTSHAFT (1.5X2.5M) FIREDUCT (1.5X2.6M) FIREDUCT (1.52.6M) LIFTSHAFT (1.52.5M) LIFTSHAFT (1.52.5M) FIREDUCT (1.52.6M) FIREDUCT (1.52.6M) (1.82.1M) TOILET(5.23.8M) 3M)3M)3M) ROOM4 3M) DUCT (1.08.0M) DUCT (1.08.0M) DUCT (1.08.0M)
SUMPHOUSE (6.866.15M) LIFTSHAFT (1.52.5M) LIFTSHAFT (1.52.5M) FIREDUCT (1.52.6M) FIREDUCT (1.52.6M) LIFTSHAFT (1.52.5M) LIFTSHAFT (1.52.5M) FIREDUCT (1.52.6M) FIREDUCT (1.52.6M) SERVICELIFT (1.8X2.1M) TOILET(5.23.8M) 3M)3M)3M) DUCT (1.08.0M) (1.08.0M) DUCT (1.0X8.0M) Y Y' X X' Y Y' X X'
BASEMENTPARKING(VENTILATIONLayout)
ROLLNO: UPPERBASEMENT(Scale1:200) LOWERBASEMENT(Scale1:200) SPRINKLER BRANCHPIPE 5OMMDIA. 2.5MFROMFFL MAINLINE 1OOMMDIA. 2.5MFROMFFL. PipeWorkMaybeMetalorCPVC FillGapwithaFireRatedSealant ThisMaybe:Fyreflex Multiflex IntumexS GlamexOne Keeppenetrationholetominimum
IndependantlyFromGibFyrelineCeiling DONOTDamageGibFyrelineLinings FIRESPRINKLERDETAIL SCALE SECTIONATSLAB SCALEO FIRE BUCKETS FIRE EXTINGUISHERS HOSE REEL KEYPLAN 12MWIDEROAD Wayto Basement SITE EXIT 8M 9 M WIDE ROAD SITE ENTRY 8M 8M 100M 120M 79.65M 74M 88M 56M SPRINKLER RCCCOLUMN600X600MM 150THKRCCSLAB RCCBEAM300X450MM SECONDARYWATER PIPELINE(50MMDIA) MAINWATERPIPELINE (100MMDIA) SPRINKLER(3.0X3.0MGRID) STRUCTURALCOLUMN (8X8MGRID) LEGENDS:
SupportSprinklerPipeWork

TwoWayRamp(Slope1:10)

BASEMENTPARKING(Plan&Sections)

DATESIGN STAMP

DR.D.Y.PATILCOLLEGEOFARCHITECTURE,AKURDI

NAME:ATHARVMEHTA

SUBJECT:ABTS-1

CLASS:FOURTHYEAR'B' ACADEMICYEAR:2020-21TERM:I

UPPERBASEMENT(Scale1:200) LOWERBASEMENT(Scale1:200) SITEPLAN(Scale1:500) 12MWIDEROAD Wayto Basement SITE EXIT 8M 9 M WIDE ROAD SITE ENTRY 8M 8M 100M 120M 79.65M 74M 88M 56M -3.1M 6MWideDriveWay 6MWideDriveWay 6MWideDriveWay 6MWideDriveWay LobbyArea LobbyArea LobbyArea LobbyArea 0.9M RaisedLvl UpperBasement 9M ROAD SITESECTION(Scale1:500) TwoWayRamp(Slope1:10) 6MWIDEDRIVEWAY6MWIDEDRIVEWAY 6MWIDEDRIVEWAY 6MWIDEDRIVEWAY6MWIDEDRIVEWAY 6M WIDE TWO WAY DRIVE WAY 6M WIDE TWO WAY DRIVE WAY RAMP FOR LOWER BASEMENTLVL 6MWIDEDRIVEWAY SUMPHOUSE (6.866.15M) 8.00M 8.00M 8.00M 6MWIDEDRIVEWAY6MWIDEDRIVEWAY 1.50M LIFTSHAFT (1.52.5M) LIFTSHAFT (1.52.5M) B1 FIREDUCT (1.52.6M) FIREDUCT (1.52.6M) 1.50 LIFTSHAFT (1.52.5M) SHAFT (1.5X2.5M) DUCT (1.5X2.6M) (1.52.6M) B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B16 B17 B18 B19 B20 B21 B22 B23 B24 B25 B26 SERVICELIFT (1.82.1M) TOILET(5.23.8M) DUCT (1.0X8.0M) DUCT (1.08.0M) DUCT (1.08.0M)
ROLLNO:
6MWIDEDRIVEWAY6MWIDEDRIVEWAY 6MWIDEDRIVEWAY 6MWIDEDRIVEWAY6MWIDEDRIVEWAY 6M WIDE TWO WAY DRIVE WAY 6M WIDE TWO WAY DRIVE WAY ENTRY FOR UPPER LVLBASEMENT RAMP FOR LOWER LVLBASEMENT 7.50M 6MWIDEDRIVEWAY SUMPHOUSE (6.866.15M) 8.00M 8.00M 8.00M 6MWIDEDRIVEWAY6MWIDEDRIVEWAY 1.50 LIFTSHAFT (1.52.5M) LIFTSHAFT (1.52.5M) B1 FIREDUCT (1.52.6M) FIREDUCT (1.52.6M) 1.50M LIFTSHAFT (1.5X2.5M) LIFTSHAFT (1.52.5M) FIREDUCT (1.52.6M) FIREDUCT (1.52.6M) B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B16 B17 B18 B19 B20 B21 B22 B23 B24 B25 B26 SERVICELIFT (1.8X2.1M) TOILET(5.23.8M) 3M) DUCT (1.08.0M) DUCT (1.08.0M) DUCT (1.08.0M) 0.0M -3.1M -7.1M 6MWideDriveWay 6MWideDriveWay 6MWideDriveWay 6MWideDriveWay LobbyArea LobbyArea LobbyArea LobbyArea Gutter GUTTER SECTIONATXX'(Scale1:200) SECTIONATYY'(Scale1:200) 0.9M RaisedLvl LowerBasementLvl UpperBasementLvl GroundLvl Gutter TwoWayRamp(Slope1:10) Y Y' X X' X X' 6MWideDriveWay Y Y' 4MWide DriveWay 4MWide DriveWay ±0.0M -3.1M -7.1M +0.9MRaisedLvl LowerBasementLvl UpperBasementLvl GroundLvl 6MWideDriveWay RETAININGWALL (Scale1:10) UPPERBASEMENT Car=126 Bike=50 LOWERBASEMENT Car=126 Bike=71 TOTAL Car=252 Bike=121

WATERBAR

50X50TWOCOAT

TwoWayRamp(Slope1:10)

TwoWayRamp(Slope1:10)

UPPERBASEMENT(Scale1:200)

REINFORCEDCONCRETE BASEMENTWALL

MAINBARS

DISTRIBUTIONBARS

REINFORCEDCONCRETE

RETAININGWALL

TwoWayRamp(Slope1:10)

LOWERBASEMENT(Scale1:200)

150mmwidemildsteelstrip

150mmkicker

PVCorrubber Constructionjoint

Structuralslab

Waterbar throughjoint

Reinforcementcontinuous Blinding

PVCwaterbarlaidonbinding

TYPICALBASEMENTSLAB

BASEMENTPARKING(Light&VentilationLayout)

A.C.

FANS DUCTS(0.5M wide)

Masticseal 20mmwidejoint

Filler

DATESIGN STAMP

DR.D.Y.PATILCOLLEGEOFARCHITECTURE,AKURDI

NAME:ATHARVMEHTA

SUBJECT:ABTS-1

CLASS:FOURTHYEAR'B'

ROLLNO:

ACADEMICYEAR:2020-21TERM:I

BASEMENTSLAB
CEMENT:SAND(1:3)
30MMTHKHORIZONTAL ASPHALTAPPLIEDIN THREECOATSOVER CONCRETEBASE 100MMTHKMASS CONCRETEBASE
50MMTHK
PROTECTIVESCREED
ANGLEFILLET
SANDGROUT
TOENSUREGOOD INTERFACECONTACT 100MMTHK PROTECTIVE WALLING INCUM.
ASPHALTAPPLIEDIN THREECOATSOVER ROUGHCONCRETEBASE
30MMTHKCEMENT
PROVIDED
20MMTHKVERTICAL
(Scale1:20)
(Scale1:20) TYPICALWALLJOINTDETAIL (Scale1:20) CONSTRUCTIONJOINT (Scale1:20) EXPANSIONJOINT (Scale1:20)
SUMPHOUSE (6.86X6.15M) LIFTSHAFT (1.5X2.5M) LIFTSHAFT (1.52.5M) FIREDUCT (1.52.6M) FIREDUCT (1.52.6M) LIFTSHAFT (1.52.5M) LIFTSHAFT (1.52.5M) FIREDUCT (1.52.6M) FIREDUCT (1.52.6M) LIFT (1.82.1M) TOILET(5.2 (23M)3M) ROOM3 (23M) ROOM4 (23M) DUCT (1.08.0M) DUCT (1.0X8.0M) DUCT (1.08.0M)
SUMPHOUSE (6.86X6.15M) LIFTSHAFT (1.5X2.5M) LIFTSHAFT (1.52.5M) FIREDUCT (1.52.6M) FIREDUCT (1.52.6M) LIFTSHAFT (1.52.5M) LIFTSHAFT (1.52.5M) FIREDUCT (1.52.6M) FIREDUCT (1.52.6M) SERVICELIFT (1.82.1M) ROOM1 3M) ROOM2 3M)(23M)(23M) DUCT (1.08.0M) DUCT (1.0X8.0M) DUCT (1.08.0M) Y Y' X X' Y Y' X X'
LEGENDS: c c' RUBBERPAD RCCCOLUMN ADHESIVE 0.60 0.60 COLUMNDETAIL CALE 60WLED TUBELIGHT (8.0X2.5MGrid)