2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
ARCHITECTURAL
PORTFOLIO NUR ATIQAH AHMAD BSC. ARCH. UTM DIP. ARCH. UTM
EMPLOYMENT
CURRICULAR VITAE
NUR ATIQAH AHMAD
Assistant Architect
SR Architects, Damansara Prepare and develop architectural concept and drawings to meet client specifications under architect’s supervision. Responsibilities included preparation of CCM and TCM minutes meeting, acquiring BP Submission approval from local authorities, and liaise with clients and other consultants. Project experience comprised of;
2021 2020
PROFILE A Part Part 1 Architecture graduate that is A passionate and challenge-driven, with passionate and challenge-driven. experience in project management. Optimism and perseverance are my forte, as the long-term is to make an Perseverance is the aim strongest point, impact to in the country's aimbuilt which assist the long-term of environment. I am on never to take making an impact the afraid country’s built chances and to for opportunities to environment bylook creating functional improve myself in all aspects. architecture through a critical design PROFILE process. Never afraid to take chances and to look forPROFILE opportunities to improve A Part 1 Architecture graduate that is in all aspects. passionate and challenge-driven. OBJECTIVE A Part 1 Architecture graduateare thatmy is Optimism and perseverance passionate and challenge-driven. forte, as the long-term aim is to make an Interests: Optimism and perseverance are built my Seeking a position as an assistant impact to the country's forte, as thejunior long-term aimafraid is to make an architect, architect, or environment. I amdesign never to take Urban Sketching impact to the country's built other related position in a respectable chances and to look for opportunities to Digital environment. Imyself amIllustration never to take architecture firm with a afraid co-operative improve in all aspects. 2D & 3D Architectural Visulatization chances and to look for opportunities and conducive working environment.to improveVideography myself in all aspects. Indoor plants
OBJECTIVE CONTACT a OBJECTIVE position as an
Seeking assistant architect,nuratiqahnaa@gmail.com junior design architect, or Seeking a position assistant other related position as in aan respectable architect, junior design or architecture firm Jaya, with a architect, co-operative Petaling other related position in a respectable and conducive working environment. Selangor. architecture firm with a co-operative and conducive working environment. linkedin.com/in/atiqahnaa issuu.com/atiqahnaa CONTACT
CONTACT
nuratiqahnaa@gmail.com nuratiqahnaa@gmail.com Petaling Jaya, Selangor. Petaling Jaya, Selangor. linkedin.com/in/atiqahnaa issuu.com/atiqahnaa linkedin.com/in/atiqahnaa issuu.com/atiqahnaa
2020 2019
• Kinrara 7A4 and Bayuemas Parcel RP1 Terrace Housing for SP Setia • Kediaman SPNB Alor Setar Masterplan for SPNB • Politeknik Bagan Datuk admin building interior design • Semi-D Interior and Exterior Design Renovation in Tiana, Elmina. • Johor X-Fit Center for KPRJ
Assistant Project Manager Malaysian Resources Corporation Berhad (MRCB)
As part of the Graduate Development Protege program, I assisted the project manager in a mixed development project, Petaling Jaya Sentral. Responsibilities include coordinating with consultants and the main contractor to ensure smooth execution of the project, which also involves; • Preparation of SOI and VO • Site inspections, site meetings and CCM • Aiding the architect on the applications for authority approvals • Update the development’s monthly budget.
EDUCATION Universiti Teknologi Malaysia, Skudai
2019
Bachelor of Science in Architecture (CGPA 3.93)
2016
2011
Universiti Teknologi Malaysia, KL Diploma in Architecture (CGPA 3.09)
Tunku Kurshiah College, Seremban Sijil Pelajaran Malaysia (9A 1B+)
COMPETITIONS & INVOLVEMENTS Carousell UTM Ambassador 2018/2019 Secretary of Run With Belang 2.0 marathon program 2019, UTM High Committee Member of UTM Volunteer Society 2019 Silver Medalist for 3rd International Built Environment Undergrad Research Competition (BEURC) 2018 Rumah Ihsan Johor Volunteer 2017 National Eco Competition 2017 finalist High Committee Member of N30N 2017 Architecture Students Workshop Top 10 for Structure Design Challenge 2014 by UDA Holdings Volunteer Media Team for WORLD INNOVATION FORUM KL 2013 KL INTERNATIONAL BOOK FAIR (PBAKL) 2013 Ambassador
2016
2015
Research Assistant
Universiti Kebangsaan Malaysia, Bangi As a research assistant for Dr. Nor Haslina Ja’afar, responsibilities included assisting in writing a few journals and book publication relating to architecture for disabled people or Universal Design.
Assistant Architect Internship
AHA Architect, Wangsa Maju Involved in creating design proposals such as Parisian cafe in Putrajaya, PR1MA housing project in Kemaman, a new campus for UPNM, Kota Bharu’s sport’s center and additional building for University of Kelantan.
AWARDS Alumni UTM Award for UTM 63rd Convocation Ceremony 2019 First Class Honors Degree & Dean List for every semester Best Architecture Student for Semester 06 Session 2018/2019 Best Student Design 1st year Architecture Sem 01 Session 16/17
SKILLS
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
“
In the big picture, architecture is the art and science of making sure that our cities and buildings fit with the way we want to live our lives.
“
- Bjarke Ingels
CONTENT
06 - 27
02
Agri[culture] Food Port
28 - 37
03
Measured Drawing
38 - 43
04
Dato’ Onn Reading Hub
44 - 55
05
PAM Southern Chapter Office
56 - 63
06
Kelarai Residence
64 - 73
07
Retreat House
74 - 77
08
FreeLance 3D Modelling
78 - 83
09
Internship
84 - 87
10
Model-Making
88 - 93
11
Traditional & Digital Artworks
94 - 99
Assistant Architect at SR Architects. Assistant Project Manager at MRCB.
Urban Farming & Malaysia’s Food Hub Architecture.
Rumah Batu Haji Wahid, Beruas, Perak.
Kampung Dato’ Onn Community Centre.
Office Architecture for PAM Southern Chapter.
Temporary Residential Building for UTM International Students & BEURC 2018
Retreat House Project for Ar. Azman Zainal Md Noor.
Selected Works
Assistant Architect Internship Selected Works
Compilation of Selected Models from Bsc. in Arch & Dip. in Arch.
Compilation of Urban Sketches, Watercolour Painting & Digital Illustration
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
01
Working Experience
Working Experience September 2020 - November 2021
Assistant Architect at SR Architects. Prepare and develop architectural concept and drawings to meet client specifications under architect’s supervision. Responsibilities included preparation of CCM and TCM minutes meeting, acquiring BP Submission approval from local authorities, and liaise with clients and other consultants.
06
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
Kinrara 7A4, Bandar Kinrara, Puchong For SP Setia Kinrara 7A4 consists 136 units of terraced housing which will be built in four phases; 7A4A, 7A4B, 7A4C, and 7A4D. Due to the challenge of previous approved DO with a number of unique lot sizes, there are a total of 26 units design for the development. Fully involved in designing all unit layouts and facade.
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
TYPE A1
TYPE A4
TYPE G2
TYPE H2
TYPE H1
TYPE C1
FLOOR PLAN
FLOOR PLAN
FLOOR PLAN
FLOOR PLAN
FLOOR PLAN
FLOOR PLAN
10
Kediaman SPNB Alor Setar 2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
For Syarikat Perumahan Negara Berhad Affordable housing consisting of 88 units of 2 storey Terrace Housing in Alor Setar. Part of involvement is assisting the Design Director in designing the masterplan and typical unit.
GROUND FLOOR PLAN NOT TO SCALE
FIRST FLOOR PLAN NOT TO SCALE
Interior Design of Politeknik Bagan Datuk, Perak For Kementerian Pendidikan Tinggi, Politeknik Malaysia and Jabatan Kerja Raya Interior Design Proposal which incorporates Maritime concept to compliment the marine engineering courses held in the institution. Under the supervision of the Design Director, 3D model, perspectives and built-in furniture details for tender drawings were generated.
12
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
Interior Design of Semi-D Tiana, Elmina Interior Design Proposal which incorporates minimal contemporary concept as requested by the client. 3D model, perspectives, and built-in furniture details were generated, Amended Building Plan Submission was drawn and submitted to MBSA. U
NO FAIL MBSA :
QIBLAT 290°30'00"
connected to existing external sewer line
UE
JALAN FREK
JALAN FREKUENSI U16/135A
NO.8, JALAN FREKUENSI U16 /137, FASA G6, ELMINA EAST, SEKSYEN U16, 40160 SHAH ALAM, SELANGOR DARUL EHSAN.
JALAN FREKUENSI U16/135
5
AM
13
G6-07 A
3
A
15
AM
G6-08
1
12
10
8
A
10
6
G6-22
G6-21 A
8
AM
G6-29
G6-28
AM A
A
1
G6-57
AM
3
AM
23
G6-58
A
5
G6-59
A
21
28.766m
12
G6-56
12
G6-30
AM
4
A
G6-23 A
14
G6-31
AM
2
G6-24 AM
A
16
10'' 88° 07' NO.8 G6-21
6000
AM
7
AM
19
G6-65
G6-64
G6-63
G6-32
A
24
AM
22
G6-70 AM
G6-69
A
4
2
G6-75
A
17
7726
A
9
11
G6-62
G6-61
G6-60
AM
15
NO.10 G6-20
13
G6-78
G6-67
G6-66
A
20
AM
18
A
8
6
A
16
All discharged pipes are connected to existing manhole
AM
10
12
G6-80
G6-79
G6-78
14
G6-74
G6-73
G6-72 AM
G6-71
G6-77
G6-76
JALAN FREKUENSI U16/135C
34
SETBACK
EX. GT
LINE
NO.6 G6-22
EX. GT
EX. 2 MANHOLE
EX. 4 MANHOLE
EX. GT
1500 9000
UENSI U16/1
JALAN FREK
11
G6-50 AM
10
G6-55
G6-54
JALAN FREKUENSI U16/136 AM
G6-20 AM
6
G6-27
A
8
6
G6-53
G6-52
37
A
G6-19 A
G6-44
A
9
G6-49
JALAN FREKUENSI U16/136
G6-16
G6-15
G6-14
AM
7
G6-48 AM
6
G6-25
11
G6-06 AM
A
4
2
G6-51
UENSI U16/1
AM
G6-43
G6-42
A
5
G6-47
EX. 3 MANHOLE
4
G6-26
7 G6-13
A
AM
3
G6-46 AM
30'' 355° 29'
0
14
G6-18 AM
2
A
9
G6-05
A
9
G6-12
A
1
G6-45
16.818m
ENSI U16/11 JALAN FREKU
A
16
12
EX. GT
AM
7
G6-04 AM
11
G6-11
11
G6-38 AM
10
10'' 358° 07'
A
5
G6-03 A
JALAN FREK
G6-17 A
13
G6-10
G6-09
AM
AM
3
G6-02 AM
15
A
9
G6-37 A
8
G6-41
G6-40
AM
7
G6-36 AM
16.800m
A
1
G6-01
6
JALAN FREKUENSI U16/135B
I U16/133
A
A
5
G6-35
A
4
G6-39
AM
UENS JALAN FREK
AM
AM
3
G6-34 AM
2
LINE
TAPAK CADANGAN
NO.8, JALAN FREKUENSI U16 /137, FASA G6, ELMINA EAST, SEKSYEN U16, 40160 SHAH ALAM, SELANGOR DARUL EHSAN.
A
1
G6-33 A
BOUNDARY
AM
TAPAK CADANGAN
KEGUNAAN MBSA :
All discharged pipes are connected to existing manhole
7 NSI U16/13
5714
EX. 1 MANHOLE
1500
A
EX. 5 MANHOLE
1 EX. GT
NO.12 G6-30
2435
A
U
1500
AM
QIBLAT 290°30'00"
LOCATION PLAN
KEY PLAN
SCALE: N.T.S
UNIT TYPE
1
UNIT NO
G6-01
LOT NO
NOTA : SEMUA KERJA PINDAAN DALAM WARNA BIRU
NO.10 G6-29
NO.8 G6-28
SEMUA KERJA BARU DALAM WARNA MERAH
TAJUK PROJEK :
CADANGAN MEMBINA TAMBAHAN DAN PINDAAN RUMAH BERKEMBAR, DUA TINGKAT SEDIA ADA DI ATAS NO.8, JALAN FREKUENSI U16 /137, FASA G6, ELMINA EAST, SEKSYEN U16, 40160 SHAH ALAM, SELANGOR DARUL EHSAN.
450
SCALE: N.T.S
10'' 88° 07'
19400
I
QIBLAT 290°30'00"
27.995m
B
4368
U
ROOF FLR LVL
LUAS LANTAI (SQ.FT)
JENIS TINGKAP
PERATUSAN LUAS TINGKAP PENGUDARAAN & (SQ.FT) PENCAHAYAAN (MIN 10%)
CATATAN NEW 40 UPVC BOTTLE TRAP
GROUND FLOOR PLAN NEW PATIO
159.74
-
OPEN AREA
-
NATURAL VENTILATION
NEW LAUNDRY
116.03
-
OPEN AREA
-
NATURAL VENTILATION
1ST FLR LVL NEW LAUNDRY GRD FLR LVL
FT
NEW PATIO
NEW BASIN FT
EX. MANHOLE 1
SCHEDULE OF VENTILATION & LIGHTING
JALA
B
C
SCALE: 1:200
D
E
F
G
H
J
I
3741
1862
1597
2590
1920
2890
5865
4800
New 150mm thk. rc.floor slab with ceramic tiles
5210 NO.10 G6-29
3741
E
F
G
H
J
I
1862
1597
2590
1920
2890
EX. DISPLAY
170 dp
1382
1689 EX. STAIRCASE
1500 B
553
EX. GUEST ROOM
5
EX. POWDER ROOM
EX. MANHOLE 5
EX. ENTRANCE
New 150mm thk rc floor slab with timber decking
3
1500
4
EX. BEDROOM 2
3185
A
NEW METAL DECK ROOF
EX. BATH 2
New 100mm x 170mm rc column to engrs detail
EX. STORE
EX MASTER BATH
EX FLAT ROOF
NEW GLASS ROOF FALL 1°
LEMBAGA ARKITEK MALAYSIA
C
EX. BEDROOM 3
EX. MASTER BEDROOM
SR ARCHITECTS SDN BHD
EMEL TEL
2596
2596
SETBACK LINE
NO.6 G6-22
EX. GT
EX. GARDEN
2564
NO.8 G6-21
GROUND FLOOR PLAN SCALE: 1:100
290°30'00" QIBLAT
U
2323
2323
SKALA : AS SHOWN
DILUKIS : AECAH
8 NO.10 G6-20
9
BOUNDARY LINE
2323
2620
EX. GT
KEY PLAN, LOCATION PLAN, SITE PLAN GROUND FLOOR PLAN FIRST FLOOR PLAN SCHEDULE OF VENTILATION AND LIGHTING DIAGRAMMATIC SANITARY LAYOUT
BOUNDARY LINE
9
EX. CAR PORCH
: lab@skalareka.com : 03 7496 7654
EX. FLAT ROOF
2564
8
6000
2620
EX. MANHOLE 3
2323
SETBACK LINE
EX. MANHOLE 4
7 EX. GT
ARKITEK
No Pendaftaran LAM : A/M 163
TAJUK LUKISAN :
EX. GT
7
........................................................................ Ar. Mohd Azli Bin Mohamad Jamil
H-2-9, BLOCK H, JALAN PJU 1A/20E, DATARAN ARA DAMANSARA, 47301 PETALING JAYA, SELANGOR
EX. BATH 3
6
EX. TERRACE
TANDATANGAN PEMOHON :
A
EX. BATH 1
EX. FAMILY AREA
No. 8, Jalan Frekuensi U16/137 Fasa G6, Elmina East, Seksyen U16, 40160 Shah Alam, Selangor
EX WARDROBE
B
EX. BEDROOM 1
............................................... Dolina Binti Hussein NRIC.NO.: 790814-01-6458 NO.TEL.: 012-212 1367
"Saya memperakui bahawa perinci-perinci dalam pelan-pelan ini adalah menurut kehendak-kehendak Undang-Undang Kecil Bangunan Seragam Selangor 1986 dan saya setuju terima tanggungjawab penuh dengan sewajarnya."
1268
2165
6
EX AIRWELL
EX. HALLWAY
5
EX. COUTRYARD GARDEN
EX. GT
EX. MANHOLE 2
New 890mm high 100mm thk brickwall to be plastered & painted on bothsides
C
EX. DINING AREA
EX. LIVING AREA
3900
2
EX. GT
EX. HALLWAY
2130
1500
1
A
NEW PATIO
TIMBER DECKING 159.74 SF
170 dp
New glass roof to manuf's detail
BOUNDARY LINE
4995
EX. DRY KITCHEN
EX WET KITCHEN EX LAUNDRY
896
1382
EX. MANHOLE 1
9000
EX. YARD
............................................... Mohamed Akkbar Bin Danial NRIC.NO.: 730904-03-5551 NO.TEL.: 012-234 1437
5865
4800
C
9000
4567
TILES 79.65 SF
1800
EX. MAID'S ROOM EX. MAID'S BATH
B
2530
EX. W/ROBE
50 dp
1350
3100
New 4800mm (W) X 900mm (H) rc counter top to archi detail
4368
3185
EX. GUEST BATH
A
NEW LAUNDRY
2530
D
19400
1350
C
1292
4
C
553
B
1
3
B
New metal roofing c/w insulation to engrs detail
New 1800mm height wall tiles to manufs detail & archi app.
2
A
New 150mm thk brickwall to be plastered & painted on bothsides.
19400 3100
"Saya / kami berjanji akan mematuhi semua peraturan dan syarat-syarat yang telah ditetapkan serta akan mematuhi pelan yang telah diluluskan Majlis. Pihak Majlis berhak mengambil tindakan undang-undang ke atas saya mengikut Akta yang diperuntukkan."
SITE PLAN
SCALE: N.T.S
A
TANDATANGAN PEMILIK :
DISCHARGE TO EXISTING MAIN SEWER
DIAGRAMMATIC SANITARY LAYOUT New 150mm thk brickwall to be plastered & painted on bothsides.
UNTUK TETUAN: MOHAMED AKKBAR BIN DANIAL DOLINA BINTI HUSSEIN
16/134
ENSI U N FREKU
EX. MANHOLE 5
4470
LOKASI
BOUNDARY LINE
JALAN FREKUENSI U16/137
FIRST FLOOR PLAN SCALE: 1:100
290°30'00" QIBLAT
U
DISEMAK : SHASHA
TARIKH : OKT 2021 NO LUKISAN :
SRA.AR.2021.31.RJ.01
Isometric 3D Model of master bath skyligh 2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
Working Experience July 2019 - July 2020
Graduate Development Program Protege at MRCB. To ensure the execution of the projects are in order, job scope as an Assistant Project Manager for Petaling Jaya Sentral included preparation of SOI by checking drawings and costing, participating in site inspections, CCM and site meetings, plus aiding the architect in the applications for authority approvals. The works displayed are drawings of MYIPO Tower/ Tower 6 where I assisted in crosschecking with other consultants’ drawings and making sure all the requirement by MBPJ was properly shown.
16
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
EXTERIOR VIEW 2019
18
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
1a' Rr'
2a'
4a'
3a'
P
5a'
D1 -
P 2 OM 30.550 .500 L: N RO FF L: 30 FA SS EA 35 1LG F CR
EP
.550 30 .500 L: FF L: 30 SS
Hc
1274
BUSINESS MANAGEMENT OFFICE LG1-30 FFL: 30.550 HOMO.T SSL: 30.500
5780
D1 -
5150
9200
WR/ HR LG1-31 FFL: 30.450 SSL: CR W
50 OM .5 00 .5 RO L: 30 FF L: 30 SS
Hb
0 1000
ER MET 79 1LG F CR
DP
I
8817
0
D3 -
LSD
W 3
FEMALE TOILET LG1-29 FFL: 30.450 HOMO.T SSL: 30.400 LSD
2575
W 5
ME 2
1920
WATER PUMP ROOM 2 LG1-87 FFL: 30.450 SSL: 30.400 CR W
2260
11a'
W 3
0
1000
MALE TOILET LG1-28 FFL: 30.450 HOMO.T SSL: 30.400
2539 10 9
WR/ HR LG1-26 FFL: 30.450 SSL: CR W
FRS 5
PLINTH: 150mm(H)
GREASE TANK ROOM LG1-88 FFL: 30.450 SSL: 30.400 CR W
FALL
11
9
15
5
1
19 20
UP
1FD 6
DN
A
MOTOCYCLE PARKING RC SPRINKLER TANK 2 LG1-40 FFL: 30.450 SSL: 30.400 CR W
RC SPRINKLER TANK 1 LG1-41 FFL: 30.450 SSL: 30.400 CR W
REFUSE CENTER
S
945
SSL: 30.5
1FD 1
1FD 2 LG1-64 CR F LG1-77 CR F
4563
DRIVER ROOM LG1-58 FFL: 30.550 HOMO.T SSL: 30.500
RC SUCTION TANK 2 LG1-54 FFL: 30.450 SSL: 30.400 CR W
4750
D1 -
D1 -
899
F
1FD 2
20000
A L
SDF ROOM 1 FFL: 30.550 LG-85 SSL: 30.500 VT F
SDF ROOM 2 FFL: 30.550 LG-84 SSL: 30.500 VT F
2FD 2
2FD 2
MDF ROOM 1 LG1-13 FFL: 30.550 SSL: 30.500 VT F
B
2FD 2
2FD 2
MDF ROOM 2 LG1-12 FFL: 30.550 SSL: 30.500 VT F
12 11
CARPARK LIFT LOBBY LG1-08 FFL: 30.550 HOMO.T SSL: 30.500
HYBRID ONLY
S
13
9
A L
2FD 2
15
7
17
5
HYBRID ONLY
21
1
23 24
UP
1FD 6
DN
HYBRID ONLY
HYBRID ONLY
HYBRID ONLY
C
L:30
1FD 5
e5
0M
M
DIA
PIP
E
sta
M
irc as
DIA TW PIP :34. E 20
0M
1
FF SL: L:32 32 .50 .45
WR/HR RC TANK 2 T2-LG1-41 FFL: 30.45 SSL: 30.4 CR W
00
00
:34.
20
7T 16
1300
4
M
PIP TW E :34. 55
19200 1
WR/ HR LG1-70 FFL: 30.450 SSL: CR W
TANDEM PARKING
A
S T2 TA CR -LG IRC NT 1-34 AS E
TW
:34.
55
1FD 2
TANDEM PARKING
HOSE REEL LG1-82 FFL: 23.900 SSL: -
:34.
600 1FD 6
55
TW
TANDEM PARKING TANDEM PARKING
15
:34.
36
55
221
250
LEVEL +30.500M
5897
227
5587
DP
1484
FRS 7
WR/ HR LG1-74 FFL: 30.450 SSL: CR W
LG1-09 LG1-10 LG1-11 LG1-12 LG1-13 LG1-14 LG1-15 LG1-16 LG1-17 LG1-18 LG1-19 LG1-20 LG1-21 LG1-22 LG1-23 LG1-24 LG1-25 LG1-26 LG1-27 LG1-28 LG1-29 LG1-30 LG1-31 LG1-32 LG1-33 LG1-34 LG1-35 LG1-36 LG1-37 LG1-38 LG1-39 LG1-40 LG1-41 LG1-42 LG1-44 LG1-45 LG1-46 LG1-47 LG1-48 LG1-49 LG1-50 LG1-51 LG1-52 LG1-53 LG1-54 LG1-55 LG1-56 LG1-57 LG1-58 LG1-59 LG1-60 LG1-61 LG1-62 LG1-63 LG1-64 LG1-65 LG1-66 LG1-67 LG1-68 LG1-69 LG1-70 LG1-71 LG1-72 LG1-73 LG1-74 LG1-75 LG1-76 LG1-77 LG1-78 LG1-79 LG1-80 LG1-81 LG1-82 LG1-83 LG1-84 LG1-85 LG1-86 LG1-87 LG1-88
ISMS ROOM TOWER STORE ROOM CORRIDOR 2 MDF ROOM 2 MDF ROOM 1 WR/ HR MDF ROOM 3 CORRIDOR 3 MSB ROOM GENSET 2 GENSET 1 BASEMENT 11KV & TX ROOM BASEMENT MSB ROOM TOWER 11 KV & TX ROOM DATA CENTER GENSET ROOM WR/ HR STAIRCASE 8 WR/ HR STAIRCASE 6 MALE TOILET FEMALE TOILET MANAGEMENT OFFICE WR/ HR POLIS BANTUAN OFFICE POLIS BANTUAN TOILET EA FAN ROOM 1 EA FAN ROOM 2 SSU TOWER 6 REFUSE CENTER SPRINKLER & HOSE REEL PUMP ROOM 1 RC HOSE REEK TANK RC SPRINKLER TANK 2 RC SPRINKLER TANK 1 DCS METER ROOM SECURITY & REGISTRATION CORRIDOR 1 MAIL ROOM HEAT EXCHANGER ROOM RC WET RISER TANK 1 RC WET RISER TANK 2 SPRINKLER & WET RISER PUMP ROOM 2 RC SPRINKLER TANK 1 RC SPRINKLER TANK 2 COLD WATER PUMP ROOM RC SUCTION TANK 2 RC SUCTION TANK 1 MALE TOILET FEMALE TOILET DRIVER ROOM CHW COLD WATER BMS/ SECURITY ELETRICAL ROOM COM ELV FA FAN ROOM 1 FA FAN ROOM 2 FA FAN ROOM 3 FA FAN ROOM 4 STAIRCASE 10 WR/ HR ELEC 2 EA FAN ROOM 3 EA FAN ROOM 4 WR/ HR WATER PUMP ROOM STAIRCASE 9 TEL & ICT BATERI METER ROOM HOSE REEL HOSE REEL HOSE REEL HOSE REEL SDF ROOM 2 SDF ROOM 1 MANAGEMENT OFFICE GREASE TANK ROOM WATER PUMP ROOM 2
SECURITY CARPARK LIFT LOBBY
10000
RAMP DOWN TO B1
10000
3880
M
4980
6120
WALL SKP SKP SKP SKP SKP SKP SKP HOMO.T
CEILING_FINN MSC PCS SKP SKP SKP MSC SKP PBC
FFL 30.550 30.550 30.550 30.500 30.550 30.550 30.550 30.550
SSL 30.500 30.500 30.500 30.400 30.500 30.500 30.500 30.500
HOMO .T CR F CR F VT F VT F
SKP SKP SKP SKP SKP
SKP PCS PBC PCS PCS
30.550 30.550 30.500 30.550 30.550
30.500 30.500 30.450 30.500 30.500
VT F CR F CR F CR F CR F CR F CR F CR F CR F CR W CR NT CR W CR NT HOMO.T HOMO.T HOMO.T CR W HOMO.T HOMO.T CR F CR F CR F HOMO.T CR W CR W CR W CR W CR F HOMO.T CR F HOMO.T CR F CR W CR W CR W CR W CR W CR W CR W CR W HOMO .T HOMO .T HOMO.T CR W CR W CR F CR F CR F CR F CR F CR F CR F CR F CR NT CR W CR F CR F CR F CR W CR W STEEL CR F CR F CR F VT F VT F CR F CR W CR W
SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP HOMO.T HOMO.T SKP SKP SKP HOMO.T SKP SKP SKP HOMO.T SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP HOMO.T HOMO.T SKP PP PP PP PP PP PP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP PP SKP SKP SKP SKP SKP SKP SKP
PCS PBC PCS PCS PCS PCS PCS PCS PCS SKP SKP PCS PCS MRBPC MRBPC MSC SKP MSC MRPBC PCS PCS PCS SCF PCS PCS PCS PCS SKP PBC PBC SKP PCS PCS PCS PCS PCS PCS PCS PCS PCS SKP SKP SKP PCS PCS PCS PCS PCS PCS SKP SKP PCS PCS SKP PCS PCS PCS PCS SKP SKP
30.550 30.500 30.550 30.550 30.550 30.550 30.550 30.550 30.550 30.450 30.550 30.450 30.550 30.450 30.450 30.550 30.450 30.550 30.550 30.550 30.550 30.550 30.550 30.450 30.450 30.450 30.450 30.450 30.550 30.500 30.550 30.450 30.450 30.450 30.450 30.450 30.450 30.450 30.450 30.450 30.450 30.450 30.550
30.500 30.450 30.500 30.500 30.500 30.500 30.500 30.500 30.500 30.400 30.500
PCS PCS PCS PCS PCS MSC MRPBC MRPBC
NO. FAIL:
NOTA: TAJUK PROJEK:
THE EXECUTION AND COMPLETION OF SUB-STRUCTURE WORKS FOR THE PROPOSED MIXED DEVELOPMENT OF PHASE 1A, PHASE 1C & PHASE 1F CONSISTING OF 1 BLOCK 27 STOREY OFFICE TOWER (TOWER 3), 1 BLOCK 42 STOREY OFFICE TOWER (TOWER 5), 1 BLOCK 25 STOREY OFFICE TOWER (TOWER 6), 1 BLOCK OFFICE TOWER (TOWER 2), 1 BLOCK OFFICE TOWER (TOWER 1), 1 STOREY SERVICE LEVEL, 4 STOREY OF BASEMENT CAR PARK AND CENTRAL UTILITY BUILDING (CUB) ON LOT 12, PERSIARAN BARAT, SECTION 52, BANDAR PETALING JAYA, PETALING DISTRICT, SELANGOR DARUL EHSAN FOR MESSRS P.J SENTRAL DEVELOPMENT SDN BHD
30.500 30.400 30.400 30.500 30.500 30.500 30.500 30.500 30.500 30.500 30.400 30.400 30.400 30.400 30.400 30.500 30.450 30.500 30.400 30.400 30.400 30.400 30.400 30.400 30.400 30.400 30.400 30.400 30.400 30.500
38.05
38.15 30.550 30.550 30.550 30.550 30.550 30.450 30.550 30.550 30.550 30.450 30.450 30.500 30.550 30.550 23.900 23.900 23.900 23.900 30.550 30.550 30.550 30.450 30.450
30.500 30.500 30.500 30.500 30.500 30.500 30.500 30.500 30.400
30.500 30.500 30.500 30.500 30.500 30.400 30.400
AREA SERVICE LIFT LOBBY STAIRCASE 1 COLD WATER CCTV HV SMATV HR / WR LPF SHAFT MAIL ROOM SERVICE CORRIDOR 1 METER ROOM ELECT RISER STAIRCASE 2 HR / WR STAIR.PRESS 2 HR / WR SERVICE CORRIDOR 2 DRIVER ROOM STAIR.PRESS 1 FA FAN ROOM 1 FA SHAFT 1 FA FAN ROOM 2 TOILET FUEL TANK ROOM GENSET ROOM GREASE INTERCEPTOR ROOM PUMP ROOM 1 RC SUCTION TANK 1 RC SUCTION TANK 2 PUMP ROOM 2 RC SUCTION TANK 3 RC SUCTION TANK 4 STAIRCASE 4 FA SHAFT 2 STAIR.PRESS 4 FAN ROOM 3 RC SPRINKLER 2 RC SPRINKLER 1 WR/SPR PUMP ROOM WR/HR RC TANK 2 WR/HR RC TANK 1 HEAT EXCHANGER ROOM WR/HR PUMP ROOM METERING ROOM 1 MAINTENANCE OFFICE / WORKSHOP MDF SDF ROOM 3 SDF ROOM 2 SDF ROOM 1 LV ROOM FIRE LOBBY PRESS TRANSFORMER ROOM CLEAN AGENT & CO2 CYLINDER ROOM SSU ROOM SWITCHGEAR ROOM BATTERY ROOM METER ROOM SECURITY HR / WR REFUSE CENTER
AREA WATER PUMP ROOM
FINN WALL CEILING_FINN FFL 30.55 HOMO.T SKP PBC 30.55 CR NT SKP SKP 30.50 CR W SKP PCS 30.55 CR F SKP PCS 30.55 CR F SKP PCS CR W SKP PCS 30.55 CR W SKP PCS 30.55 CR W SKP PCS 30.50 CR W SKP PCS 30.55 CR NT SKP SKP 30.55 CR F SKP PCS 30.55 SKP PCS CR F 30.55 CR F SKP PCS 30.55 CR NT SKP SKP 30.50 CR W SKP PCS CR W SKP CR W SKP PCS 30.50 CR F SKP PCS 30.55 CR F SKP PBC 30.55 CR W SKP 30.55 CR F SKP PCS CR W SKP 30.55 CR F SKP PCS 30.45 CR W SKP PCS 30.45 CR W SKP PCS 30.55 CR F SKP PCS CR W SKP PCS 30.45 CR W SKP PCS 30.45 CR W SKP PCS 30.45 30.45 CR W SKP PCS 30.45 CR W SKP PCS 30.45 CR W SKP PCS 30.45 CR W SKP PCS 30.55 CR NT SKP SKP CR W SKP CR W SKP CR F SKP PCS 30.55 CR W SKP PCS 30.45 CR W SKP PCS 30.45 CR F SKP PCS 30.45 30.45 CR W SKP PCS 30.45 CR W SKP PCS 30.55 CR F SKP PCS 30.45 CR W SKP PCS 30.45 CR W SKP PCS 30.55 CR F SKP PCS 30.55 CR F SKP PCS VT F SKP PCS 30.55 VT F SKP PCS 30.55 VT F SKP PCS 30.55 30.55 CR F SKP PCS CR W SKP 30.55 CR F SKP PCS 30.55 CR F SKP PCS 30.55 CR F SKP PCS 30.55 CR F SKP PCS 30.55 CR F PCS SKP CR F SKP PCS 30.55 CR F SKP PCS 30.55 CR W SKP PCS 30.50 SCF 30.55 HOMO.T HOMO.T
FINISHES CR W
FFL 34.500
SSL 30.5 30.5 30.45 30.5 30.5 30.5 30.5 30.45 30.50 30.50 30.5 30.5 30.5 30.45 30.45 30.50 30.5 30.5 30.5 30.4 30.4 30.5 30.4 30.4 30.4 30.4 30.4 30.4 30.4 30.5 30.5 30.4 30.4 30.4 30.4 30.4 30.5 30.4 30.4 30.5 30.5 30.5 30.5 30.5 30.5 30.5 30.5 30.5 30.5 30.5 30.5 30.5 30.45 30.5
DATE MAY 2019
REMARKS
REVISION R-6
MAY 2019
R-6
JUNE 2019
revised Staircase door and wet riser
A
add light weight brick
B
update door tag
R-6
C
JULY 2019
R-6
D
revised door
JULY 2019
R-6
E
revised void opening
AUG 2019
R-6
F
revised ssu ramp
SEPT 2019
R-6
G
OMIT MECHANICAL PARKING REPLACE WITH TENDEM PARKING
PEMILIK :
................................................................................................................... Nama : No. IC:
P.J SENTRAL DEVELOPMENT SDN. BHD. Level 30, Menara Allianz Sentral, No.203, Jalan Tun Sambathan Kuala Lumpur Sentral, 50470 Kuala Lumpur. No. Tel : 03-2786 8080 No. Faks : 03-2780 7988
(910966 U)
ARCHISPHERE SDN BHD 3-3, 3 rd FLOOR , PLAZA KLH BUSINESS CENTRE BANDAR PUCHONG JAYA, 47100 SELANGOR, MALAYSIA T E L : 0 3- 8 0 7 6 6 6 6 6 F A X : 0 3- 8 0 7 6 7 3 2 9 E M A I L : archispheresdnbhd@gmail.com
TANDATANGAN ARKITEK :
"SAYA MEMPERAKUI BAHAWA PERINCI-PERINCI DALAM PELAN-PELAN INI ADALAH MENURUT KEHENDAK-KEHENDAK UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWAJARNYA".
LEMBAGA ARKITEK MALAYSIA
..............................................................................
AR. FAM BOON HENG ARKITEK PROFESIONAL LAM AM/NO.A/F 31
COP KELULUSAN MAJLIS PERBANDARAN PETALING JAYA
SFL 34.450
LEGEND
-F'
EA SHAFT 2
1FD 5
1996
FINN CR F CR F CR F CR W CR NT CR F CR F HOMO.T
TOWER 2 R.NO T2-LG1-01 T2-LG1-02 T2-LG1-03 T2-LG1-04 T2-LG1-05 T2-LG1-06 T2-LG1-07 T2-LG1-08 T2-LG1-09 T2-LG1-10 T2-LG1-11 T2-LG1-12 T2-LG1-13 T2-LG1-14 T2-LG1-15 T2-LG1-16 T2-LG1-17 T2-LG1-18 T2-LG1-19 T2-LG1-20 T2-LG1-21 T2-LG1-22 T2-LG1-23 T2-LG1-24 T2-LG1-25 T2-LG1-26 T2-LG1-27 T2-LG1-28 T2-LG1-29 T2-LG1-30 T2-LG1-31 T2-LG1-32 T2-LG1-33 T2-LG1-34 T2-LG1-35 T2-LG1-36 T2-LG1-37 T2-LG1-38 T2-LG1-39 T2-LG1-40 T2-LG1-41 T2-LG1-42 T2-LG1-43 T2-LG1-44 T2-LG1-45 T2-LG1-46 T2-LG1-47 T2-LG1-48 T2-LG1-49 T2-LG1-50 T2-LG1-51 T2-LG1-52 T2-LG1-53 T2-LG1-54 T2-LG1-55 T2-LG1-56 T2-LG1-57 T2-LG1-58 T2-LG1-59 T2-LG1-60 T2-LG1-61
1 2 3
7123
34.74
Z
FRS 7
EA FAN ROOM 3 LG1-72 FFL: 30.550 SSL: 30.500 CR F
8665
4103
RAMP UP FROM B1
1FD 2
Scale : 1 : 200
10000
WATER PUMP ROOM LG1-75 FFL: 30.450 SSL: 30.400 CR W
N
LOWER GROUND 1 FLOOR PLAN
AREA SERVICE LIFT LOBBY STORE ELEC 1 WR/ HR STAIRCASE 1 MAINTENANCE ROOM
TOWER 6 - LOWER GROUND
2391
34.73
TOWER 6 R.NO LG1-01 LG1-02 LG1-03 LG1-04 LG1-05 LG1-06 LG1-07 LG1-08
ROOM NO LG- 4
DRIVEWAY
L PJ SENTRAL TOWER 2 & TOWER 6
8787
0
TO DO WE ME ME R 6 TE ST R IC BU
-E'
5
TW
Y
TANDEM PARKING
SSL: 30.4
FFL:30.500
FF 4 SS L: L: 30 30 .5 .5
15 40
IA
C 1FD 5
RC SPRINKLER 2
CR W
1FD 5
RL:34.38
Q
-D'
TANDEM PARKING
1FD 5
SCALE: 1 : 200
10000
TANDEM PARKING
DN
LK
T2- STAIRCASE 4
2400
TANDEM PARKING
2FD 2
21 23 24
UP
1FD 6
25
X
0 FF L:3 4.4
15 PIP 0MM E D
K
19
3
STAIRCASE 10 LG1-69 FFL: 30.550 SSL: 30.500 CR NT
1FD 5
T2-LG1-38 FFL: 30.45
DIA
DN
.45
E
0M
UP
16 T: 2.5m 25 m 5m m
L:34
15
RL:33.96
FF SL L:34 :34 .4 .35 0
FF
.45
J
17
5
FA FAN ROOM 4 LG1-68 FFL: 30.550 SSL: 30.500 CR F
1500
DN
1FD 6
T2
20
32
FA
S CR -LG HA W 1-35 FT FF 2 SS L: L: -
:34.
SL:
SSL: 30.4
1500
40
TW
H
CR F
65
1
14
WR/SPR PUMP ROOM
T2-LG1-40 FFL: 30.45
ELEC 2 LG1-71 FFL: 30.550 SSL: 30.500 CR F
1300
.00
R:
L:34
20
SSL: 30.4
FAN ROOM 3 T2-LG1-37 FFL: 30.55 SSL: 30.5 CR F
R T2 C CR -LG SUC W 1-33 TIO FF N SS L: TA L: 30 NK 30 .45 4 .4
:255
FF :34.
15
TW
15
Y
7 9
TW
1500
RC SPRINKLER 1
CR W
-C'
HOSE REEL LG1-83 FFL: 23.900 SSL: 13
7
T2-LG1-39 FFL: 30.45
TANDEM PARKING
STAIR.PRESS 4 12 11 9
15
3 5
G
K
5
C
10000
20 15
RL:32.98
R T2 C CR -LG SUC W 1-32 TIO FF N SS L: TA L: 30 NK 30 .45 3 .4
1FD 5
20000
00
SSL: 30.4
10000
54
P T2 UM CR -LG P R W 1-31 OO FF M SS L: 2 L: 30 30 .4 .4
DP
.00
.55
00
32
FA SHAFT 2 1500
WR/HR RC TANK 1
T2-LG1-42 FFL: 30.45
CR W
L:32
13
SL:
X
3 5 7
9
FF
1FD 2
1FD 2
G
D4a -
5286
1
T2-LG1-17 CR W
1300
11 12
15
F
-B'
TANDEM PARKING
SSL: 30.4
24
W
00
:33.
FA FAN ROOM 3 LG1-67 FFL: 30.550 SSL: 30.500 CR F
WR/HR PUMP ROOM
CR W
1300
13
13
TW
TANDEM PARKING
T2-LG1-44 FFL: 30.45
13 00
15
00
15 00
:33.
S
R T2 C CR -LG SUC W 1-29 TIO FF N SS L: TAN L: 30 K 30 .45 1 .4
LK
D4a 1FD 6
15
.55
15
L:30
:33.
.00
1FD 5
HEAT EXCHANGER ROOM T2-LG1-43 FFL: 30.55 SSL: 30.5 CR F
1FD 6
FF 1 SS L: L: 30 30 .55 .5 0
FF
TW
5
6
L:33
TANDEM PARKING
DN
FF M SS L: 1 L: 30 30 .45 .4
FF TW
SSL: 30.4
R
67
PIP
METERING ROOM 1
T2-LG1-45 FFL: 30.45
SE
C T2 OR VIC CR -LG RID E F 1-11 OR
R:1
TO E DO WE ME ME R 2 TE ST R IC BU
3
T:25 5
DIA
58
M
W 6
CR W
1FD 2 P T2 UM CR -LG P R W 1-28 OO
00
0M
W 5
D2 -
10
TO T2 IL CR -LG ET W 1-24 FF SS L: L: 30 30 .45 .4
5
F SL: FL:32 32 .0 .00 5
T:25
1
00
15
R:1
80
:33.
R T2 C CR -LG SUC W 1-30 TIO FF N SS L: TA L: 30 NK 30 .45 2 .4
TW
1FD 2
5
e6
E
sta
V PIP E IA MD 0M 30
E
1FD 2
PIP
.60
15
D1 -
U
D
DIA
31
:31.
as
00
2
irc
M
48 SL:
1:1
FF R SS L: ROO L: 30 M 30 .45 .4
mp
0M
TW
D T2 RIV CR -LG ER F 1-19 RO FF O SS L: M L: 30 30 .5 .5
Ra
20
G IN REA T2 TE SE CR -LG RCEP W 1-27 TO
80
E C R T2 OR VIC CR -LG RID E F 1-18 OR FF 2 SS L: L: 30 30 .55 .5 0
R:
:31.
TANDEM PARKING
DRIVEWAY
5
15 5 T:
25
5
U
F FF FL:32 L:31 .1 .85 0
TW
TANDEM PARKING
HOSE REEL LG1-81 FFL: 23.900 SSL: -
1FD 6 S T2 TA CR -LG IRC NT 1-14 AS FF E 3 SS L: L: 30 30 .5 .5
.55
MATCH LINE OF BLOCK T6
FF
MATCH LINE OF BLOCK T2
1
W
2 4
6 8 10
DP
AC 3
FF L: SL: 31 31 .65 .60
B C
-A'
9200
HYBRID ONLY
Z RL:31.5
A
A
STAIRCASE 8 LG1-25 FFL: 30.550 SSL: 30.500 CR NT
A
HYBRID ONLY
FRS 11
A'
19
3
FRS 8
W 6
B'
F
FIRE CONTROL ROOM LG1-10 FFL: 30.550 SSL: 30.500 CR F
GD3 -
RC SUCTION TANK 1 LG1-55 FFL: 30.450 SSL: 30.400 CR W
SSL: 30.5
CR F
10000
1FD 4
1FD 2
W 5
C
AC 2
STORE ROOM LG1-56 FFL: 30.550 SSL: 30.500 CR F
1505
W 5
2825
T2-LG1-47 FFL: 30.55
10000
50 MM DN
50 MM DN
ELEC 1 LG1-03 FFL: 30.550 SSL: 30.500 CR F
STORE LG1-02 FFL: 30.550 SSL: 30.500 CR F
1000 x 2200 PLINTH
1000 x 2200 PLINTH
CORRIDOR 1 LG1-45 FFL: 30.500 SSL: 30.450 CR F
STAIR.PRESS 1
D3 -
D1 -
FRS 5
C
SSL: 30.50
1FD 2
COLD WATER PUMP ROOM LG1-53 FFL: 30.450 SSL: 30.400 CR W
C
GENSET 2 LG1-18 FFL: 30.550 SSL: 30.500 CR F
2FD 2
D1 -
MDF
PLINT 200 X 350 FLOOR SLAB OPENING
D1 -
R
T2 CR -LG1 W -06 T2 CR -LG1 W -07
T2 CR -LG1 W -08
T2 CR -LG1 -0 F 5
SDF ROOM 3
VT F
ISMS ROOM LG1-09 FFL: 30.550 HOMO .T SSL: 30.500
W 4
MAINTENANCE ROOM LG1-06 FFL: 30.550 SSL: 30.500 CR F
RC SPRINKLER TANK 2 LG1-52 FFL: 30.450 SSL: 30.400 CR W
520
PLINTH: 150mm(H)
T2-LG1-48 FFL: 30.55
MAINTENANCE OFFICE / WORKSHOP T2-LG1-46 FFL: 30.55
CR F
Q
PLINT
10000
1FD 1
3150
1100
T2 CR -LG1 W -09
D4a -
1FD 4
T2 CR -LG1 -0 F 4
M T2 AIL CR -LG R O NT 1-10 OM FF SS L: L: 30 30 .55 .5 0
T2 CR -LG1 W -15
dn
C'
Bund Wall to m&e MSB ROOM LG1-17 FFL: 30.550 SSL: 30.500 CR F
STAIRCASE 1 LG1-05 FFL: 30.550 SSL: 30.500 CR NT
B
PLINT
1FD 2
E
S T2 TA CR -LG IRC NT 1-14 AS FF E 2 SS L: L: 30 30 .55 .5
V
1FD 1
up
E1
DN
1
19 20
D
FRS 11
T2 CR -LG1 W -03
1FD 4
1FD 6
17
2FD 3
B
640
125 D4a -
4
G T2 EN CR -LG SE F 1-26 T R FF OO SS L: M L: 31 31 .70 .6 5
1085
D3 3140
1100
SE LO R T2 B VIC HO -LG BY E LI FT M 1-01 O.T FF SS L: L: 30 30 .55 1FD .5
1FD 2
SSL: 30.5
VT F
C
1FD 1
1FD 6
3
15
GD3 -
DP
T2 CR -LG1 -1 F 2 T2 CR -LG1 -1 F 3
970
.5 AD RAM IE P NT 1 1: 8
DN
3160
GR
GR
19
1FD 1
RC SPRINKLER TANK 1 LG1-51 FFL: 30.450 SSL: 30.400 CR W
T2-LG1-49 FFL: 30.55
GENSET 1 LG1-19 FFL: 30.550 SSL: 30.500 CR F
200 X 300 FLOOR SLAB OPENING
1FD 2
SERVICE LIFT LOBBY LG1-01 FFL: 30.550 SSL: 30.500 CR F
F
C SDF ROOM 2
Q
17
SSL: 30.5
D
PLINT
CORRIDOR 2 LG1-11 FFL: 30.500 SSL: 30.450 CR F
SE C R T2 OR VIC CR -LG RID E F 1-11 OR FF 1 SS L: L: 30 30 .55 .5 0
C
5
13
SDF ROOM 1
VT F
PLINT
M
ELECT RISER (TENANTS)
FRS 12
7
11
T2-LG1-50 FFL: 30.55
1FD 1
FRS 9
15
1
D4a -
1FD 4
SSL: 30.5
CR F
11
13
20
JANITOR
LV ROOM
T2-LG1-51 FFL: 30.55
9
7
UP
10 9
2FD 2
1085 1000
S T2 TA CR -LG IRC NT 1-02 AS FF E 1 SS L: L: 30 30 .5 .5
5
AD RAM IE P NT 1 1: 8
.5
GR
W 6
10
W 7
200 X 300 FLOOR SLAB OPENING
PLINT
D'
AC 1
Bund Wall to m&e
PLINT
WR/ HR LG1-04 FFL: 30.500 SSL: 30.400 CR W
D4 -
SECURITY LG1-07 FFL: 30.550 SSL: 30.500 CR F
3275
AD RA IE MP NT 1 1: 8.5
9
2FD 2
W 6
SPRINKLER & WET RISER PUMP ROOM 2 LG1-50 FFL: 30.450 SSL: 30.400 CR W
PLINTH: 150mm(H)
S T2 TA CR -LG IR.P W 1-20 RE FF SS SS L: 1 L: -
55 38
1FD 2
FRS 9
3
1
PLINTH: 150mm(H)
PLINT
BASEMENT 11KV &
TX ROOM LG1-20 FFL: 30.550 SSL: 30.500 CR F
M
PLINTH: 150mm(H)
5
FU T2 E CR -LG L TA W 1-25 NK FF R SS L: OO L: 31 M 31 .70 .6 5
1FD 5
2FD 3
D
1FD 2
D
FA FAN ROOM 1 LG1-65 FFL: 30.550 SSL: 30.500 CR F
FA T2 S CR -LG HA W 1-22 FT FF 1 SS L: L: -
1FD 6
FIRE LOBBY PRESS
SSL: 30.5
FA
LG1-63 CR F
N
IEN
AD
GR
RC WET RISER TANK 2 LG1-49 FFL: 30.450 SSL: 30.400 CR W
TRANSFORMER ROOM
FA CR -LG N F 1-21 RO FA FF OM T2 FA CR -LG N SS L: 30 1 L: F 1-23 RO 30 .55 .5 FF O SS L: M 2 L: 30 30 .55 .5
.5
15
RC WET RISER TANK 1 LG1-48 FFL: 30.450 SSL: 30.400 CR W
FA FAN ROOM 2 LG1-66 FFL: 30.550 SSL: 30.500 CR F
1FD 5
: T1
PLINT
PLINT
PLINT
LG1-62 CR F
T2-LG1-53 FFL: 30.55
CR F
E
PLINT
DP
1FD 5
4
T2
FRS 11
1100x3700 PLINTH
FA SHAFT 1
1FD 1
:2
T1
IEN
AD
GR
HOSE REEL
R
620
VO
ID
FRS 9
SSL: 30.5
CR F
C
1FD 5
C
PLINT
2FD 3
N
3
:3
T1
IEN
AD
GR
E'
200 X 300 FLOOR SLAB OPENING
D3 -
SL 54AB 00 OP (L E ) X NIN 10 G 00 (W SLAB OPENING 4800(L) X 1000(W)
CLEAN AGENT & CO2 CYLINDER ROOM T2-LG1-54 FFL: 30.55
2
1
CH
EN
TR
1FD 5
HEAT EXCHANGER ROOM LG1-47 FFL: 30.450 SSL: 30.400 CR F
K
3
VOID
800x1700 PLINTH
EP
DE
AC 2
LG1-60 CR W
1100x3700 PLINTH
J MM
1000
8467
C
DATA CENTER GENSET ROOM LG1-23 FFL: 30.550 SSL: 30.500 CR F
TX ROOM LG1-22 FFL: 30.550 SSL: 30.500 CR F
BASEMENT MSB ROOM LG1-21 FFL: 30.550 SSL: 30.500 CR F
LG1-61 CR F
1100x3700 PLINTH
4
2500 x 1000 MCC PLINTH
SWITCHGEAR ROOM T2-LG1-56 FFL: 30.55 SSL: 30.5 CR F
GREEN PAINT (BY OTHERS)
8466
O
LG1-59 CR W
)
SSL: 30.5
CR F
SSL: 31.25
INTERNAL FLOOR OF THE S/S TO BE PAINT WITH EPOXY
TOWER 11 KV &
PLINT
G
MAIL ROOM LG1-46 FFL: 30.550 HOMO.T SSL: 30.500
W 4
1FD 5
LIGHT WEIGHT BRICK to eng's approval
B
BATTERY ROOM
T2-LG1-57 FFL: 30.55
SSU ROOM
T2-LG1-55 FFL: 31.30
1500(W) X 3000MM HIGH DOUBLE LEAVES COMPOSITE DOOR
W 4
CORRIDOR 1 LG1-45 FFL: 30.500 SSL: 30.450 CR F
2FD 3
D3 -
3250
750(W) X 3000MM HIGH SINGLE LEAF COMPOSITE DOOR
1000 x 2200 PLINTH
ME 1
800x1700 PLINTH
5
W 5
D1 -
O
2
m 5m T=25 1 3
ME 2
0
800x1700 PLINTH
m, 160m 5
R=
1.3
G
LIGHT WEIGHT BRICK to eng's approval
UP
0
1980
L:3
FF
DCS METER ROOM LG1-42 FFL: 30.450 1FD CR F SSL: 30.400
GD4 -
10000
SSL: 30.5
CR F
9800
1FD 1
T2-LG1-60 CR W
SECURITY
T2-LG1-59 FFL: 30.55
REGISTRATION LG1-44 FFL: 30.550 HOMO.T SSL: 30.500
20000
D4a -
ME 2
F
511
SECURITY &
UTILITY ROOM LG1-89 FFL: 30.450 SSL: 30.400 CR F
1693
SSL: 30.5
CR F
FALL
K
METER ROOM
T2-LG1-58 FFL: 30.55
FAL
L
W 5
J
10
T
6
D1 -
E
HOMO.T SSL: 30.5
1500(W) X 3000MM HIGH DOUBLE LEAVES COMPOSITE DOOR
E1
FRS 2
T2-LG1-61 FFL: 30.55
000
10000
RC HOSE REEK TANK LG1-39 FFL: 30.450 SSL: 30.400 CR W
0
1000
DP
7
FRS 10
G F'
14055
HOSE REEL LG1-80 FFL: 23.900 SSL: -
LOADING BAY
0 2000
H
17
3
STAIRCASE 6 LG1-27 FFL: 30.550 SSL: 30.500 CR NT
1FD 5
5945
13
7
Ha
5945
1FD 5
4566
4055
PLINTH: 150mm(H)
FALL
H
SPRINKLER & HOSE REEL PUMP ROOM 1 LG1-38 FFL: 30.450 SSL: 30.400 CR W
DP
MATCH LINE OF BLOCK T2 MATCH LINE OF BLOCK T6
3 NOS. 4 WHEELS MGB BIN (1100 LITRES)
FALL
1FD 2
T
0
1000
20
DP
8
REFUSE CENTER LG1-37 FFL: 30.550 HOMO.T SSL: 30.500
000
FRS 6
2325
3 NOS 250Ø SOIL PIPE
3181
2326
12a'
D3 -
3227
9
H
CH
RI TE BA 78 1LG F CR
EN
D1 -
INTERNAL FLOOR OF THE S/S TO BE PAINT WITH EPOXY GREEN PAINT (BY OTHERS)
1000
10a'
Hd
POLIS BANTUAN OFFICE LG1-32 FFL: 30.550 HOMO.T SSL: 30.500
W 5
TR
ME 2
0
11
1FD 5 1FD 5
LSD
DE
0
KERB 1000 :150 MM
9a'
ME 2
6 .950 .900 WERL: 30 30 U TO FF L: SS SS 36 1LG
MM
KERB : 300 MM
1 OM 30.550 .500 L: N RO FF L: 30 FA SS EA 34 1LG F CR
50
0.9
L:3
FF
1000
8a'
10
1500
F
He
SH
1800
7a'
MANAGEMENT OFFICE LG1-86 FFL: 30.550 HOMO.T SSL: 30.500
1
5500
EA
T AF
I
6a'
INE HL TC MA CK T5 O L B
RC STAIRCASE WITH 25MM HOMO TILES NOSING. RISER:165MM TREAD: 255MM
4 EA FAN ROOM 4 LG1-73 FFL: 30.550 SSL: 30.500 CR F
5
-G'
34.80
LEGEND- TOWER 2
CONSTRUCTION DRAWING TAJUK LUKISAN :
LOWER GROUND 1
FLOOR PLAN
Dilukis oleh
: GEO/LZ
Disemak oleh : ASSB
13'
12'
9'
11 12
10
8' 9
7' 8
6' 7
6
5 4
3'
2' 3
1' 2
1
No. Lukisan :
Ukuran :
1:200
Tarikh :
ASSB/1302/CD/ 2.01.05/R6
Rr' E AG WER SE NT .250 ME OM L: 27 .200 SE BA MP RO FF L: 27
SS
T1 AF FFL: L: SH SS EA 3 -3 B1 F CR
7a'
1FD 5 1 OM 27.250 .200 L: N RO FF L: 27 FA SS EA 4 -2 B1 F CR
2 OM 27.250 .200 L: N RO FF L: 27 FA SS EA -25 B1 F CR
4114
150 2444
C
PLINTH: 100mm (H)
1123 396
2000
PLINTH : 100mm (H)
5196
1500
1500
2000
5a'
1FD 5 520
He
117
1108
B1 W CR
E AG WER .250 SE 27 .200 WER OM L: TO MP RO FF L: 27 SS PU - 42
3a'
6a'
TOWER 6
PU - 43 B1 W CR
2a'
4a'
INE HL TC 5 MA CK T O BL
2110
1500
1150
500
6358
Hd
C
390
3600
1FD 5
9849
1307
9a' 0
DRIVEWAY
A
HOSE REEL FFL: 27.200 B1 -11 SSL: -
Hb
DP
2000
Hc
EM ND G TA RKIN PA EM ND G TA RKIN PA
A
0 1000
10a'
EM ND G TA RKIN PA 17202
0
1000
10000
6872
8a'
7201
215
1FD 5
0
1000
TANDEM PARKING
11a' 12a'10
11
TANDEM PARKING
A
0
1000
TANDEM PARKING
STAIR.PRESS 2 FFL: 17.200 B1 -38 SSL: 17.200 CR W
TANDEM PARKING
0
0
1000
MATCH LINE OF BLOCK T2 MATCH LINE OF BLOCK T6
13
WR/ HR FFL: 27.200 B1 -12 SSL: CR W
HOSE REEL FFL: 27.200 B1 -13 SSL: -
1
17 19 20
UP
1FD 6
TANDEM PARKING
DN
DP
STAIRCASE 6 FFL: 27.250 B1 -08 SSL: 27.200 CR NT
0
TANDEM PARKING
C
TANDEM PARKING
0
B GD3 -
C
1FD 2
PIT
LIF
T LIF
10000 13 15
D
17
UP
1FD 6
19 20
DN
HYBRID ONLY
HYBRID ONLY
PIT T LIF
TANDEM PARKING
19200
PIT T
TANDEM PARKING
DRIVEWAY
3
TANDEM PARKING
CARPOOL PARKING
CARPOOL PARKING
CARPOOL PARKING
CARPOOL PARKING
HYBRID ONLY
CARPOOL PARKING
CARPOOL PARKING
CARPOOL PARKING
CARPOOL PARKING
DRIVEWAY
TANDEM PARKING
A
FA SHAFT 2 FFL: B1 -36 SSL: CR W
A
TANDEM PARKING
00
0
10
00
0
1FD 5
G
C
FA FAN ROOM 3 T2-B1-06 FFL: 27.250 SSL: 27.200 CR F
-C'
HOSE REEL FFL: 27.200 B1 -19 SSL: ELEC 2 FFL: 27.250 B1 -23 SSL: 27.200 CR F
FA FAN ROOM 4 FFL: 27.250 B1 -31 SSL: 27.200 CR F
MATCH LINE OF BLOCK T2 MATCH LINE OF BLOCK T6
TANDEM PARKING
STAIR.PRESS 4 FFL: 17.200 B1 -40 SSL: 17.200 CR W
20
-B'
10000
TANDEM PARKING
2400
FA FAN ROOM 3 FFL: 27.250 B1 -30 SSL: 27.200 CR F
UP
STAIRCASE 10 FFL: 27.250 B1 -10 SSL: 27.200 CR NT
1FD 5
2FD 2
DN
1FD 6
TANDEM PARKING
10000
0
F
1FD 5
A
A STAIRCASE 3 T2-B1-09 FFL: 27.250 SSL: 27.200 CR NT
TANDEM PARKING
C
C
C
TANDEM PARKING
WR/ HR FFL: 27.200 B1 -20 SSL: CR W
225
TANDEM PARKING
D
20000
00
F
W T R CR2-B1-/ HR W 21 F SSFL: L: 27 27 .150 .1 00
TANDEM PARKING
10
223
HYBRID ONLY
1FD 6
A
E
1242
11
2558
D
TANDEM PARKING
DN
DP
0
T PA AN RK DE IN M T G PA AN RK DE IN M G
00
TANDEM PARKING
UP
T PA AN RK DE IN M G
10
T PA AN RK DE IN M T G PA AN RK DE IN M G
C
0
TANDEM PARKING
00
-D'
C
BO
UN
Q
N
DA
RY
LIN
AN
RO
E
DE
10
DB
VE
RT
K
EM
OG
OV
EN
ER
TS
0
NM
ET
EN
T
Scale : 1 : 200
A
BA
CK
TANDEM PARKING
HOSE REEL FFL: 27.200 B1 -32 SSL: -
S T TA CR2-B1- IRC NT 10 ASE F 4 SSFL: L: 27 27 .250 .2 00
00
AS
-E'
600
A
TANDEM PARKING
LIN
TANDEM 221 PARKING
E 10
00
0
DRIVEWAY 20
00
PJ SENTRAL TOWER 2 & TOWER 6
BASEMENT 1 FLOOR PLAN
TANDEM PARKING
TANDEM PARKING
UN
DO
TANDEM PARKING
HOSE REEL T2-B1-34 FFL: 27.200 SSL: -
5286
J
mH
1FD 6
0
2391
L
10
10000
4103
1484
5897
227
5587
H
00
RAMP UP FROM B2
RAMP UP TO LG1
FRS 4
M
WR/ HR FFL: 27.00 B1 -22 SSL: CR W
0
LEVEL +27.200M 37
70
10000
1574
RAMP DOWN TO B2
FRS 4
1996
RAMP DOWN FROM LG1
37324
1FD 5
8665
0m
0
DP
500
RG
UP
DE
10000
00
UN
10000
1FD 5
3880
20
m
TANDEM PARKING
A
EA FAN ROOM 3 FFL: 27.250 B1 -26 SSL: 27.200 CR F
-F'
EA SHAFT 2 FFL: 17.200 B1 -34 SSL: 17.200 CR F
7137
0m
STAIR.PRESS 4 T2-B1-25 FFL: SSL: CR W
7123
230
0
DN
H
TANDEM PARKING
FA SHAFT 2 T2-B1-28 FFL: SSL: CR W
00
DP
10
6120
EA FAN ROOM 4 FFL: 27.250 B1 -27 SSL: 27.200 CR F
MATCH LINE OF BLOCK T6
-G'
MATCH LINE OF BLOCK T1
13'
12'
9'
11 12
10
8' 9
7' 8
6' 7
6
5 4
3'
2' 3
1' 2
1
SSL
27.250 27.250 27.250 27.150 27.250 27.250 27.250 27.250 27.250 27.250 27.200 27.200 27.200 27.200 27.200 27.200 27.200 27.200 27.200 27.200 27.200 27.200 27.250 27.250 27.250 27.250 27.250 27.250 27.250 27.250 27.250 27.200 17.200 17.200 17.200 17.200 27.150
27.20 27.20 27.20 27.10 27.20 27.20 27.20 27.20 27.20 27.20 27.15 27.20 27.20 27.20 27.20 27.20 27.20 27.20 27.20 27.20 17.20 17.20 17.20 17.20 27.10
SKP
PCS
27.150
27.10
PCS
FLOOR
WALL
CEILING
FFL
SSL
HOMO.T HOMO.T
SKP HOMO.T
PBC PBC
27.250 27.250
27.20 27.20
CR F CR F CR F CR F CR NT CR NT CR NT CR NT CR F CR F CR F CR W CR F CR F CR W CR W CR W CR W CR W CR W CR W CR W CR W CR W CR W CR W CR W -
SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP -
PCS PCS PCS PCS SKP SKP SKP SKP PCS PCS PCS PCS PCS PCS PCS PCS PCS PCS -
27.200 27.250 27.250 27.250 27.250 27.250 27.250 27.250 27.250 27.250 27.200 27.250 27.250 27.250 27.200 27.200 27.200 27.150 -
27.15 27.20 27.20 27.20 27.20 27.20 27.20 27.20 27.20 27.20 27.15 27.20 27.20 27.20 27.20 27.15 27.10 -
27.200 27.200 27.200 27.200 27.200
-
1 2
RC STAIRCASE WITH 25MM HOMO TILES NOSING. RISER:165MM TREAD: 255MM
4
Dx -
GDX
-
XFD
X X
-A'
FFL
PBC PBC SKP PCS PCS PCS SKP SKP SKP SKP SKP PCS PCS PCS PCS PCS PCS PCS PCS PCS PCS PCS PCS PCS -
ROOM
FRS
TANDEM PARKING
HYBRID ONLY
CEILING
SERVICE LIFT LOBBY CARPARK LIFT LOBBY SERVICE CORRIDOR FA FAN ROOM 1 FA FAN ROOM 1 FA FAN ROOM 3 STAIRCASE 1 STAIRCASE 2 STAIRCASE 3 STAIRCASE 4 TEL RISER METER ROOM ELECT RISER COLD WATER CCTV HV SMATV HR / WR HOSE REEL WR/ HR STAIR.PRESS 1 STAIR.PRESS 2 STAIR.PRESS 3 STAIR.PRESS 4 FIRE LOBBY PRESS FA SHAFT 1 FA SHAFT 2 SHAFT LPF SHAFT HOSE REEL HOSE REEL HOSE REEL HOSE REEL HOSE REEL
5
A'
CR W
WALL SKP HOMO.T SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP SKP
T2-B1-01 T2-B1-02
Wx
9200
HYBRID ONLY
BASEMENT SEWERAGE PUMP ROOM
LEGEND
3
B
TANDEM PARKING
A
C STAIR.PRESS T2-B1-24 FFL: SSL: CR W
B'
A
STAIRCASE 8 FFL: 27.250 B1 -09 SSL: 27.200 CR NT
HOSE REEL FFL: 27.200 B1 -21 SSL: -
LIF
H T2- OS B1- E R 20 EE F L SSFL: L: 27 - .200
-
T PA AN RK DE IN M G
C
0
20
HYBRID ONLY
1
TANDEM PARKING
C
00
B
HYBRID ONLY
11
7 5 3
B
TANDEM PARKING
T2 CR -B1F 15
PIT PIT
LIF
T
G
9
WR/ HR FFL: 27.200 B1 -17 SSL: CR W
A
CARPARK LIFT LOBBY FFL: 27.250 B1 -02 HOMO.T SSL: 27.200
TANDEM PARKING
T
T PA AN RK DE IN M G
DP
E
GD3 -
TANDEM PARKING
A
C
WET RISER
TANDEM PARKING
STAIR.PRESS 3 FFL: 17.200 B1 -39 SSL: 17.200 CR W
TANDEM PARKING
HOSE REEL FFL: 27.200 B1 -18 SSL: -
FRS 5
TANDEM PARKING
LIF
T
SE C R T2- OR VIC CR B1- RID E F 03 OR F SSFL: L: 27 27 .200 .1 50
DN
TANDEM PARKING
D4 -
cctv
UP
1FD 6
S T2- TA CR B1- IR.P W 23 RE F SS SSFL: 2 L: -
10
S T TA CR2-B1- IRC NT 08 AS F E2 SSFL: L: 27 27 .250 .2 00
-
T PA AN RK DE IN M G
A
PIT
H T2- OS B1- E R 31 EE F L SSFL: L: 27 - .200
T PA AN RK DE IN M G 0
1FD 4
TANDEM PARKING
C
T2 CR -B1W 19
0 00 10
00
HOSE REEL T2-B1-33 FFL: 27.200 SSL: -
DP
10
SE LO R T B VIC HO2-B1-BY E LI FT M 01 O.T F SSFL: L: 27 27 .250 .2 00
C
TANDEM PARKING
DN
1FD 2
899
TANDEM PARKING
UP
C
TANDEM PARKING
A
BOUNDARY LINE
C
TANDEM PARKING
1FD 6
10000
TANDEM PARKING
ELEC 1 FFL: 27.250 B1 -06 SSL: 27.200 CR F
1678
STAIRCASE 1 FFL: 27.250 B1 -07 SSL: 27.200 CR NT
C'
TANDEM PARKING
475
C
S T2- TA CR B1- IRC NT 07 AS F E1 SSFL: L: 27 27 .250 .2 00
-
1FD 5 163
88
B
D
TANDEM PARKING
SERVICE LIFT LOBBY FFL: 27.250 B1 -01 HOMO.T SSL: 27.200
1FD 1
UP
W 6
DRIVEWAY
DP
W 7
DRIVEWAY
2FD 2
WR/ HR FFL: 27.200 B1 -14 SSL: 27.150 CR W
D4 -
TANDEM PARKING
A
2300mm BASEMENT SETBACK LINE
H T2- OS B1- E R 32 EE F L SS FL: L: 27 - .200
STAIR.PRESS 1 FFL: B1 -37 SSL: CR W
TANDEM PARKING HOSE REEL FFL: 27.200 B1 -16 SSL: -
TANDEM PARKING
56
1FD 5
A
S T TA CR2-B1- IR.P W 22 RE F SS SS FL: 1 L: -
3 82
0
FA FAN ROOM 2 FFL: 27.250 B1 -29 SSL: 27.200 CR F
B
92
RO F OM SSFL: 1 L: 27 27 .250 .2 00
00
TANDEM PARKING
TANDEM PARKING 57
F T2- IRE CR B1- LO W 26 BB F YP SSFL: RE SS L: -
49
33
F T AS CR2-B1- HA W 27 FT F 1 SSFL: L: -
10
BOMBA SERVICE LIFT
FIRE LOBBY PRESS FFL: B1 -41 SSL: CR W
DN
14
34
25
8.6
=2
C
1FD 5
F T2- A F CR B1- AN F 04 RO F OM SS FL: 1 L: 27 27 .250 .2 00
F T AF CR2-B1- AN F 05
1
1FD 5
C
79
FL
2
TANDEM PARKING
6
FL
DRIVEWAY
1 MP : 12 RA IO 1 T RA
WN DO 1 MP LG RA OM FR
=2
3864
7.61
WN DO 1 MP LG RA OM FR
8.42
3
FA SHAFT 1 FFL: B1 -35 SSL: CR W
=2
M
RA
K
1
LG
FL
P PU
TO
D'
20000
B1 -05 CR F
C
4
E
TANDEM PARKING
B1 -04 CR W
20000
FA FAN ROOM 1 FFL: 27.250 B1 -28 SSL: 27.200 CR F
1FD 5
100
STORE FFL: 27.250 B1 -03 SSL: 27.200 CR F
C
10000
D3 -
GD3 -
HOSE REEL FFL: 27.200 B1 -15 SSL: -
2FD 2
D3 -
C LO AR T B PA HO2-B1-BY RK LI M 02 FT O.T F SS FL: L: 27 27 .250 .2 00
6
TANDEM PARKING
C
TANDEM PARKING
E' 10000
WR / HR
F
511
3227
HOSE REEL T2-B1-35 FFL: 27.200 SSL: -
DP
1000
FLOOR
HOMO.T HOMO.T CR F CR W CR F CR F CR NT CR NT CR NT CR NT CR W CR W CR W CR W CR W CR F CR F CR F CR F CR F CR F CR F CR F CR F CR F CR F CR W CR W CR W CR W CR W CR W CR W CR W TOWER SEWERAGE PUMP ROOM
ROOM NO
T2-B1-03 T2-B1-04 T2-B1-05 T2-B1-06 T2-B1-07 T2-B1-08 T2-B1-09 T2-B1-10 T2-B1-11 T2-B1-12 T2-B1-13 T2-B1-14 T2-B1-15 T2-B1-16 T2-B1-17 T2-B1-18 T2-B1-19 T2-B1-20 T2-B1-21 T2-B1-22 T2-B1-23 T2-B1-24 T2-B1-25 T2-B1-26 T2-B1-27 T2-B1-28 T2-B1-29 T2-B1-30 T2-B1-31 T2-B1-32 T2-B1-33 T2-B1-34 T2-B1-35
TANDEM PARKING
C
7
10000
C
SERVICE LIFT LOBBY CARPARK LIFT LOBBY STORE COLD WATER BMS/ SECURITY ELEC 1 STAIRCASE 1 STAIRCASE 6 STAIRCASE 8 STAIRCASE 10 HOSE REEL WR/ HR HOSE REEL WR/ HR HOSE REEL HOSE REEL WR/ HR HOSE REEL HOSE REEL WR/ HR HOSE REEL WR/ HR ELEC 2 EA FAN ROOM 1 EA FAN ROOM 2 EA FAN ROOM 3 EA FAN ROOM 4 FA FAN ROOM 1 FA FAN ROOM 2 FA FAN ROOM 3 FA FAN ROOM 4 HOSE REEL EA SHAFT 1 EA SHAFT 2 FA SHAFT 1 FA SHAFT 2 STAIR.PRESS 1 STAIR.PRESS 2 STAIR.PRESS 3 STAIR.PRESS 4 FIRE LOBBY PRESS
TOWER 2
G F'
D
B
ROOM
B1 -01 B1 -02 B1 -03 B1 -04 B1 -05 B1 -06 B1 -07 B1 -08 B1 -09 B1 -10 B1 -11 B1 -12 B1 -13 B1 -14 B1 -15 B1 -16 B1 -17 B1 -18 B1 -19 B1 -20 B1 -21 B1 -22 B1 -23 B1 -24 B1 -25 B1 -26 B1 -27 B1 -28 B1 -29 B1 -30 B1 -31 B1 -32 B1 -33 B1 -34 B1 -35 B1 -36 B1 -37 B1 -38 B1 -39 B1 -40 B1 -41 B1 -42 B1 -43
H
15
3
2000
0
1000
5
Ha
TANDEM PARKING
11
7 5
DP
0 1000
8
9
20000
9
10000
2000
ROOM NO
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
1a'
PCS -
NO. FAIL:
MBPJ/1
NOTA: 1
TAJUK PROJEK
2 3 4 5 6 7 8 9 10 11 12 13 14 15
FIRE CONTROL ROOM
G-12 HT-F2
16
38.15 38.10
17 18 19 20 21 22
PEMILIK :
23
G-23 CR F
G-24 CR W
24 25
STAIRCASE 3 G-33 38.085 38.025 HW F
26
..............................
27
28
29
30
DATE
REVISION
APRIL 2019
(company no: 54114 Level 30, Menara Alli No. 203, Jalan Tun Sa Kuala Lumpur Sentra 50470 Kuala Lumpur No. Tel : 603-2786 8 No. Faks : 603-2780 7
REMARKS
R5
UPDATE WALL FINISH
STAIRCASE 7 G-31 38.085 38.025 HT-F1 NT
ROOM NO
28 28
STAIRCASE 8 G-40 38.10 37.850 HT-F1 NT
30
Scale : 1 : 125
250ØRWDP 300ØRWDP
FFL
TR
PBC
38.085
38.05
PBC
38.085
38.05
LIFT LOBBY
GR
G-02
FIRE LIFT LOBBY
GR
PP
SSL
G-03
STAIRCASE 1
HT-F1 NT
PP
SCP
38.085
G-04
STAIRCASE 2
HT-F1 NT
PP
SCP
38.085
38.05
G-05
CORRIDOR
HT-F1
PP
PBC
38.085
38.05
PP
38.05
PCS
38.135
38.10
G-07
AHU2
CRW
PP
PCS
38.135
38.10
G-08
DISABLE TOILET
HT-F1
HT-W1
MRPBC
38.05
AHU1
CRW
38.00
G-09
FEMALE TOILET
HT-F1
HT-W1
MRPBC
38.05
38.00
G-10
MALE TOILET
HT-F1
HT-W1
MRPBC
38.05
38.00
PBC
38.085
G-11
SERVICE EXIT
HT-F1
G-12
FIRE CONTROL ROOM
HT-F2
PP
PBC
38.15
38.10
G-14
STRONG ROOM 2
HT-F2
HT-W1
MSC
38.085
38.05
G-15
WR/HR
CR W
PP
PCS
38.05
PP
38.05
38.00
G-16
TEL & ICT
CR F
PP
PCS
38.15
38.10
G-17
ELV
CR F
PP
PCS
38.15
38.10
G-18
COM
CR F
PP
PCS
38.15
38.10
G-19
ELETRICAL ROOM
CR F
PP
PCS
38.15
38.10
G-20
BMS/ SECURITY
CR F
PP
PCS
38.15
38.10
G-21
COLD WATER
CR W
PP
PCS
38.05
38.00
G-22
CHW
CR W
PP
PCS
38.05
38.00
G-23
MATV
CR F
PP
PCS
38.15
G-24
WR/HR
CR W
PP
PCS
38.05
38.00
G-25
RETAIL
GR
-
PBC
38.10
38.025
G-26
BANK
GR
-
PBC
38.085
38.025
TR
38.05
G-27
28
FLOOR CEILING_ WALL FINISHES FINISHES
G-01
G-06
30
AREA
GR
38.10
PBC
38.085
G-28
UTILITY 1
CR F
PP
PCS
38.085
G-29
UTILITY 2
CR F
PP
PCS
38.085
38.10
G-30
UTILITY 3
CR F
PP
PCS
38.085
38.05
CARPARK LIFT LOBBY
PP
38.10
G-31
STAIRCASE 7
GR
SCP
38.085
38.025
G-32
STAIRCASE 5
HT-F1 NT
PP
SCP
38.10
37.850
G-33
STAIRCASE 3
HW F
GWF
PBC
38.10
38.025
G-34
STAIRCASE 6
HT-F1 NT
PP
-
38.10
37.850
G-35
RECEPTION AREA
GR
TR
PBC
38.085
38.025
G-36
MAIN ENTRANCE LOBBY
GR
G-37
DROP OFF AREA
-
-
G-38
PANTRY 1
GR
G-39
PANTRY 2
GR
G-40
STAIRCASE 8
G-41
UTILITY 4
-
PBC
38.085
38.025
38.0
37.85
PP
MC PBC
38.085
38.025
PP
PBC
38.085
38.025 37.850
HT-F1 NT
PP
-
38.10
CR F
PP
PCS
38.085
"SAYA MEMPERAKUI BAH ADALAH MENURUT KEHE BANGUNAN SERAGAM 19 PENUH DENGAN SEWAJA
CONS
TAJUK LUKISAN
38.025
Dilukis oleh
:
Disemak oleh : No. Lukisan :
AS
PELA
120100/T/P10/1189/2013 1
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
2
K:
3 4 5 6 7 8 9 10 11 12 13 14 15
28 28
16 17 18 19 20
10
21 22
2
23
STAIRCASE 3 L1-32 44.285 44.225 HW F
L1-23 CR F
28
24 25
L1-24 CR W
26
27
......................................................................................
28
29
30
LOBBY L1-35 GR
42-D) ianz Sentral ambanthan al
44.285 44.225
28
8080 7988
STAIRCASE 7 L1-33 44.285 44.25 GR
DATE
3-3, 3 rd FLOOR , PLAZA KLH BUSINESS CENTRE BANDAR PUCHONG JAYA, 47100 SELANGOR, MALAYSIA T E L : 0 3- 8 0 7 6 6 6 6 6 F A X : 0 3- 8 0 7 6 7 3 2 9 E M A I L : archispheresdnbhd@gmail.com
APRIL 2019
REVIS R-4
HAWA PERINCI-PERINCI DALAM PELAN-PELAN INI ENDAK-KEHENDAK UNDANG-UNDANG KECIL 984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB ARNYA".
..............................................................................
28
STRUCTION DRAWING
N:
250ØRWDP 300ØRWDP GEO FAM
Ukuran : AS SHOWN Tarikh : AUG 2018
SSB/1302/CD/ 2.02.01 /R5
AN PINDAAN
FLOOR_FINISHES
R.NO
AREA
L1-01
LIFT LOBBY
L1-02
FIRE LIFT LOBBY
L1-03
STAIRCASE 1
HT-F1 NT HT-F1 NT
GR HT-F1
L1-04
STAIRCASE 2
L1-05
SERVICE CORRIDOR
HT-F1
L1-06
AHU1
CRW
L1-07
AHU2
CRW
L1-08
DISABLE TOILET
HT-F1
L1-09
FEMALE TOILET
HT-F1
L1-10
MALE TOILET
HT-F1
L1-11
EXECUTIVE TOILET
HT-F1
L1-12
JANITOR ROOM
CR W
L1-13
REFUSE
HT-F1
L1-14
PANTRY 2
L1-15
WR/HR
CR W
L1-16
TEL & ICT
CR F
L1-17
ELV
CR F
L1-18
COM
CR F
L1-19
ELETRICAL ROOM
CR F
L1-20
BMS/ SECURITY
CR F
L1-21
COLD WATER
CR W
L1-22
CHW
CR W
L1-23
MATV
CR F
L1-24
WR/HR
CR W
L1-25
NURSERY
L1-26
RETAIL 2
GR
L1-27
CARPARK LIFT LOBBY
GR
L1-28
UTILITY 1
L1-29
UTILITY 2
CR F
L1-30
PANTRY 1
HT-F1
L1-31
TOILET
HT-F1
L1-32
STAIRCASE 3
GR
CRF
CR F
HW F
L1-33
STAIRCASE 7
GR
L1-34
STAIRCASE 5
HT-F1 NT
L1-35
LOBBY
L1-36
RETAIL 3
L1-37
SERVICE CHAMBER
GR GR CR W
WAL
1 2 3 4 5 6 7
MALE TOILET L2-10 48.45 48.40 HT-F1 FEMALE TOILET 2 L2-31 48.45 48.40 HT-F1
8
MALE TOILET 2 L2-30 48.45 48.40 HT-F1
9 10 11
300ØRWDP
12 13 14 15 16 17 18
PREP ROOM L2-14 48.475 48.425 CR F
19 20 21 22 23
FFL SSL
24 25
CORRIDOR L2-38 CRF
26
48.475 48.425
27
28
29
CARPARK LIFT LOBBY
L2-27 GR
48.485 48.425
30
FFL SSL
REVISION
DATE FEB 2019
R4
FEB 2019
R4
REMARKS UPDATE FFL & floor and wall Finishes UPDATE ST 5 RC WALL GAP
STAIRCASE 7 L2-33 48.50 48.45 HT-F1 NT PRE- FUNCTION ROOM
L2-32 CR F
48.475 48.425
BANQUET L2-26 CR F
48.475 48.425
250ØRWDP 300ØRWDP
R.NO
AREA
L2-01
LIFT LOBBY
FLOOR_FINISHES
WALL_ FINISHES
CEILING_FINISHES
FFL
SSL
GR
TR
PBC
48.485
48.425
L2-02
FIRE LIFT LOBBY
PP
PBC
48.485
48.45
L2-03
STAIRCASE 1
HT-F1 NT
PP
SCP
48.485
48.45
L2-04
STAIRCASE 2
HT-F1 NT
PP
SCP
48.485
48.45
HT-F1
L2-05
SERVICE CORRIDOR
HT-F1
PP
PBC
48.485
48.45
L2-06
AHU1
CRW
PP
PCS
48.435
48.40
L2-07
AHU2
CRW
PP
PCS
48.435
48.40
L2-08
DISABLE TOILET
HT-F1
HT-W1
MRPBC
48.45
48.40
L2-09
FEMALE TOILET
HT-F1
HT-W1
MRPBC
48.45
48.40
L2-10
MALE TOILET
HT-F1
HT-W1
MRPBC
48.45
48.40
L2-11
EXECUTIVE TOILET
HT-F1
HT-W1
MRPBC
48.45
48.40 48.40
L2-12
JANITOR ROOM
CR W
PP
PCS
48.45
L2-13
REFUSE
HT-F1
PP
PCS
48.435
48.40
L2-14
PREP ROOM
CR F
PP
MSC
48.475
48.425
L2-15
WR/HR
CR W
PP
PCS
48.45
48.40
L2-16
TEL & ICT
CR F
PP
PCS
48.55
48.50
L2-17
ELV
CR F
PP
PCS
48.55
48.50
L2-18
COM
CR F
PP
PCS
48.55
48.50
L2-19
ELETRICAL ROOM
CR F
PP
PCS
48.55
48.50
L2-20
BMS/ SECURITY
CR F
PP
PCS
48.55
48.50
L2-21
COLD WATER
CR W
PP
PCS
48.45
48.40
L2-22
CHW
CR W
PP
PCS
48.45
48.40
L2-23
MATV
CR F
PP
PCS
48.55
48.50
L2-24
WR/HR
CR W
PP
PCS
48.45
48.40
L2-25
VIP LOUNGE
CR F
PP
PBC
48.475
48.425
L2-26
BANQUET
CR F
PP
PBC
48.475
48.425
L2-27
CARPARK LIFT LOBBY
GR
TR
PBC
48.485
48.425
L2-28
UTILITY 1
CR F
PP
PCS
48.485
48.425
L2-29
UTILITY 2
CR F
PP
PCS
48.485
48.425
L2-30
MALE TOILET 2
HT-F1
HT-W1
MRPBC
48.45
48.40
L2-31
FEMALE TOILET 2
HT-F1
HT-W1
MRPBC
48.45
48.40 48.425
CR F
PP
PBC
48.475
HT-F1 NT
PP
SCP
48.485
HT-F1 NT
PP
SCP
48.485
48.45
CR F
PP
MSC
48.50
48.425
L2-32
PRE- FUNCTION ROOM
L2-33
STAIRCASE 7
L2-34
STAIRCASE 5
L2-35
UTILITY
L2-36
CR W
CR
MRPBC
48.45
48.40
CR W
CR
MRPBC
48.45
48.40
L2-38
VIP TOILET CHANGING ROOM TOILET CORRIDOR
CRF
PP
MSC
48.475
48.425
L2-39
SERVICE CHAMBER
CR W
PP
PCS
48.45
48.40
L2-37
48.45
AHU L2-06 CRW
NO. FAIL:
MBPJ/120100/T/P10/1189/2013
NOTA:
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
TAJUK PROJEK:
EXPANSION TANK R600.0000
PEMILIK :
M&E L24-07 CR W
140.85 140.80
9
................................................................................................................... SERVICE CORRIDOR L24-04 140.885 140.85 CR F
L24-15 CR F
L24-16 CR F
L24-17 CR F
L24-18 CR W
L24-19 CR W L24-21 CR F
(company no: 541142-D) Level 30, Menara Allianz Sentral No. 203, Jalan Tun Sambanthan Kuala Lumpur Sentral 50470 Kuala Lumpur No. Tel : 603-2786 8080 No. Faks : 603-2780 7988
STAIRCASE 1 L24-01 140.885 140.85 HT-F1 NT
3-3, 3 rd FLOOR , PLAZA KLH BUSINESS CENTRE BANDAR PUCHONG JAYA, 47100 SELANGOR, MALAYSIA T E L : 0 3- 8 0 7 6 6 6 6 6 F A X : 0 3- 8 0 7 6 7 3 2 9 E M A I L : archispheresdnbhd@gmail.com
ROOF DECK L24-11 140.85 140.80 CRW
STAIRCASE 2 L24-02 140.885 140.85 HT-F1 NT
L24-20 CR W
FIRE LIFT LOBBY L24-03 140.885 140.85 HT-F1
"SAYA MEMPERAKUI BAHAWA PERINCI-PERINCI DALAM PELAN-PELAN INI ADALAH MENURUT KEHENDAK-KEHENDAK UNDANG-UNDANG KECIL BANGUNAN SERAGAM 1984 DAN SAYA SETUJU TERIMA TANGGUNGJAWAB PENUH DENGAN SEWAJARNYA".
WATER TANK L24-22 140.85 140.80 CRW
..............................................................................
U1 6 W
Scale : 1 : 125
CONSTRUCTION DRAWING TAJUK LUKISAN :
:
GEO
Ukuran : AS SHOWN
Disemak oleh :
FAM
Tarikh : AUG 2018
Dilukis oleh
No. Lukisan :
ASSB/1302/CD/ 2.02.03/R5
R.NO L24-01 L24-02 L24-03 L24-04 L24-07 L24-11 L24-12 L24-13 L24-14 L24-15 L24-16 L24-17 L24-18 L24-19 L24-20 L24-21 L24-22
AREA STAIR STAIR FIRE L SERV M&E ROOF WR/H TEL & ELV COM ELETR BMS/ COLD CHW WR/H MATV WATE
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
Agri[culture] Food Port Semester 06 | Session 2018/2019
An effort to create a sustainable future by merging urban agriculture into Malaysia’s Food Hub Architecture. The design proposal focuses on integration of food producing and food consuming spaces: i.e Urban farming and Food court culture. Urban farming has slowly become a part of a city due to the realization of the community in terms of green consumption, organic, and healthy living.
28
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
PROBLEM STATEMENT
AIM
OBJECTIVES
WHY AGRICULTURE?
X
CLIENT
ISKANDAR MALAYSIA & JABATAN PERTANIAN JOHOR Iskandar Malaysia is the leading southern development in Johor. In 2016, Iskandar Malaysia launched the Iskandar Malaysia Urban Farming Development Centre (UFDC) in Skudai to focus on low-income community. The JOHOR department of was involved in the launching Malaysia UFDC. Their aim is guidance and nurture entrepreneurs.
X
Agriculture of Iskandar to provide agriculture
PRECEDENCE STUDIES
30
Rising City Canes, China by Penda Studio
Floating Urban Farming Tower by Studio NAB
USA Pavilion, Expo Milan 2015 by Biber Architect
KEY PLAN
CONCEPT: LIVING EXOSKELETON| Muzeum Layang-Layang
DESIGN PROCESS
Taman Bukit Layang-Layang
ROOF PLAN 2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
Masjid Jamek
LOCATION PLANPasir Gudang
An integration of exposed, industrialised structure to portray the identity of Pasir Gudang while aligning with MPPG’s green city vision.
Connectivity A block is placed near the Hospital and shophouses, where there are human activities to connect with surrounding context.
Jalan Besar
Sekolah Menengah
TNB Substation Basement Egress
Extend The private zoning block is extended to block the view of the abandoned Hotel while continuing the skyline.
Jalan Mawar
Proposed Site
Segregate Differenciate zoning and building storey according to building context. The part near the Hotel Selesa is marked as private.
Jalan Mawar
Hospital Penawar
Green Roof
Sekolah Menengah Rendah Islam At-Tahfiz
Enveloping The building envelopes the site to create a courtyard to invite nature in, and also improve the ventilation and lighting of the building.
Hotel Selesa Majlis Perbandaran Pasir Gudang Kompleks Pusat Bandar Pasir Gudang
Jalan Bandar
Jalan Mawar Merah
Basement Ingress
Tilting Facade The facade at the west side of the building is carved and tilted like the face of a diamond to avoid direct sun rays.
Jalan Mawar Biru
SITE ANALYSIS
SUN PATH
WIND PATH
S|
Strategic contoured location for design exploration.
W|
Noise pollution from the main road.
O|
Existing vegetation on site.
T|
Vehicles and pedestrian decreases at night.
Optimizing View Staggering balcony is designed facing the east side, away from the evening sun which also increase view experience
Void
Loading/ Unloading Bay Refuse Chamber
Hotel Selesa
B
Farmer’s Market
C
B
A
Food Court
D
LOWER GROUND FLOOR PLAN NOT TO SCALE
IMURFARM : Indoor Urban Farming
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
FIRST FLOOR PLAN NOT TO SCALE
GROUND FLOOR PLAN NOT TO SCALE
SECOND FLOOR PLAN NOT TO SCALE
D
FIRST FLOOR PLAN NOT TO SCALE
THIRD FLOOR PLAN NOT TO SCALE
ISOMETRIC NOT TO SCALE
SECTION Y-Y’ NOT TO SCALE
IMURFARM Research Research Garden Lab
Fourth Floor Level
Lobby Third Floor Level
IMURFARM
Lobby Second Floor Level
IMURFARM
Lobby Green Roof
FARMEQUE The Herbs
First Floor Level
Food Court
Lobby
Ground Floor Level
FARMEQUE The Vines
Lobby
Central Plaza
Farmer’s Market Lower Ground Floor Level
Basement Basement Floor Level
STRUCTURAL DIAGRAM NOT TO SCALE
SECTION X-X’ NOT TO SCALE
NORTH ELEVATION NOT TO SCALE
EAST ELEVATION NOT TO SCALE
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
Roof Beam Level
CONCEPTUAL BOARD
36
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
Measured Drawing Short Semester | Session 2017/2018
Scan for documentary of Rumah Batu Haji Wahid
A Measured drawing group study on a Malay Traditional House for KALAM, UTM. Rumah Batu Haji Wahid is over a century old Traditional House located in Kampung Paya Lima, Beruas, Perak. Although worn down due to age and abandoned, the architectural characteristics of the house are still intact, which prominently shows Hybrid and Neo-Classical Architecture for it’s combination of stone and timber material.
38
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
Gaya Senibina Senibina rumah Rumah Batu Haji Wahid yang terletak di Kampung Paya Lima, Beruas, Perak, ialah Senibina Hibrid yang menggabungkan Senibina Kolonial “neoclassical” yang menggunakan batu-bata di tingkat bawah dan Senibina Tradisional Perak yang menggunakan kayu di tingkat atas. Antara keistimewaan Rumah Batu Haji Wahid ialah penggunaan tiang “ionic” neo-classical yang disertakan dengan “lime plaster” bermotifkan flora.
PELAN LANTAI ARAS BAWAH (1965) TIDAK BERSKALA
Cara pembinaan rumah ini pada tingkat atas adalah menggunakan tanggam dan pasak serta sedikit penggunaan paku. Bumbung rumah ini dibentuk sebagai bumbung limas dibahagian ruang anjung dan rumah ibu, manakala bumbung jenis perabung bungkus terdapat dibahagian rumah dapur. Bahan binaan asal bumbung rumah ini ialah genting tanah liat dan ianya telah ditukar kepada atap zink pada tahun 1968.
Fungsi
PELAN LANTAI ARAS ATAS (1965) TIDAK BERSKALA
Rumah ini telah mengalami proses perubahan ruang berdasarkan kegunaan pemilik rumah. Pada asalnya, Haji Wahid telah menjadikan rumah ini sebagai tempat tinggalnya dan tempat untuk mengajar kelas agama. Kemudian, anaknya iaitu Haji Mansor, merupakan seorang usahawan yang telah menjalankan pelbagai jenis pekerjaan. Setelah keluarga Haji Wahid tidak lagi menetap di situ, rumah itu telah disewakan.
PELAN BUMBUNG (1965) TIDAK BERSKALA
TAMPAK HADAPAN (1965) TIDAK BERSKALA
TAMPAK BELAKANG (1965) TIDAK BERSKALA
TAMPAK KIRI (1965) TIDAK BERSKALA
42
TAMPAK KANAN (1965) TIDAK BERSKALA
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
Lukisan Isometrik dilukis menggunakan 100% software Revit sebagai sebahagian daripada keperluan subjek. LUKISAN ISOMETRIK (1965) TIDAK BERSKALA
Dato‘ Onn Reading Hub Semester 05 | Session 2017/2018
Scan for Video Walkthrough of Dato’ Onn Reading Hub
An Urban Design Architecture That Merges History and Community The public library in Kampung Dato’ Onn, Larkin, Johor is a redefination of library that serves the local community by merging Kampung Dato’ Onn Community Centre and an urban realm. The architecture is a ‘home’ for all generations to CREATE, STUDY, SOCIALIZE, and RELAX.
44
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
46
Proposed Site
ng
ro Lo
Loading/Unloading Area
Sat uA
KEY PLAN
Green Roof
Not To Scale
ong
Lor u
Sat Drop-Off
Proposed Site
Open Multi-Purpose Community Hall
Open Amphitheatre
Basement Parking Egress
LOCATION PLAN Not To Scale
SITE PLAN
Not To Scale
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
Basement Parking Ingress
ck tba Se
Lin
TECHNICAL DRAWINGS
C
N
E
B ---
D
A
QIBLAT 292.5°
MSR Loading/Unloading Area
AHU
292.5°
Genset UP
HR
JC
Storage Room Service Lift
1
8000
Refuse Chamber
Storage Room
Preparation Room
ELV
TNB
DRHR
Curator Office Stage
Toilet (F)
2
Closed Multi-Purpose Community Hall 8000
Toilet (M)
UP
3
HR
8000
Gallery/Exhibition Area
8 4
1
Boulevard Open MultiPurpose Community Hall
SECTION
8000
9
UP
Line ack Setb
10 5
ine ry L nda Bou
Drop Off Area
8000
Pond
5a 6 NOTE
FBT FILE NO.
COPYRIGHT RESERVED
PROJECT TITLE
FOR USE BY MAJLIS
All measurement must be checked on site. Only written measurements will be used. Should you find any mistakes or difference, do inform it immediately to the Architect (s). Every measurements are to depend on the site conditions.
To design and construct a 6-storey Dato' Onn Reading Hub on Jalan Satu, Kampung Dato' Onn, Larkin, 80350 Johor Bahru, Malaysia.
SIGNATURE OF LAND OWNER & CONTRACTOR
ARCHITECT'S SIGNATURE
DRAWING TITLE
Ground Floor Plan Scale 1:100
COPYRIGHT RESERVED Date
Items
Remarks
(Contractor's address)
Universiti Teknologi Malaysia (UTM), Skudai, 81310 Johor Bahru, Malaysia
Drawn by: Nur Atiqah Binti Ahmad
Scale: as stated above
Checked by: Ar. Atiqah
Date: 17 Dec 2018
Drawing No : ATIQAH / SBEA 3158 (2018/2019)
C
A
N
E
-
8000
---
D
8000
QIBLAT Switch Room Storage Room
292.5°
Void
UP
HR
Kitchen
Service Lift
1
292.5°
DN
Pop-Up Food Kiosk Area
ELV DRHR Void
Open Cafe
2
Public Lift HR UP
3
UP
Open Lobby
8
Retail 1 (Bookstore)
1 SECTION
4 9
10 5
5a
NOTE
FBT FILE NO.
COPYRIGHT RESERVED
PROJECT TITLE
FOR USE BY MAJLIS
All measurement must be checked on site. Only written measurements will be used. Should you find any mistakes or difference, do inform it immediately to the Architect (s). Every measurements are to depend on the site conditions.
To design and construct a 6-storey Dato' Onn Reading Hub on Jalan Satu, Kampung Dato' Onn, Larkin, 80350 Johor Bahru, Malaysia.
SIGNATURE OF LAND OWNER & CONTRACTOR
ARCHITECT'S SIGNATURE
DRAWING TITLE
Mezzanine Floor Plan Scale 1:100
COPYRIGHT RESERVED Date
Items
Remarks
(Contractor's address)
Universiti Teknologi Malaysia (UTM), Skudai, 81310 Johor Bahru, Malaysia
Drawn by: Nur Atiqah Binti Ahmad
Scale: as stated above
Checked by: Ar. Atiqah
Date: 17 Dec 2018
Drawing No : ATIQAH / SBEA 3158 (2018/2019)
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
B
C
N
---
B A
E
8000
D
8000
QIBLAT 292.5°
292.5°
DN
AHU Balcony ELV
1
Pantry + Office Lounge
Server Room
Switch Room
Void
UP
Book Restoration Room
Service Lift Library Administration Office
DRHR
8000
Children's Reading Station Book Reception Counter
Toilet (F)
UP
2 DN
8000
Toilet (M)
HR
Public Lift
UP
Void
UP
3
MPH Pop-Up Bookstore
8 4
3669
1 SECTION
3999
9
10 5
5a
NOTE
FBT FILE NO.
COPYRIGHT RESERVED
PROJECT TITLE
FOR USE BY MAJLIS
All measurement must be checked on site. Only written measurements will be used. Should you find any mistakes or difference, do inform it immediately to the Architect (s). Every measurements are to depend on the site conditions.
To design and construct a 6-storey Dato' Onn Reading Hub on Jalan Satu, Kampung Dato' Onn, Larkin, 80350 Johor Bahru, Malaysia.
SIGNATURE OF LAND OWNER & CONTRACTOR
ARCHITECT'S SIGNATURE
DRAWING TITLE
First Floor Plan Scale 1:100
COPYRIGHT RESERVED Date
Items
Remarks
(Contractor's address)
Universiti Teknologi Malaysia (UTM), Skudai, 81310 Johor Bahru, Malaysia
Drawn by: Nur Atiqah Binti Ahmad
Scale: as stated above
Checked by: Ar. Atiqah
Date: 17 Dec 2018
Drawing No : ATIQAH / SBEA 3158 (2018/2019)
N
---
B A
E
8000
D
8000
QIBLAT 292.5°
292.5°
DN
AHU
Balcony
ELV
Surau (M)
1
Switch Room
Server Room
UP
Seminar Room
Coffee Station
Service Lift DRHR 8000
Surau (F)
Lounge / Discussion Area
Toilet (F)
UP
2 DN
8000
Toilet (M) Public Lift
DN
HR
Void
UP
3
UP UP
Library
IT Corner
1 SECTION
8 3669
4
3999
9
to Green Roof
10 5
5a
NOTE
FBT FILE NO.
COPYRIGHT RESERVED
PROJECT TITLE
FOR USE BY MAJLIS
All measurement must be checked on site. Only written measurements will be used. Should you find any mistakes or difference, do inform it immediately to the Architect (s). Every measurements are to depend on the site conditions.
To design and construct a 6-storey Dato' Onn Reading Hub on Jalan Satu, Kampung Dato' Onn, Larkin, 80350 Johor Bahru, Malaysia.
SIGNATURE OF LAND OWNER & CONTRACTOR
ARCHITECT'S SIGNATURE
DRAWING TITLE
Second Floor Plan Scale 1:100
COPYRIGHT RESERVED Date
Items
Remarks
(Contractor's address)
Universiti Teknologi Malaysia (UTM), Skudai, 81310 Johor Bahru, Malaysia
Drawn by: Nur Atiqah Binti Ahmad
Scale: as stated above
Checked by: Ar. Atiqah
Date: 17 Dec 2018
Drawing No : ATIQAH / SBEA 3158 (2018/2019)
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
C
N QIBLAT
C
292.5°
---
292.5°
E
B D
A
DN
AHU Server Room
Switch Room
ELV Pantry
MABOPA Office
1
Meeting Room
Service Lift DRHR
Discussion Area Chief Executive Office
MABOPA Reception + Lounge
Toilet (F)
DN DN
2 DN
Toilet (M)
Public Lift UP
3
8 1
4
SECTION
9
10 5
NOTE
5a
FBT FILE NO.
COPYRIGHT RESERVED
PROJECT TITLE
FOR USE BY MAJLIS
All measurement must be checked on site. Only written measurements will be used. Should you find any mistakes or difference, do inform it immediately to the Architect (s). Every measurements are to depend on the site conditions.
To design and construct a 6-storey Dato' Onn Reading Hub on Jalan Satu, Kampung Dato' Onn, Larkin, 80350 Johor Bahru, Malaysia.
SIGNATURE OF LAND OWNER & CONTRACTOR
ARCHITECT'S SIGNATURE
DRAWING TITLE
Third Floor Plan Scale 1:100
COPYRIGHT RESERVED Date
Items
Remarks
(Contractor's address)
Universiti Teknologi Malaysia (UTM), Skudai, 81310 Johor Bahru, Malaysia
Drawn by: Nur Atiqah Binti Ahmad
Scale: as stated above
Checked by: Ar. Atiqah
Date: 17 Dec 2018
Drawing No : ATIQAH / SBEA 3158 (2018/2019)
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
C ---
B
E
A
Fan Room Pump Room
D
HR
Switch Room ELV
DRHR
Service Lift
1
UP
Storage
2
UP
3
1 SECTION
4
5
5a
6
Fan Room
HR
Fan Room
7
HR
7b
NOTE
FBT FILE NO.
COPYRIGHT RESERVED
PROJECT TITLE
FOR USE BY MAJLIS
All measurement must be checked on site. Only written measurements will be used. Should you find any mistakes or difference, do inform it immediately to the Architect (s). Every measurements are to depend on the site conditions.
To design and construct a 6storey Dato' Onn Reading Hub on Jalan Satu, Kampung Dato' Onn, Larkin, 80350 Johor Bahru, Malaysia.
SIGNATURE OF LAND OWNER & CONTRACTOR
ARCHITECT'S SIGNATURE
DRAWING TITLE
Basement Floor Plan Scale 1:100
COPYRIGHT RESERVED Date
Items
Remarks
(Contractor's address)
Universiti Teknologi Malaysia (UTM), Skudai, 81310 Johor Bahru, Malaysia
Drawn by: Nur Atiqah Binti Ahmad
Scale: as stated above
Checked by: Ar. Atiqah
Date: 17 Dec 2018
Drawing No : ATIQAH / SBEA 3158 (2018/2019)
INTERIOR PERSPECTIVE 01 - Main Library
Aluminium Framing Double Glazing Roof Skylight Expanding Foam Sealant 150mm Thc Concrete Roof 5mm Thk Gypsum Board Liner
Concrete Roof Gutter to Engr's Detail
150x50mm C-Channel
304.8mm Thick Intensive Soil Mix
Cavity Insulation
50mm Thk Drainage Plate 3mm Seperation Fabric
Detail 1
Detail 2
Scale 1:10
Scale 1:10
230x450mm Galvanized Steel I-Beam 457mm Diameter Circular Hollow Steel Column 70mm Depth Metal Decking Alum. Frame Powder Coated Light Green Tinted And Adjustable Window Above
Library
IT Corner
305x165mm Galvanized Steel I-Beam MPH Pop-Up Bookstore
Children's Reading Station
Open Lobby
Closed Multi-Purpose Community Hall Gallery/Exhibition Area
150mm Thk Concrete Slab 600x300mm Concrete Beam
50mm Thk Screed 150mm Thk Hardcore
NOTE
FBT FILE NO. FOR USE BY MAJLIS
1
Section X-X' 1 : 50
COPYRIGHT RESERVED
PROJECT TITLE
All measurement must be checked on site. Only written measurements will be used. Should you find any mistakes or difference, do inform it immediately to the Architect (s). Every measurements are to depend on the site conditions.
To design and construct a 6-storey Dato' Onn Reading Hub on Jalan Satu, Kampung Dato' Onn, Larkin, 80350 Johor Bahru, Malaysia.
Section X-X'
SIGNATURE OF LAND OWNER & CONTRACTOR Scale 1:50
ARCHITECT'S SIGNATURE
DRAWING TITLE
Section X-X' Scale 1:50
COPYRIGHT RESERVED Date
Items
Remarks
(Contractor's address)
Universiti Teknologi Malaysia (UTM), Skudai, 81310 Johor Bahru, Malaysia
Drawn by: Nur Atiqah Binti Ahmad
Scale: as stated above
Checked by: Ar. Atiqah
Date: 17 Dec 2018
Drawing No : ATIQAH / SBEA 3158 (2018/2019)
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
INTERIOR PERSPECTIVE 02 - Ramp
EXTERIOR PERSPECTIVE
06 Roof Beam Level 16000
05 Third Floor 13000
04 Second Floor 10000
03 First Floor 7000
02 Mezzanine Floor 4000
01 Ground Floor Level 150
FRONT ELEVATION
00 Basement Level -3000
PAM Southern Chapter Office Semester 04 | Session 2017/2018
Scan for Video Walkthrough of PAM Southern Chapter Office
A Commercial Office type Architecture that blurr the boundary of public-private spaces. The office building houses Pertubuhan Arkitek Malaysia Southern Chapter Members’ Service Centre, Admin office, mini conference centre and Training Centre. The layout is designed to promote friendly interaction and discourse among architects, and create a platform for the public information access and community integration.
56
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
INTRODUCTION The brief is to design a building for PAM Southern Chapter Office in Johor Bahru according to the theme/approach ‘living building’ to response to passive and green building design. The programme of theis building is to house Southern Chapter Members’ Service Centre, Administration Office, mini Conference Centre and Training Centre.
CLIENT PERTUBUHAN ARKITEK MALAYSIA is a national professional institute representing architects in Malaysia, Founded in 1920, the primary objectives of PAM are; 1. To promote and enlarge knowledge, study and practice of Architecture. 2. To provide a central organisation for Architecture. 3. To assist and advise Governments, local authorities or other private or public bodies. 4, To promote friendly interaction and discourse among Architects. 5. To obtain and disseminate among the members, information or matters affecting the profession.
ISSUES
Talk to coworker Smoke Eat/drink Social medias Nap Others
(1) Minimum integration of architecture and public realm that 30% 25% leads to community not having awareness of sustainable archiHabits of office worktecture (2) A need for condusive office with spaces for in-between work breaks that can ignite creative ideas.
ers during breaks
50% 20%
Outdoor Anywhere Desk Washroom Restaurant
A survey on human behavior in an arch. office was made on 20 Location of obtainrespondents consist of design- ing creative ideas ers, draftsmen, etc.; 95%
Increase positively Unsure
Work productivity when viewing green elements
PERSPECTIVE OF MAIN ENTRANCE
“The most creative ideas aren’t going to come while sitting in front of your monitor” - Scott Birnbaum, Samsung Vice President
PERSPECTIVE OF PAM OFFICE 2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
ROOF PLAN NOT TO SCALE
GROUND FLOOR PLAN NOT TO SCALE
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
FIRST FLOOR PLAN
THIRD FLOOR PLAN
SECOND FLOOR PLAN
ROOF PLAN
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
SECTION Y-Y’ NOT TO SCALE
62
SECTION X-X’ NOT TO SCALE
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
PERSPECTIVE OF PEDESTRIAN PATHWAY
PERSPECTIVE OF SEMINAR ROOM
Kelarai Residence Semester 03 | Session 2017/2018
Scan for Video Walkthrough of Kelarai; A temporary residential building for UTM international students
Weaving cultures and people in a place they can call home. The international Residence which serves as a temporary accommodation for UTM’s International students is built around a concept of Kelarai which is a type of Malay traditional weaving method. The symbolization of the concept is each piece of weaving strip represents an International student from various places with different character, cultures and ideas.
64
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
66
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
GROUND FLOOR PLAN NOT TO SCALE
SECTION X-X’
SECTION X-X'
NOT TO SCALE
SCALE 1:100
SECTION Y-Y’
SECTION Y-Y'
NOT TO SCALE
SCALE 1:100
FIRST FLOOR PLAN NOT TO SCALE
REAR ELEVATION NOT TO SCALE
ROOF PLAN NOT TO SCALE
LEFT ELEVATION NOT TO SCALE
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
International Built Environment Research Competition (B E U R C 2 0 1 8) SILVER MEDAL AWARD Poster Design Competition BEURC 2018 is an undergraduate competition dedicated to all registered undergraduates in Built Environment programmes at both national and international levels. This competition enables undergraduate students to develop independent critical thinking skills along with oral and written communication skills.
70
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
CATEGORY : MALAYSIAN CONTEMPORARY ARCHITECTURE (NATURAL IDENTITY) THE KELARAI AS A CONCEPT FOR CONTEMPORARY MALAYSIAN ARCHITECTURE Nur Atiqah Binti Ahmad, Malsiah Binti Hamid, Lim Yong Long, Fadhlina Binti Ahmad @ Taufik & Yakubu Aminu Dodo Department of Architecture, Faculty of Built Environment, 81310 Johor, Universiti Teknologi Malaysia nuratiqahnaa@yahoo.com, malsiah@utm.my, yllim@utm.my, fadhlina@utm.my, yadodo@utm.my
Abstract Current Malaysian Architectural scenario features consist mostly of ‘internationalism’ and other Architectural styles. The quest to design a modern contemporary residential building for international residents in Universiti Teknologi Malaysia (UTM), thus responds to the call for Malaysian National Identity to be adopted in characteristic the proposed design. The design intent uses the theory of bio-mimicry to show how the Malay traditional houses could be adopted for a contemporary form, using Kelarai (weaving) elements that portray one of the Malaysian traditional processes. The current student community has very little integration and social interaction due to the layout of the residences that have no spaces for interaction among students. An observational study and a general survey were conducted on 20 respondents who are currently international students in UTM. The survey questionnaire consists of various questions that can identify what the students need in a residence and also their behaviors. The result was further used to translate the kelarai design process. The outcome of the survey was used to generate the design of the required spaces and planning of the residence for UTM international students. An Architectural concept representing a proposed Malaysian National Identity was developed that weaves the layout of the residence to help integrate international students from various countries with their different characters, cultures and ideas. This is intended to create a diverse community that could live in peace and harmony. The novelty of this research is the induction of a contemporary Architectural edifice that houses international students in UTM; that evolves from one of the bio-mimicry principles using the Kelarai within the design process that translates into a proposed National Identity for Malaysia. Keywords: Architecture, concept, contemporary, kelarai & Malaysia,
72
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
Retreat House Semester 02 | Session 2016/2017
Scan for Video Walkthrough of Retreat House
A Retreat House Project for AR. Azman Zainal Md Noor in UTM, Skudai. The retreat house reflects the client; Ar. Azman’s characteristics of water element and deep interest in timber and traditional Malay Houses. The layout of the house adapts Fluidity concept that suits the context of the project, which is in front of a lake in the university. Rather than demolishing nature, the design approach of the house envelopes nature, hence preserving it for the benefit of the ecosystem.
74
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
76
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
Freelance 3D Modelling
78
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
Drinks & Bakery Kiosk Design Client requested a visualization concept of drinks and bakery kiosk for a foodcourt in Gombak Transport Hub with using KLCC’s foodcourt as a case study. Software used: Sketchup and Vray for Sketchup
PERSPECTIVE VIEW NOT TO SCALE
80
SCALE 1:50
LEFT ELEVATION SCALE 1:50
FLOOR PLAN SCALE 1:50
REAR ELEVATION SCALE 1:50
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
FRONT ELEVATION
PETA LOKASI MAJLIS
82
Lake Cempaka Villa Seksyen 9, 43650 Bandar Baru Bangi, Selangor Darul Ehsan
lak sek ban sel
3D MODEL OF BANDAR BARU BANGI 2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
Internship
84
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
WORK EXPERIENCE - INTERNSHIP
KINDE
NOT TO SC
KINDE
NOT TO SC
KINDE
NOT TO SC
86
KINDERGARTEN FLOOR PLAN NOT TO SCALE
KINDE
NOT TO SC
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
ERGARTEN FRONT ELEVATION
CALE
HUMMER PARISIAN CAFE PROPOSAL
ERGARTEN RIGHT ELEVATION
CALE
ERGARTEN LEFT ELEVATION
CALE
ERGARTEN REAR ELEVATION
CALE
CARTOON AND COMIC PARISIAN CAFE PROPOSAL
Model-Making
88
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
MODEL-MAKING
90
‘JOURNEY THROUGH PAPER FOLDING’ WALKTHROUGH SPACE GALLERY MODEL
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
KELARAI RETREAT HOUSE SECTIONAL MODEL
KELARAI RETREAT HOUSE MODEL CLOSE-UP
MODEL-MAKING
92
VERTICAL CLIMBING CENTRE MODEL
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
MARBLE RUN SCULPTURE
CAFE INTERIOR FOR BORDERS BOOKSTORE
Traditional & Digital Artworks
94
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
SKETCHES & PAINTING
Tokong Street
Kampung Hulu Mosque
Kota A’ Famosa
96
Portrait of Alphonso de Alburqueque
Kampung Kling Mosque
Tukang Emas Street
Jonker Walk
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
Inflight to Brisbane, 2014
Beginning of the semester briefing, UTM 2017
‘Fleeting, 2015’ - Watercolour Portrait exercise
Sungai Segget, JB 2017 KLSketchnation event in Shah Alam, 2014
Volunteering event, Melaka 2014
Mamak, 2018
‘Glance, 2015’ - Watercolour Portrait exercise
DIGITAL ILLUSTRATION
98
2012-2021 ISSUE 03 NA.ATELIER DECEMBER 2021
NUR ATIQAH AHMAD 2021