3 minute read
ToyotaPH confirms the GR Yaris is coming
TRB begins Site Acceptance Test on Skyway 3 prior to toll collection
In case you are wondering when Skyway 3 will begin collecting tolls from its users, today, the Toll Regulatory Board (TRB), together with the Independent Consultant, Tollway Operator and the Project Concessionaire, has conducted a Site Acceptance Test (SAT) of the Electronic Toll Collection System of the elevated highway, to ensure the system’s functionality and readiness, today, 29 March 2021.
Advertisement
According to Julius Corpuz of the TRB, the SAT covers the inventory and maintenance of the TCS equipment, Lane Computer System protocols, and Plaza Computer System protocols, in which different test case scenarios are tested, including the processing of exempted vehicle and towed vehicle, as well as the processing of low balance and invalid RFID transaction, among others.
During the inspection, TRB’s newlyappointed Executive Director, Atty. Alvin A. Carullo, explained the essence of conducting the Site Acceptance Test for the Electronic Toll Collection. “Mahalaga po ang tinatawag na SAT dahil para po masiguro namin na tatakbo ang ating Electronic Toll Collection System ng maayos, mabilis, matiwasay at ligtas para sa ating lahat, specially sa mga toll road users,” ED Carullo said.
He added, “Ibig sabihin po, dapat tama po ‘yung mga toll rate, tapos po dapat mabilis ang pagbasa sa RFID tag kasi importante ito para maiwasan po ‘yung paghaba ng pila sa mga toll plaza at tsaka ang pagkumpul-kumpol ng mga sasakyan.”
Also read: Skyway 3 closure – a bluff game?
The 18.83 kilometers elevated expressway from Buendia, Makati City to the North Luzon Expressway (NLEX) in Balintawak, Quezon City serves a vital role on decongesting traffic in Metro Manila, especially along EDSA, CP Garcia (C5), and other major roads in Metro Manila (i.e. Quezon Ave., Araneta Ave., Nagtahan and Quirino Ave.). Through the Skyway Stage 3, travel time from Buendia to Balintawak has been reduced from 2 hours to approximately 15 to 20 minutes.
As part of the government’s commitment to develop and improve the urban transportation system in the country, the Department of Transportation (DOTr) and the TRB, continues to develop ways to enhance and make public transportation more efficient, reliable, and technology-driven, through cashless payments and a better toll collection system.
Corpuz, however did not say when actual toll collection will happen because today’s event is only the start of a multistep process to gauge the effectivity of the Skyway 3 system.
ToyotaPH confirms the GR Yaris is coming!
Toyota’s most anticipated hatchback is coming! 2021 is an exciting year for the TOYOTA GAZOO Racing brand indeed as Toyota Motor Philippines (TMP) proudly announces the arrival of the GR Yaris here in the Philippines! Retailing at P2.65M, more thrilling details on the anticipated model’s launch and reservation info will be made available soon.
Following the recent launch of the Vios GR-S, and the announcement of the return of our premier motorsports and e-motorsports program – Gazoo Racing Vios Cup and GR GT Cup, TOYOTA GAZOO Racing gets even bigger in the country with the entry of the GR Yaris to the local market. More exciting launches, products, and news are up ahead!
Check out toyota.com.ph/GRYarisiscoming for more details on the GR Yaris. The list of dealers who will be accepting reservations will be available on the website soon. Stay tuned on the latest updates and follow Toyota Motor Philippines and Toyota Gazoo Racing PH on Facebook and Instagram, check out the official website at toyota.com.ph, and join us on Twitter (ToyotaMotorPH) and Viber (Toyota PH).