Big Rapids Community Center Concept

Page 1

SMALL TOWN STUDIO

CAPSTONE PRESENTATION presented by: anthonyAMATO

05.03.13


PRESENTATION CONTENT BACKGROUND RESEARCH PROJECT PROGRAM PROJECT SITE SUSTAINABILITY FINAL DESIGN


MISSION:

“The goal of the project was to design a new

community center in big rapids, michigan. a given site in downtown big rapids was compared to other sites in the town. the comparison was done by a sustainable assessment developed by don bucholz, a member of the small town studio. once a site was selected the program then was imagined in a built form. the sustainable theme extended into the building form and technology so that an optimal green building could be designed. the design and technology implementation was analyzed through a selected sustainable assessment such as LEED, BREEAM, or SERF to identify how sustainable the building could be.�


BLUE ASH RECREATION CENTER

CASE STUDY 02 DOOLITTLE COMMUNITY CENTER

CASE STUDY 03 THE PIONEER COMMUNITY CENTER

MAP OF BIG RAPIDS

CASE STUDY 01

N


PROGRAM BREAKDOWN

TOTAL INCLUDED SQ. FT.:

interior: 46816 exterior: 19800

INTERIOR SPACES: STAFF OFFICES STAFF TOILETS CLASSROOMS COMPUTER LAB WETROOM MEETING SPACES MULTIPURPOSE LOBBY GYM EXERCISE ROOM FITNESS ROOM LOCKER ROOMS THEATER KITCHEN KITCHENETTE TOILET ROOMS MECHANICAL CIRCULATION

1230 300 1250 625 1400 1000 950 3125 7300 2000 1500 2750 7150 1400 350 1650 3500 9336

COMPUTER LAB

WETROOM

STAFF FACILITIES

SMALL KIT.

MULTI PURPOSE CLASSROOMS MEETING SPACES

GYM

LOBBY

MECH.

KITCHEN

EXERCISE ROOM TOILET ROOMS

EXTERIOR SPACES: SKATE PARK KAYAK/CANOE RENTAL SPLASH PAD PLAYGROUND OUTDOOR TOILETS MAINTENANCE/STORAGE

10000 1000 3000 3000 800 2000

THEATER

FITNESS ROOM

CIRCULATION

LOCKER ROOMS

PROGRAM DIAGRAM


PROJECT DIAGRAMS

BARRIER VS. NATURE

GOOD VIEWS

PRIMARY > SECONDARY


FORM EXPLORATION 2D BUBBLE DIAGRAM

3D BUBBLE DIAGRAMS


WIND

SUN + SHADING

DURING 10 YEAR AVERAGE

DURING OVERHEATED PERIOD

DURING UNDERHEATED PERIOD

NOV. EQUINOX SUNRISE 83 DEG.

6:45 PM 10 DEG. ALT.

T.

WINTER SUNRISE 50 DEG.

S

E

. AY

P

M JU

G AU

N.

N VEH. + PED. TRAFFIC

.

JUL.

VIEWS FROM SITE

VIEWS TO SITE

RAFF

IC

PRIMARY VIEW

PEDE

AN T STRI

HEAVY VEHICULAR TRAFFIC

ST.

SITE ANALYSIS

8:12 AM 5 DEG. ALT.

UNDERHEATED + OVERHEATED PERIODS

LIGHT VEHICULAR TRAFFIC

DWIN

BAL

6:44 AM 8 DEG. ALT.

OC T.

R. AP WINTER SUNSET 64 DEG. 5:07 PM 7 DEG. ALT.

SUMMER SUNRISE 117 DEG. 5:00 AM 6 DEG. ALT.

MAR.

EQUINOX SUNSET 100 DEG.

FEB.

8:27 PM 7 DEG. ALT.

DEC

.

JA N.

SUMMER SUNSET 132 DEG.

C

EHI

VY V HEA

R ULA

SECONDARY VIEW

PRIMARY VIEW

FFIC

TRA

SECONDARY VIEW

BAD VIEW

PED. VIEWS TO SITE

UTILITIES PRIMARY VIEW

SECONDARY VIEW

ADJACENT OCCUPANCIES


RENDERED SITE PLAN B

A C

F

D

E

G

N

00’

50’

100’

200’


SUSTAINABILITY INITIAL SUSTAINABILITY ASSESSMENT • Solar Panels on south-facing roof planes.

LIVING BUILDING CHALLENGE

IMPERATIVES MET:

15/20

PETALS ACHIEVED: • Daylighting (controlled by screens). Use of sawtooth windows and monitor windows.

3/5

• Building components with maximum recycled content. • Geothermal heating/cooling/ventilation. • Maintain a tight building envelope and maximize thermal efficiency and insulation.

PROJECT STATUS: PETAL RECOGNITION


THE DESIGN


BUILDING FLOOR PLANS

N FIRST FLOOR

N SECOND FLOOR


KIT.

MULTIPURPOSE CLASSROOMS PRIVATE OFFICE CAFE

SHARED OFFICE “UNDERGROUND” PARKING

THEATER

LOBBY

N FIRST FLOOR 00’

50’

100’

200’


WET ROOM

FITNESS ROOM

N SECOND FLOOR

EXERCISE ROOM

00’

COMPUTER LAB MEETING ROOMS FAM. CHANGE ROOMS

LOCKER ROOMS

FLY LOFT

LOBBY BELOW

INDOOR TRACK

50’

100’

200’


ELEVATIONS

EAST ELEVATION

NORTH ELEVATION


ELEVATIONS

WEST ELEVATION

SOUTH ELEVATION


BUILDING FLY-AROUND


BUILDING SECTIONS BUILDING SECTION A-A

BUILDING SECTION B-B

C-C

BUILDING SECTION C-C

B-B

A-A


WALL SYSTEMS

SOLAR PANEL ARRAY METAL ROOF SYSTEM

METAL ROOF SYSTEM

REINF. LOADBEARING CMU WALL W/ ROUGH CUT CEDAR FURRED ON EXT.

METAL SOLAR SCREEN

METAL SOLAR SCREEN

METAL MOUNTING BRACKETS

METAL MOUNTING BRACKETS TIED INTO CMU

INTENSIVE ROOF SYSTEM

PRE-CAST HOLLOWCORE SLABS

PRE-CAST HOLLOCORE SLABS

REINF. CMU RETAINING WALL

CURTAIN WALL SYSTEM W/ ALUM. MULLIONS

POURED-IN-PLACE CONC. SLAB ON COMPACTED SAND

POURED-IN-PLACE CONC. SLAB ON COMPACTED SAND

POURED-IN-PLACE CONC. SLAB ON COMPACTED SAND POURED-IN-PLACE CONC. FOOTING W/ REINF.

POURED-IN-PLACE CONC. FOOTING

POURED-IN-PLACE CONC. FOOTING W/ REINF.

TYP. LOAD BEARING W/ SOLAR SCREEN

TYP. CMU RETAINING WALL

TYP. CURTAIN WALL W/ SOLAR SCREEN

0’

0’

0’

1’

2’

4’

6’

1’

2’

4’

6’

1’

2’

4’

6’


MEETING ROOM

INTERIOR RENDERINGS EXERCISE ROOM

UPPER LOBBY


EXTERIOR RENDERINGS

MAIN ENTRY

APPROACH FROM WEST


SMALL TOWN STUDIO

QUESTIONS ? presented by: anthonyAMATO


SMALL TOWN STUDIO

THANK YOU

presented by: anthonyAMATO


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.