SMALL TOWN STUDIO
CAPSTONE PRESENTATION presented by: anthonyAMATO
05.03.13
PRESENTATION CONTENT BACKGROUND RESEARCH PROJECT PROGRAM PROJECT SITE SUSTAINABILITY FINAL DESIGN
MISSION:
“The goal of the project was to design a new
community center in big rapids, michigan. a given site in downtown big rapids was compared to other sites in the town. the comparison was done by a sustainable assessment developed by don bucholz, a member of the small town studio. once a site was selected the program then was imagined in a built form. the sustainable theme extended into the building form and technology so that an optimal green building could be designed. the design and technology implementation was analyzed through a selected sustainable assessment such as LEED, BREEAM, or SERF to identify how sustainable the building could be.�
BLUE ASH RECREATION CENTER
CASE STUDY 02 DOOLITTLE COMMUNITY CENTER
CASE STUDY 03 THE PIONEER COMMUNITY CENTER
MAP OF BIG RAPIDS
CASE STUDY 01
N
PROGRAM BREAKDOWN
TOTAL INCLUDED SQ. FT.:
interior: 46816 exterior: 19800
INTERIOR SPACES: STAFF OFFICES STAFF TOILETS CLASSROOMS COMPUTER LAB WETROOM MEETING SPACES MULTIPURPOSE LOBBY GYM EXERCISE ROOM FITNESS ROOM LOCKER ROOMS THEATER KITCHEN KITCHENETTE TOILET ROOMS MECHANICAL CIRCULATION
1230 300 1250 625 1400 1000 950 3125 7300 2000 1500 2750 7150 1400 350 1650 3500 9336
COMPUTER LAB
WETROOM
STAFF FACILITIES
SMALL KIT.
MULTI PURPOSE CLASSROOMS MEETING SPACES
GYM
LOBBY
MECH.
KITCHEN
EXERCISE ROOM TOILET ROOMS
EXTERIOR SPACES: SKATE PARK KAYAK/CANOE RENTAL SPLASH PAD PLAYGROUND OUTDOOR TOILETS MAINTENANCE/STORAGE
10000 1000 3000 3000 800 2000
THEATER
FITNESS ROOM
CIRCULATION
LOCKER ROOMS
PROGRAM DIAGRAM
PROJECT DIAGRAMS
BARRIER VS. NATURE
GOOD VIEWS
PRIMARY > SECONDARY
FORM EXPLORATION 2D BUBBLE DIAGRAM
3D BUBBLE DIAGRAMS
WIND
SUN + SHADING
DURING 10 YEAR AVERAGE
DURING OVERHEATED PERIOD
DURING UNDERHEATED PERIOD
NOV. EQUINOX SUNRISE 83 DEG.
6:45 PM 10 DEG. ALT.
T.
WINTER SUNRISE 50 DEG.
S
E
. AY
P
M JU
G AU
N.
N VEH. + PED. TRAFFIC
.
JUL.
VIEWS FROM SITE
VIEWS TO SITE
RAFF
IC
PRIMARY VIEW
PEDE
AN T STRI
HEAVY VEHICULAR TRAFFIC
ST.
SITE ANALYSIS
8:12 AM 5 DEG. ALT.
UNDERHEATED + OVERHEATED PERIODS
LIGHT VEHICULAR TRAFFIC
DWIN
BAL
6:44 AM 8 DEG. ALT.
OC T.
R. AP WINTER SUNSET 64 DEG. 5:07 PM 7 DEG. ALT.
SUMMER SUNRISE 117 DEG. 5:00 AM 6 DEG. ALT.
MAR.
EQUINOX SUNSET 100 DEG.
FEB.
8:27 PM 7 DEG. ALT.
DEC
.
JA N.
SUMMER SUNSET 132 DEG.
C
EHI
VY V HEA
R ULA
SECONDARY VIEW
PRIMARY VIEW
FFIC
TRA
SECONDARY VIEW
BAD VIEW
PED. VIEWS TO SITE
UTILITIES PRIMARY VIEW
SECONDARY VIEW
ADJACENT OCCUPANCIES
RENDERED SITE PLAN B
A C
F
D
E
G
N
00’
50’
100’
200’
SUSTAINABILITY INITIAL SUSTAINABILITY ASSESSMENT • Solar Panels on south-facing roof planes.
LIVING BUILDING CHALLENGE
IMPERATIVES MET:
15/20
PETALS ACHIEVED: • Daylighting (controlled by screens). Use of sawtooth windows and monitor windows.
3/5
• Building components with maximum recycled content. • Geothermal heating/cooling/ventilation. • Maintain a tight building envelope and maximize thermal efficiency and insulation.
PROJECT STATUS: PETAL RECOGNITION
THE DESIGN
BUILDING FLOOR PLANS
N FIRST FLOOR
N SECOND FLOOR
KIT.
MULTIPURPOSE CLASSROOMS PRIVATE OFFICE CAFE
SHARED OFFICE “UNDERGROUND” PARKING
THEATER
LOBBY
N FIRST FLOOR 00’
50’
100’
200’
WET ROOM
FITNESS ROOM
N SECOND FLOOR
EXERCISE ROOM
00’
COMPUTER LAB MEETING ROOMS FAM. CHANGE ROOMS
LOCKER ROOMS
FLY LOFT
LOBBY BELOW
INDOOR TRACK
50’
100’
200’
ELEVATIONS
EAST ELEVATION
NORTH ELEVATION
ELEVATIONS
WEST ELEVATION
SOUTH ELEVATION
BUILDING FLY-AROUND
BUILDING SECTIONS BUILDING SECTION A-A
BUILDING SECTION B-B
C-C
BUILDING SECTION C-C
B-B
A-A
WALL SYSTEMS
SOLAR PANEL ARRAY METAL ROOF SYSTEM
METAL ROOF SYSTEM
REINF. LOADBEARING CMU WALL W/ ROUGH CUT CEDAR FURRED ON EXT.
METAL SOLAR SCREEN
METAL SOLAR SCREEN
METAL MOUNTING BRACKETS
METAL MOUNTING BRACKETS TIED INTO CMU
INTENSIVE ROOF SYSTEM
PRE-CAST HOLLOWCORE SLABS
PRE-CAST HOLLOCORE SLABS
REINF. CMU RETAINING WALL
CURTAIN WALL SYSTEM W/ ALUM. MULLIONS
POURED-IN-PLACE CONC. SLAB ON COMPACTED SAND
POURED-IN-PLACE CONC. SLAB ON COMPACTED SAND
POURED-IN-PLACE CONC. SLAB ON COMPACTED SAND POURED-IN-PLACE CONC. FOOTING W/ REINF.
POURED-IN-PLACE CONC. FOOTING
POURED-IN-PLACE CONC. FOOTING W/ REINF.
TYP. LOAD BEARING W/ SOLAR SCREEN
TYP. CMU RETAINING WALL
TYP. CURTAIN WALL W/ SOLAR SCREEN
0’
0’
0’
1’
2’
4’
6’
1’
2’
4’
6’
1’
2’
4’
6’
MEETING ROOM
INTERIOR RENDERINGS EXERCISE ROOM
UPPER LOBBY
EXTERIOR RENDERINGS
MAIN ENTRY
APPROACH FROM WEST
SMALL TOWN STUDIO
QUESTIONS ? presented by: anthonyAMATO
SMALL TOWN STUDIO
THANK YOU
presented by: anthonyAMATO