Document No 00 Document Title: Design Guidelines (Gen 2) Prepared by: Wayne Davis Title: Project Manager Housing Operations Version No 3.0 Approved by: GM Housing Design Guidelines (Gen 2) Version Date: 14/07/2022 Review Date: July 2023 Page 1 of 17 All printed copies are uncontrolled Design Guidelines (Gen 2)

Document No 00 Document Title: Design Guidelines (Gen 2) Prepared by: Wayne Davis Title: Project Manager Housing Operations Version No 3.0 Approved by: GM Housing Design Guidelines (Gen 2) Version Date: 14/07/2022 Review Date: July 2023 Page 2 of 17 All printed copies are uncontrolled Contents 1. Purpose 2 2. Electrical and Gas 2 3. Airconditioning 5 4. Tiling 6 5. Windows 8 6. Vanity Units 8 7. Robes and Storage Cupboards.................................................................................... 9 8. Laundry 10 9. Bathroom and Ensuite 10 10. WC and Powder Room............................................................................................... 11 11. Square Set and Cornice 11 12. Kitchen 14 13. Doors 14 14. Patio 14 15. Drawing Setup Items .................................................................................................. 15 16. Miscellaneous 15 17. Key Relationships/Stakeholders 16 18. Subject Matter Expert……………………………………………………………………....16 1. Purpose 1.1 Overview The purpose of this document is to capture and outline the various characteristics of a built form design to ensure consistency and alignment within the business 2. Electrical and Gas 2.1 Exhaust Fans • Include exhaust fan to Bathroom and Ensuite, switched separately from light and positioned adjacent to shower and in line with downlight • If no natural ventilation to Bathroom or Ensuite, include exhaust fan switched together with downlight • If no natural ventilation to WC and Powder, include exhaust fan switched together with downlight • If no natural ventilation to Laundry, include exhaust fan switched together with downlight 2.2 Gas Point • Include one natural gas bayonet outlet

• Electrical meter box, gas meter box and PCD to be located as per standard detail

• HWS to be shown flush back to studwork on floor plan and electrical plans

• GPOs generally are at 300mm high unless noted otherwise

Version Date: 14/07/2022

• No ceiling fan to Dining room

2.3 Ceiling Fans

2.6 GPOs, TV, Data and Telephone

• Include one DGPO to all Hallways, located approx. mid way along the Hallway

• Include one DGPO to Living (in addition to DGPO adjacent TV Point)

• Include one DGPO to Activity (in addition to DGPO adjacent TV Point)

• Include two DGPO’s to MPR (in addition to DGPO adjacent TV Point)

• Include two DGPO’s with USB, to Bedroom 1 (in addition to DGPO adjacent TV Point)

• Include wall mounted instantaneous gas HWS

o Position to allow for barbeque to sit under an eave of the patio rather than under the patio itself

• Include one ceiling fan to each Bedroom, MPR, Activity and Study (where practical based on design) Note additional ceiling fans may be required to meet energy efficiency requirements Design team to amend to suit lot specific report

Version No 3.0 Approved by: GM Housing Design Guidelines (Gen 2)

• Include one DGPO to Garage to centre of rear Garage wall and one SGPO to ceiling positioned to suit auto garage door opener

• Include one DGPO to Dining

2.5 Electrical Meter Box, Gas Meter Box & PCD

• Include one DGPO to Bedroom 2, 3 and 4

2.4 Hot Water System (HWS)

• Include one DGPO to all Broom cupboards at 1050mm. Note Do not include GPO to any other cupboards

Note: Gas HWS to be substituted with Electric HWS if project does not have a natural gas supply

Document No 00 Document Title: Design Guidelines (Gen 2)

Review Date: July 2023 Page 3 of 17 All printed copies are uncontrolled o Position outlet so as not in line of sight from Living/Dining room

• Include one ceiling fan to Living space

Prepared by: Wayne Davis Title: Project Manager Housing Operations

• Electrical & gas meter box to be shown flush back to studwork on floor plan and electrical plans

o One Telephone point, adjacent to DGPO with USB

• Include one downlight to WIP, centred and switched inside entry to WIP

• Include one DGPO to Bathroom and Ensuite at 1050mm

• Switching to Porch and Hallway lights to be located on door hardware side of Entry door in entry hall

Document No 00 Document Title: Design Guidelines (Gen 2)

Prepared by: Wayne Davis Operations

• Include two downlights to Bedroom 2, 3, 4, MPR, Study and Activity

• Review positioning of TV, DGPO and Data Points to ensure they correlate with furnishing layout and circulation spaces 2.7 Lighting

• Include one downlight to Walk in Robe, Walk in Store and Walk in Linen, centred

Approved by: GM Housing Design Guidelines (Gen 2)

Version No 3.0

Title: Project Manager Housing

• Include one DGPO to Laundry at 1050mm

• Include one downlight to WC, Powder, Laundry, Bathroom and Ensuite, centred

• Include the following GPO’s, Telephone point to Kitchen o One DGPO with USB, to Island Bench wherever possible

o Height is 1500mm to Bed 1

Version Date: 14/07/2022

• Include TV point, DGPO and Data Point (grouped together) to Living, Bedroom 1, MPR and Activity. The DGPO should be centred in this group with the data to the RHS.

Review Date: July 2023 Page 4 of 17 All printed copies are uncontrolled • Include one DGPO and one Data point to Study

o Height is 1050mm to Living, MPR and Activity

o Two DGPO’s to cooking wall o One DGPO to Pantry/WIP at 1050mm o One SGPO to Refrigerator Space at 1800mm o One SGPO to Microwave Space at 600mm o One SGPO to Dishwasher Space at 600mm

• Include one external weatherproof DGPO to Patio, located on the longest solid wall 600mm back from corner. Ensure no clash with gas bayonet outlet

• Include one LED Oyster light to Garage, centred

• Include four downlights to combined Living/Dining area in all instances

• Include three downlights to Kitchen, one over the sink and the other two centred between Island bench and cooking wall

• Design Team to consider paths of circulation for best placement of light switches.

• Entry Hallway lighting to typically include three downlights and 3 way switching. Design Team to modify number of downlights if required to suit individual house designs

o If Patio exceeds 4000mm in length, include two downlights

• Include three wall mounted lights to Stair Design Team to determine placement

Version Date: 14/07/2022

o Second switch at Garage internal door

Note in certain cases, one light may service both if they are nearby each other

Review Date: July 2023 Page 5 of 17 All printed copies are uncontrolled

o Wherever possible, internal, and external units should be located back to back o Where external unit is unable to be located back to back, locate as close as possible to the internal unit

Document No 00 Document Title: Design Guidelines (Gen 2)

o Split system air conditioning is to be included to Bed 1 and Living

o Third switch to end of hall (usually Kitchen)

• Rear Hallway to typically include one downlight. Design Team to modify number of downlights if required to suit individual house designs

Approved by: GM Housing Design Guidelines (Gen 2)

• Include one wall mounted bunker light or one downlight under Stairs where applicable

• Split System Air Conditioning (where applicable)

• Include one wall mounted bunker light outside Laundry and Rear Garage Door

• If not specified, Design Team to determine best placement of light paints 3. Airconditioning

Prepared by: Wayne Davis Title: Project Manager Housing Operations

o First switch at Entry door

• Porch and Front Facade

Design team to determine number of lights and position to suit façade design.

• Include one downlight to Patio

• Include Para flood light to Patio on external corner

Version No 3.0

o Include one downlight to Porch, centred (only where downlight not greater than 3.2m above finished ground level). If greater than 3.2m, include one wall mounted up/down light.

o Include one or two wall mounted up/down lights (in addition to light above).

Note Ensure bunker light will not clash with hinged screen doors.

o Show indicative location of 1200x600 return air grille on electrical plan. Locate centrally to home, preferably in a hallway. Locate on first floor to 2 Storey homes. Avoid locating within 2m of a stair void wherever possible

4. Tiling

• Ducted Air Conditioning (where applicable)

o If internal unit is required to be located on an internal wall, ensure there is an unobstructed wall path to an external wall for condensation pipework

Version Date: 14/07/2022

o Ensure positioning of external unit allows adequate access and 600mm min. in front of unit (i.e., between unit and fence/boundary)

o Ensure positioning of external units allows adequate access and 600mm min. in front of unit (i.e., between unit and fence/boundary)

o For Inspire Specification, 2250mm high tiling to vanity wall and shower vestibule, then reduce to 1200mm high tiling adjacent the bath (long side and both ends). Reduce to 225mm high skirting tile only to all other walls

o For Acclaim Specification, 2250mm high tiling to shower vestibule, then reduce to 1200mm high tiling adjacent the bath (long side and both ends).

o Bed 1 internal unit should be positioned to avoid air flow being directed towards bed head

• Bathroom and Ensuite

Document No 00 Document Title: Design Guidelines (Gen 2)

o Ducted outlets to be provided to all Bedrooms, Kitchen, Living, Dining, MPR, Activity and separate Study

Version No 3.0 Approved by: GM Housing Design Guidelines (Gen 2)

Review Date: July 2023 Page 6 of 17 All printed copies are uncontrolled o Avoid positioning outdoor unit near windows or doors to habitable rooms

o For 2 Storey homes, ensure adequate wall ducts are provided to suit lower floor outlet locations. Check locations are not obstructed by floor structure. Wherever possible, allow a clear space of 400x400 per outlet for wall ducts. Locate wall ducts in robe/storage areas.

Prepared by: Wayne Davis Title: Project Manager Housing Operations

o Show location of control panel on electrical plan. Typically, adjacent to kitchen light switches

o For Exceed Specification, full height tiling to vanity wall and shower vestibule, then reduce to 1200mm high tiling to all other walls

• Note There are certain scenarios where it would make sense to include additional full height tiling, for example, where bath is adjacent the shower on the same wall. Design Team to consider when documenting

o Height to underside of niche is 1180mm

Version Date: 14/07/2022

o For Inspire and Acclaim Specification, 300mm high splashback tiling above laundry bench and 225 mm high skirting tile only to all other walls

• Floor Tiling Floor tiling throughout except for Bedrooms, MPR, Robes, WIR, Garage, upstairs cupboards

o

o For Inspire and Acclaim Specification, 225mm high skirting tile only to all walls Laundry

• Linen, Brooms & Stores Ensure floor tiling shown where applicable

o

Approved

Document No 00 Document Title: Design Guidelines (Gen 2)

Prepared by: Wayne Davis Title: Project Manager Housing Operations No 3.0 by: GM Housing Design Guidelines (Gen 2)

• WC and Powder Room For Exceed Specification, 1200mm height tiling to all walls

• Ensuite and Bathroom showers should include a prefabricated tiled niche

o 365mm high x 615mm long and dimensioned as ‘stud opening’ on wet area elevations o Centred on the non showerhead/rail wall

Version

o

o Floor tiling to under stair storage spaces, typically 1200mm. Exact extent to be determined by Design Team to suit stair design

Note: Only applicable where understairs storage space adjoins a tiled floor area. Master Drawing Sets For master drawing sets show tiling pattern consistent across all models as follows

o

o For Exceed Specification 600mm x 600mm floor tiles 600mm x 600mm wall tiles

o For Inspire and Acclaim Specification 450mm x 450mm floor tiles 450mm x 450mm wall tiles

Review Date: July 2023 Page 7 of 17 All printed copies are uncontrolled Reduce to 225mm high skirting tile only to all other walls. Include 300mm high tile splashback between vanity and mirror.

o For Exceed Specification, 1200mm height tiling to all walls

o Note window sizes and configuration will vary where Bedroom 1 forms part of front façade

• Windows to wet area’s to include white translucent glass 6. Vanity Units • Bathrooms should only include single basin vanity units

• Single basin vanities must be specified in standard lengths including 750mm, 900mm & 1200mm •

• Generally, Bedroom 1 should be 1200mm deep OX sliding window. Width of window to be determined by the Design Team to suit room dimensions.

Prepared by: Wayne Davis Title: Manager Housing Operations

o For wider MPR’s, increase width of window to 2100mm or 2400mm. Again, sliding windows in OX configuration.

• Upstairs windows may vary in depth due to lower roof restrictions and/or minimum transom height requirements

• Small windows such as 0906 windows, typically to WC’s, Bathrooms and Ensuites should be sliding windows to lower floor and awning windows to upper floor

• Double hung windows are not to be used under any circumstances

• MPR windows should be 1500mm deep x 1800mm wide (minimum) sliding OX windows with no horizontal transom

Review Date: July 2023 Page 8 of 17 All printed copies are uncontrolled 5. Windows

Version No 3.0 Approved by: GM Housing Design Guidelines (Gen 2)

• Kitchens with a window at the end of galley style kitchen should be 1809 Awning (single panel)

o So, for example, an MPR with a width of 3000mm would have an 1800mm wide window. An MPR with a width of 3600mm would have an 2400mm wide window.

• Ensuites should include double basin vanity units wherever space allows, if insufficient space a single bowl vanity is acceptable

• Windows to Bedrooms and Living Spaces should typically be a minimum of 900mm wide. 600mm wide windows should only be used by exception at the discretion of the Design Team

• Bedroom 2,3 and 4 should be 1218 OX sliding windows

o When determining window width allow approx. 600mm on either side of window to allow for furnishing.

• Generally, across the board all sliding windows should be OX configuration

Project

Document No 00 Document Title: Design Guidelines (Gen 2)

Version Date: 14/07/2022

• Robes, Linen, Broom, Store to include sliding doors wherever possible (where opening size 1200mm or greater) o Sliding doors must be specified in standard lengths as follows: 2 panel 1200mm, 1500mm, 1800mm, 2100mm, 2400mm 3 panel 2700mm, 3000mm

• Robe length should be maximised whilst maintaining standard door sizes

Document No 00 Document Title: Design Guidelines (Gen 2)

• For Exceed Specification vanity drawers include square edge finger pulls

• Wall mounted spouts to be dimensioned to centre line on wet area plan and elevations.

Version

• For Acclaim Specification vanity units are wall mounted with two cupboard doors to single basin vanities and 4 doors to double basin vanities. (500 mm overall including stone top, 345mm to underside)

• For Inspire and Acclaim Specification vanity drawers and cupboards include bevel edge finger pulls

Review Date: July 2023 Page 9 of 17 All printed copies are uncontrolled • Double basin vanities must be specified in standard lengths including 1500mm & 1800mm • Vanities have 20mm stone tops • Vanities are to be offset 150mm from side of vanity to wall/shower

• Broom includes one shelf at the top (same height as top shelf of Linen)

• Store includes 3 shelves at same height as the top 3 Linen shelves

Project Manager

Approved by: GM Housing Design Guidelines (Gen 2)

• Broom, when combined with a Linen or Store, should be 600mm wide

• For Exceed and Inspire Specification vanity units are wall mounted with two drawers to single basin vanities and 4 drawers to double basin vanities. (500 mm overall including stone top, 345mm to underside)

Prepared by: Wayne Davis Title: Housing Operations No 3.0

7. Robes and Storage Cupboards

• Linen includes 4 shelves

o Where the opening size is less than 1200mm, a single swing door should be specified. 820mm is the maximum door size to be specified

• WIR’s to include 900mm wide square set opening (no hinged door). Where space dictates, opening can be reduced but only to a minimum of 800mm. Height of opening 2100mm.

o Sliding doors should be tagged with door dimension

Version Date: 14/07/2022

Title: Project Manager Housing

9. Bathroom and Ensuite

Document No 00 Document Title: Design Guidelines (Gen 2)

• Include one towel ring at 1050mm. Note where space is limited towel ring can be mounted on the end of the vanity

Version Date: 14/07/2022

Version

One mirror to single basin vanities and 2 mirrors to double basin vanities Mirrors to be centred on vanity spout. Provide tiling behind mirror.

• Internal elevations to be shown for all walls 8.2 Tub and Cabinet

• For Exceed and Inspire Specification, Laundry should include a joinery unit, typically 900mm long with a 45 litre drop in tub

• Always show washing machine adjacent to Laundry joinery unit, allow 50mm gap

8. Laundry 8.1 Washing Machine Location, GPO & Washing Machine Hose Cocks

Underside of mirror to be 300mm above finished stone height

Approved

• Do not show washing machine stops on drawings (refer to standard detail)

• Show GPO centred above washing machine

• For Acclaim Specification, Laundry should include pre fabricated metal laundry unit with 45 litre tub and metal cabinet

• Include one double towel rail at 1050mm

Prepared by: Wayne Davis Operations No 3.0 by: GM Housing Design Guidelines (Gen 2)

Flat frameless polished edge 900mm x 650mm feature mirror with 16mm HMR laminate standoff backing panel (black edged).

Note: Laminate standoff backing to be initially installed by joiner. Tiler to temporarily remove to allow tiling behind. Tiler to re install at completion.

Review Date: July 2023 Page 10 of 17 All printed copies are uncontrolled • Linen length should be maximised, always longer than the Store

o For Inspire and Acclaim Specification

• Include freestanding bath, either 1500mm or 1780mm Maintain 100mm (min.) clearance from ends of bath to wall and 120mm from side of bath to wall. Typically, the bath should be in the Bathroom In some models it may be appropriate to place the bath in the Ensuite rather than the Bathroom (subject to Project or Design brief)

• Mirrors o For Exceed Specification

11.

All

• Typically, the shower mixer should be positioned adjacent to the shower head/rail, closest to the shower entry. For longer showers position mixer separately in the centre of the long shower wall.

• Powder

Version Date: 14/07/2022

Review Date: July 2023 Page 11 of 17 All printed copies are uncontrolled Square polished edge rectangular mirror. Mirror height is 900mm and to match width of vanity unit. Underside of mirror to be 1200mm.

Document No 00 Document Title: Design Guidelines (Gen 2)

• Floor

o

Approved

Note

Prepared by: Wayne Davis Title: Manager Housing Operations No 3.0 by: GM Housing Design Guidelines (Gen 2)

11.1

Project

Version

• Internal

o Upper

• For

• Where space allows, showers should be 1000mm x 1000mm for a corner shower, and 1000mm wide for a 3 walled shower. elevations to be shown for all walls wastes Lower Floor PoEnsuiteBathroomwder Laundry does not include a floor waste Floor Wet Areas WC and Powder Room one toilet roll holder Powder, include wall hung basin with mixer tap and bottle trap Powder, include one towel ring Powder, include mirror as per Bathroom and Ensuite Internal elevations to be shown for all walls For WC, internal width should be 1000mm where possible. Square Set and Cornice For Exceed Specification, square set throughout except for the following rooms: Laundry

10.

• Include

• For

• For

• Bedrooms • Robes •

Document No 00 Document Title: Design Guidelines (Gen 2) Prepared by: Wayne Davis Title: Project Manager Housing Operations Version No 3.0 Approved by: GM Housing Design Guidelines (Gen 2) Version Date: 14/07/2022 Review Date: July 2023 Page 12 of 17 All printed copies are uncontrolled • WC • Garage • All storage cupboards • For clarity, WIP in the kitchen is square set • 90mm cove cornice elsewhere 11.2 For Inspire Specification, square set throughout except for the following rooms • Bedrooms • Bathroom, Ensuite • Robes • Laundry • Powder • WC • Garage • All storage cupboards • For clarity, WIP in the Kitchen is square set • 90mm cove cornice elsewhere • For Acclaim specification, 90mm cove cornice throughout 12. Kitchen • For Exceed Specification drawers and doors include square edge finger pulls (excludes pantry) • For Inspire and Acclaim Specification drawers and doors include bevel edge finger pulls (excludes pantry and overhead cupboards) • For Inspire and Acclaim Specification doors to overhead cupboards include square edge finger pulls • For Exceed and Inspire Specification include a bank of drawers to either side of oven/cooktop • For Acclaim Specification include cupboards to either side of oven/cooktop • For non WIP Kitchens, centralise cooktop space between fridge space and pantry location (where applicable)

o For 900mm ensure a 400mm space on either side, therefore a minimum bench length of 1700mm. o Ensure that the electrical fixture schedule is nominated the correct cooktop size

Approved by: GM Housing Design Guidelines (Gen 2)

• Water point for fridge space to centralised. Height nominated on standard details

Document No 00 Document Title: Design Guidelines (Gen 2)

Prepared by: Wayne Davis Title: Project Manager Housing Operations

• Do not show shelves to range hood cupboard or sink cupboard

• Cooktop family (Revit symbol) to be more generic without control nobs shown

o For 600mm, ensure a 400mm space on either side, therefore a minimum bench length of 1400mm.

Version Date: 14/07/2022

• For Acclaim Specification, cooktop and oven to be 600mm.

Version No 3.0

• Dishwasher space should be 610mm clear width

• Rangehoods

• No doors to be included on WIP openings

o For Exceed Specification, rangehood size will vary depending on type of cooktop. For gas cooktop an 800mm rangehood is specified. For electric induction cooktop an 860mm rangehood is specified. Overhead cupboard for rangehood should be 900mm wide to suit both scenarios

• For Exceed and Inspire Specification, cooktop, and oven size to be determined by length of bench space, either 600mm or 900mm.

• Fridge to be placed at open end of Kitchen except were located inside WIP

Review Date: July 2023 Page 13 of 17 All printed copies are uncontrolled • Bank of drawers, including cutlery drawer to be at open end of Kitchen and 600mm wide • Island bench to include (where space allows) and in order, a cutlery drawer bank, microwave space, sink, dishwasher. Note where space is limited, microwave space to be relocated to cooktop bench.

o For Inspire Specification, an 700mm rangehood is specified. Overhead cupboard for rangehood should be 900mm wide

• For Exceed Specification include waterfall stone gable to end of island bench (where applicable)

• Include an under bench dedicated microwave space 632mm wide (600mm clear width)

• For Inspire and Acclaim Specification include 16mm laminated gable with 5 mm bench overhang (where applicable). Modify width of sink cupboards to suit.

o For Acclaim Specification, an 600mm rangehood is specified. Overhead cupboard for rangehood should be 600mm wide

• Laundry external doors, wherever possible, should be a sliding glass door. Where dimensions dictate, an 820mm half glass swing door should be included.

o For all new designs, obtain shop drawings for joinery for approval

Review Date: July 2023 Page 14 of 17 All printed copies are uncontrolled

13. Doors •

Approved by: GM Housing Design Guidelines (Gen 2)

o Depth of shelves to be 500mm typically unless otherwise determined by the Design team

• WIP entry to be stud walls on either side of opening wherever possible and be 900mm clear width where possible (800mm minimum), and 900mm minimum where fridge located in WIP

All Bedroom doors to be 820mm swing doors

Document No 00 Document Title: Design Guidelines (Gen 2)

• Ensure Area Schedule is in consistent order as follows.

15. Drawing Setup Items

• All master drawing sets to be drawn with Garage on RHS when viewed from the street

• For master drawing set, all Garage doors to be nominated as Slimline, then modified to suit lot specific selection

Prepared by: Wayne Davis Title: Project Manager Housing Operations

14. Patio

• For master drawing set, all Front Entry doors to be nominated as XN7, then modified to suit lot specific selection

• Tiling to Patio to extend under eaves in both directions to maximise useable space

Version Date: 14/07/2022

• Front Entry doors to be 820mm generally, unless a 920mm will fit

• Garage external doors, wherever possible, should be a sliding glass door. Where dimensions dictate, an 820mm (preferred) or 720mm half glass swing door should be included.

Version No 3.0

• WIP Joinery shelves to be fixed (i.e., not adjustable) and dimensioned on kitchen elevations at the following heights: o 500mm, 900mm, 1300mm & 1700mm measured from floor Note No plinth to be included

• All MPR’s to have 920 cavity sliding door centred to room wherever possible

• Opening from wall to wall for Bedroom doors to be 1000mm minimum where door is adjacent to a robe

o Bulkheads to walk in Robes to be 2100mm high

Design Manager Housing Review plans to be in alignment with this standard operating procedure

All

Document No 00 Document Title: Design Guidelines (Gen 2)

Approved

o Garage o Patio o Porch o Grand

Ceiling articulation bulkhead to be typically located at the end of the Entry Hallway wherever possible. Bulkhead height to match height of kitchen bulkhead

o Note: Include additional ceiling articulation bulkheads if required

Designers Ensure drafted plans are in alignment with this standard operating procedure

Estimating Manager Review plans and BOQs to be in alignment with this standard operating procedure

Housing Operations Team Review plans and BOQs to ensure alignment with this standard operating procedure

by: Wayne Davis Title: Project Manager Housing Operations Version

o Upper

16. Miscellaneous •

Title Responsibility

Estimators Ensure BOQs are in alignment with this standard operating procedure

• Where the door to access Under Stair Storage is visible from a living space it should be specified as a square set opening with a push catch joinery door, mounted flush with face of wall Relationships/Stakeholders

Prepared No 3.0 by: GM Housing Design Guidelines (Gen 2) Date: 14/07/2022 Date: July 2023 Page 15 of 17 printed copies are uncontrolled (Lower Living where applicable) Living (where applicable) Total

o Living

Version

17. Key

• Render finish to return 2030mm on both side elevations or to nearest practical location (i.e., window or similar)

Review

are uncontrolled 18. Subject Matter Expert Title Responsibility Design Manager Housing Brayden Taylor Construction Operations Manager Ryan Taylor Project Manager Housing Operations Wayne Davis Amendment Register Revision Date Amendments 1.0

Updated

• Additional item, include exhaust fan to Laundry if no natural ventilation Airconditioning moved to a separate section

• Overall height modified to 500mm

Prepared 2) July 2023 of copies May 2022 Issue 27/06/2022 to include Inspire and Acclaim Specification

2.0

• HWS note added for electric HWS (if no gas supply)

• Bunker light outside Laundry and Rear Garage Door note added

Document No 00 Document Title: Design Guidelines (Gen 2)

For Exceed Specification, 2nd Rangehood size added to suit gas cooktop 14/07/2022 and Gas

17 All printed

Version Date: 14/07/2022 Review Date:

Cover page Airconditioningaddeddescription enhanced.

Tiling, note added regarding floor tiles to under stair storage areas Windows

• Dimension of 345mm added to underside Robes and Storage Cupboards, height of opening to WIR added

Laundry, minor amendment to description for Acclaim laundry unit

• Offset dimension modified to 150mm

• Minor amendment to description for MPR windows

Vanity Units Descriptions modified regarding number of doors and drawers

Initial

Page 16

Wall lights added to front façade Floor waste descriptions added.

by: Wayne Davis Title: Project Manager Housing Operations Version No 3.0 Approved by: GM Housing Design Guidelines (Gen

3.0

• Note added regarding glazing of windows to wet areas

Electrical

• Note added, Design Team to decide best placement of light switches and light points (if applicable)

Lighting • Porch and Front Façade lighting various amendments

• Modify description of door to access Under Stair Storage

Approved

Review Date: July 2023 Page 17 of 17 All printed copies are uncontrolled Bathroom and Ensuite Minor amendment to clarify dimensions to freestanding bath Amendment to height of mirrors in Inspire and Acclaim Specification

• Note added regarding sequence of installation of laminate standoff backing to mirrors

Prepared by: Wayne Davis Title: Project Manager Housing Operations No 3.0 by: GM Housing Design Guidelines (Gen 2)

Version

• Remove reference to floor waste types Kitchen

• Add description for waterfall stone gable to island bench for Exceed Specification

• Minor amendment to shower mixer position

Document No 00 Document Title: Design Guidelines (Gen 2)

• Delete note regarding dishwasher Doors, amend description regarding lot specific selections for Front and Garage Miscellaneousdoors

• Add description for island bench to Inspire and Acclaim Specification

• Amendments to clarify height of ceiling articulation bulkheads and Add height of WIR bulkhead

Version Date: 14/07/2022