INTRO For the first project in this semester, we are assigned to a rather different way of designing than what we usually go through. This time, we get to build the object and see how it stands in the urban condition and how people reacts to/around it. In order to do so, we must first analyze the context thoroughly to understand how this place works, what makes it ticks. Throughout all the surveys and analysis, we must look closely to find issues that could later on be responded with our design. This is what we went through, from the overall analysis to the detailed analysis. Hope you can understand Pasar Minggu the way we do by reading this.
{Overall Analysis} SURROUNDING HISTORY TIMELINE ZONING SENSES-EXPERIENCE
{
Pasar Minggu did and tried everything to survive this globalization era. It once has its own glorious years and died, but manage to revive itself and make a name for oneself again here at the South of Jakarta
PASAR MINGGU, 13 FEBRUARI 2015
ZONING
mela
SENSES
Smell ----------------------Hearing ----------------------Visual
{Detailed Analysis} Transaction: Buyer Seller Physical(existing building)
BLOK LANTAI DASAR ROBINSON
BLOK C LANTAI DASA
PEMBELI Gender
Start 05.00
Why? Efficiency in carrying and movement
Transaction : Bargain and one on one Movement linear
Buy heterogeneous and some thing
Density Age
Buy homogeneous and more things
Scatter in all area
End 16.00
PENJUAL Gender
Start 03.30 Preparing
Why? Needs of strenght Transaction : Bargain and all in one Break time
Selling herbs
Tidy up
Crowded area
Density Age
Selling meat and eggs Loading
Meat area End 18.00
Herbs area Storing
PHYSICAL
Plan
Plan of the store
AIR
LIGHTING
ACCESS
Buyer Goods Seller Wall
Display 1
Buyer Goods Seller Wall
Display 2
Buyer Goods Seller Wall
Display 3
Because of this buiding is lack in light, air, and dimension, space that has been create is so dark and narrow
wall wall
Seller Goods buyer
wall
issue  People jump over their goods because of no acces
OVER BOUNDARIES
ISSU
Maximize BOUNDARIES
Maximize Boundaries
Expirience
Storage
Elevator
BLOK C LANTAI 1
BLOK D LANTAI DASAR
BLOK D LANTAI ATAS