CAE470_CONSTRUCTION METHODS AND COST ESTIMATING PROF: LEMMING, DORN COST ESTIMATORS: GROUP 07 MICAH N. CISNEROS SAURAV (VISH) AYYAGARI YEONGGWANG (CHRIS) CHOI
PROJECT OVERVIEW
PROJECT OVERVIEW
SQUARE FOOT ESTIMATE
TYPE:
Hospital
SIZE:
21,008 SF
QUALITY:
High
UNIT COST:
$315/SF
MEDIAN SIZE:
55,000
SIZE FACTOR:
1.17
LOCATION:
Idaho, Coeur D’Alene (838)
FACTOR:
93.7
BASE COST:
$6,617,520
SIZE ADJUSTED:
$6,200,616.24
LOCATION ADJUSTED:
$7,254,721.00
PARAMETRIC ESTIMATE
$
12,722,192.53 COST BREAKDOWN
COST BREAKDOWN
DIVISION BREAKDOWN
MICAH N. CISNEROS SAURAV (VISH) AYYAGARI YEONGGWANG (CHRIS) CHOI
DIVISION BREAKDOWN
GENERAL REQUIREMENTS ●
Temporary Utilities
-
Fencing
-
Power
-
Plumbing
-
Portable Toilet
●
Cleanup
●
Field Engineering
●
Field Office
$320,768.98
DIVISION 01
METALS
DIVISION 05
METALS ●
Steel
-
Beams
-
Braces
-
Columns
-
Lintels
-
Baseplates
-
Decking
$759,093.29
DIVISION 05
WOOD AND COMPOSITES ●
Wood
-
Nailers
-
Plywood to hold Cabinets
$66,177.40
-
Cabinet interiors
●
Composites
-
Wall sheathing
DIVISION 06
THERMAL AND MOISTURE ●
TPO Roof
●
Metal Panels
●
Roof Hatch
●
Vapor Barrier
●
Waterproofing
●
Downspouts,
●
Gutters
●
Flashing
$396,588.09
DIVISION 07
FIRE SUPPRESSION ●
Sprinkler System
●
Steel Pipes
●
Valves
●
Fire Department Connection
$68,018.89
DIVISION 21
PLUMBING ●
Copper Pipes
-
Elbows
-
Tees
-
Wyes
●
Plastic Pipes
-
Elbows
-
Tees
-
Wyes
●
Valves
●
Cleanouts
●
Other Pipes, Assemblies, and Hardware
$1,188,467.90
DIVISION 22
CONCRETE ●
C.I.P Formwork
●
C.I.P Concrete
-
Footing
-
Plinth
-
Grade Beam
●
Reinforcing
●
Structural Pads
$962,741.58
DIVISION 03
MASONRY ●
Scaffolding
●
Cavity Wall
-
Brick Veneer
-
Rebar
-
Grout
-
Anchors
$1,413,164.12
DIVISION 04
EQUIPMENT + FURNISHINGS ●
Kitchen
-
Appliances
●
Countertops
-
Plastic
-
Metal
$348,426.50
DIVISION 11 + 12
HVAC ●
VRHs
●
Thermostats
●
Metal Ductwork
●
Grille, Diffuser
●
Roof
-
RTU
-
Condenser
-
Chillers
-
Humidifier
$3,681,954.73
DIVISION 23
EARTHWORK ●
Bank Fill
●
Backfill
●
Compaction
●
Grading
-
Rough
-
Fine
●
Equipment
●
Greenery
-
Reseeding
-
Silt/Snow Fence
-
Trees
●
Sidewalks
●
Utilities
-
Greywater
-
Brown Water
$452,391.84
DIVISION 31-33
OPENINGS ●
Door Slabs
●
Door Hardware
●
Door Accessories
●
Auto-Sliding Doors
$319,685.39
DIVISION 08
FINISHES ●
Floor
-
Unit: S.F.
●
Base
-
Unit: L.F.
-
Between Wall & Floor
●
Wall
-
Paintings
-
Coatings
-
Height Difference
-
Two materials on one wall
●
Ceiling
$586,945.52
DIVISION 09
SPECIALTIES ●
Wall Protection
●
Handrail
●
Toilet Accessories
$103,366.40
DIVISION 10
ELECTRICAL ●
Lighting
-
Troffers
-
Strips
●
Conduit
●
Receptacles
-
Duplex
-
Ground Fault
●
Switches
●
Junction Box
●
Panel Board
$409,779.04
DIVISION 26
COMMUNICATIONS ●
$28,375.99
Nurse Call Systems
DIVISION 27
SAFETY AND SECURITY
$35,762.64
●
Card Access
●
Detection
-
Smoke/Fire
-
ADA
DIVISION 28