construction estimation

Page 1

CAE470_CONSTRUCTION METHODS AND COST ESTIMATING PROF: LEMMING, DORN COST ESTIMATORS: GROUP 07 MICAH N. CISNEROS SAURAV (VISH) AYYAGARI YEONGGWANG (CHRIS) CHOI


PROJECT OVERVIEW


PROJECT OVERVIEW


SQUARE FOOT ESTIMATE


TYPE:

Hospital

SIZE:

21,008 SF

QUALITY:

High

UNIT COST:

$315/SF

MEDIAN SIZE:

55,000

SIZE FACTOR:

1.17

LOCATION:

Idaho, Coeur D’Alene (838)

FACTOR:

93.7

BASE COST:

$6,617,520

SIZE ADJUSTED:

$6,200,616.24

LOCATION ADJUSTED:

$7,254,721.00

PARAMETRIC ESTIMATE


$

12,722,192.53 COST BREAKDOWN


COST BREAKDOWN


DIVISION BREAKDOWN


MICAH N. CISNEROS SAURAV (VISH) AYYAGARI YEONGGWANG (CHRIS) CHOI

DIVISION BREAKDOWN


GENERAL REQUIREMENTS ●

Temporary Utilities

-

Fencing

-

Power

-

Plumbing

-

Portable Toilet

Cleanup

Field Engineering

Field Office

$320,768.98

DIVISION 01


METALS

DIVISION 05


METALS ●

Steel

-

Beams

-

Braces

-

Columns

-

Lintels

-

Baseplates

-

Decking

$759,093.29

DIVISION 05


WOOD AND COMPOSITES ●

Wood

-

Nailers

-

Plywood to hold Cabinets

$66,177.40

-

Cabinet interiors

Composites

-

Wall sheathing

DIVISION 06


THERMAL AND MOISTURE ●

TPO Roof

Metal Panels

Roof Hatch

Vapor Barrier

Waterproofing

Downspouts,

Gutters

Flashing

$396,588.09

DIVISION 07


FIRE SUPPRESSION ●

Sprinkler System

Steel Pipes

Valves

Fire Department Connection

$68,018.89

DIVISION 21


PLUMBING ●

Copper Pipes

-

Elbows

-

Tees

-

Wyes

Plastic Pipes

-

Elbows

-

Tees

-

Wyes

Valves

Cleanouts

Other Pipes, Assemblies, and Hardware

$1,188,467.90

DIVISION 22


CONCRETE ●

C.I.P Formwork

C.I.P Concrete

-

Footing

-

Plinth

-

Grade Beam

Reinforcing

Structural Pads

$962,741.58

DIVISION 03


MASONRY ●

Scaffolding

Cavity Wall

-

Brick Veneer

-

Rebar

-

Grout

-

Anchors

$1,413,164.12

DIVISION 04


EQUIPMENT + FURNISHINGS ●

Kitchen

-

Appliances

Countertops

-

Plastic

-

Metal

$348,426.50

DIVISION 11 + 12


HVAC ●

VRHs

Thermostats

Metal Ductwork

Grille, Diffuser

Roof

-

RTU

-

Condenser

-

Chillers

-

Humidifier

$3,681,954.73

DIVISION 23


EARTHWORK ●

Bank Fill

Backfill

Compaction

Grading

-

Rough

-

Fine

Equipment

Greenery

-

Reseeding

-

Silt/Snow Fence

-

Trees

Sidewalks

Utilities

-

Greywater

-

Brown Water

$452,391.84

DIVISION 31-33


OPENINGS ●

Door Slabs

Door Hardware

Door Accessories

Auto-Sliding Doors

$319,685.39

DIVISION 08


FINISHES ●

Floor

-

Unit: S.F.

Base

-

Unit: L.F.

-

Between Wall & Floor

Wall

-

Paintings

-

Coatings

-

Height Difference

-

Two materials on one wall

Ceiling

$586,945.52

DIVISION 09


SPECIALTIES ●

Wall Protection

Handrail

Toilet Accessories

$103,366.40

DIVISION 10


ELECTRICAL ●

Lighting

-

Troffers

-

Strips

Conduit

Receptacles

-

Duplex

-

Ground Fault

Switches

Junction Box

Panel Board

$409,779.04

DIVISION 26


COMMUNICATIONS ●

$28,375.99

Nurse Call Systems

DIVISION 27


SAFETY AND SECURITY

$35,762.64

Card Access

Detection

-

Smoke/Fire

-

ADA

DIVISION 28


THANK YOU! CREDITS: This presentation template was created by Slideshow, including icons by Flaticon, and infographics & images by Freepik.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.