A R C H I T E C T U R E P O R T F O L I O 2 0 2 1 - 2 0 2 3
3 Content 01 02 03 05 04 Curriculam Vitae Neo - Tidel Park, Madurai Michael Page, Bangalore Citius Tech, Chennai 3D Visualization About me Academic Work - Thesis I 2023 Live Proposal - Internship Work I 2022 Live Proposal - Internship Work I 2022 Conceptual Development I 2023 Pg: 4 - 5 Pg: 6 - 21 Pg: 22 - 33 Pg: 34 - 43 Pg: 44 - 57
Ayyanar R
I, Ayyanar R an architecture graduate from Marg Institute of Design & Architecture Swarnabhoomi(MIDAS). With a solid foundation in architectural principles and practical experience gained through internships, I am eager to embark on a rewarding career in the field of architecture.
During my time at MIDAS, I actively engaged in various design projects that allowed me to refine my skills in conceptualization, spatial planning, and 3D modeling
In addition to my academic achievements, I have had the opportunity to work as an intern at Colliers International India Property Services Pvt Ltd, where I had hands-on exposure to the real-world complexities of architectural projects. These experiences allowed me to work closely with professionals in the industry, further developing my ability to communicate and collaborate effectively within multidisciplinary teams.
I am excited to embark on my professional journey and join a forward-thinking firm where I can apply my knowledge, creativity, and dedication to create inspiring architectural solutions.
MARG INSTITUTE OF DESIGN & ARCHITECTURE SWARNABHOOMI (MIDAS)
B.ARCH I 2018 - 2023
Graduated with Bachelour of Architecture in one of the top institutes in the region. Gained experience on various typologies of academic projects and seminars. The Internship programme has broadern my understanding of Architecture and Design.
DAV MATRICULATION HIGHER SECONDARY SCHOOL, CHENNAI
GRADE 11&12 I 2016 - 2018
I completed my higher secondary education at DAV, a renowned institution known for its commitment to academic excellence. The curriculum at DAV provided a comprehensive educational experience, balancing theoretical knowledge with practical applications.
WORK EXPERIENCE
COLLIERS INTERNATIONAL INDIA PROPERTY SERVICES PRIVATE LIMITED, BANGLORE
ARCHITECTURAL INTERN I 2022 - 6 MONTHS
This experience provided me with valuable insights into the practical aspects of architecture, such as collaborating with multidisciplinary teams, managing project timelines, and adhering to budget constraints. It further honed my skills in construction documentation, site analysis, and client communication.
WORKSHOPS & SEMINARS SKILLS
PROFESSIONAL
• Concept Development
• Architectural Presentation
• GFC Drawing
• 3D Modelling
• Portrait Drawing
• Photo-realistic Rendering
• Walkthrough Rendering
• Interior Design
SOFTWARES
• AutoCAD
• Sketchup
• Lumion
• Twinmotion
• Enscape
• Photoshop
• Indesign
• MS Office
• Rhino (Beginner)
• The Himmelb(I)au Experiment from Decan to Ai - (Prof. Wolf. D. Prix)
• Sustainable Building Practices - (Prof. Eugene Pandala)
• GEO Design in Landscape Architecture - (Ar. Asif Ali Riazudeen)
• Approach to Urban Transit Design - (Ar. Sandeep Shahane)
COMPETITIONS
• ANDC - Annual Nasa Design Competition
• 120 Hours - Eco Mayo Educational Center
LANGUAGES PERSONAL INTERESTS
• TAMIL (read & write)
• ENGLISH (read & write)
• HINDI (read & write)
CONTACT
+91 - 9840268040
ayyangoks@gmail.com
• Manual & Digital Sketching
• Model Making
• Travelling
linkedin.com/inayyanar-r-333382239
ayyan_goku
I do hereby declare that above particulars of information and facts stated are true, correct and complete to the best of my knowledge and belief.
Architect & Interior Designer
EDUCATION
CURRICULAM VITAE DOB: 13 12 1999 5 4
Neo-Tidel Park, Madurai
Academic Work - Thesis I 2023
Project Title : Neo - Tidel Park, Madurai
Description :
The objective is to integrate the public and the members of the park to ensure and take care of the surrounding ecosystem. To initiate hybrid work culture which improves the work-life balance and increase productivity. To provide efficient working spaces that would encourage communication, interaction, and collaboration.
WHY ? The development of IT sector in Tamil Nadu is high in the capital city Chennai (100% urbanized as per cense 2011). The State Government will set up IT Parks in tier-2 and tier-3 cities as part of the next level of the information technology revolution. Madurai is the hotspot to begin the IT sector. The city is well developing in highway project many infrastructure developments. Thus an Information Park in Madurai (Tier 2 city) play a vital role in maximizing human presence in the life of technology by giving authenticity to human movement with flexible spaces and dynamism on the site.
Year : 2023
Softwares Used : Auto cad, Sketchup, Lumion, Photoshop
Contribution : All parameter
02
7 6
9 8
The front elevation shows the parametric facade which enhances the aesthetical view of the building.
11 10
Facade - Central plaza
Typical office tower
Typical office floor plan
Refuge area floor plan
Wing A & B seperated by podium
Wing A & B connected together
Parametric facade
Open space ratio
Main entrance
Retail floor with central plaza Service exit
13 12
The isometric view focuses on the south side of the building which highlights the vehicular and pedestrian movement. 15 14
17 16
19 18
The axonometric view focuses on the north side of the building showing the whole building. 21 20
Michael Page, Bangalore
Live Proposal - Internship Work I 2022
Project Title : Michael Page, Bangalore
Description :
Designing a modern and dynamic office space for Michael Page’s branch in Bangalore. The office will encompass approximately 15,000 square feet, accommodating a team of 100+ professionals, including recruiters, consultants, and support staff. The objective is to create an inspiring, collaborative, and employee-centric workspace that reflects Michael Page’s reputation for excellence in recruitment and fosters a vibrant and productive work environment.
Design concept :
The design concept for Michael Page’s office in Bangalore revolves around the idea of a contemporary “career hub.” The office will embody the spirit of connection, professionalism, and growth, serving as a platform for facilitating meaningful interactions between employers, job seekers, and Michael Page’s talented recruitment specialists.
Year : 2023
Softwares Used : Auto cad, Sketchup, Enscape, Photoshop
Contribution : GFC Drawings, 3D modelling, Rendering
23 03
25 24
27 26 Look & feel - The journey through the space
29 28 LG LG LACQUERED GLASS P1 WHITE PAINT P1 1205 7330 1200 R600 590 1000 3140 650 650 600 790 1100 2200 800 1200 800 BAL 1250 1250 900 900 1250 1250 1340 BAL 1550 01 02 03 500 Bal 600 900 Bal 100 ST VITRIFIED TILE FLOORING AS PER APPROVED SAMPLE-DESIGNER TILE 1200 7900 BAL 150 3600 550 650 600 650 540 GYPSUM CEILING @2600MM LVL FROM FFL METAL MESH CEILING @2600MM LVL FROM FFL 150 X 150MM PELMET TO BE PROVIDED METAL MESH CEILING TO BE ALIGNED TO THE COLUMN CLADDING SURFACE GYPSUM CURVE LINE TO BE ALIGNED TO THE CURVATURE OF THE GLAZING TRUE SLAB +2600MM LVL 850 2500 FFL Eq Eq Eq Eq Eq Eq Eq Eq Eq 700 900 1840 TRUE CEILING STORAGE SHUTTER WITH 19MM THK PLY FINISHED WITH APPROVED LAMINATE COUNTER TOP @850MM LVL FROM FFL FINISHED IN 6MM THK CORIAN TOP SINK TO BE PROVIDED AS PER APPROVED SAMPLE LACQUERED GLASS (WHITE) OVERHEAD STORAGE MADE UP WITH 19MM THK PLY IN APPROVED LAMINATE FINISH 75 MM HIGH SKIRTING FINISHED IN APP.LAMINATE 450 400 GYPSUM CEILING @2700MM LVL FROM FFL 1800 2340 450 650 LACQUERED GLASS 150 750 850 COVE/STRIP LIGHTING 150 Eq Eq 560 150MM HIGH BACKSPLASH WITH 6MM CORIAN A A 1200 5140 METAL MESH CEILING @2600MM LVL FROM FFL 1800 X 2600MM DOUBLE LEAF STILE SOLID DOOR DETAIL DETAIL DETAIL 2 DETAIL 4 900 Bal GREY PAINT-P2 150 Bal 150 TRUE CEILING METAL MESH CEILING @2600MM LVL FROM FFL STORAGE SHUTTER WITH 19MM THK PLY FINISHED WITH APPROVED LAMINATE COUNTER TOP @850MM LVL FROM FFL FINISHED IN 6MM THK CORIAN TOP 150MM HIGH LACQUERED GLASS (WHITE) OVERHEAD STORAGE MADE UP WITH 19MM THK PLY IN APPROVED LAMINATE FINISH 50 MM HIGH SKIRTING FINISHED IN APP.LAMINATE GYPSUM CEILING @2700MM LVL FROM FFL 1200 X 2600MM SINGLE LEAF STILE GLASS DOOR (REFER THE DOOR DETAIL DWG) TRUE SLAB +2600MM LVL FFL 850 750 850 Eq Eq Eq Eq 1440 2100 900 40 100 1000 2600 150 Eq Eq Eq Eq MICROWAVE MICROWAVE COFFEE MACHINE WASTE WATER COLLECTION FOR COFFEE MACHINE 150 700 700 1900 40 COVE/STRIP LIGHTING BACKSPLASH WITH 6MM CORIAN 1250 3600 540 WHITE PAINT-P1 600 Eq Eq 75 50 150 100 800 1000 800 Eq Eq Eq Eq Eq Eq WHITE PAINT - P2 TRUE SLAB +2600MM LVL FFL 2600 7330 1700 WHITE PAINT P1 1200 7900 Bal 1205 TRUE CEILING GYPSUM CEILING @2700MM LVL FROM FFL 150MM SPACING TO BE PROVIDED FOR PELMET 10MM THK TOUGHENED GLASS PARTITION-BROOKLYN TYPE (REFER PELMET DETAIL DWG NO: 302) PARTITION TO BE FINISHED WITH WHITE SHADE PAINT (P1) AS PER APPROVAL METAL MESH CEILING @2600MM LVL FROM FFL 50 MM HIGH SKIRTING FINISHED IN APP.LAMINATE BACKREST TO BE INCLINED @100 DEGREE ANGLE FROM THE SEATING FFL SEATING TO BE MADE OUT OF MEDIUM DENSITY CUSHION WRAPPED WITH APPROVED FABRIC 100MM THK 50 X 50MM ALUMINUM BOX SECTION WITH NECESSARY SUPPORTS 50MM HIGH BLACK ALUMINUM SKIRTING BACKREST MADE OUT OF MEDIUM DENSITY CUSHION WRAPPED WITH APPROVED FABRIC 75MM THK 850 350 100 400 100° 450 700 650 700 12MM THK SEGMENTED PLY+6MM THK FLEXI PLY FINISHED IN LAMINATE 25 6MM THK CORIAN FINISHED COUNTER TOP WITH BEVELED EDGES STORAGE SHUTTERS TO HAVE 25MM GAP FOR FINGER GROOVES 19MM THK. PLY SHUTTERS TO BE FINISHED IN LAMINATE 19MM THK. PLY SUPPORT FOR FINGER GROOVE 19MM THK. PLY SUPPORT BELOW COUNTER TO BE PROVIDED 70 75 MM HIGH SKIRTING FINISHED IN APP. LAMINATE SHUTTERS MADE UP OF 19MM PLY FINISHED IN APP. LAMINATE AND WITH PVC BANDING AT THE EDGES. 75 25 19MM THK PLY FINISHED WITH LAMINATE (WHITE) STORAGE SHUTTERS TO HAVE 25MM GAP FOR FINGER GROOVES 19MM THK. PLY SHUTTERS TO BE FINISHED IN LAMINATE 19MM THK. PLY SUPPORT FOR FINGER GROOVE 19MM THK. PLY SUPPORT BELOW COUNTER TO BE PROVIDED 70 RFACE 25 50 19MM THK. PLY BACKING TO BE FINISHED IN LAMINATE 6MM THK LACQUERED GLASS AS APPROVED 19MM THK. PLY LINEAR PROFILE LIGHT 19 - THIS DRAWING IS A COPYRIGHT AND PROPERTY OF THE ARCHITECT, IS NOT TO BE PRODUCED, COPIED, HANDED OVER TO THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT IS INTENDED. - ALL DIMENSIONS SHALL BE VERIFIED ON SITE PRIOR TO START OF WORK ANY DISCREPANCY SHALL BE BROUGHT TO THE NOTICE OF THE ARCHITECT. - THIS DRAWING IS TO BE READ AND NOT SCALED. - DRAWING APPROVAL IS FOR THE CONFIRMITY WITH OUTLINE DESIGN INTENT AND DOES NOT RELIEVE THE CONTRACTOR/SUBCONTRACTOR FROM FULL RESPONSIBILITY FOR THE ACCURACY, INTEGRATION AND FITNESS FOR PURPOSE OF DESIGN - THE ABOVE NOTES FORM THE ESSENTIAL INSTRUCTIONS TO INFORMATION PROVIDED IN THIS DRAWING. THE NON CONFORMITY TO THESE WOULD CONSTITUTE TO THE CONSTRUCTION NOT BEING CARRIED OUT AS PER - THE ARCHITECTURAL INTENT. THE ARCHITECT IS AT LIBERTY TO INSTRUCT THE CONTRACTORS TO DEMOLISH ALL SUCH CONSTRUCTION AND REBUILD AS PER ARCHITECTURAL DRAWINGS. - ALL LEVELS MENTIONED IN THE DRAWING ARE FINISHED - THE CONTRACTOR/PROJECT MANAGER MUST CHECK ALL DIMENSIONS AND DETAILS AND BE RESPONSIBLE FOR THE SAME. ANY DISCREPANCY SHALL BE BROUGHT TO THE NOTICE OF THE ARCHITECT. - THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, INTERIOR, STRUCTURAL AND SERVICES DRAWINGS. DISCREPANCY IF ANY NOTICED BY THE CONTRACTOR SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND GOT RESOLVED WITHIN TWO (2) WORKING DAYS OF ISSUE OF THIS DRAWING OR PRIOR TO PROCUREMENT/ EXECUTION OF WORKS AT SITE WHICHEVER IS EARLIER - ANY CHANGES IF REQUIRED, SHALL BE CONFIRMED BY THE ARCHITECT AND SIGNED OFF, PRIOR TO THE START OF WORK DRAWING NOTE NORTH SIGNATURE FOR APPROVAL REVISION ISSUES NO. DATE REV. NO. ISSUED TO NO. DATE REV. NO. DESCRIPTION GENERAL NOTES: MICHAEL PAGE, BENGALURU PROJECT TITLE DESIGN & BUILD CONSULTANTS DRAWING TITLE DATE SCALE DRAWN BY: CHECKED BY: DWG. NO: REV: DWG. CODE: GFC DRAWINGS HVAC, FPS, ELEC., FDAPA CONSULTANTS E- SOLLUTIONS CONSULTANCY PVT LTD NO. 567, 25TH MAIN, JP NAGAR, 1ST PHASE, BENGALURU - 560078 E - esollutions@gmail.com ECPL Colliers International (India) Pvt Ltd, First Floor, Sunningdale Embassy Golf Link Business Park, Domlur, Bengaluru 560071 India T +91 80 48147150 FLOOR LEVELS (FFL) CAFETERIA 15 - 11 - 2022 AYYANAR VIGNESH MP - ID - 1F - 107 R0 1:60 (A1) 107 SCALE 1:45 MARKING PLAN SCALE 1:45 FALSE CEILING PLAN SCALE 1:45 FLOOR FINISH PLAN WALL FINISH PLAN SCALE 1:45 VIEWS Scale- 1:25 (A1) Elevation Cafeteria 01 Scale- 1:25 (A1) Elevation Cafeteria 02 Scale- 1:25 (A1) Elevation Cafeteria 03 1. SOCKET TO BE PROVIDED AS PER POWER LAYOUT DETAIL C SCALE 1:10 DETAIL 2 SCALE 1:5 SCALE 1:5 DETAIL 4 DETAIL 1 SCALE 1:5 KEY PLAN SCALE 1:5 DETAIL 3
31 30 TRUE SLAB +2500MM LVL FFL 850 2500 2400 150 150 TRUE CEILING 50MM HIGH BLACK ALUMINUM SKIRTING 150MM SPACING TO BE PROVIDED FOR PELMET 3050 500 PARTITION TO BE FINISHED WITH BLUE SHADE PAINT (P3) AS PER APPROVAL (REFER PELMET DETAIL DWG NO: 302) 75MM THK METAL BAFFLE CEILING BT @2500MM LVL BLUE PAINT - P3 LAMINATE FINISH (MAPLE) D D SEATING TO BE MADE OUT OF MEDIUM DENSITY CUSHION WRAPPED WITH APPROVED FABRIC 100MM THK BACKREST MADE OUT OF MEDIUM DENSITY CUSHION WRAPPED WITH APPROVED FABRIC - 75MM THK Bal 1550 3285 450 400 Eq E E R500 R500 1900 500 500 1900 500 500 2050 AXIOM TRIMS TO BE PROVIDED IN THE CORNERS Eq Eq 3070 250 LG P1 LG LACQUERED GLASS P1 WHITE PAINT P3 P3 BLUE PAINT TRUE SLAB +2500MM LVL FFL 850 2500 1000 800 Eq LACQUERED GLASS Eq 150 150 800 1800 1700 TRUE CEILING 75MM THK METAL BAFFLE CEILING BT @2500MM LVL 10MM THK TOUGHENED GLASS PARTITION - BROOKLYN TYPE 50MM HIGH ALUMINUM SKIRTING 3500 6MM THK LACQUERED GLASS TO BE FIXED ON 19MM THK PLY 6MM GROOVE TO BE PROVIDED BETWEEN LACQUERED GLASS & SKIRTING Eq Eq 01 02 BAL 1700 200 750 R500 3050 200 750 250 LVT (MAPLE) FLOORING AS PER APPROVED SAMPLE NOTE: CARPET & LVT FLOOR LVL TO BE MATCHED CARPET FLOORING AS PER APPROVED SAMPLE 50 200 200 150 EXPOSED CEILING 150 X 150MM PELMET TO BE PROVIDED 75MM THK METAL BAFFLE CEILING BT @2500MM LVL FROM FFL 2 TRUE SLAB +2400MM LVL FFL TRUE CEILING 50MM HIGH BLACK ALUMINUM SKIRTING 850 350 100 400 SOFT SEATING (AS PER DETAIL D) 100° 450 50 700 750 2400 650 BLUE PAINT P3 12+12MM THK GYPSUM BOARD WITH AL FRAMING SUPPORT FROM THE TRUE CEILING 12MM PLY+12MM GYPSUM BOARD PARTITION TO BE FINISHED WITH BLUE SHADE PAINT (P3) AS PER APPROVAL TRUE SLAB +2600MM LVL FFL 850 2500 2600 TRUE CEILING 50MM HIGH BLACK ALUMINUM SKIRTING EXTERNAL GLAZING PELMET PROFILE @2500MM LVL FROM FFL LAMINATE FINISH (MAPLE) SEATING TO BE MADE OUT OF MEDIUM DENSITY CUSHION WRAPPED WITH APPROVED FABRIC 100MM THK BACKREST MADE OUT OF MEDIUM DENSITY CUSHION WRAPPED WITH APPROVED FABRIC 75MM THK GREY PAINT - P2 COLUMN TO BE FINISHED WITH GERY SHADE PAINT (P2) AS PER APPROVAL F F G G METAL MESH TO BE WRAPPED AROUND THE COLUMN BT TILL 2600MM LVL BACKREST TO BE INCLINED @100 DEGREE ANGLE FROM THE SEATING FFL 50 X 50MM ALUMINUM BOX SECTION WITH NECESSARY SUPPORTS BACKREST MADE OUT OF MEDIUM DENSITY CUSHION WRAPPED WITH APPROVED FABRIC - 75MM THK 850 350 100 400 100° 450 700 650 50 SEATING TO BE MADE OUT OF MEDIUM DENSITY CUSHION WRAPPED WITH APPROVED FABRIC - 100MM THK PROVISION FOR COVE/STRIP LIGHTING 750 50MM HIGH BLACK ALUMINUM SKIRTING 12MM THK DOUBLE PLY FINISHED IN APP.LAMINATE TRUE SLAB +2400MM LVL FFL TRUE CEILING 850 350 100 400 SOFT SEATING (AS PER DETAIL D) 100° 450 700 2500 650 150 150 150MM SPACING TO BE PROVIDED FOR PELMET (REFER PELMET DETAIL DWG NO: 302) 50MM HIGH BLACK ALUMINUM SKIRTING 700 705 710 715 725 725 500 500 500 500 500 500 1150 500 500 500 500 500 500 165 335 R300 165 700 705 710 715 720 735 85 85 R300 03 415 BACKREST TO BE INCLINED @100 DEGREE ANGLE FROM THE SEATING FFL SEATING TO BE MADE OUT OF MEDIUM DENSITY CUSHION WRAPPED WITH APPROVED FABRIC 100MM THK 50 50MM ALUMINUM BOX SECTION WITH NECESSARY SUPPORTS 50MM HIGH BLACK ALUMINUM SKIRTING BACKREST MADE OUT OF MEDIUM DENSITY CUSHION WRAPPED WITH APPROVED FABRIC 75MM THK 850 350 100 400 100° 450 700 650 700 12MM THK SEGMENTED PLY+6MM THK FLEXI PLY FINISHED IN LAMINATE - THIS DRAWING IS A COPYRIGHT AND PROPERTY OF THE ARCHITECT, IS NOT TO BE PRODUCED, COPIED, HANDED OVER TO THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT IS INTENDED. - ALL DIMENSIONS SHALL BE VERIFIED ON SITE PRIOR TO START OF WORK ANY DISCREPANCY SHALL BE BROUGHT TO THE NOTICE OF THE ARCHITECT. - THIS DRAWING IS TO BE READ AND NOT SCALED. - DRAWING APPROVAL IS FOR THE CONFIRMITY WITH OUTLINE DESIGN INTENT AND DOES NOT RELIEVE THE CONTRACTOR/SUBCONTRACTOR FROM FULL RESPONSIBILITY FOR THE ACCURACY, INTEGRATION AND FITNESS FOR PURPOSE OF DESIGN - THE ABOVE NOTES FORM THE ESSENTIAL INSTRUCTIONS TO INFORMATION PROVIDED IN THIS DRAWING. THE NON CONFORMITY TO THESE WOULD CONSTITUTE TO THE CONSTRUCTION NOT BEING CARRIED OUT AS PER - THE ARCHITECTURAL INTENT. THE ARCHITECT IS AT LIBERTY TO INSTRUCT THE CONTRACTORS TO DEMOLISH ALL SUCH CONSTRUCTION AND REBUILD AS PER ARCHITECTURAL DRAWINGS. - ALL LEVELS MENTIONED IN THE DRAWING ARE FINISHED - THE CONTRACTOR/PROJECT MANAGER MUST CHECK ALL DIMENSIONS AND DETAILS AND BE RESPONSIBLE FOR THE SAME. ANY DISCREPANCY SHALL BE BROUGHT TO THE NOTICE OF THE ARCHITECT. - THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, INTERIOR, STRUCTURAL AND SERVICES DRAWINGS. DISCREPANCY IF ANY NOTICED BY THE CONTRACTOR SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND GOT RESOLVED WITHIN TWO (2) WORKING DAYS OF ISSUE OF THIS DRAWING OR PRIOR TO PROCUREMENT/ EXECUTION OF WORKS AT SITE WHICHEVER IS EARLIER - ANY CHANGES IF REQUIRED, SHALL BE CONFIRMED BY THE ARCHITECT AND SIGNED OFF, PRIOR TO THE START OF WORK DRAWING NOTE : NORTH SIGNATURE FOR APPROVAL REVISION ISSUES NO. DATE REV. NO. ISSUED TO NO. DATE REV. NO. DESCRIPTION GENERAL NOTES: MICHAEL PAGE, BENGALURU PROJECT TITLE DESIGN & BUILD CONSULTANTS DRAWING TITLE DATE SCALE DRAWN BY: CHECKED BY: DWG. NO: REV: DWG. CODE: GFC DRAWINGS HVAC, FPS, ELEC., FDAPA CONSULTANTS E- SOLLUTIONS CONSULTANCY PVT LTD NO. 567, 25TH MAIN, JP NAGAR, 1ST PHASE, BENGALURU 560078 E - esollutions@gmail.com ECPL Colliers International (India) Pvt Ltd, First Floor, Sunningdale Embassy Golf Link Business Park, Domlur, Bengaluru 560071 India +91 80 48147150 FLOOR LEVELS (FFL) COLLAB & GLAZING SIDE SEATING 27 - 10 - 2022 AYYANAR VIGNESH MP - ID - 1F - 109 R0 1:60 (A1) 109 Scale- 1:25 (A1) Elevation Collab 01 Scale- 1:25 (A1) Elevation Collab 02 SCALE 1:60 MARKING PLAN KEY PLAN VIEWS DETAIL D SCALE 1:10 DETAIL F SCALE 1:10 Scale- 1:25 (A1) Elevation Glazing side seating 03 GLAZING SIDE SEATING Scale- 1:25 (A1) Section Alcove seating G Scale- 1:25 (A1) Section Collab E SCALE 1:60 SCALE 1:60 SCALE 1:60 FLOOR FINISH PLAN FALSE CEILING PLAN WALL FINISH PLAN FOLLOW THE GLAZING CURVE PROFILE WITH THE SEATING 1 2
33 32 As built images of the project
Citius Tech, Chennai
Live Proposal - Internship Work I 2022
Project Title : Michael Page, Bangalore
Description :
Designing a state-of-the-art office space for Citius Tech’s new branch in Chennai, spanning approximately 25,000 square feet. The office will accommodate around 200 employees, including software engineers, developers, project managers, and administrative staff. The goal is to create an innovative, collaborative, and inspiring workspace that reflects Citius Tech’s commitment to cutting-edge healthcare solutions and promotes employee well-being and productivity.
Design concept :
The design concept for Citius Tech’s office in Chennai draws inspiration from the convergence of technology and healthcare. The overarching theme centers on a modern, futuristic aesthetic that seamlessly blends elements of digital innovation with the nurturing aspects of healthcare.
Year : 2023
Softwares Used : Auto cad, Sketchup, Enscape, Photoshop
Contribution : GFC Drawings, 3D modelling, Rendering
35 04
37 36 Look & feel - The journey through the space
39 38 RECEPTION AREA 4 PAX FIRE ALARM PANEL 600 5150 1425 1425 750 2130 750 +150MM FROM WALL 600 580 580 600 580 600 AV 1200 1200 1210 3725 SLIDING GLASS PARTITION FIXED GLASS PARTITION (FIRE RATED) 2400 FIXED GLASS PARTITION (FIRE RATED) 2400 900 600 1200 3715 10370 43 inches TV 65" inches TV 03 02 04 01 4280 350 150 1000 470 3400 1425 5150 1425 3090 100 4280 550 1000 425 300 1000 275 100 550 200 4315 100 3615 100 1000 100 1200 1200 1200 1200 300 2065 SP SP SP RECEPTION AREA 4 PAX FIRE ALARM PANEL +150MM FROM WALL AV SLIDING GLASS PARTITION FIXED GLASS PARTITION (FIRE RATED) FIXED GLASS PARTITION (FIRE RATED) 10370 65" inches TV P1 GP1 GD1 VNP GP2 GP1 P1.A GD1 P1 GP1 VNP VNP GD.SL GD.SL GP1 GP1 GP1 GP1 GP1 P1 P1 P1.A VNP GP3 P1.A P1.A P1.A P1.A P1.A P1.A VNP GP2 10370 3600 4200 3750 3750 275 1050 750 275 750 750 275 275 4800 300 300 EQ EQ EQ EQ 450 4800 1050 1050 4800 450 1300 1105 RECEPTION AREA 4 PAX PANEL RACK SLIDING GLASS PARTITION FIXED GLASS PARTITION (FIRE RATED) FIXED GLASS PARTITION (FIRE RATED) 10370 43 inches TV 65" inches TV GP FR PA VN VN MWA GP VN PA MWA GP VN GP VN GP LA GP FR GP/FR GP FR BR.C BR.C BR.C VN CON.PA CON.PA PA PA PA GR PA LA METAL LOOP CEILING @2800MM FROM FFL STRETCH FABRIC CEILING @2750 FROM FFL GYPSUM CEILING @ 2800MM FINISHED WITH APPD: WHITE PAINT 30MM X 100MM METAL BAFFLE CEILING @ 2800MM FROM FFL FINISHED WITH POWDER-COATED WOODEN FINISH 40MM THICK MDF CEILING FINISHED WITH GREY DUCO PAINT @2700 FROM FFL GYPSUM CEILING @ 2800MM FINISHED WITH APPD: WHITE PAINT EXISTING COLUMN FINISHED WITH APPD: PAINT 10MM THICK GLASS PARTITION WITH FROST FILM FROM FFL TILL 2700 EXISTING MASONRY WALL CLADDED WITH FLEXI-BRICK TILE FIRE RATED GLASS SLIDING DOOR FIXED GLASS DOOR COLUMN FINISHED WITH FLEXI BRICK CLADDING FIXED GLASS DOOR SHAFT FINISHED WITH APPD: PAINT PA FFL ± 00MM FCL @2700MM EFL SLIDING GLASS DOOR 1200 SLIDING GLASS DOOR 1200 FIXED GLASS DOOR BAL FIXED GLASS DOOR PARTITION FINISHED WITH MOSS WITH NECESSARY PLY BACKING 75MMX100MM THICK WOODEN RAFTER FINISHED WITH APPD: VENEER 200MM LAMINATE PORTAL FINISHED WITH APPD: WHITE LAMINATE PARTITION FINISHED WITH MOSS WITH NECESSARY PLY BACKING METAL LOOP CEILING @2800MM FROM FFL STRETCH FABRIC CEILING @2750 FROM FFL GYPSUM CEILING @ 2800MM FINISHED WITH APPD: WHITE PAINT 30MM X 100MM METAL BAFFLE CEILING @ 2800MM FROM FFL FINISHED WITH POWDER-COATED WOODEN FINISH 40MM THICK MDF CEILING FINISHED WITH GREY DUCO PAINT @2700 FROM FFL GYPSUM CEILING @ 2800MM FINISHED WITH APPD: WHITE PAINT 1OMM THICK CURVED GLASS PARTITION 100MM THICK GYPSUM PARTITION FINISHED WITH APPD: WHITE PAINT GYPSUM CEILING @ 2700MM FINISHED WITH APPD: BLUE DUCO PAINT MWA (MOSS WALL) LP GP2 GP PA MWA (MOSS WALL) VN VN 1200 1500 FFL ± 00MM FCL @2700MM EFL GD1 PA 1 3 4 5 6 7 8 WALL FINISHES CODING VN LA MWA GP BR.C GR PAINT WOODEN VENEER LAMINATE MOSS WALL GLASS PARTITION BRICK CLADDING (FLEXI-BRICK) CON.PA CONCRETE PAINT GRAPHICS 2 GYPSUM CEILING METAL BAFFLE CEILING LOOP CEILING MDF CEILING STRETCH FABRIC CEILING 4 @2700MM FROM FFL, @2800MM FROM FFL @2800MM FROM FFL @2700MM FROM FFL @2800MM FROM FFL @2800MM FROM FFL CEILING LAYOUT - THIS DRAWING IS A COPYRIGHT AND PROPERTY OF THE ARCHITECT, IS NOT TO BE PRODUCED, COPIED, HANDED OVER TO THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT IS INTENDED. - ALL DIMENSIONS SHALL BE VERIFIED ON SITE PRIOR TO START OF WORK ANY DISCREPANCY SHALL BE BROUGHT TO THE NOTICE OF THE ARCHITECT. - THIS DRAWING IS TO BE READ AND NOT SCALED. - DRAWING APPROVAL IS FOR THE CONFIRMITY WITH OUTLINE DESIGN INTENT AND DOES NOT RELIEVE THE CONTRACTOR/SUBCONTRACTOR FROM FULL RESPONSIBILITY FOR THE ACCURACY, INTEGRATION AND FITNESS FOR PURPOSE OF DESIGN - THE ABOVE NOTES FORM THE ESSENTIAL INSTRUCTIONS TO INFORMATION PROVIDED IN THIS DRAWING. THE NON CONFORMITY TO THESE WOULD CONSTITUTE TO THE CONSTRUCTION NOT BEING CARRIED OUT AS PER THE ARCHITECTURAL INTENT. THE ARCHITECT IS AT LIBERTY TO INSTRUCT THE CONTRACTORS TO DEMOLISH ALL SUCH CONSTRUCTION AND REBUILD AS PER ARCHITECTURAL DRAWINGS. - ALL LEVELS MENTIONED IN THE DRAWING ARE FINISHED FLOOR LEVELS (FFL) - THE CONTRACTOR/PROJECT MANAGER MUST CHECK ALL DIMENSIONS AND DETAILS AND BE RESPONSIBLE FOR THE SAME. ANY DISCREPANCY SHALL BE BROUGHT TO THE NOTICE OF THE ARCHITECT. - THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, INTERIOR, STRUCTURAL AND SERVICES DRAWINGS. DISCREPANCY IF ANY NOTICED BY THE CONTRACTOR SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND GOT RESOLVED WITHIN TWO (2) WORKING DAYS OF ISSUE OF THIS DRAWING OR PRIOR TO PROCUREMENT/ EXECUTION OF WORKS AT SITE WHICHEVER IS EARLIER - ANY CHANGES IF REQUIRED, SHALL BE CONFIRMED BY THE ARCHITECT AND SIGNED OFF, PRIOR TO THE START OF WORK REFERENCE DWGS NORTH SIGNATURE FOR APPROVAL REVISION ISSUES NO. DATE REV. NO. ISSUED TO NO. DATE REV. NO. DESCRIPTION NOTES: CITIUSTECH, CHENNAI PROJECT DESIGN CONSULTANTS DRAWING TITLE DATE SCALE DRAWN BY: CHECKED BY: DWG. NO: REV: DWG. CODE: Colliers International (India), First Floor, Sunningdale Embassy Golf Link Business Park, Domlur Bangalore 560071 India +91 80 48147150 HVAC CONSULTANTS PROJECT MANAGEMENT PHE & FIRE FIGHTING CONSULTANTS GFC DRAWING ELECTRIC & FIRE SAFETY CONSULTANTS Colliers International (India), First Floor, Sunningdale Embassy Golf Link Business Park, Domlur Bangalore 560071 India +91 80 48147150 KEY PLAN RECEPTION AREA SHEET 1 OF 2 13-12-2022 AS MNTD R0_CIT - ID - 7F - 013 MARKING PLAN RECEPTION AREA FALSE CEILING PLAN RECEPTION AREA DOOR AND PARTITION CODING RECEPTION AREA SCALE 1:75 SCALE 1:75 SCALE 1:75 WALL FINISHES LAYOUT RECEPTION AREA SCALE 1:75 ELEVATION RECEPTION AREA 01 SCALE 1:40 ELEVATION RECEPTION AREA 02 SCALE 1:40 LEGENDS SCALE 1:80 ANUSH R0 13 ASHISH
41 40 400 EQ 10 EQ 825 1200 600 600 ABOVE HEAD STORAGE MADE OF 19MM PLY FINISHED WITH 4MM VENEER OF APPD: SHADE FIRE PANEL ACCESS DOOR MADE OF GLASS WITH 25MM VENEER BORDER ON ALL SIDES OF APPD: SHADE ABOVE HEAD STORAGE MADE OF 19MM PLY FINISHED WITH 4MM VENEER OF APPD: SHADE ADJUSTABLE SHELVES MADE UP OF 12MM PLY 75 75MM SPACING FOR COVE LIGHT 900 1200 600 19MM PLY FINISHED WITH FLEXI-BRICK TILE CLADDING WITH GROUTING 150 TILL FALSE CEILING @2700MM LVL 19MM PLY FINISHED WITH FLEXI-BRICK TILE CLADDING WITH GROUTING 19MM PLY FINISHED WITH 4MM THK APPROVED SHADE OF VENEER DETAIL A VN BR.C PA VN VN BR.C 900 1200 600 900 1200 600 19MM PLY FINISHED WITH FLEXI-BRICK TILE CLADDING WITH GROUTING 2 FFL ± 00MM FCL @2700MM EFL METAL LOOP CEILING @2800MM FROM FFL GYPSUM CEILING @ 2800MM FINISHED WITH APPD: WHITE PAINT FFL ± 00MM FCL @2700MM EFL VIEW TOWARDS THE OPEN OFFICE GP LA GD1 30MM X 100MM METAL BAFFLE CEILING @ 2800MM FROM FFL FINISHED WITH POWDER-COATED WOODEN FINISH GYPSUM CEILING @ 2800MM FINISHED WITH APPD: WHITE PAINT 2700 1500 1755 730 300 730 600 600 LA GR PA +330MM FROM COLUMN FFL ± 00MM FCL @2700MM 100 THICK SOLID PARTITION FINISHED WITH APPD: GRAPHICS 2 LAYER OF 19M THICK PLY FINISHED WITH APPD: LAMINATE (NICHE FOR 100 THICK SOLID PARTITION FINISHED WITH APPD: GRAPHICS 100 THICK SOLID PARTITION FINISHED WITH APPD: SHADE OF PAINT 1500 600 600 SECTION OF THE COLUMN 100 THICK SOLID PARTITION FINISHED WITH APPD: GRAPHICS 2 LAYER OF 19M THICK PLY FINISHED WITH APPD: LAMINATE (NICHE FOR 100 THICK SOLID PARTITION FINISHED WITH APPD: GRAPHICS 100 230 1100 230 100 1755 FFL ± 00MM FCL @2700MM 100 THICK SOLID PARTITION FINISHED WITH APPD: SHADE OF PAINT 112 100 12.5MM THICK SOUND SOAK GYPSUM BOARD 12MM THICK PLY ON BOTH SIDES 12MM THICK PLY FINISHED WITH MOSS WALL WITH ADDITIONAL PLY BACKING ACOUSTIC INSULATION INFILL WITH 50MM THICK ROCK WOOL 6 6 75 100 VENEER PORTAL FINISHED WITH 4MM VENEER ON 9MM MDF WITH NECESSARY SUPPORTS 6MM V-GROOVE 600 19MM PLY FINISHED WITH FLEXI-BRICK TILE CLADDING WITH GROUTING 150 TILL FALSE CEILING @2700MM LVL 19MM PLY FINISHED WITH 4MM THK APPROVED SHADE OF VENEER - THIS DRAWING IS A COPYRIGHT AND PROPERTY OF THE ARCHITECT, IS NOT TO BE PRODUCED, COPIED, HANDED OVER TO THIRD PARTY OR USED FOR ANY OTHER PURPOSE OTHER THAN FOR WHICH IT IS INTENDED. - ALL DIMENSIONS SHALL BE VERIFIED ON SITE PRIOR TO START OF WORK ANY DISCREPANCY SHALL BE BROUGHT TO THE NOTICE OF THE ARCHITECT. - THIS DRAWING IS TO BE READ AND NOT SCALED. - DRAWING APPROVAL IS FOR THE CONFIRMITY WITH OUTLINE DESIGN INTENT AND DOES NOT RELIEVE THE CONTRACTOR/SUBCONTRACTOR FROM FULL RESPONSIBILITY FOR THE ACCURACY, INTEGRATION AND FITNESS FOR PURPOSE OF DESIGN - THE ABOVE NOTES FORM THE ESSENTIAL INSTRUCTIONS TO INFORMATION PROVIDED IN THIS DRAWING. THE NON CONFORMITY TO THESE WOULD CONSTITUTE TO THE CONSTRUCTION NOT BEING CARRIED OUT AS PER THE ARCHITECTURAL INTENT. THE ARCHITECT IS AT LIBERTY TO INSTRUCT THE CONTRACTORS TO DEMOLISH ALL SUCH CONSTRUCTION AND REBUILD AS PER ARCHITECTURAL DRAWINGS. - ALL LEVELS MENTIONED IN THE DRAWING ARE FINISHED FLOOR LEVELS (FFL) - THE CONTRACTOR/PROJECT MANAGER MUST CHECK ALL DIMENSIONS AND DETAILS AND BE RESPONSIBLE FOR THE SAME. ANY DISCREPANCY SHALL BE BROUGHT TO THE NOTICE OF THE ARCHITECT. - THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL, INTERIOR, STRUCTURAL AND SERVICES DRAWINGS. DISCREPANCY IF ANY NOTICED BY THE CONTRACTOR SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND GOT RESOLVED WITHIN TWO (2) WORKING DAYS OF ISSUE OF THIS DRAWING OR PRIOR TO PROCUREMENT/ EXECUTION OF WORKS AT SITE WHICHEVER IS EARLIER - ANY CHANGES IF REQUIRED, SHALL BE CONFIRMED BY THE ARCHITECT AND SIGNED OFF, PRIOR TO THE START OF WORK REFERENCE DWGS NORTH SIGNATURE FOR APPROVAL REVISION ISSUES NO. DATE REV. NO. ISSUED TO NO. DATE REV. NO. DESCRIPTION NOTES: CITIUSTECH, CHENNAI PROJECT DESIGN CONSULTANTS DRAWING TITLE DATE SCALE DRAWN BY: CHECKED BY: DWG. NO: REV: DWG. CODE: Colliers International (India), First Floor, Sunningdale Embassy Golf Link Business Park, Domlur Bangalore 560071 India +91 80 48147150 HVAC CONSULTANTS PROJECT MANAGEMENT PHE & FIRE FIGHTING CONSULTANTS GFC DRAWING ELECTRIC & FIRE SAFETY CONSULTANTS Colliers International (India), First Floor, Sunningdale Embassy Golf Link Business Park, Domlur Bangalore 560071 India +91 80 48147150 RECEPTION AREA SHEET 2 OF 2 SCALE 1:40 04 SCALE 1:25 SECTION 3 SCALE 1:25 SECTION 2 SCALE 1:40 03 KEY PLAN SCALE 1:25 ELEVATION - A SCALE 1:25 SECTION A SCALE 1:5 SECTION 1 - MOSS WALL SCALE 1:15 VENEER PORTAL DETAIL 13-12-2022 R0_CIT - ID - 7F - 013 ANUSH R0 13 SCALE 1:20 DETAIL A ASHISH AS MNTD
43 42 Look & feel - The journey through the space
3D - Visualization
Residence Design - Conceptual Development I 2023
Project Title : The Sunshine Retreat - Residence Design
Description :
This is a conceptual residence project that showcases my 3D visualization skills. Rooted in minimalism, this design embodies simplicity and elegance in every aspect, capturing the essence of modern living.
Design concept :
Through this conceptual residence, the harmonious integration of architectural elements, interior spaces, and the natural environment creates a tranquil sanctuary, providing residents with an enriched and elevated living experience.
Year : 2023
Softwares Used : Auto cad, Sketchup, Lumion, Enscape, Photoshop
Contribution : All parameter
45 05
Look & feel - The journey through the space
Look & feel - The journey through the space (Living Space)
51 50 Look & feel - The journey through the
space (Living Space)
53 52 Look & feel - The journey through the space (Living Space)
55 54 Look & feel - The journey through the space (Bathroom)
57 56 Look & feel - The journey through the space (Study Room)
THANK YOU! Ar Ayyanar R | 9840268040 | ayyangoks@gmail.com @ayyan_coku