1 minute read

increasing uncertainty and change resulting

Method and Phasing

Phase 3: Revising Sep 1st to Oct 7th

Advertisement

In this phase all the drafts of the policies, designs and guidelines will be revised based on the feedback from the stakeholders and community input. And the implementation schedule will be developed.

Phase 4: Finalizing Oct 8th to Dec 30th

In this phase the guiding drawings will be finalized and all the data including engagement summaries will be documented and the final downtown improvement plan will be completed and submitted. As the final step, the plan will be presented to the groups of stakeholders.

This article is from: