![](https://assets.isu.pub/document-structure/230525124621-651724f9615d8a716c71dd25b9dc9153/v1/4f674fc02142ec81d8421c3815f4faa9.jpeg?width=720&quality=85%2C50)
1 minute read
Seabrook
opportunity for a restaurant operator ….
Waterfront restaurant - new construction - at Seabrook Marina & Shipyard. Upper level is 5,476 SF and 3,200 SF lower level. Ready to build-out.
Highland Center – mixed-use waterfront development by Highland Resources.
▪ 13-story, 238 units and single story 5,200 SF restaurant with 3,000 SF dining deck.
▪ Former site of Louie’s on the Lake … next to Villa Capri.
▪ Tower will have a 9,700 SF amenity deck with a pool on top of the garage.
![](https://assets.isu.pub/document-structure/230525124621-651724f9615d8a716c71dd25b9dc9153/v1/8ef6820731ff5c347c37db3e82c75360.jpeg?width=720&quality=85%2C50)
▪ Parking is on 1st and 2nd floors.
Opportunity for developers!
A combined 67+ acre tract south of Red Bluff Rd. on the east side of SH 146. The site is ideal for multi-family in the back with retail and commercial up front
![](https://assets.isu.pub/document-structure/230525124621-651724f9615d8a716c71dd25b9dc9153/v1/559589ff3676e59c8f8d2efa2d812a72.jpeg?width=720&quality=85%2C50)