YE HTET PAING - MEP BIM Portfolio

Page 1


MEPBIMPortfolio

Myskills,Mytalents,Mydreams.

Mr.YeHtetPaing

BachelorofEngineering(ElectricalPower)

TechnologicalUniversity(Mandalay) (Feb2017–Feb2019)

BachelorofTechnology(ElectricalPower)

TechnologicalUniversity(Mandalay) (Dec2012–Feb2017)

+959798746082(WhatsApp)

yehtetpaing96.mm@gmail.com

Key Qualifications

• Modelling and drafting in Plumbing, Sanitary, Fire Protection and Electrical services using Revit and AutoCAD.

• Able to model for Electrical services such as lighting and power layout plan, single line drawing and cablecontainmentssystem.

• AbletomodelforFireServicessuchassprinklerlayoutplan,pipinglayoutplanandfirealarmsystem.

• AbletomodelforPlumbingServicessuchascoldwater,hotwaterpipinglayoutplan.

• Abletoprepareclashreports,visualcheckreportsforcoordinationusingNavisworksManage.

• AbletouseMicrosoftOffice.

• Self-motivated,goodproblem-solvingandwillingtolearnnewtechnologies.

• Learntechnicalinformationquickly(FirstLearner).

School Project – 10th Storey Building (MEP BIM Modeler)

School Project – 10th Storey Building (Electrical System Revit Model)

OverallElectricalSystemmodel

CableContainmentsmodellingatriserandlvl.1(3DView)

CableContainmentsmodellingatlvl.1(3DView)

School Project–10th Storey Building(Fire Protection Sprinkler

OverallFireProtectionSprinklerSystemModel

ModellingFiresprinklertankincomingpipefromPUBmain

Sprinklerriserroom

changingatlevel2

School Project–10th Storey Building(Fire Protection Sprinkler System Revit

ModellingFireProtectionSprinkler system(two layer)in3Dview

ModellingFireProtectionSprinklersystem

(twolayer)insectionview

School Project – 10th Storey Building (Plumbing System Revit Model)

OverallPlumbingSystemModel

PipingforPlumbingFixturesatlvl.2 (3DView)
PipingforPlumbing Fixturesatlvl.2 (PlanView)

School Project – 10th Storey Building (Plumbing System Revit Model)

PUBmainsupplypipeatlvl.1(3Dview)

WaterStorageTankandPumpatRoof(3Dview)

ModellingWaterTransferTank andPumpRoomatlvl.3in3Dand planview

Modelling

School

OverallSanitaryModel(DoubleStackSystem)
ICNetworkModelling(3Dview)
SoilWastePipe
WastePipe

School Project – 10th Storey Building (Sanitary System Revit Model)

PipingforSanitary System(SoilWaste andVentpipe)atLvl.2 (PlanView)

PipingforSanitarySystem(SoilWasteand Ventpipe)atLvl.2(3DView)

FloorWaste, FloorTrapand P-trapatlvl.2(3Dview)

School Project – 10th Storey Building (Sanitary System Revit Model)

ModellingCrossVentatSanitaryRiser(3Dview)

ModellingVentCowlatRooflevel(3Dview)

School

OverallACMV-DuctingSystemModel

ModellingDuctingsystemforlvl.1andAHUforlvl.1islocatedatlvl.2(3Dview)

DuctingPlanViewforLevel1

School Project – 10th Storey Building (ACMV-Ducting

DuctColorFillLegendbySizeforLevel.1

DuctingPlanand3DviewforLevel.2

Condominium

Condo

OverallPlumbingSystemModel

lvl.1(3DView)

PipingforPlumbing Fixturesat
PipingforPlumbing Fixturesatlvl.1 (PlanView)

Condo Project – 11th Storey Building (Plumbing System Revit Model)

Typicalpipingconnectiondetailsfortransferwaterpumpsetsatlvl.1

Typicalpipingconnectiondetailsforboosterwaterpumpsets atRoof

TransferWaterTankandPumpRoomatlvl.1(3Dview)

StorageWaterTank,BoosterWaterPumpandPressureVessel

modellingatRoof(3Dview)

Condo

OverallSanitaryModel

(DoubleStackSystem)

PipingforSanitarySystem(SoilWaste, Waste andVentpipe)atLvl.2(3DView)

PipingforSanitarySystem(SoilWaste, Waste andVentpipe)atLvl.1(3DView)

PipingforSanitarySystem(SoilWaste,Wasteand Ventpipe)atLvl.1(PlanView)

SoilWastePipe WastePipe VentPipe

OverallFireProtectionSystemModel

(Sprinkler,DryRisingMain,Horse-reelSystem)

ModellingSprinklerTankandPump(Duty, StandbyandJockeyPump)

FireHose-reelsystem(3D view)
DryRisingMainsystem(3D view)

Condo

ACMV-DuctingSystemModel

DuctingPlanViewand3D ViewforLevel.2

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.